CORPORATE PRESENTATION 
21 JULY 2016
westernareas.com.au   | ASX: WSAwww.westernareas.com.au   | ASX: WSA
ASX:WSA
DISCLAIMER AND FORWARD LOOKING STATEMENTS
This presentation is being furnished to you solely for your information and for your use and may not be copied, reproduced or redistributed to any other person in
any manner. You agree to keep the contents of this presentation and these materials confidential. The information contained in this presentation does not
f f ff h d h h f h f h d h h ll fconstitute or form any part of any offer or invitation to purchase any securities and neither the issue of the information nor anything contained herein shall form
the basis of, or be relied upon in connection with, any contract or commitment on the part of any person to proceed with any transaction.
The distribution of this presentation in jurisdictions outside Australia may be restricted by law, and persons into whose possession this presentation comes should
inform themselves about, and observe, any such restrictions. This is not for distribution or dissemination in the U.S.
The information contained in this presentation has been prepared by Western Areas Ltd. No representation or warranty, express or implied, is or will be made in or
in relation to, and no responsibility or liability is or will be accepted by Western Areas Ltd, employees or representatives as to the accuracy or completeness of this
information or any other written or oral information made available to any interested party or its advisers and any liability therefore is hereby expressly disclaimed.
No party has any obligation to notify opinion changes or if it becomes aware of any inaccuracy in or omission from this presentation. All opinions and projections
expressed in this presentation are given as of this date and are subject to change without noticeexpressed in this presentation are given as of this date and are subject to change without notice.
This document contains forward‐looking statements including nickel production targets and cost estimates. These statements are based on assumptions and
contingencies that are subject to change without notice, and certain risks and uncertainties that could cause the performance or achievements of Western Areas
Ltd to differ materially from the information set forth herein. Often, but not always, forward looking statements can generally be identified by the use of forward
looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”, “anticipate”, “continue”, and “guidance”, or other similar words and may include,looking words such as may , will , expect , intend , plan , estimate , anticipate , continue , and guidance , or other similar words and may include,
without limitation, statements regarding plans, strategies and objectives of management, anticipated production and expected costs. Western Areas Ltd
undertakes no obligation to revise these forward‐looking statements to reflect subsequent events or circumstances. Individuals should not place undue reliance on
forward‐looking statements and are advised to make their own independent analysis and determination with respect to the forecasted periods, which reflect
Western Areas Ltd’s view only as of the date hereof.
The information within this PowerPoint presentation was compiled by Western Areas management, but the information as it relates to mineral resources and
reserves was prepared by Mr. Dan Lougher and Mr. Andre Wulfse. Mr. Lougher and Mr. Wulfse are full time employees of Western Areas Ltd. Mr. Lougher and Mr.
Wulfse are members of Australian Institute of Mining and Metallurgy (AusIMM) and have sufficient experience which is relevant to the style of mineralisation and
type of deposit under consideration and to the activity which they are undertaking to qualify as Competent Persons as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’(2012 JORC Code). Mr. Lougher and Mr. Wulfse consent to thep g p , ( ) g
inclusion in this presentation of the matters based on the information in the form and context in which it appears. The information contained in this presentation
in relation to the New Morning Deposit was prepared and first disclosed under the 2004 Edition of the JORC Code. It has not been updated since to comply with
the 2012 JORC Code on the basis that the information has not materially changed since it was last reported.
For the Purposes of Clause 3.4(e) in Canadian instrument 43‐101, the Company warrants that Mineral Resources which are not Mineral Reserves do not have
ASX:WSAASX:WSA 2
demonstrated economic viability.
AGENDAAGENDA
Explore Minep
Corporate
Operations
Produce Sales
Operations
Produce Sales
Growth & Exploration
Nickel MarketNickel Market
ASX:WSAASX:WSA 3
CORPORATE
ASX:WSAASX:WSAASX:WSA 4
CORPORATE OVERVIEW
ASX code WSAHigh quality assets
Share price 2.58
Shares outstanding (m) 270.9
Market Cap (A$m) 1 698.9
g q y
 Highest grade, low cash cost nickel producer
 Operational cashflow positive at current prices
p ( $ )
Cash (A$m)2 75.7
No debt, clean balance sheet, low costs
 Further flexibility with undrawn A$50m ANZ facility
Organic growth options
 Low unit cash cost producer Cosmos Nickel Complex
567kt Ni resources
Scoping study being
reviewedg g p
 Strong near‐mine and regional exploration
 Cosmos exploration and Odysseus PFS
Flying Fox
12.4kt Ni mined FY16
48.2kt Ni reserves
102 2kt Ni
Positioned for nickel recovery
 A$1/lb lift in nickel price = circa A$35m EBITDA
102.2kt Ni resources
Spotted Quoll
15.2kt Ni mined FY16
97kt Ni
 Portfolio delivers optionality
A leading mid‐tier base metal producer
97kt Ni reserves
119.8kt Ni resources
ASX:WSAASX:WSA 5
1. Based on share price of on 20 July 2016
2. Cash as at 30 June 2016
A leading mid tier base metal producer
WESTERN AREAS ARE SAFE AREAS
12 h LTIFR iD LTI f 12 month LTIFR moving averageDays LTI free
Nov-08
1 904
2,921
S tt d Q ll
Exploration
1.0
1.5
2.0
LTIFR
Aug-11
Oct-131,103
1,904
Cosmic Boy
Concentrator
Spotted Quoll
0.0
0.5
1.0
Safe operations make efficient operations
Nov-131,086Flying Fox
ASX:WSAASX:WSA 6
Safe operations make efficient operations
CONSISTENT LOW COST OPERATIONS
Cash cost Ni in conc.
(LHS)
Production – cont. Ni processed
(RHS)
WSA cost position provides ability to weather cyclical low nickel prices
ASX:WSAASX:WSA 7
WSA cost position provides ability to weather cyclical low nickel prices
WSA reports its unit cash cost on a nickel in concentrate basis given confidential offtake payable terms
ORGANIC GROWTH PROFILE
Historic reserves & resourcesLarge holding in 2 significantly endowed nickel provinces
1,250
Cosmos Nickel Complex / Odysseus – Western Australia
 Existing resources and infrastructure (previous Glencore/ 
Xstrata/Jubilee Mines operation)
750
1,000
el(kt)
Xstrata/Jubilee Mines operation)
 Option to develop a new West Australian integrated Nickel 
operation
500
ontainedNicke
980%Forrestania Operations – Western Australia
 New Morning project – Near mine leveraging existing 
infrastructure with studies underway
250
Co
 History of reserve/resource extension
 Mill Recovery Enhancement Project – lift metallurgical 
recoveries by 3‐5%
0
Reser es Reso rces C m lati e nickel mined
recoveries by 3 5%
Western Gawler – South Australia
 First mover advantage
Reserves Resources Cumulative nickel mined
WSA has a track‐record of discovery and development
 Intrusive style and geologically similar to Nova
ASX:WSAASX:WSA 8
WSA has a track record of  discovery and development
MANAGING THROUGH THE CYCLE
Reducing cost  Cash cost reduction has been a consistent featureg
structure
f
 Expertise in waste dilution and maximising grade and tonnage versus reserve
 Maximising plant and equipment productivity
 Absolute cost out with contractors, suppliers and at the corporate level
Prudent capital 
management
Remaining debt free with A$76m cash at bank
D f d h Mill E h P j b 6 h b l l d i d dmanagement  Deferred the Mill Enhancement Project by 6 months, but long lead items ordered
 Exploration spend reduced, but still robust. Focus on Cosmos and Western Gawler
 Retain a strong balance sheet to provide flexibility
Opportunistic 
approach
Build portfolio
 Add quality projects that suffer through a lack of funding and/or play to our core
strengths
Maintain valuation discipline
 Be patient in assessing opportunities. Do not succumb to the fear of “missing out”p g pp g
The cost structure and capabilities to prosper throughout the cycle
ASX:WSAASX:WSA 9
The cost structure and capabilities to prosper throughout the cycle
FY16 GUIDANCE MET AND EXCEEDED
FY16 G id FY16 A lGuidance FY16 Guidance FY16 Actual
Mine Production (Nickel in Ore) 25,000 to 27,000 27,607
Nickel in Concentrate Production 24,000 to 25,000 25,009, , ,
Unit Cash Cost of Production (In Concentrate) A$2.25 /lb to A$2.45/lb A$2.26/lb
Sustaining Capex A$34.0m Reported with FY16 Results
Forrestania and Regional Exploration A$11.0m Reported with FY16 Results
Mill Enhancement* A$7.4m Reported with FY16 Results
Cosmos Exploration and Study Work A$4.0m Reported with FY16 Results
Comments
 Capex and exploration results to be reported in August – likely to be below or at guidance levels
Cosmos Exploration and Study Work A$4.0m Reported with FY16 Results
