App Development Process
Case Studies
What’s
Inside?
CONTENTS
We start the process by breaking the
Development Cycle into different Stages.
In accordance with these stages, we
allocate the right resources and build
a team that works towards a common
vision and goal.
A & U What’s
Inside?
The Adsnurl Story
App Development Process
Case Studies
www.adsnurl.com
Welcome to
Adsnurl
We start the process by breaking the
Development Cycle into different stages.
In accordance with these stages, we
allocate the right resources and build
a team that works towards a common
vision and angle
We are
because of
our people
NOTEW ORTHY NUMBERS
23,000+ 200+
400+ 20+
Global Projects Crazy People
LIve Apps Awards
We are
because of
our people
NOTEWORTHY NUMBERS
23,000+
Initial Consultation
200+
Live Apps
500+
Websites
200+
Tech Nerds
Based in the Heart of India; New Delhi, we’re
one of the finest App Development Agency
in India run by Mobile Evangelists and serial
Entrepreneurs.
We’ve helped many Startups, Entrepreneurs,
SMEs, Corporate and even some Fortune 500
companies to build their Mobile Strategy.
This has enabled us to plant our footprints in
various industries such as Healthcare, Travel,
Education, Fintech, Retail, Enterprise, On-
Demand, and many more.
A Story of
Stalwarts.
Who we are?
www.adsandurl.com
&
A Story of
Stalwarts
Based in the Heart of India; New Delhi, we’re
one of the finest App Developement Agency
in India run by Mobile Evangelists and serial
Entrepreneurs.
We’ve helped many Startups, Entrepreneurs,
SMEs, Corporate and even some Fortune 500
companies to build their Mobile Strategy.
This has enabled us to plant our footprints in
various industries such as Healthcare, Travel,
Education, Fintech, Retail, Enterprise, On-
Demand, and many more.
Who we are?
www.adsnurl.com
Believers &
Practitioners.
We have one of the best teams of App
Developers, UI/UX Designers, Product
Managers, Quality Analysts, Backend Experts,
and App Marketers. Our Team of 250 people
makes sure that no stones are left unturned.
www.adsandurl.com
Our Team
&
We have one of the best teams of App
Developers, UI/UX Designers, Product
Managers, Quality Analysts, Backend Experts,
and App Marketers. Our Team of 250 people
makes sure that no stones are left unturned.
Believers &
Practitioners
Our Team
www.adsnurl.com
Our App
Development
Process
We start the process by breaking the Development Cycle into different Stages. In accordance
with these stages, we allocate the right resources and build a team that works towards a
common vision and goal.
Ideation Strategizing Design Sprint MVP Phase Final Launch
Our App
Development
Process
We start the process by breaking the Development Cycle into different Stages. In accordance
with these stages,, we allocate the right resources and build a team that works towards a
common vision and goal.
Ideation Strategizing Design Sprint MVP Phase Final Launch
Our team of Business Analysts, Product
Managers, Technology Experts identify the
true value of your idea, see what feature can
be integrated to shape the idea better and help
you to better IDENTIFY the users’ Problems,
clearly understand your TARGET AUDIENCE,
and ANALYZE it further to focus on the ultimate
Solution.
Through this, we refine and shape your
Business idea more effectively.
After this, we suggest you the technical
solutions and lay down the **Scope of
Work** where we underline the Project scope,
Estimated Project Budget, Estimated Project
Timeline.
Our Process
What You Get:
1. Non Diclosure Document
2. Scope of Work
3. Business Proposal
Ideation
www.adsandurl.com
&
Our Process
Ideation
www.adsnurl.com
What you get:
1. Non Disclosure Document
2. Scope of Work
3. Business Proposal
Our team of Business Analysts, Product Managers,
Technology Experts identify the true value of your idea,
see what feature can be integrated to shape the idea
better and helpyou to better identify the user’s Prob-
lems, clearly understand your target audience, and
analyze it further to focus on the ultimate Solution.
Through this, we refine and shape our Business idea
more effectively.
After this, we suggest you the technical solutions and
lay down the **Scope of Work**where we underline
the Project scope, Estimated Project Budget, Estimated
Project Timeline.
Every step of the Project is strategized keeping
the user in mind to provide the maximum value
to the end users.
Our Product team defines the Roadmap
to the Project team so they have a clear
understanding of the intent and vision of the
new product.
Besides this, they identify ways to achieve
strategic goals and initiatives.
