Change Guide
 
                      
 

 

 

 

 

Developed for

[place name of department / unit here]




                               CHANGE GUIDE  1 
 
 
Plan for Change in [department/unit]

       A. Plan for Change


          B. Manage Type of Change


                   C. Communicate and Enagage ‐
                   Manager Guide

                      D. Measure Success ‐ Manager 
                      Guide


A. Plan for             B. Manager         C. Communicate          D. Measure 
   Change                  Type of            and Engage –            Success – 
                           Change             Managers                Managers 
Step 1: Learn 
                                              guide                   guide 
about change            Step 4: 
management              Customise          Step 5: Prepare         Step 8: Track 
                        change strategy    leaders for             change initiatives 
Step 2: Build a 
                        for specific       change 
case for                                                           Step 9: Measure 
                        initiative  
managing                                   Step 6:                 change success 
change                                     Communicate             post‐
                                           change                  implementation  
Step 3: 
Determine                                  Step 7: Engage 
ownership of                               team members 
change                                     through change  




                                                              CHANGE GUIDE  2 
    
    
Step 1: Learn about change management
                                      Change	Management	Definitions		

                                                  Change Management as a Competitive Tactic 

                                                  Change management is the continuous process of aligning an 


                                              1
                                                  organisation with its market place – and doing so more responsively 
                                                  and effectively than competitors 


                                       

                                                  Change Management as a Systematic Process 

                                                  Change management is the formal process for organisational change, 

                                              2   including a systematic approach and application of knowledge. Change 
                                                  management means defining and adopting strategies, structures, 
                                                  procedures, and technologies to deal with change stemming from 

Activity	                                         internal and external conditions 


                                                  Change Management as a means of Transitioning People 
Determine your teams preferred 
                                                  Change management is a critical part of any project that leads, 
definition of change to ensure 

consistency in future planning. 
                                          3       manages, and enables people to accept new processes, technologies, 
                                                  systems structures, and values. It is the set of activities that helps 
                                                  people transition from their present way of working to the desired way 
                                                  of working 
Have a friendly discussion and 
                                       
                                                  Change Management as “All of the Above” 
select a change management 
         
                                           
                                                  In thinking about what is meant by “change management”, at least 
definition in the list provided.   
         
                                                  four basic definitions come to mind: 

         
Having selected one definition,           4           
                                                      
                                                           The task of managing change 
                                                           An area of professional practice 
         
discuss how it relates to you and                         A body of knowledge 
                                       
                                                          A control mechanism 
        
your interpretation of the             
         
definition.                                       My definition of Change Management in these circumstances means 
                                       
                                                   
Write down your own                    
         
interpretation of Change 
         
Management in relation to the 
                                       

                                       
                                          5
         
discussion and current state.          
         
                                       
         

                                                                                     CHANGE GUIDE  3 
         
         
Step 1: Learn about change management

                                     Completing the “inventory” worksheet will assist you in applying abstract 
                                     change management concepts to the publications team initiative. 




                                                              Please complete your Change 
                                                               Management Fundamentals 
                                                            Worksheet. This can be completed 
                                                             individually or in groups. Please 
                                                              ensure that a team discussion 
                                                              follows and that you have the 
Activity	                                                   opportunity to provide input and 
                                                              your own individual responses 
Complete an “inventory” of the 
                                                                               
[department] change initiative to                                 Please see Appendix A 
assist in the planning and 

implementation process. 


 


Now is a good time to review any     Pulse survey 

strategy documents relating to       How am I feeling about change within the publications team?  


your department or unit.             1                     2                      3                  4                          5 

                                     Anxious                                                                         Positive & Energised 
 
                                     How will the change impact me? 


It’s time to take your pulse         1                     2                      3                  4                          5 

                                     I have no idea!                                                                   I am clear about my role  

                                                                                                               And what’s expected from me 

                                     Overall I think that this change process will be: 

                                     1                     2                      3                  4                          5 

                                     A waste of time                                                                    Provide real value to MQ 




                                                                                              CHANGE GUIDE  4 
       
       
Step 2: Building your case for managing change

         
                                      Why are we in need of change? 
         