g g
 Production outperformance driven by strong June quarter and record mill throughput
 Unit cash cost of production lower than last year with cost reduction program
 FY17 Guidance to be provided with release of FY16 Financial Results in AugustFY17 Guidance to be provided with release of FY16 Financial Results in August
Five consecutive financial years of meeting or beating guidance – no misses
ASX:WSAASX:WSA 10
Five consecutive financial years of meeting or beating guidance  no misses
JUNE 2016 QUARTERLY REPORTQ
FY16 ‐ Some Facts
 ALL FY16 GUIDANCE METRICS MET OR
YTD
Tonnes Mined Sep Qtr Dec Qtr Mar Qtr Jun Qtr Total
FY16
 ALL FY16 GUIDANCE METRICS MET OR 
BEATEN
 LTIFR – ZERO – over 2 years LTI free
Flying Fox
Ore Tonnes Mined Tns 67,400      76,163      62,017      68,161      273,741   
Grade Ni % 4.7% 4.2% 4.6% 4.7% 4.5%
Ni Tonnes Mined Tns 3,155        3,183        2,876        3,218        12,432     
Spotted Quoll ‐ Underground
 Record Spotted Quoll mine production 
of 15,175 nickel tonnes
 Highest Flying Fox production in the
Ore Tonnes Mined Tns 80,702      81,318      82,711      71,774      316,505   
Grade Ni % 4.8% 4.6% 4.7% 5.0% 4.8%
Ni Tonnes Mined Tns 3,905        3,734        3,922        3,614        15,175     
Total ‐ Ore Tonnes Mined Tns 148,102    157,481    144,728    139,935    590,246   
Grade Ni % 4 8% 4 4% 4 7% 4 9% 4 7%  Highest Flying Fox production in the 
June quarter
 Unit cash cost of production at 
A$2 26/lb (US$1 64/lb) f i k l
Grade Ni % 4.8% 4.4% 4.7% 4.9% 4.7%
Total Ni Tonnes Mined Tns 7,060        6,917        6,798        6,832        27,607     
YTD
Tonnes Milled and Sold Sep Qtr Dec Qtr Mar Qtr Jun Qtr Total
Ore Processed Tns 153,540    152,435    156,190    154,114    616,279   
FY16
A$2.26/lb (US$1.64/lb) of nickel 
contained in concentrate
 Record mill throughput for the year at 
Grade % 4.6% 4.6% 4.4% 4.5% 4.5%
Ave. Recovery % 89% 89% 90% 90% 90%
Ni Tonnes in Concentrate Produced Tns 6,252        6,256        6,180        6,321        25,009     
Ni Tonnes in Concentrate Sold Tns 6,233        6,281        6,011        6,268        24,793     
FY16
616,279 tonnes (and record month in 
June)
Financial Statistics Sep Qtr Dec Qtr Mar Qtr Jun Qtr YTD
Cash Cost Ni in Con (***) A$/lb 2.26          2.24          2.27          2.25          2.26         
Cash Cost Ni in Con/lb (***) US$/lb (**) 1.64         1.61         1.64         1.68         1.64        
FY16
Exchange Rate US$ / A$ 0.73       0.72       0.72       0.75       0.73       
ASX:WSAASX:WSA 11
A management team which consistently delivers guidance
INVESTMENT HIGHLIGHTS
 One of the highest grade mines and lowest unit cash cost nickel concentrate producers
 A history of discovery and development
 A proven operator led by an experienced management team
 Operating cash flow positive, despite the current cyclically low nickel prices
 Guidance consistently met or exceeded
 Net cash with significant balance sheet flexibility and strength
 Strong safety track record with zero Lost Time Injuries for over 2 years
 An S&P/ASX 200 index member
 Strategic owner of sought after nickel in concentrate
 Committed to stable organic growth with a pipeline of growth opportunities including the 
recently acquired Cosmos Nickel Complex
 Well positioned to benefit from an improvement in nickel price sentiment and outlook Well positioned to benefit from an improvement in nickel price sentiment and outlook
 A good time to be exploring with significantly lower costs, whilst having the ability to asses 
small scale opportunities
ASX:WSAASX:WSA 12
OPERATIONS
ASX:WSAASX:WSAASX:WSA 13
LOCATION, LOCATION, LOCATION……, ,
Lounge Lizard 10m wide face of 7% Massive Nickel SulphideLounge Lizard 10m wide face of 7% Massive Nickel Sulphide
Premier and stable mining district with high quality mines and organic growth options
Spotted Quoll face at average 10.6% Nickel Sulphide
ASX:WSAASX:WSA 14
Premier and stable mining district with high quality mines and organic growth options
FLYING FOX MINE
Reserve 1.2Mt @ 4.0%
Contained nickel
@
48,280 Ni tonnes
Resource
Contained nickel
2.0Mt @ 5.1%
102 212 Ni tonnesContained nickel 102,212 Ni tonnes
Mine life 5 years
Key points
 Reserve life has a demonstrated history of 
replenishmentreplenishment
 Added OTZ South Massive Zone – 182,898t @ 4.1% 
Ni for 7,417 nickel tonnes
 Recent drilling into T5 and T6 domain has been 
encouraging, including 6.3m @ 8.0% Ni
 Has been operating for over 10 yearsHas been operating for over 10 years
WSA’s foundation asset within Forrestania
ASX:WSAASX:WSA 15
WSA s foundation asset within Forrestania
SPOTTED QUOLL MINEQ
Reserve 2.4Mt @ 4.0%
Contained nickel
@
97,030 Ni tonnes
Resource
Contained nickel
2.3Mt @ 5.3%
119 756 Ni tonnesContained nickel 119,756 Ni tonnes
Mine life  +8 years
Key points
 Discovered by WSA in 2007, 6km south of Flying Fox
 Remains open at depth and to the North
 Production has outperformed reserve tonnes and 
grade consistently
 Top down mining with paste fill
 Has never recorded an LTI
WSA Explored Discovered and Developed
ASX:WSAASX:WSA 16
WSA Explored, Discovered and Developed
FORRESTANIA NICKEL CONCENTRATOR
Concentrator Summary
 Current nameplate capacity of 550,000tpa have been achieving 
over 10% above
 Mill processed 616kt of ore in FY16 for 25 009 nickel tonnes Mill processed 616kt of ore in FY16, for 25,009 nickel tonnes
 Concentrate grades of between 14.0% to 15.5% Ni 
 Premium blending product (Fe/Mg ratio >15:1) Premium blending  product (Fe/Mg ratio >15:1)
 Desirable to smelters
 14,000t of concentrate storage capacity
Export Infrastructure and Logistics 
 Well established container logistics chain into China
 Shipping contract in place, FOB Esperance Port
 BHPB Nickel West concentrate delivered to Kambalda
WSA produces a high quality and in demand nickel concentrate
ASX:WSAASX:WSA 17
WSA produces a high quality and in demand nickel concentrate
INDEPENDENT PRODUCER – OFFTAKE CONTRACTS
Offtake Contracts
 FOB Terms
 Very competitive payable percentage of LME
Offtake Status – Opportunities for Western Areas
 10ktpa contract for BHPB expires for first time in 7 years
BHPB
~12ktpa
JINCHUAN
~13ktpa
D 2016 10ktpa contract for BHPB expires for first time in 7 years
 Tender process commences in September quarter
 Potential growth in roasting market in Asia the Company
~12ktpa
Dec 2017
Dec 2016
 Potential growth in roasting market in Asia – the Company 
is investigating alternative markets
 Shortage of high quality premium blending concentrate
 Strong EOI’s already received from new and existing 
parties
Well positioned to take advantage of tight market conditions
ASX:WSAASX:WSA 18
Well positioned to take advantage of tight market conditions
GROWTH AND EXPLORATION OUTLOOK
ASX:WSAASX:WSAASX:WSA 19
... WHILE PRUDENTLY BUILDING THE PLATFORM
Production Development Exploration & Growth
Spotted Quoll Odysseus PFS Western Gawler JV
Flying Fox
Mill Recovery Enhancement 
New Morning
Forrestania & Lithium
Cosmos
Cosmic Boy Concentrator
y
Project
Forrestania & Lithium
A portfolio with production longevity and growth optionality
Cosmic Boy Concentrator
ASX:WSAASX:WSA 20
A portfolio with production longevity and growth optionality 
COSMOS ACQUISITIONQ
Strategic Rationale
 Low cost entry
 Plays to WSA’s core strengths
 Right street address
 WSA approach to exploration will be different
 Potential 2nd operation – FY19
 Full infrastructure and facilities
 Future potential concentrate blending
 “Ready to go” when nickel prices support development
Settlement Completed – 100% Owned
 Paid A$12.653m in April 2016 as full and final settlement
ASX:WSAASX:WSA 21
COSMOS AERIAL VIEW
Significant infrastructure in place:
 450ktpa mill with expansion options
 Tailings storage and evaporation ponds
 Concentrate storage
 Coreyard facilities
 Gas connection
 Mill and mining spares inventory
 Approximately 500 person accommodation 
village
 Recreational facilities
 Aerodrome
 Administration and workshop buildings
 Telecommunications
ASX:WSAASX:WSA 22
COSMOS EXPLORATION
 Tenements covering 88km2
 N t BHP L i t i k l ti Near to BHP Leinster nickel operations
 Previous highest grade open pit nickel mine globally
 17km long ultramafic sequence
 Dominated by high MgO ultramafic rocksy g g
 Similar to Forrestania, higher than Leinster
 Mining grades around 5% Nickel
( l k d ) Focus on Neptune (previously Lake Miranda)
 Heritage surveys successfully completed
 Section 18 lodged
 Significant anomalies detected through MLEM
 Drilling targeted by end of CY16
 Review of Xstrata drill data base reveals intersections Review of Xstrata drill data base reveals intersections 
requiring follow‐up work
 Prospero ‐ 4.2m @ 12.5% Ni (incl 2.4m @ 19.7% Ni)
 Aries 4 5m @ 12 3% Ni and 3 3m @ 10 6% Ni Aries – 4.5m @ 12.3% Ni and 3.3m @ 10.6% Ni
 DHEM being completed between Odysseus and 
Prospero
ASX:WSAASX:WSA 23
ODYSSEUS PRE‐FEASIBILITY STUDY
Significant undeveloped resource containing massive sulphides, matrix sulphides and high grade 
disseminated sulphidesp
Xstrata Scoping Study Update Completed
Si ifi t i 30% id tifi d f ti d it l t Significant savings >30% identified for operating and capital costs
