The document discusses the implementation of a Local Area Network (LAN) project across Customs, Central Excise, and Service Tax buildings in India. The LAN will connect thin clients and peripherals to applications hosted in centralized data centers. Hardware will be delivered and installed by HP over several phases with support from local offices. The network is aimed at improving access to key applications like ICES and ACES while adhering to security protocols.
Delivering Carrier Grade OCP for Virtualized Data CentersRadisys Corporation
This webinar explores the requirements for carrier grade Open Compute Project (OCP) infrastructure for virtualized telecom data centers delivering SDN and NFV for digital services.
Delivering Carrier Grade OCP for Virtualized Data CentersRadisys Corporation
This webinar explores the requirements for carrier grade Open Compute Project (OCP) infrastructure for virtualized telecom data centers delivering SDN and NFV for digital services.
Industrial Ethernet,Part 2: Case StudiesControlEng
Industrial Ethernet case studies provide lessons learned as detailed in specific installations to gain practical advice from working installations, to ensure your next application uses the best practices to maximize benefits in a minimum amount of time. Ethernet survey results will be discussed. An exam and certificate are available for one professional development hour (PDH), according to Registered Continuing Education Program (RCEP) rules from the American Council of Engineering Companies.
IT327-1404A-01 Implementing, Managing and Mainta.docxpriestmanmable
IT327-1404A-01 Implementing, Managing and Maintaining a Network I
Phase 1 Individual Project
Michael F. Ryan Jr.
10/14/14
Contents
Week 1: Target Organization 3
Target Organization 3
Analysis and Recommendations 3
Week 2: Transmission Control Protocol/Internet Protocol (TCP/IP) Addressing and Management 4
Week 3: Fault Tolerance Plan 5
Week 4: Security Plan 6
Week 5: Network Monitoring 7
All Weeks: Network Pro Prep Toolkit 8
Week 1: Target OrganizationTarget Organization
About Ryan Computer Enterprises
Ryan Computer Enterprises formed in 2000, and provides leading business solutions. Currently there are over 8000 employees that are located throughout five states with three locations in Pennsylvania, Florida, California, Texas and New York. The administrative office currently is located in Pennsylvania. Currently there are over 500 additional employees located in the corporate headquarters. The company provides cutting edge solutions and needs USAA, JP Morgan, Goldman Sacks and other financial institutions. In 2002, Forbes magazine rated Ryan Computer Enterprises as the number one business organization for the field of technical consultation.
Major clients of Ryan Computer Enterprises are all in the field of investment banking and insurance. Some major factors of focus for the company will be improvement of business process the clientele have set in place, legacy systems and to have a set solution in place to be utilized thought their organization. Ryan Computer Enterprises has stated that our goal is align both the company and client goals.
Ryan Computer Enterprises has slowly replaced existing infrastructure over the years focusing on workstation, printer, switch and routers. Some areas of interest that go beyond the physical infrastructure are application upgrades. The applications that are in questions for upgrades are DBMS and other various apps such as Office 365. It has been over 2 years since the last upgrade to the IT system has been conducted and in order to provide better security and stability it has been decided that specific facets that have been listed must be upgraded as well as servers and the use of cloud technology must be implemented to allow for virtual storage of information. Other technology that should be visited is the addition of WAPs through out the facilities this allows the vendors and employees to use their mobile devices and other wireless items as well as the clientele.
The last item for discussion that will be addressed as an upgrade will be the addition of remote access. Having VPN capabilities allows Ryan Computer Enterprises to better facilitate troubleshooting and adds to the functionality of its employees. All email services as well as server access allow an employee to better assist with technical work as well as giving the clients the ability to conduct business wherever they might be located.
Metrics that are used to identify some of the issues are based on multiple factors but some ...
Get ready to dive into the exciting world of IoT data processing! 🌐📊
Join us for a thought-provoking webinar on "Processing: Turning IoT Data into Intelligence" hosted by industry visionary Deepak Shankar, founder of Mirabilis Design. Discover how to harness the potential of IoT devices by strategically choosing processors that optimize power, performance, and space.
In this engaging session, you'll explore key insights:
✅ Impact of processor architecture on Power-Performance-Area optimization
✅ Enabling AI and ML algorithms through precise compute and storage requirements
✅ Future trends in IoT hardware innovation
✅ Strategies for extending battery life and cost prediction through system design
Don't miss the chance to learn how to leverage a single IoT Edge processor for multiple applications and much more. This is your opportunity to gain a competitive edge in the evolving IoT landscape.
