GENERAL RISK ASSESSMENT
PROGRAMME AREA All Sites REF NO. RA 1
OPERATION BEING ASSESSED COMPUTER WORKSTATIONS
PURPOSE/METHOD OF WORK (3)
To use a VDU workstation for a variety of tasks, including word processing, accounting, record keeping, graphic design and general data
input.
Use of the computer may be via a keyboard, a mouse or both.
1. Switch on power to workstation.
2. Run software appropriate to the task.
3. Use keyboard or mouse to input information and commands
4. Store data to floppy disk.
5. Produce hardcopy of data documents.
6. Shut down software package on completion of the task.
7. Switch off power to workstation.
SPECIFIC LEGISLATIVE REQUIREMENTS (4) LEVEL OF SKILL/TRAINING REQUIRED (5)
Health and Safety (Display Screen Equipment) Regulations
Provision and Use of Work Equipment Regulations
Health and Safety at Work etc. Act
Workplace (Health, Safety and Welfare) Regulations
Electricity at Work Regulations
Management of Health and Safety at Work Regulations
Knowledge of operation of computer hardware and
peripherals.
Knowledge and understanding of the appropriate
software.
Knowledge of the outcome of any specific Display Screen
Equipment assessments as required by the Regulations.
CHEMICALS/MATERIALS
INVOLVED (6)
HSC NO. ASSESSMENT
DATE
SPECIFIC WORK EQUIPMENT PROVIDED (7)
Screen Cleaner Computer with Monitor and Keyboard
Optionally a mouse and a printer
Other peripheral equipment
MAIN HAZARDS IDENTIFIED (8) WHO WILL BE AFFECTED (9) CONTROL MEASURES TO REDUCE THE RISK (10)
Work Related Disorders
Stress/Fatigue/Eyestrain etc.
Effects from use of chemicals
Electrical Hazard
VDU User
VDU User
VDU User
VDU User
Ensure workstation assessed in accordance with the
Display Screen Equipment Regulations and complies with
the Code of Practice on Visual Display Units.
Ensure users are aware of basic requirements of Display
Screen Equipment Regulations and have competence to
adjust workstations to comply with the above.
Operators to follow varied work regime and take breaks
away from the workstation and after every hour of
continuous use.
Ensure only approved substances and Safety Control
Systems are used and assessments undertaken where
required.
Ensure user awareness regarding potential hazards from
toner and instructions for safe use as outlined in health
and safety control sheet.
Toners replaced by trained personnel (Network Services).
Ensure all electrical equipment tested in accordance with
the PUWER Regulations.
Equipment must not be powered permanently with four
gang leads. All computers and peripherals should have
individual socket outlets.
Ensure that any member of staff or student without the
relevant competencies does not interfere with, or attempt
to make repairs to electrical equipment etc.
MANUAL HANDLING RISK (11) PERSONAL PROTECTIVE EQUIPMENT REQUIRED (12)
Has a manual handling risk been identified NO
Is the risk considered to be LOW
Is a further detailed assessment required NO
If the answer to the above question is YES a separate manual
handling assessment will be required to fulfil the requirements of
the Manual Handling Operations Regulations 1992.
Is training and instruction required NO
Is there need for special accommodation NO
Is there need for test/examination NO
Is all P. P. E. compatible N/A
FREQUENCY OF MONITORING (13) ASSESSMENT REVIEW PERIOD
N/A 3
Months
6 Months 1 Year > 1 Year < 1 Year 2 Years 3 Years 4 Years > 4
Years
X X
Signed: Samantha Hampton
Facilities Manager
Date: 1st
April 2010

More Related Content

Viewers also liked

Final project schedule 3rd april 2013
Final project schedule 3rd april 2013Final project schedule 3rd april 2013
Final project schedule 3rd april 2013Jason
 
Production log e6 7 december
Production log e6 7 decemberProduction log e6 7 december
Production log e6 7 decemberJason
 
Final project schedule 6th mar 2013
Final project schedule 6th mar 2013Final project schedule 6th mar 2013
Final project schedule 6th mar 2013Jason
 
