Change Request
Project: Arc shape Pedestrian Bridge Date: 2015/08/23
Change Requestor: Nipuna Fernando(Director) Change No: 01
Change Category:
□ Schedule □ Cost □ Scope □ Requirements/Deliverables
□ Testing/Quality □ Design
Does this Change Affect :
□ Corrective Action □ Preventative Action □ Defect Repair □ Updates
□ Other
Change Being Requested: To change the design of the bridge
Reason for the Change: To be more stable
Alternatives Considered: Flat bridge, Pratt truss bridge
Technical Changes Required to Implement this Change: Reduce the curvature
Risks to be Considered for this Change: Can be slippery during rainy days
Resources and Costs Needed to Implement this Change: A amended detailed design has to be
provided
Implications to Quality: As there was a complicated detailed design submitted with the proposal the
quality of the product could not be decided where the client will not accept the product at the end due
to sudden changes made
Disposition:
□ Approve □ Reject □ Defer
Justification of Approval, Rejection, or Deferral:
Change Board Approval:
Name Signature Date
Alternative designs to be consider
Alternative 1
Flat Base Bridge
Alternative 2
Pratt truss Bridge
***Important-All the measurements in the detail design which is provided are
valid to all alternative designs and hand bars will be included

More Related Content

Similar to Change request 1

Contract_Design_for_Dam_Construction.pdf
Contract_Design_for_Dam_Construction.pdfContract_Design_for_Dam_Construction.pdf
Contract_Design_for_Dam_Construction.pdfYeshiharegAlemu
 
DBIA 2016 Presentation on Progressive Design Build Aqua Marion WTP Project
DBIA 2016 Presentation on Progressive Design Build Aqua Marion WTP Project DBIA 2016 Presentation on Progressive Design Build Aqua Marion WTP Project
DBIA 2016 Presentation on Progressive Design Build Aqua Marion WTP Project Bowen
 
Delay analysis of raw water reservoir and pumping Station
Delay analysis of raw water reservoir and pumping StationDelay analysis of raw water reservoir and pumping Station
Delay analysis of raw water reservoir and pumping Stationchetlapally balakrishna
 
Boiler Supporting structure-Steel detailing
Boiler Supporting structure-Steel detailingBoiler Supporting structure-Steel detailing
Boiler Supporting structure-Steel detailingGaurav Kumar
 
Project change request template v2.0
Project change request template v2.0Project change request template v2.0
Project change request template v2.0Aditya Pandey
 
AIWSP presentation SCM 3 11.09.2018 (1).ppt
AIWSP presentation SCM 3  11.09.2018 (1).pptAIWSP presentation SCM 3  11.09.2018 (1).ppt
AIWSP presentation SCM 3 11.09.2018 (1).pptRajabdeen Amjath
 
Senior Design Presntation - Spring Term
Senior Design Presntation - Spring TermSenior Design Presntation - Spring Term
Senior Design Presntation - Spring TermSteven E. Kreeley, EIT
 

Similar to Change request 1 (7)

Contract_Design_for_Dam_Construction.pdf
Contract_Design_for_Dam_Construction.pdfContract_Design_for_Dam_Construction.pdf
Contract_Design_for_Dam_Construction.pdf
 
DBIA 2016 Presentation on Progressive Design Build Aqua Marion WTP Project
DBIA 2016 Presentation on Progressive Design Build Aqua Marion WTP Project DBIA 2016 Presentation on Progressive Design Build Aqua Marion WTP Project
DBIA 2016 Presentation on Progressive Design Build Aqua Marion WTP Project
 
Delay analysis of raw water reservoir and pumping Station
Delay analysis of raw water reservoir and pumping StationDelay analysis of raw water reservoir and pumping Station
Delay analysis of raw water reservoir and pumping Station
 
Boiler Supporting structure-Steel detailing
Boiler Supporting structure-Steel detailingBoiler Supporting structure-Steel detailing
Boiler Supporting structure-Steel detailing
 
Project change request template v2.0
Project change request template v2.0Project change request template v2.0
Project change request template v2.0
 
AIWSP presentation SCM 3 11.09.2018 (1).ppt
AIWSP presentation SCM 3  11.09.2018 (1).pptAIWSP presentation SCM 3  11.09.2018 (1).ppt
AIWSP presentation SCM 3 11.09.2018 (1).ppt
 
Senior Design Presntation - Spring Term
Senior Design Presntation - Spring TermSenior Design Presntation - Spring Term
Senior Design Presntation - Spring Term
 

Change request 1

  • 1. Change Request Project: Arc shape Pedestrian Bridge Date: 2015/08/23 Change Requestor: Nipuna Fernando(Director) Change No: 01 Change Category: □ Schedule □ Cost □ Scope □ Requirements/Deliverables □ Testing/Quality □ Design Does this Change Affect : □ Corrective Action □ Preventative Action □ Defect Repair □ Updates □ Other Change Being Requested: To change the design of the bridge Reason for the Change: To be more stable Alternatives Considered: Flat bridge, Pratt truss bridge Technical Changes Required to Implement this Change: Reduce the curvature Risks to be Considered for this Change: Can be slippery during rainy days Resources and Costs Needed to Implement this Change: A amended detailed design has to be provided Implications to Quality: As there was a complicated detailed design submitted with the proposal the quality of the product could not be decided where the client will not accept the product at the end due to sudden changes made Disposition: □ Approve □ Reject □ Defer Justification of Approval, Rejection, or Deferral: Change Board Approval: Name Signature Date
  • 2. Alternative designs to be consider Alternative 1 Flat Base Bridge Alternative 2 Pratt truss Bridge ***Important-All the measurements in the detail design which is provided are valid to all alternative designs and hand bars will be included