4. Geographical detail (census-2011) Chhatarpur SSA SL. Description Figures 1 Area (in Sq. Km.) 13,665 2 Population 27,83,584 3 District 02 4 Total Tahsil 19 5 Blocks 19 6 Total Villages 2156 7 Panchayat 1917 8 Populated Villages 1950
5. Technical Details Chhatarpur SSA SL. Description Figures 1 Total no SDCA 12 (CPU-8,TKG-4) 2 Number of Exchanges 70 3 Total Switching Capacity 37880 4 No. of MBM 4 5 No. of SBM/RSU 26 6 AN-RAX 44 7 Land Line connection 15842 8 ISDN connection 49 (CPU-39,TKG-10) 9 Number of Exchanges having broadband facility 70 10 Internet connection 2827(BB-2176) 11 One PCO 1194 12 VPT (Covered/Total villages) 2045/2156 13 VPT (OH+UG) Land Line 227 14 VPT on WLL 1760
6. Technical Details continued …… Chhatarpur SSA SL. Description FIGURES 15 GSM BTS 192 (CPU-119, TKG-74) 16 Mobile GSM connection 55871 17 Prepaid Mobile connection 53666 18 Post-paid Mobile connection 2205 19 WLL BTS 34 (CPU-21, TKG-13) 20 WLL connections 8102 21 FWT 7001 22 LMT 1101 23 TAX Exchange (EWSD) 01 (6K) 24 TAX Loading(EWSD) 69% 25 OFC Route Km. 1281.92 26 C- III Internet Node 2
7. Development Plan for Mobile and WLL Chhatarpur SSA SL. Description Figures 1 Mobile: 2G BTS: In Chhatarpur Distt. 21 In Tikamgarh Distt. 25 3G BTS: In Chhatarpur Distt. 3 In Tikamgarh Distt. 3 2 WLL / WiMax WiMax BTS: In Chhatarpur Distt. 19 In Tikamgarh Distt. 14
8.
9.
10.
11. 2. O&M issues of GSM Services. Chhatarpur SSA ALCATEL Issues:- List of pending Alcatel faults. ITI Issues:- List of pending ITI faults. ELECTRICAL Wing Issues:- As on date 4 GSM BTS are working without DG At 25 USO sites 3 phase is either pending or faulty. At 31 Non USO sites 3 phase is pending. Other miscellaneous issues.