2. Tables are usedafor storing information.
There is Root Problem in IT:
So what’s wrong with that? Here
is the short list...
• Tables require pre-defined specifications from
known requirements and then inherently resist or
block change
• But reality and requirements both change
• Tables are 2 dimensional structures for storing
data
• But Information is ‘n’- dimensional
• Tables and columns are named by IT professionals
• But Users need to get information, don’t care how
its stored, don’t have time to learn to write SQL
queries themselves, and don’t want to wait for the
IT pros to do it, eventually, after the SAP ERP
and SCM systems, and the big data warehouse
projects, are finished, installed and working.
There is a serious disconnect here:
The Solution and the Requirements do not match, ...
3. are:
A New Relavance for Information Storage /
Paradigm Associative Information Systems
Management
• ‘n’-D Information Storage Model, Multi-D
Management
An Associative Information Architecture
• Many to Many relationship oriented architecture,
holds all possible quantities and types of
relationships an item (concept) may have, in all
dimensions of association
Employing an active, dynamic Dendritic Network
Model
• Works analogously to the brain, creating a fact
based learning environment that can embody any
real world info
Models all types of humanly differentiable
relationships
• Every way we can think of things is
intrinsically supported
Namespace, Data -Structure, and Data Type
Copyright 2010 2012, Relavance Corp. Confidential and Proprietary.
4. The Relavance Associative Information Systems
Relavance Associative Information
Architecture::
- stores each piece of information, each concept,
at the center of its own Universe of
relationships,
- supports implementation of complex and rapidly
changing data models and structures without
redesign,
- accommodates every kind of data and information
in:
• A Table-Free, Encapsulated Data Object Free,
Dynamic Storage Model that can have a perfect one-
to-one correspondence with the Concept model or
schema of the target system or business
• A run-time Configurable, Adaptable, Evolvable
Application, with unbounded extensibility
• A fully inclusive, inter-reference-able, data-type
and data-source agnostic, information management
platform that scales linearly with complexity and
size Copyright 2010 - 2012, Relavance Corp. Confidential and Proprietary.
9. COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL CONSULTANTS PRIORITY STATUS ...
PRODUCTION
DESIGN
HR
INVENTORY
IT
MARKETING
PRODUCTION
PURCHASING
321 16
R&D 123 36
12 14
SALES
ALL DEPARTMENTS 37 ENVIRONMENTAL SOURCE MATERIALS 7
23 8 15 2
PUBLIC ELECTRONIC
SAFETY RECORDS
54 793 97
28 11 486 79 44 13
PUBLIC ALL CORPORATE
HEALTH REGULATIONS GOVERNANCE
49 137
67 3 48 9
BIO-RISK 71 12 ACCOUNTING
29 2 52 15
BIO-HAZARD EMPLOYEE
SAFETY
10. COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL CONSULTANTS PRIORITY STATUS ...
PRODUCTION
DESIGN
HR
INVENTORY
IT
MARKETING
PRODUCTION
PURCHASING
321 16
R&D 123 36
12 14
SALES
ALL DEPARTMENTS 37 ENVIRONMENTAL SOURCE MATERIALS 7
23 8 15 2
PUBLIC ELECTRONIC
SAFETY RECORDS
54 793 97
28 11 486 79 44 13
PUBLIC ALL CORPORATE
HEALTH REGULATIONS GOVERNANCE
49 137
67 3 48 9
BIO-RISK 71 12 ACCOUNTING
29 2 52 15
BIO-HAZARD EMPLOYEE
SAFETY
11. COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL CONSULTANTS PRIORITY STATUS ...
PRODUCTION
104 16
37 2 36 14
12 ENVIRONMENTAL SOURCE MATERIALS 7
6 3 15 2
PUBLIC ELECTRONIC
SAFETY RECORDS
32 310 18
21 7 235 42 4 6
PUBLIC PRODUCTION CORPORATE
HEALTH REGULATIONS GOVERNANCE
49 0
67 2 0 0
BIO-RISK 71 8 ACCOUNTING
29 2 19 4
BIO-HAZARD EMPLOYEE
SAFETY
12. COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL CONSULTANTS PRIORITY STATUS ...
PRODUCTION
104 16
37 2 36 14
12 ENVIRONMENTAL SOURCE MATERIALS 7
6 3 15 2
PUBLIC ELECTRONIC
SAFETY RECORDS
32 310 18
21 7 235 42 4 6
PUBLIC PRODUCTION CORPORATE
HEALTH REGULATIONS GOVERNANCE
49 0
67 2 0 0
BIO-RISK 71 8 ACCOUNTING
29 2 19 4
BIO-HAZARD EMPLOYEE
SAFETY
13. COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL CONSULTANTS PRIORITY STATUS ...
PRODUCTION
REGULATION AREA REGULATION ID ASSIGNED INTERNAL PROCESS ID LAST QUALIFIED TEST /
ACCOUNTABILITY DOCUMENT REFERENCE
Air Exchange Filtration / BR-38-A-724 Prod.92.137 2011/11/28
Contamination
Surface Contaminant Cleansing BR-38-W-27 Prod.6.12 2011/10/01
104 16
37 2 36 14
12 ENVIRONMENTAL SOURCE MATERIALS 7
6 3 15 2
PUBLIC ELECTRONIC
SAFETY RECORDS
32 310 18
21 7 235 42 4 6
PUBLIC PRODUCTION CORPORATE
HEALTH REGULATIONS GOVERNANCE
49 0
67 2 0 0
BIO-RISK 71 8 ACCOUNTING
29 2 19 4
BIO-HAZARD EMPLOYEE
SAFETY
14. COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL CONSULTANTS PRIORITY STATUS ...
PRODUCTION
PRODUCTION Anne Bitmonger
Billy Snarguffle
REGULATION AREA REGULATION ID ASSIGNED INTERNAL PROCESS ID LAST QUALIFIED TEST /
Colin Fludgrister ACCOUNTABILITY DOCUMENT REFERENCE
Air Exchange Filtration /
David Waterhead BR-38-A-724 Prod.92.137 2011/11/28
Contamination
Evelyn Sneeple
Surface Contaminant Cleansing BR-38-W-27 Prod.6.12 2011/10/01
Frampton Rockstar
Gary Bonecrusher
Harvey Luggage
Ivy League 104 16
37 2 36 14
Jimmy Gotcha
ALL PERSONNEL
12 ENVIRONMENTAL SOURCE MATERIALS 7
6 3 15 2
PUBLIC ELECTRONIC
SAFETY RECORDS
32 310 18
21 7 235 42 4 6
PUBLIC PRODUCTION CORPORATE
HEALTH REGULATIONS GOVERNANCE
49 0
67 2 0 0
BIO-RISK 71 8 ACCOUNTING
29 2 19 4
BIO-HAZARD EMPLOYEE
SAFETY
15. COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL CONSULTANTS PRIORITY STATUS ...
PRODUCTION
PRODUCTION Anne Bitmonger
Billy Snarguffle
