Crews are installing new water mains in Kellenberg Circle, Parking Lot A, and along Hempstead Avenue where the road is also being widened. Additionally, the first beam of steel was erected for the Public Square project on July 16, 2010.
This job involved placing a temporary water barrier and drainage pipes alongside a newly opened road in Olsztyn, Poland to protect it from heavy rains. A 14-person crew used a 14x12 cm mold over 1400 meters. When roads are built, the excavation destroys roots and leaves the area weak until regrowth. As Poland develops infrastructure and roads for EURO 2012, temporary barriers protect sides until roots regrow to prevent erosion and road damage from water runoff.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and cost $1.7 billion to plan, design, and construct the S-shaped cable-stayed bridge linking Ningbo and Jiaxing. The bridge features a 6-lane highway and cuts 120 km off the drive between Shanghai and Ningbo. It also has a unique 10,000 square meter service center in the middle with a restaurant, hotel, and observation tower allowing visitors to view the tidal waves of Hangzhou Bay.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and 600 engineers to plan and design the S-shaped bridge, which links Ningbo and Jiaxing and cuts 120 km off the drive between Shanghai and Ningbo. The unique bridge has a 10,000 square meter service center in the middle with facilities like a restaurant, hotel, and observation tower to view the bay's extraordinary tides. The specially designed bridge can withstand typhoons and hurricanes in the bay known for its fast-moving 30 kph tides.
The document summarizes key details about the Hangzhou Bay Bridge in China. It is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and cost $1.7 billion to plan, design, and construct. The unique bridge has a service center in the middle with a hotel, restaurant, and observation tower allowing visitors to view the bay's large tides and waves.
Amazing Bridges of China (By : E. Cheong)ttfintlcom
The document summarizes key details about the Hangzhou Bay Bridge in China. It is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and cost $1.7 billion to plan, design, and construct. The unique bridge has a service center in the middle with a hotel, restaurant, and observation tower allowing visitors to view the bay's large tides and waves. The S-shaped design allows it to withstand typhoons and hurricanes.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and cost $1.7 billion to plan, design, and construct. A unique feature is a 10,000 square meter service center located in the middle of the bridge that includes a hotel, restaurant, and observation tower offering views of the bay's large tides and waves. The S-shaped design allows it to withstand major storms and typhoons.
This document provides an overview and status update of restoration projects along Four Mile Run in Arlington and Alexandria, Virginia. It discusses the history and milestones of restoration efforts since 2000, including the adoption of a master plan in 2006. Current projects include restoring tidal wetlands in Four Mile Run Park, creating living shorelines along the Arlington side, and plans to install 23 "watermarks" art pieces throughout the area by 2017. The wetlands restoration was largely completed in 2015 while the living shorelines project in Arlington is scheduled to begin construction in mid-2016. Upcoming areas of focus are also mentioned.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and 600 engineers to plan and design the S-shaped bridge, which links Ningbo and Jiaxing and cuts 120 km off the drive between Shanghai and Ningbo. The unique bridge has a 10,000 square meter service center in the middle with a restaurant, gas station, hotel, and observation tower allowing visitors to view the bay's extraordinary tides and waves. The specially designed bridge can withstand typhoons and hurricanes.
This job involved placing a temporary water barrier and drainage pipes alongside a newly opened road in Olsztyn, Poland to protect it from heavy rains. A 14-person crew used a 14x12 cm mold over 1400 meters. When roads are built, the excavation destroys roots and leaves the area weak until regrowth. As Poland develops infrastructure and roads for EURO 2012, temporary barriers protect sides until roots regrow to prevent erosion and road damage from water runoff.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and cost $1.7 billion to plan, design, and construct the S-shaped cable-stayed bridge linking Ningbo and Jiaxing. The bridge features a 6-lane highway and cuts 120 km off the drive between Shanghai and Ningbo. It also has a unique 10,000 square meter service center in the middle with a restaurant, hotel, and observation tower allowing visitors to view the tidal waves of Hangzhou Bay.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and 600 engineers to plan and design the S-shaped bridge, which links Ningbo and Jiaxing and cuts 120 km off the drive between Shanghai and Ningbo. The unique bridge has a 10,000 square meter service center in the middle with facilities like a restaurant, hotel, and observation tower to view the bay's extraordinary tides. The specially designed bridge can withstand typhoons and hurricanes in the bay known for its fast-moving 30 kph tides.