Spidercloud Wireless - Small Cell enterprise deploymentSmall Cell Forum
A joint presentation from Spidercloud Wireless and IBWave on the Small Cell Forum stand at MWC15. A Scalable Small Cell System Practical Medium–Large Enterprise Deployment & Case Studies
Virtualization for efficiency: by Kathrin Winkler, The green gridDCC Mission Critical
The green grid is a not-for-profit global consortium focused on driving energy efficiency in the computing ecosystem
Developing meaningful and user-centric metrics to help IT and Facilities better manage their computing resources
Developing and promoting standards, measurement methods, best practices and technologies that support these metrics.
Industrial Ethernet,Part 2: Case StudiesControlEng
Industrial Ethernet case studies provide lessons learned as detailed in specific installations to gain practical advice from working installations, to ensure your next application uses the best practices to maximize benefits in a minimum amount of time. Ethernet survey results will be discussed. An exam and certificate are available for one professional development hour (PDH), according to Registered Continuing Education Program (RCEP) rules from the American Council of Engineering Companies.
IT327-1404A-01 Implementing, Managing and Mainta.docxpriestmanmable
IT327-1404A-01 Implementing, Managing and Maintaining a Network I
Phase 1 Individual Project
Michael F. Ryan Jr.
10/14/14
Contents
Week 1: Target Organization 3
Target Organization 3
Analysis and Recommendations 3
Week 2: Transmission Control Protocol/Internet Protocol (TCP/IP) Addressing and Management 4
Week 3: Fault Tolerance Plan 5
Week 4: Security Plan 6
Week 5: Network Monitoring 7
All Weeks: Network Pro Prep Toolkit 8
Week 1: Target OrganizationTarget Organization
About Ryan Computer Enterprises
Ryan Computer Enterprises formed in 2000, and provides leading business solutions. Currently there are over 8000 employees that are located throughout five states with three locations in Pennsylvania, Florida, California, Texas and New York. The administrative office currently is located in Pennsylvania. Currently there are over 500 additional employees located in the corporate headquarters. The company provides cutting edge solutions and needs USAA, JP Morgan, Goldman Sacks and other financial institutions. In 2002, Forbes magazine rated Ryan Computer Enterprises as the number one business organization for the field of technical consultation.
Major clients of Ryan Computer Enterprises are all in the field of investment banking and insurance. Some major factors of focus for the company will be improvement of business process the clientele have set in place, legacy systems and to have a set solution in place to be utilized thought their organization. Ryan Computer Enterprises has stated that our goal is align both the company and client goals.
Ryan Computer Enterprises has slowly replaced existing infrastructure over the years focusing on workstation, printer, switch and routers. Some areas of interest that go beyond the physical infrastructure are application upgrades. The applications that are in questions for upgrades are DBMS and other various apps such as Office 365. It has been over 2 years since the last upgrade to the IT system has been conducted and in order to provide better security and stability it has been decided that specific facets that have been listed must be upgraded as well as servers and the use of cloud technology must be implemented to allow for virtual storage of information. Other technology that should be visited is the addition of WAPs through out the facilities this allows the vendors and employees to use their mobile devices and other wireless items as well as the clientele.
The last item for discussion that will be addressed as an upgrade will be the addition of remote access. Having VPN capabilities allows Ryan Computer Enterprises to better facilitate troubleshooting and adds to the functionality of its employees. All email services as well as server access allow an employee to better assist with technical work as well as giving the clients the ability to conduct business wherever they might be located.
Metrics that are used to identify some of the issues are based on multiple factors but some ...
Get ready to dive into the exciting world of IoT data processing! 🌐📊
Join us for a thought-provoking webinar on "Processing: Turning IoT Data into Intelligence" hosted by industry visionary Deepak Shankar, founder of Mirabilis Design. Discover how to harness the potential of IoT devices by strategically choosing processors that optimize power, performance, and space.
In this engaging session, you'll explore key insights:
✅ Impact of processor architecture on Power-Performance-Area optimization
✅ Enabling AI and ML algorithms through precise compute and storage requirements
✅ Future trends in IoT hardware innovation
✅ Strategies for extending battery life and cost prediction through system design
Don't miss the chance to learn how to leverage a single IoT Edge processor for multiple applications and much more. This is your opportunity to gain a competitive edge in the evolving IoT landscape.
Spidercloud Wireless - Small Cell enterprise deploymentSmall Cell Forum
A joint presentation from Spidercloud Wireless and IBWave on the Small Cell Forum stand at MWC15. A Scalable Small Cell System Practical Medium–Large Enterprise Deployment & Case Studies
Virtualization for efficiency: by Kathrin Winkler, The green gridDCC Mission Critical
The green grid is a not-for-profit global consortium focused on driving energy efficiency in the computing ecosystem
Developing meaningful and user-centric metrics to help IT and Facilities better manage their computing resources
Developing and promoting standards, measurement methods, best practices and technologies that support these metrics.