 Board approved commencement of the pre‐feasibility study
P f ibili S dPre‐feasibility Study
 Targeted completion in December quarter
 Review mining method, mining schedule, underground infrastructure and decline dewatering options
 Reduce concentrate grade specification in line with FNO grades to improve nickel recovery 
 Review metallurgical testwork and flow sheet to optimise processing plant
 Further optimise capital and operating cost assumptions for the current lower cost environment
 Explore contractor versus owner operator alternatives and leverage FNO experience
ASX:WSAASX:WSA 24
ODYSSEUS COMPLEX AND OTHER RESOURCES
Cosmos
d i
Mt Goode
52.9Mt @ 0.62% Ni (327Kt Ni) ‐ 250m
Actual decline infrastructure
C D
AM6 + Odysseus Deposits:
9.4Mt @ 2.4% Ni (227Kt Ni)
AM5(partially mined)
‐ 500m
Odysseus Odysseus North
Cosmos Deeps
AM1
AM5(partially mined)
0.5Mt @ 2.6% Ni (13Kt Ni)
‐ 750m
4.0Mt @ 2.2% Ni (88Kt Ni) 3.2Mt @ 2.5% Ni (81Kt Ni)
15.6m @ 3.9% Ni
‐ 1,000m
AM6 (unmined)
Longitudinal Section – Looking West
AM6 (unmined)
2Mt @ 2.6% Ni (53Kt Ni)
Untested EM Plates
5.4m @ 12% Ni
Odysseus Massive
48Kt @ 11.6% Ni (5.5Kt Ni)
ASX:WSAASX:WSA 25
WESTERN GAWLER JOINT VENTURES – SOUTH AUSTRALIA
 Two separate agreements with Strandline 
Resources Ltd and Monax Mining Ltd:
 Monax withdrawn from JV – now 100% WSA
 Strandline farm in agreement – WSA 75%
 First mover advantages targeting massive high 
grade poly‐metallic mineralisation
 Potential to host mafic‐ultramafic intrusive relatedPotential to host mafic ultramafic intrusive related 
deposits
 High resolution airborne geophysics completed 
(57,477km were flown)(57,477km were flown)
 Numerous features likely to represent large mafic‐
ultramafic intrusions
ASX:WSAASX:WSA 26
EXPLORATION SUMMARY
i d illi i h i l
Broad scale prospectivity for Ni/Cu and Gold
 Ongoing RC drilling with encouraging early 
results
 Targeting potential mafic/ultramafic 
intrusions and generating geochemical targets 
in the broader areas
 115 AC/RC/DD drill holes completed to date/ / p
 Full heritage access approvals nearing 
completion
 Geochemical review of drilling data highlights 
gold anomalism, confirms base metal 
potential
 Petrology confirms the presence of intrusive 
mafic and ultramafic rocks
Exploration activity overlaying magnetics (RTP)
10km
ASX:WSAASX:WSA
Exploration activity overlaying magnetics (RTP) 
Insets show residual gravity overlaying magnetics (RTP)
27
FORRESTANIA – NEAR MINE EXPLORATION
Focus is on near mine opportunities
ASX:WSAASX:WSA 28
NEW MORNING
 2 5km from Flying Fox and 2 8km from Spotted2.5km from Flying Fox and 2.8km from Spotted 
Quoll
 All material approvals in place, potential major 
i d ibl f ith icapex savings and accessible from either mine
 Open Pit and shallow underground studies 
commenced
 Massive sulphide Indicated Resource of 321.8kt 
@ 3.7% nickel
 Si ifi t i t ti Significant intersections:
 4.4m @ 7.4% nickel including 3.6m @ 8.7% 
nickel
 3 0m @ 6 3% nickel including 2 4m @ 7 6% 3.0m @ 6.3% nickel including 2.4m @ 7.6% 
nickel 
 1.5m @ 5.6% nickel including 0.7m @ 10.2% 
nickel
 Recent shallow hit of 54m @ 1.7% nickel from 
38m (including 2.5m @ 5.0% nickel)
ASX:WSAASX:WSA 29
NICKEL MARKET
ASX:WSAASX:WSAASX:WSA 30
NICKEL MARKET SNAPSHOT
 Historically, on a through the cycle basis, the 90th percentile on the cost curve has acted as aHistorically, on a through the cycle basis, the 90 percentile on the cost curve has acted as a 
catalyst for supply / demand adjustments by the nickel market
 The nickel price is now trading below the 50th percentile on the cash cost curve 
 WSA believes >60% of producers losing money, even before sustaining capex
 WSA is one of the few nickel miners with a positive gross margin
Historic spot prices v cash cost ‐ CopperHistoric spot prices v cash cost ‐ Nickel
4 5
3.0
4.5
16
24
1.5
US$/lb
8
16
US$/lb
0.0
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
Cu spot 90th percentile 50th percentile
0
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
Ni spot 90th percentile 50th percentile
ASX:WSAASX:WSA 31
Cu spot 90th percentile 50th percentileNi spot 90th percentile 50th percentile
NICKEL PRICE DRIVERS
There are a number of factors that influence the nickel price including:
1. LME and Chinese (SHFE) nickel inventories
2. Cost and capacity of Chinese nickel pig iron (“NPI”) production
3. Philippine government change and near political issues 
4. Global stainless steel demand
What we believe is occurring:
 High grade Indonesian laterite stockpiles in China have depleted
 Philippine exports of high grade falling, some mines now closed
 LME stockpile has decreased from record highs, with some transfers to the SHFELME stockpile has decreased from record highs, with some transfers to the SHFE
 Stainless steel demand (300 series) on balance remains solid in China, however significant de‐
stocking over the first half of CY15 has occurred
 Nickel supply closures now occurring, NPI production down and market now in structural deficit
ASX:WSAASX:WSA 32
WESTERN AREAS VALUE EQUATIONQ
• High Grade = 
Margin
• Lowest Quartile
• Consistent 
returns to 
shareholders in 
• Guidance 
continually met 
or exceeded
• Zero Lost Time 
Injuries in past 
12 monthsLowest Quartile 
Cash Costs
Highest Grade 
Dividends
Cashflow 
Strong Track 
R d f Safet
g
Nickel Globally Positive
Record of 
Delivery
Safety
• Pipeline of 
growth 
opportunities
• Fundamentals 
and forecasts 
positioned to
• New mine 
successfully 
brought on in
• No debt with 
significant 
financialopportunities positioned to 
rebound
Nickel Price
brought on in 
24 months
History of
financial 
flexibility
Growth
Nickel Price 
Primed for 
Upside
History of 
Discovery and 
Development
Strong Balance 
Sheet
ASX:WSAASX:WSA 33
APPENDIX
ASX:WSAASX:WSAASX:WSA 34
EXPERIENCED BOARD AND SENIOR MANAGEMENT TEAM
Ian Macliver Dan Lougher David Southam Joseph BelladonnaIan Macliver
Independent Non-Executive Chairman
Dan Lougher
Managing Director & CEO
David Southam
Executive Director
Joseph Belladonna
CFO & Company Secretary
Mr Macliver is a Chartered Accountant
with many years experience as a senior
executive and Director of both resource
Mr Lougher is a qualified Mining
Engineer with over 30 years experience
in all facets of resource and mining,
Mr Southam is a Certified Practicing
Accountant with over 20 years
experience in accounting, capital
Mr Belladonna has been responsible
for the initial set-up and ongoing
management of the Group's accounting
and industrial companies, with
particular responsibility for capital
raising and other corporate
development initiatives
project exploration, feasibility,
development and operational activities
in Australia and overseas
markets, banking and finance across
the resources and industrial sectors
and information systems, corporate
governance, and the risk management
program of the Company
Richard Yeates
Independent, Non-Executive Director
Craig Readhead
Independent, Non-Executive Director
Tim Netscher
Independent, Non-Executive Director
Mr Yeates is a Geologist with more
than 30 years mining industry
experience in various roles and has
significant experience across a wide
range of resource projects around the
world
Mr Readhead is a Lawyer with over 30
years legal and corporate advisory
experience with specialisation in the
resources sector, including the
implementation of large scale mining
projects both in Australia and overseas
Mr Netscher is a Metallurgist and has
significant broad-based experience at
senior levels in the international
resources industry, in roles spanning
marketing, operations management,
project management and business
ASX:WSAASX:WSA 35
world projects both in Australia and overseas project management and business
development
COSMOS INFRASTRUCTURE
Mill with tailings dam in background Refuge chambers
ASX:WSAASX:WSA 36
Water evaporation fansMill infrastructure
COSMOS INFRASTRUCTURE
Administration infrastructure Spare and brand new SAG mill in storage
ASX:WSAASX:WSA 37
Fuel tanks Aerodrome infrastructure
MILL RECOVERY ENHANCEMENT PROJECT
 Increase average nickel recoveries from 3% to 5% over the life of mine
 A$22m project with 6 month construction time
 Project construction has been deferred until July 2016 as part of capex optimisation initiatives
 Long lead items ordered A$7 4m Long lead items ordered – A$7.4m
 Unit cash operating cost A$2.42/lb in concentrate
 The treatment of the Flash Cleaner Stream utilises the BioHeap® cultures 
 Very short residence time of 5‐7 days 
 Sulphide precipitation circuit produces a high grade nickel sulphide product (~50% nickel)
WSA is at the forefront of technological improvements
ASX:WSAASX:WSA 38
WSA is at the forefront of technological improvements
FORRESTANIA TENEMENTS
Regional Geology
 120km strike length (900 sq km) of 
prospective Forrestania Nickel Project, 
within 400km long nickel provincewithin 400km long nickel province
 Total endowment of 29.97Mt at 2.28% Ni 
for 684k Ni tonnes
 Nickel sulphide deposits and most 
occurrences in two belts (Eastern and 
W )Western)
 Western Ultramafic Belt hosts the high 
grade Flying Fox Spotted Quoll and Newgrade Flying Fox, Spotted Quoll and New 
Morning deposits
ASX:WSAASX:WSA 39