	
         
When building a business case for 
                                      “Every generation needs a new 
actively managing change, clearly 
                                      revolution” 
show how effective change 
         
                                                                           Thomas Jefferson 
management directly impacts you 
         
personally, the objectives of your 
         
team and the Marketing Unit – 
                                            What is the rationale for change in [department]?
         
University   
         
The case for managing change is 
         
four‐fold: 
         

       Building the rationale 

       Identifying your 

          emotional Commitment  

       Making the connection 

       Organisational objectives 

         
 
         
Building the rationale 
         

         
Discuss and write down the major 

        
reasons for change in 

[department] 
        

         

         
                                                                             CHANGE GUIDE  5 
         
         
Step 2: Building your case for managing change 
         

         
Identifying my emotional                Change is dependent on a few factors, but one major contributor to a 
                                        successful change initiative is your ENGAGEMENT 
commitment 
         
It’s in understanding your own 
                                             “You need to understand how to do 
values, enjoyment, and belief in 
         
your job, the team and the 
                                                your job and why it matters” 
         
organisation. 
         
Some points to consider when 
       
                                                          Understanding my emotional commitment
understanding your emotional 
         
commitment are: 
         

      
    The connection between my 

       
    work and the organisation 

      
    The importance of my job to 

        
    the organisations success 

   My job fit and personal goals 
       

   The quality of my job, its 
       
    variety, challenge and 
        
    freedom 
        
   My available resources, tools 
         
    and skills to do a great job 
         
Feel free to discuss this personally 
         
with your manager to get a better 
         
sense of you emotional 
         
commitment 
         
     
         
                                                                                 CHANGE GUIDE  6 
         
         
Step 2: Building your case for managing change 
         

         
Making the connection                   The connection is the lifeline required to power up your ability to achieve 
                                        change success and succeed in your role 
Following from your rationale, 
         
understanding your commitment 
                                                                      Making the connection
to strengthen your engagement, 
         
your next step will be to make the 
         
necessary connections between 
        
the change process and your 

       
commitment to the program. 

         

        
Take some time to reflect and 

        
draw together what areas of the 

         
rationale will strengthen your 

commitment and play to your 
       

strengths. Have you identified any 
        
potential developmental areas 
        
arising from the need to acquire 
          
new skills or knowledge?  
         
 
         
Feel free to discuss this personally 
         
with your manager to get a better 
         
sense of your connection and 
         
developmental areas identified 
         
 
         
     
         

         
                                                                                   CHANGE GUIDE  7 
         
         
Step 2: Building your case for managing change 
          

          
Organisational Objectives 
          
Reflecting on the rationale for 
          
change you will need to 
          
understand and answer the 
          
following: 
          
1.           What are the current 
          
             teams objectives 
          
2.           What will be the new              Please complete your 
                                             Organisational Objectives 
             team objectives 
                                          Worksheet. Please ensure that a 
3.         How will the new team 
                                          team discussion follows and that 
           objectives be measured           you have the opportunity to 
                                            provide input and your own 
4.         What will my personal 
                                               individual responses 
           objectives become                               
                                              Please see Appendix B 
5.         How will me personal 

           objectives be measured  

          

          

          

          

          

          

          

          

          

          
                                                             CHANGE GUIDE  8 
          
          
Step 2: Building your case for managing change
         

         

                                          Please complete your Training and 
                                             Development Needs Analysis 
                                           Worksheet. Please ensure that a 
                                           team discussion follows and that 
         
                                             you have the opportunity to 
                                             provide input and your own 
Additional Activity 
                                                 individual responses 
                                                             
       
Training and Development                        Please see Appendix C 
       
Needs Analysis 

         
Having the opportunity to 
reflect, analyse and discuss the 
         
change agenda within 
[department], there is a likely 
         
chance there will be core skills 
         
that will be required or current 
skills and knowledge that will 
         
need to be enhanced. 
         