The document summarizes key details about the Hangzhou Bay Bridge in China. It is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and cost $1.7 billion to plan, design, and construct. The unique bridge has a service center in the middle with a hotel, restaurant, and observation tower allowing visitors to view the bay's large tides and waves.
Amazing Bridges of China (By : E. Cheong)ttfintlcom
The document summarizes key details about the Hangzhou Bay Bridge in China. It is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and cost $1.7 billion to plan, design, and construct. The unique bridge has a service center in the middle with a hotel, restaurant, and observation tower allowing visitors to view the bay's large tides and waves. The S-shaped design allows it to withstand typhoons and hurricanes.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and cost $1.7 billion to plan, design, and construct. A unique feature is a 10,000 square meter service center located in the middle of the bridge that includes a hotel, restaurant, and observation tower offering views of the bay's large tides and waves. The S-shaped design allows it to withstand major storms and typhoons.
This document provides an overview and status update of restoration projects along Four Mile Run in Arlington and Alexandria, Virginia. It discusses the history and milestones of restoration efforts since 2000, including the adoption of a master plan in 2006. Current projects include restoring tidal wetlands in Four Mile Run Park, creating living shorelines along the Arlington side, and plans to install 23 "watermarks" art pieces throughout the area by 2017. The wetlands restoration was largely completed in 2015 while the living shorelines project in Arlington is scheduled to begin construction in mid-2016. Upcoming areas of focus are also mentioned.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and 600 engineers to plan and design the S-shaped bridge, which links Ningbo and Jiaxing and cuts 120 km off the drive between Shanghai and Ningbo. The unique bridge has a 10,000 square meter service center in the middle with a restaurant, gas station, hotel, and observation tower allowing visitors to view the bay's extraordinary tides and waves. The specially designed bridge can withstand typhoons and hurricanes.
The document provides an overview of the A556 Project in North West England. The A556 is a strategic trunk road linking North Cheshire and Southern Greater Manchester. The project involves upgrading a 6.5km non-motorway section to a dual carriageway with 7 new bridges to improve safety and traffic flow. Construction began in 2010 and involves moving over 1 million cubic meters of earth, providing environmental mitigations, and collaborating across multiple organizations using BIM and other digital technologies. The presentation emphasizes the importance of designing for safety and managing residual hazards through modeling and linking to hazard logs.
The Hangzhou Bay Bridge in China is one of the longest sea-crossing bridges in the world at 36 kilometers long. It took 9 years and over 600 engineers to plan, design, and construct the S-shaped bridge linking Ningbo and Jiaxing. What makes the Hangzhou Bay Bridge unique is that it has a 10,000 square meter service center located in the middle of the bridge to provide amenities to travelers. The service center is designed like an artificial island to not obstruct the tidal currents in Hangzhou Bay. The specially designed S-shape of the bridge allows it to withstand typhoons and hurricanes that frequently pass through the area.
Very large floating structures are man-made islands that can be used for airports, storage facilities, military purposes, and industry. They are classified based on their geometry as pontoons or semisubmersibles, and by location as coastal or offshore. Examples include mega floats, mobile offshore bases, and pneumatically stabilized platforms. VLFS have advantages like low cost for deep waters, lack of environmental damage, and immunity to earthquakes. However, their unique large size and offshore environment present challenges for design, construction, positioning, and connection at sea.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and 600 engineers to plan and design the S-shaped bridge, which links Ningbo and Jiaxing and cuts 120 km off the drive between Shanghai and Ningbo. The unique bridge has a 10,000 square meter service center in the middle with facilities like a restaurant, hotel, and observation tower to view the bay's extraordinary tides. The specially designed bridge can withstand typhoons and hurricanes in the bay known for its fast-moving 30 kph tides.
