Here are the key tools and materials used in decorating cakes:
- Spatulas - Come in different sizes for removing items from pans or frosting cakes. Flexible blades are multipurpose.
- Rubber scrapers - Used to remove food bits from bowls, pans, mixers. Also gather or consolidate batter/dough.
- Piping bags - Hold frostings, fillings for decorating. Disposable bags or reusable bags with couplers.
- Decorating tips - Attach to piping bags. Different shapes (star, round, flower) for various effects.
- Cake comb - Creates patterns/designs on frosted cakes.
- C