Please complete the needs 
analysis in reference to 
         
managing change and identify 
         
what training and development 
will be required: 
         
       Immediately 
     3‐6 months 
       12 months +  
         
       
 
         
     
         

         

         

         
                                                           CHANGE GUIDE  9 
         
         
Step 3: Determine ownership of change
                                      Senior Leaders                        Human Resources 

                                             Actively and visibly              Develop change 
Determining the ownership of                  support change                     management strategy & 
                                             Communicate directly               plans 
change is important as it clearly 
                                              with team members                 Provide support to 
       
designates the responsibilities of                                               managers and team 
                                                                                 members 
        
all individuals involved in the 

      
change initiative to prevent 
                                      Managers                              Team Members 
       
confusion and provides more 
                                             Coach team members                Thrive and engage during 
transparent expectations 
                                              through the transition             change 
                                              and manage expectations           Provide feedback on 
                                             Communicate to team                implementation of 
 
                                              members how change                 change 
       
                                              will affect their everyday 
 
                                              work 

       

       
 
                                          My role:  
       
Which role do you play within 
                                           
change?  
       

        
Select your quadrant and write 

down some actions you can take to 
      

assist the change program. Discuss 
         

this with the team and set the 
        
expectations with the team 
       

       

       

       

       

       
                                                                                CHANGE GUIDE  10 
       
       
Step 3: Determine ownership of change  
             

             
RACI models are an effective 
             
means of clearly assigning roles 
             
and responsibilities during project 
       
management. 

         
RACI stands for: 

             

       
Responsible: Leads the work for 
             
the decision of the activity 
             
Accountable: Has ultimate 
                                                             
ownership for the decision or 
                                                             
             
activity                                                     
                                                Please review your RACI 
Consulted: Input sought about 
                                                      Worksheet.  
             
the decision or activity                                     
                                                Please see Appendix D 
Informed: Told about the 
             
decision or activity  
             
 
             
 
             
 
             

             

             
 
             
             

             

             
                                                             CHANGE GUIDE  11 
             
             
Step 4: Customise change strategy for [department] 
                                        Some action steps for the [department] change program are listed 

                                        below: 
While standard change 
       
management practices and 
                                        1. [insert steps here] 
       
principles apply across all types of 
                                        2. [insert steps here] 
      
change, strategies should be 
                                        3. [insert steps here] 
      
customised for each individual 
                                        4. [insert steps here] 
        
initiative 
                                        5. [insert steps here] 
       

      
The [department] change initiative 
                                        6. [insert steps here] 

is based on fundamentals of 
                                        7. Measure success (Identify the measures)  

change platforms: [select 
      
                                         
appropriate drivers below] 
      
         Re‐organisation 

         Technology  
                                                   Please complete the 7 step change 
         Mergers & Acquisitions 
                                                    customisation strategy and place 
         Culture                                    this within the RACI worksheet.  
       
                                                                       
 
                                                                       
                                                          Please see Appendix D 
       
[Summarise the drivers for change 
       
here] 
       
 
       
 
       

       

       
 
       

       
                                                                        CHANGE GUIDE  12 
       
       
Step 5: Prepare leaders for change
        

        
Before launching a change 
        
initiative, the leader/manager will 
        
need to be assessed against key 
        
change management 
        
competencies. 
        
 
        
                                        Please complete the Change 
        
The information obtained from            Management Competency 
       
these assessments can also be 
                                           Diagnostic worksheet  
                                                       
used to assist you in your 
                                                       
development of change skills 
       
                                           Please see Appendix E 

required to implement a successful 
       
program. 
       

        

        

Note:   

       
Your manager will be asked to 

       
provide their assessments to the 

      
competencies within the 

diagnostic to assist in the 
       

evaluation  
       
        

 
        

        
 
        
                                                        CHANGE GUIDE  13 
        
        
Step 6: Communicate the change
                                       Effective communication during small and large scale change primarily 
                                       serves to provide team members with timely and accurate information, 
       
Before implementing change             which can positively influence whether the initiative can maintain 
                                       productivity and morale and overcome resistance to change. The 
initiatives, create a comprehensive    following five areas outline questions to consider when building and 
                                       delivering a communications strategy designed to inform and guide 
communication strategy to align 
                                       team members through a change event.  
       
change messages across the 
                                       Change management communications strategy considerations 
       
[department] 
                                           ‐    What do we need to accomplish? 
       