Global Warming has an enormous impact on melting glaciers and ice sheets. Rising
global temperatures melt glaciers increasing the amount of seawater. A large in rise sea level across the world
poses many threats. With continuous increase of rise in water level, the area occupied by land decreases. This
paper represents the study concerning floating construction to counter the ill effects of global warming in terms
of utilisation of offshore renewable energy resources and improving an awareness to construct them.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and 600 engineers to plan and design the S-shaped bridge, which links Ningbo and Jiaxing and cuts 120 km off the drive between Shanghai and Ningbo. The unique bridge has a 10,000 square meter service center in the middle with a restaurant, gas station, hotel, and observation tower allowing visitors to view the bay's extraordinary tides and waves. The specially designed bridge can withstand typhoons and hurricanes.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and 600 engineers to plan and design the S-shaped bridge, which links Ningbo and Jiaxing and cuts 120 km off the drive between Shanghai and Ningbo. The unique bridge has a 10,000 square meter service center in the middle with a restaurant, gas station, hotel, and observation tower allowing visitors to view the bay's extraordinary tides and waves. The specially designed bridge can withstand typhoons and hurricanes.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and 600 engineers to plan and design the S-shaped bridge, which links Ningbo and Jiaxing and cuts 120 km off the drive between Shanghai and Ningbo. The unique bridge has a 10,000 square meter service center in the middle with a restaurant, gas station, hotel, and observation tower allowing visitors to view the bay's extraordinary tides and waves. The specially designed bridge can withstand typhoons and hurricanes.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and 600 engineers to plan and design the S-shaped bridge, which links Ningbo and Jiaxing and cuts 120 km off the drive between Shanghai and Ningbo. The unique bridge has a 10,000 square meter service center in the middle with a restaurant, gas station, hotel, and observation tower allowing visitors to view the bay's extraordinary tides and waves. The specially designed bridge can withstand typhoons and hurricanes.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and 600 engineers to plan and design the S-shaped bridge, which links Ningbo and Jiaxing and cuts 120 km off the drive between Shanghai and Ningbo. The unique bridge has a 10,000 square meter service center in the middle with facilities like a restaurant, gas station, hotel and observation tower allowing visitors to view the bay's extraordinary tides. The specially designed bridge can withstand typhoons and hurricanes.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and 600 engineers to plan and design the S-shaped bridge, which links Ningbo and Jiaxing and cuts 120 km off the drive between Shanghai and Ningbo. The unique bridge has a 10,000 square meter service center in the middle with a restaurant, gas station, hotel, and observation tower allowing visitors to view the bay's extraordinary tides and waves. The specially designed bridge can withstand typhoons and hurricanes.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and 600 engineers to plan and design the S-shaped bridge, which links Ningbo and Jiaxing and cuts 120 km off the drive between Shanghai and Ningbo. The unique bridge has a 10,000 square meter service center in the middle with a restaurant, gas station, hotel, and observation tower allowing visitors to view the bay's extraordinary tides and waves. The specially designed bridge can withstand typhoons and hurricanes.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and 600 engineers to plan and design the S-shaped bridge, which links Ningbo and Jiaxing and cuts 120 km off the drive between Shanghai and Ningbo. The unique bridge has a 10,000 square meter service center in the middle with a restaurant, gas station, hotel, and observation tower allowing visitors to view the bay's extraordinary tides and waves. The specially designed bridge can withstand typhoons and hurricanes.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and 600 engineers to plan and design the S-shaped bridge, which links Ningbo and Jiaxing and cuts 120 km off the drive between Shanghai and Ningbo. The unique bridge has a 10,000 square meter service center in the middle with facilities like a restaurant, hotel, and observation tower to view the bay's extraordinary tides. The specially designed bridge can withstand typhoons and hurricanes in the bay known for its fast-moving 30 kph tides.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and 600 engineers to plan and design the S-shaped bridge, which links Ningbo and Jiaxing and cuts 120 km off the drive between Shanghai and Ningbo. The unique bridge has a 10,000 square meter service center in the middle with a restaurant, gas station, hotel, and observation tower allowing visitors to view the bay's extraordinary tides and waves. The specially designed bridge can withstand typhoons and hurricanes.
