THE INSTITUTE'S DOSSIER
Redrawing
Corporate Social
Responsibility
May 2014
The Dossiers de l’Institut are a collaborative
result of the work of BPI group consultants.
Publication director:
Philippe BIGARD
Coordination and editing:
Shwetha CHANDRASHEKHAR
Expert contributors:
Audrey BARBE
Pawel SABAL
Shwetha CHANDRASHEKHAR
Anne LEMAITRE
Jean-Marie THUILLIER
Philippe BIGARD
Sabine LOCHMANN
Illustrations: Jean-Michel MILON
All illustrations are from the blog of J.M. Milon
(lamineducoach.fr) and were chosen and used
with permission of the author. Reproduction is
prohibited.
Other external sources and images used
in support of this document are referenced
and explicitly mentioned in the bibliography.
Anything that is not referenced refers to the
ideas developed by BPI group consultants and
has been produced in-house. Therefore, use
and citation of this file without permission of
the authors is prohibited.
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 3
When the wind blows,
there are those that build walls
and then there are those that build windmills.
Clare Woodcraft, CEO of the Emirates Foundation
4 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
Table of contents
1I	 A Historical & Philosophical Overview of CSR	 7
Milton Friedman – The Agency Argument Against CSR	 7
The Argument for CSR	 8
2I	 International Lens – A National & Global Look into CSR	 21
CSR in Canada	 21
CSR in the U.S.	 23
France’s CSR Engagement 	 25
CSR in Italy	 26
CSR in Spain	 29
3I	 CSR’s Influence on Human Resource Management	 33
The Future of Business - Redrawing CSR	 38
Maturity matrix - HR & Social Best Practices	 41
4I	 Real-World Application – CSR Business Cases 	 43
5I	 BPI group – An Internal View of Corporate Social Responsibility	 53
6I	 Closing Notes – Redrawing Corporate Social Responsibility 	 63
7I	 Sources	65
Literature	65
Web sites	 66
8I	 Appendix	67
Videos	67
Books	67
Articles	68
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 5
Editorial
Globalization, the universal financial crisis, the incessant exploitation of natural resources and
the relentless quest to strategically position the external organizational image are all collectively
contributing to the increasing number of executives who want to align their organization with
social responsibility and sustainable growth strategy.
Implementation of CSR (corporate social responsibility) has become not only the guideline of
how a company can develop its business while making a better contribution to society and
the sustainability of the planet, but also a way of doing business which is designed to deliver
long-term profits.
In doing so, it is becoming apparent that Human Resources managers play a pivotal role in
helping their organizations to achieve their goals of becoming socially and environmentally
responsible firms while also aligning these objectives with financial performance metrics.
This is as the Human Resources function today influences many key business processes
which enable and foster the implementation of CSR practices and the development of a high
performance CSR culture.
Reflecting this, a survey conducted by The Society for Human Resources Management indi-
cates that in companies with strong CSR policies, employee morale was 55% higher, while
business processes were 43% more efficient than in companies with weak or non-existent
CSR policies.
Notably, despite sharing a mutual goal, CSR values adopt different forms not only due to
the area in which they are applied, but also due to the specificity of the respective industry,
culture, legal requirements, and organizational size.
Taking these aspects into account, it is a key responsibility of the HR function to provide the
organization with tools that enable the creation of a workforce which encompasses the values,
skills, trust and motivation in achieving CSR strategy goals. By doing so, the HR function
encourages and nurtures the concept of the "triple bottom line," which is also referred to
as the 3P model: Profit, Planet and People. The TBL suggests that companies should be
formulating three different bottom lines: one being the traditional measure of corporate profit,
the second being the bottom line of a company's social involvement and the third being the
bottom line of the company's environmental practices.
Generally, the role of HR has primarily related to aspects of employment and workforce
planning, compensation and benefits, well-being, safety at work and human development.
Although, increasingly, we are witnessing a trend in which HR is beginning to embrace its
role as the organizational advocate and manager
of CSR.
This is as talent today is progressively seek-
ing to affiliate itself with companies which are
invested in their sustainable development and
social responsibility strategy. Hence it is crucial
for the HR function and the entire organization
as a whole to prioritize compliance with CSR
values and policy.
Audrey Barbe
International Sales
Development
Manager
BPI group
6 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
However, at present, CSR initiatives are not being effectively executed and handled by
organizations worldwide. On one extreme, an emerging trend CSR is beginning to influence
is the birth of "greenwashing." Greenwashing refers to companies who deceptively promote
their organization’s products, aims and/or policies as environmentally friendly and socially
responsible.
Furthermore, adding to the ineptitude of CSR today on the other end, there are several compa-
nies and HR professionals who are executing innovative and socially responsible initiatives,
yet not promoting their actions to the general public- consequently detracting its value to
organizational stakeholders and the general public.
This is only a minute fraction of the problem the application of CSR faces today. As we head
into the business world tomorrow, we must learn to effectually integrate corporate social
responsibility based practices into the foundation of the way business is conducted.
In spirit, the following report examines and analyzes CSR trends today and tomorrow, and
offers a lens into redrawing the conventional business approach to corporate social respon-
sibility.
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 7
A Historical & Philosophical
Overview of CSR chapter
1Corporate social responsibility has long been strategically edged
as fitting to good business practices. Aggressively rousing two
extremes, the topic of CSR poses two arguments: The first stub-
bornly states that it is against common business sense to part with profit, while the
second disproves this by suggesting that conducting sustainable business through the inte-
gration of CSR values is the only key to acquiring healthy bottom lines.
Historically, Corporate Social Responsibility has etched its place into discussion and practice
since the inception of business. As echoed by Mark S. Schwartz in his 2011 book, Corporate
Social Responsibility: An Ethical Approach, the widespread assumption that the concept of
CSR is only a recent sensation is not entirely accurate. In fact, even the notion that CSR has
developed only over the last century is a fallacy.
Social responsibility in a business context has been discussed and debated since the very
beginning of business activity. Tracing back to the Code of Hammurabi almost 4000 years
ago, a Babylonian law code and one of the oldest deciphered writings of significant length
in the world, builders, innkeepers, and farmers were required to avoid acting negligently by
causing death to others, or were condemned to punishment. Furthermore, responsible busi-
ness practices have been outlined in the doctrines of the world’s religions such as Judaism,
Christianity and Islam, which have existed for thousands of years, as the early conceptu-
alization of CSR was broadly based on religious virtues and values such as honesty, love,
truthfulness and trust1
.
Milton Friedman – The Agency Argument Against CSR
Progressing forward, the infamous modern debate of CSR was conceived and given prom-
inence in the 18th
century when Milton Friedman, a disciple of The Wealth of Nations author
and economist Adam Smith, suggested from a conservative point of view that there is only
one social responsibility of business, which is to use its resources and engage in activities
designed to increase its profits.
"There is one and only one social responsibility of business -- to use its resources and
engage in activities designed to increase its profits so long as it stays within the rules of the
game, which is to say, engages in open and free competition without deception or fraud."
Milton Friedman, New York Times Magazine, September 1970
Although Friedman does mention this corporate motive to be in alignment with ensuring that
businesses must remain without fraud or deception, this loosely termed statement provides
room for great misconception about what it truly means to be an organizational entity oper-
ating amidst societies of people who are employees, consumers, stakeholders, voters and
taxpayers alike.
1  Cheng et al.,2014
8 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
According to Milton Friedman, the principle that a business as an enterprise has social
responsibilities is an ignorant statement, as it implies that a business is then a person, not an
artificial system, as only people can have responsibilities, and business as a whole cannot
be said to have responsibilities.
Hence, the individuals who hold “responsibility” within a corporation are rather individual corpo-
rate executives - these are employees of the owners of the business and they have a direct
responsibility to their employers. This responsibility is to conduct the business in accordance
with their desires, and generally, in respect particularly to corporations, this desire is to make
as much money as possible while conforming only to basic rules of the society - including
law and ethical custom.
Thereby, if a corporation is seeking to increase overall profits by opting for a decision which
may prove to be inconvenient to its community, it is entirely ethical, as it is complying with
its business’ or rather employers’ desires of cutting expenses and maximizing profits, as a
corporation generally seeks to do, and duly fulfilling its primary responsibility to its owners.
Secondly, Freidman’s agency argument elaborates that the corporate executive is an agent
of the stockholders of a company and would be exercising a distinct “social responsibility”
of his own, if he were to spend the organization’s ‘money’ in a different way which does not
complement the stockholders’ desires, or as how they would have spent it.
In this sense, corporations must comply with their role as an agent of its stockholders by
only conducting actions they desire. This ultimately is to increase profits by minimizing costs,
because when management is hired, they are selected by stockholders of the business to
facilitate management in such a way that would directly benefit the stockholders.
In addition, Friedman states that a corporate executive does not have the social authority
to make policy choices, and possibly lacks moral and social expertise, and should therefore
avoid moral distractions by focusing on their specialized role of turning a profit.
The Argument for CSR
The Grassroots of CSR in Europe: Father Wilhelm Emmanuel von Ketteler, Count
Albert De Mun & The Birth of Social Catholicism
The grassroots of Corporate Social Responsibility were also prevalent in European history.
In 1848, Father Wilhelm Emmanuel von Ketteler from Germany was initiating a new way
of approaching the social and economic devastation caused by the Industrial Revolution2
.
Through his ministry, he started a movement known as “Social Catholicism.”
Identifying the early foundation of capitalism stained with ruthless competition and harsh
individualism, he not only challenged the socialist and capitalist mindsets of his day, but also
offered specific solutions which foreshadow current day management strategy.
To note, at an assembly of German bishops on September 5, 1869, he listed the following,
which, he maintained, “eliminate or at any rate diminish the evils of our present industrial
system” – an early depiction of CSR values:
1	 the prohibition of child labor in factories
2	 the limitation of working hours for factory workers
3	 the separation of the sexes in the workshops
4	 the closing of unsanitary workshops
5	 Sunday rest
6	 the obligation to care for workers who are temporarily or permanently disabled
7	 the appointment by the state of factory inspectors
2  Sister, 1953
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 9
Continuing forward, Count Albert de Mun (1841-1914) a French pioneer in the Catholic Social
Movement amidst the horrors of the Civil War, resolved to devote his life to serving workers.
Among De Mun's most notable contributions to social reform in France was his decisive
support for labor legislation. Through his speeches, articles, and organizations, he wielded
a powerful influence in creating a public opinion favorable to state intervention to improve
working conditions. As spokesman in the Chamber of Deputies for the conservatives who
favored social reform, De Mun introduced many bills and amendments on labor questions,
served on legislative commissions, and played a leading role in the debates on social laws.
The program of laws which De Mun proposed may seem moderate enough today, but
three decades passed before many of his recommendations were adopted3
. The reforms
he advocated included the regulation of hours of work and the prohibition of night work for
women and children, a fifty-eight hour week with a Sunday holiday, four weeks of rest for
women after childbirth, compulsory accident and sickness insurance, old age pensions for
farmers and for industrial workers, joint arbitration councils, minimum wages for sweatshop
industries, encouragement of profit-sharing plans and cooperatives, the abolition of child
labor, the protection of small rural holdings, and international cooperation on labor legislation.
The Modern Day CSR Advocates
The 20th
and 21st
century has begun to encompass transformations in perspective as opposed
to those of Smith and Friedman, with opinions such as those of Joseph Stiglitz, former Chief
Economist at World Bank and a Nobel Prize winner, who suggests that-
“Whenever there are externalities–where the actions of an individual have impacts on
others for which they do not pay, or for which they are not compensated–markets will
not work well.”
"I think it would probably be preferable to create clear standards of expectations, because
"corporate social responsibility" are words that mean very different things for different
people.
Joseph E. Stiglitz, a 2001 Nobel Prize winning Economist
Edward Freeman’s Stakeholder Approach
In fact, dating back historically, there have been loyal and staunch advocates of the social
responsibility of business much before it became engrained into mainstream business culture.
As a world leader in business ethics and strategic management, R. Edward Freeman's foun-
dational work in his book, Strategic Management: A Stakeholder Approach, published first
in 1984, argues that management must balance its relationship amongst all stakeholders, or
else, risks the sustainability of the firm. He reflects that corporations must not give prevalence
to their shareholders over local community members, despite the inevitable truth that there
will be occurrences when one group will benefit at the expense of others.
Fundamentally, Stakeholder Theory is a theoretical explanation of how business actually oper-
ates. The approach suggests that for any organization to be successful and sustainable, it has
to create value for all its shareholders. This includes consumers, clients, suppliers, employees,
local communities and shareholders. A key point it validates is that placing primacy to any
one of these stakeholders in isolation translates to negligence. This is because the interests
of all stakeholders must marry in alignment, and it is the respective job of management to
examine and critically analyze how exactly these various interests will travel in harmony along
the same direction.
3  Sister, 1953
10 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
Stakeholder theory systematically analyzes the impact that organizations have on those
who "affect them or are affected by them"4
. The company’s managers "should on the one
hand manage the corporation for the benefit of its stakeholders in order to ensure their rights
and participation in decision making and on the other hand management must act as the
stockholder’s agent to ensure the survival of the firm; to safeguard the long term stakes of
each group".
Stakeholder theory is rising in application within multinational companies, who in many cases
are more powerful than nations. These multinational corporations (MNCs) are able to recog-
nize the distinct link between shareholders and long-term wealth. Moreover, companies and
local authorities are realizing how important responsible management is, and thereby the
significance of sustainable development.
Considering how important all stakes are for a company to steadily survive in the marketplace,
it is clear that sustainability is no easy feat for any organization today. Hence, Stakeholder
Theory wisely suggests that a community of groups can together create something that no
one of them singularly can create alone.
ISO 26000
According to the Commission Green Paper (2001), CSR is a concept whereby companies
integrate social and environmental concerns in their business operations and in their interaction
with their stakeholders on a voluntary basis.
Amongst other things, this definition helps to emphasize that an important aspect of CSR
is the interactions enterprises have with their internal and external stakeholders- namely,
employees, customers, neighbors, non-governmental organizations, public authorities, etc.,
as emphasized above.
Notably, stakeholder theory is an important part of ISO 26000, which is the only international
standard designed to provide organizations with guidelines for social responsibility.
According to ISO 26000 an organization should:
ƒƒ identify its stakeholders;
ƒƒ be conscious of and respect the interests of its stakeholders and respond to their
expressed concerns;
ƒƒ recognize the interests and legal rights of stakeholders;
ƒƒ recognize that some stakeholders can significantly affect the activities of the organization
ƒƒ assess and take into account the relative ability of stakeholders to contact, engage with
and influence the organization;
ƒƒ take into account the relation of stakeholders' interests to the broader expectations of
society and to sustainable development, as well as the nature of stakeholders' relation-
ships with the organization;
ƒƒ consider the views of stakeholders that may be affected by a decision even if they have
no formal role in the governance of the organization or are unaware of their interest in the
decisions or activities of the organization.
Business’ Relationship with Society
Posing a considerable argument for CSR, Mark Sagoff, one of America’s foremost environ-
mental philosophers emphasizes that we must question whether what we want for ourselves
individually as business entities is consistent with the goals we would set for ourselves
collectively as citizens.
Adding in to this perspective, Peter Singer, Australian ethical and political philosopher best
known for his work in bioethics and his role as one of the intellectual founders of the modern
animal rights movement, points out that when we humans change the natural environment
in which we live, that we often harm ourselves.
4  Freeman, 1984
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 11
These two key points inform us that the business as an entity does not operate in isolation- it
in fact is fueled day in and day out solely on its interdependency with its community and all
respective stakeholders. Thereby, it is evident that organizations have a special responsibility
to protect the communities within which they operate - especially in preserving their very
own self-interest.
As evident, the role of business in society has borne a profound transformation in the last few
decades. While companies have been given increasingly greater freedom, they have also been
held responsible for a range of issues that were previously considered the sole responsibility of
the state. At present, whether we accept it or not, business is expected to voluntarily promote
efforts to mitigate climate change, protect human rights and safeguard the environment.
Operating within a multi-tier economic, social and environmental playing field, the organization
of today can no longer afford to conduct business in a solely linear fashion, as it has been
accustomed to for so long.
The Meaning of Corporate Social Responsibility Today
Today, simply put, CSR refers to an institution which insists that companies as well as local
authorities and offices voluntarily take into account the interests of social and environmental
concerns in their business operations, and additionally also consider relationships with groups
operating in their environment – namely, stakeholders.
This model enables profit generating organizations to take into account social interests such
as: environmental issues, honest relationships with customers and employees, owners and
investors, suppliers, competitors and the local community.
The modern concept of CSR was proposed in 1953 by Howard R. Bowen - who is considered
as the "father" of CSR. In his book "Social Responsibility of Businessmen", he introduced for
the first time the term "corporate social responsibility" and developed the first of its definition.
His thesis was a basis for discussion on the phenomenon of social responsibility for a long
time. According to Bowen’s definition, corporate social responsibility is a "duty of managers
to implement policies and make decisions regarding business in a manner which is consistent
with the goals and values of our society."
Interestingly, during Bowen’s time, and even long after, it was assumed that corporate social
responsibility was only an attribute entitled to entrepreneurs, as opposed to how it is embraced
today – as an organizational duty.
The first doctrine of corporate social responsibility was contrived by an American industrialist
and philanthropist, one of the richest men of his time: Andrew Carnegie. Carnegie wrote that
"wealth should be regarded as a sacred trust, managed by the possessor, into whose hands
it flows, for the greatest good of the people". According to Carnegie, the concept of CSR is
primarily based on the principle of beneficence, according to which the wealthy members of
society should help those who are less privileged, such as the unemployed and the disabled,
the sick and elderly.
The idea of CSR expectedly also has its fair share of opposition. This includes, amongst others,
Milton Friedman, who had a negative preconception about the interdependent relationship
between the actions of society and the environment. His opinions were largely based on
the belief that the ultimate goal of the enterprise should be to multiply its profits, with a key
focus on shareholder expectations and realities of the free market - which are both based
on consumer interest rather than public interest. Outlined in more detail, the debate against
CSR suggests that a company’s activities should be focused solely on the implementation
of economic assumptions, and not on moral actions. It further elaborates that CSR based
decisions are often imposing, which can lead to unnecessary animosity among management.
Despite the opposition which CSR faces today, it is becoming a practice which is emerging
as crucial to long-term sustainability. Although there is no universal definition of a socially
responsible company, usually it refers to an organization which operates with transparent
12 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
business practices based on ethical values, compliance with legal requirements and respect
for the community and the environment.
Essentially, CSR propels that in complement to the prioritization of profit, the company is
responsible for its whole impact on its surrounding communities and moreover, the planet.
Specifically, the "people" it refers to are the company’s stakeholders who include: employees,
customers, business partners, investors, suppliers, retailers, and both governmental and civil
society. Conversely, stakeholders are increasingly expecting companies to adopt business
conduct which is more environmentally and socially responsible.
Today, more and more companies realize that in order to maintain efficiency and compet-
itiveness in a rapidly changing business world, they need to become socially responsible.
In the last decade itself, globalization has blurred boundaries in the marketplace, while the
emergence of post-modern technology has accelerated time into an easily quantifiable
commodity. Contemplating these changes in the corporate environment, there is an increasing
need for companies to develop their risk management ability and to effectually protect the
reputation of their brands, and due to the advent of globalization, embracing CSR practices
positions organizations at a fiercely competitive level in attracting skilled workers, investors
and consumer loyalty.
A common misconception about CSR is that it merely subsists of community based philan-
thropic and charitable services, which is entirely not the case. Although engaging in these
types of initiatives is not irrelevant, as it allows companies to
create a good equation with members of its local commu-
nity, limiting CSR only to philanthropy can have a negative
impact on organizational climate. Notably, an organization
must be comprehensive in its CSR approach to include the
governance of working conditions of employees and its
external suppliers in addition to considering accountability
for the environment it operates in.
Distinctly, Archie Carroll was one of the first scientists to
have made a distinction between the different types of
organizational responsibility. He termed it as the “Pyramid
of Corporate Social Responsibility” for corporations.
Fundamentally, Carroll defined the primary duty of the
enterprise to be its economic responsibility, which involves
ensuring profitability. The second responsibility outlined in
the model is an organization’s legal responsibility; its duty
to act in accordance with the framework drawn up by the
government and the judiciary. Following, the company’s
third responsibility is an ethical obligation which comprises
of remaining rightful to stakeholders and its own operating
environment. Finally, the company’s fourth commission is
its discretionary responsibility, which refers to proactive
and strategic behavior that may help the company and
the society, or both, such as contribution of resources to
educational, cultural or social purposes.
Why is CSR a Necessity Today?
The conclusions of research on CSR progressively point to the evident fact that incorporating
corporate social responsibility practices in business is crucial for the long-term stability of a
company.
Companies, who blindly and narrowly are enticed by the profit motive alone, without concern
for a wide range of stakeholders, will face external discrepancies in the long term. Thus,
companies must be able to understand the needs of their stakeholders in a broader sense
and duly recognize them as interdependent factors to their success. For example, the stra-
Discretionary
Responsibilities
Ethical
Responsibilities
Legal
Responsabilities
Economic
Responsibilities
Archie Carroll Model
of Corporate
Social Responsibility
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 13
tegic management of human resources is interconnected to customer satisfaction, and it is
essential for companies seeking to understand customer needs to align themselves with the
fluctuating market by effective self-management. This is as success in the corporate world is
not linear; there are several implicit factors which must be taken into consideration to arrive
at a holistic perspective of what contributes to the sustainability of the enterprise.
Duly, Corporate Social Responsibility is gradually gaining deserved importance in discussion
of its broader role in society. Its emergent number of supporters rightfully draws attention to
the clear impact of business on the world around us, and moreover to the fact that social and
environmental concern is crucial for sustainable development and survival.
In effect, the implementation of CSR practices within all facets of the organization is a key
element to build lasting value and a competitive advantage in the marketplace. This is primarily
due to growing expectations from society at large with respect to how business should be
conducted in the 21st
century.
The Triple Bottom Line – Why CSR Cares about the Planet & People alongside Profits
Fittingly so, the topic of CSR draws light to the triple bottom line. Contrived in 1994 by John
Elkington, a world authority on corporate responsibility and sustainable development, the
triple bottom line refers to the allocation of three distinct bottom lines which place emphasis
on profit, people and the planet.
The first one outlines the conventional summation of corporate profit, fundamentally, the bottom
line of the enterprise’s financial profit and loss. The second refers to the organization’s account
of ‘people’ which measures how socially responsible an organization has been throughout its
operations in respect to its human capital. The third bottom line of the company aims to assess
its impact on the ‘planet,’ configuring how environmentally responsible it has been.
Parting ways with a one metric measurement of success, the TBL suggests that success
can be defined otherwise. It offers a non-linear approach to organizational sustainability.
Aiming to quantify and examine the financial, social and environmental performance of the
enterprise, the TBL is a holistic approach to conducting business which is morally conscious
and strategically profitable.
Overall, the long-term benefits of corporate social responsibility should be examined when
considering embracing a CSR based company culture.
The following outlines how CSR impacts the 3Ps – Profits, People and the Planet:
PROFITS •	 Maximizes profit due to sustainable business practices
•	 Company growth and development
•	 Increased competitive advantage in marketplace
•	 Strong incentive for innovation & product development
•	 Positive external and internal organizational reputation
•	 Increased customer and investor interest
•	 Increased customer and stakeholder loyalty
•	 Increased reduction in costs due to operational efficiencies
PEOPLE •	 Increased employee satisfaction and motivation
•	 Increased interest of applicants
•	 Greater talent attraction and retention
•	 Positive organizational image among employees
•	 Improvement of organizational culture
•	 Improved public relations with community and local authorities
•	 Increased employee engagement and consequent performance
PLANET •	 Environmental risk reduction
•	 Environmentally friendly products
•	 Reduction of raw materials wastage
•	 Reduction of pollution and greenhouse gas emissions
14 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
Global CSR – The Brundtland Commission
Due to the emerging recognition and interest in CSR amongst organizations and their stake-
holders, the United Nations established The Brundtland Commission in 1983, aiming to
unite countries to pursue sustainable development together. The result of the committee’s
unison was a report published in 1987 that among others defined sustainable development
as "development that meets the needs of the present without compromising the ability of
future generations to meet their own needs". Moreover, the report clearly indicated the strong
correlation between social, economic and environmental factors in respect to sustainable
development as illustrated below.
Social
Environmental Economic
EquitableBearable
Viable
Sustainable
The Brundtland Commission also played a key role in incentivizing the formation many other
organizations, initiatives and institutions designed to promote sustainable growth and social
responsibility among societies and business.
Economic
dimension
Social
dimension
20101987
Social Responsible
Investinf
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 15
In 2010, the International Standardization Organization (ISO) launched a standard in address-
ing sustainable development and social responsibility: ISO 26000, which is the only interna-
tional standard designed to provide organizations with guidelines for social responsibility, as
mentioned previously. This standard helps to clarify what social responsibility is, by helping
businesses and organizations to translate principles into effective actions and shares best
practices relating to social responsibility on a global scale.
Its universal application allows for use of ISO 26000 in all types of organizations (small to large
businesses, communities, NGOs, trade unions, etc.) regardless of their size, field of activity
and location. Furthermore, ISO 26000 complies with several major international founding
documents such as the Universal Declaration of Human Rights, the conventions of the
International Labour Organization, which reflects its international accord.
Social Responsibility: 7 Core Subjects
More than 90 countries participated in the development of the ISO26000 standard, with more
than 100 organizations actively taking part in the process in France alone. As an internationally
communal tool available for all organizations, ISO26000 propels business practices which
positively contribute to society at large. Additionally, it is important to note that many of the
rules and best practices described in ISO 26000 may already be imposed by the current legis-
lation system. In accordance, BPI group as a leading HR consulting firm, wholly acknowledges
the necessity for CSR and hence took part in the standard development process and today
continues to embrace CSR practices in its daily activities.
Extensively, there are several potential areas of action for the inclusion of Corporate Social
Responsibility in daily business practices. For example, each country can deem which activ-
ities can be considered as a social responsibility, such as the degree of energy efficiency,
establishing a code of ethics, the programs implemented for the local community, reliable
information on labels, etc. Then, the consequent development of standards and appropriate
regulations can encourage the implementation of CSR principles.
Corporate Social Responsibility Methodology
As mentioned, CSR activities are not limited to conventional volunteering and charity based
work, which are relatively easy to implement and assess. CSR practices extend beyond the
vicinity of frontline activities, as they include all exchanges of the company- both internal and
external. Hence, it is crucial to adopt a systematic approach and methodology that clearly
defines how to implement CSR. Some companies, like Danone and others, develop their
own tools which guarantee continuous improvement, as they identify and prioritize both
stakeholders and required action.
Due to the fact that CSR commands long-term commitment, businesses may not be able
to apply policies within all facets of operations. For this reason, organizations should decide
which areas it will take action in as its first step. Next, once the company decides to engage
in CSR activities, it should duly take the right steps to identify and create an action plan.
CSR involvement decision-making
The decision to become socially responsible can often be seen as a small step which is merely
consequent to legal requirements. However, CSR means much more than that. It means a
new way of thinking about company protocol. It entails thinking about the organization as
an interdependent entity, not one which is entirely autonomous. Moreover, the decision to
become socially responsible is a decision which requires company executives to have a great
thorough understanding of the organization’s relationship with its direct stakeholders, and
indirect stakeholders- the general public.
16 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
An organization first needs to answer 3 key questions during the CSR involvement deci-
sion-making process:
1)	What is CSR?
2)	Why do we want to do engage in CSR? and
3)	What are the ultimate potential benefits and costs?
Subsequently, only when executives are completely convinced of the necessity of CSR, will it
become a part of the firm’s strategy. At this point, the right actions to be undertaken can be
defined in order to achieve the company’s strategic goals.
Definition and prioritization of stakeholders
According to ISO 26000, when addressing its social responsibility strategy, an organization
must understand three integral relationships:
ƒƒ Between the organization and society An organization should understand how its
decisions and activities impact society at large. An organization should also understand
society’s expectations of responsible behaviour concerning these impacts.
ƒƒ Between the organization and its stakeholders An organization should be aware of
its various stakeholders. The decisions and activities of an organization may have poten-
tial and actual impacts on these individuals and organizations. These potential or actual
impacts are the basis of the "stake" or interest that causes the organizations or individuals
to be considered stakeholders; and
ƒƒ Between the stakeholders and society An organization should understand the rela-
tionship between the stakeholders who are affected by the organization, on one hand, and
the expectations of society on the other. Although stakeholders are part of society, they
may have an interest which is not consistent with the expectations of society. Stakeholders
have unique interests with respect to the organization which can be distinguished from
societal expectations of socially responsible behaviour with respect to any issue.
Once a company understands these three relationships, it is ready to define and recognize its
stakeholders. A company should also take into account that the organization, stakeholders
and society all have different perspectives.
The primary step for organizations when prioritizing its stakeholders includes the assessment
of the relationship between its stakeholders and itself, and moreover of the mutual impact they
have on each other. Subsequently, the company can illustrate the result on a matrix, which
helps to signify the dialogue from the two previous criteria. This includes:
i.	 Engaging in dialogue with key stakeholders, little known or unknown;
ii.	 Supporting information with important stakeholders, little known or unknown;
iii.	 Continuing the dialogue with major stakeholders, and already well known.
Definition and prioritization of actions and action plan
In a similar manner to prioritizing stakeholders, a company should define and prioritize activities
to undertake. The identification of relevant policy areas is a prerequisite for the determination
of priorities of action. According to ISO 26000, an organization should "develop a set of
criteria for deciding which core subjects and issues have the greatest relevance
and are the most important."
The policy should include the specifics of the organization, including an analysis of the current
situation, in terms of risks, opportunities, strengths, and weaknesses. In order to design an
apt plan of action to address priorities within the organization, a company should:
ƒƒ 	Determine the importance of the issue - assess the risks and opportunities relating
to action;
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 17
ƒƒ Assess the current performance of the organization in this field (its strengths and
weaknesses);
Once a company defines and prioritizes its stakeholders and its consequent actions to
execute, it is ready to define an action plan. This action plan should include all allocated
resources to each respective action. At this point there are two challenges for HR, first, to
define its own resources for implementation of action and second, to support others within
the department during this process.
Sustainable reporting & investment
An important part of the decision making process when considering a long term investment
is the comprehensive analysis of a company’s governance. Duly, many companies include
their main assumption of management, long term strategy and CSR activities in their annual
performance report along with additional financial information.
The Global Reporting Initiative (GRI) founded in 1997 in Boston is a non-profit organization
which was established to promote sustainable development and to provide Sustainable
Reporting Framework for companies around the world. A sustainability report is an organi-
zational report that gives information about economic, environmental, social and managerial
performance.
Internal benefits resulting from sustainable reporting include:
ƒƒ Increased understanding of risks and opportunities
ƒƒ Emphasized link between financial and non-financial performance
ƒƒ Influencing long term management strategy and policy, and business plans
ƒƒ Streamlining processes, reducing costs and improving efficiency
ƒƒ Benchmarking and assessing sustainability performance with respect to laws, norms,
codes, performance standards, and voluntary initiatives
ƒƒ Sidestepping blame in publicized environmental, social and governance failures
ƒƒ Comparison of internal performance, and between other organizations and sectors
External benefits of sustainability reporting include:
ƒƒ Mitigating - or reversing - negative environmental, social and managerial impact
ƒƒ Improved organizational reputation and brand loyalty
ƒƒ Enabling transparency to external stakeholders about company’s true value, tangible and
intangible assets
ƒƒ Demonstrating how the organization influences, and is influenced by expectations of
sustainable development
According to a survey conducted by GRI, Accounting for Sustainability and Redley Yeldar in
2011, over 80% of respondents share that additional financial information is very useful and
relevant to their decision-making process when analyzing an investment. This reflects the need
for comprehensive, transparent, and thorough information about company performance during
the investment decision making process. In order to benchmark organizational sustainability
performance, S&P Down Jones provides Sustainability Indices which assess how a company
is performing – sustainability wise. The index is a response for increasing investor needs and
an emergence of investor willingness to diversify their portfolios by investing in companies
which embrace industry-wide best practices with regard to sustainability and social respon-
sibility. In recent times, visible social and environmental changes and an incline in acknowl-
edgement of all related issues played a strong incentive for investors to invest particularly in
socially responsible companies and create a separate investment category known as Social
Responsibility Investment (SRI). From 2007 to 2010 alone, SRI assets increased more than
13%, while professionally managed assets overall increased less than 1%.
18 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
5 Great Socially Responsible Funds
1.	 Parnassus Equity Income
2.	 Neuberger Berman Socially Responsible
3.	 Winslow Green Growth
4.	 Vanguard Intermediate-Term Tax Exempt
5.	 Domini International Social Equity
Higher Education: Training for Top Management
Another sign of societal evolution which depicts the growth of socially responsible thinking
are schools and universities around the world which provide dedicated CSR and sustainable
development courses. Specifically, the influence of corporate social responsibility on MBA
programs is rapidly evolving as a result of the economic difficulties over the past five years.
Following the 2008 financial crisis, and protests around the world against the perceived
greed fostered in some industries, there has been an upsurge of blame placed at business
schools for failing to ingrain the importance of CSR values on their students. According to
the Association of MBAs, only 20% of UK MBA courses have a mandatory CSR module.
Whereas, on the other hand, more business schools are beginning to provide CSR dedicated
MSc and MBA courses.
Global Ranking - Top 10 MBA Programs with Corporate Social Responsibility Curriculum
1. 	 Harvard Business School, Harvard University
2. 	 Stanford Graduate School of Business, Stanford University
3. 	 INSEAD
4.	 The Wharton School, University of Pennsylvania
5. 	 IE Business School, IE University
6. 	 Columbia Business School, Columbia University
7. 	 Tuck School of Business, Dartmouth College
8. 	 London Business School
9. 	 The Kellogg School of Management
10.	Ross School of Business, University of Michigan
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 19
CSR Rating Agencies: What is Their Global Impact? A 2010 Journal of Business Ethics Study by Steven
Scalet & Thomas F. Kelly - Summary of Findings
In the last two decades, there has been a pronounced growth of CSR rating agencies that assess corporations based on their
social and environmental performance. Steven Scalet & Thomas F. Kelly investigate the impact of CSR ratings on the behavior of
individual corporations in their study. They examine in particular to what extent corporations adjust their behavior based on how they
rank. Their primary finding is that being dropped from a CSR ranking appears to do little to encourage firms to acknowledge and
address problems related to their social and environmental performance. Specific rankings appear not to have a widespread effect
of influencing firms to acknowledge negative CSR events and publicly present plans and actions to address them. Whether firms
are well or poorly ranked, they appear to focus on and publicly discuss their “positive” CSR activities. The study discusses the
wider significance of these results as well as the overall significance of CSR rankings for a global economy. It suggests that to
fully understand the significance of CSR rating agencies for a market society, it matters to know their actual impact on corporate
decision making. Regardless of the reasons that motivate agents to seek information about social responsibility, CSR rating
agencies are an industry that has emerged to provide non-financial assessments to guide decisions for investors, consumers
and many other stakeholders. Whether rating agencies are assessed from a strategic or larger moral perspective, the relationship
between rankings and firm behavior is a fundamental concern for anyone interested in the development of the CSR movement
and the impact of rating agencies on the social performance of corporations.