                                           ‐    How can the communications strategy accomplish the desired 
                                                state? 
                                           ‐    What do we need to communicate? 
                                           ‐    Who relays what message? 
                                           ‐    With whom do we need to communicate? 
Note:  
                                           ‐    In what order do we communicate with our audiences? 
     
Communication strategies should            ‐    When are messages communicated? With what frequency? 
                                           ‐    What tools/channels do we use? 
       
reinforce change messages 
                                           ‐    How will we measure whether the communications strategy 
through multiple channels. Please 
                                                achieves its objectives?  

                                       Checklist for communicating change 
look in Appendix H for the 
       

                                        
Change Communications Channels 
                                           1.   Building a communication strategy 
Matrix that explores various               2.   Involving Key Stakeholders in communications efforts 
       
distribution channels to                   3.   Determining message content 
                                           4.   Identifying most effective communications channels 
     
communicate the change message             5.   Ensuring follow up 
       
 
                                                         Please complete the checklist for 
                                                             communicating change   
       
                                                                          
                                                                          
                                                              Please see Appendix F 
       
 
       

       



                                                                                CHANGE GUIDE  14 
       
       
Step 6: Communicate the change
                                     Components of Change Messages Checklist 

                                     Provide background information about the change 
Ensure that change messages 
                                        o   Provide Reasoning 
include all necessary components  
                                        o   Involve team members 
                                        o   Show support 
 
                                     Present employee‐specific information when possible at ally concerns 
                                     about the change 

                                        o   Provide specifics 
                                        o   Be realistic 
                                        o   Identify with team member reactions  

                                     Discuss questions, concerns, and/or ideas about the change 

                                        o   Ask team members 
                                        o   Listen 

                                     Agree on solutions, resources, and/or support 
        
                                        o   Offer support 
        
                                        o   Ask for help with team members in finding solutions 
        
                                     Summarise and express appreciation 
        
                                        o   Identify key points 
                                        o   Express gratitude  

        

        
                                                   Please review the Components of 
        
                                                  Change Messages Checklist in more 
                                                                detail 
                                                                    
        
                                                                    
                                                        Please see Appendix G 

        

        

        


                                                                              CHANGE GUIDE  15 
        
        
Step 7: Engage team members through change
                                         Three stages of engagement during change initiatives 

       
Engage employees in the change 
                                                                       Inform: This stage creates the foundation for 
          
initiative to mitigate the discontent                                  gaining team member commitment. It consists 
                                                                       of the following: 
        
and disillusion that often follows 
                                                                               Contact – The earliest moment team 
       
change. 
                                             Inform                        
                                                                                members learn of the change 
                                                                                Awareness – Team members realise 
        
Each phase of this model                                                        that change will take place 
                                                                               Understanding – Team members 
represents a critical stage that                                                demonstrate that they understand the 
                                                                                nature and rationale of change and 
presents the opportunity to gain or 
                                                                                what is expected from them 
        
lose employee commitment to 
                                                                       Educate: Team members learn how the change 
                                                                       will directly affect them and their current 
change. 
                                                                       routines. They can make a decision whether to 
                                                                       accept or reject the change. It is critical at this 
Without responding with                                                stage to communicate information that 
        
                                                                       highlights the benefits of the change program. 
appropriate information and 
                                                                       The educate stage is composed of two 
        
support in each phase,                                                 commitment stages: 
        
departments risk losing team 
                                            Educate                            Positive Perception – Team members 
                                                                                develop a positive mentality toward 
members’ acceptance of or                                                       the change 
                                                                               Adoption – Team members have been 
commitment to the change. This                                                  exposed to the change long enough to 
                                                                                understand the worth and impact on 
can result I team members 
                                                                                the department / unit 
        
disengagement, confusion, and 
                                                                       Commit: Implementation occurs during this 
                                                                       phase. Team members adjust to the change as 
other negative reactions with can 
                                                                       it becomes a part of their daily work. Two 
        
significantly affect ongoing                                           stages compose this phase: 
       
business and the value add to the                                              Institutionalisation – The change 
                                                                                proves durable and permanent and 
       
bottom line.                                                                    has been formally adopted into the 