More Related Content

What's hot

Corporate Presentation February 2017
Corporate Presentation February 2017Corporate Presentation February 2017
Corporate Presentation February 2017Western Areas Ltd
 
Corporate Presentation June 2016
Corporate Presentation June 2016Corporate Presentation June 2016
Corporate Presentation June 2016Western Areas Ltd
 
Western Areas FY 2013 Results Presentation
Western Areas FY 2013 Results PresentationWestern Areas FY 2013 Results Presentation
Western Areas FY 2013 Results PresentationWestern Areas Ltd
 
Corporate Presentation October 2016
Corporate Presentation October 2016Corporate Presentation October 2016
Corporate Presentation October 2016Western Areas Ltd
 
Corporate Presentation March 2016
Corporate Presentation March 2016Corporate Presentation March 2016
Corporate Presentation March 2016Western Areas Ltd
 
Diggers & Dealers Presentation Aug 2017
Diggers & Dealers Presentation Aug 2017Diggers & Dealers Presentation Aug 2017
Diggers & Dealers Presentation Aug 2017Rebekah Webb
 
Western Areas FY16 Financial Results Presentation
 Western Areas FY16 Financial Results Presentation   Western Areas FY16 Financial Results Presentation
Western Areas FY16 Financial Results Presentation Western Areas Ltd
 
Corporate Presentation May 2017
Corporate Presentation May 2017Corporate Presentation May 2017
Corporate Presentation May 2017Western Areas Ltd
 
Corporate Presentation October 2014
Corporate Presentation October 2014Corporate Presentation October 2014
Corporate Presentation October 2014Western Areas Ltd
 
Corporate Presentation March 2019
Corporate Presentation March 2019Corporate Presentation March 2019
Corporate Presentation March 2019Western Areas Ltd
 
Corporate Presentation April 2013
Corporate Presentation April 2013Corporate Presentation April 2013
Corporate Presentation April 2013Western Areas Ltd
 
Corporate Presentation June 2017
Corporate Presentation June 2017Corporate Presentation June 2017
Corporate Presentation June 2017Western Areas Ltd
 
Corporate Presentation May 2013
Corporate Presentation May 2013Corporate Presentation May 2013
Corporate Presentation May 2013Western Areas Ltd
 
Corporate Presentation March 2018
Corporate Presentation March 2018Corporate Presentation March 2018
Corporate Presentation March 2018Rebekah Webb
 
Corporate Presentation November 2017
Corporate Presentation November 2017Corporate Presentation November 2017
Corporate Presentation November 2017Rebekah Webb
 
Corporate Presentation October 2015
Corporate Presentation October 2015Corporate Presentation October 2015
Corporate Presentation October 2015Western Areas Ltd
 
Corporate Presentation June 2015
Corporate Presentation June 2015Corporate Presentation June 2015
Corporate Presentation June 2015Western Areas Ltd
 
Corporate Presentation June 2013
Corporate Presentation June 2013Corporate Presentation June 2013
Corporate Presentation June 2013Western Areas Ltd
 
Diggers and Dealers Presentation August 2015
Diggers and Dealers Presentation August 2015Diggers and Dealers Presentation August 2015
Diggers and Dealers Presentation August 2015Western Areas Ltd
 
Corporate Presentation November 2015
Corporate Presentation November 2015Corporate Presentation November 2015
Corporate Presentation November 2015Western Areas Ltd
 

What's hot (20)

Corporate Presentation February 2017
Corporate Presentation February 2017Corporate Presentation February 2017
Corporate Presentation February 2017
 
Corporate Presentation June 2016
Corporate Presentation June 2016Corporate Presentation June 2016
Corporate Presentation June 2016
 
Western Areas FY 2013 Results Presentation
Western Areas FY 2013 Results PresentationWestern Areas FY 2013 Results Presentation
Western Areas FY 2013 Results Presentation
 
Corporate Presentation October 2016
Corporate Presentation October 2016Corporate Presentation October 2016
Corporate Presentation October 2016
 
Corporate Presentation March 2016
Corporate Presentation March 2016Corporate Presentation March 2016
Corporate Presentation March 2016
 
Diggers & Dealers Presentation Aug 2017
Diggers & Dealers Presentation Aug 2017Diggers & Dealers Presentation Aug 2017
Diggers & Dealers Presentation Aug 2017
 
Western Areas FY16 Financial Results Presentation
 Western Areas FY16 Financial Results Presentation   Western Areas FY16 Financial Results Presentation
Western Areas FY16 Financial Results Presentation
 
Corporate Presentation May 2017
Corporate Presentation May 2017Corporate Presentation May 2017
Corporate Presentation May 2017
 
Corporate Presentation October 2014
Corporate Presentation October 2014Corporate Presentation October 2014
Corporate Presentation October 2014
 
Corporate Presentation March 2019
Corporate Presentation March 2019Corporate Presentation March 2019
Corporate Presentation March 2019
 
Corporate Presentation April 2013
Corporate Presentation April 2013Corporate Presentation April 2013
Corporate Presentation April 2013
 
Corporate Presentation June 2017
Corporate Presentation June 2017Corporate Presentation June 2017
Corporate Presentation June 2017
 
Corporate Presentation May 2013
Corporate Presentation May 2013Corporate Presentation May 2013
Corporate Presentation May 2013
 
Corporate Presentation March 2018
Corporate Presentation March 2018Corporate Presentation March 2018
Corporate Presentation March 2018
 
Corporate Presentation November 2017
Corporate Presentation November 2017Corporate Presentation November 2017
Corporate Presentation November 2017
 
Corporate Presentation October 2015
Corporate Presentation October 2015Corporate Presentation October 2015
Corporate Presentation October 2015
 
Corporate Presentation June 2015
Corporate Presentation June 2015Corporate Presentation June 2015
Corporate Presentation June 2015
 
Corporate Presentation June 2013
Corporate Presentation June 2013Corporate Presentation June 2013
Corporate Presentation June 2013
 
Diggers and Dealers Presentation August 2015
Diggers and Dealers Presentation August 2015Diggers and Dealers Presentation August 2015
Diggers and Dealers Presentation August 2015
 
Corporate Presentation November 2015
Corporate Presentation November 2015Corporate Presentation November 2015
Corporate Presentation November 2015
 

Viewers also liked

Corporate Presentation February 2014
Corporate Presentation February 2014Corporate Presentation February 2014
Corporate Presentation February 2014Western Areas Ltd
 
Equity Raising Presentation March 2016
Equity Raising Presentation March 2016Equity Raising Presentation March 2016
Equity Raising Presentation March 2016Western Areas Ltd
 
Western Areas Corporate Presentation April 2015
Western Areas Corporate Presentation April 2015Western Areas Corporate Presentation April 2015
Western Areas Corporate Presentation April 2015Western Areas Ltd
 
Half Year Results Presentation February 2015
Half Year Results Presentation February 2015Half Year Results Presentation February 2015
Half Year Results Presentation February 2015Western Areas Ltd
 
Western Areas FY12 full Year financials
Western Areas FY12 full Year financialsWestern Areas FY12 full Year financials
Western Areas FY12 full Year financialsWestern Areas Ltd
 
Half Year Results Presentation February 2016
Half Year Results Presentation February 2016Half Year Results Presentation February 2016
Half Year Results Presentation February 2016Western Areas Ltd
 
Diggers & Dealers Presentation Aug 2016
Diggers & Dealers Presentation Aug 2016Diggers & Dealers Presentation Aug 2016
Diggers & Dealers Presentation Aug 2016Western Areas Ltd
 
Corporate Presentation May 2014
Corporate Presentation May 2014Corporate Presentation May 2014
Corporate Presentation May 2014Western Areas Ltd
 