REGULATION AREA REGULATION ID ASSIGNED INTERNAL PROCESS ID LAST QUALIFIED TEST /
Colin Fludgrister ACCOUNTABILITY DOCUMENT REFERENCE
Air Exchange Filtration /
David Waterhead BR-38-A-724 David Waterhead Prod.92.137 2011/11/28
Contamination
Evelyn Sneeple
Surface Contaminant Cleansing BR-38-W-27 Prod.6.12 2011/10/01
Frampton Rockstar
Gary Bonecrusher
Harvey Luggage
Ivy League 104 16
37 2 36 14
Jimmy Gotcha
ALL PERSONNEL
12 ENVIRONMENTAL SOURCE MATERIALS 7
6 3 15 2
PUBLIC ELECTRONIC
SAFETY RECORDS
32 310 18
21 7 235 42 4 6
PUBLIC PRODUCTION CORPORATE
HEALTH REGULATIONS GOVERNANCE
50 0
67 1 0 0
BIO-RISK 71 8 ACCOUNTING
29 2 19 4
BIO-HAZARD EMPLOYEE
SAFETY
16. COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL CONSULTANTS PRIORITY STATUS ...
PRODUCTION
PRODUCTION Anne Bitmonger
Billy Snarguffle
REGULATION AREA REGULATION ID ASSIGNED INTERNAL PROCESS ID LAST QUALIFIED TEST /
Colin Fludgrister ACCOUNTABILITY DOCUMENT REFERENCE
Air Exchange Filtration /
David Waterhead BR-38-A-724 David Waterhead Prod.92.137 2011/11/28
Contamination
Evelyn Sneeple
Surface Contaminent Cleansing BR-38-W-27 Prod.6.12 2011/10/01
Frampton Rockstar
Gary Bonecrusher
Harvey Luggage
Ivy League 104 16
37 2 36 14
Jimmy Gotcha
ALL PERSONNEL
12 ENVIRONMENTAL SOURCE MATERIALS 7
6 3 15 2
PUBLIC ELECTRONIC
SAFETY RECORDS
32 310 18
21 7 235 42 4 6
PUBLIC PRODUCTION CORPORATE
HEALTH REGULATIONS GOVERNANCE
50 0
67 1 0 0
BIO-RISK 71 8 ACCOUNTING
29 2 19 4
BIO-HAZARD EMPLOYEE
SAFETY
17. COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL CONSULTANTS PRIORITY STATUS ...
PRODUCTION
PRODUCTION Anne Bitmonger
Billy Snarguffle
REGULATION AREA REGULATION ID ASSIGNED INTERNAL PROCESS ID LAST QUALIFIED TEST /
Colin Fludgrister ACCOUNTABILITY DOCUMENT REFERENCE
Air Exchange Filtration /
David Waterhead BR-38-A-724 David Waterhead Prod.92.137 2011/11/28
Contamination
Evelyn Sneeple
Surface Contaminent Cleansing BR-38-W-27 Billy Snarguffle Prod.6.12 2011/10/01
Frampton Rockstar
Gary Bonecrusher
Harvey Luggage
Ivy League 104 16
37 2 36 14
Jimmy Gotcha
ALL PERSONNEL
12 ENVIRONMENTAL SOURCE MATERIALS 7
6 3 15 2
PUBLIC ELECTRONIC
SAFETY RECORDS
32 310 18
21 7 235 42 4 6
PUBLIC PRODUCTION CORPORATE
HEALTH REGULATIONS GOVERNANCE
51 0
67 0 0 0
BIO-RISK 71 8 ACCOUNTING
29 2 19 4
BIO-HAZARD EMPLOYEE
SAFETY
18. COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL CONSULTANTS PRIORITY STATUS ...
PRODUCTION
REGULATION AREA REGULATION ID ASSIGNED INTERNAL PROCESS ID LAST QUALIFIED TEST /
ACCOUNTABILITY DOCUMENT REFERENCE
Air Exchange Filtration / BR-38-A-724 David Waterhead Prod.92.137 2011/11/28
Contamination
Surface Contaminant Cleansing BR-38-W-27 Billy Snarguffle Prod.6.12 2011/10/01
104 16
37 2 36 14
12 ENVIRONMENTAL SOURCE MATERIALS 7
6 3 15 2
PUBLIC ELECTRONIC
SAFETY RECORDS
32 310 18
21 7 235 42 4 6
PUBLIC PRODUCTION CORPORATE
HEALTH REGULATIONS GOVERNANCE
51 0
67 0 0 0
BIO-RISK 71 8 ACCOUNTING
29 2 19 4
BIO-HAZARD EMPLOYEE
SAFETY
19. COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL CONSULTANTS PRIORITY STATUS ...
PRODUCTION
REF ID REGULATION ID REGULATION NAME COMPLIANCE COMPLIANCE ACTIVITIES ASSIGNED Accountability Expertise PRIORITY COMPLIANCE