An exchange between John Mackey, the CEO of Whole Foods Market, and the late Nobel Laureate Milton Friedman offers a
particularly illuminating contrast between these two competing points of view. Mackey writes, ‘‘It is the function of company
leadership to develop solutions that continually work for the common good.’’ Friedman responds: The differences between John
Mackey and me regarding the social responsibility of business are for the most part rhetorical. Strip off the camouflage, and it
turns out we are in essential agreement. [Whole Foods Market] has done well in a highly competitive industry. Had it devoted any
significant fraction of its resources to exercising a social responsibility unrelated to the bottom line, it would be out of business
by now or would have been taken over.
Source: Scalet & Kelly, 2010
A CSR Must Read - Sustainable Excellence: The Future of Business in a Fast-Changing
World by Aron Cramer & Zachary Karabell (2010)
From their work with these Global 1000 companies, authors Cramer and Karabell know firsthand how
business can successfully grapple with big-picture issues like resource scarcity, supply chain complexities,
and the diverse expectations of government and the public. In Sustainable Excellence, they tell the story
of how Coca-Cola and Greenpeace collaborated on a refrigerator that fights climate change. They show
how companies like Best Buy and Nike are transforming the very products they sell to deliver more value
to consumers with less waste. They recount how GE and Google created an innovative partnership that
is developing "smart grids" that radically reduce energy use. And they show how business leaders like
Starbucks' founder and CEO Howard Schultz put sustainable excellence at the center of his company's
business strategy.
Through these and other fascinating stories, Sustainable Excellence makes the case for a different way
of doing business--one that will define both business success and economic vitality in the 21st
century.
Source: The Corporate Social Responsibility Newswire
20 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
Morningstar Socially Responsible Investment Index
The Morningstar Socially Responsible Investment Index was created jointly by Morningstar Japan K.K.
and the Center for Public Resources Development, a non-profit organization. Companies are reviewed
based on a thorough analysis of their performance on governance/accountability, market (consumers/
customers, suppliers), employment, social contribution, and the environment. (January 2012)
FTSE4Good Global Index
The FTSE4Good Global Index has been designed by FTSE, which is an independent company jointly
owned by The Financial Times and the London Stock Exchange. Companies on the FTSE4Good Global
Index have met stringent social and environmental criteria, and are positioned to capitalize on the benefits
of responsible business practices. (September 2011)
Dow Jones Sustainability Index (DJSI)
The Dow Jones Sustainability World Index was developed jointly by Dow Jones & Company and SAM
Research to assess corporate sustainability. Companies are reviewed based on a thorough analysis of
economic, environmental, and social performance. (September 2013)
Vigeo
Vigeo assesses both the performance of companies and organizations and their level of Corporate Social
Responsibility (CSR) management. They assess the degree to which companies and public corporations
take into account environmental, social, and corporate governance objectives, which constitute risk
factors and business opportunities for them in the definition and implementation of their strategy and
policies.
Oddo & Cie
Oddo Securities propose analyses that generally take into account ESG issues which have a financial
impact on the companies in their business sector. They also provide services that monitor the day-by-day
non-financial news at companies.
Ethibel Pioneer & Excellence
Forum Ethibel, which maintains Ethibel Investment Registers, is an independent consultancy agency for
socially responsible investments that advises banks and brokers offering ethical savings accounts and
investment funds. Ethibel Excellence Investment Registers is a universe for the investment composed by
highly scored companies from a social responsibility perspective. This universe is continuously updated
and monitored. (October 2013)
Standard & Poor’s
Standard & Poor's Ratings Services, the world's leading provider of credit ratings, provides transparency
not only on a company's financial fitness but also its environmental, social and governance (ESG)
performance.
They specialize in exploring how ESG issues affect creditworthiness. They have also established an
Environmental Finance Global Industry Focus Team (GIFT) to promote the global consistency and analytic
rigor of their environmental finance sector analysis, including global carbon markets, climate change
finance and clean energy.
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 21
International Lens – A National
& Global Look into CSR chapter
2CSR in Canada
Canadian organizations recognize the value of incorporating CSR prac-
tices into their organizational infrastructures. This form of operating responsibly and ethically
is a direct reflection of Canadian values which thrive on promoting and contributing to the
sustainable development of domestic and global communities.
Canada as a nation is a strong advocate of CSR. The Government of Canada requires and
urges all Canadian companies working both domestically and internationally to respect all
applicable laws and standards, to operate transparently and in consultation with local and
foreign government policy in order to ensure business activities are conducted in a socially
and environmentally responsible manner. The Government of Canada works with organiza-
tions in the country, civil society groups, foreign governments and communities, as well as
other stakeholders to foster and promote CSR thoroughly (Government of Canada, 2014).
Canada’s CSR Strategy
In March 2009, building on its long-standing commitment to the Organisation for Economic
Co-operation and Development (OECD) and its Guidelines for Multinational Enterprises,
the Government of Canada released Building the Canadian Advantage: A Corporate Social
Responsibility (CSR) Strategy for the Canadian International Extractive Sector.
This is enforced by the government’s belief that Canadian companies are often instrumental
in bettering the lives of people in the communities in which they operate, as these comple-
mentary initiatives will provide the tools, guidance and advice they need to meet and exceed
their obligations with respect to corporate social responsibility.
The specific initiatives are:
ƒƒ Creating a new Office of the Extractive Sector Corporate Social Responsibility Counsellor
to assist in resolving social and environmental issues relating to Canadian companies
operating abroad in this field. A competency-based selection process will be launched
shortly to identify qualified candidates for this position.
ƒƒ Supporting a new Centre of Excellence to be established outside government as a
one-stop shop to provide information for companies, non-governmental organizations
and others.
ƒƒ Continuing Canadian International Development Agency assistance for foreign govern-
ments to develop their capacity to manage natural resource development in a sustainable
and responsible manner.
ƒƒ Promoting internationally recognized, voluntary guidelines for corporate social responsi-
bility performance and reporting.
22 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
The four pillars of the Strategy are:
1.	 Support for host country capacity-building initiatives related to resource governance
and for host countries to benefit from these resources to reduce poverty;
2.	 Promote the following widely-recognized voluntary international CSR performance
guidelines:
ƒƒ 	The OECD Guidelines for Multinational Enterprises (DFAIT chairs and provides the
secretariat for Canada’s National Contact Point for the OECD Guidelines);
ƒƒ The International Finance Corporation Performance Standards on Social and
Environmental Sustainability;
ƒƒ The Voluntary Principles on Security and Human Rights; and
ƒƒ The Global Reporting Initiative
3.	 The Office of the Extractive Sector CSR Counsellor;
4.	 The development of the Centre for Excellence in CSR1
.
The CSR Strategy was informed by consultations undertaken with a number of stakeholders,
including the "National Roundtables on Corporate Social Responsibility and the Canadian
Extractive Sector in Developing Countries," as well as recommendations made by the
former Standing Committee on Foreign Affairs and International Trade (SCFAIT). In 2006, the
Government of Canada organized the multi-stakeholder National Roundtables, which provided
an opportunity to encourage a practical and solutions-oriented dialogue on ways to expand
the knowledge and capacity of Canadian companies to conduct their operations in a socially
and environmentally sustainable manner.
Active Promotion of CSR
Canada’s network of diplomatic missions abroad actively promotes CSR guidelines through
seminars, conferences, workshops and other activities involving companies, representatives
of host governments and civil society; and provides advice to companies and stakeholders
related to CSR.
Canada promotes CSR in a number of multilateral fora including the OECD, the Group of
Eight, the Asia Pacific Economic Co-operation, the Organization of American States, la
Francophonie, and the Commonwealth.
Canada’s efforts are further advanced by including voluntary provisions for CSR in its most
recent free trade agreements (FTAs) and foreign investment promotion and protection agree-
ments (FIPAs). Canadian companies, civil society, and government have been at the forefront of
efforts to create a global consensus on responsible mining and sourcing practices to address
the phenomenon of “conflict minerals” in the gold, tin, and tantalum and tungsten sectors.
Canada supports the OECD Due Diligence Initiative for responsible supply chains of conflict
minerals. In addition, Canada has provided strategic funding of key projects towards peace
and prosperity in the Great Lakes Region and provided funding in the 2009-2010 fiscal year to
50 corporate social responsibility projects and initiatives in over 30 countries around the world2
.
1  Government of Canada, 2014
2  Government of Canada, 2014
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 23
CSR in the U.S.
CSR is recognized as a critical component to business operations by American organiza-
tions today. The Corporate Social Responsibility (CSR) team in the Bureau of Economic and
Business Affairs leads the Department’s engagement with U.S. businesses in the promotion
of responsible and ethical business practices. As shared by the U.S. Department of State,
the mission of the CSR office is to:
ƒƒ Promote a holistic approach to CSR to complement the EB Bureau’s mission of building
economic security and fostering sustainable development at home and abroad.
ƒƒ Provide guidance and support for American companies engaging in socially responsible,
forward-thinking corporate activities that complement U.S. foreign policy and the principles
of the Secretary’s Award for Corporate Excellence (ACE) program.
ƒƒ Build on this synergy, working with multinational companies, civil society, labor groups,
environmental advocates, and others to encourage the adoption of corporate policies that
help companies "do well by doing good."
EB’s CSR team coordinates a cross-functional, intra-departmental, and interagency
team to provide support and guidance on major areas of responsible corporate conduct,
including:
-- Good Corporate Citizenship
-- Contribution to the Growth and Development of the Local Economy
-- Innovation
-- Employment and Industrial Relations
-- Human Rights
-- Environmental Protection
-- Natural Resources Governance, including the Kimberley Process
-- Transparency
-- Anti-Corruption
-- Trade and Supply Chain Management
-- Intellectual Property
-- Women's Economic Empowerment
The Organization for Economic Cooperation and Development (OECD) is a
unique forum where the governments of 34 democracies with market econo-
mies work with each other, as well as with more than 70 non-member econo-
mies to promote economic growth, prosperity, and sustainable development.
Source : U.S. Department of State
OECD Guidelines: Concepts and Principles
1.	The Guidelines are recommendations jointly addressed by governments to multinational
enterprises. They provide principles and standards of good practice consistent with
applicable laws and internationally recognised standards. Observance of the Guidelines
by enterprises is voluntary and not legally enforceable. Nevertheless, some matters
covered by the Guidelines may also be regulated by national law or international
commitments.
2.	 Obeying domestic laws is the first obligation of enterprises. The Guidelines are not a
substitute for nor should they be considered to override domestic law and regulation.
While the Guidelines extend beyond the law in many cases, they should not and are
not intended to place an enterprise in situations where it faces conflicting requirements.
However, in countries where domestic laws and regulations conflict with the princi-
ples and standards of the Guidelines, enterprises should seek ways to honour such
24 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
principles and standards to the fullest extent which does not place them in violation of
domestic law.
3.	 Since the operations of multinational enterprises extend throughout the world, interna-
tional co-operation in this field should extend to all countries. Governments adhering
to the Guidelines encourage the enterprises operating on their territories to observe
the Guidelines wherever they operate, while taking into account the particular circum-
stances of each host country.
4.	 A precise definition of multinational enterprises is not required for the purposes of
the Guidelines. These enterprises operate in all sectors of the economy. They usually
comprise companies or other entities established in more than one country and so
linked that they may coordinate their operations in various ways. While one or more of
these entities may be able to exercise a significant influence over the activities of others,
their degree of autonomy within the enterprise may vary widely from one multinational
enterprise to another. Ownership may be private, State or mixed. The Guidelines are
addressed to all the entities within the multinational enterprise (parent companies and/
or local entities). According to the actual distribution of responsibilities among them,
the different entities are expected to co-operate and to assist one another to facilitate
observance of the Guidelines.
5.	The Guidelines are not aimed at introducing differences of treatment between multina-
tional and domestic enterprises; they reflect good practice for all. Accordingly, multi-
national and domestic enterprises are subject to the same expectations in respect of
their conduct wherever the Guidelines are relevant to both.
6.	 Governments wish to encourage the widest possible observance of the Guidelines.
While it is acknowledged that small- and medium-sized enterprises may not have the
same capacities as larger enterprises, governments adhering to the Guidelines never-
theless encourage them to observe the Guidelines’ recommendations to the fullest
extent possible.
7.	 Governments adhering to the Guidelines should not use them for protectionist purposes
nor use them in a way that calls into question the comparative advantage of any country
where multinational enterprises invest.
8.	 Governments have the right to prescribe the conditions under which multinational
enterprises operate within their jurisdictions, subject to international law. The entities of a
multinational enterprise located in various countries are subject to the laws applicable in
these countries. When multinational enterprises are subject to conflicting requirements
by adhering countries or third countries, the governments concerned are encouraged
to co-operate in good faith with a view to resolving problems that may arise.
9. 	 Governments adhering to the Guidelines set them forth with the understanding that
they will fulfil their responsibilities to treat enterprises equitably and in accordance with
international law and with their contractual obligations.
10.	The use of appropriate international dispute settlement mechanisms, including arbitra-
tion, is encouraged as a means of facilitating the resolution of legal problems arising
between enterprises and host country governments.
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 25
France’s CSR Engagement
Recent legal evolutions at the EU level
The European Commission is encouraging European countries to integrate CSR into their poli-
cies and practices of all public and private stakes. A proposal for a directive on the disclosure
of non-financial and diversity information has been made in April 2013 (the examination by
the European Parliament and the European Council is momentarily unknown). This proposal
sets the necessity to make non-financial reporting compulsory. Over 18,000 companies will
have to observe this new obligation (this comprises of companies with over 500 employees,
companies whose statement of account is above 20 million euros, and companies whose
turnover is above 40 million euros). Companies will have to provide non-financial information
on environmental and social issues, on respect for human rights, on policies fighting against
bribery, and on gender equity policies. For each, they should describe their policies, give an
account on the results, and give an evaluation of the risks on these five issues and how they
propose handling it. Although, the rule offers companies the possibility of not disclosing all
information, provided they explain why they choose to opt out of doing so. With this proposal,
it is very clear that extra-financial information is becoming a key element in the private market
place. But, public companies also have to comply to some CSR obligations. A directive on
public procurement has in fact been adopted on January the 15th
2014 (Le mieux disant
met l'Etat au défi). It aims at enhancing CSR in public procurement processes. European
countries are required to integrate non-financial criteria in their procurement processes, and
to consider CSR during production and manufacturing. The public contract will also outline
concerns about gender equity, balance between professional and personal life, environmental
protection and respecting the International Labor Organization standards. This new directive
has been reciprocated well in France thus far. In fact, a new public CSR initiative has been
recently launched in the country, reflecting how Europe’s legal requirements are influencing
and shaping the establishment of CSR amongst domestic businesses.
CSR in France: a lens on the CSR platform
In France, a law regarding extra financial reporting has been in place since 2001. It was
followed by the two “lois de Grenelle” in 2009 and 2010, which make it compulsory for large
organizations to publish an annual report on CSR. Under the influence of the European Union
and after a continuous lobbying of diverse actors from NGOs to employee unions, France
has arrived at a new agreement. On June the 17th
2013, the government launched the CSR
platform. It aims at creating a space where all the actors concerned by CSR can share their
point of views on CSR, talk about concrete actions that have been or should be put in place,
all in order to reach a certain degree of coherency on this large subject. The government of
France hopes that this new platform helps organizations to implement CSR actions in large
but also small companies (La législation française en matière de reporting extra-financier). The
ambition is to spread awareness amongst French citizens on CSR related issues. The platform
is made of 48 members split into 5 different colleges which are organized by specialty: public
administration, employer representatives and members of professional associations (national
association of HR directors, college of CSR directors, etc.), unions, NGOs and lobbying
groups, and researchers (two economists specializing in CSR, one expert on gender equality
and another on HR).
The president of the platform is Patrick Pierron, national secretary of CFDT (one of the five
main unions in France) and he is primarily in charge of the government of CSR policies. Michel
Doucin has been designated permanent general secretary of the platform. Since 2008, he
has been ambassador in charge of bioethics and CSR. After several discussions, it has been
decided that members could voluntarily join one of the three working groups. Each of the
three groups will focus on a specific theme. The issues to be discussed are the following:
26 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
ƒƒ CSR, competitiveness and sustainable development in SMB. This working group has
three main objectives:
-- Identify all good practices of companies with less than 5,000 employees;
-- Try to define and measure the economic advantages gained due to CSR, and evalu-
ate if measurement should vary between sectors and amidst the size of companies;
-- Identify how to promote CSR in those companies and help them to integrate CSR
actions into their practices.
ƒƒ How to improve financial transparency and companies’ governance on sustainable
development by integrating European and international legal evolution on the subject?
-- Identify all the different legal frameworks on extra-financial reporting (at a national
and international level);
-- Identify the tools that could help gain leverage in the promotion of responsible
governance, that could help share the added value of business, and that could
help develop responsible finances.
ƒƒ How to enhance responsibility of companies on their value chain, meaning on their
subsidiaries and their suppliers?
-- Enhance the development of responsible purchases;
-- Promote fair competitiveness;
-- Precisely outline the extent to which companies should be responsible towards
their subsidiaries;
-- Promote the adherence of international legal frameworks
The following insights into CSR in Italy and Spain are shared as released by the updated
edition of CSR Europe’s Guide to CSR in Europe. Offering an overview of corporate social
responsibility (CSR) currently, the country insights have been developed by CSR Europe’s
national partner organisations based upon their areas of operations. Topics covered in each
chapter include national CSR policies and legislation, key drivers of CSR, main organisational
actors, and recent developments in various thematic areas including environment, supply
chain, human rights, equal opportunities, community engagement, and sustainable products
and services (A Guide to CSR in Europe, 2010).
CSR in Italy
CSR Policies and Legislation
After the Italian Multi-Stakeholder Forum launched by the Labor Minister Maroni in 2004-2005,
there were no longer high level CSR initiatives by the national Government or Parliament. While
initiatives were often promoted locally with a bottom-up approach by some Regions – Toscana,
Umbria, Marche, Emilia-Romagna – with very active legislation and programs. The current
Minister of Labor and Social Affairs, Sacconi, published in 2009 a White Book on the Future
Social Model, focusing on subsidiarity, employability, health and safety and equal opportunities.
On the other hand, the activities of the Foundation I-CSR, established by Maroni to promote
CSR, were further scaled down. The debate around the “social market economy” has been
recently gaining ground, with the powerful Economic Minister Tremonti committed to promote,
in collaboration with OECD, “global legal standards” based on propriety, integrity, transparency.
Also having the Italian Tajani as Commissioner of DG Enterprise and Entrepreneurship might
represent an opportunity to revive government interest in CSR.
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 27
Key Drivers of CSR
The key CSR drivers in Italy currently are climate change, safety in the workplace, high
unemployment with youth unemployment also hindered by skill shortages, an increasingly
diverse workforce (ageing population, lowest female activity rate in Europe, lack of culture
in the integration of a large number of immigrants, up until a few decades ago many Italians
were emigrants).
Degree of Public Awareness on CSR
Awareness with the public at large is growing, but their understanding remains relatively
limited. On the contrary, in the most progressive sectors of the business community, accord-
ing to a recent survey (link) conducted by Fondazione Sodalitas with the CEOs of 45 leading
companies about the future of CSR in Italy, substantial progress has been achieved recently in
integrating responsible and sustainable competitiveness into company strategies and related
mainstreaming practices.
Environment
ƒƒ National Action Plan: Italy, as an EU country, signed the Kyoto Protocol in 2001 and it
also now belongs to the EU ETS schemes. Italy approved on April 28th
2010, the CO2
Emissions National Allocation Plan for the new plants of the ETS system, effective from
2009 until 2012. Italy approved on June 11th
the National Action Plan for Renewable
Energies and Energy Efficiency, requested by the European Directive 2009/28/CE, which
foresees that Italy will achieve the 17% target of renewable energy use by 2020.
ƒƒ Main Environmental Challenges: Key challenges include the dominance of oil/gas as
energy supplies, inefficient waste management (high level of waste production, still low
recycling rates in many regions, predominance of landfill disposal) and water scarcity in
several regions. The most relevant environmental challenges are: costal erosion; sea level
rises along the costal areas; air pollution, mainly in the Pianura Padana geographic area,
and in the cities located in this region. Levels of PM10 and other pollutants are often higher
than maximum permitted levels.
ƒƒ Energy and Eco-Efficiency: Companies and sectors (such as glass, ceramic and cement
industries) which are expected to reduce their gas emissions have been identified and their
reduction targets assigned. In recent years, the progress in achieving Kyoto objectives has
been slow at the national level, due to reluctance by businesses and government due to
their claim that it could be damaging for an economy still relying heavily on manufacturing.
However, the economic crisis had a positive impact in the CO2 emission reduction, and
it’s now foreseeable to achieve the Kyoto target (-8% for Italy).
The renewable Energy sector grew thanks to the introduction of an incentive scheme (“Conto
Energia”) that is the most generous in Europe. It is estimated that the production of renewable
energies by 2008 was 60,5 TWh, while by 2020 107 TWh should be produced (a majority of
this derived from hydroelectric) in order to meet the targets of the action plan.
Public Awareness on Environment
Regional and local levels demonstrate good awareness and carry out successful initiatives.
There are different forms of incentives for private citizens and for companies: Green and
White Certificates, “Energy Account” and detraction from taxes. Consumers are becoming
greener, but this is still a relatively recent phenomenon. At a National level, there is an increas-
ing awareness of this issue: the Ministry of the Environment has recently launched the SCP
(Sustainable Consumption and Production) Strategy in order to favor and spread models of
sustainable consumption and production.
28 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
Supply Chain
There are no national programs or partnerships related to supply chain control, while manage-
ment systems are widespread with Italy ranking number one worldwide in SA8000 certification.
Several suppliers of big companies are involved in the control process. Additionally, many
Tuscan SMEs are certified through the regional Fabrica Etica process. Requirements on control
of environmental aspects are also becoming increasingly important.
Human Rights
Italian laws, in general, respect ILO standards on human rights and working conditions. The
rights of employees are described in the Law of Work Protection covering work safety, trainings
and working conditions. An important document that has been published and diffused is the
“OECD Guidelines on CSR focusing on SMEs”promoted by the Italian Foreign Ministry in the
context of the project “Sustainable development through the Global Compact”.
Equal Opportunities
Gender equality is an especially important issue in Italy, as women’s activity rate is considerably
behind the rest of Europe. Commitment by companies to well structured diversity management
programs is still rather limited. A big step forward has been the launch in October 2009 of the
Italian Diversity Charter by leading business networks and the network of Equality Bodies, with
the patronage of the Ministries of Employment and Equal Opportunities. By September 2010,
about 80 companies, employing more than 500.000 people had signed the Diversity Chart.
Conversely, integration of immigrants and foreign workers is well developed in some compa-
nies, especially those with a high percentage of foreign employees.
Community Engagement
ƒƒ Perceived role of businesses in the local community: Italy has a long tradition of company
philanthropy, evolved in time from paternalism to partnering with NGOs.
ƒƒ Cooperation between local communities and businesses: There is encouraging growth
in Corporate Foundations, established also by SMEs, to enhance effectiveness of philan-
thropic programs. The first baseline survey on Italian Corporate Foundations, conducted
in 2009 by Fondazione Sodalitas in partnership with Università Cattolica and Fondazione
Giovanni Agnelli, allowed this emerging community to surface and profile its key features
and challenges.
Employee volunteering, first adopted by multinationals, is gaining ground also with Italian
companies, including SMEs.
Sustainable Products and Services
The number of SMEs working on sustainable products is growing, especially in the mass
market. There are also some good examples of innovation in the service sector (especially for
waste management and green energy). The new Sustainable Products and Services Program
of the Ministry for Environment is promoting Green Public Procurement and local programs to
increase green consumer policies. In this respect, a working group between different levels
and departments of Government, Control Bodies, NGOs and best practice companies was
recently established.
Main CSR Challenges
The main CSR challenges in Italy are engaging public authorities in the CSR debate and
enforcing a strategic approach towards CSR involving the organization as a whole, especially
the products and sales departments.
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 29
CSR in Spain
CSR Policies and Legislation
Spain’s national government has been gaining prominence in CSR areas, especially during
the last 4 years and some important legislation has come into force:
ƒƒ LISMI. Ley 13/1982, Law for the social integration of handicapped people, among other
measures it establishes the obligation of hiring a minimum quota of 2% of handicapped
people in companies with more than 50 workers. (It also establishes alternative measures).
ƒƒ LO 3/2007 for the effective equality between women and men. Organic law passed in
2007 that pursues to guarantee the effective equality between women and men within all
fields, especially within the labor market.
ƒƒ Ley 30/2007 on Public Procurement and PRE/116/2008 the Green Public Bid Plan of the
ƒƒ General Administration of the Government and its Public Bodies. Environmental and social
criteria are included under certain requirements for the hiring of Civil Servants.
ƒƒ Royal Decree 221/2008 by which the State Council of Social Responsibility of Companies
is set up3. It’s a multi-stakeholder advisory body for the State Government regarding CSR
that includes representatives from different key areas for CSR such as public administra-
tions, enterprises, trade unions or organizations and institutions focused on CSR.
ƒƒ Royal Decree 1615/2009, for regulating the granting and use of the distinctive “Equality
in the Company.” At a regional level, there have been some interesting initiatives like a
Corporate Citizenship Law in Valencia (11/2009 of 20 November), a bill of law of steward-
ship and governance in Baleares and a bill of law of CSR in Extremadura.
Key Drivers of CSR
According to the 5 working groups created in the State Council, there are 5 key areas in Spain:
ƒƒ Diversity management, social cohesion and cooperation development
ƒƒ CSR to face economic crisis: CSR contribution to productive economy
ƒƒ Transparency, communication, CSR standards and Reporting
ƒƒ Social Responsible Investment
ƒƒ Integrating CSR in Education Scheme.
Main CSR Actors
The main state actor is MTIN, Ministry of Labour and Immigration, who is in charge of CSR.
Spanish regions (Comunidades Autónomas) are also approaching CSR in a formal way. Islas
Baleares (Balearic Islands) has created the Dirección General de RSE4. Other regions such
as Cataluña, País Vasco and Andalucía are taking action.
Other organizations pushing forward CSR agenda are:
ƒƒ Forética as a multistakeholder organization (including companies, NGOs and universities),
ƒƒ Club de Excelencia en Sostenibilidad as a business organization,
ƒƒ Asepam, the Spanish association of Global Compact or the different
CSR Observatories promoted by workers and NGOs.
Degree of Public Awareness on CSR
In relation to CSR awareness, Spain has a long way to go. According to Informe Forética
2008 90% of big companies know what CSR is about but only 49.3% of small companies
carry it out. In this sense, CSR is present in the vision, mission and strategy of most large
companies in Spain. Nearly 80% of them have generalized policies on the subject and the
creation and consolidation of specific units within the organization. On the other hand, only
48.3% of Spanish consumers could identify what CSR was according to the same report.
30 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
Media Coverage
CSR specialist media has been developing in recent years, especially online. Broader media
are just starting to cover CSR (normally within special reports). The economic crisis has rein-
forced media interest on CSR as it’s seen as a way out of it.
Environment
In 2007, the Spanish Government developed “Spanish Climate Change and Clean Energy
Strategy” in defining ongoing actions and establishing objectives together with a follow-up
plan, assessment and verification. For public procurement please refer to section 2. Among
main Environmental Challenges are greenhouse gas emissions, water availability, demographic
change, as well as unsustainable urban development.
In the National Climate Change and Clean Energy Strategy there is one chapter dedicated
to Energy Efficiency, with objectives, measures and indicators. Foretica’s report or Informe
Forética 2008 shows a consensus on the origin of Climate Change; more than 80% of the
people interviewed acknowledged it and agreed that it has been produced by human activities
together with natural phenomenon.
Supply Chain
According to Informe Forética 2008 Spanish companies are aware of the importance of
complying with Human Rights in their Supply Chain and with their workers (and so do
customers) and it appears as one of the top issues to label a company as socially responsible.
Nonetheless, only 12% of companies develop any kind of social or environmental audits for
their suppliers to monitor if they are working on it.
Human Rights
No big problems in relation to Human Rights in companies operating just in Spain, medium
risk in relation to immigrant workers, especially in the construction sector. Multinational
companies are working hard on these issues abroad, especially in relation to supply chains.
Multi-sectoral research conducted by Club de Excelencia en Sostenibilidad shows that
implementing Suppliers Code of Conduct has become an increasingly common practice in
enterprises in order to protect their own public reputations.
Equal Opportunities
Although strong public involvement (with initiatives such as the Equality Ministry, Organic
Law for the effective equality between women and men, Diversity Charter,…) is still one of
the biggest issues in Spain. Big companies, with more than 250 employees, are compelled
to develop equality programs but there are also voluntary initiatives both public (Distinction
of equality) or by other organizations (i.e. Charter de la diversidad).
Community Engagement
Community Engagement is extensively developed in Spain especially thanks to Savings Banks
and their social programs, and thanks to the Foundations created by big companies which
work hard in this area.
Sustainable Products and Services
According to Forética’s report (Foot note 1) nearly 40% of Spanish consumers have given
up buying products produced by irresponsible companies. Around 55% declared that they
would pay more for a product from a responsible company if they could be 100% sure
about it. Another report on the issue was published in 2008 by CECU11 (Consumer associ-
ation) Another research study published by Club de Excelencia is “Consumo Responsible y
Desarrollo Sostenible”.
Company Best Practices
Best practices presented to the 2007 and 2008 CSR Spanish Marketplace El Mercado de
la RSE carried out by Forética can be downloaded, and organized by up to 12 categories.
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 31
Club de Excelencia en Sostenibilidad has joined best practices in the field of CR in the “Best
Practices Catalogue in Corporate Responsibility”.
Main CSR Challenges
The main challenges are to bring CSR to SMEs, and to generate greater consumer awareness.
Club de Excelencia en Sostenibilidad in collaboration with PWC and Madrid City Council has
developed an initiative to help SMEs plan their strategies on CSR15. Specific CSR issues could
be equal opportunities and CSR management, and the relation of CSR to the economic crisis.
The Role of CSR in India
India is widely regarded as a country in which corporate social responsibility has long played an important
role. National and international nongovernmental organizations and UN agencies are involved in the public
debate in the business community and the media. However, the involvement of the business community is
concentrated among a few long-established family-owned companies that contribute a significant amount
in the field of CSR, in both theory and practice. The Indian subsidiaries of German companies are bound by
their parent companies’ guidelines for socially responsible behavior, but how these guidelines are actually
implemented is left up to each subsidiary. Their CSR activities focus on their employees (providing training
and improving social security), the environment and aid efforts within India or in the region, which are
currently concentrating on providing help to tsunami victims. Public policymakers are seeking to achieve
inclusive and sustainable growth, and calling on private enterprise to contribute its share.
There is no evidence of CSR activities in the informal sector of the Indian economy, which is responsible
for slightly less than half of GDP and employs some 93 percent of India’s workforce. Indeed, workers
in this sector are afforded no rights or protections whatsoever, and all indications are that no efforts are
being made to fight poverty, promote education or health, protect the environment or encourage employee
participation in business development.
The UN Global Compact seeks to promote the CSR activities of businesses in India. However, it has
not succeeded in involving important NGOs, or most importantly, the unions. The UN Global Compact
is not well known within the business sector or the NGO community. For some time now, German
development organizations (GTZ, InWent) have been cooperating closely with the country’s important
trade associations. The Indo-German Chamber of Commerce has developed its own approach to CSR,
and provides conceptual and advisory support for German companies in India.
While CSR is not at the top of the agenda of German political foundations, some of them are starting
to devote more attention to this area. The German government, represented by the Ministry of Labor, is
working to achieve greater international cooperation on CSR under the Heiligendamm Process, which
includes India as one of five outreach countries. Talks have been held in the context of a formalized
partnership between Germany and India. Representatives of the German business community meet with
embassy officials at least once a year, during their monthly business lunches, to discuss CSR.
Source: German Embassy, New Delhi
32 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
The Role of CSR in China
Corporate social responsibility (CSR) is receiving more attention in China, although it still plays only
a marginal role for the majority of Chinese companies, particularly private ones. Large state-owned
companies and companies that invest in China are expected to increase their social involvement, which
will no doubt have an effect on small and medium-sized enterprises as well.
Foreign companies have traditionally been active in this area, and they are increasingly involved in
environmental and labor-protection projects. Generally they are guided by their own corporate standards.
As domestic and foreign private companies engage in direct competition, they are recognizing that social
responsibility can be used as a tool in marketing their products and increasingly resonates with the growing
middle class, which has the resources to purchase these products.
CSR receives little media coverage. After the Sichuan earthquake in the spring of 2008, however, it was
obvious that the efforts of domestic and foreign companies were recognized and appreciated.
Source: German Embassy, Beijing
The Role of CSR in South Africa
ICompanies’ social responsibility is an important topic in South Africa with respect to the economy, the
state, and public opinion. There is active support from the government as well as domestic and foreign
companies. In response to a 2005 survey by Trialoge of more than 100 stock exchange-noted companies
in South Africa, 73.5% of those surveyed said that they take corporate citizenship “very seriously,” 24.5%
said that they take it “seriously.”
The social involvement of companies in South Africa reaches back to the time of social grievances
during apartheid. Until 1994, many companies invested actively in social initiatives since the state saw
no need to act on behalf of the colored groups in the population. Business recognized that the poor living
conditions of the black majority were putting the brakes on economic development. In this context, the
“Urban Foundation,” which was established in 1976 (today: National Business Initiative, NBI) set as its
goal the improvement of the quality of life of the black communities.
Since 1994, political change and the efforts to balance out the unequal distribution of wealth from the
times of apartheid have driven CSR forward in South Africa. Decisive for the involvement today is the
“Black Economic Empowerment Act” (BEE) of 2003, which was set up by the government and specifies
the advancement of historically-disadvantaged groups in the population. Especially the “Corporate Social
Investment” guidelines of the BEE have a supporting effect since with their assistance, CSR programs
are formalized and the results can be communicated.
In 2003, companies spent 2.35 billion RAND (approximately 193.4 million EUR) for social programs in
South Africa. Companies’ expenditures in the CSR sector thus correspond to approximately half of what
international donors gave for comparable activities, however only 1% of the total that the state invests in
social projects each year. The trend indicates increasing expenditures in the CSR sector.