 
                                            Commit                              routine operations of the department 
                                                                                / unit 
                                                                               Internalisation – Team members are 
                                                                                highly committed to the change 
                                                                                because it aligns with their personal 

        
                                                                                   CHANGE GUIDE  16 
        
        
Step 8: Track change initiatives  
        

        
Use the change dashboard to 

        
outline change objectives and 

       
monitor progress against these 

        
objectives throughout the change 

       
program 

        
 
                                            Please review and complete the 
 
        
                                            change management dashboard 
                                                             
                                                             
                                                 Please see Appendix I 
        

        

        

        

        

        

        

        

        

        

        

        

        

        

        

        
                                                              CHANGE GUIDE  17 
        
        
Step 9: Measure change success post-implementation  
                                      Components of Post‐Implementation Review 

                                               1                     2                       3              4                   5 
Change leaders should conduct a 
                                       Strongly Disagree                                      Neutral                        Strongly Agree 
       
post‐implementation review to 

       
evaluate the success of the 
                                       Responsiveness:                                                            Your Score 
         
initiative and gather ‘lessons         Did HR respond promptly to needs for service? 

       
learned”.                               


                                        
Successful reviews include                                                                                        Your Score 
                                       Did HR maintain regular and proactive contact during the 
                                       change initiative?  
representatives of all key 
       
stakeholder groups involved in the 
       
change initiative and any others       Quality of deliverables:                                                   Your Score 

       
with a vested interest in change       Did you achieve the deliverables in a timely manner? 


                                        
management within the 
                                                                                                                  Your Score
                                       Was the HR advice clear and findings clearly presented? 
       
department / unit. 
                                        
       
To provide a comprehensive             Were HR services delivered with objectivity?  
                                                                                                                  Your Score
       
assessment, the relevant function 
       
evaluates the change team as a 
                                       Value of contribution:                                                     Your Score
whole and individual team 
                                       Was the deliverable aligned with business goals/objectives? 
       
member performance, particularly 
                                        
       
team leaders.                          Did HR add value to your unit through the change support                   Your Score 

                                       provided? 

                                         
       
                                       Overall Rating:                                                            Your Score
       
                                       How would you describe the overall experience with the 
                                       service provided for this change program? 


                                        

                                        
       

       
                                                                                                      CHANGE GUIDE  18 
       
       
 

    

      
It’s time to take your pulse 

    

    

    
                       
    

    

    

    
                                 Please review and complete the 
                                pulse survey found on the last page 
                                         of your document. 
                                    This survey should be taken 
                                  towards the end of the change 
                                              program 
                                                   
                                                   

    

    

    

    

    

    

    

    

    

    

    

    


                                                   CHANGE GUIDE  19 
    
    
 
 
Please feel free to contact me if you would like to know more or would like to 
                         obtain the appendix inventory 
 




                                     CHANGE GUIDE  20 
 
 