José Romero habla varias lenguas romances como el español, francés, italiano, rumano, portugués y romanche. Consultó Wikipedia y Facebook como referencias sobre las lenguas romances.
Disney Effects: Building web/mobile castle in OpenGL 2D & 3DSVWB
The document discusses 2D game development using OpenGL ES. It covers topics like rotations, translations, and scaling; setting up the rendering context and viewport; using textures; and ordering of transformations and drawing calls. Code snippets demonstrate functions for rotations, translations, texture mapping, and the basic render loop setup. The document aims to explain the fundamentals of 2D graphics and best practices in OpenGL ES.
Gauss-Jordan elimination is a variant of Gaussian elimination that transforms the coefficient matrix into a diagonal matrix with ones on the diagonal through elementary row operations, allowing easy reading of the solutions directly from the augmented matrix. It introduces zeros above and below the diagonal element in each column through a single pass of row operations. The steps are to write the augmented matrix, transform the coefficient matrix into diagonal form through row operations, and then divide each row by its diagonal element to make the diagonal ones.
Sports marketing: where does the future lie - in the content or the conversa...cainster
As the FIFA World Cup draws to a close, what will the growth of social media mean to sports rights holders and should sponsors chase the content or the conversation moving forward?
Boris Nemtsov, seorang politikus oposisi Rusia yang vokal mengkritik Presiden Vladimir Putin, ditembak mati di jembatan Moskow. Ia sebelumnya merencanakan menerbitkan laporan tentang keterlibatan militer Rusia di Ukraina. Pemerintah menyelidiki kemungkinan Nemtsov dijadikan martir untuk meningkatkan dukungan terhadap oposisi.
The document discusses open source governance at HP. It provides an introduction to open source licenses and communities, and defines open source governance as a framework to help organizations effectively manage interactions with open source software. It outlines HP's interactions with open source and describes some of HP's best practices, including an open source program office, review board, tools like Fossology and PTS, and policies and processes to guide open source use.
The document provides an overview of the A556 Project in North West England. The A556 is a strategic trunk road linking North Cheshire and Southern Greater Manchester. The project involves upgrading a 6.5km non-motorway section to a dual carriageway with 7 new bridges to improve safety and traffic flow. Construction began in 2010 and involves moving over 1 million cubic meters of earth, providing environmental mitigations, and collaborating across multiple organizations using BIM and other digital technologies. The presentation emphasizes the importance of designing for safety and managing residual hazards through modeling and linking to hazard logs.
The Hangzhou Bay Bridge in China is one of the longest sea-crossing bridges in the world at 36 kilometers long. It took 9 years and over 600 engineers to plan, design, and construct the S-shaped bridge linking Ningbo and Jiaxing. What makes the Hangzhou Bay Bridge unique is that it has a 10,000 square meter service center located in the middle of the bridge to provide amenities to travelers. The service center is designed like an artificial island to not obstruct the tidal currents in Hangzhou Bay. The specially designed S-shape of the bridge allows it to withstand typhoons and hurricanes that frequently pass through the area.
Very large floating structures are man-made islands that can be used for airports, storage facilities, military purposes, and industry. They are classified based on their geometry as pontoons or semisubmersibles, and by location as coastal or offshore. Examples include mega floats, mobile offshore bases, and pneumatically stabilized platforms. VLFS have advantages like low cost for deep waters, lack of environmental damage, and immunity to earthquakes. However, their unique large size and offshore environment present challenges for design, construction, positioning, and connection at sea.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and 600 engineers to plan and design the S-shaped bridge, which links Ningbo and Jiaxing and cuts 120 km off the drive between Shanghai and Ningbo. The unique bridge has a 10,000 square meter service center in the middle with facilities like a restaurant, hotel, and observation tower to view the bay's extraordinary tides. The specially designed bridge can withstand typhoons and hurricanes in the bay known for its fast-moving 30 kph tides.