PROCESS ID / EVENTS REQUIRED RANK STATE
11174 BR-38-A-724 Air Exchange Filtration / PROD.92.137 Initiative 1174 David Waterhead 4
Contamination
11175 BR-38-W-27 Surface Contaminant Cleansing PROD.06.12 Initiative 1175 Billy Snarguffle 4
13812 Et cetera Et cetera Et cetera Initiative …
... Initiative
Initiative
Initiative
104 Initiative 16
37 2 Initiative 36 14
Initiative
12 ENVIRONMENTAL Initiative SOURCE MATERIALS 7
6 3 Initiative 15 2
Initiative
PUBLIC ELECTRONIC
SAFETY RECORDS
32 312 18
21 7 235 40 4 6
PUBLIC PRODUCTION CORPORATE
HEALTH REGULATIONS GOVERNANCE
51 0
67 0 0 0
BIO-RISK 71 8 ACCOUNTING
29 2 19 4
BIO-HAZARD EMPLOYEE
SAFETY
20. COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL CONSULTANTS PRIORITY STATUS ...
PRODUCTION
REF ID REGULATION ID REGULATION NAME COMPLIANCE COMPLIANCE ACTIVITIES ASSIGNED Accountability Expertise PRIORITY COMPLIANCE
PROCESS ID / EVENTS REQUIRED RANK STATE
11174 BR-38-A-724 Air Exchange Filtration / PROD.92.137 Initiative 1174 David Waterhead 4
Contamination
11175 BR-38-W-27 Surface Contaminant Cleansing PROD.06.12 Initiative 1175 Billy Snarguffle 4
13812 Et cetera Et cetera Et cetera Initiative …
... Initiative
Initiative
Initiative
104 Initiative 16
37 2 Initiative 36 14
Initiative
12 ENVIRONMENTAL Initiative SOURCE MATERIALS 7
6 3 Initiative 15 2
Initiative
PUBLIC ELECTRONIC
SAFETY RECORDS
32 312 18
21 7 235 40 4 6
PUBLIC PRODUCTION CORPORATE
HEALTH REGULATIONS GOVERNANCE
51 0
67 0 0 0
BIO-RISK 71 8 ACCOUNTING
29 2 19 4
BIO-HAZARD EMPLOYEE
SAFETY
21. COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL ACTIVITY REGULATION STATUS DATE
PRODUCTION David Waterhead Initiative 1174 BR-38-A-724 Gap: No Process 2012/01/27
104 16
37 2 36 14
12 ENVIRONMENTAL SOURCE MATERIALS 7
6 3 15 2
PUBLIC ELECTRONIC
SAFETY RECORDS
32 312 18
21 7 235 40 4 6
PUBLIC PRODUCTION CORPORATE
HEALTH REGULATIONS GOVERNANCE
51 0
67 0 0 0
BIO-RISK 71 8 ACCOUNTING
29 2 19 4
BIO-HAZARD EMPLOYEE
SAFETY
22. COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL ACTIVITY REGULATION STATUS DATE
PRODUCTION David Waterhead Initiative 1174 BR-38-A-724 Gap: No Process 2012/01/27
104 16
37 2 36 14
12 ENVIRONMENTAL SOURCE MATERIALS 7
6 3 15 2
PUBLIC ELECTRONIC
SAFETY RECORDS
32 312 18
21 7 235 40 4 6
PUBLIC PRODUCTION CORPORATE
HEALTH REGULATIONS GOVERNANCE
51 0
67 0 0 0
BIO-RISK 71 8 ACCOUNTING
29 2 19 4
BIO-HAZARD EMPLOYEE
SAFETY
23. COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL ACTIVITY REGULATION STATUS DATE
PRODUCTION David Waterhead Gap Determined BR-38-A-724 Gap: No Process 2012/01/27
Schedule Done
Process Developed
Proc Docs Done
Training Developed
Training Done
Institute Process
Inspect & Verify
Evaluate Process
Process Approved
Initiative 1174
COMPLIANCE REGULATION ID REGULATION COMPLIANCE ASSIGNED COMPLIANCE ACTIVITY DATE BEGUN DATE PLANNED