Our Process
What You Get:
1. Project Roadmap
2. Account Manager
3. Product Owner
4. Development Team
Strategy &
Roadmap
www.adsandurl.com
&
Our Process
Strategy &
Roadmap
What you get:
1. Project Roadmap
2. Account Manager
3. Product Owner
4. Development team
www.adsnurl.com
Every step of the Project is strategized keeping the
user in mind to provide the maximum value to the
end users.
Our Product team defines the Roadmap to the
Project Team so they have a clear understanding
of the intent and vision of the new product.
Besides this, they identify ways to achieve strate-
gic goals and initiatives.
Next, we perform and brainstorm a 5 days long
Product Design Sprint activity which helps
us to transform the idea into a functionally
designed Prototype.
This helps the entire team to get in the shoes
of the users and gain insights on how a user is
going to interact with the product, it helps us to
filter out and identify what works for them and
what doesn’t.
It also helps to eliminate the risk of Failure.
Our Process
Design
Sprint
www.adsandurl.com
&
Design
Sprint
www.adsnurl.com
Our Process
Next, we perform and brainstorm a 5 days along Prod-
uct Design Sprint activity which helps us to transform
the idea into a functionally designed Prototype.
This helps the entire team to get in the shoes of the
users and gain insights on how a user is going to inter-
act with the product, it helps us to filter out and identify
what works for them and what doesn’t.
It also helps to eliminate the risk of failure.
An MVP is basically a Beta and First version of the App
which is launched to the first set of users in order to
observe their engagement with your product, and
garner invaluable insights.
All this while, our Quality Analysts and App Testers
constantly review Lines of Code and Algorithm
and lays down the scope of optimization with the
Development team. MVP is the core of any digital
product. The terminology may sound simple but there
is a definite process that we follow to deliver cutting
edge apps.
This stage is also the best to seek Angel Funding or
some extra Capital from the Investors as you already
have a working product which just needs to launch
into the market.
Our Process
MVP
COMING
SOON
COMING
SOON
Feature
Advertisement
Feature
Continue
www.adsandurl.com
&
MVP
An MVP is basically a Beta and FIrst version of the App
which is launched to the first set of users in order to
observe their engagement with your product, and
garner invaluable insights.
All this while, our Quality Analysts and App Testers
constantly review lines of code and algorithm and lays
down the scope of optimization with the development
team. MVP is the core of any digital product.
This stage is also the best to seek Angel Funding or
some extra Capital from the investors as you already
have a working product which just needs to launch
into the market.
www.adsnurl.com
Our Process
After collecting and analyzing the data points
of users through the MVP of the App, we
Launch the Final version of the App on the App
store/Play Store.
This includes Publishing the App on the
Google Play store OR Apple’s App Store.
After that, It has to go through a review process
to make sure that the App is Bug Free and
compatible with the devices.
But again, this isn’t a problem because we
make sure to review the App many times before
sending it for the Review.
Our Process
Launch
Now Available on
Amazing App
www.adsandurl.com
&
Launch
www.adsnurl.com
After collecting and analyzing the data points of users
through the MVP of the App, we launch the final
version of the App on the App Store/Play Store.
This includes publishing the App on the Google Play
Store OR Apple’s App Store.
After that, It has to go through a review process to
make sure that the App is Bug free and compatible
with the devices.
But again, this isn’t a problem because we make sure
to review the App many times before sending it for the
review.
Our Process
Figma
Sketch
Invision
Adobe Photoshop
Adobe Illustrator
Adobe XD
Adobe After Effects
JavaScript
TypeScript
HTML5
CCS3
Angular
React
Flutter
Swift
Kotlin
Java
React Native
Objective C
Ruby
Node.js
Elixir
Phoenix
Go
Ruby on Rails
DynamoDB
Firebase
PostgreSQL
MongoDB
MySQL/MariaDB
Technical Stack
Design Tools Frontend
Framework Backend Database
Languages, Tools &
Frameworks
We also work on AWS, Gitlab, Jenkins & Nginx Infrastructures and test on Apache Jmeter, Browser Stack, Sauce labs,
Appium & Selenium WebDriver Platforms for increased efficiency.
