Embed presentation
Download to read offline

The document outlines the procedures and steps involved in mechanical commissioning, including the development of standard operating procedures and commissioning schedules. It emphasizes factory acceptance testing, pre-commissioning checks, and the handover process from construction to operations. Key elements such as leak testing, safety studies, and updating operating documentation are highlighted to ensure a successful commissioning process.