L3 gd contractual_061111_01
L3 gd contractual_061111_01L3 gd contractual_061111_01
L3 gd contractual_061111_01Jason
 
Brain storm
Brain stormBrain storm
Brain stormJason
 
Ethical Checklist
Ethical ChecklistEthical Checklist
Ethical ChecklistJason
 
Artist research fmp
Artist research fmpArtist research fmp
Artist research fmpJason
 
Classrooms 09
Classrooms 09Classrooms 09
Classrooms 09Jason
 
Final project schedule 20th mar 2013
Final project schedule 20th mar 2013Final project schedule 20th mar 2013
Final project schedule 20th mar 2013Jason
 
Fmp production log_6th_mar_2013
Fmp production log_6th_mar_2013Fmp production log_6th_mar_2013
Fmp production log_6th_mar_2013Jason
 
Production log e6 16 november
Production log e6 16 novemberProduction log e6 16 november
Production log e6 16 novemberJason
 
L3 gd ip_061111_01
L3 gd ip_061111_01L3 gd ip_061111_01
L3 gd ip_061111_01Jason
 
Final project schedule 13th mar 2013
Final project schedule 13th mar 2013Final project schedule 13th mar 2013
Final project schedule 13th mar 2013Jason
 
Final project schedule 22nd may 2013
Final project schedule 22nd may 2013Final project schedule 22nd may 2013
Final project schedule 22nd may 2013Jason
 
Final project schedule 20th feb 2013
Final project schedule 20th feb 2013Final project schedule 20th feb 2013
Final project schedule 20th feb 2013Jason
 
John's ideas
John's ideasJohn's ideas
John's ideasJason
 
Production log e6 23 november
Production log e6 23 novemberProduction log e6 23 november
Production log e6 23 novemberJason
 
Fmp production log_27th_mar_2013
Fmp production log_27th_mar_2013Fmp production log_27th_mar_2013
Fmp production log_27th_mar_2013Jason
 
Final project schedule 17th april 2013
Final project schedule 17th april 2013Final project schedule 17th april 2013
Final project schedule 17th april 2013Jason
 
Fmp production log_10th_apr_2013
Fmp production log_10th_apr_2013Fmp production log_10th_apr_2013
Fmp production log_10th_apr_2013Jason
 

Viewers also liked (20)

Final project schedule 3rd april 2013
Final project schedule 3rd april 2013Final project schedule 3rd april 2013
Final project schedule 3rd april 2013
 
Production log e6 7 december
Production log e6 7 decemberProduction log e6 7 december
Production log e6 7 december
 
Final project schedule 6th mar 2013
Final project schedule 6th mar 2013Final project schedule 6th mar 2013
Final project schedule 6th mar 2013
 
L3 gd contractual_061111_01
L3 gd contractual_061111_01L3 gd contractual_061111_01
L3 gd contractual_061111_01
 
Brain storm
Brain stormBrain storm
Brain storm
 
Ethical Checklist
Ethical ChecklistEthical Checklist
Ethical Checklist
 
Artist research fmp
Artist research fmpArtist research fmp
Artist research fmp
 
Classrooms 09
Classrooms 09Classrooms 09
Classrooms 09
 
Final project schedule 20th mar 2013
Final project schedule 20th mar 2013Final project schedule 20th mar 2013
Final project schedule 20th mar 2013
 
Fmp production log_6th_mar_2013
Fmp production log_6th_mar_2013Fmp production log_6th_mar_2013
Fmp production log_6th_mar_2013
 
Production log e6 16 november
Production log e6 16 novemberProduction log e6 16 november
Production log e6 16 november
 
L3 gd ip_061111_01
L3 gd ip_061111_01L3 gd ip_061111_01
L3 gd ip_061111_01
 
Final project schedule 13th mar 2013
Final project schedule 13th mar 2013Final project schedule 13th mar 2013
Final project schedule 13th mar 2013
 
Final project schedule 22nd may 2013
Final project schedule 22nd may 2013Final project schedule 22nd may 2013
Final project schedule 22nd may 2013
 
Final project schedule 20th feb 2013
Final project schedule 20th feb 2013Final project schedule 20th feb 2013
Final project schedule 20th feb 2013
 