This presentation poster infographic delves into the multifaceted impacts of globalization through the lens of Nike, a prominent global brand. It explores how globalization has reshaped Nike's supply chain, marketing strategies, and cultural influence worldwide, examining both the benefits and challenges associated with its global expansion.
PPrreesseenntteedd bbyy:: GGrroouupp 66
GGlloobbaalliizzaattiioonn
o f
PP
oo
ll
yy
ee
ss
tt
ee
rr
RR
uu
bb
bb
ee
rr
EE
tt
hh
yy
ll
ee
nn
ee
VV
ii
nn
yy
ll
AA
cc
ee
tt
aa
tt
ee
GG
ee
nn
uu
ii
nn
ee
LL
ee
aa
tt
hh
ee
rr
SS
yy
nn
tt
hh
ee
tt
ii
cc
LL
ee
aa
tt
hh
ee
rr
CC
oo
tt
tt
oo
nn
C
o
u
n
t
r
i
e
s
I
n
v
o
l
v
e
d
Ni
k
e
h
a
s
m
o
r
e
t
h
a
n
7
0
0
s
h
o
p
s
i
n
c
o
n
t
r
a
c
t
w
i
t
h
w
o
r
l
d
w
i
d
e,
w
h
e
r
e
i
n
t
h
e
i
r
offi
c
e
s
a
n
d
i
n
d
e
p
e
n
d
e
n
t
fa
c
t
o
r
y
o
u
t
l
e
t
s
a
r
e
fo
u
n
d
w
i
t
h
i
n
t
h
e
p
r
e
m
i
s
e
s
of
ap
p
r
o
x
i
m
a
t
e
l
y
4
5
c
o
u
n
t
r
i
e
s.
AAuussttrraalliiaa
China
India
IInnddoonneessiiaa
TThhaaiillaanndd
TTuurrkkeeyy
USA
VViieettnnaamm
NNiikkee SSuuppppllyy CChhaaiinn
RRuubbbbeerr,, FFaabbrriicc
aanndd ootthheerr rraaww
mmaatteerriiaallss
Shoe
MMaannuuffaaccttuurriinngg
aanndd AAsssseemmbbllyy
MMaarrkkeettiinngg
SSppoorrttiinngg ggooooddss,,
ddeevveellooppmmeenntt
aanndd SShhooee ssttoorreess
OOnnlliinnee,, CCaattaalloogg
aanndd ootthheerr rreettaaiill
NNiikkee bbrraannddeedd
shoes
PPrroodduucctt
ddeevveellooppmmeenntt
CCuussttoommeerr nneeeeddss//wwaannttss ffeeeeddbbaacckk
NNiikk
Nike Supply Chain
Globalization of Nike
Nike Manufacturing Process
Rubber Materials Nike
Ethylene Vinyl Acetate Nike
Genuine Leather Nike
Synthetic Leather Nike
Cotton in Nike Apparel
Nike Shops Worldwide
Nike Manufacturing Countries
Cold Cement Assembly Nike
3D Printing Nike Shoes
Nike Product Development
Nike Marketing Strategies
Nike Customer Feedback
Nike Distribution Centers
Automation in Nike Manufacturing
Nike Consumer Direct Acceleration
Nike Logistics and Transport
how to swap pi coins to foreign currency withdrawable.DOT TECH
As of my last update, Pi is still in the testing phase and is not tradable on any exchanges.
However, Pi Network has announced plans to launch its Testnet and Mainnet in the future, which may include listing Pi on exchanges.
The current method for selling pi coins involves exchanging them with a pi vendor who purchases pi coins for investment reasons.
If you want to sell your pi coins, reach out to a pi vendor and sell them to anyone looking to sell pi coins from any country around the globe.
Below is the what'sapp information for my personal pi vendor.
+12349014282
BYD SWOT Analysis and In-Depth Insights 2024.pptxmikemetalprod
Indepth analysis of the BYD 2024
BYD (Build Your Dreams) is a Chinese automaker and battery manufacturer that has snowballed over the past two decades to become a significant player in electric vehicles and global clean energy technology.
This SWOT analysis examines BYD's strengths, weaknesses, opportunities, and threats as it competes in the fast-changing automotive and energy storage industries.
Founded in 1995 and headquartered in Shenzhen, BYD started as a battery company before expanding into automobiles in the early 2000s.
Initially manufacturing gasoline-powered vehicles, BYD focused on plug-in hybrid and fully electric vehicles, leveraging its expertise in battery technology.