Sources: German Embassy, Pretoria / Stef Coetzee, CSR-Towards a new paradigm
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 33
CSR’s Influence on Human
Resource Management chapter
3Today, as organizations face economic crises, structural
upheaval, societal changes, environmental degradation, inter-
nal and external conflicts, they are seeking for a concrete solu-
tion which may offer sustainability in the days to come - a solution w h i c h
provides value in creating a better today and an even better tomorrow. With CSR emerging as
the novel approach to conducting business currently, it is becoming more apparent that the
pull between organizational goals and CSR based goals is a product of the aim to co-create
both private and public value.
A 2012 Harvard Business Case Paper, Why Every Company Needs a CSR Strategy and How
to Build It, proposes that: “The heart of CSR’s concept rests on the ability of a company to
create private value for itself, which in turn creates public value for society.”
It continues to elaborate a key reality for organizations who seek to adopt CSR into the core
of their business operations – a point which examines the analysis of value creation. For
example, top management of large corporations who are required to inexcusably adhere to
their business’ figures will not place the concept of creating shared value at the top of their
priority list. Whereas, when concerning smaller players in the marketplace, namely, smaller
organizations, it would not be financially viable to pursue identical CSR goals which market
leaders, and expectedly, larger, more successful organizations seek after. Hence, in this
situation, the kind of shared value a smaller organization would strive for would have to be
streamlined and more appropriately outlined in order to truly benefit proportionately from the
value it creates through its CSR efforts.
Issues such as these are exactly why the application and integration of CSR requires the
involvement and mediation of the HR function. The bottom line is essentially that the effective
and active integration of CSR influences and impacts all company activity, deeming it as a
substantially demanding process in which HR plays a key role.
The collaboration of CSR with HR management efforts will lead an organization to several
fundamental changes concerning objectives, priorities, and respective course of action
required. Ultimately, this will necessitate a strong commitment and acknowledgement of the
necessity of the proposed changes from top management as well as from each key player
within the HR management team.
Looking back for example, the history of strategic integration of CSR values dates back to at
least the 19th Century in the UK where the innovative working practices of Quaker organiza-
tions such as Cadburys and Rowntree Mackintosh put employee welfare and ethical behavior
at the heart of their business values (Rangan, Chase, Karim, 2012).
As mentioned in the introduction, HR plays a significant role in leading and coordinating various
aspects of CSR. This is as social responsibility is directly related to a company’s values, as
it naturally involves people and their relationships. Identically, organizational culture greatly
influences how people interact and their following contributions to society, as the nature of a
company’s internal culture determines how employees view CSR related issues. According to
Fernandez, Junquera & Ordiz, organizational culture and HR decisions are critical components
for creating a sustainable competitive.
34 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
Moreover, several CSR based guidance standards, such as ISO 26000, directly involve the
integration of socially responsible values into HR management. These include the efficient
and effective use of human resource capital, intellectual and competency development which
contribute to sustainable development and compliance with human rights and justice among
people.
The HR profession has a three-fold role in CSR. Firstly, HR needs to make sure people
management practices are ethical and in alignment with the organization’s long-term objec-
tives. Secondly, it needs to implant corporate responsibility values by providing the right
support and training. To execute this effectively, HR has a role in learning and developing its
scope in the years to come. Next, the third and most critical aspect involves embedding CSR
ethics into the organizational culture itself. This is where the question of strategic management
comes into play, which is primarily about being able to ask and address challenging questions
– at top management level.
According to the Global Reporting Initiative, which provides 79 environmental, social, and
business performance indicators measuring sustainability, there are as many as one-third of
them which fall under HR’s responsibility. Taking into account the stakeholder’s approach of
CSR, undoubtedly, employees are defined as the key stakeholder group and their perspective
on CSR can be summarized to include fair remuneration, effective communication, learning
and development opportunities, fulfilling work, a healthy and safe working environment, equal
employment opportunities, job security, competent leadership, community spirit and social
mission integration. Considering that the adoption of CSR requires many changes in company
philosophy and employee behaviour, HR can assume the role of the change agent. Tailored
work design, training, performance and rewards management can be novel ways to facilitate
the change arising from the newfound CSR strategy.
HR in the Change Management Process
To successfully incorporate CSR strategies into organizational operations, they need to be
carefully integrated into a company’s strategy, structure, culture and processes. During this
course, a key challenge CSR poses to organizations is the transition from a target driven
culture to a value driven culture. This requires a company to revise its strategy, mission,
and values, and to provide a message to all stakeholders about internal reorganization, and
company goals and priorities, which will ultimately result in a shift of activities, behaviours
and perceptions. Likewise, considering that social and human related matters are key facets
of CSR, the active role of HR in the process of the company’s strategy revision is evident
to say the least. As a department which has regular exchanges with all divisions across the
organization, HR is well positioned to provide an objective view across units. Moreover, if a
navigation committee is to be formed, the HR function should be playing a critical role on it.
HR’s Role in Shaping CSR
Recent research shows that HR is not currently recognized as a true partner in determining
sustainability strategy, nor is HR a key implementer of sustainability programs. In a survey of
more than 700 corporate social responsibility (CSR) and HR professionals in the United States,
only 6% of respondents confirmed that HR was involved in developing CSR strategy and 25%
maintained that HR was involved in implementing CSR strategy. Yet, 89% of respondents
said that CSR is important for attracting top talent, improving employee retention (85%) and
developing the organization’s leaders (81%). This demonstrates a significant disconnect—and
an opportunity for human resources to bridge the gap. The HR function clearly has an impor-
tant role to play in designing and implementing CSR strategy, but it has not yet achieved an
influential position as it must seek to do in tomorrow’s workplace.
The Power of Leadership in Delivering CSR Values
Leaders, as figureheads and controllers of human resources, have a strong influence on
employee behaviour - so also on their commitment to CSR. Hence, it is essential that senior
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 35
managers embody and embrace pro-CSR attitudes and behaviours in their daily activities – as
they must "walk the talk" and act as a leading example for their employees. Otherwise, there
is a real risk of decline in employee engagement which may impede successful implemen-
tation and development of CSR policies within the company. As we are able to witness, HR
has a major impact on CSR, as it plays a role in the recruitment of managers and leaders of
the organization. Therefore, HR can continue to foster a pro-CSR perception amongst top
management by recruiting candidates with both transformational leadership characteristics
to provide vision, engage stakeholders and drive changes and transactional leadership qual-
ities to coordinate tasks, manage information, control finances, set objectives and monitor
efficiency.
Education and communication
The effective implementation of CSR practices requires thorough commitment and the contri-
bution of all employees within the organization; not only top management, as often assumed.
Thus, a detailed plan outlining all activities related to communication, education and overall
awareness of CSR related matters is crucial in establishing a clear channel of exchange with
employees. HR needs to serve an educative role in raising social consciousness in areas
such as ethical management, leadership, performance management, non-discrimination
and well-being.
Talent acquisition and development
The effective implementation of CSR initiatives relies on well-informed, experienced and
devoted employees with CSR-oriented values. According to a report published by Net Impact
in 2012, 72% of students share that a job where they can make a social or environmental
impact is an important life goal to them - ranking above having children, wealth or a prestigious
career. Moreover, 35% of them said they would take a 15% pay cut to work for a company
committed to CSR. Hence, as evident, it is essential to promote a company’s CSR activities
to all stakeholders including prospective employees, as CSR is a highly respected and valued
organizational practice in today’s business world. This is partly because it directly has a
significant impact on strategizing wage related matters and on the recruitment process itself.
The exercise of explicitly embracing CSR activities clearly indicates the overall values of the
organization and any CSR-specific job requirements and thus should be compulsory as part of
an organization’s CSR culture. Likewise, to complement organizational CSR practices, HR can
utilize personality tests to configure applicants’ characteristics and values during the process
of screening applicants. Then, after acquiring suitable talent, it will become the organization’s
responsibility to provide training and development programs to help the employee understand,
adopt and contribute to progress in CSR initiatives.
Employee engagement
Employee involvement contribute to CSR in multiple ways. One of the important part of CSR
is quality of employee’s work-life that results also from engagement. "Organizations around the
world are discovering that corporate social responsibility (CSR) is a powerful way to encourage
employee engagement". Many international companies encourage employees to do volunteer
work, as this not only gives them a sense of purpose and engages them with their employer,
it also provides them with new skill sets, which in turn can be useful to the business". Taking
into account the fact that high level of employee engagement reduce turnover, improve reten-
tion and productivity, crucial becomes for human resources departments involve employee in
CSR initiatives Moreover, effectively managed CSR activities could in some cases substitute
trainings and thereby it influenced also development and training strategy.
Performance and reward management
Compensation and performance management are critical components of the HR function
in determining the long-term sustainability of an organization’s most coveted resources - its
36 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
people. In effect, HR practitioners understand very well that "what gets rewarded gets done,"
as detailed from the Expectancy Theory, which fundamentally propels that organizations must
relate rewards directly to performance in order to nurture and foster greater heights of produc-
tivity. Providing employees with appropriate compensation acts as a catalyst to motivate their
behavior to achieve company goals. Thus, HR has significant influence over work design
and should work closely with line departments to serve as the coordinator for matters on job
description and specification and job evaluation. The total reward and recognition program,
including base salary, incentive pay, long term incentives and other non-monetary recognition
benefits (such as award programs, employee of the month, promotions, career path planning,
etc.), needs to be aligned with the company’s CSR values and strategy. It is essential to set
CSR related goals between the supervisor and the employee to ensure that they both truly
understand how to accomplish their objectives and also how to measure their achievement.
This allows both the supervisor and employee to feel a greater sense of commitment to their
goals – a key in paving way to increased productivity and engagement.
Ethics management – Promoting ethical practices
When approaching CSR, it is important to avoid defining it to merely legal compliance, as it also
comprises of "ethical behaviour that goes beyond the letter of the law," as ethics are almost
an inherent part of all HR policies and processes affecting employees’ work-life and livelihood.
Areas of internal ethics management include: respect for human rights, embracing diversity,
providing equal employment and rewards, and opportunities to employees and job applicants
irrespective of their demographic characteristics. Moreover, building an organizational culture
which supports ethical behaviour impacts both the organization and its external stakeholder
community. Notably, it is imperative to consider that there is a risk of overemphasizing only the
financial aspect in respect to ethical CSR related issues because matters such as employees
adopting unethical practices involving providing misleading information to customers to get
sales or making up fictitious accounts to fool management into believing their superb perfor-
mance are given precedence over other matters. Hence, HR should play a significant role in
the management of ethics through developing policy and procedure manuals on employee
terms and conditions, suggesting expected employee conduct to guide behaviour, and
including ethical standards indicators in the performance and rewards management system.
Monitoring
The performance management system, CSR monitoring and feedback, which can be
termed as the CSR audit, involves the administration of all CSR-related activities such as the
management of individual CSR-related performance assessments. With the direction for more
socially, environmentally, and ethically conscious organizations, it has become a rising trend
to hire an external CSR auditor. Before an organization hires an external consulting company
to review its CSR performance, the HR function should first internally review how well it has
contributed to CSR initiatives. Once HR has done this thoroughly, the scope of long-term
success in other CSR-related activities can be expected to substantially increase. During this
process, the information required to review CSR policy and activities, can be gathered by
using a questionnaire or survey amongst employees involved in CSR or influenced by CSR
activities. With this information in hand, HR can compare its organization’s CSR performance
against generally accepted or pre-set standards and its own organizational core values, as
well as against the specific needs of stakeholders to determine which areas are thriving and
which areas require improvement.
Revision and Institutionalization
For activities/areas which are not meeting their previously set goals, it is crucial to investigate
the respective root causes, entirely understand them, find practical solutions, assign adequate
resources and rectify them. Sometimes when certain activities fail to meet their set benchmark,
it could require appointing more realistic CSR goals, postponing them to the next fiscal period
or investing in strong support initiatives such as effective education and training.
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 37
In addition, CSR policies and processes may need to be revised to rectify previous inade-
quacies and oversights in order to acknowledge change in circumstances. In other words,
weaknesses identified during the CSR audit provide a basis for revisiting and revising the
planning and implementation process.
On the other hand, for CSR areas which are successful in meeting their goals, it is essential
to institutionalize their respective initiatives, associated structures, processes, learning, and
support systems in order to set an example for similar future CSR endeavours. This can help
in establishing formal, integral and sustainable standards, as clear documentation on effective
practices outlining how things should be done are a vital tool for any organization seeking
to maintain and develop their CSR initiatives. On the other hand, failed CSR attempts also
provide valuable learning opportunities, and so it is important to also note "what not to do."
HR challenges: improving HR policy
Due to the fact that HR is crucial for implementing CSR policies and best practices, it is very
important to rightly examine and manage CSR-HR policy. This is because CSR-HR policy
supports not only risk, but also opportunity management.
Four central challenges HR faces when directing and improving CSR and HR policy:
1.	 The HR Department’s internal issues
2.	 The lack of clear social responsibility framework in the HR policy
3.	 The lack of support and commitment from top management and employees
4.	 The obligation to comply with the law
According to a survey conducted in an accounting firm of 500 executives in 2007, half shared
that environmental and sustainability issues were the responsibility of Operational Departments
rather than HR. In the same year, a CSR Pilot Study conducted by the Society of Human
Resource Management in the US found that only 34% of HR respondents monitor the CSR
aspects of business within their organization.
To overcome these challenges, HR practitioners should first recognize CSR as a fundamental
responsibility within their scope of operations. Only when HR professionals themselves fully
acknowledge their critical role in administering CSR within their organization, will they be able
to convince top management to assign them with the role of a CSR champion.
Progressively influencing an organization’s CSR practices is definitely not an overnight feat. It
takes great organizational initiative, effort, and perseverance in addition to individual employee
knowledge, skill, and ability to make a profound and lasting impact. Being able to take on a
principal role in CSR will provide HR a great opportunity to raise its strategic profile and have
a more enriched and positive influence on employees.
As a part of this report in Chapter 4.2, we have included a section titled "Maturity Matrix – HR
and social best practices" which outlines exactly how to address certain CSR issues and how
to deal with consequent challenges.
How to implement HR/social best practices?
Once the incorporation of CSR strategy within the organization is initiated, HR becomes
primarily responsible for governance and regulation during this process to ensure all activities
are effectively and efficiently being conducted. According to ISO 26000, there are 4 - 7 core
subject areas which directly affect HR and in which HR should play a key role in overseeing.
While in this phase, HR faces two main challenges:
Questioning – Which area and which practices should be directly affected by CSR in my
company? As well as in my suppliers’ and subcontractors’ companies?
Improving – What can we do better? In a more efficient way? In line with best practices? By
asking these fundamental questions, CSR is leveraging the power of innovation to improve
business in all its dimensions.
38 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
Below is an example of one activity that we included in the attached Maturity Matrix regarding
HR and social best practices. Proposed actions based on our experience and relative to 4
core ISO 26000 subjects are:
ƒƒ Community involvement and development
ƒƒ Organizational governance
ƒƒ Labour practices
ƒƒ Human rights
The Future of Business - Redrawing CSR
The future of CSR lies in two things: authentic and effective application and organizational
agility. If CSR continues its peripheral orbit around theory, we will not see the future of social
responsibility any differently than where we are at presently. And presently, what we are mostly
a witness to is pseudo change and moreover, pseudo CSR.
Hence, as we progress towards the shift to the post-change organization, we will have two
choices two make: one being to opt for authentic CSR with a defined purpose, clarity and
real impact, and the other being continuing a superficial journey which refutes the strategic
integration of CSR into management values and practices.
To effectively manage this paradigm in shift, the future of the corporation will have to reconcile
with its core: its human capital. What this will mean, will be to re-humanize the way business
is conducted by redrawing the role of CSR within organizations today.
Time Magazine’s 2012 publication, “Are Companies More Powerful Than Countries?” shares
that the world’s largest companies are moving on and moving ahead of governments and
countries that they perceive to be “inept and anemic.” Operating in isolation from local issues
domestic markets, there is a great foreshadowing occurring which indicates that large organ-
izations may soon take over much of what government itself does.
With such a reality, business leaders have a vast and demanding task on hand- to put CSR
to work.
Outlining a model called CSR 2.0 (Visser, 2011), CSR thought-leader Dr. Wayne Visser iden-
tifies the hallmarks of a truly sustainable company. He sketches out five essentials which are
central in examining whether a company is truly incorporating CSR which is both transform-
ative and concrete -
Creativity (C)
Does the organization inhabit itself in innovation, the concept of social enterprise and free-
range imagination as a way to solve its biggest social and environmental challenges. This is as
conventional CSR standards and guidelines have a tendency to nurture a check-list approach
in which compliance is given top priority over actual and effective change – which ultimately
is only facilitating an endless journey with no true progress.
Scalability (S)
Are the designed solutions able to scale? Authentic CSR requires a rapid movement away from
case studies and pilot projects towards universal application and integration. Best industry
practices must be shared as public knowledge across companies, sectors and globally in an
initiative to promote the development of a learning based culture. This at times may mean
'choice editing' - when companies make critical decisions on behalf of consumers based
on their values, i.e. refusing to offer both sustainable and unsustainable products, such as
Walmart exclusively selling Marine Stewardship Council certified fish or CVS removing tobacco
products form their shelves. This approach does not eliminate risk, as for example, this deci-
sion for CVS is estimated to cost a potential lost revenue of up to $2 billion.
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 39
Responsiveness (R)
Is the effort really responding to the needs of stakeholders or is it just a public relations effort?
Unilever's strategy to 'double in size, halve their environmental footprint and lift a billion people
out of poverty' is genuinely responsive to the issues of the day (environmental degradation
and the human condition).
"Glocality" (2)
Combining global principles with local application in a way that meets both sets of needs.
Circularity (0)
Does the effort help to move to a circular economy where zero waste is a possibility?
Dr. Wayne Visser further shares:
"We used to think this was just a dream, but there are more and more companies -- Fuji
Xerox in their Asian operations has now reached 98.5% recycling of their products. We have
companies like Interface with their 'mission zero' -- zero environmental impact by 2020."
Redesigning the Human Workplace: Emotional Wellness and Business
A key aspect of redrawing the fundamentals of modern-day CSR involves acknowledging a
vital aspect of business: the process of re-acclimating work culture with human values and
moreover, placing emotional wellness as a top business priority. Top management is aware
that the ultimate success of their organization relies heavily on the welfare of their employees.
However, unfortunately, most executives give inadequate or no importance to the physical,
mental, and emotional health of a company’s employees. Neglecting human assets is one of
the foremost errors an organization must strive to correct in adopting CSR values. If business’
primary focus transfigures into monetary investment for the maintenance of a company’s
machinery, supply chain and customer relationships, the people who sustain the organization’s
life will suffer. This crucial element of the CSR system earnestly requires organizations to hold
genuine and complete care and concern for all employees.
With employers beginning to discover the linear relationship between accomplishing corporate
goals and employee well-being, serving to improve and maintain the overall health of employ-
ees within an organization as part of a holistic CSR approach is imperative.
These CSR success elements include the following:
ƒƒ Improving health of all the employees within the organization
ƒƒ Offering the best financial support which encourages the use of valuable services to
protect the employee health
ƒƒ Officially assigning employers, purchasers, and individuals with roles of responsibility for
health and associated productivity
ƒƒ Emphasizing a cultural focus on improving health and fostering well-being
Redesigning the Human Workplace: Diversity, Inclusion and Business
A second key element in reengineering conventional business practices by adopting socially
responsible systems is to acknowledge the power of diversity in the corporate landscape
today. Diversity plays a key role in business success, as it allows organizations to draw from
top talent regardless of discriminatory criteria. The inclusion of different ethnic, religious, sexual
identity and gender groups in the workplace may make some uncomfortable, but the future
of CSR and the success of business activity does not lie in a comfort zone, it awaits us in the
territory of growth and the unknown. Hence by layering diversity as a chief CSR fundamental,
by delivering training sessions on diversity, building mixed team dynamics and directly linking
diversity to the company's strategic solutions, organizations can make great strides toward
promoting diversity and inclusion in the workplace – a CSR imperative.
Most large corporations routinely provide some form of diversity training for employees, with-
out venturing into concrete application of diversity in ideas, practices and values. Companies
40 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
seeking to renew their culture through a CSR based approach, should offer diversity training
which focuses on how people, despite their apparent differences, are at the root the very
same, deserving the same respect and accommodations as others. Once management begins
to deliver training such as this which will encourage open discussion on the topic, they need
to reinforce the message by being the prime example of acceptance. This can be done by
demonstrating inclusive acts as part of standard management practices.
Unlearning age-old conjecture which has portrayed differences as unwanted is the first step in
adopting a shift in internal organization culture. Companies today are beginning to recognize
differences for what they actually are: a considerable opportunity for growth, for learning, for
innovation, and moreover, for evolution.
Hence companies which are seeking to grow, and aspiring to succeed utilize values of diver-
sity in their workforce as a competitive advantage. Mostly because they recognize that this
form of corporate social responsibility leads to growth of exchange, the ability to understand
a wider range of market segments and the ability to expand internationally with greater ease.
Closing Notes
The HR department is usually beset with ever-growing responsibilities of CSR and a lack of
direction in respect to application and strategic integration. Hence, it is essential to recog-
nize that to truly integrate CSR into strategic management principles, all functions within the
organization must be asked to take part in the integration of socially responsible driven values,
policies and regulations. Sure enough when this is attempted, this will be the first step towards
authentic and genuine CSR application.
A key factor organizations today will have to battle is one against pseudo-change. Pseudo-
change is a commonly present, yet largely neglected business reality today. It refers to the
intentional or inadvertent implementation of a change effort which does not address the
problem it is designed to, but instead engages in activities that only offer and suggest the
superficial appearance of change.
Well into the 21st
century, it is imperative that this paradigm shifts. Standing at an impelling
crossroads, companies today must begin to recognize that CSR is no longer simply an
option to conveniently align with, nor a branding strategy or short-term solution, but rather, a
crucial necessity which should be incorporated into corporate policy. This is attributable to the
relentless fact that CSR will become central to the way society and moreover, the economy
operates in the coming years, as global markets increase in complexity and as consumers
and workers evolve as more morally obliged individuals.
As social and environmental concerns incline, today’s and tomorrow’s workplace will have to
become engaged in the communities within which it operates, acknowledge global planetary
preservation issues, acclimate to limited resources, and embrace new ways of conducting
business.
As we are able to see, CSR has been victimized by inaction for far too long. This is perhaps
because it has required a redefinition which supports its amorphous nature, and one which
encourages its holistic application.
But mostly perhaps because Corporate Social Responsibility has needed to be entirely
redrawn.
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 41
Maturity matrix - HR & Social Best Practices
ISO 26000 Core
Subjects
HR & social
issues
Maturity Level N°1
(planning,
awareness,
compliance)
Maturity Level N°2
(implementation and
actions of progress)
Maturity Level N°3
(optimization,
monitoring,
innovations)
Maturity Level N°4
(maturity, continuous
improvement,
institutionalization)
ISO 26 000
Subchapter
Labor
practices
and working
conditions
Employment
responsibility during
downsizing projects
•	 Compliance with
social dialogue
and local labor
law
•	Transparency,
fairness for
employees enga-
gement
•	 Resettlement help
for employees
(outplace- ment
programs)
•	Employment
and territory
stakeholders
involvement
•	Develop
managers general
awareness
during the
sensitive period
before collective
redundancy
•	Develop
Psychosocial risks
awareness of key
stakeholders
•	Financial
measures for
salaries
•	Individualized
and qua- litative
approach for OP
programs
•	Psychosocial
risks action plan
(for both the em-
ployees made
redundant and
the ones that will
be staying)
•	 Actions to lower
the impact of the
jobs losses in the
local territory
•	 External and
inter- nal career
transition
process built with
stakeholders
•	 Follow-up and
monitoring results
•	 Conditions of
work and social
protection
•	Employment
and employment
relationships
•	 ILO Principles
Community
involvement
and
development
Contribution to
local economic
development
•	Identification
of key local
economic issues
•	 Identification of
the key impacts of
the organization
regarding
employment and
skills
•	Identification
of territorial
impact in case
of col- lective
redundancies
(in terms of
employment)
•	 Support local
economic
development
(dedicated
actions)
•	 Implication of the
stake- holders
to facilitate job
and people
redeployment
(restructuring
project)
•	Revitalization
aspects
(mandatory in
France when
downsizing
project)
•	Support
development of
local programs
related to CSR
•	 Support entrepre-
neurship and
value creation
•	Innovative
approaches
regarding territory
revitalization
and people
redeployment
(“integra- ted
platform”)
•	 Voluntary and
proactive actions
towards the local
economy and the
communities in
order to help the
territory being
more attractive
•	 ROI approach
and follow-up
•	 “Bottom of
the pyramid”
business model
•	Employment
creation and skills
development
•	 Wealth and
income creation
The complete version of the maturity matrix can be provided as a separate document as per request
42 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 43
Real-World Application – CSR
Business Cases chapter
4The following nine real-world business cases illustrate an authentic integration
of CSR driven management initiatives. Organization names have been kept
anonymous to prevent reader bias.
Non-business partner:
Association of the Blind and Partially Sighted
Year of implementation and impact:
2011 - present
CSR issues addressed:
Employment, diversity & equal opportunities, Stakeholder
engagement, Products & services
SUMMARY OF THE PROJECT
Only 30% of the 180,000 blind and partially sighted
persons in Norway are employed. Given that human
resources are expected to become scarce due to demo-
graphic change, Organization A saw an opportunity to
increase the employability of this group and tackle a key
sustainability issue.
The goal of this partnership was to create a business
system that was accessible and user-friendly for all
users regardless of their mental and physical health.
Cooperation between Organization A and the Association
of the Blind and Partially Sighted (ABP) includes innova-
tion and software development (ERP-system based). The
parties contribute their complementary expertise which
ensures that high quality software and collaboration on
marketing communication give ABP clients access to
new tools and communication channels.
INNOVATION AND IMPACT
By voluntarily following the recommendations of the
Web Content Accessibility Guidelines (WCAG) 2.0,
Organization A has made the ERP-system accessible
to people with partial and full loss of sight. Through the
cooperation with the ABP, Organization A was able to
engage with the key stakeholder group and develop its
product in close cooperation with this group.
Over the past two years, ABP has been involved in the
validation and testing process to ensure that Organization
A’s software meets the Web Content Accessibility
Guidelines (WCAG 2.0), which define how to make web
content accessible to people with disabilities. The project
has been a front runner in this field. It is expected that in
the near future the Norwegian government will implement
the requirements in this area. Driving an important infor-
mational campaign, Organization A contributes consid-
erably to creating positive attitudes towards employees
with disabilities among employers and the general public.
As a positive side-effect, the ERP-system has become
more user-friendly and healthier for everyone, e.g. through
reduced use of mouse.
ORGANIZATION A
IT - Hardware Software & Services
44 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
ORGANIZATION B
Financial – Banks & Building Societies
Year of implementation and impact:
2013 – 2016
CSR issues addressed:
Community impact/ engagement, Products & Services
SUMMAR Y OF THE PROJECT
Organization B launched "Your Choice, Your Project",
an innovative online tool for employees of its company
throughout Europe. The aim was to involve staff in the
final stage of the decision-making process for the alloca-
tion of extra grants for projects implemented by non-profit
organisations, in a perspective of sharing and dissemina-
tion of philanthropy and solidarity. The initiative involved
9 of the 22 countries where Organization B is present
(Bosnia and Herzegovina, Bulgaria, Croatia, Italy, Poland,
Romania, Slovakia, Slovenia, Ukraine) providing a total
amount of EUR 2,614,000 and focused on two main
topics:
1.	 Job market inclusion of young people affected by
marginalisation or in a vulnerable position
2.	 Degenerative diseases (such as dementia) that
affect the aging European population
INNOVATION ON AND IMPACT
A key innovative aspect is the "direct online voting"
process, allowing employees to raise their awareness
of social issues and evaluate the effectiveness of the
solution proposed by the project. Also the "calls for
proposals" designed by Organization B feature innovative
aspects, developed according to the "action-research"
model applied to social entrepreneurship, thus ensuring
sustainability, possibility to scale up and replicate and the
flexibility of additional contributions to adopted projects
by group employees. The main direct impact of "Your
Choice, Your Project" were 58 social solidarity projects
funded with EUR 2,614,000. The initiative was highly
appreciated by Organization B’s employees as demon-
strated by a strong participation in both voting and also
frequent offers to actively support projects as volunteer
"ambassadors". The Project strengthened employees’
identification and affiliation to their company and posi-
tively influenced their motivation. Also the reputation of
Organization B in communities which benefit from the
Project was greatly enhanced.
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 45
ORGANIZATION C
Packaging, Fulfilment
Non business partner:
Local authority, Local university
Year of implementation and impact:
2008 – present
CSR issues addressed:
Employees health & wellbeing, Employees impact/
engagement
SUMMARY OF THE PROJECT
Organization C had undertaken a workplace health audit,
funded by a partnership between the local authority and
a local university, to assess both the reported and actual
health of its workforce and its link to workplace produc-
tivity. The results of audit showed that the employee
sickness absence and turnover level, which were impact-
ing on productivity, product quality and the company
finances is unacceptable by company senior manager.
he workplace health audit found that most of the work-
force displayed low levels of physical health, even among
younger workers. Forty five per cent were smokers and
over 60 per cent reported drinking to excess at least
once a week. The audit also found low levels of physical
activity (aside from their work) and poor dietary choices.
Alongside its health audit, Organization C conducted its
first ever employee attitude survey. Of most concern, the
survey found that only 48 per cent of employees were
satisfied with their jobs, 28 per cent were actively looking
to leave the company and 56 per cent would consider
alternative employment.
INNOVATION AND IMPACT
Callahan decided to introduce a wider range of workplace
initiatives with the following objectives:
ƒƒ To improve employee quality of life both inside and
outside of the workplace
ƒƒ To raise staff awareness of health and well-being issues
ƒƒ To improve the health and physical fitness of its
employees
ƒƒ To reduce the incidence of work-related injury and
illness
ƒƒ To improve productivity, employee attendance and
staff morale
To implement them company built an on-site gymnasium
for use by both staff and their families, hire full-time well-
being advisor workers, the staff canteen now offers only
health options and all employees are entitled to two free
meals per shift. In addition, Organization C has developed
a relationship with a nearby leisure centre who provide
a range of regular activities and classes which staff can
undertake at reduced prices including tennis, badminton,
tai chi, yoga and climbing. The innovative aspect have
been indicative that allow employees to take advantage
of tax and NI savings on bike purchases in order to
commute to work.
Importantly, the wellbeing initiatives have been put in
place as part of a wider set of HR policies and practices
designed to engage staff, for example, the establishment
of a company council, an employee suggestion scheme
and more formal performance management practices.
In order to monitor the impact of the wellbeing initiatives,
Organization C conducts an annual health audit and
employee attitude survey. One year after the wellbeing
programme was started the results indicates:
ƒƒ Employee absenteeism well below the sector average
ƒƒ Reduced cost of hiring temporary workers
ƒƒ Increase in reported employee satisfaction
ƒƒ Increased productivity
ƒƒ Reduced employee turnover and intention to quit.
46 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
ORGANIZATION D
Pharmaceutical
Year of implementation and impact:
1997 – present
CSR issues addressed:
Employees engagement, Recruitment process
SUMMARY OF THE PROJECT
In order to introduce Organization D’s way of effective
management and implement corporate CSR values
across the organization, Organization D proposed meth-
odology which originates from the company’s vision,
values, commitments and fundamentals. This consisted
of three managerial tools: sustainability reporting, the
Balanced Scorecard and the use of facilitators. All of
these tools clearly show Organization D’s commitment
toward financial, environmental and social responsibility
– all aspects which are in line with the triple bottom line
(TBL) approach.
INNOVATION AND IMPACT
A very innovative aspect of this CSR approach was
Organization D’s use of the Balanced Scorecard in its
financial and non-financial targets which are a part of the
remuneration package at the company.
Non-financial performance is guided by measures for the
company’s impact on the TBL.
Even though, there are difficulties in quantifying the
impact and effectiveness of CSR activities especially the
impact of management initiatives to external stakehold-
ers and environment, Organization D makes an effort
to attempt one in a specific area. Their results show
them the financial impact of CSR driven activities that
refer to cost efficiency, lower employee retention cost,
productivity benefits, lower insurance cost and higher
market values.
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 47
ORGANIZATION E
IT & communication
Year of implementation and impact:
2005 - present
CSR issues addressed:
Employees engagement, Non-discrimination, Work-life
balance
SUMMARY OF THE PROJECT
Organization E implemented a gender equality-oriented
program "Women in Power." The aim of this is to ensure
equal opportunities for men and women in manage-
rial positions. The project is also supposed to prepare
women for promotion and development.
INNOVATION AND IMPACT
Organization E has organized a discussion forum, which
can be used by everyone to exchange views on equal
rights/emancipation. Moreover, this initiative helps to
recognize the problems and barriers women in the labour
market face to a greater degree. Detailed problems and
ideas are discussed at special employee meetings and
through the company’s intranet. This allows senior female
managers to counsel junior women who aspire to work
in managerial positions. Organization E has also estab-
lished a follow-up of this program which is a system of
training for women to help them find the balance between
their career and family life. Also it is in aim to help them
understand the unwritten rules of men in the corporate
world. This includes the existence of self-promotion and
atypical stereotypes.
48 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
ORGANIZATION F
IT & communication
Year of implementation and impact:
2000 - present
CSR issues addressed:
Work-life balance, Wellbeing, Non-discrimination,
SUMMARY OF THE PROJECT
In 2000, Organization F decided to standardize shifts and
work hours throughout the whole organization. Full-time
Organization F operators work seven 12-hour shifts over
a two-week period, on the basis of four days one week,
and three days the next. When the work hours were
changed, employees were offered job sharing, either
on the day or night shifts. Job sharing refers to a work
system in which two people share a full-time job between
them, splitting equally the number of hours worked.
INNOVATION AND IMPACT
In order to participate in the job sharing system, employ-
ees were obligated to submit a claim along with justifi-
cation. Mainly, single parents and women benefit from
the opportunity to share a job and all of them point out
family life as an advantage of this system. Other benefits
that were noticed by employees was a feeling of work-
life balance.
Also Organization F’s managers have seen benefits aris-
ing from job sharing such as higher productivity and a
high level of retention of highly qualified and well-trained
talent.
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 49
ORGANIZATION G
Public sector - city
Year of implementation and impact:
2000 - present
CSR issues addressed:
CSR awareness and implementation
SUMMARY OF THE PROJECT AND
BACKGROUND
Organization G, a city in Europe, is inarguably the most
prosperous and dynamic area in the country. Yet its adja-
cent boroughs face higher levels of unemployment, social
exclusion and child poverty than elsewhere in the country.