John's ideas
John's ideasJohn's ideas
John's ideas
 
Production log e6 23 november
Production log e6 23 novemberProduction log e6 23 november
Production log e6 23 november
 
Fmp production log_27th_mar_2013
Fmp production log_27th_mar_2013Fmp production log_27th_mar_2013
Fmp production log_27th_mar_2013
 
Final project schedule 17th april 2013
Final project schedule 17th april 2013Final project schedule 17th april 2013
Final project schedule 17th april 2013
 
Fmp production log_10th_apr_2013
Fmp production log_10th_apr_2013Fmp production log_10th_apr_2013
Fmp production log_10th_apr_2013
 

Similar to Computers 09

Computers 09
Computers 09Computers 09
Computers 09AkiTenshi
 
Computers assesment
Computers assesmentComputers assesment
Computers assesmentDom9533
 
Computers Health and Safety
Computers Health and SafetyComputers Health and Safety
Computers Health and SafetyWildOakForrest
 
Computers 09
Computers 09Computers 09
Computers 09j45a45ck
 
Vijeo citect quick start tutorial - part 1 ver d
Vijeo citect   quick start tutorial - part 1 ver dVijeo citect   quick start tutorial - part 1 ver d
Vijeo citect quick start tutorial - part 1 ver dAbdul Budiman
 
Shahid Akbar Ali - CV
Shahid Akbar Ali - CVShahid Akbar Ali - CV
Shahid Akbar Ali - CVS AK Ali
 
SIWES REPORT ON NETWORKING AND BASIC WEB DESIGN
SIWES REPORT ON NETWORKING AND BASIC WEB DESIGNSIWES REPORT ON NETWORKING AND BASIC WEB DESIGN
SIWES REPORT ON NETWORKING AND BASIC WEB DESIGNEjiro Ndifereke
 
Mutassem Shalab CV
Mutassem Shalab CVMutassem Shalab CV
Mutassem Shalab CVpaldosar
 
Neles NDX Intelligent Valve Positioner
Neles NDX Intelligent Valve PositionerNeles NDX Intelligent Valve Positioner
Neles NDX Intelligent Valve PositionerMead O'Brien, Inc.
 
FIDP_1_Quarter_CSS1 (1).docx
FIDP_1_Quarter_CSS1 (1).docxFIDP_1_Quarter_CSS1 (1).docx
FIDP_1_Quarter_CSS1 (1).docxjonathanlabajo2
 
Shahid Akbar Ali - CV
Shahid Akbar Ali - CVShahid Akbar Ali - CV
Shahid Akbar Ali - CVS AK Ali
 
TLE-10-ICT-Computer-System-Servicing-NC-docx.docx
TLE-10-ICT-Computer-System-Servicing-NC-docx.docxTLE-10-ICT-Computer-System-Servicing-NC-docx.docx
TLE-10-ICT-Computer-System-Servicing-NC-docx.docxgringoguman
 
HDL-32E High Definition LiDAR™ Sensor
HDL-32E High Definition LiDAR™ SensorHDL-32E High Definition LiDAR™ Sensor
HDL-32E High Definition LiDAR™ SensorBrett Johnson
 
5 assessment instrument evidence_ tos_ written t_est_etc
5  assessment instrument  evidence_ tos_ written t_est_etc5  assessment instrument  evidence_ tos_ written t_est_etc
5 assessment instrument evidence_ tos_ written t_est_etcMCabz1
 
computer css nc2 slides.pptx
computer css nc2 slides.pptxcomputer css nc2 slides.pptx
computer css nc2 slides.pptxRodjoneBinondo1
 

Similar to Computers 09 (20)

Computers 09
Computers 09Computers 09
Computers 09
 
Computers assesment
Computers assesmentComputers assesment
Computers assesment
 
Computers Health and Safety
Computers Health and SafetyComputers Health and Safety
Computers Health and Safety
 