Today, BYD is the world’s largest electric vehicle manufacturer, delivering over 1.2 million electric cars globally. The company also produces electric buses, trucks, forklifts, and rail transit.
On the energy side, BYD is a major supplier of rechargeable batteries for cell phones, laptops, electric vehicles, and energy storage systems.
how to sell pi coins in South Korea profitably.DOT TECH
Yes. You can sell your pi network coins in South Korea or any other country, by finding a verified pi merchant
What is a verified pi merchant?
Since pi network is not launched yet on any exchange, the only way you can sell pi coins is by selling to a verified pi merchant, and this is because pi network is not launched yet on any exchange and no pre-sale or ico offerings Is done on pi.
Since there is no pre-sale, the only way exchanges can get pi is by buying from miners. So a pi merchant facilitates these transactions by acting as a bridge for both transactions.
How can i find a pi vendor/merchant?
Well for those who haven't traded with a pi merchant or who don't already have one. I will leave the what'sapp number of my personal pi merchant who i trade pi with.
Message: +12349014282 VIA Whatsapp.
#pi #sell #nigeria #pinetwork #picoins #sellpi #Nigerian #tradepi #pinetworkcoins #sellmypi
1. Elemental Economics - Introduction to mining.pdfNeal Brewster
After this first you should: Understand the nature of mining; have an awareness of the industry’s boundaries, corporate structure and size; appreciation the complex motivations and objectives of the industries’ various participants; know how mineral reserves are defined and estimated, and how they evolve over time.
Understanding how timely GST payments influence a lender's decision to approve loans, this topic explores the correlation between GST compliance and creditworthiness. It highlights how consistent GST payments can enhance a business's financial credibility, potentially leading to higher chances of loan approval.
when will pi network coin be available on crypto exchange.DOT TECH
There is no set date for when Pi coins will enter the market.
However, the developers are working hard to get them released as soon as possible.
Once they are available, users will be able to exchange other cryptocurrencies for Pi coins on designated exchanges.
But for now the only way to sell your pi coins is through verified pi vendor.
Here is the what'sapp contact of my personal pi vendor
+12349014282
Turin Startup Ecosystem 2024 - Ricerca sulle Startup e il Sistema dell'Innov...Quotidiano Piemontese
Turin Startup Ecosystem 2024
Una ricerca de il Club degli Investitori, in collaborazione con ToTeM Torino Tech Map e con il supporto della ESCP Business School e di Growth Capital
1. DIRECTORATE GENERAL OF SYSTEMS & DATA MANAGEMENT
www.icegate.gov.in
www.cbec.gov.in
CENTRAL BOARD OF EXCISE
& CUSTOMS
IT CONSOLIDATION PROGRAMME
Local Area Network (LAN) Project
2. PricewaterhouseCoopers
Directorate General of Systems & Data Management
2
Slide 2
About IT Consolidation Programme (ITCP)
SUB-COMPONENTS:
1. Wide Area Networks (WAN) at 584 CBEC locations
• (One WAN point per building)
• using MPLS (Multi Protocol Label Switching) Technology
• bandwidth on demand
2. Local Area Networks (LAN) at CBEC buildings, thin clients, peripherals
(printers etc), UPS, DG sets
3. Data Centers – Three data centres - Primary, Business Continuity and Disaster Recovery
4. Project Monitoring and program management – Inter-Vendor coordination, Service level
monitoring (For eg: Monitoring Network Availability, Quality of Service (QoS) etc)
OBJECTIVE :
To provide quality services to all stake holders, including tax
payers, by consolidating CBEC’s information technology (IT)
infrastructure
3. PricewaterhouseCoopers
Directorate General of Systems & Data Management
3
Slide 3
The IT Consolidation Project will enable
1. Roll out of ICES 1.5 – this upgraded version of ICES would be deployed
on Oracle 10g and service all locations, including existing locations
2. Roll out of ACES – the newly developed Central Excise & Service Tax
workflow application
3. Data Warehouse – Single window data repository of CBEC data for
decision support in tax planning, risk management etc
4. Upgraded ICEGATE facilities
5. Upgraded Risk Management System
6. Upgraded iCERT infrastructure
7. Corporate Mail facilities to all officers
8. Other initiatives such as APIS, Intranet and Knowledge Management
system etc. in due course
4. PricewaterhouseCoopers
Directorate General of Systems & Data Management
4
Slide 4
Existing v/s Future Scenario – WAN/ LAN
Present Wide area network called Indian Customs
and Excise Network (ICENET) covering 35
Customs (ICES) locations
Existing WAN connectivity is through dedicated 64
kbps or 2 Mbps point to point leased lines
Existing LAN in Customs House based on
structured UTP cabling
Some Central Excise offices have building wide
LANs
• Augmented network infrastructure to meet the data,
voice and video communication requirements of the
Department
• All India Wide Area Network (WAN) for around 584
CBEC buildings (one WAN point in each building) .