Hence, Organization G as a city is currently working
closely with public, private and community sector bodies
to bring lasting economic and physical regeneration to
the city and its neighbouring boroughs. This project offers
support to companies in the city and its neighbouring
boroughs, that are interested in starting up or devel-
oping authentic Corporate Social Responsibility (CSR)
programs that fit their size, sector and experience.
INNOVATION AND IMPACT
Organization G is best known for its flagship newcomers
program which offers free CSR support for up to 70
companies every year through a range of workshops,
guides and templates, signposting and dedicated
account management initiatives. The city’s programs
are supported by over 100 contributor businesses, which
provide support by sharing their expertise of CSR. Since
the year 2000, more than 450 business have adopted
the newcomers program. Moreover, 70% of newcomers
have managed to start and establish an internal CSR
business structure without any particular dedicated CSR
resources from the city.
50 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
ORGANIZATION H
Food production
Year of implementation and impact:
2006 – present
CSR issues addressed:
Societal health and well-being
SUMMARY OF THE PROJECT
Launched in March 2006, Organization G’s “Green”
Foods was established through a joint venture between
Green Bank (the “bank of the poor") and Organization
G Foods.
The mission of company is to reduce poverty by bringing
health through food to children using a unique commu-
nity-based business model. Although the company has
to be profitable – profits from the first plants are needed
to finance the construction of new plants – the success
of the project will above all be judged on non-financial
criteria: the number of direct and indirect jobs created
(milk producers, small wholesalers, door to door sellers),
improvements to children’s health and protection of the
environment.
INNOVATION AND IMPACT
The “green” yogurt has been specially designed to make
up for the nutritional deficiencies that many Bangladeshi
children suffer from. Reduced from cow’s milk produced
locally and date molasses, “green” milk contains the
natural calcium proteins needed for growth and bone
solidity. Also enriched in micronutrients, an 80 gram pot is
enough to cover 30% of daily needs for a child in vitamin
A , iron, zinc and iodine.
Organization G’s “Green” Foods has planned to set up
and launch as many as 50 production plants during the
ten years between 2006 and 2016 for what is in accord-
ance with an aim in creating as many jobs as possible
within the local community. Moreover, in order to ensure
environmental protection, each plant will use renewable
energy through the fixtures of solar panels and rainwater
recovery systems which reduce the risk of depleting
groundwater levels.
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 51
BUSINESS CASES
Fair trade - gold
SUMMARY OF THE PROJECT
Around 50% of the global demand for gold is for jewellery and the jewellery market was estimated at 137,6B$ in 2010,
making it one of the world’s largest categories of consumer goods. But for the 100 million people globally who depend
on artisanal and small-scale mining for their livelihood, the reality is exploitation, poor and difficult working conditions,
complex and non-transparent supply chains and unfair prices for products. As is the case for other Fairtrade certified
producer organizations, Fairtrade and Fairmined offers mining organizations and their communities a better deal.
INNOVATION AND IMPACT
Miners develop a long-term business relationship with
their commercial partners and get a fair price for their
gold, along with the Fairtrade Premium for investment in
economic, social or environmental improvements. The
Standards ensure that the Fairtrade and Fairmined gold
has been extracted, processed and traded in a fair and
responsible manner. This means:
•	 Strengthened miners organizations - Miners have
the opportunity to empower themselves through their
organization. They form groups to give themselves better
bargaining power with traders, to get a fairer return for their
produce, and gain greater control over the jewellery supply
chain.
•	 Improved working conditions - Fairtrade and Fairmined
certification requires mandatory use of protective gear and
health and safety training for all miners.
•	 Freedom of association and collective bargaining
- Certified miners’ organizations must recognise the right of
all workers to establish and join trade unions and collectively
negotiate their working conditions.
•	 Responsible use of chemicals - Certified miners must
use safe and responsible practices for management of toxic
chemicals in gold recovery, such as mercury and cyanide.
Chemicals have to be reduced to a minimum, and where
possible eliminated over an agreed time period.
52 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 53
BPI group – An Internal View of
Corporate Social Responsibility chapter
5Recognizing the growing prominence of CSR for both our
clients and ourselves as a socially responsible HR services
provider, we, together with our International Business Unit and Institute for Leadership
conducted a survey regarding Corporate Social Responsibility to examine internal and external
perceptions and assumptions on the subject. All consultants involved in commercial activities
within our network were invited to complete the survey. This allowed us to collect responses
from people interacting with a diverse set of clients, from various demographics, located in
different economic and social environments.
The survey was conducted between July 30th
and September 10th
, 2013, in 14 countries.
Participants answered 14 questions regarding both their clients’ and their own personal expe-
rience and knowledge about CSR. The results enabled us to assess our CSR policy and social
responsibility related initiatives - particularly regarding the involvement of HR management.
The survey results shared that 83% of respondents assessed their knowledge about
social responsibility as fair or good. However, only 45% of all
respondents (and 17% of respondents from emerging markets)
were aware of the establishment of the ISO 26000 standard – a key
to the foundation of corporate CSR application.
Additionally, 59% of respondents around the world and 83% of
respondents in emerging markets observed an incline in interest
in CSR services amongst their clients. They attributed this emerging
interest to their clients’ needs for brand differentiation, customer
engagement and good PR. Up to 83% of all respondents, with
100% of them from France suggested that CSR should be given
more prominence in organizations and particularly should be a focus
within businesses with a concentration in providing HR services.
Notably, respondents of our survey shared that the most important aspects of social respon-
sibility policy include local development, human development, training in the workplace,
compensation, benefits and social protection as the Top 3, while they rated governance and
organization, management, health and safety at work as the least important.
Furthermore, respondents also indicated that they developed an increase in trust for organ-
izations which adopted CSR values, and additionally shared that CSR, despite its altruistic
nature, does also offer a form of positive PR for commercial activities, deeming it a mutually
beneficial exchange between businesses and their respective communities.
As reflective in the results, the need for organizations to care for the domestic communities
in which they operate within is becoming an increasingly emergent demand in terms of CSR
objectives. As stakeholders, consumers, employees and citizens, people are recognizing the
need for corporations to hold true to transparency, accountability, and moreover, authenticity
– mostly due to the nature of the information age we exist in today. With the ease of access to
information presently, corporate reputation has largely become a top priority for organizations
seeking both success and stability in the marketplace.
Employee engagement
Customer engagement
Brand differentation
Innovation
Cost savings
Sustainable growth strategy
Good PR
16%
11%
10%
9%22%
17%
15%
54 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
Conclusively, the survey results strongly indi-
cate that it is imperative for organizations to
implement and develop socially responsible
policies and practices. Acknowledging the
considerable shift in stakeholder expectations
today and also the progressive trend which
shows more and more companies beginning
to observe CSR policies in their daily opera-
tions, it is critical as modern day businesses
to speak in the same "language" with clients.
As enterprises operating in an aggressively
competitive market, functioning on the leading
edge of strategy by expanding organizational
knowledge regarding social responsibility and
further addressing CSR as a business tool for
growth is key in creating long-lasting value.
Executive Summary:
•	 83% of survey participants found CSR to be a potentially valuable topic to focus upon
as a HR services provider
•	 Respondents noticed a 59% increase in interest in CSR amongst their clients
•	 The most important aspects for companies regarding human rights and labour prac-
tices within CSR policy are local development and human development and training
in the workplace
•	 Company information about CSR involvement increases internal and external trust
and is a good measure for PR in RFP processes
What aspects regarding to human rights
and labour practices in CSR policies are
the most important for your clients?
1 Local development
2 Human development and training in the
workplace
3 Compensation, benefits and social
protection
4 Employment and wxorkforce planing
5 Social dialogue
6 Discrimination and culnerable groups
7 Governance and organization
8 Management
9 Health and safety at work
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 55
Industry Thoughts On CSR - BPI group Event: How Can Social
Dialogue Drive Business Competitiveness?
In the context of the International Women's day 2014
7th
of March 2014
Dominique de la GARANDERIE (Senior Associate Attorney, specialist in labor law, La
Garanderie & Associés)
CSR is most definitely a competitive asset. This is a proactive approach that transcends rigid
frameworks. What’s more, CSR is evolving in a context of relative freedom even though, in keeping
with the French habit of regulating, legislation has nevertheless been passed. Lastly, CSR was
for many years viewed as a communications tool. But today, major enterprises take CSR very
seriously and they have had positive feedback. There is an established link between performance
gains from investing in extra-financial factors and financial performance.
Brigitte DUMONT (Director of Corporate Social Responsibility, Orange), said that Orange had
already included employees on its board of directors within the scope of the group’s CSR policy
[before law made it compulsory in 2013]: As for CSR, there is currently a strong trend to include
more extra-financial criteria, which is a welcome development. CSR is not about philanthropy,
but a different way of looking at business and relations within the company. At the same time, the
efforts made by companies in the area of CSR merit real recognition, notably in financial ratings.
Laurence LAIGO (expert at the 1st
Minster Office) observed that behind an apparent confidence
in social dialogue, authorities nevertheless proposed legislation, meaning that in reality there is
no room for any innovative approach to negotiations.
Carole COUVERT (president of the CFE CGC trade union) pointed out that social dialogue is
rarely mentioned in career résumés, but the issue of the career itineraries of men or women who
are engaged in labor relations needs to be addressed, along with their redeployment. Also, good
corporate citizenship must be reconciled with consumer expectations.
Blandine TRIDON (Chief Executive, Groupe Labellemontagne, President of the Savoie young
executives center) noted that Labellemontagne practices CSR every day. The company manages
ski lift concessions under a public service delegation contract and its business is by definition
very seasonal. But this in no way creates job insecurity for its employees, since the collective
bargaining agreement established the right to renew employment contracts. On the other hand,
the employment catchment areas where the Labellemontagne group operates are sometimes
limited. The solution is flexibility, enabling the company to find people with the skills matched to
needs.
56 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
An interview with Sabine Lochmann, Managing Director of BPI group
What is the responsibility of business today?
Today, the responsibility of business is threefold: it is to simultaneously generate wealth
while supporting the growth and development of innovation, all whilst ensuring the ethical
management of business practices. With modern day shareholders expecting much more
from their investments than they did decades back, businesses now must seek to reward
growing expectations in order to sustain themselves as competitive entities. This applies
particularly for global companies who possess power which oftentimes exceeds the power
of a state. With such influence, there definitely brings about a greater sense of responsibility
towards ensuring sustainable development. Factors such as respecting employee treatment
by regulating working conditions and not endangering life in respective communities of
operations, all attribute to the unique responsibility and role of business in the marketplace
today. Overall, organizations now considerably impact what can happen tomorrow for the
generation to come. Duly, they have to ensure that they do not cause a threat to a whole
sector of activity due to an absence of ethics and furthermore a lack of balance between
understanding sustainable growth versus greedy growth.
Is corporate social responsibility an imperative for organizational success?
CSR has been a part of the DNA of some companies ever since their origin of operations.
Historically, this is apparent when we refer back to paternalistic management. But today, CSR
is becoming more prevalent and necessary as organizations today stand in a role of significant
impact and influence - more so, as models for political advocates and public citizens to follow.
This has transfigured the idea of social responsibility for business as a tool and moderator to
manage several risks in regards to their various stakeholders. It also acts as a platform to be
more accountable - not only for the immediate time, but also for the coming generation. We
are now living in a world which is welcoming a new cycle of how things are being done. With
everything moving faster and faster, and with the acclimatization of the digital revolution, CSR
is now no longer a long-term business aspiration, but a current reality. It should be recognized
and appropriately addressed globally by organizations, as it dictates the future of business
entirely. From employee engagement- which is a critical element to organizational productiv-
ity and health, to market sustainability, CSR is a core component to what will determine the
success on business in the days to come.
Is CSR a concept which is realistic in real-world application?
Yes, CSR is absolutely realistic in application. It is pliable in nature, so businesses may choose
to adopt it holistically or simply integrate its more readily available aspects. Personally, I
recognize the importance of creating value as an organization for the environment from which
you draw from – whether that be human capital, natural resources or living communities.
Because we as organizations carry with us a size which has the potential to draw a legacy, it
is essential to build value despite what you may destroy along the way. This is essentially the
spirit of corporate social responsibility – an entirely applicable business practice. Moreover,
CSR is a form of organizational leadership which offers the challenge of how to behave when
there are tough decisions to be made. This then brings into question the disparity between
a mid-range CSR and a long-term CSR model; both which require very different decision
making criteria. But overall, CSR is a concept which is realistic in application as it is simply a
business attitude which approaches value creation by reframing CSR from a business penalty
into an incredible business opportunity to build, create, and strengthen systems which can
leverage growth for the future.
How can organizations with no previous background in socially responsible business
practices begin to adopt a CSR enforced work culture?
There is always a key challenge to address within every company. Whether the challenge is
internal or external in existence, what makes all the difference is how an organization as a
whole chooses to meet this challenge. In the case of adopting CSR values with no previous
experience, the beginning of this objective lies in creating a clear and solid foundation within the
Sabine Lochmann
Managing Director –
BPI group
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 57
business’ internal structure. This is done by providing employees with a clear business mission
and vision through the means of a simple and efficient structure set with clear boundaries.
Every grand possibility begins with a small step in the right direction. Likewise, allowing the
birth of CSR within the organization is promising when approached essentially from the bottom
up. This is a critical first step in breeding a socially responsible, value infused, corporate spirit.
What is the future of CSR in the next decade?
The future of CSR now lies in diversity. What organizations should understand today is that
the presence of diversity within the company plays a considerable role in fostering sustainable
business values, as it brings about different people who share different ideas and allow for
hybrid collaboration in vision which would not have been conceived without a mix in percep-
tion. Diversity further encourages organizations today which are seeking to walk along the
path of CSR to adopt a 360 degree approach. What this means is to be open to learning,
growing and developing as an organization from all aspects. Being present amidst radical
change in the way we work and live today, the notion of corporate social responsibility has lent
its meaning to sharing wealth with the community. It has grown to embrace the responsibility
of providing for the environment in which you are working. This is all in an aim to offer the new
generations to come with stability and possibility.
In a few words, what does CSR essentially mean to you as a business leader?
As a business leader, the integration of CSR values is what makes me proud of working in
and for a company.
Closing Remarks:
Jean de la Fontaine’s infamous fables share one story about a father and his children in which
the father assures to his children of a treasure in his garden once he passes away. Upon his
death, the children dig and dig, only to find nothing of the sort. After some time, they come
to the realization that the true wealth their father was referring to was that the joint effort and
collaboration in work that the children endured together to achieve their one mutual goal of
finding the treasure.
As businesses operating in an extremely complex climate, we can adopt one simple lesson
from this fable ourselves which is that true wealth is not simply monetary. For example, when
you partake in unreasonable pollution and environmental degradation, money cannot fix this
by renewing life. There is only so much finances can and will achieve. True wealth lies much
beyond the numbers. It echoes in a place which speaks of how you help the community and
society, and what you impart to the people around you for a time when you will not be there
anymore.
58 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
As organizations, we have been speaking about corporate social responsibility in theory,
aggressively, for the past five years. Although, if examined closely, the present application and
integration of CSR values in France, and globally, is not an organizational reality. In fact, the
idea of CSR today inclines more toward a strategic marketing tactic which aims to maintain
a positive external image to consumers and stakeholders without any actual and concrete
action.
Indicative of this, I have personally come across several large companies in the past few years
who have claimed to thoroughly incorporate CSR values into their business practices, whereas
the reality of the situation was entirely different. These companies stated that they did not
have the budget required to actually implement their initial CSR goals, but regardless, went
ahead to misleadingly portray otherwise through their organizational communication efforts.
This leads us to recognize that the discrepancy between what is being said and what is being
done is an apparent reality in regards to corporate social responsibility today.
Initially, when the concept of CSR was introduced, it mostly addressed the environment and
the preservation of natural resources. Although, as emergent recently, CSR has transformed
into much more than merely governing our external environment. Now, CSR regards the
significance of caring about the internal environment within the company, and caring for our
most valuable resource – human capital.
Recently in France, a new law which was passed in June 2013, La loi sur la sécurisation
de l’emploi (LSE) depicts just how fundamental CSR values are for businesses today. The
LSE has provided CSR with a public platform which holds organizations responsible for the
well-being of their employees. It gives attention to communities within companies, allowing
employees to express themselves, which in turn helps to improve social dialogue at every
level of the company – an integral element to CSR.
Consequently, as we can see, today, CSR is captivating the larger percentage of the popu-
lation because it is engaging us in a critical discussion on the importance of employment.
Specifically, it is opening up the future to workers by ensuring the utilization of their talent.
To note, in France, when we talk about CSR, we mainly focus on the journey of humans in
their professional evolution. Even though this is only one aspect of CSR, it is likely the most
important, as it is the people in the workforce who define its perennial existence.
As we at BPI group believe, it is most critical to now address the overall well-being of work-
ers - essentially, helping our national and global talent pool to live better and to enhance their
employability by developing themselves professionally and evolving themselves personally.
Likewise, recognizing the value in effective social dialogue, we strive to be key players in
making CSR a relevant topic of discussion.
When deliberating on social responsibility, we ought to recognize that CSR is a duty which a
company has the option to adopt, and definitely not an obligation of any sort. Hence, when
integrating CSR into organizational operations, authenticity is fundamental for the successful
establishment of the system.
Three key points of consideration for organizations contemplating CSR as a business tool are:
1)	 Currently, the economic crisis we are in is enabling us to recognize and reinforce the
importance of CSR. This is particularly because during an uncertain time such as this,
the need for talent management is placed in emphasis. Being so, as the prominence of
talent management grows in France and worldwide, CSR is becoming a tool in helping
talent attraction and retention in the days to come.
2)	 As with any product which is being introduced into the market, CSR has already
made its initial entry and breakthrough, and is currently being gradually accepted and
discussed as it is in its phase of growth. This means that it will soon arrive at a phase
of product maturity – a time when thorough integration of CSR will become common-
place.
Jean-Marie Thuillier
Associate
Director BPI group
Directeur des Practices,
des Métiers et de
L’Innovation
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 59
3)	 It is key to note that when speaking of CSR, all stakeholders in the company should be
accounted for. CSR does not merely include acknowledging externalities. It is a holistic
strategy which involves addressing the fair treatment of all relative groups: employees,
consumers, citizens, taxpayers, subcontractors and unions.
Now, as we head into an era of integrative CSR management, the greatest challenge we face
as organizations is to justifiably answer to the ROI (return on investment) of being socially
responsible. With a lack of concrete evidence illustrating exactly how CSR positively enhances
the bottom line, being socially responsible has to prove its cost in order to become a reality
in the world of business both today and tomorrow. Hence, as we will begin to see, the future
of CSR will witness an improvement in real application, contingent on its ability to prove its
impact. And by doing so, ultimately CSR will enable the reconciliation of human values to the
corporate workplace.
60 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
Today, there is no longer any question about whether CSR is an objective which is worthwhile
pursuing or not. Presently operating within environments which demand social responsibility,
CSR has become a business necessity rather than a mere option. With companies having
become public entities in the past decade, it is essential to ensure that organizational brands
thrive in the marketplace. For this reason alone, the adoption of CSR values into management
infrastructure is required - as it simply makes good sense.
As we have been a witness to and participant of, there have been radical changes to the model
Adam Smith has proposed about the responsibility of business. It is still valid that companies
are here to generate wealth, but it is essential in our global world to also critically consider
externalities in our environment. This is largely because we have new responsibilities as we
become more powerful entities – and this new power is initiating a new distribution of roles
to maintain the national and global community alike - as both healthy and wealthy.
In particular, in France, CSR is extremely valuable because one of our national problems is the
lack of acute business sense. Due to our cultural underpinnings, business activity is not valued
enough. Hence, we have yet to, as a national society, widely acknowledge that business is
the only way for growth. This is primarily attributed to our lack of knowledge about what a
company is and how it works. Duly, this negative view about how businesses function, is a
product of associating the enterprise with layoffs rather than output and productivity, while
equating organizational bureaucracy with unreasonable compensation.
In light of this, the application of CSR values to the core of organizational culture suggests to
the French, and likely global population, that we need our companies in order for our country
to retain itself as both a competent and thriving nation. In addition, CSR has the potential to
become a wonderful and effective lever in helping people to appreciate the world of business
and its enriching contributions to the economy and moreover, the welfare of society.
It is becoming clear that CSR now is entering a new era. For years, it has usually been a
placeholder in financial reports, but now it is not the case anymore. There is now an authentic
attempt to truly integrate CSR into strategic management regardless of company size. With
organizations recognizing ultimately that CSR is not just an option which is convenient, but
rather now the most efficient and effective way to do good business, CSR is gradually transfix-
ing itself into a business world reality as its multi-dimensional nature can no longer be ignored.
As a powerful way to conduct business in a global world where employees are also citizens
and citizens are also voters and consumers, who in turn are also taxpayers and stakehold-
ers, social responsibility has affixed itself always from theory alone. However, despite this
progressive shift, we face a paradox today when dealing with the application of CSR, as we
have to walk the talk. With fragile and ineffectual internal organizational infrastructures, we
have to first and foremost begin to adopt CSR values by caring for our human capital. This
is the beginning of anything: the first step of any CSR approach. Being a socially responsible
business begins first with the well-being of employees, as your workers are the advocates
and frontrunners of your organization.
With that being said, CSR is also a difficult feat today as it is greatly challenging to arbitrate
between conflicts of interest. Win-win outcomes are a rarity in the business world and not
always possible, as the interest of stakeholders are not always corresponding to the interests
of employees. In fact, they rarely match, and hence you have to arbitrate between several
conflicts of interest which involve all shareholders: employees, people, subcontractors, etc.
In addition, when closely contemplated, what we are beginning to discover is that CSR also
includes the adoption of relatively new and innovative ideas, both internally and externally. One
such key element of the future of CSR will be in the consideration and strategic application
of co-opetition. Co-opetition involves cooperation with people you are in competition with. It
explores a terrain which studies how to cooperate within competitive environments and how
to conduct business in a way which is much simpler yet much more effective. It suggests
that we have to be smart enough to combine competition and cooperation, as competition
is not entirely antagonistic. In this sense, it is reflective of CSR values which similarly suggest
Philippe Bigard
Director
Institute for Leadership -
BPI group
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 61
that sustainable business activity lies in combining various interests of various shareholders.
Markedly, CSR obliges you to appreciate the intricacy of management in a more enlightened
manner, and less through a lens which is solely black and white.
Straying away from theory and into the domain of concrete application, CSR faces a very big
challenge in proving itself as a profitable return on investment. As a new frontier which compa-
nies are exploring, we have to acknowledge that the application of CSR is a huge challenge
which will be very difficult to overcome. To get true results will be an arduous journey, as we
are far from where we should stand, both socially and environmentally.
Hence, it is crucial as organizations that we need to take a calculated risk and venture into
establishing CSR as a business reality - although, at the same time, we must not undertake
difficulties which are impractical to address. For example, to be noted, a very real question
CSR brings to the forefront is the question of scale of values. The concept of CSR cannot
be necessarily regulated globally. For example, what is considered treating an employee well
in Canada differs greatly in India or Tunisia. Hence, CSR prompts us to examine whether we
can accept differences in these standards and moreover, to which extent.
If we do not have this kind of progressive dialogue about real world business issues, big
companies will continue to hide behind the shadow of their CSR branding and continue
their unethical behaviour without intervention. So the key is to not make CSR a new layer of
constraints, but rather a wonderful opportunity to reconcile the French community with its
economy.
Moreover, as consultants, we have a key role to play in the sensibilization of our clients and
partners to convince them that CSR is the right direction to rediscover what it truly means to be
a company. Also, it is the best answer we can imagine to the big question of social innovation.
At present, people – particularly young talent, no longer seek to work just for a salary. They
want to be making an impact in their society through the span of their career.
Unaware of the holistic aspect of business, there has been a divorce between French compa-
nies and the national society, so CSR can unite this rift. The CSR spirit is the best solution
to this and is absolutely required if we want to get out of the never ending economic crisis
in France.
Business is the only way of safeguarding our social model and we need to become better
at doing this.
A key message which needs to be widely embraced is that companies are not creating money
by ‘evil’ means. The national population needs to understand that you can do business in
an ethical way, as business is about taking care of your people and secondly, it is about
safeguarding people in the community – while simultaneously generating profit in order to
stimulate the economy.
An additional reason CSR is an investment for any organization is because a new organiza-
tional model opens your company up to new networks – a key for success and sustainability
in the marketplace.
62 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 63
Closing Notes – Redrawing
Corporate Social
Responsibility
chapter
6We resist change, yet seek novelty. Traversing on the same
edge of the sword, we pursue organizational greatness.
However, altogether indulged and comforted by familiarity, we
cringe at the possibility of operating any differently than we have been accustomed to. Are
we as organizations today simply apathetic to our needs for growth? In misalignment with
our ‘values?’ Or more so, unwilling to weave the new into our way of the old?
Blissfully cemented in our versed customs, we must acknowledge that we cannot become
what we aspire to be tomorrow by remaining what we are today. When closely examined, it
is evident that organizations over time have become products of man’s inclination for habit.
Synthesized by the greed for profit and amalgamated by a blind ambition to conquest our
competitors, we have neglected the most critical element the enterprise requires for long-
standing success: sustainability. More specifically, Corporate Social Responsibility.
Directional, definitive, and precipitant, corporate social responsibility is strategically begin-
ning to etch its place into the world of business today in an aim of remaining in its vicinity
permanently. Unifying ethics with corporate practices and reconciling morals and values with
organizational culture, CSR has made its arrival heard and is here to stay.
In the past decade, as the business climate has been shifting, CSR has been propitiously
suggested as crowning to good business practices. Since its inception, the concept of
business’ role of becoming socially conscious has transformed into a necessity for compa-
nies vying for a deep-rooted standing in the marketplace. This is partly attributed to the
technological revolution and as consequent, partly credited to globalization. Hence, the
larger international population which is composed of consumers, suppliers, subcontractors
and stakeholders, is becoming more morally inclined and socially aware, as they are swiftly
welcomed into the information age.
Yet unfortunately, at present, the topic of CSR has been saturated and moreover, diluted in
its definition. This is mostly because it has garnered an unfortunate stance as being more
spoken and deliberated upon than executed and practiced.
As a concept so theologically demanding, CSR requires meticulous and effective handling
in order to successfully deliver its intention of humanizing and endearing capitalism. This
brings us to address three main points as part and parcel of the CSR debate through our
comprehensive research:
1)	 Are we entering an era in which CSR values will be entirely applied in all facets of stra-
tegic management? Hence, will a redefined model of CSR help to concurrently design
a new model of management for the workplace of tomorrow?
2)	 Will the thorough integration of CSR policy into all organizational practices offer a
viable solution to management issues such as employee engagement, well-being,
productivity and satisfaction? Furthermore, will the incorporation of CSR values into
corporate culture essay social issues such as poverty, child labour and environmental
degradation as declining occurrences?
64 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
3)	 Lastly, but as importantly, is the real-world employment of CSR reserved only for large
organizations? For developed nations? Essentially, for the wealthy?
Operating in the 21st
century, there is a great discrepancy between what is being said and
what is being done. Unaware of how to authentically integrate CSR into corporate practices,
companies today are failing to recognize the opportunity they have to grow and evolve much
beyond the foresights of their predecessors. As an example, in historic retrospect, Milton
Freidman was credited with affirming that the only responsibility of business is to generate
profit.
Yet, we have come a long way since then to recognize that we in fact, live in a society which is
much more multi-dimensional than Friedman acknowledged. We have consumers to please,
suppliers to manage, subcontractors to direct, stakeholders to satisfy and entire markets to
influence. If our only responsibility in such a role were to simply conduct business, in neglect
of social issues, we would be decrying the most valuable resource known to mankind:
mankind himself.
As we are able to understand, the ways in which we have been operating have been primitive
in vision. It is now that our journey as organizations of today begins. We have to methodically
plan ahead. It’s a peril of life and the cycle of business, because if innovation in management
does not form the greater part of our organizational tapestry at present, we can consider it a
warning sign for defeat tomorrow.
Evidently, our organizational culture needs a facelift. We need employees to collectively
understand the significance of CSR and its direct effect on business. The enterprise of the
21st
century can no longer acquaint itself with old traditions. We need to seek new directions
in defining what it means to be a successful business. If we cannot take care of the commu-
nities which hold our consumers and stakeholders, then we cannot expect their loyalty on
this two-way street. Hence, we must embark on a journey to marry CSR values into our
organizational culture, and ultimately evocate what we know into successive action.
However, making the decision to adopt CSR as a principal organizational value is only the first
step to internal transformation and reengineering of business practices. The actual application
and integration of socially responsible values is a perpetual balancing act.
As this report examines, reaching a consensus on CSR is a challenging feat. This is primarily
because the interests of stakeholders are oftentimes in conflict. What this essentially proposes,
is a new management problem which needs to be efficaciously addressed. To note, employees
have entirely different expectations from their company than a shareholder would. Therefore, it
is fundamental for businesses to enlarge their organizational objectives in order to encompass
effective management of this prevalent difference in priorities.
Despite this, though CSR integration into business practices is an arduous path, it is an
equally rewarding one. However, it does demand a mastery of the art of arbitrating between
various organizational interests and stakeholders. The complexity in application is where most
organizations fall short. What companies today must embrace is that the art of management
lies in the relentless practice of mediation. The cold hard truth stands before us: not all stake-
holders can always be completely satisfied, and not all situations can be entirely win-win in
outcome, but a middle ground does exist - one which offers the incorporation of Corporate
Social Responsibility and one which fosters sustainability – the key to the future of business.
Shwetha Chandrashekhar
BPI group Intern
Top 10 National Finalist, Focus 2040
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 65
Sources chapter
7Literature
Lam, H., Kahare, A. (2010). HR’s Crucial Role For Successful CSR,
Journal of Business Ethics, Vol.3 No.2 2010
Sharma, S., Sharma J. (2009). Corporate Social Responsibility: The Key Role Of Human
Resource Management, Business Intelligence Journal - January, Vol.2 No.1 2009
Cohen, E. (2010). A Necessary Partnership for Advancing Responsible Business Practices
Carolle, A. (1991). The pyramid of corporate social responsibility, Business Horizons, July –
August
Garriga, E., Mele, D. (2004). Corporate Social Responsibility Theories: Mapping the Territory,
Journal of Business Ethics 52,
International Organization For Standardization (ISO (2010). Draft International Standard ISO/
DIS 26000, Guidance on social responsibility
International Labour Organization (2008). ILO Declaration on Social Justice for a Fair
Globalization
European Commission(2013). Golden Book of the first European CSR Awards
Melcrum. (2006). Engaging Employees in Corporate Responsibility: How the World’s Leading
Companies Embed CR in Employee Decision-making. London, UK: Author
Maxwell, G. (2008). Case Study Series on Work-Life Balance in Large Organizations, Society
for Human Resource Management.
Count Albert de Mun: His Theory of the Social Apostolate, Sister Miriam, O. S. U., The
American Catholic Sociological Review, Vol. 14, No. 1 (Mar., 1953), pp. 13-24
Scalet, S., & Kelly, T. F. (2010). CSR Rating Agencies: What is Their Global Impact? A 2010
Journal of Business Ethics Study. Journal of Business Ethics, 94(1), 69-88.
Visser, W. (2011). The Age of Responsibility: CSR 2.0 and the New DNA of Business. Wiley.
Schwartz, M. S. (2011). Corporate social responsibility: an ethical approach. Peterborough,
Ont.: Broadview Press.
Cheng, K., Low, P., Ang, S. L., & Idowu, S. O. (2013). Corporate Social Responsibility in Asia:
Practice and Experience . Springer.
Chase, L. A., Rangan, K., & Karim, S. (2012). Why Every Company Needs a CSR Strategy
and How to Build It. Harvard Business Case Paper, Working Paper.
66 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
Web sites
http://ec.europa.eu/enterprise/policies/sustainable-business/corporate-socialresponsibility/
http://corostrandberg.com/
http://www.ic.gc.ca/eic/site/icgc.nsf/eng/home
https://www.melcrum.com/
http://www.shrm.org/
http://www.iso.org/
http://corporate.walmart.com/
http://www.csreurope.org/
http://www.ilo.org/
http://www.un.org/
http://www.theheartofthecity.com/
http://www.danone.com/
http://www.yunussb.com/
https://www.ic.gc.ca/
http://www.state.gov/e/eb/eppd/csr/
www.finyear.com
www.diplomatie.gouv.fr
http://www.csreurope.org/guide-csr-europe
http://www.csr-weltweit.de/
http://www.oddo.fr/
https://ratings.standardandpoors.com/about/who-we-are/Our-Approach-to-Corporate-
Social-Responsibility.html
http://www.vigeo.com/csr-rating-agency/
http://www.csrwire.com/
Institute for Leadership - BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 67
Appendix chapter
8Videos
Due to its strategic character social responsibility is very important topic from the perspective
of companies’ management. Please find bellow links to information videos and interviews
with executives of various companies who tell about their experience related to this topic.
ƒƒ https://www.youtube.com/watch?v=E0NkGtNU_9w about CSR
ƒƒ https://www.youtube.com/watch?v=PdkYieDuVvY IBM
ƒƒ https://www.youtube.com/watch?v=gbcVzeTKxp8 McDonald’s
ƒƒ https://www.youtube.com/watch?v=8w0x_RAgsjY Dell
ƒƒ http://www.youtube.com/watch?v=NiivSxLyEUI KPMG
ƒƒ https://www.youtube.com/watch?v=a79RQ5ZMrdo Unilever
Morover, many interesting videos regarding CSR and sustainable development you can finde
on www.ted.com.
Books
Very valuable source of knowledge on CSR is books, which amount in book stores can
surprise. Based on list of most popular books on goodreads.com and our experience we
create the list of "must read" CSR books. They all show that CSR should be consider as
way of doing and thinking about our business and life that enable long term development.
ƒƒ The Triple Bottom Line: How Today’s Best-Run Companies Are Achieving Economic,
Social and Environmental Success -- And How You Can Too by Andrew W. Savitz, Karl
Weber, 2006
ƒƒ Corporate Social Responsibility: Doing the Most Good for Your Company and Your Cause
by Philip Kotler, Nancy Lee, 2004
ƒƒ Milton Hershey: Chocolate King, Town Builder by Charnan Simon, Sarah De Capua, 1998
ƒƒ Creating a World Without Poverty: Social Business and the Future of Capitalism by
Muhammad Yunus, Karl Weber, 1999
ƒƒ Fair Trade and How It Works by Jacqueline Decarlo, 2011
ƒƒ In Good Company: An Anatomy of Corporate Social Responsibility by Dinah Rajak, 2011
ƒƒ CSR for HR: A Necessary Partnership for Advancing Responsible Business Practices by
Elaine Cohen, 2010
68 - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
Articles
That newspapers and magazines very often are the first source of some ideas for executives.
Especial when this ideas are related to company’s strategy and possibility of development.