Computers 09
Computers 09Computers 09
Computers 09
 
Computers 09
Computers 09Computers 09
Computers 09
 
Computers 09
Computers 09Computers 09
Computers 09
 
css 1.pptx
css 1.pptxcss 1.pptx
css 1.pptx
 
Vijeo citect quick start tutorial - part 1 ver d
Vijeo citect   quick start tutorial - part 1 ver dVijeo citect   quick start tutorial - part 1 ver d
Vijeo citect quick start tutorial - part 1 ver d
 
Shahid Akbar Ali - CV
Shahid Akbar Ali - CVShahid Akbar Ali - CV
Shahid Akbar Ali - CV
 
SIWES REPORT ON NETWORKING AND BASIC WEB DESIGN
SIWES REPORT ON NETWORKING AND BASIC WEB DESIGNSIWES REPORT ON NETWORKING AND BASIC WEB DESIGN
SIWES REPORT ON NETWORKING AND BASIC WEB DESIGN
 
CE CV 1
CE CV 1CE CV 1
CE CV 1
 
Mutassem Shalab CV
Mutassem Shalab CVMutassem Shalab CV
Mutassem Shalab CV
 
Neles NDX Intelligent Valve Positioner
Neles NDX Intelligent Valve PositionerNeles NDX Intelligent Valve Positioner
Neles NDX Intelligent Valve Positioner
 
FIDP_1_Quarter_CSS1 (1).docx
FIDP_1_Quarter_CSS1 (1).docxFIDP_1_Quarter_CSS1 (1).docx
FIDP_1_Quarter_CSS1 (1).docx
 
Shahid Akbar Ali - CV
Shahid Akbar Ali - CVShahid Akbar Ali - CV
Shahid Akbar Ali - CV
 
TLE-10-ICT-Computer-System-Servicing-NC-docx.docx
TLE-10-ICT-Computer-System-Servicing-NC-docx.docxTLE-10-ICT-Computer-System-Servicing-NC-docx.docx
TLE-10-ICT-Computer-System-Servicing-NC-docx.docx
 
HDL-32E High Definition LiDAR™ Sensor
HDL-32E High Definition LiDAR™ SensorHDL-32E High Definition LiDAR™ Sensor
HDL-32E High Definition LiDAR™ Sensor
 
P44x_EN_M_Ka7__E0__M.pdf
P44x_EN_M_Ka7__E0__M.pdfP44x_EN_M_Ka7__E0__M.pdf
P44x_EN_M_Ka7__E0__M.pdf
 
5 assessment instrument evidence_ tos_ written t_est_etc
5  assessment instrument  evidence_ tos_ written t_est_etc5  assessment instrument  evidence_ tos_ written t_est_etc
5 assessment instrument evidence_ tos_ written t_est_etc
 
computer css nc2 slides.pptx
computer css nc2 slides.pptxcomputer css nc2 slides.pptx
computer css nc2 slides.pptx
 

More from Jason

Fmp production log_22nd_may_2013
Fmp production log_22nd_may_2013Fmp production log_22nd_may_2013
Fmp production log_22nd_may_2013Jason
 
Fmp production log_15th_may_2013
Fmp production log_15th_may_2013Fmp production log_15th_may_2013
Fmp production log_15th_may_2013Jason
 
Fmp production log_8th_may_2013
Fmp production log_8th_may_2013Fmp production log_8th_may_2013
Fmp production log_8th_may_2013Jason
 
Fmp production log_1st_may_2013
Fmp production log_1st_may_2013Fmp production log_1st_may_2013
Fmp production log_1st_may_2013Jason
 
Fmp production log_24th_apr_2013
Fmp production log_24th_apr_2013Fmp production log_24th_apr_2013
Fmp production log_24th_apr_2013Jason
 
Fmp production log_17th_apr_2013
Fmp production log_17th_apr_2013Fmp production log_17th_apr_2013
Fmp production log_17th_apr_2013Jason
 
Fmp production log_3rd_apr_2013
Fmp production log_3rd_apr_2013Fmp production log_3rd_apr_2013
Fmp production log_3rd_apr_2013Jason
 
Fmp production log_20th_mar_2013
Fmp production log_20th_mar_2013Fmp production log_20th_mar_2013
Fmp production log_20th_mar_2013Jason
 