Western Areas Half Year Results Presentation Feb 2013
Western Areas Half Year Results Presentation Feb 2013Western Areas Half Year Results Presentation Feb 2013
Western Areas Half Year Results Presentation Feb 2013Western Areas Ltd
 
Corporate Presentation May 2016
Corporate Presentation May 2016Corporate Presentation May 2016
Corporate Presentation May 2016Western Areas Ltd
 
Corporate Presentation December 2014
Corporate Presentation December 2014Corporate Presentation December 2014
Corporate Presentation December 2014Western Areas Ltd
 
Half Year Results Presentation February 2014
Half Year Results Presentation February 2014Half Year Results Presentation February 2014
Half Year Results Presentation February 2014Western Areas Ltd
 
Corporate Presentation December 2013
Corporate Presentation December 2013Corporate Presentation December 2013
Corporate Presentation December 2013Western Areas Ltd
 

Viewers also liked (15)

Corporate Presentation February 2014
Corporate Presentation February 2014Corporate Presentation February 2014
Corporate Presentation February 2014
 
FY 15 Results Presentation
FY 15 Results PresentationFY 15 Results Presentation
FY 15 Results Presentation
 
Equity Raising Presentation March 2016
Equity Raising Presentation March 2016Equity Raising Presentation March 2016
Equity Raising Presentation March 2016
 
Western Areas Corporate Presentation April 2015
Western Areas Corporate Presentation April 2015Western Areas Corporate Presentation April 2015
Western Areas Corporate Presentation April 2015
 
Half Year Results Presentation February 2015
Half Year Results Presentation February 2015Half Year Results Presentation February 2015
Half Year Results Presentation February 2015
 
Western Areas FY12 full Year financials
Western Areas FY12 full Year financialsWestern Areas FY12 full Year financials
Western Areas FY12 full Year financials
 
Half Year Results Presentation February 2016
Half Year Results Presentation February 2016Half Year Results Presentation February 2016
Half Year Results Presentation February 2016
 
Diggers & Dealers Presentation Aug 2016
Diggers & Dealers Presentation Aug 2016Diggers & Dealers Presentation Aug 2016
Diggers & Dealers Presentation Aug 2016
 
FY2014 Results Presentation
FY2014 Results PresentationFY2014 Results Presentation
FY2014 Results Presentation
 
Corporate Presentation May 2014
Corporate Presentation May 2014Corporate Presentation May 2014
Corporate Presentation May 2014
 
Western Areas Half Year Results Presentation Feb 2013
Western Areas Half Year Results Presentation Feb 2013Western Areas Half Year Results Presentation Feb 2013
Western Areas Half Year Results Presentation Feb 2013
 
Corporate Presentation May 2016
Corporate Presentation May 2016Corporate Presentation May 2016
Corporate Presentation May 2016
 
Corporate Presentation December 2014
Corporate Presentation December 2014Corporate Presentation December 2014
Corporate Presentation December 2014
 
Half Year Results Presentation February 2014
Half Year Results Presentation February 2014Half Year Results Presentation February 2014
Half Year Results Presentation February 2014
 
Corporate Presentation December 2013
Corporate Presentation December 2013Corporate Presentation December 2013
Corporate Presentation December 2013
 

Similar to Corporate Presentation July 2016

Corporate Presentation September 2016
Corporate Presentation September 2016Corporate Presentation September 2016
Corporate Presentation September 2016Western Areas Ltd
 
Corporate Presentation November 2016
Corporate Presentation November 2016Corporate Presentation November 2016
Corporate Presentation November 2016Western Areas Ltd
 
Corporate Presentation March 2017
Corporate Presentation March 2017Corporate Presentation March 2017
Corporate Presentation March 2017Western Areas Ltd
 
Australian Nickel Conference October 2018
Australian Nickel Conference October 2018 Australian Nickel Conference October 2018
Australian Nickel Conference October 2018 Western Areas Ltd
 
Corporate Presentation August 2017
Corporate Presentation August 2017Corporate Presentation August 2017
Corporate Presentation August 2017Western Areas Ltd
 
Corporate Presentation May 2019
Corporate Presentation May 2019Corporate Presentation May 2019
Corporate Presentation May 2019Western Areas Ltd
 
Rox Resources (ASX:RXL) Investor Presentation February 2015
Rox Resources (ASX:RXL) Investor Presentation February 2015Rox Resources (ASX:RXL) Investor Presentation February 2015
Rox Resources (ASX:RXL) Investor Presentation February 2015Symposium
 
Corporate presentation November 2018
Corporate presentation November 2018Corporate presentation November 2018
Corporate presentation November 2018Western Areas Ltd
 
Corporate Presentation December 2018
Corporate Presentation December 2018Corporate Presentation December 2018
Corporate Presentation December 2018Western Areas Ltd
 

Similar to Corporate Presentation July 2016 (9)

Corporate Presentation September 2016
Corporate Presentation September 2016Corporate Presentation September 2016
Corporate Presentation September 2016
 
Corporate Presentation November 2016
Corporate Presentation November 2016Corporate Presentation November 2016
Corporate Presentation November 2016
 
Corporate Presentation March 2017
Corporate Presentation March 2017Corporate Presentation March 2017
Corporate Presentation March 2017
 
Australian Nickel Conference October 2018
Australian Nickel Conference October 2018 Australian Nickel Conference October 2018
Australian Nickel Conference October 2018
 
Corporate Presentation August 2017
Corporate Presentation August 2017Corporate Presentation August 2017
Corporate Presentation August 2017
 
Corporate Presentation May 2019
Corporate Presentation May 2019Corporate Presentation May 2019
Corporate Presentation May 2019
 
Rox Resources (ASX:RXL) Investor Presentation February 2015
Rox Resources (ASX:RXL) Investor Presentation February 2015Rox Resources (ASX:RXL) Investor Presentation February 2015
Rox Resources (ASX:RXL) Investor Presentation February 2015
 
Corporate presentation November 2018
Corporate presentation November 2018Corporate presentation November 2018
Corporate presentation November 2018
 
Corporate Presentation December 2018
Corporate Presentation December 2018Corporate Presentation December 2018
Corporate Presentation December 2018
 

More from Western Areas Ltd

Western Areas FY18 Financial Results Presentation
Western Areas FY18 Financial Results PresentationWestern Areas FY18 Financial Results Presentation
Western Areas FY18 Financial Results PresentationWestern Areas Ltd
 
Corporate Presentation August 2018
Corporate Presentation August 2018Corporate Presentation August 2018
Corporate Presentation August 2018Western Areas Ltd
 
Diggers & Dealers Presentation Aug 2018
Diggers & Dealers Presentation Aug 2018Diggers & Dealers Presentation Aug 2018
Diggers & Dealers Presentation Aug 2018Western Areas Ltd
 
Corporate Presentation June 2018
Corporate Presentation June 2018Corporate Presentation June 2018
Corporate Presentation June 2018Western Areas Ltd
 
Corporate Presentation May 2018
Corporate Presentation May 2018Corporate Presentation May 2018
Corporate Presentation May 2018Western Areas Ltd
 
Corporate Presentation April 2018
Corporate Presentation April 2018Corporate Presentation April 2018
Corporate Presentation April 2018Western Areas Ltd
 
Corporate Presentation July 2016
Corporate Presentation July 2016Corporate Presentation July 2016
Corporate Presentation July 2016Western Areas Ltd
 

More from Western Areas Ltd (8)

Western Areas FY18 Financial Results Presentation
Western Areas FY18 Financial Results PresentationWestern Areas FY18 Financial Results Presentation
Western Areas FY18 Financial Results Presentation
 
Corporate Presentation August 2018
Corporate Presentation August 2018Corporate Presentation August 2018
Corporate Presentation August 2018
 
Diggers & Dealers Presentation Aug 2018
Diggers & Dealers Presentation Aug 2018Diggers & Dealers Presentation Aug 2018
Diggers & Dealers Presentation Aug 2018
 
Corporate Presentation June 2018
Corporate Presentation June 2018Corporate Presentation June 2018
Corporate Presentation June 2018
 
Corporate Presentation May 2018
Corporate Presentation May 2018Corporate Presentation May 2018
Corporate Presentation May 2018
 
Corporate Presentation April 2018
Corporate Presentation April 2018Corporate Presentation April 2018
Corporate Presentation April 2018
 
Full Year Results FY16
Full Year Results FY16 Full Year Results FY16
Full Year Results FY16
 
Corporate Presentation July 2016
Corporate Presentation July 2016Corporate Presentation July 2016
Corporate Presentation July 2016
 

Recently uploaded

Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
LANDMARKS AND MONUMENTS IN NIGERIA.pptx
LANDMARKS  AND MONUMENTS IN NIGERIA.pptxLANDMARKS  AND MONUMENTS IN NIGERIA.pptx
LANDMARKS AND MONUMENTS IN NIGERIA.pptxBasil Achie
 
SBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSebastiano Panichella
 
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSimulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSebastiano Panichella
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfhenrik385807
 
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Salam Al-Karadaghi
 
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...henrik385807
 
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)Basil Achie
 
Philippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptPhilippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptssuser319dad
 
call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@vikas rana
 
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...NETWAYS
 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxmavinoikein
 
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Pooja Nehwal
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Krijn Poppe
 
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...NETWAYS
 
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...NETWAYS
 
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...NETWAYS
 
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxFamilyWorshipCenterD
 
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝soniya singh
 

Recently uploaded (20)

Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
LANDMARKS AND MONUMENTS IN NIGERIA.pptx
LANDMARKS  AND MONUMENTS IN NIGERIA.pptxLANDMARKS  AND MONUMENTS IN NIGERIA.pptx
LANDMARKS AND MONUMENTS IN NIGERIA.pptx
 
SBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation Track
 
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSimulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
 
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
 
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
 
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
 
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
 
Philippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptPhilippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.ppt
 
call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@
 
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptx
 
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
 
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
 
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
 
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
 
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
 
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
 

Corporate Presentation July 2016

  • 2. DISCLAIMER AND FORWARD LOOKING STATEMENTS This presentation is being furnished to you solely for your information and for your use and may not be copied, reproduced or redistributed to any other person in any manner. You agree to keep the contents of this presentation and these materials confidential. The information contained in this presentation does not f f ff h d h h f h f h d h h ll fconstitute or form any part of any offer or invitation to purchase any securities and neither the issue of the information nor anything contained herein shall form the basis of, or be relied upon in connection with, any contract or commitment on the part of any person to proceed with any transaction. The distribution of this presentation in jurisdictions outside Australia may be restricted by law, and persons into whose possession this presentation comes should inform themselves about, and observe, any such restrictions. This is not for distribution or dissemination in the U.S. The information contained in this presentation has been prepared by Western Areas Ltd. No representation or warranty, express or implied, is or will be made in or in relation to, and no responsibility or liability is or will be accepted by Western Areas Ltd, employees or representatives as to the accuracy or completeness of this information or any other written or oral information made available to any interested party or its advisers and any liability therefore is hereby expressly disclaimed. No party has any obligation to notify opinion changes or if it becomes aware of any inaccuracy in or omission from this presentation. All opinions and projections expressed in this presentation are given as of this date and are subject to change without noticeexpressed in this presentation are given as of this date and are subject to change without notice. This document contains forward‐looking statements including nickel production targets and cost estimates. These statements are based on assumptions and contingencies that are subject to change without notice, and certain risks and uncertainties that could cause the performance or achievements of Western Areas Ltd to differ materially from the information set forth herein. Often, but not always, forward looking statements can generally be identified by the use of forward looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”, “anticipate”, “continue”, and “guidance”, or other similar words and may include,looking words such as may , will , expect , intend , plan , estimate , anticipate , continue , and guidance , or other similar words and may include, without limitation, statements regarding plans, strategies and objectives of management, anticipated production and expected costs. Western Areas Ltd undertakes no obligation to revise these forward‐looking statements to reflect subsequent events or circumstances. Individuals should not place undue reliance on forward‐looking statements and are advised to make their own independent analysis and determination with respect to the forecasted periods, which reflect Western Areas Ltd’s view only as of the date hereof. The information within this PowerPoint presentation was compiled by Western Areas management, but the information as it relates to mineral resources and reserves was prepared by Mr. Dan Lougher and Mr. Andre Wulfse. Mr. Lougher and Mr. Wulfse are full time employees of Western Areas Ltd. Mr. Lougher and Mr. Wulfse are members of Australian Institute of Mining and Metallurgy (AusIMM) and have sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which they are undertaking to qualify as Competent Persons as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’(2012 JORC Code). Mr. Lougher and Mr. Wulfse consent to thep g p , ( ) g inclusion in this presentation of the matters based on the information in the form and context in which it appears. The information contained in this presentation in relation to the New Morning Deposit was prepared and first disclosed under the 2004 Edition of the JORC Code. It has not been updated since to comply with the 2012 JORC Code on the basis that the information has not materially changed since it was last reported. For the Purposes of Clause 3.4(e) in Canadian instrument 43‐101, the Company warrants that Mineral Resources which are not Mineral Reserves do not have ASX:WSAASX:WSA 2 demonstrated economic viability.
  • 3. AGENDAAGENDA Explore Minep Corporate Operations Produce Sales Operations Produce Sales Growth & Exploration Nickel MarketNickel Market ASX:WSAASX:WSA 3
  • 5. CORPORATE OVERVIEW ASX code WSAHigh quality assets Share price 2.58 Shares outstanding (m) 270.9 Market Cap (A$m) 1 698.9 g q y  Highest grade, low cash cost nickel producer  Operational cashflow positive at current prices p ( $ ) Cash (A$m)2 75.7 No debt, clean balance sheet, low costs  Further flexibility with undrawn A$50m ANZ facility Organic growth options  Low unit cash cost producer Cosmos Nickel Complex 567kt Ni resources Scoping study being reviewedg g p  Strong near‐mine and regional exploration  Cosmos exploration and Odysseus PFS Flying Fox 12.4kt Ni mined FY16 48.2kt Ni reserves 102 2kt Ni Positioned for nickel recovery  A$1/lb lift in nickel price = circa A$35m EBITDA 102.2kt Ni resources Spotted Quoll 15.2kt Ni mined FY16 97kt Ni  Portfolio delivers optionality A leading mid‐tier base metal producer 97kt Ni reserves 119.8kt Ni resources ASX:WSAASX:WSA 5 1. Based on share price of on 20 July 2016 2. Cash as at 30 June 2016 A leading mid tier base metal producer
  • 6. WESTERN AREAS ARE SAFE AREAS 12 h LTIFR iD LTI f 12 month LTIFR moving averageDays LTI free Nov-08 1 904 2,921 S tt d Q ll Exploration 1.0 1.5 2.0 LTIFR Aug-11 Oct-131,103 1,904 Cosmic Boy Concentrator Spotted Quoll 0.0 0.5 1.0 Safe operations make efficient operations Nov-131,086Flying Fox ASX:WSAASX:WSA 6 Safe operations make efficient operations
  • 7. CONSISTENT LOW COST OPERATIONS Cash cost Ni in conc. (LHS) Production – cont. Ni processed (RHS) WSA cost position provides ability to weather cyclical low nickel prices ASX:WSAASX:WSA 7 WSA cost position provides ability to weather cyclical low nickel prices WSA reports its unit cash cost on a nickel in concentrate basis given confidential offtake payable terms
  • 8. ORGANIC GROWTH PROFILE Historic reserves & resourcesLarge holding in 2 significantly endowed nickel provinces 1,250 Cosmos Nickel Complex / Odysseus – Western Australia  Existing resources and infrastructure (previous Glencore/  Xstrata/Jubilee Mines operation) 750 1,000 el(kt) Xstrata/Jubilee Mines operation)  Option to develop a new West Australian integrated Nickel  operation 500 ontainedNicke 980%Forrestania Operations – Western Australia  New Morning project – Near mine leveraging existing  infrastructure with studies underway 250 Co  History of reserve/resource extension  Mill Recovery Enhancement Project – lift metallurgical  recoveries by 3‐5% 0 Reser es Reso rces C m lati e nickel mined recoveries by 3 5% Western Gawler – South Australia  First mover advantage Reserves Resources Cumulative nickel mined WSA has a track‐record of discovery and development  Intrusive style and geologically similar to Nova ASX:WSAASX:WSA 8 WSA has a track record of  discovery and development
  • 9. MANAGING THROUGH THE CYCLE Reducing cost  Cash cost reduction has been a consistent featureg structure f  Expertise in waste dilution and maximising grade and tonnage versus reserve  Maximising plant and equipment productivity  Absolute cost out with contractors, suppliers and at the corporate level Prudent capital  management Remaining debt free with A$76m cash at bank D f d h Mill E h P j b 6 h b l l d i d dmanagement  Deferred the Mill Enhancement Project by 6 months, but long lead items ordered  Exploration spend reduced, but still robust. Focus on Cosmos and Western Gawler  Retain a strong balance sheet to provide flexibility Opportunistic  approach Build portfolio  Add quality projects that suffer through a lack of funding and/or play to our core strengths Maintain valuation discipline  Be patient in assessing opportunities. Do not succumb to the fear of “missing out”p g pp g The cost structure and capabilities to prosper throughout the cycle ASX:WSAASX:WSA 9 The cost structure and capabilities to prosper throughout the cycle