Knowing the power of shape opinion and view publisher, also as social responsible company,
should included articles regarding CSR.
The list shows easy available worth reading articles:
ƒƒ An Innovative Approach to Funding CSR Projects by Theo Vermaelen, Harvard Business
Review, June 2011.
ƒƒ Column: It’s Time to Take Full Responsibility by Rosabeth Moss Kanter, Harvard Business
Review, October 2010.
ƒƒ Corporate Social Responsibility in Mexico and France: Exploring the Role of Normative
Institutions by Maribel Blasco and Mette Zølner, Business & Society, June 2010.
ƒƒ Just good business, Special report: Corporate Social Responsibility, The Economist,
January 2008.
ƒƒ Strategy and Society: The Link Between Competitive Advantage and Corporate Social
Responsibility by Michael E. Porter and Mark R. Kramer, Harvard Business Review,
December 2006.
ƒƒ Building the Green Way by Charles Lockwood, Harvard Business Review, June 2006
ƒƒ The Path to Corporate Responsibility by Simon Zadek, Harvard Business Review,
December 2004.
ƒƒ From Spare Change to Real Change: The Social Sector as Beta Site for Business
Innovation by Rosabeth Moss Kanter, Harverd Business Review, May 1999.
THE INSTITUTE'S DOSSIERS
The Institute's Dossiers are a distillation of the knowledge drawn from the
experience of BPI group consultants, and represent all activities, areas, and
countries, in which the Institute for Leadership team has conducted research.
The Institute for Leadership is BPI group’s dedicated center for analysis and
forecasting.
Dealing with major contemporary questions in the fields of management, HRM
and social issues, the Institute's Dossiers aim to offer various insights in order
to provide guidance over the medium / long term. They are intended to allow
everyone to form as enlightened an opinion as possible.
As exercises in applied research, these folders have a practical purpose as
well. Today the HR and Social fields are facing unprecedented questions
whose solutions may be crucial to avoiding a number of significant challenges
and dysfunctions.
Each folder proposes a new analytical and thinking perspective on issues
related to contemporary transformations of work and labor relations, as well
as the significant challenges they pose to all stakeholders: business leaders,
human resources managers and directors of social relations, staff repre-
sentatives and trade union stakeholders, managers, employees, students or
researchers, consultants.
To all, we wish a pleasant and informative reading experience. As always, this
folder is also published on the Institute for Leadership website, where everyone
is invited to express his/her reactions, critical or complementary perspectives
in order to push the debate for innovation and social advancement forward.
Philippe BIGARD
Director of the Institute for Leadership - BPI group
Directeur de la publication :
Philippe Bigard
Coordination : Shwetha Chandrashekhar
The Institute's Dossiers
37 rue du Rocher - 75008 Paris
FRANCE
institut-leadership@bpi-group.com
http://www.institut-leadership-bpi.com/

Corporate Social Responsability (english version)

  • 1.
    THE INSTITUTE'S DOSSIER Redrawing CorporateSocial Responsibility May 2014
  • 2.
    The Dossiers del’Institut are a collaborative result of the work of BPI group consultants. Publication director: Philippe BIGARD Coordination and editing: Shwetha CHANDRASHEKHAR Expert contributors: Audrey BARBE Pawel SABAL Shwetha CHANDRASHEKHAR Anne LEMAITRE Jean-Marie THUILLIER Philippe BIGARD Sabine LOCHMANN Illustrations: Jean-Michel MILON All illustrations are from the blog of J.M. Milon (lamineducoach.fr) and were chosen and used with permission of the author. Reproduction is prohibited. Other external sources and images used in support of this document are referenced and explicitly mentioned in the bibliography. Anything that is not referenced refers to the ideas developed by BPI group consultants and has been produced in-house. Therefore, use and citation of this file without permission of the authors is prohibited.
  • 3.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 3 When the wind blows, there are those that build walls and then there are those that build windmills. Clare Woodcraft, CEO of the Emirates Foundation
  • 4.
    4 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group Table of contents 1I A Historical & Philosophical Overview of CSR 7 Milton Friedman – The Agency Argument Against CSR 7 The Argument for CSR 8 2I International Lens – A National & Global Look into CSR 21 CSR in Canada 21 CSR in the U.S. 23 France’s CSR Engagement 25 CSR in Italy 26 CSR in Spain 29 3I CSR’s Influence on Human Resource Management 33 The Future of Business - Redrawing CSR 38 Maturity matrix - HR & Social Best Practices 41 4I Real-World Application – CSR Business Cases 43 5I BPI group – An Internal View of Corporate Social Responsibility 53 6I Closing Notes – Redrawing Corporate Social Responsibility 63 7I Sources 65 Literature 65 Web sites 66 8I Appendix 67 Videos 67 Books 67 Articles 68
  • 5.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 5 Editorial Globalization, the universal financial crisis, the incessant exploitation of natural resources and the relentless quest to strategically position the external organizational image are all collectively contributing to the increasing number of executives who want to align their organization with social responsibility and sustainable growth strategy. Implementation of CSR (corporate social responsibility) has become not only the guideline of how a company can develop its business while making a better contribution to society and the sustainability of the planet, but also a way of doing business which is designed to deliver long-term profits. In doing so, it is becoming apparent that Human Resources managers play a pivotal role in helping their organizations to achieve their goals of becoming socially and environmentally responsible firms while also aligning these objectives with financial performance metrics. This is as the Human Resources function today influences many key business processes which enable and foster the implementation of CSR practices and the development of a high performance CSR culture. Reflecting this, a survey conducted by The Society for Human Resources Management indi- cates that in companies with strong CSR policies, employee morale was 55% higher, while business processes were 43% more efficient than in companies with weak or non-existent CSR policies. Notably, despite sharing a mutual goal, CSR values adopt different forms not only due to the area in which they are applied, but also due to the specificity of the respective industry, culture, legal requirements, and organizational size. Taking these aspects into account, it is a key responsibility of the HR function to provide the organization with tools that enable the creation of a workforce which encompasses the values, skills, trust and motivation in achieving CSR strategy goals. By doing so, the HR function encourages and nurtures the concept of the "triple bottom line," which is also referred to as the 3P model: Profit, Planet and People. The TBL suggests that companies should be formulating three different bottom lines: one being the traditional measure of corporate profit, the second being the bottom line of a company's social involvement and the third being the bottom line of the company's environmental practices. Generally, the role of HR has primarily related to aspects of employment and workforce planning, compensation and benefits, well-being, safety at work and human development. Although, increasingly, we are witnessing a trend in which HR is beginning to embrace its role as the organizational advocate and manager of CSR. This is as talent today is progressively seek- ing to affiliate itself with companies which are invested in their sustainable development and social responsibility strategy. Hence it is crucial for the HR function and the entire organization as a whole to prioritize compliance with CSR values and policy. Audrey Barbe International Sales Development Manager BPI group
  • 6.
    6 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group However, at present, CSR initiatives are not being effectively executed and handled by organizations worldwide. On one extreme, an emerging trend CSR is beginning to influence is the birth of "greenwashing." Greenwashing refers to companies who deceptively promote their organization’s products, aims and/or policies as environmentally friendly and socially responsible. Furthermore, adding to the ineptitude of CSR today on the other end, there are several compa- nies and HR professionals who are executing innovative and socially responsible initiatives, yet not promoting their actions to the general public- consequently detracting its value to organizational stakeholders and the general public. This is only a minute fraction of the problem the application of CSR faces today. As we head into the business world tomorrow, we must learn to effectually integrate corporate social responsibility based practices into the foundation of the way business is conducted. In spirit, the following report examines and analyzes CSR trends today and tomorrow, and offers a lens into redrawing the conventional business approach to corporate social respon- sibility.
  • 7.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 7 A Historical & Philosophical Overview of CSR chapter 1Corporate social responsibility has long been strategically edged as fitting to good business practices. Aggressively rousing two extremes, the topic of CSR poses two arguments: The first stub- bornly states that it is against common business sense to part with profit, while the second disproves this by suggesting that conducting sustainable business through the inte- gration of CSR values is the only key to acquiring healthy bottom lines. Historically, Corporate Social Responsibility has etched its place into discussion and practice since the inception of business. As echoed by Mark S. Schwartz in his 2011 book, Corporate Social Responsibility: An Ethical Approach, the widespread assumption that the concept of CSR is only a recent sensation is not entirely accurate. In fact, even the notion that CSR has developed only over the last century is a fallacy. Social responsibility in a business context has been discussed and debated since the very beginning of business activity. Tracing back to the Code of Hammurabi almost 4000 years ago, a Babylonian law code and one of the oldest deciphered writings of significant length in the world, builders, innkeepers, and farmers were required to avoid acting negligently by causing death to others, or were condemned to punishment. Furthermore, responsible busi- ness practices have been outlined in the doctrines of the world’s religions such as Judaism, Christianity and Islam, which have existed for thousands of years, as the early conceptu- alization of CSR was broadly based on religious virtues and values such as honesty, love, truthfulness and trust1 . Milton Friedman – The Agency Argument Against CSR Progressing forward, the infamous modern debate of CSR was conceived and given prom- inence in the 18th century when Milton Friedman, a disciple of The Wealth of Nations author and economist Adam Smith, suggested from a conservative point of view that there is only one social responsibility of business, which is to use its resources and engage in activities designed to increase its profits. "There is one and only one social responsibility of business -- to use its resources and engage in activities designed to increase its profits so long as it stays within the rules of the game, which is to say, engages in open and free competition without deception or fraud." Milton Friedman, New York Times Magazine, September 1970 Although Friedman does mention this corporate motive to be in alignment with ensuring that businesses must remain without fraud or deception, this loosely termed statement provides room for great misconception about what it truly means to be an organizational entity oper- ating amidst societies of people who are employees, consumers, stakeholders, voters and taxpayers alike. 1  Cheng et al.,2014
  • 8.
    8 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group According to Milton Friedman, the principle that a business as an enterprise has social responsibilities is an ignorant statement, as it implies that a business is then a person, not an artificial system, as only people can have responsibilities, and business as a whole cannot be said to have responsibilities. Hence, the individuals who hold “responsibility” within a corporation are rather individual corpo- rate executives - these are employees of the owners of the business and they have a direct responsibility to their employers. This responsibility is to conduct the business in accordance with their desires, and generally, in respect particularly to corporations, this desire is to make as much money as possible while conforming only to basic rules of the society - including law and ethical custom. Thereby, if a corporation is seeking to increase overall profits by opting for a decision which may prove to be inconvenient to its community, it is entirely ethical, as it is complying with its business’ or rather employers’ desires of cutting expenses and maximizing profits, as a corporation generally seeks to do, and duly fulfilling its primary responsibility to its owners. Secondly, Freidman’s agency argument elaborates that the corporate executive is an agent of the stockholders of a company and would be exercising a distinct “social responsibility” of his own, if he were to spend the organization’s ‘money’ in a different way which does not complement the stockholders’ desires, or as how they would have spent it. In this sense, corporations must comply with their role as an agent of its stockholders by only conducting actions they desire. This ultimately is to increase profits by minimizing costs, because when management is hired, they are selected by stockholders of the business to facilitate management in such a way that would directly benefit the stockholders. In addition, Friedman states that a corporate executive does not have the social authority to make policy choices, and possibly lacks moral and social expertise, and should therefore avoid moral distractions by focusing on their specialized role of turning a profit. The Argument for CSR The Grassroots of CSR in Europe: Father Wilhelm Emmanuel von Ketteler, Count Albert De Mun & The Birth of Social Catholicism The grassroots of Corporate Social Responsibility were also prevalent in European history. In 1848, Father Wilhelm Emmanuel von Ketteler from Germany was initiating a new way of approaching the social and economic devastation caused by the Industrial Revolution2 . Through his ministry, he started a movement known as “Social Catholicism.” Identifying the early foundation of capitalism stained with ruthless competition and harsh individualism, he not only challenged the socialist and capitalist mindsets of his day, but also offered specific solutions which foreshadow current day management strategy. To note, at an assembly of German bishops on September 5, 1869, he listed the following, which, he maintained, “eliminate or at any rate diminish the evils of our present industrial system” – an early depiction of CSR values: 1 the prohibition of child labor in factories 2 the limitation of working hours for factory workers 3 the separation of the sexes in the workshops 4 the closing of unsanitary workshops 5 Sunday rest 6 the obligation to care for workers who are temporarily or permanently disabled 7 the appointment by the state of factory inspectors 2  Sister, 1953
  • 9.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 9 Continuing forward, Count Albert de Mun (1841-1914) a French pioneer in the Catholic Social Movement amidst the horrors of the Civil War, resolved to devote his life to serving workers. Among De Mun's most notable contributions to social reform in France was his decisive support for labor legislation. Through his speeches, articles, and organizations, he wielded a powerful influence in creating a public opinion favorable to state intervention to improve working conditions. As spokesman in the Chamber of Deputies for the conservatives who favored social reform, De Mun introduced many bills and amendments on labor questions, served on legislative commissions, and played a leading role in the debates on social laws. The program of laws which De Mun proposed may seem moderate enough today, but three decades passed before many of his recommendations were adopted3 . The reforms he advocated included the regulation of hours of work and the prohibition of night work for women and children, a fifty-eight hour week with a Sunday holiday, four weeks of rest for women after childbirth, compulsory accident and sickness insurance, old age pensions for farmers and for industrial workers, joint arbitration councils, minimum wages for sweatshop industries, encouragement of profit-sharing plans and cooperatives, the abolition of child labor, the protection of small rural holdings, and international cooperation on labor legislation. The Modern Day CSR Advocates The 20th and 21st century has begun to encompass transformations in perspective as opposed to those of Smith and Friedman, with opinions such as those of Joseph Stiglitz, former Chief Economist at World Bank and a Nobel Prize winner, who suggests that- “Whenever there are externalities–where the actions of an individual have impacts on others for which they do not pay, or for which they are not compensated–markets will not work well.” "I think it would probably be preferable to create clear standards of expectations, because "corporate social responsibility" are words that mean very different things for different people. Joseph E. Stiglitz, a 2001 Nobel Prize winning Economist Edward Freeman’s Stakeholder Approach In fact, dating back historically, there have been loyal and staunch advocates of the social responsibility of business much before it became engrained into mainstream business culture. As a world leader in business ethics and strategic management, R. Edward Freeman's foun- dational work in his book, Strategic Management: A Stakeholder Approach, published first in 1984, argues that management must balance its relationship amongst all stakeholders, or else, risks the sustainability of the firm. He reflects that corporations must not give prevalence to their shareholders over local community members, despite the inevitable truth that there will be occurrences when one group will benefit at the expense of others. Fundamentally, Stakeholder Theory is a theoretical explanation of how business actually oper- ates. The approach suggests that for any organization to be successful and sustainable, it has to create value for all its shareholders. This includes consumers, clients, suppliers, employees, local communities and shareholders. A key point it validates is that placing primacy to any one of these stakeholders in isolation translates to negligence. This is because the interests of all stakeholders must marry in alignment, and it is the respective job of management to examine and critically analyze how exactly these various interests will travel in harmony along the same direction. 3  Sister, 1953
  • 10.
    10 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group Stakeholder theory systematically analyzes the impact that organizations have on those who "affect them or are affected by them"4 . The company’s managers "should on the one hand manage the corporation for the benefit of its stakeholders in order to ensure their rights and participation in decision making and on the other hand management must act as the stockholder’s agent to ensure the survival of the firm; to safeguard the long term stakes of each group". Stakeholder theory is rising in application within multinational companies, who in many cases are more powerful than nations. These multinational corporations (MNCs) are able to recog- nize the distinct link between shareholders and long-term wealth. Moreover, companies and local authorities are realizing how important responsible management is, and thereby the significance of sustainable development. Considering how important all stakes are for a company to steadily survive in the marketplace, it is clear that sustainability is no easy feat for any organization today. Hence, Stakeholder Theory wisely suggests that a community of groups can together create something that no one of them singularly can create alone. ISO 26000 According to the Commission Green Paper (2001), CSR is a concept whereby companies integrate social and environmental concerns in their business operations and in their interaction with their stakeholders on a voluntary basis. Amongst other things, this definition helps to emphasize that an important aspect of CSR is the interactions enterprises have with their internal and external stakeholders- namely, employees, customers, neighbors, non-governmental organizations, public authorities, etc., as emphasized above. Notably, stakeholder theory is an important part of ISO 26000, which is the only international standard designed to provide organizations with guidelines for social responsibility. According to ISO 26000 an organization should: ƒƒ identify its stakeholders; ƒƒ be conscious of and respect the interests of its stakeholders and respond to their expressed concerns; ƒƒ recognize the interests and legal rights of stakeholders; ƒƒ recognize that some stakeholders can significantly affect the activities of the organization ƒƒ assess and take into account the relative ability of stakeholders to contact, engage with and influence the organization; ƒƒ take into account the relation of stakeholders' interests to the broader expectations of society and to sustainable development, as well as the nature of stakeholders' relation- ships with the organization; ƒƒ consider the views of stakeholders that may be affected by a decision even if they have no formal role in the governance of the organization or are unaware of their interest in the decisions or activities of the organization. Business’ Relationship with Society Posing a considerable argument for CSR, Mark Sagoff, one of America’s foremost environ- mental philosophers emphasizes that we must question whether what we want for ourselves individually as business entities is consistent with the goals we would set for ourselves collectively as citizens. Adding in to this perspective, Peter Singer, Australian ethical and political philosopher best known for his work in bioethics and his role as one of the intellectual founders of the modern animal rights movement, points out that when we humans change the natural environment in which we live, that we often harm ourselves. 4  Freeman, 1984
  • 11.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 11 These two key points inform us that the business as an entity does not operate in isolation- it in fact is fueled day in and day out solely on its interdependency with its community and all respective stakeholders. Thereby, it is evident that organizations have a special responsibility to protect the communities within which they operate - especially in preserving their very own self-interest. As evident, the role of business in society has borne a profound transformation in the last few decades. While companies have been given increasingly greater freedom, they have also been held responsible for a range of issues that were previously considered the sole responsibility of the state. At present, whether we accept it or not, business is expected to voluntarily promote efforts to mitigate climate change, protect human rights and safeguard the environment. Operating within a multi-tier economic, social and environmental playing field, the organization of today can no longer afford to conduct business in a solely linear fashion, as it has been accustomed to for so long. The Meaning of Corporate Social Responsibility Today Today, simply put, CSR refers to an institution which insists that companies as well as local authorities and offices voluntarily take into account the interests of social and environmental concerns in their business operations, and additionally also consider relationships with groups operating in their environment – namely, stakeholders. This model enables profit generating organizations to take into account social interests such as: environmental issues, honest relationships with customers and employees, owners and investors, suppliers, competitors and the local community. The modern concept of CSR was proposed in 1953 by Howard R. Bowen - who is considered as the "father" of CSR. In his book "Social Responsibility of Businessmen", he introduced for the first time the term "corporate social responsibility" and developed the first of its definition. His thesis was a basis for discussion on the phenomenon of social responsibility for a long time. According to Bowen’s definition, corporate social responsibility is a "duty of managers to implement policies and make decisions regarding business in a manner which is consistent with the goals and values of our society." Interestingly, during Bowen’s time, and even long after, it was assumed that corporate social responsibility was only an attribute entitled to entrepreneurs, as opposed to how it is embraced today – as an organizational duty. The first doctrine of corporate social responsibility was contrived by an American industrialist and philanthropist, one of the richest men of his time: Andrew Carnegie. Carnegie wrote that "wealth should be regarded as a sacred trust, managed by the possessor, into whose hands it flows, for the greatest good of the people". According to Carnegie, the concept of CSR is primarily based on the principle of beneficence, according to which the wealthy members of society should help those who are less privileged, such as the unemployed and the disabled, the sick and elderly. The idea of CSR expectedly also has its fair share of opposition. This includes, amongst others, Milton Friedman, who had a negative preconception about the interdependent relationship between the actions of society and the environment. His opinions were largely based on the belief that the ultimate goal of the enterprise should be to multiply its profits, with a key focus on shareholder expectations and realities of the free market - which are both based on consumer interest rather than public interest. Outlined in more detail, the debate against CSR suggests that a company’s activities should be focused solely on the implementation of economic assumptions, and not on moral actions. It further elaborates that CSR based decisions are often imposing, which can lead to unnecessary animosity among management. Despite the opposition which CSR faces today, it is becoming a practice which is emerging as crucial to long-term sustainability. Although there is no universal definition of a socially responsible company, usually it refers to an organization which operates with transparent
  • 12.
    12 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group business practices based on ethical values, compliance with legal requirements and respect for the community and the environment. Essentially, CSR propels that in complement to the prioritization of profit, the company is responsible for its whole impact on its surrounding communities and moreover, the planet. Specifically, the "people" it refers to are the company’s stakeholders who include: employees, customers, business partners, investors, suppliers, retailers, and both governmental and civil society. Conversely, stakeholders are increasingly expecting companies to adopt business conduct which is more environmentally and socially responsible. Today, more and more companies realize that in order to maintain efficiency and compet- itiveness in a rapidly changing business world, they need to become socially responsible. In the last decade itself, globalization has blurred boundaries in the marketplace, while the emergence of post-modern technology has accelerated time into an easily quantifiable commodity. Contemplating these changes in the corporate environment, there is an increasing need for companies to develop their risk management ability and to effectually protect the reputation of their brands, and due to the advent of globalization, embracing CSR practices positions organizations at a fiercely competitive level in attracting skilled workers, investors and consumer loyalty. A common misconception about CSR is that it merely subsists of community based philan- thropic and charitable services, which is entirely not the case. Although engaging in these types of initiatives is not irrelevant, as it allows companies to create a good equation with members of its local commu- nity, limiting CSR only to philanthropy can have a negative impact on organizational climate. Notably, an organization must be comprehensive in its CSR approach to include the governance of working conditions of employees and its external suppliers in addition to considering accountability for the environment it operates in. Distinctly, Archie Carroll was one of the first scientists to have made a distinction between the different types of organizational responsibility. He termed it as the “Pyramid of Corporate Social Responsibility” for corporations. Fundamentally, Carroll defined the primary duty of the enterprise to be its economic responsibility, which involves ensuring profitability. The second responsibility outlined in the model is an organization’s legal responsibility; its duty to act in accordance with the framework drawn up by the government and the judiciary. Following, the company’s third responsibility is an ethical obligation which comprises of remaining rightful to stakeholders and its own operating environment. Finally, the company’s fourth commission is its discretionary responsibility, which refers to proactive and strategic behavior that may help the company and the society, or both, such as contribution of resources to educational, cultural or social purposes. Why is CSR a Necessity Today? The conclusions of research on CSR progressively point to the evident fact that incorporating corporate social responsibility practices in business is crucial for the long-term stability of a company. Companies, who blindly and narrowly are enticed by the profit motive alone, without concern for a wide range of stakeholders, will face external discrepancies in the long term. Thus, companies must be able to understand the needs of their stakeholders in a broader sense and duly recognize them as interdependent factors to their success. For example, the stra- Discretionary Responsibilities Ethical Responsibilities Legal Responsabilities Economic Responsibilities Archie Carroll Model of Corporate Social Responsibility
  • 13.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 13 tegic management of human resources is interconnected to customer satisfaction, and it is essential for companies seeking to understand customer needs to align themselves with the fluctuating market by effective self-management. This is as success in the corporate world is not linear; there are several implicit factors which must be taken into consideration to arrive at a holistic perspective of what contributes to the sustainability of the enterprise. Duly, Corporate Social Responsibility is gradually gaining deserved importance in discussion of its broader role in society. Its emergent number of supporters rightfully draws attention to the clear impact of business on the world around us, and moreover to the fact that social and environmental concern is crucial for sustainable development and survival. In effect, the implementation of CSR practices within all facets of the organization is a key element to build lasting value and a competitive advantage in the marketplace. This is primarily due to growing expectations from society at large with respect to how business should be conducted in the 21st century. The Triple Bottom Line – Why CSR Cares about the Planet & People alongside Profits Fittingly so, the topic of CSR draws light to the triple bottom line. Contrived in 1994 by John Elkington, a world authority on corporate responsibility and sustainable development, the triple bottom line refers to the allocation of three distinct bottom lines which place emphasis on profit, people and the planet. The first one outlines the conventional summation of corporate profit, fundamentally, the bottom line of the enterprise’s financial profit and loss. The second refers to the organization’s account of ‘people’ which measures how socially responsible an organization has been throughout its operations in respect to its human capital. The third bottom line of the company aims to assess its impact on the ‘planet,’ configuring how environmentally responsible it has been. Parting ways with a one metric measurement of success, the TBL suggests that success can be defined otherwise. It offers a non-linear approach to organizational sustainability. Aiming to quantify and examine the financial, social and environmental performance of the enterprise, the TBL is a holistic approach to conducting business which is morally conscious and strategically profitable. Overall, the long-term benefits of corporate social responsibility should be examined when considering embracing a CSR based company culture. The following outlines how CSR impacts the 3Ps – Profits, People and the Planet: PROFITS • Maximizes profit due to sustainable business practices • Company growth and development • Increased competitive advantage in marketplace • Strong incentive for innovation & product development • Positive external and internal organizational reputation • Increased customer and investor interest • Increased customer and stakeholder loyalty • Increased reduction in costs due to operational efficiencies PEOPLE • Increased employee satisfaction and motivation • Increased interest of applicants • Greater talent attraction and retention • Positive organizational image among employees • Improvement of organizational culture • Improved public relations with community and local authorities • Increased employee engagement and consequent performance PLANET • Environmental risk reduction • Environmentally friendly products • Reduction of raw materials wastage • Reduction of pollution and greenhouse gas emissions
  • 14.
    14 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group Global CSR – The Brundtland Commission Due to the emerging recognition and interest in CSR amongst organizations and their stake- holders, the United Nations established The Brundtland Commission in 1983, aiming to unite countries to pursue sustainable development together. The result of the committee’s unison was a report published in 1987 that among others defined sustainable development as "development that meets the needs of the present without compromising the ability of future generations to meet their own needs". Moreover, the report clearly indicated the strong correlation between social, economic and environmental factors in respect to sustainable development as illustrated below. Social Environmental Economic EquitableBearable Viable Sustainable The Brundtland Commission also played a key role in incentivizing the formation many other organizations, initiatives and institutions designed to promote sustainable growth and social responsibility among societies and business. Economic dimension Social dimension 20101987 Social Responsible Investinf
  • 15.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 15 In 2010, the International Standardization Organization (ISO) launched a standard in address- ing sustainable development and social responsibility: ISO 26000, which is the only interna- tional standard designed to provide organizations with guidelines for social responsibility, as mentioned previously. This standard helps to clarify what social responsibility is, by helping businesses and organizations to translate principles into effective actions and shares best practices relating to social responsibility on a global scale. Its universal application allows for use of ISO 26000 in all types of organizations (small to large businesses, communities, NGOs, trade unions, etc.) regardless of their size, field of activity and location. Furthermore, ISO 26000 complies with several major international founding documents such as the Universal Declaration of Human Rights, the conventions of the International Labour Organization, which reflects its international accord. Social Responsibility: 7 Core Subjects More than 90 countries participated in the development of the ISO26000 standard, with more than 100 organizations actively taking part in the process in France alone. As an internationally communal tool available for all organizations, ISO26000 propels business practices which positively contribute to society at large. Additionally, it is important to note that many of the rules and best practices described in ISO 26000 may already be imposed by the current legis- lation system. In accordance, BPI group as a leading HR consulting firm, wholly acknowledges the necessity for CSR and hence took part in the standard development process and today continues to embrace CSR practices in its daily activities. Extensively, there are several potential areas of action for the inclusion of Corporate Social Responsibility in daily business practices. For example, each country can deem which activ- ities can be considered as a social responsibility, such as the degree of energy efficiency, establishing a code of ethics, the programs implemented for the local community, reliable information on labels, etc. Then, the consequent development of standards and appropriate regulations can encourage the implementation of CSR principles. Corporate Social Responsibility Methodology As mentioned, CSR activities are not limited to conventional volunteering and charity based work, which are relatively easy to implement and assess. CSR practices extend beyond the vicinity of frontline activities, as they include all exchanges of the company- both internal and external. Hence, it is crucial to adopt a systematic approach and methodology that clearly defines how to implement CSR. Some companies, like Danone and others, develop their own tools which guarantee continuous improvement, as they identify and prioritize both stakeholders and required action. Due to the fact that CSR commands long-term commitment, businesses may not be able to apply policies within all facets of operations. For this reason, organizations should decide which areas it will take action in as its first step. Next, once the company decides to engage in CSR activities, it should duly take the right steps to identify and create an action plan. CSR involvement decision-making The decision to become socially responsible can often be seen as a small step which is merely consequent to legal requirements. However, CSR means much more than that. It means a new way of thinking about company protocol. It entails thinking about the organization as an interdependent entity, not one which is entirely autonomous. Moreover, the decision to become socially responsible is a decision which requires company executives to have a great thorough understanding of the organization’s relationship with its direct stakeholders, and indirect stakeholders- the general public.
  • 16.
    16 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group An organization first needs to answer 3 key questions during the CSR involvement deci- sion-making process: 1) What is CSR? 2) Why do we want to do engage in CSR? and 3) What are the ultimate potential benefits and costs? Subsequently, only when executives are completely convinced of the necessity of CSR, will it become a part of the firm’s strategy. At this point, the right actions to be undertaken can be defined in order to achieve the company’s strategic goals. Definition and prioritization of stakeholders According to ISO 26000, when addressing its social responsibility strategy, an organization must understand three integral relationships: ƒƒ Between the organization and society An organization should understand how its decisions and activities impact society at large. An organization should also understand society’s expectations of responsible behaviour concerning these impacts. ƒƒ Between the organization and its stakeholders An organization should be aware of its various stakeholders. The decisions and activities of an organization may have poten- tial and actual impacts on these individuals and organizations. These potential or actual impacts are the basis of the "stake" or interest that causes the organizations or individuals to be considered stakeholders; and ƒƒ Between the stakeholders and society An organization should understand the rela- tionship between the stakeholders who are affected by the organization, on one hand, and the expectations of society on the other. Although stakeholders are part of society, they may have an interest which is not consistent with the expectations of society. Stakeholders have unique interests with respect to the organization which can be distinguished from societal expectations of socially responsible behaviour with respect to any issue. Once a company understands these three relationships, it is ready to define and recognize its stakeholders. A company should also take into account that the organization, stakeholders and society all have different perspectives. The primary step for organizations when prioritizing its stakeholders includes the assessment of the relationship between its stakeholders and itself, and moreover of the mutual impact they have on each other. Subsequently, the company can illustrate the result on a matrix, which helps to signify the dialogue from the two previous criteria. This includes: i. Engaging in dialogue with key stakeholders, little known or unknown; ii. Supporting information with important stakeholders, little known or unknown; iii. Continuing the dialogue with major stakeholders, and already well known. Definition and prioritization of actions and action plan In a similar manner to prioritizing stakeholders, a company should define and prioritize activities to undertake. The identification of relevant policy areas is a prerequisite for the determination of priorities of action. According to ISO 26000, an organization should "develop a set of criteria for deciding which core subjects and issues have the greatest relevance and are the most important." The policy should include the specifics of the organization, including an analysis of the current situation, in terms of risks, opportunities, strengths, and weaknesses. In order to design an apt plan of action to address priorities within the organization, a company should: ƒƒ Determine the importance of the issue - assess the risks and opportunities relating to action;
  • 17.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 17 ƒƒ Assess the current performance of the organization in this field (its strengths and weaknesses); Once a company defines and prioritizes its stakeholders and its consequent actions to execute, it is ready to define an action plan. This action plan should include all allocated resources to each respective action. At this point there are two challenges for HR, first, to define its own resources for implementation of action and second, to support others within the department during this process. Sustainable reporting & investment An important part of the decision making process when considering a long term investment is the comprehensive analysis of a company’s governance. Duly, many companies include their main assumption of management, long term strategy and CSR activities in their annual performance report along with additional financial information. The Global Reporting Initiative (GRI) founded in 1997 in Boston is a non-profit organization which was established to promote sustainable development and to provide Sustainable Reporting Framework for companies around the world. A sustainability report is an organi- zational report that gives information about economic, environmental, social and managerial performance. Internal benefits resulting from sustainable reporting include: ƒƒ Increased understanding of risks and opportunities ƒƒ Emphasized link between financial and non-financial performance ƒƒ Influencing long term management strategy and policy, and business plans ƒƒ Streamlining processes, reducing costs and improving efficiency ƒƒ Benchmarking and assessing sustainability performance with respect to laws, norms, codes, performance standards, and voluntary initiatives ƒƒ Sidestepping blame in publicized environmental, social and governance failures ƒƒ Comparison of internal performance, and between other organizations and sectors External benefits of sustainability reporting include: ƒƒ Mitigating - or reversing - negative environmental, social and managerial impact ƒƒ Improved organizational reputation and brand loyalty ƒƒ Enabling transparency to external stakeholders about company’s true value, tangible and intangible assets ƒƒ Demonstrating how the organization influences, and is influenced by expectations of sustainable development According to a survey conducted by GRI, Accounting for Sustainability and Redley Yeldar in 2011, over 80% of respondents share that additional financial information is very useful and relevant to their decision-making process when analyzing an investment. This reflects the need for comprehensive, transparent, and thorough information about company performance during the investment decision making process. In order to benchmark organizational sustainability performance, S&P Down Jones provides Sustainability Indices which assess how a company is performing – sustainability wise. The index is a response for increasing investor needs and an emergence of investor willingness to diversify their portfolios by investing in companies which embrace industry-wide best practices with regard to sustainability and social respon- sibility. In recent times, visible social and environmental changes and an incline in acknowl- edgement of all related issues played a strong incentive for investors to invest particularly in socially responsible companies and create a separate investment category known as Social Responsibility Investment (SRI). From 2007 to 2010 alone, SRI assets increased more than 13%, while professionally managed assets overall increased less than 1%.
  • 18.