Our Process
Languages, Tools &
Frameworks
Design Tools Framework Frontend Backend Database
Figma
Sketch
Invision
Adobe Photoshop
Adobe Illustrator
Adobe XD
Adobe After effects
Flutter
Swift
Kotlin
Java
React Native
Objective C
JavaScript
TypeScript
HTML5
CCS3
Angular
React
Laravel
Node.js
Elixir
Python
Go
Ruby on Rails
DynamoDB
Firebase
PostgreSQL
MongoDB
MySQL/MariaDB
We also work on AWS, Gitlab, Jenkins & Nginx Infrastructures and test on Apache Jmeter, Browser Stack,
Sauce Labs, Appium & Selenium WebDriver platforms for increased efficiency.
Adsandurl’s
foundation of
great apps.
Adsnurl’s
foundation
of great apps.
Nerva
Manage your IBS with your mind.
Nerva helps you self-manage your IBS symp-
toms through science-backed gut-directed
hypnotherapy. Start your assessment below to
see if it's likely to work for you.
https://play.google.com/store/apps/details?id=com.mindsethealth.ibs&hl=en_IN&gl=US https://apps.apple.com/us/app/nerva-ibs-relief-hypnotherapy/id1467398796
Our Case Studies
Fimi Hub
A wide range of daily needs and food to
choose from.
With N number of brands and products to
choose from, get everything you want.
From fresh fruits and vegetables, grocery to
daily needs, packaged products to ordering
food from your favourite restaurants - Fimi Hub
is India's ultimate online delivery platform.
Our Case Studies
https://play.google.com/store/apps/details?id=com.adsnurl.fimihub_rider https://apps.apple.com/us/app/fimi-hub-partner/id1531557546
Dr Spine
Exceptional Personlized Spine Care
Dr. Spine is a leading spine practice focusing
on Minimally Invasive Spine Surgery in the
outpatient ASC setting. We offer the latest
spine treatments and advanced surgical tech-
niques to speed our patient's recovery and to
help them regain pain-free and productive
lives.
Our Case Studies
View Demo
https://drive.google.com/file/d/1RvXvrdABgwACJtQqgGu6nuv2zGAzH10O/view?usp=sharing
Eastro
Unravel the mysteries of life!
Want to know what your future holds? Want to
undergo a total cleansing process to get rid of the
effects of negative planetary movements? Eastro
is the answer to all your holistic wellness-related
queries.
Our Case Studies
Visit Website
http://eastro.in/
Stoop Up
Share, communicate and get followed.
Make happiness go viral and keep the good
vibes rolling. Connect with people who share
your interests, post good memories or have a
warm chit-chat with Stoop Up.
Our Case Studies
https://play.google.com/store/apps/details?id=com.stoopup.stoopup https://apps.apple.com/us/app/stoopup/id1547571967
Jeff
Say No to stress with Mr Jeff.
Jeff is a multi-services app that lets you handle
your daily tasks with flair and ease. Be it a heap
of laundry that needs quick washing, booking
a salon service, scheduling your appoint-
ments, or determining your pick-ups and deliv-
eries, Jeff can do it all!
Our Case Studies
https://play.google.com/store/apps/details?id=com.mrjefflab.app https://apps.apple.com/us/app/jeff-the-super-services-app/id1382291792
Branded
Baba
Fashionably Forward.
From your favourite sunglasses, and wrist-
watches, to sassy new earplugs and home
accessories, Branded Baba is here to enrich
your lifestyle with elegance and style.
Visit Website
https://brandedbaba.com/
Our Case Studies
Aisle
Finding your Perfect Match, Now Just a
Click Away.
Downloaded and loved by over 1 million
people, Aisle app comes adorned with games
and in-app chat features to help fire up the
spark that flies between two striking hearts.
https://play.google.com/store/apps/details?id=com.aisle.app&hl=en_IN&gl=US https://apps.apple.com/in/app/aisle-dating-app-for-indians/id1001481078
Our Case Studies
FOOD BOSS
FoodBoss
The superbrand supermarket.
Coming Soon...
Order your favourite grocery products from
over 50+ brands at best price with Food Boss.
Delivered at your desirable time, operational in
over 27+ cities, multiple payment gateways
available.
Dear Pet
Everything your furry friends need.
From nutritious food to stylish apparels &
accessories and entertaining toys, shop from a
wide range of pet products that would leave
tails wagging and ears twitching.
Visit Website
https://dearpet.in/
Our Case Studies
Great companies know
the power of true CX
through Mobile Apps.
Refer to the blogs on our website to understand more.
A & U
www.adsandurl.com
adsandurl
Ready to make
the quantum
jump with us?