Global Warming has an enormous impact on melting glaciers and ice sheets. Rising
global temperatures melt glaciers increasing the amount of seawater. A large in rise sea level across the world
poses many threats. With continuous increase of rise in water level, the area occupied by land decreases. This
paper represents the study concerning floating construction to counter the ill effects of global warming in terms
of utilisation of offshore renewable energy resources and improving an awareness to construct them.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and 600 engineers to plan and design the S-shaped bridge, which links Ningbo and Jiaxing and cuts 120 km off the drive between Shanghai and Ningbo. The unique bridge has a 10,000 square meter service center in the middle with a restaurant, gas station, hotel, and observation tower allowing visitors to view the bay's extraordinary tides and waves. The specially designed bridge can withstand typhoons and hurricanes.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and 600 engineers to plan and design the S-shaped bridge, which links Ningbo and Jiaxing and cuts 120 km off the drive between Shanghai and Ningbo. The unique bridge has a 10,000 square meter service center in the middle with a restaurant, gas station, hotel, and observation tower allowing visitors to view the bay's extraordinary tides and waves. The specially designed bridge can withstand typhoons and hurricanes.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and 600 engineers to plan and design the S-shaped bridge, which links Ningbo and Jiaxing and cuts 120 km off the drive between Shanghai and Ningbo. The unique bridge has a 10,000 square meter service center in the middle with a restaurant, gas station, hotel, and observation tower allowing visitors to view the bay's extraordinary tides and waves. The specially designed bridge can withstand typhoons and hurricanes.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and 600 engineers to plan and design the S-shaped bridge, which links Ningbo and Jiaxing and cuts 120 km off the drive between Shanghai and Ningbo. The unique bridge has a 10,000 square meter service center in the middle with a restaurant, gas station, hotel, and observation tower allowing visitors to view the bay's extraordinary tides and waves. The specially designed bridge can withstand typhoons and hurricanes.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and 600 engineers to plan and design the S-shaped bridge, which links Ningbo and Jiaxing and cuts 120 km off the drive between Shanghai and Ningbo. The unique bridge has a 10,000 square meter service center in the middle with facilities like a restaurant, gas station, hotel and observation tower allowing visitors to view the bay's extraordinary tides. The specially designed bridge can withstand typhoons and hurricanes.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and 600 engineers to plan and design the S-shaped bridge, which links Ningbo and Jiaxing and cuts 120 km off the drive between Shanghai and Ningbo. The unique bridge has a 10,000 square meter service center in the middle with a restaurant, gas station, hotel, and observation tower allowing visitors to view the bay's extraordinary tides and waves. The specially designed bridge can withstand typhoons and hurricanes.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and 600 engineers to plan and design the S-shaped bridge, which links Ningbo and Jiaxing and cuts 120 km off the drive between Shanghai and Ningbo. The unique bridge has a 10,000 square meter service center in the middle with a restaurant, gas station, hotel, and observation tower allowing visitors to view the bay's extraordinary tides and waves. The specially designed bridge can withstand typhoons and hurricanes.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and 600 engineers to plan and design the S-shaped bridge, which links Ningbo and Jiaxing and cuts 120 km off the drive between Shanghai and Ningbo. The unique bridge has a 10,000 square meter service center in the middle with a restaurant, gas station, hotel, and observation tower allowing visitors to view the bay's extraordinary tides and waves. The specially designed bridge can withstand typhoons and hurricanes.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and 600 engineers to plan and design the S-shaped bridge, which links Ningbo and Jiaxing and cuts 120 km off the drive between Shanghai and Ningbo. The unique bridge has a 10,000 square meter service center in the middle with facilities like a restaurant, hotel, and observation tower to view the bay's extraordinary tides. The specially designed bridge can withstand typhoons and hurricanes in the bay known for its fast-moving 30 kph tides.