• Ranges will be connected through VPN over
Broadband
• All buildings connected to central data centre
through Multi Protocol Label Switching (MPLS)
based network
• All offices of CBEC connected to the Centralised
Data Centre
AS IS TO BE
5. PricewaterhouseCoopers
Directorate General of Systems & Data Management
5
Slide 5
About LAN
LAN: A communications network that serves users within a confined
geographical area, such as a floor of a building or among the floors of a
building or among buildings.
To be implemented across India by Hewlett Packard India Sales Pvt. Ltd. (HP)
ROLES OF VENDORS WHO WOULD INTERACT WITH FIELD FORMATIONS:
a) HP : LAN Service Provider : Site Survey, Supply & Installation of equipments,
Integration with WAN (where WAN already exists) and maintenance for 5 yrs. HP
will supported by its national/regional partners in this execution.
b) PwC :Selected as “ Project Management and Monitoring Agency” (supported in
field work by (M/s CMS Computers Ltd. )
6. PricewaterhouseCoopers
Directorate General of Systems & Data Management
6
Slide 6
Schematic Diagram – WAN / LAN
M P L S
WAN
Central Excise
Data Centre (DC)
Importer /
Exporter
Banks
Custodians
Customs
Directorates
& Other
Offices
Centrally Hosted
Applications
ICES / ACES
Disaster
Recovery (DR)
BCP
INTERNET
LAN
7. PricewaterhouseCoopers
Directorate General of Systems & Data Management
7
Slide 7
7/15/2023 7
Implementing of Local Area Network across Customs,
Central Excise and Service Tax buildings spread
across the country. The LAN is being setup for officers
to access the applications (e.g. ICES and ACES)
being hosted in the Datacenter. The environment will
adhere to a strict security policy considering the
sensitivity of the operations.
Scope Brief
Note: The existing LAN and stand alone PCs performing
functions not related to the application will continue as before
and will not be part of the new LAN.
8. PricewaterhouseCoopers
Directorate General of Systems & Data Management
8
Slide 8
Brief – LAN Components
Thin Clients
• Thin clients perform the same functionality as PCs except that there is no
local storage
• Used for accessing the applications hosted at the Data center
Scanners
• The scanning facility will be available in the LAN at the Utility Area in
specified CBEC offices
Print servers
• Used for supporting the printing and scanning functions.
9. PricewaterhouseCoopers
Directorate General of Systems & Data Management
9
Slide 9
Brief – LAN Components
Printers
DeskJet Printers
• To be connected to a Thin client or redeployed PC.
Network Laser Printers
• Shared by all LAN Users.
• Will be placed in Utility areas, easily accessible for all LAN Users
Dot Matrix Line Printers
• Heavy duty printers for printing Bills of Entry and shipping bills and
other documents at Customs locations.
10. PricewaterhouseCoopers
Directorate General of Systems & Data Management
10
Slide 10
Brief – LAN Components
UPS
• UPS with in-built redundancy.
• 15 min back up.
• Provide interim power between mains power failure and DG set switching on.
• Will power on the equipment on the LAN.
Diesel Generator (DG) Set
• The Diesel Generator (DG) set (or sets) will used for powering on the LAN
equipment. The ACs, Fans, lights and non LAN equipment will not be
connected to the DG set.
• During a power failure, the DG set will switch on automatically within 3 to 4
minutes.
11. PricewaterhouseCoopers
Directorate General of Systems & Data Management
11
Slide 11
Brief – LAN Components
LAN and Electrical cabling
• Provisioning of electrical and network points for all the equipment supplied in
the LAN Project.
• For all the buildings with more than four users, in addition to the
electrical cabling ,structured LAN cabling provided for connecting equipment.
• Implementation also includes provision of switches, and racks to be placed in
the communication room.
Fire Extinguisher
• One fire extinguisher per building
12. PricewaterhouseCoopers
Directorate General of Systems & Data Management
12
Slide 12
Benefits – LAN Project
• Standardized Implementation and maintenance of Local
Area Network across the country.
• High availability of applications, such as ACES and ICES.
• Onsite resident engineer in locations where no. of users on
LAN is more than 25.
• Engineers on- call for other locations.