    18 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group 5 Great Socially Responsible Funds 1. Parnassus Equity Income 2. Neuberger Berman Socially Responsible 3. Winslow Green Growth 4. Vanguard Intermediate-Term Tax Exempt 5. Domini International Social Equity Higher Education: Training for Top Management Another sign of societal evolution which depicts the growth of socially responsible thinking are schools and universities around the world which provide dedicated CSR and sustainable development courses. Specifically, the influence of corporate social responsibility on MBA programs is rapidly evolving as a result of the economic difficulties over the past five years. Following the 2008 financial crisis, and protests around the world against the perceived greed fostered in some industries, there has been an upsurge of blame placed at business schools for failing to ingrain the importance of CSR values on their students. According to the Association of MBAs, only 20% of UK MBA courses have a mandatory CSR module. Whereas, on the other hand, more business schools are beginning to provide CSR dedicated MSc and MBA courses. Global Ranking - Top 10 MBA Programs with Corporate Social Responsibility Curriculum 1. Harvard Business School, Harvard University 2. Stanford Graduate School of Business, Stanford University 3. INSEAD 4. The Wharton School, University of Pennsylvania 5. IE Business School, IE University 6. Columbia Business School, Columbia University 7. Tuck School of Business, Dartmouth College 8. London Business School 9. The Kellogg School of Management 10. Ross School of Business, University of Michigan
  • 19.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 19 CSR Rating Agencies: What is Their Global Impact? A 2010 Journal of Business Ethics Study by Steven Scalet & Thomas F. Kelly - Summary of Findings In the last two decades, there has been a pronounced growth of CSR rating agencies that assess corporations based on their social and environmental performance. Steven Scalet & Thomas F. Kelly investigate the impact of CSR ratings on the behavior of individual corporations in their study. They examine in particular to what extent corporations adjust their behavior based on how they rank. Their primary finding is that being dropped from a CSR ranking appears to do little to encourage firms to acknowledge and address problems related to their social and environmental performance. Specific rankings appear not to have a widespread effect of influencing firms to acknowledge negative CSR events and publicly present plans and actions to address them. Whether firms are well or poorly ranked, they appear to focus on and publicly discuss their “positive” CSR activities. The study discusses the wider significance of these results as well as the overall significance of CSR rankings for a global economy. It suggests that to fully understand the significance of CSR rating agencies for a market society, it matters to know their actual impact on corporate decision making. Regardless of the reasons that motivate agents to seek information about social responsibility, CSR rating agencies are an industry that has emerged to provide non-financial assessments to guide decisions for investors, consumers and many other stakeholders. Whether rating agencies are assessed from a strategic or larger moral perspective, the relationship between rankings and firm behavior is a fundamental concern for anyone interested in the development of the CSR movement and the impact of rating agencies on the social performance of corporations. An exchange between John Mackey, the CEO of Whole Foods Market, and the late Nobel Laureate Milton Friedman offers a particularly illuminating contrast between these two competing points of view. Mackey writes, ‘‘It is the function of company leadership to develop solutions that continually work for the common good.’’ Friedman responds: The differences between John Mackey and me regarding the social responsibility of business are for the most part rhetorical. Strip off the camouflage, and it turns out we are in essential agreement. [Whole Foods Market] has done well in a highly competitive industry. Had it devoted any significant fraction of its resources to exercising a social responsibility unrelated to the bottom line, it would be out of business by now or would have been taken over. Source: Scalet & Kelly, 2010 A CSR Must Read - Sustainable Excellence: The Future of Business in a Fast-Changing World by Aron Cramer & Zachary Karabell (2010) From their work with these Global 1000 companies, authors Cramer and Karabell know firsthand how business can successfully grapple with big-picture issues like resource scarcity, supply chain complexities, and the diverse expectations of government and the public. In Sustainable Excellence, they tell the story of how Coca-Cola and Greenpeace collaborated on a refrigerator that fights climate change. They show how companies like Best Buy and Nike are transforming the very products they sell to deliver more value to consumers with less waste. They recount how GE and Google created an innovative partnership that is developing "smart grids" that radically reduce energy use. And they show how business leaders like Starbucks' founder and CEO Howard Schultz put sustainable excellence at the center of his company's business strategy. Through these and other fascinating stories, Sustainable Excellence makes the case for a different way of doing business--one that will define both business success and economic vitality in the 21st century. Source: The Corporate Social Responsibility Newswire
  • 20.
    20 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group Morningstar Socially Responsible Investment Index The Morningstar Socially Responsible Investment Index was created jointly by Morningstar Japan K.K. and the Center for Public Resources Development, a non-profit organization. Companies are reviewed based on a thorough analysis of their performance on governance/accountability, market (consumers/ customers, suppliers), employment, social contribution, and the environment. (January 2012) FTSE4Good Global Index The FTSE4Good Global Index has been designed by FTSE, which is an independent company jointly owned by The Financial Times and the London Stock Exchange. Companies on the FTSE4Good Global Index have met stringent social and environmental criteria, and are positioned to capitalize on the benefits of responsible business practices. (September 2011) Dow Jones Sustainability Index (DJSI) The Dow Jones Sustainability World Index was developed jointly by Dow Jones & Company and SAM Research to assess corporate sustainability. Companies are reviewed based on a thorough analysis of economic, environmental, and social performance. (September 2013) Vigeo Vigeo assesses both the performance of companies and organizations and their level of Corporate Social Responsibility (CSR) management. They assess the degree to which companies and public corporations take into account environmental, social, and corporate governance objectives, which constitute risk factors and business opportunities for them in the definition and implementation of their strategy and policies. Oddo & Cie Oddo Securities propose analyses that generally take into account ESG issues which have a financial impact on the companies in their business sector. They also provide services that monitor the day-by-day non-financial news at companies. Ethibel Pioneer & Excellence Forum Ethibel, which maintains Ethibel Investment Registers, is an independent consultancy agency for socially responsible investments that advises banks and brokers offering ethical savings accounts and investment funds. Ethibel Excellence Investment Registers is a universe for the investment composed by highly scored companies from a social responsibility perspective. This universe is continuously updated and monitored. (October 2013) Standard & Poor’s Standard & Poor's Ratings Services, the world's leading provider of credit ratings, provides transparency not only on a company's financial fitness but also its environmental, social and governance (ESG) performance. They specialize in exploring how ESG issues affect creditworthiness. They have also established an Environmental Finance Global Industry Focus Team (GIFT) to promote the global consistency and analytic rigor of their environmental finance sector analysis, including global carbon markets, climate change finance and clean energy.
  • 21.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 21 International Lens – A National & Global Look into CSR chapter 2CSR in Canada Canadian organizations recognize the value of incorporating CSR prac- tices into their organizational infrastructures. This form of operating responsibly and ethically is a direct reflection of Canadian values which thrive on promoting and contributing to the sustainable development of domestic and global communities. Canada as a nation is a strong advocate of CSR. The Government of Canada requires and urges all Canadian companies working both domestically and internationally to respect all applicable laws and standards, to operate transparently and in consultation with local and foreign government policy in order to ensure business activities are conducted in a socially and environmentally responsible manner. The Government of Canada works with organiza- tions in the country, civil society groups, foreign governments and communities, as well as other stakeholders to foster and promote CSR thoroughly (Government of Canada, 2014). Canada’s CSR Strategy In March 2009, building on its long-standing commitment to the Organisation for Economic Co-operation and Development (OECD) and its Guidelines for Multinational Enterprises, the Government of Canada released Building the Canadian Advantage: A Corporate Social Responsibility (CSR) Strategy for the Canadian International Extractive Sector. This is enforced by the government’s belief that Canadian companies are often instrumental in bettering the lives of people in the communities in which they operate, as these comple- mentary initiatives will provide the tools, guidance and advice they need to meet and exceed their obligations with respect to corporate social responsibility. The specific initiatives are: ƒƒ Creating a new Office of the Extractive Sector Corporate Social Responsibility Counsellor to assist in resolving social and environmental issues relating to Canadian companies operating abroad in this field. A competency-based selection process will be launched shortly to identify qualified candidates for this position. ƒƒ Supporting a new Centre of Excellence to be established outside government as a one-stop shop to provide information for companies, non-governmental organizations and others. ƒƒ Continuing Canadian International Development Agency assistance for foreign govern- ments to develop their capacity to manage natural resource development in a sustainable and responsible manner. ƒƒ Promoting internationally recognized, voluntary guidelines for corporate social responsi- bility performance and reporting.
  • 22.
    22 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group The four pillars of the Strategy are: 1. Support for host country capacity-building initiatives related to resource governance and for host countries to benefit from these resources to reduce poverty; 2. Promote the following widely-recognized voluntary international CSR performance guidelines: ƒƒ The OECD Guidelines for Multinational Enterprises (DFAIT chairs and provides the secretariat for Canada’s National Contact Point for the OECD Guidelines); ƒƒ The International Finance Corporation Performance Standards on Social and Environmental Sustainability; ƒƒ The Voluntary Principles on Security and Human Rights; and ƒƒ The Global Reporting Initiative 3. The Office of the Extractive Sector CSR Counsellor; 4. The development of the Centre for Excellence in CSR1 . The CSR Strategy was informed by consultations undertaken with a number of stakeholders, including the "National Roundtables on Corporate Social Responsibility and the Canadian Extractive Sector in Developing Countries," as well as recommendations made by the former Standing Committee on Foreign Affairs and International Trade (SCFAIT). In 2006, the Government of Canada organized the multi-stakeholder National Roundtables, which provided an opportunity to encourage a practical and solutions-oriented dialogue on ways to expand the knowledge and capacity of Canadian companies to conduct their operations in a socially and environmentally sustainable manner. Active Promotion of CSR Canada’s network of diplomatic missions abroad actively promotes CSR guidelines through seminars, conferences, workshops and other activities involving companies, representatives of host governments and civil society; and provides advice to companies and stakeholders related to CSR. Canada promotes CSR in a number of multilateral fora including the OECD, the Group of Eight, the Asia Pacific Economic Co-operation, the Organization of American States, la Francophonie, and the Commonwealth. Canada’s efforts are further advanced by including voluntary provisions for CSR in its most recent free trade agreements (FTAs) and foreign investment promotion and protection agree- ments (FIPAs). Canadian companies, civil society, and government have been at the forefront of efforts to create a global consensus on responsible mining and sourcing practices to address the phenomenon of “conflict minerals” in the gold, tin, and tantalum and tungsten sectors. Canada supports the OECD Due Diligence Initiative for responsible supply chains of conflict minerals. In addition, Canada has provided strategic funding of key projects towards peace and prosperity in the Great Lakes Region and provided funding in the 2009-2010 fiscal year to 50 corporate social responsibility projects and initiatives in over 30 countries around the world2 . 1  Government of Canada, 2014 2  Government of Canada, 2014
  • 23.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 23 CSR in the U.S. CSR is recognized as a critical component to business operations by American organiza- tions today. The Corporate Social Responsibility (CSR) team in the Bureau of Economic and Business Affairs leads the Department’s engagement with U.S. businesses in the promotion of responsible and ethical business practices. As shared by the U.S. Department of State, the mission of the CSR office is to: ƒƒ Promote a holistic approach to CSR to complement the EB Bureau’s mission of building economic security and fostering sustainable development at home and abroad. ƒƒ Provide guidance and support for American companies engaging in socially responsible, forward-thinking corporate activities that complement U.S. foreign policy and the principles of the Secretary’s Award for Corporate Excellence (ACE) program. ƒƒ Build on this synergy, working with multinational companies, civil society, labor groups, environmental advocates, and others to encourage the adoption of corporate policies that help companies "do well by doing good." EB’s CSR team coordinates a cross-functional, intra-departmental, and interagency team to provide support and guidance on major areas of responsible corporate conduct, including: -- Good Corporate Citizenship -- Contribution to the Growth and Development of the Local Economy -- Innovation -- Employment and Industrial Relations -- Human Rights -- Environmental Protection -- Natural Resources Governance, including the Kimberley Process -- Transparency -- Anti-Corruption -- Trade and Supply Chain Management -- Intellectual Property -- Women's Economic Empowerment The Organization for Economic Cooperation and Development (OECD) is a unique forum where the governments of 34 democracies with market econo- mies work with each other, as well as with more than 70 non-member econo- mies to promote economic growth, prosperity, and sustainable development. Source : U.S. Department of State OECD Guidelines: Concepts and Principles 1. The Guidelines are recommendations jointly addressed by governments to multinational enterprises. They provide principles and standards of good practice consistent with applicable laws and internationally recognised standards. Observance of the Guidelines by enterprises is voluntary and not legally enforceable. Nevertheless, some matters covered by the Guidelines may also be regulated by national law or international commitments. 2. Obeying domestic laws is the first obligation of enterprises. The Guidelines are not a substitute for nor should they be considered to override domestic law and regulation. While the Guidelines extend beyond the law in many cases, they should not and are not intended to place an enterprise in situations where it faces conflicting requirements. However, in countries where domestic laws and regulations conflict with the princi- ples and standards of the Guidelines, enterprises should seek ways to honour such
  • 24.
    24 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group principles and standards to the fullest extent which does not place them in violation of domestic law. 3. Since the operations of multinational enterprises extend throughout the world, interna- tional co-operation in this field should extend to all countries. Governments adhering to the Guidelines encourage the enterprises operating on their territories to observe the Guidelines wherever they operate, while taking into account the particular circum- stances of each host country. 4. A precise definition of multinational enterprises is not required for the purposes of the Guidelines. These enterprises operate in all sectors of the economy. They usually comprise companies or other entities established in more than one country and so linked that they may coordinate their operations in various ways. While one or more of these entities may be able to exercise a significant influence over the activities of others, their degree of autonomy within the enterprise may vary widely from one multinational enterprise to another. Ownership may be private, State or mixed. The Guidelines are addressed to all the entities within the multinational enterprise (parent companies and/ or local entities). According to the actual distribution of responsibilities among them, the different entities are expected to co-operate and to assist one another to facilitate observance of the Guidelines. 5. The Guidelines are not aimed at introducing differences of treatment between multina- tional and domestic enterprises; they reflect good practice for all. Accordingly, multi- national and domestic enterprises are subject to the same expectations in respect of their conduct wherever the Guidelines are relevant to both. 6. Governments wish to encourage the widest possible observance of the Guidelines. While it is acknowledged that small- and medium-sized enterprises may not have the same capacities as larger enterprises, governments adhering to the Guidelines never- theless encourage them to observe the Guidelines’ recommendations to the fullest extent possible. 7. Governments adhering to the Guidelines should not use them for protectionist purposes nor use them in a way that calls into question the comparative advantage of any country where multinational enterprises invest. 8. Governments have the right to prescribe the conditions under which multinational enterprises operate within their jurisdictions, subject to international law. The entities of a multinational enterprise located in various countries are subject to the laws applicable in these countries. When multinational enterprises are subject to conflicting requirements by adhering countries or third countries, the governments concerned are encouraged to co-operate in good faith with a view to resolving problems that may arise. 9. Governments adhering to the Guidelines set them forth with the understanding that they will fulfil their responsibilities to treat enterprises equitably and in accordance with international law and with their contractual obligations. 10. The use of appropriate international dispute settlement mechanisms, including arbitra- tion, is encouraged as a means of facilitating the resolution of legal problems arising between enterprises and host country governments.
  • 25.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 25 France’s CSR Engagement Recent legal evolutions at the EU level The European Commission is encouraging European countries to integrate CSR into their poli- cies and practices of all public and private stakes. A proposal for a directive on the disclosure of non-financial and diversity information has been made in April 2013 (the examination by the European Parliament and the European Council is momentarily unknown). This proposal sets the necessity to make non-financial reporting compulsory. Over 18,000 companies will have to observe this new obligation (this comprises of companies with over 500 employees, companies whose statement of account is above 20 million euros, and companies whose turnover is above 40 million euros). Companies will have to provide non-financial information on environmental and social issues, on respect for human rights, on policies fighting against bribery, and on gender equity policies. For each, they should describe their policies, give an account on the results, and give an evaluation of the risks on these five issues and how they propose handling it. Although, the rule offers companies the possibility of not disclosing all information, provided they explain why they choose to opt out of doing so. With this proposal, it is very clear that extra-financial information is becoming a key element in the private market place. But, public companies also have to comply to some CSR obligations. A directive on public procurement has in fact been adopted on January the 15th 2014 (Le mieux disant met l'Etat au défi). It aims at enhancing CSR in public procurement processes. European countries are required to integrate non-financial criteria in their procurement processes, and to consider CSR during production and manufacturing. The public contract will also outline concerns about gender equity, balance between professional and personal life, environmental protection and respecting the International Labor Organization standards. This new directive has been reciprocated well in France thus far. In fact, a new public CSR initiative has been recently launched in the country, reflecting how Europe’s legal requirements are influencing and shaping the establishment of CSR amongst domestic businesses. CSR in France: a lens on the CSR platform In France, a law regarding extra financial reporting has been in place since 2001. It was followed by the two “lois de Grenelle” in 2009 and 2010, which make it compulsory for large organizations to publish an annual report on CSR. Under the influence of the European Union and after a continuous lobbying of diverse actors from NGOs to employee unions, France has arrived at a new agreement. On June the 17th 2013, the government launched the CSR platform. It aims at creating a space where all the actors concerned by CSR can share their point of views on CSR, talk about concrete actions that have been or should be put in place, all in order to reach a certain degree of coherency on this large subject. The government of France hopes that this new platform helps organizations to implement CSR actions in large but also small companies (La législation française en matière de reporting extra-financier). The ambition is to spread awareness amongst French citizens on CSR related issues. The platform is made of 48 members split into 5 different colleges which are organized by specialty: public administration, employer representatives and members of professional associations (national association of HR directors, college of CSR directors, etc.), unions, NGOs and lobbying groups, and researchers (two economists specializing in CSR, one expert on gender equality and another on HR). The president of the platform is Patrick Pierron, national secretary of CFDT (one of the five main unions in France) and he is primarily in charge of the government of CSR policies. Michel Doucin has been designated permanent general secretary of the platform. Since 2008, he has been ambassador in charge of bioethics and CSR. After several discussions, it has been decided that members could voluntarily join one of the three working groups. Each of the three groups will focus on a specific theme. The issues to be discussed are the following:
  • 26.
    26 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group ƒƒ CSR, competitiveness and sustainable development in SMB. This working group has three main objectives: -- Identify all good practices of companies with less than 5,000 employees; -- Try to define and measure the economic advantages gained due to CSR, and evalu- ate if measurement should vary between sectors and amidst the size of companies; -- Identify how to promote CSR in those companies and help them to integrate CSR actions into their practices. ƒƒ How to improve financial transparency and companies’ governance on sustainable development by integrating European and international legal evolution on the subject? -- Identify all the different legal frameworks on extra-financial reporting (at a national and international level); -- Identify the tools that could help gain leverage in the promotion of responsible governance, that could help share the added value of business, and that could help develop responsible finances. ƒƒ How to enhance responsibility of companies on their value chain, meaning on their subsidiaries and their suppliers? -- Enhance the development of responsible purchases; -- Promote fair competitiveness; -- Precisely outline the extent to which companies should be responsible towards their subsidiaries; -- Promote the adherence of international legal frameworks The following insights into CSR in Italy and Spain are shared as released by the updated edition of CSR Europe’s Guide to CSR in Europe. Offering an overview of corporate social responsibility (CSR) currently, the country insights have been developed by CSR Europe’s national partner organisations based upon their areas of operations. Topics covered in each chapter include national CSR policies and legislation, key drivers of CSR, main organisational actors, and recent developments in various thematic areas including environment, supply chain, human rights, equal opportunities, community engagement, and sustainable products and services (A Guide to CSR in Europe, 2010). CSR in Italy CSR Policies and Legislation After the Italian Multi-Stakeholder Forum launched by the Labor Minister Maroni in 2004-2005, there were no longer high level CSR initiatives by the national Government or Parliament. While initiatives were often promoted locally with a bottom-up approach by some Regions – Toscana, Umbria, Marche, Emilia-Romagna – with very active legislation and programs. The current Minister of Labor and Social Affairs, Sacconi, published in 2009 a White Book on the Future Social Model, focusing on subsidiarity, employability, health and safety and equal opportunities. On the other hand, the activities of the Foundation I-CSR, established by Maroni to promote CSR, were further scaled down. The debate around the “social market economy” has been recently gaining ground, with the powerful Economic Minister Tremonti committed to promote, in collaboration with OECD, “global legal standards” based on propriety, integrity, transparency. Also having the Italian Tajani as Commissioner of DG Enterprise and Entrepreneurship might represent an opportunity to revive government interest in CSR.
  • 27.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 27 Key Drivers of CSR The key CSR drivers in Italy currently are climate change, safety in the workplace, high unemployment with youth unemployment also hindered by skill shortages, an increasingly diverse workforce (ageing population, lowest female activity rate in Europe, lack of culture in the integration of a large number of immigrants, up until a few decades ago many Italians were emigrants). Degree of Public Awareness on CSR Awareness with the public at large is growing, but their understanding remains relatively limited. On the contrary, in the most progressive sectors of the business community, accord- ing to a recent survey (link) conducted by Fondazione Sodalitas with the CEOs of 45 leading companies about the future of CSR in Italy, substantial progress has been achieved recently in integrating responsible and sustainable competitiveness into company strategies and related mainstreaming practices. Environment ƒƒ National Action Plan: Italy, as an EU country, signed the Kyoto Protocol in 2001 and it also now belongs to the EU ETS schemes. Italy approved on April 28th 2010, the CO2 Emissions National Allocation Plan for the new plants of the ETS system, effective from 2009 until 2012. Italy approved on June 11th the National Action Plan for Renewable Energies and Energy Efficiency, requested by the European Directive 2009/28/CE, which foresees that Italy will achieve the 17% target of renewable energy use by 2020. ƒƒ Main Environmental Challenges: Key challenges include the dominance of oil/gas as energy supplies, inefficient waste management (high level of waste production, still low recycling rates in many regions, predominance of landfill disposal) and water scarcity in several regions. The most relevant environmental challenges are: costal erosion; sea level rises along the costal areas; air pollution, mainly in the Pianura Padana geographic area, and in the cities located in this region. Levels of PM10 and other pollutants are often higher than maximum permitted levels. ƒƒ Energy and Eco-Efficiency: Companies and sectors (such as glass, ceramic and cement industries) which are expected to reduce their gas emissions have been identified and their reduction targets assigned. In recent years, the progress in achieving Kyoto objectives has been slow at the national level, due to reluctance by businesses and government due to their claim that it could be damaging for an economy still relying heavily on manufacturing. However, the economic crisis had a positive impact in the CO2 emission reduction, and it’s now foreseeable to achieve the Kyoto target (-8% for Italy). The renewable Energy sector grew thanks to the introduction of an incentive scheme (“Conto Energia”) that is the most generous in Europe. It is estimated that the production of renewable energies by 2008 was 60,5 TWh, while by 2020 107 TWh should be produced (a majority of this derived from hydroelectric) in order to meet the targets of the action plan. Public Awareness on Environment Regional and local levels demonstrate good awareness and carry out successful initiatives. There are different forms of incentives for private citizens and for companies: Green and White Certificates, “Energy Account” and detraction from taxes. Consumers are becoming greener, but this is still a relatively recent phenomenon. At a National level, there is an increas- ing awareness of this issue: the Ministry of the Environment has recently launched the SCP (Sustainable Consumption and Production) Strategy in order to favor and spread models of sustainable consumption and production.
  • 28.
    28 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group Supply Chain There are no national programs or partnerships related to supply chain control, while manage- ment systems are widespread with Italy ranking number one worldwide in SA8000 certification. Several suppliers of big companies are involved in the control process. Additionally, many Tuscan SMEs are certified through the regional Fabrica Etica process. Requirements on control of environmental aspects are also becoming increasingly important. Human Rights Italian laws, in general, respect ILO standards on human rights and working conditions. The rights of employees are described in the Law of Work Protection covering work safety, trainings and working conditions. An important document that has been published and diffused is the “OECD Guidelines on CSR focusing on SMEs”promoted by the Italian Foreign Ministry in the context of the project “Sustainable development through the Global Compact”. Equal Opportunities Gender equality is an especially important issue in Italy, as women’s activity rate is considerably behind the rest of Europe. Commitment by companies to well structured diversity management programs is still rather limited. A big step forward has been the launch in October 2009 of the Italian Diversity Charter by leading business networks and the network of Equality Bodies, with the patronage of the Ministries of Employment and Equal Opportunities. By September 2010, about 80 companies, employing more than 500.000 people had signed the Diversity Chart. Conversely, integration of immigrants and foreign workers is well developed in some compa- nies, especially those with a high percentage of foreign employees. Community Engagement ƒƒ Perceived role of businesses in the local community: Italy has a long tradition of company philanthropy, evolved in time from paternalism to partnering with NGOs. ƒƒ Cooperation between local communities and businesses: There is encouraging growth in Corporate Foundations, established also by SMEs, to enhance effectiveness of philan- thropic programs. The first baseline survey on Italian Corporate Foundations, conducted in 2009 by Fondazione Sodalitas in partnership with Università Cattolica and Fondazione Giovanni Agnelli, allowed this emerging community to surface and profile its key features and challenges. Employee volunteering, first adopted by multinationals, is gaining ground also with Italian companies, including SMEs. Sustainable Products and Services The number of SMEs working on sustainable products is growing, especially in the mass market. There are also some good examples of innovation in the service sector (especially for waste management and green energy). The new Sustainable Products and Services Program of the Ministry for Environment is promoting Green Public Procurement and local programs to increase green consumer policies. In this respect, a working group between different levels and departments of Government, Control Bodies, NGOs and best practice companies was recently established. Main CSR Challenges The main CSR challenges in Italy are engaging public authorities in the CSR debate and enforcing a strategic approach towards CSR involving the organization as a whole, especially the products and sales departments.
  • 29.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 29 CSR in Spain CSR Policies and Legislation Spain’s national government has been gaining prominence in CSR areas, especially during the last 4 years and some important legislation has come into force: ƒƒ LISMI. Ley 13/1982, Law for the social integration of handicapped people, among other measures it establishes the obligation of hiring a minimum quota of 2% of handicapped people in companies with more than 50 workers. (It also establishes alternative measures). ƒƒ LO 3/2007 for the effective equality between women and men. Organic law passed in 2007 that pursues to guarantee the effective equality between women and men within all fields, especially within the labor market. ƒƒ Ley 30/2007 on Public Procurement and PRE/116/2008 the Green Public Bid Plan of the ƒƒ General Administration of the Government and its Public Bodies. Environmental and social criteria are included under certain requirements for the hiring of Civil Servants. ƒƒ Royal Decree 221/2008 by which the State Council of Social Responsibility of Companies is set up3. It’s a multi-stakeholder advisory body for the State Government regarding CSR that includes representatives from different key areas for CSR such as public administra- tions, enterprises, trade unions or organizations and institutions focused on CSR. ƒƒ Royal Decree 1615/2009, for regulating the granting and use of the distinctive “Equality in the Company.” At a regional level, there have been some interesting initiatives like a Corporate Citizenship Law in Valencia (11/2009 of 20 November), a bill of law of steward- ship and governance in Baleares and a bill of law of CSR in Extremadura. Key Drivers of CSR According to the 5 working groups created in the State Council, there are 5 key areas in Spain: ƒƒ Diversity management, social cohesion and cooperation development ƒƒ CSR to face economic crisis: CSR contribution to productive economy ƒƒ Transparency, communication, CSR standards and Reporting ƒƒ Social Responsible Investment ƒƒ Integrating CSR in Education Scheme. Main CSR Actors The main state actor is MTIN, Ministry of Labour and Immigration, who is in charge of CSR. Spanish regions (Comunidades Autónomas) are also approaching CSR in a formal way. Islas Baleares (Balearic Islands) has created the Dirección General de RSE4. Other regions such as Cataluña, País Vasco and Andalucía are taking action. Other organizations pushing forward CSR agenda are: ƒƒ Forética as a multistakeholder organization (including companies, NGOs and universities), ƒƒ Club de Excelencia en Sostenibilidad as a business organization, ƒƒ Asepam, the Spanish association of Global Compact or the different CSR Observatories promoted by workers and NGOs. Degree of Public Awareness on CSR In relation to CSR awareness, Spain has a long way to go. According to Informe Forética 2008 90% of big companies know what CSR is about but only 49.3% of small companies carry it out. In this sense, CSR is present in the vision, mission and strategy of most large companies in Spain. Nearly 80% of them have generalized policies on the subject and the creation and consolidation of specific units within the organization. On the other hand, only 48.3% of Spanish consumers could identify what CSR was according to the same report.
  • 30.
    30 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group Media Coverage CSR specialist media has been developing in recent years, especially online. Broader media are just starting to cover CSR (normally within special reports). The economic crisis has rein- forced media interest on CSR as it’s seen as a way out of it. Environment In 2007, the Spanish Government developed “Spanish Climate Change and Clean Energy Strategy” in defining ongoing actions and establishing objectives together with a follow-up plan, assessment and verification. For public procurement please refer to section 2. Among main Environmental Challenges are greenhouse gas emissions, water availability, demographic change, as well as unsustainable urban development. In the National Climate Change and Clean Energy Strategy there is one chapter dedicated to Energy Efficiency, with objectives, measures and indicators. Foretica’s report or Informe Forética 2008 shows a consensus on the origin of Climate Change; more than 80% of the people interviewed acknowledged it and agreed that it has been produced by human activities together with natural phenomenon. Supply Chain According to Informe Forética 2008 Spanish companies are aware of the importance of complying with Human Rights in their Supply Chain and with their workers (and so do customers) and it appears as one of the top issues to label a company as socially responsible. Nonetheless, only 12% of companies develop any kind of social or environmental audits for their suppliers to monitor if they are working on it. Human Rights No big problems in relation to Human Rights in companies operating just in Spain, medium risk in relation to immigrant workers, especially in the construction sector. Multinational companies are working hard on these issues abroad, especially in relation to supply chains. Multi-sectoral research conducted by Club de Excelencia en Sostenibilidad shows that implementing Suppliers Code of Conduct has become an increasingly common practice in enterprises in order to protect their own public reputations. Equal Opportunities Although strong public involvement (with initiatives such as the Equality Ministry, Organic Law for the effective equality between women and men, Diversity Charter,…) is still one of the biggest issues in Spain. Big companies, with more than 250 employees, are compelled to develop equality programs but there are also voluntary initiatives both public (Distinction of equality) or by other organizations (i.e. Charter de la diversidad). Community Engagement Community Engagement is extensively developed in Spain especially thanks to Savings Banks and their social programs, and thanks to the Foundations created by big companies which work hard in this area. Sustainable Products and Services According to Forética’s report (Foot note 1) nearly 40% of Spanish consumers have given up buying products produced by irresponsible companies. Around 55% declared that they would pay more for a product from a responsible company if they could be 100% sure about it. Another report on the issue was published in 2008 by CECU11 (Consumer associ- ation) Another research study published by Club de Excelencia is “Consumo Responsible y Desarrollo Sostenible”. Company Best Practices Best practices presented to the 2007 and 2008 CSR Spanish Marketplace El Mercado de la RSE carried out by Forética can be downloaded, and organized by up to 12 categories.
  • 31.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 31 Club de Excelencia en Sostenibilidad has joined best practices in the field of CR in the “Best Practices Catalogue in Corporate Responsibility”. Main CSR Challenges The main challenges are to bring CSR to SMEs, and to generate greater consumer awareness. Club de Excelencia en Sostenibilidad in collaboration with PWC and Madrid City Council has developed an initiative to help SMEs plan their strategies on CSR15. Specific CSR issues could be equal opportunities and CSR management, and the relation of CSR to the economic crisis. The Role of CSR in India India is widely regarded as a country in which corporate social responsibility has long played an important role. National and international nongovernmental organizations and UN agencies are involved in the public debate in the business community and the media. However, the involvement of the business community is concentrated among a few long-established family-owned companies that contribute a significant amount in the field of CSR, in both theory and practice. The Indian subsidiaries of German companies are bound by their parent companies’ guidelines for socially responsible behavior, but how these guidelines are actually implemented is left up to each subsidiary. Their CSR activities focus on their employees (providing training and improving social security), the environment and aid efforts within India or in the region, which are currently concentrating on providing help to tsunami victims. Public policymakers are seeking to achieve inclusive and sustainable growth, and calling on private enterprise to contribute its share. There is no evidence of CSR activities in the informal sector of the Indian economy, which is responsible for slightly less than half of GDP and employs some 93 percent of India’s workforce. Indeed, workers in this sector are afforded no rights or protections whatsoever, and all indications are that no efforts are being made to fight poverty, promote education or health, protect the environment or encourage employee participation in business development. The UN Global Compact seeks to promote the CSR activities of businesses in India. However, it has not succeeded in involving important NGOs, or most importantly, the unions. The UN Global Compact is not well known within the business sector or the NGO community. For some time now, German development organizations (GTZ, InWent) have been cooperating closely with the country’s important trade associations. The Indo-German Chamber of Commerce has developed its own approach to CSR, and provides conceptual and advisory support for German companies in India. While CSR is not at the top of the agenda of German political foundations, some of them are starting to devote more attention to this area. The German government, represented by the Ministry of Labor, is working to achieve greater international cooperation on CSR under the Heiligendamm Process, which includes India as one of five outreach countries. Talks have been held in the context of a formalized partnership between Germany and India. Representatives of the German business community meet with embassy officials at least once a year, during their monthly business lunches, to discuss CSR. Source: German Embassy, New Delhi
  • 32.