The Hangzhou Bay Bridge in China is the longest sea-crossing bridge in the world at 36 kilometers long. It took 9 years and 600 engineers to plan and design the S-shaped bridge, which links Ningbo and Jiaxing and cuts 120 km off the drive between Shanghai and Ningbo. The unique bridge has a 10,000 square meter service center in the middle with a restaurant, gas station, hotel, and observation tower allowing visitors to view the bay's extraordinary tides and waves. The specially designed bridge can withstand typhoons and hurricanes.
José Romero habla varias lenguas romances como el español, francés, italiano, rumano, portugués y romanche. Consultó Wikipedia y Facebook como referencias sobre las lenguas romances.
Disney Effects: Building web/mobile castle in OpenGL 2D & 3DSVWB
The document discusses 2D game development using OpenGL ES. It covers topics like rotations, translations, and scaling; setting up the rendering context and viewport; using textures; and ordering of transformations and drawing calls. Code snippets demonstrate functions for rotations, translations, texture mapping, and the basic render loop setup. The document aims to explain the fundamentals of 2D graphics and best practices in OpenGL ES.
Gauss-Jordan elimination is a variant of Gaussian elimination that transforms the coefficient matrix into a diagonal matrix with ones on the diagonal through elementary row operations, allowing easy reading of the solutions directly from the augmented matrix. It introduces zeros above and below the diagonal element in each column through a single pass of row operations. The steps are to write the augmented matrix, transform the coefficient matrix into diagonal form through row operations, and then divide each row by its diagonal element to make the diagonal ones.
Sports marketing: where does the future lie - in the content or the conversa...cainster
As the FIFA World Cup draws to a close, what will the growth of social media mean to sports rights holders and should sponsors chase the content or the conversation moving forward?
Boris Nemtsov, seorang politikus oposisi Rusia yang vokal mengkritik Presiden Vladimir Putin, ditembak mati di jembatan Moskow. Ia sebelumnya merencanakan menerbitkan laporan tentang keterlibatan militer Rusia di Ukraina. Pemerintah menyelidiki kemungkinan Nemtsov dijadikan martir untuk meningkatkan dukungan terhadap oposisi.
The document discusses open source governance at HP. It provides an introduction to open source licenses and communities, and defines open source governance as a framework to help organizations effectively manage interactions with open source software. It outlines HP's interactions with open source and describes some of HP's best practices, including an open source program office, review board, tools like Fossology and PTS, and policies and processes to guide open source use.
The document outlines a proposed digital marketing strategy for the North Dublin Chamber of Commerce (NDCC). It discusses conducting primary and secondary research to understand members' needs. Based on a survey, members wanted regular website and email updates on NDCC activities. The strategy involves creating a new website that is the central hub for information and reflects NDCC services better. It also proposes using search engine optimization and social media networking to increase the NDCC's online presence, brand awareness, and become the key information source for businesses in North Dublin. A social media networking workshop is suggested to educate members on using alternative networking sites to strengthen ties with customers.
This document discusses Spago4Q, an open source platform for measuring, analyzing, and monitoring the quality of products, processes, and services. It can extract data from various open source software forges and repositories, store the data in a data warehouse, apply computational rules and quality models to calculate key performance indicators, and generate reports. The document provides examples of how Spago4Q has been used to analyze license distributions and project development statuses on various forges to improve quality.
Tulisan soal lambatnya perundingan damai israel-Palestina. Banyaknya masalah yang belum disepakati menyebabkan tenggat yang ditetapkan Amerika Serikat pasti terlewati.
Dokumen tersebut membahas tentang pentingnya mempromosikan toleransi dan kerukunan antar umat beragama. Dokumen tersebut juga menekankan bahwa agama-agama besar seperti Islam, Kristen, dan Hindu sebenarnya memiliki pesan moral yang sama tentang cinta kasih dan kerukunan.