INITIATIVE AREA PROCESS ID ACCOUNTABILTY COMPLETE
Initiative 1174 BR-38-A-724 Air Exchange PROD.92.137 David Waterhead Schedule Initiative 2012/01/27 2012/02/03 TBC by end of
Filtration / March
Contamination
24. COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL ACTIVITY REGULATION STATUS DATE
PRODUCTION David Waterhead Gap Determined BR-38-A-724 Process Req’d 2012/02/02
Schedule Done
Process Developed
Proc Docs Done
Training Developed
Training Done
Institute Process
Inspect & Verify
Evaluate Process
Process Approved
Initiative 1174
COMPLIANCE REGULATION ID REGULATION COMPLIANCE ASSIGNED COMPLIANCE ACTIVITY DATE BEGUN DATE PLANNED
INITIATIVE AREA PROCESS ID ACCOUNTABILTY COMPLETE
Initiative 1174 BR-38-A-724 Air Exchange PROD.92.137 David Waterhead Schedule Initiative 2012/01/27 2012/02/03 TBC by end of
Filtration / March
Contamination
Gary Bonecrusher Identify Available Process Model 2012/02/07
25. COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL ACTIVITY REGULATION STATUS DATE
PRODUCTION David Waterhead Gap Determined BR-38-A-724 Process Modified 2012/02/10
Schedule Done
Process Developed
Proc Docs Done
Training Developed
Training Done
Institute Process
Inspect & Verify
Evaluate Process
Process Approved
Initiative 1174
COMPLIANCE REGULATION ID REGULATION COMPLIANCE ASSIGNED COMPLIANCE ACTIVITY DATE BEGUN DATE PLANNED
INITIATIVE AREA PROCESS ID ACCOUNTABILTY COMPLETE
Initiative 1174 BR-38-A-724 Air Exchange PROD.92.137 David Waterhead Schedule Initiative 2012/01/27 2012/02/03 TBC by end of
Filtration / March
Contamination
Gary Bonecrusher Identify Available Process Model 2012/02/07
GAP Determined 2012/02/09 2012/02/09
PROD.92.137-A Modify Process Model 2012/02/09 2012/02/10
26. COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL ACTIVITY REGULATION STATUS DATE
PRODUCTION David Waterhead Gap Determined BR-38-A-724 Training Done 2012/02/22
Schedule Done
Process Developed
Proc Docs Done
Training Developed
Training Done
Institute Process
Inspect & Verify
Evaluate Process
Process Approved
Initiative 1174
COMPLIANCE REGULATION ID REGULATION COMPLIANCE ASSIGNED COMPLIANCE ACTIVITY DATE BEGUN DATE PLANNED
INITIATIVE AREA PROCESS ID ACCOUNTABILTY COMPLETE
Initiative 1174 BR-38-A-724 Air Exchange PROD.92.137 David Waterhead Schedule Initiative 2012/01/27 2012/02/03 TBC by end of
Filtration / March
Contamination
Gary Bonecrusher Identify Available Process Model 2012/02/07
GAP Determined 2012/02/09 2012/02/09
PROD.92.137-A Modify Process Model 2012/02/09 2012/02/10
Review with DE 2012/02/13 2012/02/13
Update Process Docs 2012/02/14 2012/02/15
Evelyn Sneeple Institute Process Training 2012/02/20 2012/02/22
Implement Process in Lab 2012/02/23 2012/02/24
27. COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL ACTIVITY REGULATION STATUS DATE