Fmp production log_13th_mar_2013
Fmp production log_13th_mar_2013Fmp production log_13th_mar_2013
Fmp production log_13th_mar_2013Jason
 
Fmp production log_27th_feb_2013
Fmp production log_27th_feb_2013Fmp production log_27th_feb_2013
Fmp production log_27th_feb_2013Jason
 
Final project schedule 15th may 2013
Final project schedule 15th may 2013Final project schedule 15th may 2013
Final project schedule 15th may 2013Jason
 
Final project schedule 8th may 2013
Final project schedule 8th may 2013Final project schedule 8th may 2013
Final project schedule 8th may 2013Jason
 
Production log e6 9 november
Production log e6 9 novemberProduction log e6 9 november
Production log e6 9 novemberJason
 
Production log e6 30 november
Production log e6 30 novemberProduction log e6 30 november
Production log e6 30 novemberJason
 
Production log e6 26 october
Production log e6 26 octoberProduction log e6 26 october
Production log e6 26 octoberJason
 
Production log e6 2 november
Production log e6 2 novemberProduction log e6 2 november
Production log e6 2 novemberJason
 
Production log e6 14 december
Production log e6 14 decemberProduction log e6 14 december
Production log e6 14 decemberJason
 
Unit6 cacmp response_240112_01
Unit6 cacmp response_240112_01Unit6 cacmp response_240112_01
Unit6 cacmp response_240112_01Jason
 
L3 gd unit6cacmp_task3_121211
L3 gd unit6cacmp_task3_121211L3 gd unit6cacmp_task3_121211
L3 gd unit6cacmp_task3_121211Jason
 
Final project schedule 1st may 2013
Final project schedule 1st may 2013Final project schedule 1st may 2013
Final project schedule 1st may 2013Jason
 

More from Jason (20)

Fmp production log_22nd_may_2013
Fmp production log_22nd_may_2013Fmp production log_22nd_may_2013
Fmp production log_22nd_may_2013
 
Fmp production log_15th_may_2013
Fmp production log_15th_may_2013Fmp production log_15th_may_2013
Fmp production log_15th_may_2013
 
Fmp production log_8th_may_2013
Fmp production log_8th_may_2013Fmp production log_8th_may_2013
Fmp production log_8th_may_2013
 
Fmp production log_1st_may_2013
Fmp production log_1st_may_2013Fmp production log_1st_may_2013
Fmp production log_1st_may_2013
 
Fmp production log_24th_apr_2013
Fmp production log_24th_apr_2013Fmp production log_24th_apr_2013
Fmp production log_24th_apr_2013
 
Fmp production log_17th_apr_2013
Fmp production log_17th_apr_2013Fmp production log_17th_apr_2013
Fmp production log_17th_apr_2013
 
Fmp production log_3rd_apr_2013
Fmp production log_3rd_apr_2013Fmp production log_3rd_apr_2013
Fmp production log_3rd_apr_2013
 
Fmp production log_20th_mar_2013
Fmp production log_20th_mar_2013Fmp production log_20th_mar_2013
Fmp production log_20th_mar_2013
 
Fmp production log_13th_mar_2013
Fmp production log_13th_mar_2013Fmp production log_13th_mar_2013
Fmp production log_13th_mar_2013
 
Fmp production log_27th_feb_2013
Fmp production log_27th_feb_2013Fmp production log_27th_feb_2013
Fmp production log_27th_feb_2013
 
Final project schedule 15th may 2013
Final project schedule 15th may 2013Final project schedule 15th may 2013
Final project schedule 15th may 2013
 
Final project schedule 8th may 2013
Final project schedule 8th may 2013Final project schedule 8th may 2013
Final project schedule 8th may 2013
 
Production log e6 9 november
Production log e6 9 novemberProduction log e6 9 november
Production log e6 9 november
 
Production log e6 30 november
Production log e6 30 novemberProduction log e6 30 november
Production log e6 30 november
 
Production log e6 26 october
Production log e6 26 octoberProduction log e6 26 october
Production log e6 26 october
 
Production log e6 2 november
Production log e6 2 novemberProduction log e6 2 november
Production log e6 2 november
 