14. PricewaterhouseCoopers
Directorate General of Systems & Data Management
14
Slide 14
Site Survey
The Site Survey nearing completion. The information
collected includes :
• Data on the Name, Designation and Section of personnel
• Existing IT equipment
• Location of the LAN points and the electrical points
• Location for the DG set in the building
• Location of the UPS and the peripherals, such as printers and
scanners
• Site related data, such as input power to the DG set
15. PricewaterhouseCoopers
Directorate General of Systems & Data Management
15
Slide 15
Bill of Material Finalisation
Based on the Site Survey inputs, Directorate of Systems (DOS), in
consultation with respective Commissionerates, is finalising the following
for each building:
- The LAN users who will be provided Thin clients or redeployed PCs .
- Peripherals such as printers and scanners for each building.
The final Bill of Material (BOM) including the position of the DG Set and
the UPS, is being prepared by HP.
16. PricewaterhouseCoopers
Directorate General of Systems & Data Management
16
Slide 16
Hardware Delivery
- Based on the final Bill of Material (BOM), HP will dispatch the required
equipment to the respective buildings after obtaining the requisite local
permissions.
- Inform the Lead Nodal Officers/Officer in Charge on the expected dates of
arrival of equipment and material. There will be multiple consignments for
each building. Only number of boxes to be tallied.
- Storage of equipment would require facilitation, pending installation and
commissioning.
- Hardware verification as per consignment by HP representative, at time of
implementation.
- Road permits required in some states. Officers already identified for
facilitating the process.
17. PricewaterhouseCoopers
Directorate General of Systems & Data Management
17
Slide 17
Installation
The Installation activity will involve the following activities:
• Obtaining local permissions eg. from building owner/custodian
• Installation of the DG Set
• Laying the DG Foundation
• DG to be connected to the mains distribution board.
• Digging for preparing Earth Pits
• Erecting the exhaust pipe routing ( chimney) against the boundary of the building
• Assembly and Installation of UPS
• Connecting the DGset, UPS and the Mains Power.
• Will require Mains Power switched off for approximately 2 hrs
18. PricewaterhouseCoopers
Directorate General of Systems & Data Management
18
Slide 18
Installation
• Installation of equipment such as ,switches and routers in the new racks
• Cabling for providing electrical and LAN points for connecting equipment
- The activity will involve drilling. Likely to cause some disturbance due to
noise.
- The activity will require extended working hours
- Cooperation of local officers essential for timely execution of project
• Software changes in redeployed PCs.
- Some PCs may also require hardware upgrade.
• Installation of equipment.
19. PricewaterhouseCoopers
Directorate General of Systems & Data Management
19
Slide 19
Site Handover
The following activities inter alia will be performed:
- Testing Integration of LAN with WAN
- Testing for functionality.
- Access of applications in the datacenter
- Printing
- Scanning
The format for Acceptance Test Process (ATP) and the documentation
to be provided at site, will be communicated by Directorate of Systems
(DoS).
20. PricewaterhouseCoopers
Directorate General of Systems & Data Management
20
Slide 20
Support Required from Local Offices
• Assignment of alternate Nodal officer for the delivery and installation phase
for ensuring continuity in the implementation phase.
• Assignment of a representative of the Nodal officer in the Stand alone
Ranges for the delivery, installation and the ATP phase (ex.
Supdt./Inspector).
• The Nodal officer is required to sign off on the Proof of Delivery documents
and Copy of Invoice. For standalone Ranges, Nodal officer is required to
nominate a consignee who would coordinate locally and would be receiving
the equipment and material for the range building.
• Facilitation of safe storage of equipment till the completion of the installation
phase.
21. PricewaterhouseCoopers
Directorate General of Systems & Data Management
21
Slide 21
Local Office Support
• Facilitation for getting permission for DG set Installations
from the respective building landlords. HP issuing letters to
these authorities through nodal officers.
• Interface with the building-in-charge and electrician critical
for cabling and DG set installation.
• Provision of gate passes for HP personnel.
• Permissions and supervision for working for extended
hours in the office.