PRODUCTION David Waterhead Gap Determined BR-38-A-724 Process Approved 2012/03/08
Schedule Done
Process Developed
Proc Docs Done
Training Developed
Training Done
Institute Process
Inspect & Verify
Evaluate Process
Process Approved
Initiative 1174
COMPLIANCE REGULATION ID REGULATION COMPLIANCE ASSIGNED COMPLIANCE ACTIVITY DATE BEGUN DATE PLANNED
INITIATIVE AREA PROCESS ID ACCOUNTABILTY COMPLETE
Initiative 1174 BR-38-A-724 Air Exchange PROD.92.137 David Waterhead Schedule Initiative 2012/01/27 2012/02/03 TBC by end of
Filtration / March
Contamination
Gary Bonecrusher Identify Available Process Model 2012/02/07
GAP Determined 2012/02/09 2012/02/09
PROD.92.137-A Modify Process Model 2012/02/09 2012/02/10
Review with DE 2012/02/13 2012/02/13
Update Process Docs 2012/02/14 2012/02/15
Evelyn Sneeple Institute Process Training 2012/02/20 2012/02/22
Implement Process in Lab 2012/02/23 2012/02/24
Inspect Process activities 2012/03/05 2012/03/05
Evaluate Process Efficacy 2012/03/07 2012/03/07
Determined Process Satisfies 2012/03/07 2012/03/07
Regulation Req’s
Process Approved 2012/03/08 2012/03/08 2012/03/31
28. COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL ACTIVITY REGULATION STATUS DATE
PRODUCTION David Waterhead Initiative 1174 BR-38-A-724 Process Approved 2012/03/08
COMPLIANCE REGULATION ID REGULATION COMPLIANCE ASSIGNED COMPLIANCE ACTIVITY DATE BEGUN DATE PLANNED
INITIATIVE AREA PROCESS ID ACCOUNTABILTY COMPLETE
Initiative 1174 BR-38-A-724 Air Exchange PROD.92.137 David Waterhead Schedule Initiative 2012/01/27 2012/02/03 TBC by end of
Filtration / March
Contamination
Gary Bonecrusher Identify Available Process Model 2012/02/07 2012/02/07
GAP Determined 2012/02/09 2012/02/09
PROD.92.137-A Modify Process Model 2012/02/09 2012/02/10
Review with DE 2012/02/13 2012/02/13
Update Process Docs 2012/02/14 2012/02/15
Evelyn Sneeple Institute Process Training 2012/02/20 2012/02/22
Implement Process in Lab 2012/02/23 2012/02/24
Inspect Process activities 2012/03/05 2012/03/05
Evaluate Process Efficacy 2012/03/07 2012/03/07
Determined Process Satisfies 2012/03/07 2012/03/07
Regulation Req’s
Process Approved 2012/03/08 2012/03/08 2012/03/31
REGULATION ID: BR-38-A-724 - INITIATIVE 1174 - PRODUCTION DEPARTMENT - DAVID WATERHEAD
Regulation Assigned Initiative Scheduled Process Model Ready Personnel Trained Inspection Done
Process Implemented Process Approved
01/18 01/23 01/30 02/06 02/13 02/20 02/27 03/05 03/12
29. COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL ACTIVITY REGULATION STATUS DATE
PRODUCTION David Waterhead Initiative 1174 BR-38-A-724 Process Approved 2012/03/08
BIO RISK REGULATION ID: BR-38-A-724 - INITIATIVE 1174 - PRODUCTION DEPARTMENT - DAVID WATERHEAD
Regulation Assigned Initiative Scheduled Process Model Ready Personnel Trained Inspection Done
