Cameron Borgland has over 25 years of experience as a control room operator and senior operator in the gas plant and power generation industries. He has extensive experience operating gas wells, pipelines, gas turbines, compressors, and DCS systems. Currently he works as a control room operator for CNRL at their Horizon Oil Sands site in Fort McMurray, Alberta.
Cooling Down a Refrigeration Plant - Columbus, GeorgiaMcKenney's Inc
McKenney’s installed multiple packaged air conditioning units at an industrial plant in Columbus, Georgia. For more info visit http://www.mckenneys.com.
Cooling Down a Refrigeration Plant - Columbus, GeorgiaMcKenney's Inc
McKenney’s installed multiple packaged air conditioning units at an industrial plant in Columbus, Georgia. For more info visit http://www.mckenneys.com.
CASE STUDY: Two Harbors Municipal Power PlantAditi Paul
Solberg partnered with Fairbanks Morse to reduce and eliminate
crankcase emissions from its marine and stationary engines. Read about the challenge and solution in this Case Study.
CASE STUDY: Two Harbors Municipal Power PlantAditi Paul
Solberg partnered with Fairbanks Morse to reduce and eliminate
crankcase emissions from its marine and stationary engines. Read about the challenge and solution in this Case Study.
Parte 1: las TIC, la Internet y el estado del arte.
Parte 2: las potencialidades en el dominio para el uso en el ámbito laboral poniendo énfasis en los aspectos que pueda ser aplicable al e-commerce como apoyo y soporte.
I am a Diploma in Mechanical Engineer with 25 years of experience in Oil & Gas,Power Plant(Combined cycle & Thermal),Steel,Cement,Material Handling. Returned from Abu-Dhabi(Combined cycle power project) under HYUNDAI Engg & Constrn.
I had overseas experience in Saudi Arabia,U.A.E,China.
I have 25 years hands – on experience in Construction, Operation, maintenance, commissioning, Overhauling, Fault diagnosis & trouble shooting of large capacity of All Rotating & Static Equipments, Install, align, dismantling, examine and re-assembling, adjust and repair or replace of defective parts of mechanical equipment, such as Boiler,Turbine,Large Gear & centrifugal pumps, Compressors, Turbochargers, Heat exchangers, HFO & lub oil separators, all types of Valves, and other general mechanical maintenance works. I will do independently , as well as team work.
I would like to discuss further suitability to my position at an interview stage to work in your esteemed organization.
1. Cameron Borgland
borgland@shaw.ca
44 Midridge Close
Calgary AB
T2X 1G1
403-519-1300
Summary:
Punctual, dedicated, reliable, hard working gas plant operator. Experienced in
commissioned gas wells, pipelines and two RB211 gas turbines driving Elliot
Compressors. I have operated Honeywell Experion DCS, RSLogix 5000 DCS, DeltaV
and have gas chromatograph and lab experience.
Employment History:
CNRL December 2014 – Present
Fort Mackay Alberta
Control Room Operator:
Control room operator in the Ore Preparation Plant at the Horizon Oil
Sands sight.
Kensington Crowsnest Power January 2014 - November 2014
Sparwood British Columbia
Control Room Operator:
Contracted to Kensington Crowsnest Power as the Chief Engineer.
Operated the powerplant in the capacity as a control room operator.
Qualitas International December 2012 - November 2013
Calgary Alberta
Control Room Supervisor:
Contracted to Zhaikmunai at their GTF in the Chinarevskoye Field in
north western Kazakhstan. Working with a team to monitor and facilitate
control room operations.
2. Interpipeline Trust Fund 1995 - 2012
Cochrane Extraction Plant
2.4 BSCF/D
Senior Operator:
Member of a team responsible for providing safe and reliable operation of
the Cochrane Extraction Facility. Responsible for shutting down and
preparing equipment for maintenance. Assist with trouble shooting
process problems. Assist with commissioning of new equipment, field
wells and pipelines.
♦ Issue work permits. Lead and supervise a shift of operators. Operate a
gas plant in a control room with processing capabilities of 2.4 BCF/D.
Coordinate between operations and maintenance for my shift.
♦ Assisted with construction and commissioning of two RB211 gas
turbines with Elliot compressors and a heat recovery unit.
♦ Operate remote well heads with plunger lift systems. Operate pipelines
including pigging (sending and receiving).
Center for Performing Arts 1993 -1995
Calgary AB
Building Operator:
Operated hot water and steam boilers and HVAC system. Maintained
and repair pumps, compressors, and HVAC systems.
♦ Instrumental in launching a system for scheduling automatic start
and stop times for HVAC systems reducing operating costs.
Magnesium Company of Canada. 1991-1992 (closed down)
High River AB
Operator:
Operated a carbon monoxide production plant, a chlorine recovery system and a
wastewater well injection system.
Resume Cam Borgland Page 2 of 2
3. Ellis-don Construction. 1988-1990
Calgary AB
Operated tower cranes in a Journeyman operator capacity at Bankers Hall.
Education:
SAIT:
Fourth Class Power Engineering Certificate (1989)
Courses/Job Training:
♦ First Aid ♦ Fire Fighter ♦ WHIMS
♦ Transportation of
Dangerous Goods (TDG)
♦ Reciprocating
Compressors
♦ Confined Space Entry /
Rescue
♦ Modern Safety
Management
♦ Ken Blanchard Situational
Leadership
♦ Personality Types
(colour)
♦ SCBA ♦ H2S Alive
Resume Cam Borgland Page 2 of 2