    32 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group The Role of CSR in China Corporate social responsibility (CSR) is receiving more attention in China, although it still plays only a marginal role for the majority of Chinese companies, particularly private ones. Large state-owned companies and companies that invest in China are expected to increase their social involvement, which will no doubt have an effect on small and medium-sized enterprises as well. Foreign companies have traditionally been active in this area, and they are increasingly involved in environmental and labor-protection projects. Generally they are guided by their own corporate standards. As domestic and foreign private companies engage in direct competition, they are recognizing that social responsibility can be used as a tool in marketing their products and increasingly resonates with the growing middle class, which has the resources to purchase these products. CSR receives little media coverage. After the Sichuan earthquake in the spring of 2008, however, it was obvious that the efforts of domestic and foreign companies were recognized and appreciated. Source: German Embassy, Beijing The Role of CSR in South Africa ICompanies’ social responsibility is an important topic in South Africa with respect to the economy, the state, and public opinion. There is active support from the government as well as domestic and foreign companies. In response to a 2005 survey by Trialoge of more than 100 stock exchange-noted companies in South Africa, 73.5% of those surveyed said that they take corporate citizenship “very seriously,” 24.5% said that they take it “seriously.” The social involvement of companies in South Africa reaches back to the time of social grievances during apartheid. Until 1994, many companies invested actively in social initiatives since the state saw no need to act on behalf of the colored groups in the population. Business recognized that the poor living conditions of the black majority were putting the brakes on economic development. In this context, the “Urban Foundation,” which was established in 1976 (today: National Business Initiative, NBI) set as its goal the improvement of the quality of life of the black communities. Since 1994, political change and the efforts to balance out the unequal distribution of wealth from the times of apartheid have driven CSR forward in South Africa. Decisive for the involvement today is the “Black Economic Empowerment Act” (BEE) of 2003, which was set up by the government and specifies the advancement of historically-disadvantaged groups in the population. Especially the “Corporate Social Investment” guidelines of the BEE have a supporting effect since with their assistance, CSR programs are formalized and the results can be communicated. In 2003, companies spent 2.35 billion RAND (approximately 193.4 million EUR) for social programs in South Africa. Companies’ expenditures in the CSR sector thus correspond to approximately half of what international donors gave for comparable activities, however only 1% of the total that the state invests in social projects each year. The trend indicates increasing expenditures in the CSR sector. Sources: German Embassy, Pretoria / Stef Coetzee, CSR-Towards a new paradigm
  • 33.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 33 CSR’s Influence on Human Resource Management chapter 3Today, as organizations face economic crises, structural upheaval, societal changes, environmental degradation, inter- nal and external conflicts, they are seeking for a concrete solu- tion which may offer sustainability in the days to come - a solution w h i c h provides value in creating a better today and an even better tomorrow. With CSR emerging as the novel approach to conducting business currently, it is becoming more apparent that the pull between organizational goals and CSR based goals is a product of the aim to co-create both private and public value. A 2012 Harvard Business Case Paper, Why Every Company Needs a CSR Strategy and How to Build It, proposes that: “The heart of CSR’s concept rests on the ability of a company to create private value for itself, which in turn creates public value for society.” It continues to elaborate a key reality for organizations who seek to adopt CSR into the core of their business operations – a point which examines the analysis of value creation. For example, top management of large corporations who are required to inexcusably adhere to their business’ figures will not place the concept of creating shared value at the top of their priority list. Whereas, when concerning smaller players in the marketplace, namely, smaller organizations, it would not be financially viable to pursue identical CSR goals which market leaders, and expectedly, larger, more successful organizations seek after. Hence, in this situation, the kind of shared value a smaller organization would strive for would have to be streamlined and more appropriately outlined in order to truly benefit proportionately from the value it creates through its CSR efforts. Issues such as these are exactly why the application and integration of CSR requires the involvement and mediation of the HR function. The bottom line is essentially that the effective and active integration of CSR influences and impacts all company activity, deeming it as a substantially demanding process in which HR plays a key role. The collaboration of CSR with HR management efforts will lead an organization to several fundamental changes concerning objectives, priorities, and respective course of action required. Ultimately, this will necessitate a strong commitment and acknowledgement of the necessity of the proposed changes from top management as well as from each key player within the HR management team. Looking back for example, the history of strategic integration of CSR values dates back to at least the 19th Century in the UK where the innovative working practices of Quaker organiza- tions such as Cadburys and Rowntree Mackintosh put employee welfare and ethical behavior at the heart of their business values (Rangan, Chase, Karim, 2012). As mentioned in the introduction, HR plays a significant role in leading and coordinating various aspects of CSR. This is as social responsibility is directly related to a company’s values, as it naturally involves people and their relationships. Identically, organizational culture greatly influences how people interact and their following contributions to society, as the nature of a company’s internal culture determines how employees view CSR related issues. According to Fernandez, Junquera & Ordiz, organizational culture and HR decisions are critical components for creating a sustainable competitive.
  • 34.
    34 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group Moreover, several CSR based guidance standards, such as ISO 26000, directly involve the integration of socially responsible values into HR management. These include the efficient and effective use of human resource capital, intellectual and competency development which contribute to sustainable development and compliance with human rights and justice among people. The HR profession has a three-fold role in CSR. Firstly, HR needs to make sure people management practices are ethical and in alignment with the organization’s long-term objec- tives. Secondly, it needs to implant corporate responsibility values by providing the right support and training. To execute this effectively, HR has a role in learning and developing its scope in the years to come. Next, the third and most critical aspect involves embedding CSR ethics into the organizational culture itself. This is where the question of strategic management comes into play, which is primarily about being able to ask and address challenging questions – at top management level. According to the Global Reporting Initiative, which provides 79 environmental, social, and business performance indicators measuring sustainability, there are as many as one-third of them which fall under HR’s responsibility. Taking into account the stakeholder’s approach of CSR, undoubtedly, employees are defined as the key stakeholder group and their perspective on CSR can be summarized to include fair remuneration, effective communication, learning and development opportunities, fulfilling work, a healthy and safe working environment, equal employment opportunities, job security, competent leadership, community spirit and social mission integration. Considering that the adoption of CSR requires many changes in company philosophy and employee behaviour, HR can assume the role of the change agent. Tailored work design, training, performance and rewards management can be novel ways to facilitate the change arising from the newfound CSR strategy. HR in the Change Management Process To successfully incorporate CSR strategies into organizational operations, they need to be carefully integrated into a company’s strategy, structure, culture and processes. During this course, a key challenge CSR poses to organizations is the transition from a target driven culture to a value driven culture. This requires a company to revise its strategy, mission, and values, and to provide a message to all stakeholders about internal reorganization, and company goals and priorities, which will ultimately result in a shift of activities, behaviours and perceptions. Likewise, considering that social and human related matters are key facets of CSR, the active role of HR in the process of the company’s strategy revision is evident to say the least. As a department which has regular exchanges with all divisions across the organization, HR is well positioned to provide an objective view across units. Moreover, if a navigation committee is to be formed, the HR function should be playing a critical role on it. HR’s Role in Shaping CSR Recent research shows that HR is not currently recognized as a true partner in determining sustainability strategy, nor is HR a key implementer of sustainability programs. In a survey of more than 700 corporate social responsibility (CSR) and HR professionals in the United States, only 6% of respondents confirmed that HR was involved in developing CSR strategy and 25% maintained that HR was involved in implementing CSR strategy. Yet, 89% of respondents said that CSR is important for attracting top talent, improving employee retention (85%) and developing the organization’s leaders (81%). This demonstrates a significant disconnect—and an opportunity for human resources to bridge the gap. The HR function clearly has an impor- tant role to play in designing and implementing CSR strategy, but it has not yet achieved an influential position as it must seek to do in tomorrow’s workplace. The Power of Leadership in Delivering CSR Values Leaders, as figureheads and controllers of human resources, have a strong influence on employee behaviour - so also on their commitment to CSR. Hence, it is essential that senior
  • 35.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 35 managers embody and embrace pro-CSR attitudes and behaviours in their daily activities – as they must "walk the talk" and act as a leading example for their employees. Otherwise, there is a real risk of decline in employee engagement which may impede successful implemen- tation and development of CSR policies within the company. As we are able to witness, HR has a major impact on CSR, as it plays a role in the recruitment of managers and leaders of the organization. Therefore, HR can continue to foster a pro-CSR perception amongst top management by recruiting candidates with both transformational leadership characteristics to provide vision, engage stakeholders and drive changes and transactional leadership qual- ities to coordinate tasks, manage information, control finances, set objectives and monitor efficiency. Education and communication The effective implementation of CSR practices requires thorough commitment and the contri- bution of all employees within the organization; not only top management, as often assumed. Thus, a detailed plan outlining all activities related to communication, education and overall awareness of CSR related matters is crucial in establishing a clear channel of exchange with employees. HR needs to serve an educative role in raising social consciousness in areas such as ethical management, leadership, performance management, non-discrimination and well-being. Talent acquisition and development The effective implementation of CSR initiatives relies on well-informed, experienced and devoted employees with CSR-oriented values. According to a report published by Net Impact in 2012, 72% of students share that a job where they can make a social or environmental impact is an important life goal to them - ranking above having children, wealth or a prestigious career. Moreover, 35% of them said they would take a 15% pay cut to work for a company committed to CSR. Hence, as evident, it is essential to promote a company’s CSR activities to all stakeholders including prospective employees, as CSR is a highly respected and valued organizational practice in today’s business world. This is partly because it directly has a significant impact on strategizing wage related matters and on the recruitment process itself. The exercise of explicitly embracing CSR activities clearly indicates the overall values of the organization and any CSR-specific job requirements and thus should be compulsory as part of an organization’s CSR culture. Likewise, to complement organizational CSR practices, HR can utilize personality tests to configure applicants’ characteristics and values during the process of screening applicants. Then, after acquiring suitable talent, it will become the organization’s responsibility to provide training and development programs to help the employee understand, adopt and contribute to progress in CSR initiatives. Employee engagement Employee involvement contribute to CSR in multiple ways. One of the important part of CSR is quality of employee’s work-life that results also from engagement. "Organizations around the world are discovering that corporate social responsibility (CSR) is a powerful way to encourage employee engagement". Many international companies encourage employees to do volunteer work, as this not only gives them a sense of purpose and engages them with their employer, it also provides them with new skill sets, which in turn can be useful to the business". Taking into account the fact that high level of employee engagement reduce turnover, improve reten- tion and productivity, crucial becomes for human resources departments involve employee in CSR initiatives Moreover, effectively managed CSR activities could in some cases substitute trainings and thereby it influenced also development and training strategy. Performance and reward management Compensation and performance management are critical components of the HR function in determining the long-term sustainability of an organization’s most coveted resources - its
  • 36.
    36 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group people. In effect, HR practitioners understand very well that "what gets rewarded gets done," as detailed from the Expectancy Theory, which fundamentally propels that organizations must relate rewards directly to performance in order to nurture and foster greater heights of produc- tivity. Providing employees with appropriate compensation acts as a catalyst to motivate their behavior to achieve company goals. Thus, HR has significant influence over work design and should work closely with line departments to serve as the coordinator for matters on job description and specification and job evaluation. The total reward and recognition program, including base salary, incentive pay, long term incentives and other non-monetary recognition benefits (such as award programs, employee of the month, promotions, career path planning, etc.), needs to be aligned with the company’s CSR values and strategy. It is essential to set CSR related goals between the supervisor and the employee to ensure that they both truly understand how to accomplish their objectives and also how to measure their achievement. This allows both the supervisor and employee to feel a greater sense of commitment to their goals – a key in paving way to increased productivity and engagement. Ethics management – Promoting ethical practices When approaching CSR, it is important to avoid defining it to merely legal compliance, as it also comprises of "ethical behaviour that goes beyond the letter of the law," as ethics are almost an inherent part of all HR policies and processes affecting employees’ work-life and livelihood. Areas of internal ethics management include: respect for human rights, embracing diversity, providing equal employment and rewards, and opportunities to employees and job applicants irrespective of their demographic characteristics. Moreover, building an organizational culture which supports ethical behaviour impacts both the organization and its external stakeholder community. Notably, it is imperative to consider that there is a risk of overemphasizing only the financial aspect in respect to ethical CSR related issues because matters such as employees adopting unethical practices involving providing misleading information to customers to get sales or making up fictitious accounts to fool management into believing their superb perfor- mance are given precedence over other matters. Hence, HR should play a significant role in the management of ethics through developing policy and procedure manuals on employee terms and conditions, suggesting expected employee conduct to guide behaviour, and including ethical standards indicators in the performance and rewards management system. Monitoring The performance management system, CSR monitoring and feedback, which can be termed as the CSR audit, involves the administration of all CSR-related activities such as the management of individual CSR-related performance assessments. With the direction for more socially, environmentally, and ethically conscious organizations, it has become a rising trend to hire an external CSR auditor. Before an organization hires an external consulting company to review its CSR performance, the HR function should first internally review how well it has contributed to CSR initiatives. Once HR has done this thoroughly, the scope of long-term success in other CSR-related activities can be expected to substantially increase. During this process, the information required to review CSR policy and activities, can be gathered by using a questionnaire or survey amongst employees involved in CSR or influenced by CSR activities. With this information in hand, HR can compare its organization’s CSR performance against generally accepted or pre-set standards and its own organizational core values, as well as against the specific needs of stakeholders to determine which areas are thriving and which areas require improvement. Revision and Institutionalization For activities/areas which are not meeting their previously set goals, it is crucial to investigate the respective root causes, entirely understand them, find practical solutions, assign adequate resources and rectify them. Sometimes when certain activities fail to meet their set benchmark, it could require appointing more realistic CSR goals, postponing them to the next fiscal period or investing in strong support initiatives such as effective education and training.
  • 37.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 37 In addition, CSR policies and processes may need to be revised to rectify previous inade- quacies and oversights in order to acknowledge change in circumstances. In other words, weaknesses identified during the CSR audit provide a basis for revisiting and revising the planning and implementation process. On the other hand, for CSR areas which are successful in meeting their goals, it is essential to institutionalize their respective initiatives, associated structures, processes, learning, and support systems in order to set an example for similar future CSR endeavours. This can help in establishing formal, integral and sustainable standards, as clear documentation on effective practices outlining how things should be done are a vital tool for any organization seeking to maintain and develop their CSR initiatives. On the other hand, failed CSR attempts also provide valuable learning opportunities, and so it is important to also note "what not to do." HR challenges: improving HR policy Due to the fact that HR is crucial for implementing CSR policies and best practices, it is very important to rightly examine and manage CSR-HR policy. This is because CSR-HR policy supports not only risk, but also opportunity management. Four central challenges HR faces when directing and improving CSR and HR policy: 1. The HR Department’s internal issues 2. The lack of clear social responsibility framework in the HR policy 3. The lack of support and commitment from top management and employees 4. The obligation to comply with the law According to a survey conducted in an accounting firm of 500 executives in 2007, half shared that environmental and sustainability issues were the responsibility of Operational Departments rather than HR. In the same year, a CSR Pilot Study conducted by the Society of Human Resource Management in the US found that only 34% of HR respondents monitor the CSR aspects of business within their organization. To overcome these challenges, HR practitioners should first recognize CSR as a fundamental responsibility within their scope of operations. Only when HR professionals themselves fully acknowledge their critical role in administering CSR within their organization, will they be able to convince top management to assign them with the role of a CSR champion. Progressively influencing an organization’s CSR practices is definitely not an overnight feat. It takes great organizational initiative, effort, and perseverance in addition to individual employee knowledge, skill, and ability to make a profound and lasting impact. Being able to take on a principal role in CSR will provide HR a great opportunity to raise its strategic profile and have a more enriched and positive influence on employees. As a part of this report in Chapter 4.2, we have included a section titled "Maturity Matrix – HR and social best practices" which outlines exactly how to address certain CSR issues and how to deal with consequent challenges. How to implement HR/social best practices? Once the incorporation of CSR strategy within the organization is initiated, HR becomes primarily responsible for governance and regulation during this process to ensure all activities are effectively and efficiently being conducted. According to ISO 26000, there are 4 - 7 core subject areas which directly affect HR and in which HR should play a key role in overseeing. While in this phase, HR faces two main challenges: Questioning – Which area and which practices should be directly affected by CSR in my company? As well as in my suppliers’ and subcontractors’ companies? Improving – What can we do better? In a more efficient way? In line with best practices? By asking these fundamental questions, CSR is leveraging the power of innovation to improve business in all its dimensions.
  • 38.
    38 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group Below is an example of one activity that we included in the attached Maturity Matrix regarding HR and social best practices. Proposed actions based on our experience and relative to 4 core ISO 26000 subjects are: ƒƒ Community involvement and development ƒƒ Organizational governance ƒƒ Labour practices ƒƒ Human rights The Future of Business - Redrawing CSR The future of CSR lies in two things: authentic and effective application and organizational agility. If CSR continues its peripheral orbit around theory, we will not see the future of social responsibility any differently than where we are at presently. And presently, what we are mostly a witness to is pseudo change and moreover, pseudo CSR. Hence, as we progress towards the shift to the post-change organization, we will have two choices two make: one being to opt for authentic CSR with a defined purpose, clarity and real impact, and the other being continuing a superficial journey which refutes the strategic integration of CSR into management values and practices. To effectively manage this paradigm in shift, the future of the corporation will have to reconcile with its core: its human capital. What this will mean, will be to re-humanize the way business is conducted by redrawing the role of CSR within organizations today. Time Magazine’s 2012 publication, “Are Companies More Powerful Than Countries?” shares that the world’s largest companies are moving on and moving ahead of governments and countries that they perceive to be “inept and anemic.” Operating in isolation from local issues domestic markets, there is a great foreshadowing occurring which indicates that large organ- izations may soon take over much of what government itself does. With such a reality, business leaders have a vast and demanding task on hand- to put CSR to work. Outlining a model called CSR 2.0 (Visser, 2011), CSR thought-leader Dr. Wayne Visser iden- tifies the hallmarks of a truly sustainable company. He sketches out five essentials which are central in examining whether a company is truly incorporating CSR which is both transform- ative and concrete - Creativity (C) Does the organization inhabit itself in innovation, the concept of social enterprise and free- range imagination as a way to solve its biggest social and environmental challenges. This is as conventional CSR standards and guidelines have a tendency to nurture a check-list approach in which compliance is given top priority over actual and effective change – which ultimately is only facilitating an endless journey with no true progress. Scalability (S) Are the designed solutions able to scale? Authentic CSR requires a rapid movement away from case studies and pilot projects towards universal application and integration. Best industry practices must be shared as public knowledge across companies, sectors and globally in an initiative to promote the development of a learning based culture. This at times may mean 'choice editing' - when companies make critical decisions on behalf of consumers based on their values, i.e. refusing to offer both sustainable and unsustainable products, such as Walmart exclusively selling Marine Stewardship Council certified fish or CVS removing tobacco products form their shelves. This approach does not eliminate risk, as for example, this deci- sion for CVS is estimated to cost a potential lost revenue of up to $2 billion.
  • 39.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 39 Responsiveness (R) Is the effort really responding to the needs of stakeholders or is it just a public relations effort? Unilever's strategy to 'double in size, halve their environmental footprint and lift a billion people out of poverty' is genuinely responsive to the issues of the day (environmental degradation and the human condition). "Glocality" (2) Combining global principles with local application in a way that meets both sets of needs. Circularity (0) Does the effort help to move to a circular economy where zero waste is a possibility? Dr. Wayne Visser further shares: "We used to think this was just a dream, but there are more and more companies -- Fuji Xerox in their Asian operations has now reached 98.5% recycling of their products. We have companies like Interface with their 'mission zero' -- zero environmental impact by 2020." Redesigning the Human Workplace: Emotional Wellness and Business A key aspect of redrawing the fundamentals of modern-day CSR involves acknowledging a vital aspect of business: the process of re-acclimating work culture with human values and moreover, placing emotional wellness as a top business priority. Top management is aware that the ultimate success of their organization relies heavily on the welfare of their employees. However, unfortunately, most executives give inadequate or no importance to the physical, mental, and emotional health of a company’s employees. Neglecting human assets is one of the foremost errors an organization must strive to correct in adopting CSR values. If business’ primary focus transfigures into monetary investment for the maintenance of a company’s machinery, supply chain and customer relationships, the people who sustain the organization’s life will suffer. This crucial element of the CSR system earnestly requires organizations to hold genuine and complete care and concern for all employees. With employers beginning to discover the linear relationship between accomplishing corporate goals and employee well-being, serving to improve and maintain the overall health of employ- ees within an organization as part of a holistic CSR approach is imperative. These CSR success elements include the following: ƒƒ Improving health of all the employees within the organization ƒƒ Offering the best financial support which encourages the use of valuable services to protect the employee health ƒƒ Officially assigning employers, purchasers, and individuals with roles of responsibility for health and associated productivity ƒƒ Emphasizing a cultural focus on improving health and fostering well-being Redesigning the Human Workplace: Diversity, Inclusion and Business A second key element in reengineering conventional business practices by adopting socially responsible systems is to acknowledge the power of diversity in the corporate landscape today. Diversity plays a key role in business success, as it allows organizations to draw from top talent regardless of discriminatory criteria. The inclusion of different ethnic, religious, sexual identity and gender groups in the workplace may make some uncomfortable, but the future of CSR and the success of business activity does not lie in a comfort zone, it awaits us in the territory of growth and the unknown. Hence by layering diversity as a chief CSR fundamental, by delivering training sessions on diversity, building mixed team dynamics and directly linking diversity to the company's strategic solutions, organizations can make great strides toward promoting diversity and inclusion in the workplace – a CSR imperative. Most large corporations routinely provide some form of diversity training for employees, with- out venturing into concrete application of diversity in ideas, practices and values. Companies
  • 40.
    40 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group seeking to renew their culture through a CSR based approach, should offer diversity training which focuses on how people, despite their apparent differences, are at the root the very same, deserving the same respect and accommodations as others. Once management begins to deliver training such as this which will encourage open discussion on the topic, they need to reinforce the message by being the prime example of acceptance. This can be done by demonstrating inclusive acts as part of standard management practices. Unlearning age-old conjecture which has portrayed differences as unwanted is the first step in adopting a shift in internal organization culture. Companies today are beginning to recognize differences for what they actually are: a considerable opportunity for growth, for learning, for innovation, and moreover, for evolution. Hence companies which are seeking to grow, and aspiring to succeed utilize values of diver- sity in their workforce as a competitive advantage. Mostly because they recognize that this form of corporate social responsibility leads to growth of exchange, the ability to understand a wider range of market segments and the ability to expand internationally with greater ease. Closing Notes The HR department is usually beset with ever-growing responsibilities of CSR and a lack of direction in respect to application and strategic integration. Hence, it is essential to recog- nize that to truly integrate CSR into strategic management principles, all functions within the organization must be asked to take part in the integration of socially responsible driven values, policies and regulations. Sure enough when this is attempted, this will be the first step towards authentic and genuine CSR application. A key factor organizations today will have to battle is one against pseudo-change. Pseudo- change is a commonly present, yet largely neglected business reality today. It refers to the intentional or inadvertent implementation of a change effort which does not address the problem it is designed to, but instead engages in activities that only offer and suggest the superficial appearance of change. Well into the 21st century, it is imperative that this paradigm shifts. Standing at an impelling crossroads, companies today must begin to recognize that CSR is no longer simply an option to conveniently align with, nor a branding strategy or short-term solution, but rather, a crucial necessity which should be incorporated into corporate policy. This is attributable to the relentless fact that CSR will become central to the way society and moreover, the economy operates in the coming years, as global markets increase in complexity and as consumers and workers evolve as more morally obliged individuals. As social and environmental concerns incline, today’s and tomorrow’s workplace will have to become engaged in the communities within which it operates, acknowledge global planetary preservation issues, acclimate to limited resources, and embrace new ways of conducting business. As we are able to see, CSR has been victimized by inaction for far too long. This is perhaps because it has required a redefinition which supports its amorphous nature, and one which encourages its holistic application. But mostly perhaps because Corporate Social Responsibility has needed to be entirely redrawn.
  • 41.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 41 Maturity matrix - HR & Social Best Practices ISO 26000 Core Subjects HR & social issues Maturity Level N°1 (planning, awareness, compliance) Maturity Level N°2 (implementation and actions of progress) Maturity Level N°3 (optimization, monitoring, innovations) Maturity Level N°4 (maturity, continuous improvement, institutionalization) ISO 26 000 Subchapter Labor practices and working conditions Employment responsibility during downsizing projects • Compliance with social dialogue and local labor law • Transparency, fairness for employees enga- gement • Resettlement help for employees (outplace- ment programs) • Employment and territory stakeholders involvement • Develop managers general awareness during the sensitive period before collective redundancy • Develop Psychosocial risks awareness of key stakeholders • Financial measures for salaries • Individualized and qua- litative approach for OP programs • Psychosocial risks action plan (for both the em- ployees made redundant and the ones that will be staying) • Actions to lower the impact of the jobs losses in the local territory • External and inter- nal career transition process built with stakeholders • Follow-up and monitoring results • Conditions of work and social protection • Employment and employment relationships • ILO Principles Community involvement and development Contribution to local economic development • Identification of key local economic issues • Identification of the key impacts of the organization regarding employment and skills • Identification of territorial impact in case of col- lective redundancies (in terms of employment) • Support local economic development (dedicated actions) • Implication of the stake- holders to facilitate job and people redeployment (restructuring project) • Revitalization aspects (mandatory in France when downsizing project) • Support development of local programs related to CSR • Support entrepre- neurship and value creation • Innovative approaches regarding territory revitalization and people redeployment (“integra- ted platform”) • Voluntary and proactive actions towards the local economy and the communities in order to help the territory being more attractive • ROI approach and follow-up • “Bottom of the pyramid” business model • Employment creation and skills development • Wealth and income creation The complete version of the maturity matrix can be provided as a separate document as per request
  • 42.
    42 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
  • 43.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 43 Real-World Application – CSR Business Cases chapter 4The following nine real-world business cases illustrate an authentic integration of CSR driven management initiatives. Organization names have been kept anonymous to prevent reader bias. Non-business partner: Association of the Blind and Partially Sighted Year of implementation and impact: 2011 - present CSR issues addressed: Employment, diversity & equal opportunities, Stakeholder engagement, Products & services SUMMARY OF THE PROJECT Only 30% of the 180,000 blind and partially sighted persons in Norway are employed. Given that human resources are expected to become scarce due to demo- graphic change, Organization A saw an opportunity to increase the employability of this group and tackle a key sustainability issue. The goal of this partnership was to create a business system that was accessible and user-friendly for all users regardless of their mental and physical health. Cooperation between Organization A and the Association of the Blind and Partially Sighted (ABP) includes innova- tion and software development (ERP-system based). The parties contribute their complementary expertise which ensures that high quality software and collaboration on marketing communication give ABP clients access to new tools and communication channels. INNOVATION AND IMPACT By voluntarily following the recommendations of the Web Content Accessibility Guidelines (WCAG) 2.0, Organization A has made the ERP-system accessible to people with partial and full loss of sight. Through the cooperation with the ABP, Organization A was able to engage with the key stakeholder group and develop its product in close cooperation with this group. Over the past two years, ABP has been involved in the validation and testing process to ensure that Organization A’s software meets the Web Content Accessibility Guidelines (WCAG 2.0), which define how to make web content accessible to people with disabilities. The project has been a front runner in this field. It is expected that in the near future the Norwegian government will implement the requirements in this area. Driving an important infor- mational campaign, Organization A contributes consid- erably to creating positive attitudes towards employees with disabilities among employers and the general public. As a positive side-effect, the ERP-system has become more user-friendly and healthier for everyone, e.g. through reduced use of mouse. ORGANIZATION A IT - Hardware Software & Services
  • 44.
    44 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group ORGANIZATION B Financial – Banks & Building Societies Year of implementation and impact: 2013 – 2016 CSR issues addressed: Community impact/ engagement, Products & Services SUMMAR Y OF THE PROJECT Organization B launched "Your Choice, Your Project", an innovative online tool for employees of its company throughout Europe. The aim was to involve staff in the final stage of the decision-making process for the alloca- tion of extra grants for projects implemented by non-profit organisations, in a perspective of sharing and dissemina- tion of philanthropy and solidarity. The initiative involved 9 of the 22 countries where Organization B is present (Bosnia and Herzegovina, Bulgaria, Croatia, Italy, Poland, Romania, Slovakia, Slovenia, Ukraine) providing a total amount of EUR 2,614,000 and focused on two main topics: 1. Job market inclusion of young people affected by marginalisation or in a vulnerable position 2. Degenerative diseases (such as dementia) that affect the aging European population INNOVATION ON AND IMPACT A key innovative aspect is the "direct online voting" process, allowing employees to raise their awareness of social issues and evaluate the effectiveness of the solution proposed by the project. Also the "calls for proposals" designed by Organization B feature innovative aspects, developed according to the "action-research" model applied to social entrepreneurship, thus ensuring sustainability, possibility to scale up and replicate and the flexibility of additional contributions to adopted projects by group employees. The main direct impact of "Your Choice, Your Project" were 58 social solidarity projects funded with EUR 2,614,000. The initiative was highly appreciated by Organization B’s employees as demon- strated by a strong participation in both voting and also frequent offers to actively support projects as volunteer "ambassadors". The Project strengthened employees’ identification and affiliation to their company and posi- tively influenced their motivation. Also the reputation of Organization B in communities which benefit from the Project was greatly enhanced.
  • 45.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 45 ORGANIZATION C Packaging, Fulfilment Non business partner: Local authority, Local university Year of implementation and impact: 2008 – present CSR issues addressed: Employees health & wellbeing, Employees impact/ engagement SUMMARY OF THE PROJECT Organization C had undertaken a workplace health audit, funded by a partnership between the local authority and a local university, to assess both the reported and actual health of its workforce and its link to workplace produc- tivity. The results of audit showed that the employee sickness absence and turnover level, which were impact- ing on productivity, product quality and the company finances is unacceptable by company senior manager. he workplace health audit found that most of the work- force displayed low levels of physical health, even among younger workers. Forty five per cent were smokers and over 60 per cent reported drinking to excess at least once a week. The audit also found low levels of physical activity (aside from their work) and poor dietary choices. Alongside its health audit, Organization C conducted its first ever employee attitude survey. Of most concern, the survey found that only 48 per cent of employees were satisfied with their jobs, 28 per cent were actively looking to leave the company and 56 per cent would consider alternative employment. INNOVATION AND IMPACT Callahan decided to introduce a wider range of workplace initiatives with the following objectives: ƒƒ To improve employee quality of life both inside and outside of the workplace ƒƒ To raise staff awareness of health and well-being issues ƒƒ To improve the health and physical fitness of its employees ƒƒ To reduce the incidence of work-related injury and illness ƒƒ To improve productivity, employee attendance and staff morale To implement them company built an on-site gymnasium for use by both staff and their families, hire full-time well- being advisor workers, the staff canteen now offers only health options and all employees are entitled to two free meals per shift. In addition, Organization C has developed a relationship with a nearby leisure centre who provide a range of regular activities and classes which staff can undertake at reduced prices including tennis, badminton, tai chi, yoga and climbing. The innovative aspect have been indicative that allow employees to take advantage of tax and NI savings on bike purchases in order to commute to work. Importantly, the wellbeing initiatives have been put in place as part of a wider set of HR policies and practices designed to engage staff, for example, the establishment of a company council, an employee suggestion scheme and more formal performance management practices. In order to monitor the impact of the wellbeing initiatives, Organization C conducts an annual health audit and employee attitude survey. One year after the wellbeing programme was started the results indicates: ƒƒ Employee absenteeism well below the sector average ƒƒ Reduced cost of hiring temporary workers ƒƒ Increase in reported employee satisfaction ƒƒ Increased productivity ƒƒ Reduced employee turnover and intention to quit.
  • 46.
    46 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group ORGANIZATION D Pharmaceutical Year of implementation and impact: 1997 – present CSR issues addressed: Employees engagement, Recruitment process SUMMARY OF THE PROJECT In order to introduce Organization D’s way of effective management and implement corporate CSR values across the organization, Organization D proposed meth- odology which originates from the company’s vision, values, commitments and fundamentals. This consisted of three managerial tools: sustainability reporting, the Balanced Scorecard and the use of facilitators. All of these tools clearly show Organization D’s commitment toward financial, environmental and social responsibility – all aspects which are in line with the triple bottom line (TBL) approach. INNOVATION AND IMPACT A very innovative aspect of this CSR approach was Organization D’s use of the Balanced Scorecard in its financial and non-financial targets which are a part of the remuneration package at the company. Non-financial performance is guided by measures for the company’s impact on the TBL. Even though, there are difficulties in quantifying the impact and effectiveness of CSR activities especially the impact of management initiatives to external stakehold- ers and environment, Organization D makes an effort to attempt one in a specific area. Their results show them the financial impact of CSR driven activities that refer to cost efficiency, lower employee retention cost, productivity benefits, lower insurance cost and higher market values.
  • 47.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 47 ORGANIZATION E IT & communication Year of implementation and impact: 2005 - present CSR issues addressed: Employees engagement, Non-discrimination, Work-life balance SUMMARY OF THE PROJECT Organization E implemented a gender equality-oriented program "Women in Power." The aim of this is to ensure equal opportunities for men and women in manage- rial positions. The project is also supposed to prepare women for promotion and development. INNOVATION AND IMPACT Organization E has organized a discussion forum, which can be used by everyone to exchange views on equal rights/emancipation. Moreover, this initiative helps to recognize the problems and barriers women in the labour market face to a greater degree. Detailed problems and ideas are discussed at special employee meetings and through the company’s intranet. This allows senior female managers to counsel junior women who aspire to work in managerial positions. Organization E has also estab- lished a follow-up of this program which is a system of training for women to help them find the balance between their career and family life. Also it is in aim to help them understand the unwritten rules of men in the corporate world. This includes the existence of self-promotion and atypical stereotypes.
  • 48.
    48 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group ORGANIZATION F IT & communication Year of implementation and impact: 2000 - present CSR issues addressed: Work-life balance, Wellbeing, Non-discrimination, SUMMARY OF THE PROJECT In 2000, Organization F decided to standardize shifts and work hours throughout the whole organization. Full-time Organization F operators work seven 12-hour shifts over a two-week period, on the basis of four days one week, and three days the next. When the work hours were changed, employees were offered job sharing, either on the day or night shifts. Job sharing refers to a work system in which two people share a full-time job between them, splitting equally the number of hours worked. INNOVATION AND IMPACT In order to participate in the job sharing system, employ- ees were obligated to submit a claim along with justifi- cation. Mainly, single parents and women benefit from the opportunity to share a job and all of them point out family life as an advantage of this system. Other benefits that were noticed by employees was a feeling of work- life balance. Also Organization F’s managers have seen benefits aris- ing from job sharing such as higher productivity and a high level of retention of highly qualified and well-trained talent.
  • 49.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 49 ORGANIZATION G Public sector - city Year of implementation and impact: 2000 - present CSR issues addressed: CSR awareness and implementation SUMMARY OF THE PROJECT AND BACKGROUND Organization G, a city in Europe, is inarguably the most prosperous and dynamic area in the country. Yet its adja- cent boroughs face higher levels of unemployment, social exclusion and child poverty than elsewhere in the country. Hence, Organization G as a city is currently working closely with public, private and community sector bodies to bring lasting economic and physical regeneration to the city and its neighbouring boroughs. This project offers support to companies in the city and its neighbouring boroughs, that are interested in starting up or devel- oping authentic Corporate Social Responsibility (CSR) programs that fit their size, sector and experience. INNOVATION AND IMPACT Organization G is best known for its flagship newcomers program which offers free CSR support for up to 70 companies every year through a range of workshops, guides and templates, signposting and dedicated account management initiatives. The city’s programs are supported by over 100 contributor businesses, which provide support by sharing their expertise of CSR. Since the year 2000, more than 450 business have adopted the newcomers program. Moreover, 70% of newcomers have managed to start and establish an internal CSR business structure without any particular dedicated CSR resources from the city.
  • 50.
    50 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group ORGANIZATION H Food production Year of implementation and impact: 2006 – present CSR issues addressed: Societal health and well-being SUMMARY OF THE PROJECT Launched in March 2006, Organization G’s “Green” Foods was established through a joint venture between Green Bank (the “bank of the poor") and Organization G Foods. The mission of company is to reduce poverty by bringing health through food to children using a unique commu- nity-based business model. Although the company has to be profitable – profits from the first plants are needed to finance the construction of new plants – the success of the project will above all be judged on non-financial criteria: the number of direct and indirect jobs created (milk producers, small wholesalers, door to door sellers), improvements to children’s health and protection of the environment. INNOVATION AND IMPACT The “green” yogurt has been specially designed to make up for the nutritional deficiencies that many Bangladeshi children suffer from. Reduced from cow’s milk produced locally and date molasses, “green” milk contains the natural calcium proteins needed for growth and bone solidity. Also enriched in micronutrients, an 80 gram pot is enough to cover 30% of daily needs for a child in vitamin A , iron, zinc and iodine. Organization G’s “Green” Foods has planned to set up and launch as many as 50 production plants during the ten years between 2006 and 2016 for what is in accord- ance with an aim in creating as many jobs as possible within the local community. Moreover, in order to ensure environmental protection, each plant will use renewable energy through the fixtures of solar panels and rainwater recovery systems which reduce the risk of depleting groundwater levels.