Process Implemented Process Approved
01/18 01/23 01/30 02/06 02/13 02/20 02/27 03/05 03/12
104 16
37 2 36 14
12 ENVIRONMENTAL SOURCE MATERIALS 7
6 3 15 2
PUBLIC ELECTRONIC
SAFETY RECORDS
32 312 18
21 7 235 40 4 6
PUBLIC PRODUCTION CORPORATE
HEALTH REGULATIONS GOVERNANCE
50 0
68 0 0 0
BIO-RISK 71 8 ACCOUNTING
29 2 19 4
BIO-HAZARD EMPLOYEE
SAFETY
30. COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL CONSULTANTS PRIORITY STATUS ...
PRODUCTION
104 16
37 2 36 14
12 ENVIRONMENTAL SOURCE MATERIALS 7
6 3 15 2
PUBLIC ELECTRONIC
SAFETY RECORDS
32 312 18
21 7 235 40 4 6
PUBLIC PRODUCTION CORPORATE
HEALTH REGULATIONS GOVERNANCE
51 0
67 0 0 0
BIO-RISK 71 8 ACCOUNTING
29 2 19 4
BIO-HAZARD EMPLOYEE
SAFETY
31. COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL CONSULTANTS PRIORITY STATUS ...
PRODUCTION Status Bubbles
Grid 1
Grid 2
Grid 3
Dropdown 1
Dropdown 2
Dropdown 3
Dropdown 4
104 16 Dropdown 5
37 2 36 14
Dropdown 6
12 ENVIRONMENTAL SOURCE MATERIALS 7 ALL CONTROLS
6 3 15 2
PUBLIC ELECTRONIC
SAFETY RECORDS
32 312 18
21 7 235 40 4 6
PUBLIC PRODUCTION CORPORATE
HEALTH REGULATIONS GOVERNANCE
51 0
67 0 0 0
BIO-RISK 71 8 ACCOUNTING
29 2 19 4
BIO-HAZARD EMPLOYEE
SAFETY
32. COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL CONSULTANTS PRIORITY STATUS ...
PRODUCTION Status Bubbles
COMPLIANCE REFERENCE CONTEXTS Status 1 Status 2 Status 3
Ref ID x x
REGULATION ID x x x
REGULATION AREA x x x
COMPLIANCE PROCESS ID x x
COMPLIANCE ACTIVITIES / EVENTS x x
ASSIGNED Accountability x x x
Expertise area x x
PRIORITY RANK x x
104
COMPLIANCE STATE 16 x x
37 2 36 14
DATE BEGUN x
DATE COMPLETED x
12 ENVIRONMENTAL
COMPLIANCE Initiative ID SOURCE MATERIALS 7
6 3 PLANNED / Scheduled 15 2
PROGRAM / PROCESS IDENTIFIED
PUBLIC PROGRAM / PROCESS DEVELOPED ELECTRONIC
SAFETY RECORDS
PROGRAM / PROCESS DOCUMENTATION DONE
PROGRAM / PROCESS TRAINING DEVELOPED
TRAINING DONE
32 312 18
21 7 PROGRAM / PROCESS INSTITUTED
235 40 4 6
COMPLIANCE INSPECTION COMPLETED
PUBLIC PROGRAM / PROCESS EVALUATION COMPLETED
PRODUCTION CORPORATE
HEALTH REGULATIONS
PROGRAM / PROCESS APPROVED GOVERNANCE
51 0
67 0 0 0
BIO-RISK 71 8 ACCOUNTING
29 2 19 4
BIO-HAZARD EMPLOYEE
SAFETY
33. COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL CONSULTANTS PRIORITY STATUS ...
PRODUCTION Status Bubbles
COMPLIANCE REFERENCE CONTEXTS Status 1 Status 2 Status 3
Ref ID x
REGULATION ID x x x
REGULATION AREA x x x
COMPLIANCE PROCESS ID x x
COMPLIANCE ACTIVITIES / EVENTS x x
ASSIGNED Accountability x x x
Expertise area x x
PRIORITY RANK x x
104
COMPLIANCE STATE 16 x x
37 2 36 14
DATE BEGUN x x
DATE COMPLETED x x
12 ENVIRONMENTAL
COMPLIANCE Initiative ID SOURCE MATERIALS
x 7
6 3 PLANNED / Scheduled x 15 2
PROGRAM / PROCESS IDENTIFIED
PUBLIC PROGRAM / PROCESS DEVELOPED ELECTRONIC
SAFETY RECORDS
PROGRAM / PROCESS DOCUMENTATION DONE
PROGRAM / PROCESS TRAINING DEVELOPED
TRAINING DONE
32 312 18
21 7 PROGRAM / PROCESS INSTITUTED
235 40 4 6
COMPLIANCE INSPECTION COMPLETED
PUBLIC PROGRAM / PROCESS EVALUATION COMPLETED
PRODUCTION CORPORATE
HEALTH REGULATIONS
PROGRAM / PROCESS APPROVED GOVERNANCE
51 0
67 0 0 0
BIO-RISK 71 8 ACCOUNTING
29 2 19 4
BIO-HAZARD EMPLOYEE
SAFETY
Copyright 2009, Relavance Canada Inc. Confidential and Proprietary.
This slide presents a view of a regulation compliance model. It is self explanatory. One can see the three models referred to on the previous slide in turquoise, in the middle. Clicking on any of these items populates the top menu appropriately.
This page represents a Compliance officers view into the entire organization ’s Compliance activities and status. The node graph view information can be modified by applying qualifiers from any area of interest, such as department, personnel, priority, etc., within the organization. Initially, the values in the highlighted Red, Yellow and Green bubbles, show the total number of regulations which have Non-Compliant, In Process, and Compliant status, respectively for the entire organization.
There are three interacting ‘models’ which provide the necessary framework to facilitate the breadth and depth of correlation needed to produce this kind of status: an organization model, with all the structural elements of the organization, such as divisions, departments, offices, or whatever; an org chart, with all the people and their positions in the organization, and a model of the roles, rights and responsibilities of each position / job in the organization.
The top menu bar is fully contextual, that is, it configures itself based in part on the user ’s workflow process, into which this system is integrated. The Categories in the menu bar are completely re-assignable at run-time to reflect different perspectives, or work-flow needs, as will be evident later in the presentation. The sets of items presented in any category can be filtered by prior category selections. In this case, the visible departments are those from the Organizational Model where existing regulations apply.
When an initial qualifier (or filter) is selected, the count of items referenced in the status bubbles are modified by applying the selected item as a filter. In an associative model, there is no need to search all records for an occurrence of the selected item, or a reference (FK) to the selected item. The selected item has direct reference relationships with everything that is conceptually related.