Change Guide

  • 1.
                                Change Guide               Developed for [place name of department / unit here] CHANGE GUIDE  1     
  • 2.
    Plan for Changein [department/unit] A. Plan for Change B. Manage Type of Change C. Communicate and Enagage ‐ Manager Guide D. Measure Success ‐ Manager  Guide A. Plan for  B. Manager  C. Communicate  D. Measure  Change  Type of  and Engage –  Success –  Change  Managers  Managers  Step 1: Learn  guide  guide  about change  Step 4:  management  Customise  Step 5: Prepare  Step 8: Track  change strategy  leaders for  change initiatives  Step 2: Build a  for specific  change  case for  Step 9: Measure  initiative   managing  Step 6:  change success  change  Communicate  post‐ change  implementation   Step 3:  Determine  Step 7: Engage  ownership of  team members  change  through change   CHANGE GUIDE  2     
  • 3.
    Step 1: Learnabout change management Change Management Definitions   Change Management as a Competitive Tactic    Change management is the continuous process of aligning an  1 organisation with its market place – and doing so more responsively    and effectively than competitors      Change Management as a Systematic Process    Change management is the formal process for organisational change,    2 including a systematic approach and application of knowledge. Change  management means defining and adopting strategies, structures,  procedures, and technologies to deal with change stemming from  Activity   internal and external conditions     Change Management as a means of Transitioning People  Determine your teams preferred    Change management is a critical part of any project that leads,  definition of change to ensure  consistency in future planning.    3 manages, and enables people to accept new processes, technologies,  systems structures, and values. It is the set of activities that helps  people transition from their present way of working to the desired way    of working  Have a friendly discussion and    Change Management as “All of the Above”  select a change management        In thinking about what is meant by “change management”, at least  definition in the list provided.        four basic definitions come to mind:    Having selected one definition,    4   The task of managing change  An area of professional practice    discuss how it relates to you and   A body of knowledge     A control mechanism    your interpretation of the      definition.      My definition of Change Management in these circumstances means          Write down your own      interpretation of Change    Management in relation to the      5   discussion and current state.          CHANGE GUIDE  3     
  • 4.
    Step 1: Learnabout change management Completing the “inventory” worksheet will assist you in applying abstract  change management concepts to the publications team initiative.  Please complete your Change  Management Fundamentals  Worksheet. This can be completed  individually or in groups. Please  ensure that a team discussion  follows and that you have the  Activity opportunity to provide input and  your own individual responses  Complete an “inventory” of the    [department] change initiative to  Please see Appendix A  assist in the planning and  implementation process.    Now is a good time to review any  Pulse survey  strategy documents relating to  How am I feeling about change within the publications team?   your department or unit.   1    2    3    4    5  Anxious                 Positive & Energised    How will the change impact me?  It’s time to take your pulse  1    2    3    4    5  I have no idea!                            I am clear about my role                         And what’s expected from me  Overall I think that this change process will be:    1    2    3    4    5  A waste of time                             Provide real value to MQ  CHANGE GUIDE  4     
  • 5.
    Step 2: Buildingyour case for managing change   Why are we in need of change?      When building a business case for    “Every generation needs a new  actively managing change, clearly    revolution”  show how effective change              Thomas Jefferson  management directly impacts you    personally, the objectives of your    team and the Marketing Unit –  What is the rationale for change in [department]?   University      The case for managing change is    four‐fold:       Building the rationale     Identifying your    emotional Commitment      Making the connection     Organisational objectives        Building the rationale      Discuss and write down the major    reasons for change in  [department]        CHANGE GUIDE  5     
  • 6.
    Step 2: Buildingyour case for managing change      Identifying my emotional  Change is dependent on a few factors, but one major contributor to a    successful change initiative is your ENGAGEMENT  commitment    It’s in understanding your own    “You need to understand how to do  values, enjoyment, and belief in    your job, the team and the  your job and why it matters”    organisation.    Some points to consider when    Understanding my emotional commitment understanding your emotional    commitment are:       The connection between my    work and the organisation     The importance of my job to    the organisations success   My job fit and personal goals     The quality of my job, its    variety, challenge and    freedom     My available resources, tools    and skills to do a great job    Feel free to discuss this personally    with your manager to get a better    sense of you emotional    commitment        CHANGE GUIDE  6     
  • 7.
    Step 2: Buildingyour case for managing change      Making the connection  The connection is the lifeline required to power up your ability to achieve    change success and succeed in your role  Following from your rationale,    understanding your commitment    Making the connection to strengthen your engagement,    your next step will be to make the    necessary connections between    the change process and your    commitment to the program.        Take some time to reflect and    draw together what areas of the    rationale will strengthen your  commitment and play to your    strengths. Have you identified any    potential developmental areas    arising from the need to acquire    new skills or knowledge?         Feel free to discuss this personally    with your manager to get a better    sense of your connection and    developmental areas identified              CHANGE GUIDE  7     