2010 ADA Standards Seminar: Application for Existing BuildingsREBNY
The document summarizes an upcoming seminar on applying the 2010 ADA Standards to existing buildings. The seminar will cover accessibility codes, standards, and guidelines; definitions; barrier removal requirements; alterations requirements; and new requirements in the 2010 Standards. Attendees will learn about triggers for compliance, safe harbors, priority lists for barrier removal and alterations, and exceptions for disproportionate cost.
Tulisan soal perselisihan antara badan intelijen Amerika Serikat, CIA, dengan Kongres soal program penyiksaan badan intelijen saat memburu tersangka terorisme
This document outlines a voucher code program between Osmond, a supplier of ergonomic products, and physio practices. The program aims to provide physio clients with a 10% discount on ergonomic products while also promoting the physio-client relationship and generating sales for Osmond. Osmond issues voucher codes to physio practices that clients can use online or over the phone for a discount, with the goal of improving client conditions and reinforcing the physio-client partnership.
This document discusses strategies for creating an open source community as a software publisher. It recommends building community to get feedback, contributors, and evangelists which improves software quality. Key elements include choosing an open source license and development model, and using tools like websites, code repositories, issue trackers, and mailing lists for marketing, development, and governance. Community engagement is important through conferences, workshops, and being responsive to contributors.
The document summarizes the initiatives of the New York City Department of Environmental Protection (DEP) to supply water and manage wastewater for New York City residents. It outlines DEP's mission to provide these essential services to 9 million customers. It then summarizes DEP's proposed 7.5% water rate increase for 2012, customer service initiatives like the My DEP online account and paperless billing, capital projects, and efforts to reduce regulatory mandates and costs.
हिंदी वर्णमाला पीपीटी, hindi alphabet PPT presentation, hindi varnamala PPT, Hindi Varnamala pdf, हिंदी स्वर, हिंदी व्यंजन, sikhiye hindi varnmala, dr. mulla adam ali, hindi language and literature, hindi alphabet with drawing, hindi alphabet pdf, hindi varnamala for childrens, hindi language, hindi varnamala practice for kids, https://www.drmullaadamali.com
How to Setup Warehouse & Location in Odoo 17 InventoryCeline George
In this slide, we'll explore how to set up warehouses and locations in Odoo 17 Inventory. This will help us manage our stock effectively, track inventory levels, and streamline warehouse operations.
Strategies for Effective Upskilling is a presentation by Chinwendu Peace in a Your Skill Boost Masterclass organisation by the Excellence Foundation for South Sudan on 08th and 09th June 2024 from 1 PM to 3 PM on each day.
This presentation includes basic of PCOS their pathology and treatment and also Ayurveda correlation of PCOS and Ayurvedic line of treatment mentioned in classics.
it describes the bony anatomy including the femoral head , acetabulum, labrum . also discusses the capsule , ligaments . muscle that act on the hip joint and the range of motion are outlined. factors affecting hip joint stability and weight transmission through the joint are summarized.
How to Make a Field Mandatory in Odoo 17Celine George
In Odoo, making a field required can be done through both Python code and XML views. When you set the required attribute to True in Python code, it makes the field required across all views where it's used. Conversely, when you set the required attribute in XML views, it makes the field required only in the context of that particular view.
How to Add Chatter in the odoo 17 ERP ModuleCeline George
In Odoo, the chatter is like a chat tool that helps you work together on records. You can leave notes and track things, making it easier to talk with your team and partners. Inside chatter, all communication history, activity, and changes will be displayed.
বাংলাদেশের অর্থনৈতিক সমীক্ষা ২০২৪ [Bangladesh Economic Review 2024 Bangla.pdf] কম্পিউটার , ট্যাব ও স্মার্ট ফোন ভার্সন সহ সম্পূর্ণ বাংলা ই-বুক বা pdf বই " সুচিপত্র ...বুকমার্ক মেনু 🔖 ও হাইপার লিংক মেনু 📝👆 যুক্ত ..