29, Shivaji Marg, Moti Nagar, Delhi 110015
Phone: 98990 69010
Ready to make
the quantum
jump with us?
Adsnurl
www.adsnurl.com
29, Shivaji Marg, Moti Nagar, Delhi 110015
Phone: 9899069010

Company doc

  • 1.
    We build products thathave helped great Startups go Global. www.adsnurl.com Mobile App Development ingenious
  • 2.
    Welcome to Adsandurl The AdsandurlStory www.adsandurl.com App Development Process Case Studies What’s Inside? CONTENTS We start the process by breaking the Development Cycle into different Stages. In accordance with these stages, we allocate the right resources and build a team that works towards a common vision and goal. A & U What’s Inside? The Adsnurl Story App Development Process Case Studies www.adsnurl.com Welcome to Adsnurl We start the process by breaking the Development Cycle into different stages. In accordance with these stages, we allocate the right resources and build a team that works towards a common vision and angle
  • 3.
    We are because of ourpeople NOTEW ORTHY NUMBERS 23,000+ 200+ 400+ 20+ Global Projects Crazy People LIve Apps Awards We are because of our people NOTEWORTHY NUMBERS 23,000+ Initial Consultation 200+ Live Apps 500+ Websites 200+ Tech Nerds
  • 4.
    Based in theHeart of India; New Delhi, we’re one of the finest App Development Agency in India run by Mobile Evangelists and serial Entrepreneurs. We’ve helped many Startups, Entrepreneurs, SMEs, Corporate and even some Fortune 500 companies to build their Mobile Strategy. This has enabled us to plant our footprints in various industries such as Healthcare, Travel, Education, Fintech, Retail, Enterprise, On- Demand, and many more. A Story of Stalwarts. Who we are? www.adsandurl.com & A Story of Stalwarts Based in the Heart of India; New Delhi, we’re one of the finest App Developement Agency in India run by Mobile Evangelists and serial Entrepreneurs. We’ve helped many Startups, Entrepreneurs, SMEs, Corporate and even some Fortune 500 companies to build their Mobile Strategy. This has enabled us to plant our footprints in various industries such as Healthcare, Travel, Education, Fintech, Retail, Enterprise, On- Demand, and many more. Who we are? www.adsnurl.com
  • 5.
    Believers & Practitioners. We haveone of the best teams of App Developers, UI/UX Designers, Product Managers, Quality Analysts, Backend Experts, and App Marketers. Our Team of 250 people makes sure that no stones are left unturned. www.adsandurl.com Our Team & We have one of the best teams of App Developers, UI/UX Designers, Product Managers, Quality Analysts, Backend Experts, and App Marketers. Our Team of 250 people makes sure that no stones are left unturned. Believers & Practitioners Our Team www.adsnurl.com
  • 6.
    Our App Development Process We startthe process by breaking the Development Cycle into different Stages. In accordance with these stages, we allocate the right resources and build a team that works towards a common vision and goal. Ideation Strategizing Design Sprint MVP Phase Final Launch Our App Development Process We start the process by breaking the Development Cycle into different Stages. In accordance with these stages,, we allocate the right resources and build a team that works towards a common vision and goal. Ideation Strategizing Design Sprint MVP Phase Final Launch
  • 7.
    Our team ofBusiness Analysts, Product Managers, Technology Experts identify the true value of your idea, see what feature can be integrated to shape the idea better and help you to better IDENTIFY the users’ Problems, clearly understand your TARGET AUDIENCE, and ANALYZE it further to focus on the ultimate Solution. Through this, we refine and shape your Business idea more effectively. After this, we suggest you the technical solutions and lay down the **Scope of Work** where we underline the Project scope, Estimated Project Budget, Estimated Project Timeline. Our Process What You Get: 1. Non Diclosure Document 2. Scope of Work 3. Business Proposal Ideation www.adsandurl.com & Our Process Ideation www.adsnurl.com What you get: 1. Non Disclosure Document 2. Scope of Work 3. Business Proposal Our team of Business Analysts, Product Managers, Technology Experts identify the true value of your idea, see what feature can be integrated to shape the idea better and helpyou to better identify the user’s Prob- lems, clearly understand your target audience, and analyze it further to focus on the ultimate Solution. Through this, we refine and shape our Business idea more effectively. After this, we suggest you the technical solutions and lay down the **Scope of Work**where we underline the Project scope, Estimated Project Budget, Estimated Project Timeline.
  • 8.