  • 8.
    Step 2: Buildingyour case for managing change      Organisational Objectives    Reflecting on the rationale for    change you will need to    understand and answer the    following:    1. What are the current    teams objectives    2. What will be the new  Please complete your    Organisational Objectives  team objectives  Worksheet. Please ensure that a  3.   How will the new team  team discussion follows and that    objectives be measured  you have the opportunity to  provide input and your own  4.   What will my personal  individual responses    objectives become    Please see Appendix B  5.   How will me personal    objectives be measured                         CHANGE GUIDE  8     
  • 9.
    Step 2: Buildingyour case for managing change       Please complete your Training and    Development Needs Analysis  Worksheet. Please ensure that a    team discussion follows and that    you have the opportunity to  provide input and your own  Additional Activity    individual responses      Training and Development  Please see Appendix C    Needs Analysis    Having the opportunity to  reflect, analyse and discuss the    change agenda within  [department], there is a likely    chance there will be core skills    that will be required or current  skills and knowledge that will    need to be enhanced.    Please complete the needs  analysis in reference to    managing change and identify    what training and development  will be required:       Immediately   3‐6 months     12 months +                     CHANGE GUIDE  9     
  • 10.
    Step 3: Determineownership of change   Senior Leaders Human Resources     Actively and visibly   Develop change  Determining the ownership of  support change  management strategy &     Communicate directly  plans  change is important as it clearly  with team members   Provide support to    designates the responsibilities of  managers and team  members    all individuals involved in the    change initiative to prevent  Managers Team Members    confusion and provides more   Coach team members   Thrive and engage during  transparent expectations    through the transition  change  and manage expectations   Provide feedback on     Communicate to team  implementation of    members how change  change    will affect their everyday      work          My role:     Which role do you play within      change?       Select your quadrant and write  down some actions you can take to    assist the change program. Discuss    this with the team and set the    expectations with the team              CHANGE GUIDE  10     
  • 11.
    Step 3: Determineownership of change       RACI models are an effective    means of clearly assigning roles    and responsibilities during project    management.    RACI stands for:        Responsible: Leads the work for    the decision of the activity    Accountable: Has ultimate      ownership for the decision or      activity      Please review your RACI  Consulted: Input sought about  Worksheet.     the decision or activity      Please see Appendix D  Informed: Told about the    decision or activity                                   CHANGE GUIDE  11     
  • 12.
    Step 4: Customisechange strategy for [department]    Some action steps for the [department] change program are listed    below:  While standard change    management practices and  1. [insert steps here]    principles apply across all types of  2. [insert steps here]    change, strategies should be  3. [insert steps here]    customised for each individual  4. [insert steps here]    initiative  5. [insert steps here]        The [department] change initiative  6. [insert steps here]  is based on fundamentals of    7. Measure success (Identify the measures)   change platforms: [select      appropriate drivers below]      Re‐organisation    Technology   Please complete the 7 step change    Mergers & Acquisitions  customisation strategy and place   Culture  this within the RACI worksheet.               Please see Appendix D    [Summarise the drivers for change    here]                        CHANGE GUIDE  12     
  • 13.
    Step 5: Prepareleaders for change     Before launching a change    initiative, the leader/manager will    need to be assessed against key    change management    competencies.        Please complete the Change    The information obtained from  Management Competency    these assessments can also be  Diagnostic worksheet     used to assist you in your      development of change skills    Please see Appendix E  required to implement a successful    program.            Note:      Your manager will be asked to    provide their assessments to the    competencies within the  diagnostic to assist in the    evaluation                   CHANGE GUIDE  13     
  • 14.