আমাদের সবার জন্য খুব খুব গুরুত্বপূর্ণ একটি বই ..বিসিএস, ব্যাংক, ইউনিভার্সিটি ভর্তি ও যে কোন প্রতিযোগিতা মূলক পরীক্ষার জন্য এর খুব ইম্পরট্যান্ট একটি বিষয় ...তাছাড়া বাংলাদেশের সাম্প্রতিক যে কোন ডাটা বা তথ্য এই বইতে পাবেন ...
তাই একজন নাগরিক হিসাবে এই তথ্য গুলো আপনার জানা প্রয়োজন ...।
বিসিএস ও ব্যাংক এর লিখিত পরীক্ষা ...+এছাড়া মাধ্যমিক ও উচ্চমাধ্যমিকের স্টুডেন্টদের জন্য অনেক কাজে আসবে ...
Chapter wise All Notes of First year Basic Civil Engineering.pptxDenish Jangid
Chapter wise All Notes of First year Basic Civil Engineering
Syllabus
Chapter-1
Introduction to objective, scope and outcome the subject
Chapter 2
Introduction: Scope and Specialization of Civil Engineering, Role of civil Engineer in Society, Impact of infrastructural development on economy of country.
Chapter 3
Surveying: Object Principles & Types of Surveying; Site Plans, Plans & Maps; Scales & Unit of different Measurements.
Linear Measurements: Instruments used. Linear Measurement by Tape, Ranging out Survey Lines and overcoming Obstructions; Measurements on sloping ground; Tape corrections, conventional symbols. Angular Measurements: Instruments used; Introduction to Compass Surveying, Bearings and Longitude & Latitude of a Line, Introduction to total station.
Levelling: Instrument used Object of levelling, Methods of levelling in brief, and Contour maps.
Chapter 4
Buildings: Selection of site for Buildings, Layout of Building Plan, Types of buildings, Plinth area, carpet area, floor space index, Introduction to building byelaws, concept of sun light & ventilation. Components of Buildings & their functions, Basic concept of R.C.C., Introduction to types of foundation
Chapter 5
Transportation: Introduction to Transportation Engineering; Traffic and Road Safety: Types and Characteristics of Various Modes of Transportation; Various Road Traffic Signs, Causes of Accidents and Road Safety Measures.
Chapter 6
Environmental Engineering: Environmental Pollution, Environmental Acts and Regulations, Functional Concepts of Ecology, Basics of Species, Biodiversity, Ecosystem, Hydrological Cycle; Chemical Cycles: Carbon, Nitrogen & Phosphorus; Energy Flow in Ecosystems.
Water Pollution: Water Quality standards, Introduction to Treatment & Disposal of Waste Water. Reuse and Saving of Water, Rain Water Harvesting. Solid Waste Management: Classification of Solid Waste, Collection, Transportation and Disposal of Solid. Recycling of Solid Waste: Energy Recovery, Sanitary Landfill, On-Site Sanitation. Air & Noise Pollution: Primary and Secondary air pollutants, Harmful effects of Air Pollution, Control of Air Pollution. . Noise Pollution Harmful Effects of noise pollution, control of noise pollution, Global warming & Climate Change, Ozone depletion, Greenhouse effect
Text Books:
1. Palancharmy, Basic Civil Engineering, McGraw Hill publishers.
2. Satheesh Gopi, Basic Civil Engineering, Pearson Publishers.
3. Ketki Rangwala Dalal, Essentials of Civil Engineering, Charotar Publishing House.
4. BCP, Surveying volume 1
This slide is special for master students (MIBS & MIFB) in UUM. Also useful for readers who are interested in the topic of contemporary Islamic banking.
Main Java[All of the Base Concepts}.docxadhitya5119
This is part 1 of my Java Learning Journey. This Contains Custom methods, classes, constructors, packages, multithreading , try- catch block, finally block and more.