In this case, where the Production department was selected, it acted as a filter to now show the count of all Regulations that are only associated with the Production department, relative to each regulation area.
To examine (drill down to) the information that is represented by the count of two in the Red bubble connected to the Bio-Risk area of regulations, click on the Red bubble adjacent to the Bio-Risk bubble.
A tabular report is automatically produced. A distinction here is that the ‘report’ is actually updatable. Any ‘field’ can be masked for or from update, associatively, according to the user’s rights profile. Any ‘field’ can also be associated with a data model context to activate that context as a data source
Clicking in any empty ‘field’, auto-activates the associated data context (either as a drop-down in the grid or) as a drop-down in the menu, in this case Personnel. The items appearing in Personnel are filtered by the selected department, so only ‘appropriate’ personnel can be chosen to fill the selected ‘field’. The personnel can also be filtered by any associated attributes (items in columns) of the record within which the selected empty ‘field’ is, such as the expertise required for that regulation.
Dragging and Dropping the selected personnel to the empty field, modifies the status of the record updating the count of the regulation area status. This propagation effect is intrinsic to the associative model, and provides significant efficiencies when one wishes to offer customizable views to the end users.
To carry out the rest of the accountability assignment, another person is selected and dropped onto the other empty ‘field’. Again the related statuses are consequentially auto-updated.
This assignment action has been timestamped and digitally signed, which means that, from an audit trail point of view, there is no additional ‘form’ to fill out or checklist to keep track of or bother with. The process checklist is actually represented by a list of activities that appears later in the presentation as a workflow integrated element.
If one next wishes to see a report on all the compliance activities in the area of Bio-Risk that are in process, clicking on the Yellow bubble opens an associated report.
Compliance activities related to a given regulation are managed like projects, except much more effectively. Industry standard project, business process, and workflow management systems focus on the documentation and hence create a work intensive, secondary process, which involves keeping the documentation up to date. The more complex the project or process, the more documentation work there is to do. By integrating all the compliance activities related to each given regulation into existing workflows and associatively ‘connecting’ them to an ‘initiative’ item for that regulation, a single point access to all the information about every activity is enabled, simplifying everything from set-up to update to management to audits. It also means the end to having to manually fill out forms and spreadsheets, as this process can be effectively automated.
To explore the activities related to a given initiative just click on it.
All compliance processes are generically templated. The general activities that compose every compliance process which are fundamentally essential to achieve best practices are included. These can be easily adapted to each new initiative, ( ‘customized’ to suit the actual regulation requirements), simply by changing the text and / or order of operations and associating the modified version to the initiative (just a click away). This then becomes a ‘specialized’ template and all activities can be connected to it like nerve fibres to a backbone.
A generalized template of compliance activities for the lifecycle of any compliance process. This is just a general example but follows industry process norms and hence is usable as a starting point. The lifecycle of any regulation compliance initiative starts with a new or modified regulation. Tracking the rest of the activities involves associating this model (customized as required) with a particular initiative and connecting it with a list of tags ...
These tags automatically become available on the page. Each of the activities has a completion point: ‘... Done’. Clicking on ‘... Done’ signals the beginning of the next activity, and automatically informs the person responsible for the next step with a notification, the current status, and the planned schedule. The notification appears on their screen, not in some email box. This obviates the hand-off problem where things typically ‘fall through the cracks’.
Here Gary is informed that Initiative 1174 next needs a process to be defined to and he is responsible.
Here Gary has finished the process development.
As the steps progress towards compliance, documentation is auto-generated to validate and register each step. Where qualification or information is required from a user, the necessary entry means is presented, injected into their workflow, and automatically stored (time-stamped and digitally signed) in association with the initiative.
As the steps progress towards compliance, documentation is auto-generated to validate and register each step. Where qualification or information is required from a user, the necessary entry means is presented, injected into their workflow, and automatically stored (time-stamped and digitally signed) in association with the initiative.
When it is determined through all appropriate means that the process meets regulation requirements, the process is approved and the initiative is complete. The status is immediately updated on the dashboard.
And a time-line, with links to all evidentiary documentation, is presented. Clicking on any of the time-line events brings up the associated documentation.