  • 10. FY16 GUIDANCE MET AND EXCEEDED FY16 G id FY16 A lGuidance FY16 Guidance FY16 Actual Mine Production (Nickel in Ore) 25,000 to 27,000 27,607 Nickel in Concentrate Production 24,000 to 25,000 25,009, , , Unit Cash Cost of Production (In Concentrate) A$2.25 /lb to A$2.45/lb A$2.26/lb Sustaining Capex A$34.0m Reported with FY16 Results Forrestania and Regional Exploration A$11.0m Reported with FY16 Results Mill Enhancement* A$7.4m Reported with FY16 Results Cosmos Exploration and Study Work A$4.0m Reported with FY16 Results Comments  Capex and exploration results to be reported in August – likely to be below or at guidance levels Cosmos Exploration and Study Work A$4.0m Reported with FY16 Results g g  Production outperformance driven by strong June quarter and record mill throughput  Unit cash cost of production lower than last year with cost reduction program  FY17 Guidance to be provided with release of FY16 Financial Results in AugustFY17 Guidance to be provided with release of FY16 Financial Results in August Five consecutive financial years of meeting or beating guidance – no misses ASX:WSAASX:WSA 10 Five consecutive financial years of meeting or beating guidance  no misses
  • 11. JUNE 2016 QUARTERLY REPORTQ FY16 ‐ Some Facts  ALL FY16 GUIDANCE METRICS MET OR YTD Tonnes Mined Sep Qtr Dec Qtr Mar Qtr Jun Qtr Total FY16  ALL FY16 GUIDANCE METRICS MET OR  BEATEN  LTIFR – ZERO – over 2 years LTI free Flying Fox Ore Tonnes Mined Tns 67,400      76,163      62,017      68,161      273,741    Grade Ni % 4.7% 4.2% 4.6% 4.7% 4.5% Ni Tonnes Mined Tns 3,155        3,183        2,876        3,218        12,432      Spotted Quoll ‐ Underground  Record Spotted Quoll mine production  of 15,175 nickel tonnes  Highest Flying Fox production in the Ore Tonnes Mined Tns 80,702      81,318      82,711      71,774      316,505    Grade Ni % 4.8% 4.6% 4.7% 5.0% 4.8% Ni Tonnes Mined Tns 3,905        3,734        3,922        3,614        15,175      Total ‐ Ore Tonnes Mined Tns 148,102    157,481    144,728    139,935    590,246    Grade Ni % 4 8% 4 4% 4 7% 4 9% 4 7%  Highest Flying Fox production in the  June quarter  Unit cash cost of production at  A$2 26/lb (US$1 64/lb) f i k l Grade Ni % 4.8% 4.4% 4.7% 4.9% 4.7% Total Ni Tonnes Mined Tns 7,060        6,917        6,798        6,832        27,607      YTD Tonnes Milled and Sold Sep Qtr Dec Qtr Mar Qtr Jun Qtr Total Ore Processed Tns 153,540    152,435    156,190    154,114    616,279    FY16 A$2.26/lb (US$1.64/lb) of nickel  contained in concentrate  Record mill throughput for the year at  Grade % 4.6% 4.6% 4.4% 4.5% 4.5% Ave. Recovery % 89% 89% 90% 90% 90% Ni Tonnes in Concentrate Produced Tns 6,252        6,256        6,180        6,321        25,009      Ni Tonnes in Concentrate Sold Tns 6,233        6,281        6,011        6,268        24,793      FY16 616,279 tonnes (and record month in  June) Financial Statistics Sep Qtr Dec Qtr Mar Qtr Jun Qtr YTD Cash Cost Ni in Con (***) A$/lb 2.26          2.24          2.27          2.25          2.26          Cash Cost Ni in Con/lb (***) US$/lb (**) 1.64         1.61         1.64         1.68         1.64         FY16 Exchange Rate US$ / A$ 0.73       0.72       0.72       0.75       0.73        ASX:WSAASX:WSA 11 A management team which consistently delivers guidance
  • 12. INVESTMENT HIGHLIGHTS  One of the highest grade mines and lowest unit cash cost nickel concentrate producers  A history of discovery and development  A proven operator led by an experienced management team  Operating cash flow positive, despite the current cyclically low nickel prices  Guidance consistently met or exceeded  Net cash with significant balance sheet flexibility and strength  Strong safety track record with zero Lost Time Injuries for over 2 years  An S&P/ASX 200 index member  Strategic owner of sought after nickel in concentrate  Committed to stable organic growth with a pipeline of growth opportunities including the  recently acquired Cosmos Nickel Complex  Well positioned to benefit from an improvement in nickel price sentiment and outlook Well positioned to benefit from an improvement in nickel price sentiment and outlook  A good time to be exploring with significantly lower costs, whilst having the ability to asses  small scale opportunities ASX:WSAASX:WSA 12
  • 14. LOCATION, LOCATION, LOCATION……, , Lounge Lizard 10m wide face of 7% Massive Nickel SulphideLounge Lizard 10m wide face of 7% Massive Nickel Sulphide Premier and stable mining district with high quality mines and organic growth options Spotted Quoll face at average 10.6% Nickel Sulphide ASX:WSAASX:WSA 14 Premier and stable mining district with high quality mines and organic growth options
  • 15. FLYING FOX MINE Reserve 1.2Mt @ 4.0% Contained nickel @ 48,280 Ni tonnes Resource Contained nickel 2.0Mt @ 5.1% 102 212 Ni tonnesContained nickel 102,212 Ni tonnes Mine life 5 years Key points  Reserve life has a demonstrated history of  replenishmentreplenishment  Added OTZ South Massive Zone – 182,898t @ 4.1%  Ni for 7,417 nickel tonnes  Recent drilling into T5 and T6 domain has been  encouraging, including 6.3m @ 8.0% Ni  Has been operating for over 10 yearsHas been operating for over 10 years WSA’s foundation asset within Forrestania ASX:WSAASX:WSA 15 WSA s foundation asset within Forrestania
  • 16. SPOTTED QUOLL MINEQ Reserve 2.4Mt @ 4.0% Contained nickel @ 97,030 Ni tonnes Resource Contained nickel 2.3Mt @ 5.3% 119 756 Ni tonnesContained nickel 119,756 Ni tonnes Mine life  +8 years Key points  Discovered by WSA in 2007, 6km south of Flying Fox  Remains open at depth and to the North  Production has outperformed reserve tonnes and  grade consistently  Top down mining with paste fill  Has never recorded an LTI WSA Explored Discovered and Developed ASX:WSAASX:WSA 16 WSA Explored, Discovered and Developed
  • 17. FORRESTANIA NICKEL CONCENTRATOR Concentrator Summary  Current nameplate capacity of 550,000tpa have been achieving  over 10% above  Mill processed 616kt of ore in FY16 for 25 009 nickel tonnes Mill processed 616kt of ore in FY16, for 25,009 nickel tonnes  Concentrate grades of between 14.0% to 15.5% Ni   Premium blending product (Fe/Mg ratio >15:1) Premium blending  product (Fe/Mg ratio >15:1)  Desirable to smelters  14,000t of concentrate storage capacity Export Infrastructure and Logistics   Well established container logistics chain into China  Shipping contract in place, FOB Esperance Port  BHPB Nickel West concentrate delivered to Kambalda WSA produces a high quality and in demand nickel concentrate ASX:WSAASX:WSA 17 WSA produces a high quality and in demand nickel concentrate
  • 18. INDEPENDENT PRODUCER – OFFTAKE CONTRACTS Offtake Contracts  FOB Terms  Very competitive payable percentage of LME Offtake Status – Opportunities for Western Areas  10ktpa contract for BHPB expires for first time in 7 years BHPB ~12ktpa JINCHUAN ~13ktpa D 2016 10ktpa contract for BHPB expires for first time in 7 years  Tender process commences in September quarter  Potential growth in roasting market in Asia the Company ~12ktpa Dec 2017 Dec 2016  Potential growth in roasting market in Asia – the Company  is investigating alternative markets  Shortage of high quality premium blending concentrate  Strong EOI’s already received from new and existing  parties Well positioned to take advantage of tight market conditions ASX:WSAASX:WSA 18 Well positioned to take advantage of tight market conditions
  • 20. ... WHILE PRUDENTLY BUILDING THE PLATFORM Production Development Exploration & Growth Spotted Quoll Odysseus PFS Western Gawler JV Flying Fox Mill Recovery Enhancement  New Morning Forrestania & Lithium Cosmos Cosmic Boy Concentrator y Project Forrestania & Lithium A portfolio with production longevity and growth optionality Cosmic Boy Concentrator ASX:WSAASX:WSA 20 A portfolio with production longevity and growth optionality 
  • 21. COSMOS ACQUISITIONQ Strategic Rationale  Low cost entry  Plays to WSA’s core strengths  Right street address  WSA approach to exploration will be different  Potential 2nd operation – FY19  Full infrastructure and facilities  Future potential concentrate blending  “Ready to go” when nickel prices support development Settlement Completed – 100% Owned  Paid A$12.653m in April 2016 as full and final settlement ASX:WSAASX:WSA 21
  • 22. COSMOS AERIAL VIEW Significant infrastructure in place:  450ktpa mill with expansion options  Tailings storage and evaporation ponds  Concentrate storage  Coreyard facilities  Gas connection  Mill and mining spares inventory  Approximately 500 person accommodation  village  Recreational facilities  Aerodrome  Administration and workshop buildings  Telecommunications ASX:WSAASX:WSA 22
  • 23. COSMOS EXPLORATION  Tenements covering 88km2  N t BHP L i t i k l ti Near to BHP Leinster nickel operations  Previous highest grade open pit nickel mine globally  17km long ultramafic sequence  Dominated by high MgO ultramafic rocksy g g  Similar to Forrestania, higher than Leinster  Mining grades around 5% Nickel ( l k d ) Focus on Neptune (previously Lake Miranda)  Heritage surveys successfully completed  Section 18 lodged  Significant anomalies detected through MLEM  Drilling targeted by end of CY16  Review of Xstrata drill data base reveals intersections Review of Xstrata drill data base reveals intersections  requiring follow‐up work  Prospero ‐ 4.2m @ 12.5% Ni (incl 2.4m @ 19.7% Ni)  Aries 4 5m @ 12 3% Ni and 3 3m @ 10 6% Ni Aries – 4.5m @ 12.3% Ni and 3.3m @ 10.6% Ni  DHEM being completed between Odysseus and  Prospero ASX:WSAASX:WSA 23