22. PricewaterhouseCoopers
Directorate General of Systems & Data Management
22
Slide 22
Essential Points
• Offices shifting within one year should not be included for LAN
implementation
• Location of Communication room not to be shifted unless approved
by DoS
• Users would not have the option of seeking shifting of node within a
room post installation. Hence, due care to be taken at the time of
implementation
• On account of security considerations, any existing LAN must be
kept entirely distinct from the new LAN infrastructure
• Extending cooperation to the vendor personnel for timely
completion of project, including permission for working during and
after office hours, to the extent feasible
23. PricewaterhouseCoopers
Directorate General of Systems & Data Management
23
Slide 23
CBEC Project Team
Smt.Somya Dave
ADG Systems (Consolidation)
011-26119994
somya.dave@icegate.gov.in
Sh.Yashodhan Parande
DG Systems
011-26877960
yashodhan.parande@icegate.gov.in
Sh.Yogendra Garg
Additional Director
011-26113618
yogendra.garg@icegate.gov.in
24. PricewaterhouseCoopers
Directorate General of Systems & Data Management
24
Slide 24
PwC Project Team
Cdr Deepak Uppal (Retd)
Project Manager
0-9810363454
deepak.uppal@in.pwc.com
Tripti Batra
Team Member
0-9818440384
tripti.batra@in.pwc.com
Jivesh K. Anand
Team Member
0-9999425785
Jivesh.kumar.anand@in.pwc.com
Maryam Ahmad
Team Member
0-9971108291
Maryam.ahmad@in.pwc.com
Regional Team Member
West Zone : Venugopal - Mumbai
0-9820276371
Venugopal.s.u@in.pwc.com
East Zone : Reshma Patra - Kolkata
0-9836457333
Reshma.patra@in.pwc.com
South Zone : T M Sudershan - Bangalore
0-9900105628
t.m.sudershan@in.pwc.com
25. PricewaterhouseCoopers
Directorate General of Systems & Data Management
25
Slide 25
HP Project Team
R.Gurumurthy
Country Manager
0-9830181222; gurumurthy.raman@hp.com
Rohit Dhawan
Project Director
+91 9811256256 ; rohit.dhawan@hp.com
Kamal Deep Sharma
Project Manager
+91 9818387558; kamaldeep.sharma@hp.com
Debashish Dutta
Project Manager
+91 9818166121; ddutta@hp.com
Regional Team
RM North : Ajay Joshi – Delhi
+91 9810660237 ; ajay.joshi@hp.com
RM East : Sanjeev Langoo – Kolkata
+91 9831112466; sanjeev-kumar.langoo@hp.com
RM South : Amit Aggarwal – Chennai
+91 9899781310 ; amit.agarwal@hp.com
RM West : Vivek Chopra – Mumbai
+91 9819030051; vivek.chopra@hp.com
28. PricewaterhouseCoopers
Directorate General of Systems & Data Management
28
Slide 28
The Difference
Thin Client
PC
Data is stored in
the Hard disk
Hard Disk
is here
Data is stored in
the Data Center
in Delhi
29. PricewaterhouseCoopers
Directorate General of Systems & Data Management
29
Slide 29
DATA CENTER AT DELHI
Thin Client – How Does it work
Applications
seen on the
screen
Applications & data reside in
the Datacenter in Delhi
Thin client
Keyboard &
mouse events
Screen
updates
Access to the Datacenter will be
through the WAN Point /leased line/
Broadband/ISDN/VSAT
30. PricewaterhouseCoopers
Directorate General of Systems & Data Management
30
Slide 30
Benefit to the User
• In case the Thin Client becomes faulty during
application access, user can go to another thin
client and log in again to resume work at the
last point of work
• Updates on the thin client will be managed
centrally
• More durable than a PC
32. PricewaterhouseCoopers
Directorate General of Systems & Data Management
32
Slide 32
Specifications of Communication Room
Formation Suggested Communication room
Customs Server room housing the ICES servers
Central Excise Room housing the SERMON servers
Other Formations Air conditioned room housing PC’s or servers
If no separate room is available The room of AC / JC
A dedicated room is preferred for the purpose. However, in case a dedicated room
of appropriate size is not available then following rooms may be used, provided
sufficient space is available for accommodating the required equipment.
As an exceptional scenario, if no room is available at all, then a segregated area in
the common hall/room should be designated as the WAN / LAN point. Care is to be
exercised to ensure that sufficient area is delimited in order to securely
accommodate the required installation.
33. PricewaterhouseCoopers
Directorate General of Systems & Data Management
33
Slide 33
Specifications of Communication Room
The room will contain :
- Rack with router and modems installed as part of WAN Project
- Telecom Multiplexer installed as part of WAN project
- 15U/42U rack with LAN equipment
- UPS
Note : Where all equipment cannot fit into the communication room, some
equipment, eg. UPS, will be installed in an alternate room.
The Room/Space Conditions:
- Area should be 8’ x 6’. It will be desirable if the room size of 10’ X 15’ is
made available
- Air Conditioning to keep the temperature between 22–25deg C
- Dust free
- Pest control measures required to prevent damage
- No water seepage
- Secure room with restricted access
Return
34. PricewaterhouseCoopers
Directorate General of Systems & Data Management
34
Slide 34
Utility Room
The room will contain :
- Network Printer
- Scanner
- Print server
The Room/Space Conditions:
- Should be easily accessible from the work place.