    Every step ofthe Project is strategized keeping the user in mind to provide the maximum value to the end users. Our Product team defines the Roadmap to the Project team so they have a clear understanding of the intent and vision of the new product. Besides this, they identify ways to achieve strategic goals and initiatives. Our Process What You Get: 1. Project Roadmap 2. Account Manager 3. Product Owner 4. Development Team Strategy & Roadmap www.adsandurl.com & Our Process Strategy & Roadmap What you get: 1. Project Roadmap 2. Account Manager 3. Product Owner 4. Development team www.adsnurl.com Every step of the Project is strategized keeping the user in mind to provide the maximum value to the end users. Our Product team defines the Roadmap to the Project Team so they have a clear understanding of the intent and vision of the new product. Besides this, they identify ways to achieve strate- gic goals and initiatives.
  • 9.
    Next, we performand brainstorm a 5 days long Product Design Sprint activity which helps us to transform the idea into a functionally designed Prototype. This helps the entire team to get in the shoes of the users and gain insights on how a user is going to interact with the product, it helps us to filter out and identify what works for them and what doesn’t. It also helps to eliminate the risk of Failure. Our Process Design Sprint www.adsandurl.com & Design Sprint www.adsnurl.com Our Process Next, we perform and brainstorm a 5 days along Prod- uct Design Sprint activity which helps us to transform the idea into a functionally designed Prototype. This helps the entire team to get in the shoes of the users and gain insights on how a user is going to inter- act with the product, it helps us to filter out and identify what works for them and what doesn’t. It also helps to eliminate the risk of failure.
  • 10.
    An MVP isbasically a Beta and First version of the App which is launched to the first set of users in order to observe their engagement with your product, and garner invaluable insights. All this while, our Quality Analysts and App Testers constantly review Lines of Code and Algorithm and lays down the scope of optimization with the Development team. MVP is the core of any digital product. The terminology may sound simple but there is a definite process that we follow to deliver cutting edge apps. This stage is also the best to seek Angel Funding or some extra Capital from the Investors as you already have a working product which just needs to launch into the market. Our Process MVP COMING SOON COMING SOON Feature Advertisement Feature Continue www.adsandurl.com & MVP An MVP is basically a Beta and FIrst version of the App which is launched to the first set of users in order to observe their engagement with your product, and garner invaluable insights. All this while, our Quality Analysts and App Testers constantly review lines of code and algorithm and lays down the scope of optimization with the development team. MVP is the core of any digital product. This stage is also the best to seek Angel Funding or some extra Capital from the investors as you already have a working product which just needs to launch into the market. www.adsnurl.com Our Process
  • 11.
    After collecting andanalyzing the data points of users through the MVP of the App, we Launch the Final version of the App on the App store/Play Store. This includes Publishing the App on the Google Play store OR Apple’s App Store. After that, It has to go through a review process to make sure that the App is Bug Free and compatible with the devices. But again, this isn’t a problem because we make sure to review the App many times before sending it for the Review. Our Process Launch Now Available on Amazing App www.adsandurl.com & Launch www.adsnurl.com After collecting and analyzing the data points of users through the MVP of the App, we launch the final version of the App on the App Store/Play Store. This includes publishing the App on the Google Play Store OR Apple’s App Store. After that, It has to go through a review process to make sure that the App is Bug free and compatible with the devices. But again, this isn’t a problem because we make sure to review the App many times before sending it for the review. Our Process
  • 12.
    Figma Sketch Invision Adobe Photoshop Adobe Illustrator AdobeXD Adobe After Effects JavaScript TypeScript HTML5 CCS3 Angular React Flutter Swift Kotlin Java React Native Objective C Ruby Node.js Elixir Phoenix Go Ruby on Rails DynamoDB Firebase PostgreSQL MongoDB MySQL/MariaDB Technical Stack Design Tools Frontend Framework Backend Database Languages, Tools & Frameworks We also work on AWS, Gitlab, Jenkins & Nginx Infrastructures and test on Apache Jmeter, Browser Stack, Sauce labs, Appium & Selenium WebDriver Platforms for increased efficiency. Our Process Languages, Tools & Frameworks Design Tools Framework Frontend Backend Database Figma Sketch Invision Adobe Photoshop Adobe Illustrator Adobe XD Adobe After effects Flutter Swift Kotlin Java React Native Objective C JavaScript TypeScript HTML5 CCS3 Angular React Laravel Node.js Elixir Python Go Ruby on Rails DynamoDB Firebase PostgreSQL MongoDB MySQL/MariaDB We also work on AWS, Gitlab, Jenkins & Nginx Infrastructures and test on Apache Jmeter, Browser Stack, Sauce Labs, Appium & Selenium WebDriver platforms for increased efficiency.