  • 51.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 51 BUSINESS CASES Fair trade - gold SUMMARY OF THE PROJECT Around 50% of the global demand for gold is for jewellery and the jewellery market was estimated at 137,6B$ in 2010, making it one of the world’s largest categories of consumer goods. But for the 100 million people globally who depend on artisanal and small-scale mining for their livelihood, the reality is exploitation, poor and difficult working conditions, complex and non-transparent supply chains and unfair prices for products. As is the case for other Fairtrade certified producer organizations, Fairtrade and Fairmined offers mining organizations and their communities a better deal. INNOVATION AND IMPACT Miners develop a long-term business relationship with their commercial partners and get a fair price for their gold, along with the Fairtrade Premium for investment in economic, social or environmental improvements. The Standards ensure that the Fairtrade and Fairmined gold has been extracted, processed and traded in a fair and responsible manner. This means: • Strengthened miners organizations - Miners have the opportunity to empower themselves through their organization. They form groups to give themselves better bargaining power with traders, to get a fairer return for their produce, and gain greater control over the jewellery supply chain. • Improved working conditions - Fairtrade and Fairmined certification requires mandatory use of protective gear and health and safety training for all miners. • Freedom of association and collective bargaining - Certified miners’ organizations must recognise the right of all workers to establish and join trade unions and collectively negotiate their working conditions. • Responsible use of chemicals - Certified miners must use safe and responsible practices for management of toxic chemicals in gold recovery, such as mercury and cyanide. Chemicals have to be reduced to a minimum, and where possible eliminated over an agreed time period.
  • 52.
    52 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
  • 53.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 53 BPI group – An Internal View of Corporate Social Responsibility chapter 5Recognizing the growing prominence of CSR for both our clients and ourselves as a socially responsible HR services provider, we, together with our International Business Unit and Institute for Leadership conducted a survey regarding Corporate Social Responsibility to examine internal and external perceptions and assumptions on the subject. All consultants involved in commercial activities within our network were invited to complete the survey. This allowed us to collect responses from people interacting with a diverse set of clients, from various demographics, located in different economic and social environments. The survey was conducted between July 30th and September 10th , 2013, in 14 countries. Participants answered 14 questions regarding both their clients’ and their own personal expe- rience and knowledge about CSR. The results enabled us to assess our CSR policy and social responsibility related initiatives - particularly regarding the involvement of HR management. The survey results shared that 83% of respondents assessed their knowledge about social responsibility as fair or good. However, only 45% of all respondents (and 17% of respondents from emerging markets) were aware of the establishment of the ISO 26000 standard – a key to the foundation of corporate CSR application. Additionally, 59% of respondents around the world and 83% of respondents in emerging markets observed an incline in interest in CSR services amongst their clients. They attributed this emerging interest to their clients’ needs for brand differentiation, customer engagement and good PR. Up to 83% of all respondents, with 100% of them from France suggested that CSR should be given more prominence in organizations and particularly should be a focus within businesses with a concentration in providing HR services. Notably, respondents of our survey shared that the most important aspects of social respon- sibility policy include local development, human development, training in the workplace, compensation, benefits and social protection as the Top 3, while they rated governance and organization, management, health and safety at work as the least important. Furthermore, respondents also indicated that they developed an increase in trust for organ- izations which adopted CSR values, and additionally shared that CSR, despite its altruistic nature, does also offer a form of positive PR for commercial activities, deeming it a mutually beneficial exchange between businesses and their respective communities. As reflective in the results, the need for organizations to care for the domestic communities in which they operate within is becoming an increasingly emergent demand in terms of CSR objectives. As stakeholders, consumers, employees and citizens, people are recognizing the need for corporations to hold true to transparency, accountability, and moreover, authenticity – mostly due to the nature of the information age we exist in today. With the ease of access to information presently, corporate reputation has largely become a top priority for organizations seeking both success and stability in the marketplace. Employee engagement Customer engagement Brand differentation Innovation Cost savings Sustainable growth strategy Good PR 16% 11% 10% 9%22% 17% 15%
  • 54.
    54 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group Conclusively, the survey results strongly indi- cate that it is imperative for organizations to implement and develop socially responsible policies and practices. Acknowledging the considerable shift in stakeholder expectations today and also the progressive trend which shows more and more companies beginning to observe CSR policies in their daily opera- tions, it is critical as modern day businesses to speak in the same "language" with clients. As enterprises operating in an aggressively competitive market, functioning on the leading edge of strategy by expanding organizational knowledge regarding social responsibility and further addressing CSR as a business tool for growth is key in creating long-lasting value. Executive Summary: • 83% of survey participants found CSR to be a potentially valuable topic to focus upon as a HR services provider • Respondents noticed a 59% increase in interest in CSR amongst their clients • The most important aspects for companies regarding human rights and labour prac- tices within CSR policy are local development and human development and training in the workplace • Company information about CSR involvement increases internal and external trust and is a good measure for PR in RFP processes What aspects regarding to human rights and labour practices in CSR policies are the most important for your clients? 1 Local development 2 Human development and training in the workplace 3 Compensation, benefits and social protection 4 Employment and wxorkforce planing 5 Social dialogue 6 Discrimination and culnerable groups 7 Governance and organization 8 Management 9 Health and safety at work
  • 55.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 55 Industry Thoughts On CSR - BPI group Event: How Can Social Dialogue Drive Business Competitiveness? In the context of the International Women's day 2014 7th of March 2014 Dominique de la GARANDERIE (Senior Associate Attorney, specialist in labor law, La Garanderie & Associés) CSR is most definitely a competitive asset. This is a proactive approach that transcends rigid frameworks. What’s more, CSR is evolving in a context of relative freedom even though, in keeping with the French habit of regulating, legislation has nevertheless been passed. Lastly, CSR was for many years viewed as a communications tool. But today, major enterprises take CSR very seriously and they have had positive feedback. There is an established link between performance gains from investing in extra-financial factors and financial performance. Brigitte DUMONT (Director of Corporate Social Responsibility, Orange), said that Orange had already included employees on its board of directors within the scope of the group’s CSR policy [before law made it compulsory in 2013]: As for CSR, there is currently a strong trend to include more extra-financial criteria, which is a welcome development. CSR is not about philanthropy, but a different way of looking at business and relations within the company. At the same time, the efforts made by companies in the area of CSR merit real recognition, notably in financial ratings. Laurence LAIGO (expert at the 1st Minster Office) observed that behind an apparent confidence in social dialogue, authorities nevertheless proposed legislation, meaning that in reality there is no room for any innovative approach to negotiations. Carole COUVERT (president of the CFE CGC trade union) pointed out that social dialogue is rarely mentioned in career résumés, but the issue of the career itineraries of men or women who are engaged in labor relations needs to be addressed, along with their redeployment. Also, good corporate citizenship must be reconciled with consumer expectations. Blandine TRIDON (Chief Executive, Groupe Labellemontagne, President of the Savoie young executives center) noted that Labellemontagne practices CSR every day. The company manages ski lift concessions under a public service delegation contract and its business is by definition very seasonal. But this in no way creates job insecurity for its employees, since the collective bargaining agreement established the right to renew employment contracts. On the other hand, the employment catchment areas where the Labellemontagne group operates are sometimes limited. The solution is flexibility, enabling the company to find people with the skills matched to needs.
  • 56.
    56 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group An interview with Sabine Lochmann, Managing Director of BPI group What is the responsibility of business today? Today, the responsibility of business is threefold: it is to simultaneously generate wealth while supporting the growth and development of innovation, all whilst ensuring the ethical management of business practices. With modern day shareholders expecting much more from their investments than they did decades back, businesses now must seek to reward growing expectations in order to sustain themselves as competitive entities. This applies particularly for global companies who possess power which oftentimes exceeds the power of a state. With such influence, there definitely brings about a greater sense of responsibility towards ensuring sustainable development. Factors such as respecting employee treatment by regulating working conditions and not endangering life in respective communities of operations, all attribute to the unique responsibility and role of business in the marketplace today. Overall, organizations now considerably impact what can happen tomorrow for the generation to come. Duly, they have to ensure that they do not cause a threat to a whole sector of activity due to an absence of ethics and furthermore a lack of balance between understanding sustainable growth versus greedy growth. Is corporate social responsibility an imperative for organizational success? CSR has been a part of the DNA of some companies ever since their origin of operations. Historically, this is apparent when we refer back to paternalistic management. But today, CSR is becoming more prevalent and necessary as organizations today stand in a role of significant impact and influence - more so, as models for political advocates and public citizens to follow. This has transfigured the idea of social responsibility for business as a tool and moderator to manage several risks in regards to their various stakeholders. It also acts as a platform to be more accountable - not only for the immediate time, but also for the coming generation. We are now living in a world which is welcoming a new cycle of how things are being done. With everything moving faster and faster, and with the acclimatization of the digital revolution, CSR is now no longer a long-term business aspiration, but a current reality. It should be recognized and appropriately addressed globally by organizations, as it dictates the future of business entirely. From employee engagement- which is a critical element to organizational productiv- ity and health, to market sustainability, CSR is a core component to what will determine the success on business in the days to come. Is CSR a concept which is realistic in real-world application? Yes, CSR is absolutely realistic in application. It is pliable in nature, so businesses may choose to adopt it holistically or simply integrate its more readily available aspects. Personally, I recognize the importance of creating value as an organization for the environment from which you draw from – whether that be human capital, natural resources or living communities. Because we as organizations carry with us a size which has the potential to draw a legacy, it is essential to build value despite what you may destroy along the way. This is essentially the spirit of corporate social responsibility – an entirely applicable business practice. Moreover, CSR is a form of organizational leadership which offers the challenge of how to behave when there are tough decisions to be made. This then brings into question the disparity between a mid-range CSR and a long-term CSR model; both which require very different decision making criteria. But overall, CSR is a concept which is realistic in application as it is simply a business attitude which approaches value creation by reframing CSR from a business penalty into an incredible business opportunity to build, create, and strengthen systems which can leverage growth for the future. How can organizations with no previous background in socially responsible business practices begin to adopt a CSR enforced work culture? There is always a key challenge to address within every company. Whether the challenge is internal or external in existence, what makes all the difference is how an organization as a whole chooses to meet this challenge. In the case of adopting CSR values with no previous experience, the beginning of this objective lies in creating a clear and solid foundation within the Sabine Lochmann Managing Director – BPI group
  • 57.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 57 business’ internal structure. This is done by providing employees with a clear business mission and vision through the means of a simple and efficient structure set with clear boundaries. Every grand possibility begins with a small step in the right direction. Likewise, allowing the birth of CSR within the organization is promising when approached essentially from the bottom up. This is a critical first step in breeding a socially responsible, value infused, corporate spirit. What is the future of CSR in the next decade? The future of CSR now lies in diversity. What organizations should understand today is that the presence of diversity within the company plays a considerable role in fostering sustainable business values, as it brings about different people who share different ideas and allow for hybrid collaboration in vision which would not have been conceived without a mix in percep- tion. Diversity further encourages organizations today which are seeking to walk along the path of CSR to adopt a 360 degree approach. What this means is to be open to learning, growing and developing as an organization from all aspects. Being present amidst radical change in the way we work and live today, the notion of corporate social responsibility has lent its meaning to sharing wealth with the community. It has grown to embrace the responsibility of providing for the environment in which you are working. This is all in an aim to offer the new generations to come with stability and possibility. In a few words, what does CSR essentially mean to you as a business leader? As a business leader, the integration of CSR values is what makes me proud of working in and for a company. Closing Remarks: Jean de la Fontaine’s infamous fables share one story about a father and his children in which the father assures to his children of a treasure in his garden once he passes away. Upon his death, the children dig and dig, only to find nothing of the sort. After some time, they come to the realization that the true wealth their father was referring to was that the joint effort and collaboration in work that the children endured together to achieve their one mutual goal of finding the treasure. As businesses operating in an extremely complex climate, we can adopt one simple lesson from this fable ourselves which is that true wealth is not simply monetary. For example, when you partake in unreasonable pollution and environmental degradation, money cannot fix this by renewing life. There is only so much finances can and will achieve. True wealth lies much beyond the numbers. It echoes in a place which speaks of how you help the community and society, and what you impart to the people around you for a time when you will not be there anymore.
  • 58.
    58 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group As organizations, we have been speaking about corporate social responsibility in theory, aggressively, for the past five years. Although, if examined closely, the present application and integration of CSR values in France, and globally, is not an organizational reality. In fact, the idea of CSR today inclines more toward a strategic marketing tactic which aims to maintain a positive external image to consumers and stakeholders without any actual and concrete action. Indicative of this, I have personally come across several large companies in the past few years who have claimed to thoroughly incorporate CSR values into their business practices, whereas the reality of the situation was entirely different. These companies stated that they did not have the budget required to actually implement their initial CSR goals, but regardless, went ahead to misleadingly portray otherwise through their organizational communication efforts. This leads us to recognize that the discrepancy between what is being said and what is being done is an apparent reality in regards to corporate social responsibility today. Initially, when the concept of CSR was introduced, it mostly addressed the environment and the preservation of natural resources. Although, as emergent recently, CSR has transformed into much more than merely governing our external environment. Now, CSR regards the significance of caring about the internal environment within the company, and caring for our most valuable resource – human capital. Recently in France, a new law which was passed in June 2013, La loi sur la sécurisation de l’emploi (LSE) depicts just how fundamental CSR values are for businesses today. The LSE has provided CSR with a public platform which holds organizations responsible for the well-being of their employees. It gives attention to communities within companies, allowing employees to express themselves, which in turn helps to improve social dialogue at every level of the company – an integral element to CSR. Consequently, as we can see, today, CSR is captivating the larger percentage of the popu- lation because it is engaging us in a critical discussion on the importance of employment. Specifically, it is opening up the future to workers by ensuring the utilization of their talent. To note, in France, when we talk about CSR, we mainly focus on the journey of humans in their professional evolution. Even though this is only one aspect of CSR, it is likely the most important, as it is the people in the workforce who define its perennial existence. As we at BPI group believe, it is most critical to now address the overall well-being of work- ers - essentially, helping our national and global talent pool to live better and to enhance their employability by developing themselves professionally and evolving themselves personally. Likewise, recognizing the value in effective social dialogue, we strive to be key players in making CSR a relevant topic of discussion. When deliberating on social responsibility, we ought to recognize that CSR is a duty which a company has the option to adopt, and definitely not an obligation of any sort. Hence, when integrating CSR into organizational operations, authenticity is fundamental for the successful establishment of the system. Three key points of consideration for organizations contemplating CSR as a business tool are: 1) Currently, the economic crisis we are in is enabling us to recognize and reinforce the importance of CSR. This is particularly because during an uncertain time such as this, the need for talent management is placed in emphasis. Being so, as the prominence of talent management grows in France and worldwide, CSR is becoming a tool in helping talent attraction and retention in the days to come. 2) As with any product which is being introduced into the market, CSR has already made its initial entry and breakthrough, and is currently being gradually accepted and discussed as it is in its phase of growth. This means that it will soon arrive at a phase of product maturity – a time when thorough integration of CSR will become common- place. Jean-Marie Thuillier Associate Director BPI group Directeur des Practices, des Métiers et de L’Innovation
  • 59.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 59 3) It is key to note that when speaking of CSR, all stakeholders in the company should be accounted for. CSR does not merely include acknowledging externalities. It is a holistic strategy which involves addressing the fair treatment of all relative groups: employees, consumers, citizens, taxpayers, subcontractors and unions. Now, as we head into an era of integrative CSR management, the greatest challenge we face as organizations is to justifiably answer to the ROI (return on investment) of being socially responsible. With a lack of concrete evidence illustrating exactly how CSR positively enhances the bottom line, being socially responsible has to prove its cost in order to become a reality in the world of business both today and tomorrow. Hence, as we will begin to see, the future of CSR will witness an improvement in real application, contingent on its ability to prove its impact. And by doing so, ultimately CSR will enable the reconciliation of human values to the corporate workplace.
  • 60.
    60 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group Today, there is no longer any question about whether CSR is an objective which is worthwhile pursuing or not. Presently operating within environments which demand social responsibility, CSR has become a business necessity rather than a mere option. With companies having become public entities in the past decade, it is essential to ensure that organizational brands thrive in the marketplace. For this reason alone, the adoption of CSR values into management infrastructure is required - as it simply makes good sense. As we have been a witness to and participant of, there have been radical changes to the model Adam Smith has proposed about the responsibility of business. It is still valid that companies are here to generate wealth, but it is essential in our global world to also critically consider externalities in our environment. This is largely because we have new responsibilities as we become more powerful entities – and this new power is initiating a new distribution of roles to maintain the national and global community alike - as both healthy and wealthy. In particular, in France, CSR is extremely valuable because one of our national problems is the lack of acute business sense. Due to our cultural underpinnings, business activity is not valued enough. Hence, we have yet to, as a national society, widely acknowledge that business is the only way for growth. This is primarily attributed to our lack of knowledge about what a company is and how it works. Duly, this negative view about how businesses function, is a product of associating the enterprise with layoffs rather than output and productivity, while equating organizational bureaucracy with unreasonable compensation. In light of this, the application of CSR values to the core of organizational culture suggests to the French, and likely global population, that we need our companies in order for our country to retain itself as both a competent and thriving nation. In addition, CSR has the potential to become a wonderful and effective lever in helping people to appreciate the world of business and its enriching contributions to the economy and moreover, the welfare of society. It is becoming clear that CSR now is entering a new era. For years, it has usually been a placeholder in financial reports, but now it is not the case anymore. There is now an authentic attempt to truly integrate CSR into strategic management regardless of company size. With organizations recognizing ultimately that CSR is not just an option which is convenient, but rather now the most efficient and effective way to do good business, CSR is gradually transfix- ing itself into a business world reality as its multi-dimensional nature can no longer be ignored. As a powerful way to conduct business in a global world where employees are also citizens and citizens are also voters and consumers, who in turn are also taxpayers and stakehold- ers, social responsibility has affixed itself always from theory alone. However, despite this progressive shift, we face a paradox today when dealing with the application of CSR, as we have to walk the talk. With fragile and ineffectual internal organizational infrastructures, we have to first and foremost begin to adopt CSR values by caring for our human capital. This is the beginning of anything: the first step of any CSR approach. Being a socially responsible business begins first with the well-being of employees, as your workers are the advocates and frontrunners of your organization. With that being said, CSR is also a difficult feat today as it is greatly challenging to arbitrate between conflicts of interest. Win-win outcomes are a rarity in the business world and not always possible, as the interest of stakeholders are not always corresponding to the interests of employees. In fact, they rarely match, and hence you have to arbitrate between several conflicts of interest which involve all shareholders: employees, people, subcontractors, etc. In addition, when closely contemplated, what we are beginning to discover is that CSR also includes the adoption of relatively new and innovative ideas, both internally and externally. One such key element of the future of CSR will be in the consideration and strategic application of co-opetition. Co-opetition involves cooperation with people you are in competition with. It explores a terrain which studies how to cooperate within competitive environments and how to conduct business in a way which is much simpler yet much more effective. It suggests that we have to be smart enough to combine competition and cooperation, as competition is not entirely antagonistic. In this sense, it is reflective of CSR values which similarly suggest Philippe Bigard Director Institute for Leadership - BPI group
  • 61.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 61 that sustainable business activity lies in combining various interests of various shareholders. Markedly, CSR obliges you to appreciate the intricacy of management in a more enlightened manner, and less through a lens which is solely black and white. Straying away from theory and into the domain of concrete application, CSR faces a very big challenge in proving itself as a profitable return on investment. As a new frontier which compa- nies are exploring, we have to acknowledge that the application of CSR is a huge challenge which will be very difficult to overcome. To get true results will be an arduous journey, as we are far from where we should stand, both socially and environmentally. Hence, it is crucial as organizations that we need to take a calculated risk and venture into establishing CSR as a business reality - although, at the same time, we must not undertake difficulties which are impractical to address. For example, to be noted, a very real question CSR brings to the forefront is the question of scale of values. The concept of CSR cannot be necessarily regulated globally. For example, what is considered treating an employee well in Canada differs greatly in India or Tunisia. Hence, CSR prompts us to examine whether we can accept differences in these standards and moreover, to which extent. If we do not have this kind of progressive dialogue about real world business issues, big companies will continue to hide behind the shadow of their CSR branding and continue their unethical behaviour without intervention. So the key is to not make CSR a new layer of constraints, but rather a wonderful opportunity to reconcile the French community with its economy. Moreover, as consultants, we have a key role to play in the sensibilization of our clients and partners to convince them that CSR is the right direction to rediscover what it truly means to be a company. Also, it is the best answer we can imagine to the big question of social innovation. At present, people – particularly young talent, no longer seek to work just for a salary. They want to be making an impact in their society through the span of their career. Unaware of the holistic aspect of business, there has been a divorce between French compa- nies and the national society, so CSR can unite this rift. The CSR spirit is the best solution to this and is absolutely required if we want to get out of the never ending economic crisis in France. Business is the only way of safeguarding our social model and we need to become better at doing this. A key message which needs to be widely embraced is that companies are not creating money by ‘evil’ means. The national population needs to understand that you can do business in an ethical way, as business is about taking care of your people and secondly, it is about safeguarding people in the community – while simultaneously generating profit in order to stimulate the economy. An additional reason CSR is an investment for any organization is because a new organiza- tional model opens your company up to new networks – a key for success and sustainability in the marketplace.
  • 62.
    62 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group
  • 63.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 63 Closing Notes – Redrawing Corporate Social Responsibility chapter 6We resist change, yet seek novelty. Traversing on the same edge of the sword, we pursue organizational greatness. However, altogether indulged and comforted by familiarity, we cringe at the possibility of operating any differently than we have been accustomed to. Are we as organizations today simply apathetic to our needs for growth? In misalignment with our ‘values?’ Or more so, unwilling to weave the new into our way of the old? Blissfully cemented in our versed customs, we must acknowledge that we cannot become what we aspire to be tomorrow by remaining what we are today. When closely examined, it is evident that organizations over time have become products of man’s inclination for habit. Synthesized by the greed for profit and amalgamated by a blind ambition to conquest our competitors, we have neglected the most critical element the enterprise requires for long- standing success: sustainability. More specifically, Corporate Social Responsibility. Directional, definitive, and precipitant, corporate social responsibility is strategically begin- ning to etch its place into the world of business today in an aim of remaining in its vicinity permanently. Unifying ethics with corporate practices and reconciling morals and values with organizational culture, CSR has made its arrival heard and is here to stay. In the past decade, as the business climate has been shifting, CSR has been propitiously suggested as crowning to good business practices. Since its inception, the concept of business’ role of becoming socially conscious has transformed into a necessity for compa- nies vying for a deep-rooted standing in the marketplace. This is partly attributed to the technological revolution and as consequent, partly credited to globalization. Hence, the larger international population which is composed of consumers, suppliers, subcontractors and stakeholders, is becoming more morally inclined and socially aware, as they are swiftly welcomed into the information age. Yet unfortunately, at present, the topic of CSR has been saturated and moreover, diluted in its definition. This is mostly because it has garnered an unfortunate stance as being more spoken and deliberated upon than executed and practiced. As a concept so theologically demanding, CSR requires meticulous and effective handling in order to successfully deliver its intention of humanizing and endearing capitalism. This brings us to address three main points as part and parcel of the CSR debate through our comprehensive research: 1) Are we entering an era in which CSR values will be entirely applied in all facets of stra- tegic management? Hence, will a redefined model of CSR help to concurrently design a new model of management for the workplace of tomorrow? 2) Will the thorough integration of CSR policy into all organizational practices offer a viable solution to management issues such as employee engagement, well-being, productivity and satisfaction? Furthermore, will the incorporation of CSR values into corporate culture essay social issues such as poverty, child labour and environmental degradation as declining occurrences?
  • 64.
    64 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group 3) Lastly, but as importantly, is the real-world employment of CSR reserved only for large organizations? For developed nations? Essentially, for the wealthy? Operating in the 21st century, there is a great discrepancy between what is being said and what is being done. Unaware of how to authentically integrate CSR into corporate practices, companies today are failing to recognize the opportunity they have to grow and evolve much beyond the foresights of their predecessors. As an example, in historic retrospect, Milton Freidman was credited with affirming that the only responsibility of business is to generate profit. Yet, we have come a long way since then to recognize that we in fact, live in a society which is much more multi-dimensional than Friedman acknowledged. We have consumers to please, suppliers to manage, subcontractors to direct, stakeholders to satisfy and entire markets to influence. If our only responsibility in such a role were to simply conduct business, in neglect of social issues, we would be decrying the most valuable resource known to mankind: mankind himself. As we are able to understand, the ways in which we have been operating have been primitive in vision. It is now that our journey as organizations of today begins. We have to methodically plan ahead. It’s a peril of life and the cycle of business, because if innovation in management does not form the greater part of our organizational tapestry at present, we can consider it a warning sign for defeat tomorrow. Evidently, our organizational culture needs a facelift. We need employees to collectively understand the significance of CSR and its direct effect on business. The enterprise of the 21st century can no longer acquaint itself with old traditions. We need to seek new directions in defining what it means to be a successful business. If we cannot take care of the commu- nities which hold our consumers and stakeholders, then we cannot expect their loyalty on this two-way street. Hence, we must embark on a journey to marry CSR values into our organizational culture, and ultimately evocate what we know into successive action. However, making the decision to adopt CSR as a principal organizational value is only the first step to internal transformation and reengineering of business practices. The actual application and integration of socially responsible values is a perpetual balancing act. As this report examines, reaching a consensus on CSR is a challenging feat. This is primarily because the interests of stakeholders are oftentimes in conflict. What this essentially proposes, is a new management problem which needs to be efficaciously addressed. To note, employees have entirely different expectations from their company than a shareholder would. Therefore, it is fundamental for businesses to enlarge their organizational objectives in order to encompass effective management of this prevalent difference in priorities. Despite this, though CSR integration into business practices is an arduous path, it is an equally rewarding one. However, it does demand a mastery of the art of arbitrating between various organizational interests and stakeholders. The complexity in application is where most organizations fall short. What companies today must embrace is that the art of management lies in the relentless practice of mediation. The cold hard truth stands before us: not all stake- holders can always be completely satisfied, and not all situations can be entirely win-win in outcome, but a middle ground does exist - one which offers the incorporation of Corporate Social Responsibility and one which fosters sustainability – the key to the future of business. Shwetha Chandrashekhar BPI group Intern Top 10 National Finalist, Focus 2040
  • 65.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 65 Sources chapter 7Literature Lam, H., Kahare, A. (2010). HR’s Crucial Role For Successful CSR, Journal of Business Ethics, Vol.3 No.2 2010 Sharma, S., Sharma J. (2009). Corporate Social Responsibility: The Key Role Of Human Resource Management, Business Intelligence Journal - January, Vol.2 No.1 2009 Cohen, E. (2010). A Necessary Partnership for Advancing Responsible Business Practices Carolle, A. (1991). The pyramid of corporate social responsibility, Business Horizons, July – August Garriga, E., Mele, D. (2004). Corporate Social Responsibility Theories: Mapping the Territory, Journal of Business Ethics 52, International Organization For Standardization (ISO (2010). Draft International Standard ISO/ DIS 26000, Guidance on social responsibility International Labour Organization (2008). ILO Declaration on Social Justice for a Fair Globalization European Commission(2013). Golden Book of the first European CSR Awards Melcrum. (2006). Engaging Employees in Corporate Responsibility: How the World’s Leading Companies Embed CR in Employee Decision-making. London, UK: Author Maxwell, G. (2008). Case Study Series on Work-Life Balance in Large Organizations, Society for Human Resource Management. Count Albert de Mun: His Theory of the Social Apostolate, Sister Miriam, O. S. U., The American Catholic Sociological Review, Vol. 14, No. 1 (Mar., 1953), pp. 13-24 Scalet, S., & Kelly, T. F. (2010). CSR Rating Agencies: What is Their Global Impact? A 2010 Journal of Business Ethics Study. Journal of Business Ethics, 94(1), 69-88. Visser, W. (2011). The Age of Responsibility: CSR 2.0 and the New DNA of Business. Wiley. Schwartz, M. S. (2011). Corporate social responsibility: an ethical approach. Peterborough, Ont.: Broadview Press. Cheng, K., Low, P., Ang, S. L., & Idowu, S. O. (2013). Corporate Social Responsibility in Asia: Practice and Experience . Springer. Chase, L. A., Rangan, K., & Karim, S. (2012). Why Every Company Needs a CSR Strategy and How to Build It. Harvard Business Case Paper, Working Paper.
  • 66.
    66 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group Web sites http://ec.europa.eu/enterprise/policies/sustainable-business/corporate-socialresponsibility/ http://corostrandberg.com/ http://www.ic.gc.ca/eic/site/icgc.nsf/eng/home https://www.melcrum.com/ http://www.shrm.org/ http://www.iso.org/ http://corporate.walmart.com/ http://www.csreurope.org/ http://www.ilo.org/ http://www.un.org/ http://www.theheartofthecity.com/ http://www.danone.com/ http://www.yunussb.com/ https://www.ic.gc.ca/ http://www.state.gov/e/eb/eppd/csr/ www.finyear.com www.diplomatie.gouv.fr http://www.csreurope.org/guide-csr-europe http://www.csr-weltweit.de/ http://www.oddo.fr/ https://ratings.standardandpoors.com/about/who-we-are/Our-Approach-to-Corporate- Social-Responsibility.html http://www.vigeo.com/csr-rating-agency/ http://www.csrwire.com/
  • 67.
    Institute for Leadership- BPI group - REDRAWING CORPORATE SOCIAL RESPONSIBILITY - 67 Appendix chapter 8Videos Due to its strategic character social responsibility is very important topic from the perspective of companies’ management. Please find bellow links to information videos and interviews with executives of various companies who tell about their experience related to this topic. ƒƒ https://www.youtube.com/watch?v=E0NkGtNU_9w about CSR ƒƒ https://www.youtube.com/watch?v=PdkYieDuVvY IBM ƒƒ https://www.youtube.com/watch?v=gbcVzeTKxp8 McDonald’s ƒƒ https://www.youtube.com/watch?v=8w0x_RAgsjY Dell ƒƒ http://www.youtube.com/watch?v=NiivSxLyEUI KPMG ƒƒ https://www.youtube.com/watch?v=a79RQ5ZMrdo Unilever Morover, many interesting videos regarding CSR and sustainable development you can finde on www.ted.com. Books Very valuable source of knowledge on CSR is books, which amount in book stores can surprise. Based on list of most popular books on goodreads.com and our experience we create the list of "must read" CSR books. They all show that CSR should be consider as way of doing and thinking about our business and life that enable long term development. ƒƒ The Triple Bottom Line: How Today’s Best-Run Companies Are Achieving Economic, Social and Environmental Success -- And How You Can Too by Andrew W. Savitz, Karl Weber, 2006 ƒƒ Corporate Social Responsibility: Doing the Most Good for Your Company and Your Cause by Philip Kotler, Nancy Lee, 2004 ƒƒ Milton Hershey: Chocolate King, Town Builder by Charnan Simon, Sarah De Capua, 1998 ƒƒ Creating a World Without Poverty: Social Business and the Future of Capitalism by Muhammad Yunus, Karl Weber, 1999 ƒƒ Fair Trade and How It Works by Jacqueline Decarlo, 2011 ƒƒ In Good Company: An Anatomy of Corporate Social Responsibility by Dinah Rajak, 2011 ƒƒ CSR for HR: A Necessary Partnership for Advancing Responsible Business Practices by Elaine Cohen, 2010
  • 68.
    68 - REDRAWINGCORPORATE SOCIAL RESPONSIBILITY - Institute for Leadership - BPI group Articles That newspapers and magazines very often are the first source of some ideas for executives. Especial when this ideas are related to company’s strategy and possibility of development. Knowing the power of shape opinion and view publisher, also as social responsible company, should included articles regarding CSR. The list shows easy available worth reading articles: ƒƒ An Innovative Approach to Funding CSR Projects by Theo Vermaelen, Harvard Business Review, June 2011. ƒƒ Column: It’s Time to Take Full Responsibility by Rosabeth Moss Kanter, Harvard Business Review, October 2010. ƒƒ Corporate Social Responsibility in Mexico and France: Exploring the Role of Normative Institutions by Maribel Blasco and Mette Zølner, Business & Society, June 2010. ƒƒ Just good business, Special report: Corporate Social Responsibility, The Economist, January 2008. ƒƒ Strategy and Society: The Link Between Competitive Advantage and Corporate Social Responsibility by Michael E. Porter and Mark R. Kramer, Harvard Business Review, December 2006. ƒƒ Building the Green Way by Charles Lockwood, Harvard Business Review, June 2006 ƒƒ The Path to Corporate Responsibility by Simon Zadek, Harvard Business Review, December 2004. ƒƒ From Spare Change to Real Change: The Social Sector as Beta Site for Business Innovation by Rosabeth Moss Kanter, Harverd Business Review, May 1999.
  • 69.
    THE INSTITUTE'S DOSSIERS TheInstitute's Dossiers are a distillation of the knowledge drawn from the experience of BPI group consultants, and represent all activities, areas, and countries, in which the Institute for Leadership team has conducted research. The Institute for Leadership is BPI group’s dedicated center for analysis and forecasting. Dealing with major contemporary questions in the fields of management, HRM and social issues, the Institute's Dossiers aim to offer various insights in order to provide guidance over the medium / long term. They are intended to allow everyone to form as enlightened an opinion as possible. As exercises in applied research, these folders have a practical purpose as well. Today the HR and Social fields are facing unprecedented questions whose solutions may be crucial to avoiding a number of significant challenges and dysfunctions. Each folder proposes a new analytical and thinking perspective on issues related to contemporary transformations of work and labor relations, as well as the significant challenges they pose to all stakeholders: business leaders, human resources managers and directors of social relations, staff repre- sentatives and trade union stakeholders, managers, employees, students or researchers, consultants. To all, we wish a pleasant and informative reading experience. As always, this folder is also published on the Institute for Leadership website, where everyone is invited to express his/her reactions, critical or complementary perspectives in order to push the debate for innovation and social advancement forward. Philippe BIGARD Director of the Institute for Leadership - BPI group Directeur de la publication : Philippe Bigard Coordination : Shwetha Chandrashekhar The Institute's Dossiers 37 rue du Rocher - 75008 Paris FRANCE institut-leadership@bpi-group.com http://www.institut-leadership-bpi.com/