Production log e6 14 december
Production log e6 14 decemberProduction log e6 14 december
Production log e6 14 december
 
Unit6 cacmp response_240112_01
Unit6 cacmp response_240112_01Unit6 cacmp response_240112_01
Unit6 cacmp response_240112_01
 
L3 gd unit6cacmp_task3_121211
L3 gd unit6cacmp_task3_121211L3 gd unit6cacmp_task3_121211
L3 gd unit6cacmp_task3_121211
 
Final project schedule 1st may 2013
Final project schedule 1st may 2013Final project schedule 1st may 2013
Final project schedule 1st may 2013
 

Computers 09

  • 1. GENERAL RISK ASSESSMENT PROGRAMME AREA All Sites REF NO. RA 1 OPERATION BEING ASSESSED COMPUTER WORKSTATIONS PURPOSE/METHOD OF WORK (3) To use a VDU workstation for a variety of tasks, including word processing, accounting, record keeping, graphic design and general data input. Use of the computer may be via a keyboard, a mouse or both. 1. Switch on power to workstation. 2. Run software appropriate to the task. 3. Use keyboard or mouse to input information and commands 4. Store data to floppy disk. 5. Produce hardcopy of data documents. 6. Shut down software package on completion of the task. 7. Switch off power to workstation. SPECIFIC LEGISLATIVE REQUIREMENTS (4) LEVEL OF SKILL/TRAINING REQUIRED (5) Health and Safety (Display Screen Equipment) Regulations Provision and Use of Work Equipment Regulations Health and Safety at Work etc. Act Workplace (Health, Safety and Welfare) Regulations Electricity at Work Regulations Management of Health and Safety at Work Regulations Knowledge of operation of computer hardware and peripherals. Knowledge and understanding of the appropriate software. Knowledge of the outcome of any specific Display Screen Equipment assessments as required by the Regulations. CHEMICALS/MATERIALS INVOLVED (6) HSC NO. ASSESSMENT DATE SPECIFIC WORK EQUIPMENT PROVIDED (7) Screen Cleaner Computer with Monitor and Keyboard Optionally a mouse and a printer Other peripheral equipment
  • 2. MAIN HAZARDS IDENTIFIED (8) WHO WILL BE AFFECTED (9) CONTROL MEASURES TO REDUCE THE RISK (10) Work Related Disorders Stress/Fatigue/Eyestrain etc. Effects from use of chemicals Electrical Hazard VDU User VDU User VDU User VDU User Ensure workstation assessed in accordance with the Display Screen Equipment Regulations and complies with the Code of Practice on Visual Display Units. Ensure users are aware of basic requirements of Display Screen Equipment Regulations and have competence to adjust workstations to comply with the above. Operators to follow varied work regime and take breaks away from the workstation and after every hour of continuous use. Ensure only approved substances and Safety Control Systems are used and assessments undertaken where required. Ensure user awareness regarding potential hazards from toner and instructions for safe use as outlined in health and safety control sheet. Toners replaced by trained personnel (Network Services). Ensure all electrical equipment tested in accordance with the PUWER Regulations. Equipment must not be powered permanently with four gang leads. All computers and peripherals should have individual socket outlets. Ensure that any member of staff or student without the relevant competencies does not interfere with, or attempt to make repairs to electrical equipment etc. MANUAL HANDLING RISK (11) PERSONAL PROTECTIVE EQUIPMENT REQUIRED (12) Has a manual handling risk been identified NO Is the risk considered to be LOW Is a further detailed assessment required NO If the answer to the above question is YES a separate manual handling assessment will be required to fulfil the requirements of the Manual Handling Operations Regulations 1992. Is training and instruction required NO Is there need for special accommodation NO Is there need for test/examination NO Is all P. P. E. compatible N/A FREQUENCY OF MONITORING (13) ASSESSMENT REVIEW PERIOD N/A 3 Months 6 Months 1 Year > 1 Year < 1 Year 2 Years 3 Years 4 Years > 4 Years X X Signed: Samantha Hampton Facilities Manager Date: 1st April 2010