    Step 6: Communicatethe change   Effective communication during small and large scale change primarily  serves to provide team members with timely and accurate information,    Before implementing change  which can positively influence whether the initiative can maintain    productivity and morale and overcome resistance to change. The  initiatives, create a comprehensive  following five areas outline questions to consider when building and    delivering a communications strategy designed to inform and guide  communication strategy to align  team members through a change event.     change messages across the  Change management communications strategy considerations    [department]  ‐ What do we need to accomplish?      ‐ How can the communications strategy accomplish the desired      state?  ‐ What do we need to communicate?      ‐ Who relays what message?  ‐ With whom do we need to communicate?  Note:   ‐ In what order do we communicate with our audiences?    Communication strategies should  ‐ When are messages communicated? With what frequency?  ‐ What tools/channels do we use?    reinforce change messages  ‐ How will we measure whether the communications strategy  through multiple channels. Please    achieves its objectives?   Checklist for communicating change  look in Appendix H for the        Change Communications Channels    1. Building a communication strategy  Matrix that explores various  2. Involving Key Stakeholders in communications efforts    distribution channels to  3. Determining message content  4. Identifying most effective communications channels    communicate the change message  5. Ensuring follow up        Please complete the checklist for    communicating change              Please see Appendix F          CHANGE GUIDE  14     
  • 15.
    Step 6: Communicatethe change Components of Change Messages Checklist  Provide background information about the change  Ensure that change messages  o Provide Reasoning  include all necessary components   o Involve team members  o Show support    Present employee‐specific information when possible at ally concerns    about the change  o Provide specifics  o Be realistic  o Identify with team member reactions   Discuss questions, concerns, and/or ideas about the change  o Ask team members  o Listen  Agree on solutions, resources, and/or support    o Offer support    o Ask for help with team members in finding solutions    Summarise and express appreciation    o Identify key points    o Express gratitude       Please review the Components of    Change Messages Checklist in more    detail          Please see Appendix G        CHANGE GUIDE  15     
  • 16.
    Step 7: Engageteam members through change   Three stages of engagement during change initiatives    Engage employees in the change  Inform: This stage creates the foundation for    initiative to mitigate the discontent  gaining team member commitment. It consists  of the following:    and disillusion that often follows   Contact – The earliest moment team    change.  Inform  members learn of the change  Awareness – Team members realise    Each phase of this model  that change will take place     Understanding – Team members  represents a critical stage that  demonstrate that they understand the    nature and rationale of change and  presents the opportunity to gain or  what is expected from them    lose employee commitment to  Educate: Team members learn how the change    will directly affect them and their current  change.  routines. They can make a decision whether to    accept or reject the change. It is critical at this  Without responding with  stage to communicate information that    highlights the benefits of the change program.  appropriate information and  The educate stage is composed of two    support in each phase,  commitment stages:    departments risk losing team  Educate  Positive Perception – Team members    develop a positive mentality toward  members’ acceptance of or  the change     Adoption – Team members have been  commitment to the change. This  exposed to the change long enough to    understand the worth and impact on  can result I team members  the department / unit    disengagement, confusion, and  Commit: Implementation occurs during this    phase. Team members adjust to the change as  other negative reactions with can  it becomes a part of their daily work. Two    significantly affect ongoing  stages compose this phase:    business and the value add to the   Institutionalisation – The change  proves durable and permanent and    bottom line.   has been formally adopted into the      Commit routine operations of the department  / unit     Internalisation – Team members are  highly committed to the change      because it aligns with their personal    CHANGE GUIDE  16     
  • 17.
    Step 8: Trackchange initiatives       Use the change dashboard to    outline change objectives and    monitor progress against these    objectives throughout the change    program        Please review and complete the      change management dashboard        Please see Appendix I                                  CHANGE GUIDE  17     
  • 18.
    Step 9: Measurechange success post-implementation     Components of Post‐Implementation Review            1            2          3    4    5  Change leaders should conduct a  Strongly Disagree                          Neutral               Strongly Agree    post‐implementation review to    evaluate the success of the  Responsiveness: Your Score    initiative and gather ‘lessons  Did HR respond promptly to needs for service?    learned”.        Successful reviews include  Your Score  Did HR maintain regular and proactive contact during the    change initiative?   representatives of all key    stakeholder groups involved in the    change initiative and any others  Quality of deliverables: Your Score    with a vested interest in change  Did you achieve the deliverables in a timely manner?      management within the  Your Score Was the HR advice clear and findings clearly presented?    department / unit.      To provide a comprehensive  Were HR services delivered with objectivity?   Your Score   assessment, the relevant function    evaluates the change team as a    Value of contribution: Your Score whole and individual team  Was the deliverable aligned with business goals/objectives?    member performance, particularly      team leaders.   Did HR add value to your unit through the change support  Your Score    provided?         Overall Rating: Your Score     How would you describe the overall experience with the    service provided for this change program?            CHANGE GUIDE  18     
  • 19.
          It’s time to take your pulse                  Please review and complete the    pulse survey found on the last page  of your document.    This survey should be taken    towards the end of the change  program                                  CHANGE GUIDE  19     
  • 20.