  • 13.
  • 14.
    Nerva Manage your IBSwith your mind. Nerva helps you self-manage your IBS symp- toms through science-backed gut-directed hypnotherapy. Start your assessment below to see if it's likely to work for you. https://play.google.com/store/apps/details?id=com.mindsethealth.ibs&hl=en_IN&gl=US https://apps.apple.com/us/app/nerva-ibs-relief-hypnotherapy/id1467398796 Our Case Studies
  • 15.
    Fimi Hub A widerange of daily needs and food to choose from. With N number of brands and products to choose from, get everything you want. From fresh fruits and vegetables, grocery to daily needs, packaged products to ordering food from your favourite restaurants - Fimi Hub is India's ultimate online delivery platform. Our Case Studies https://play.google.com/store/apps/details?id=com.adsnurl.fimihub_rider https://apps.apple.com/us/app/fimi-hub-partner/id1531557546
  • 16.
    Dr Spine Exceptional PersonlizedSpine Care Dr. Spine is a leading spine practice focusing on Minimally Invasive Spine Surgery in the outpatient ASC setting. We offer the latest spine treatments and advanced surgical tech- niques to speed our patient's recovery and to help them regain pain-free and productive lives. Our Case Studies View Demo https://drive.google.com/file/d/1RvXvrdABgwACJtQqgGu6nuv2zGAzH10O/view?usp=sharing
  • 17.
    Eastro Unravel the mysteriesof life! Want to know what your future holds? Want to undergo a total cleansing process to get rid of the effects of negative planetary movements? Eastro is the answer to all your holistic wellness-related queries. Our Case Studies Visit Website http://eastro.in/
  • 18.
    Stoop Up Share, communicateand get followed. Make happiness go viral and keep the good vibes rolling. Connect with people who share your interests, post good memories or have a warm chit-chat with Stoop Up. Our Case Studies https://play.google.com/store/apps/details?id=com.stoopup.stoopup https://apps.apple.com/us/app/stoopup/id1547571967
  • 19.
    Jeff Say No tostress with Mr Jeff. Jeff is a multi-services app that lets you handle your daily tasks with flair and ease. Be it a heap of laundry that needs quick washing, booking a salon service, scheduling your appoint- ments, or determining your pick-ups and deliv- eries, Jeff can do it all! Our Case Studies https://play.google.com/store/apps/details?id=com.mrjefflab.app https://apps.apple.com/us/app/jeff-the-super-services-app/id1382291792
  • 20.
    Branded Baba Fashionably Forward. From yourfavourite sunglasses, and wrist- watches, to sassy new earplugs and home accessories, Branded Baba is here to enrich your lifestyle with elegance and style. Visit Website https://brandedbaba.com/ Our Case Studies
  • 21.
    Aisle Finding your PerfectMatch, Now Just a Click Away. Downloaded and loved by over 1 million people, Aisle app comes adorned with games and in-app chat features to help fire up the spark that flies between two striking hearts. https://play.google.com/store/apps/details?id=com.aisle.app&hl=en_IN&gl=US https://apps.apple.com/in/app/aisle-dating-app-for-indians/id1001481078 Our Case Studies
  • 22.
    FOOD BOSS FoodBoss The superbrandsupermarket. Coming Soon... Order your favourite grocery products from over 50+ brands at best price with Food Boss. Delivered at your desirable time, operational in over 27+ cities, multiple payment gateways available.
  • 23.
    Dear Pet Everything yourfurry friends need. From nutritious food to stylish apparels & accessories and entertaining toys, shop from a wide range of pet products that would leave tails wagging and ears twitching. Visit Website https://dearpet.in/ Our Case Studies
  • 24.
    Great companies know thepower of true CX through Mobile Apps. Refer to the blogs on our website to understand more.
  • 25.
    A & U www.adsandurl.com adsandurl Readyto make the quantum jump with us? 29, Shivaji Marg, Moti Nagar, Delhi 110015 Phone: 98990 69010 Ready to make the quantum jump with us? Adsnurl www.adsnurl.com 29, Shivaji Marg, Moti Nagar, Delhi 110015 Phone: 9899069010