  • 24. ODYSSEUS PRE‐FEASIBILITY STUDY Significant undeveloped resource containing massive sulphides, matrix sulphides and high grade  disseminated sulphidesp Xstrata Scoping Study Update Completed Si ifi t i 30% id tifi d f ti d it l t Significant savings >30% identified for operating and capital costs  Board approved commencement of the pre‐feasibility study P f ibili S dPre‐feasibility Study  Targeted completion in December quarter  Review mining method, mining schedule, underground infrastructure and decline dewatering options  Reduce concentrate grade specification in line with FNO grades to improve nickel recovery   Review metallurgical testwork and flow sheet to optimise processing plant  Further optimise capital and operating cost assumptions for the current lower cost environment  Explore contractor versus owner operator alternatives and leverage FNO experience ASX:WSAASX:WSA 24
  • 25. ODYSSEUS COMPLEX AND OTHER RESOURCES Cosmos d i Mt Goode 52.9Mt @ 0.62% Ni (327Kt Ni) ‐ 250m Actual decline infrastructure C D AM6 + Odysseus Deposits: 9.4Mt @ 2.4% Ni (227Kt Ni) AM5(partially mined) ‐ 500m Odysseus Odysseus North Cosmos Deeps AM1 AM5(partially mined) 0.5Mt @ 2.6% Ni (13Kt Ni) ‐ 750m 4.0Mt @ 2.2% Ni (88Kt Ni) 3.2Mt @ 2.5% Ni (81Kt Ni) 15.6m @ 3.9% Ni ‐ 1,000m AM6 (unmined) Longitudinal Section – Looking West AM6 (unmined) 2Mt @ 2.6% Ni (53Kt Ni) Untested EM Plates 5.4m @ 12% Ni Odysseus Massive 48Kt @ 11.6% Ni (5.5Kt Ni) ASX:WSAASX:WSA 25
  • 26. WESTERN GAWLER JOINT VENTURES – SOUTH AUSTRALIA  Two separate agreements with Strandline  Resources Ltd and Monax Mining Ltd:  Monax withdrawn from JV – now 100% WSA  Strandline farm in agreement – WSA 75%  First mover advantages targeting massive high  grade poly‐metallic mineralisation  Potential to host mafic‐ultramafic intrusive relatedPotential to host mafic ultramafic intrusive related  deposits  High resolution airborne geophysics completed  (57,477km were flown)(57,477km were flown)  Numerous features likely to represent large mafic‐ ultramafic intrusions ASX:WSAASX:WSA 26
  • 27. EXPLORATION SUMMARY i d illi i h i l Broad scale prospectivity for Ni/Cu and Gold  Ongoing RC drilling with encouraging early  results  Targeting potential mafic/ultramafic  intrusions and generating geochemical targets  in the broader areas  115 AC/RC/DD drill holes completed to date/ / p  Full heritage access approvals nearing  completion  Geochemical review of drilling data highlights  gold anomalism, confirms base metal  potential  Petrology confirms the presence of intrusive  mafic and ultramafic rocks Exploration activity overlaying magnetics (RTP) 10km ASX:WSAASX:WSA Exploration activity overlaying magnetics (RTP)  Insets show residual gravity overlaying magnetics (RTP) 27
  • 29. NEW MORNING  2 5km from Flying Fox and 2 8km from Spotted2.5km from Flying Fox and 2.8km from Spotted  Quoll  All material approvals in place, potential major  i d ibl f ith icapex savings and accessible from either mine  Open Pit and shallow underground studies  commenced  Massive sulphide Indicated Resource of 321.8kt  @ 3.7% nickel  Si ifi t i t ti Significant intersections:  4.4m @ 7.4% nickel including 3.6m @ 8.7%  nickel  3 0m @ 6 3% nickel including 2 4m @ 7 6% 3.0m @ 6.3% nickel including 2.4m @ 7.6%  nickel   1.5m @ 5.6% nickel including 0.7m @ 10.2%  nickel  Recent shallow hit of 54m @ 1.7% nickel from  38m (including 2.5m @ 5.0% nickel) ASX:WSAASX:WSA 29
  • 31. NICKEL MARKET SNAPSHOT  Historically, on a through the cycle basis, the 90th percentile on the cost curve has acted as aHistorically, on a through the cycle basis, the 90 percentile on the cost curve has acted as a  catalyst for supply / demand adjustments by the nickel market  The nickel price is now trading below the 50th percentile on the cash cost curve   WSA believes >60% of producers losing money, even before sustaining capex  WSA is one of the few nickel miners with a positive gross margin Historic spot prices v cash cost ‐ CopperHistoric spot prices v cash cost ‐ Nickel 4 5 3.0 4.5 16 24 1.5 US$/lb 8 16 US$/lb 0.0 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Cu spot 90th percentile 50th percentile 0 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Ni spot 90th percentile 50th percentile ASX:WSAASX:WSA 31 Cu spot 90th percentile 50th percentileNi spot 90th percentile 50th percentile
  • 32. NICKEL PRICE DRIVERS There are a number of factors that influence the nickel price including: 1. LME and Chinese (SHFE) nickel inventories 2. Cost and capacity of Chinese nickel pig iron (“NPI”) production 3. Philippine government change and near political issues  4. Global stainless steel demand What we believe is occurring:  High grade Indonesian laterite stockpiles in China have depleted  Philippine exports of high grade falling, some mines now closed  LME stockpile has decreased from record highs, with some transfers to the SHFELME stockpile has decreased from record highs, with some transfers to the SHFE  Stainless steel demand (300 series) on balance remains solid in China, however significant de‐ stocking over the first half of CY15 has occurred  Nickel supply closures now occurring, NPI production down and market now in structural deficit ASX:WSAASX:WSA 32
  • 33. WESTERN AREAS VALUE EQUATIONQ • High Grade =  Margin • Lowest Quartile • Consistent  returns to  shareholders in  • Guidance  continually met  or exceeded • Zero Lost Time  Injuries in past  12 monthsLowest Quartile  Cash Costs Highest Grade  Dividends Cashflow  Strong Track  R d f Safet g Nickel Globally Positive Record of  Delivery Safety • Pipeline of  growth  opportunities • Fundamentals  and forecasts  positioned to • New mine  successfully  brought on in • No debt with  significant  financialopportunities positioned to  rebound Nickel Price brought on in  24 months History of financial  flexibility Growth Nickel Price  Primed for  Upside History of  Discovery and  Development Strong Balance  Sheet ASX:WSAASX:WSA 33
  • 35. EXPERIENCED BOARD AND SENIOR MANAGEMENT TEAM Ian Macliver Dan Lougher David Southam Joseph BelladonnaIan Macliver Independent Non-Executive Chairman Dan Lougher Managing Director & CEO David Southam Executive Director Joseph Belladonna CFO & Company Secretary Mr Macliver is a Chartered Accountant with many years experience as a senior executive and Director of both resource Mr Lougher is a qualified Mining Engineer with over 30 years experience in all facets of resource and mining, Mr Southam is a Certified Practicing Accountant with over 20 years experience in accounting, capital Mr Belladonna has been responsible for the initial set-up and ongoing management of the Group's accounting and industrial companies, with particular responsibility for capital raising and other corporate development initiatives project exploration, feasibility, development and operational activities in Australia and overseas markets, banking and finance across the resources and industrial sectors and information systems, corporate governance, and the risk management program of the Company Richard Yeates Independent, Non-Executive Director Craig Readhead Independent, Non-Executive Director Tim Netscher Independent, Non-Executive Director Mr Yeates is a Geologist with more than 30 years mining industry experience in various roles and has significant experience across a wide range of resource projects around the world Mr Readhead is a Lawyer with over 30 years legal and corporate advisory experience with specialisation in the resources sector, including the implementation of large scale mining projects both in Australia and overseas Mr Netscher is a Metallurgist and has significant broad-based experience at senior levels in the international resources industry, in roles spanning marketing, operations management, project management and business ASX:WSAASX:WSA 35 world projects both in Australia and overseas project management and business development
  • 38. MILL RECOVERY ENHANCEMENT PROJECT  Increase average nickel recoveries from 3% to 5% over the life of mine  A$22m project with 6 month construction time  Project construction has been deferred until July 2016 as part of capex optimisation initiatives  Long lead items ordered A$7 4m Long lead items ordered – A$7.4m  Unit cash operating cost A$2.42/lb in concentrate  The treatment of the Flash Cleaner Stream utilises the BioHeap® cultures   Very short residence time of 5‐7 days   Sulphide precipitation circuit produces a high grade nickel sulphide product (~50% nickel) WSA is at the forefront of technological improvements ASX:WSAASX:WSA 38 WSA is at the forefront of technological improvements
  • 39. FORRESTANIA TENEMENTS Regional Geology  120km strike length (900 sq km) of  prospective Forrestania Nickel Project,  within 400km long nickel provincewithin 400km long nickel province  Total endowment of 29.97Mt at 2.28% Ni  for 684k Ni tonnes  Nickel sulphide deposits and most  occurrences in two belts (Eastern and  W )Western)  Western Ultramafic Belt hosts the high  grade Flying Fox Spotted Quoll and Newgrade Flying Fox, Spotted Quoll and New  Morning deposits ASX:WSAASX:WSA 39