- Air-conditioned to maintain temperature between 22–25 degree C
- Dust free
- Pest control to be implemented
- Should not have water seepage
Return
35. PricewaterhouseCoopers
Directorate General of Systems & Data Management
35
Slide 35
LAN Locations
Nodal Officer Details
LAN
S# State City Loc as per CBEC Type Formation Building Address Buil
ding
WAN Old Site
Code
WAN New Site
Code
LAN Site Code
1 Assam &
North East
Barsora Commissioner of
Customs Custom
House 110 Mahatma
Gandhi Road,
Shillong-793001
LCS Customs O/o The
Superintendent,Land
Customs
Station,Barsora,P.O.
Borsora(via Balat),Dist:West
Khasi Hills,Meghalaya.Pin-
793106
1 AS/BRS/01_C0
4
AS/BRA/01_C04 AS/BRA/01/C/SH
L/LCS
2 Assam &
North East
Dawki Commissioner of
Customs Custom
House 110 Mahatma
Gandhi Road,
Shillong-793001
LCS Customs O/o The Superintendent
Land Customs
Station,Dawki,P.O.Dawki
,Dist:-West Khasi
Hills,Meghlaya.Pin:793109.
1 AS/DWK/01_C
04
AS/DWK/01_C04 AS/DWK/01/C/SH
L/LCS
3 Assam &
North East
Ghasuar
para
Commissioner of
Customs Custom
House 110 Mahatma
Gandhi Road,
Shillong-793001
LCS Customs O/o The Superintendent
Land Customs
Station,Village:Gandhibor,Di
st:-South Garo
Hills,Meghalaya.Pin:-793104
1 AS/GSP/01_C0
4
AS/GHP/01_C04 AS/GHP/01/C/SH
L/LCS
4 Assam &
North East
Sutar
Kandi
Commissioner of
Customs
(Preventive), Custom
House, MG.Road,
Shillong-793001
LCS Customs O/o The Superintendent
Land Customs
Station,Sutarkandi,P.O.
Sutarkandi,Dist:Karimganj,A
ssam.Pin:-788712
1 AS/STK/01_C0
4
AS/STR/01_C04 AS/STR/01/C/SHL
/LCS
5 Bihar Jayanag
ar
Commissioner of
Customs CR
Building B.C. Patel
Path, Patna-80001
LCS Customs Jaya Nagar ,LCS, Bihar 1 BR/JYN/01_C0
4
BR/JAY/01_C04 BR/JAY/01/C/PAT
/LCS
6 Bihar Jogbani Commissioner of
Customs, CR
Building, BC Patel
Path, Patna-800001
LCS Customs Jogbani, LCS* 1 BR/JGB/01_C0
1
BR/JBN/01_C01 BR/JBN/01/C/PA
T/LCS
7 Delhi Delhi Directorate General
of Audit, Delhi Zonal
Unit
Directorate Directorate "D" Block, I.P. Bhawan, 5th
Floor, I.P. Estate, New Delhi
1 DL/DLH/01_A0
6
DL/DEL/01_A06 DL/DEL/01/D/DEL
/Aud
11 Delhi Delhi Directorate General
of Vigilance
Directorate Directorate 1st & 2nd floor, Hotel Samrat,
Kautilya Marg,
Chanakyapuri, New Delhi
1 DL/DLH/02_A0
5
DL/DEL/02_A05 DL/DEL/02/D/DEL
/Vig
13 Delhi Delhi Central Excise Div-6 Division Central
Excise
3rd Floor,37 Nehru
Place,kalkaji
1 DL/DLH/03_C0
1
DL/DEL/03_C01 DL/DEL/03/E/DEL-
II/Div-VI
26 Delhi Delhi Central Excise Div-1 Division Central
Excise
8,Deepshikha building,2nd
floor,Rajendra Place
1 DL/DLH/04_B0
3
DL/DEL/04_B03 DL/DEL/04/E/DEL-
I/Div-I
32 Delhi Delhi Central Excise Div-8 Division Central
Excise
G-80,Preet vihar,Laxmi
Nagar,East Delhi
1 DL/DLH/05_C0
1
DL/DEL/05_C01 DL/DEL/05/E/DEL-
II/Div-VIII
38 Delhi Delhi Directorate of
Logistics
Directorate Directorate 4th Floor, Lok Nayak
Bhawan, Khan Market, New
Delhi
1 DL/DLH/06_B0
4
DL/DEL/06_B04 DL/DEL/06/D/DEL
/Log
39 Delhi Delhi Directorate of Legal
Affairs
Directorate Directorate 4th Floor, Rajendra Bhawan,
210, Deen Dayal Upadhyay
Marg, New Delhi
1 DL/DLH/07_C0
2
DL/DEL/07_C02 DL/DEL/07/D/DEL
/Leg
40 Delhi Delhi Directorate of
Logistics,
Communication
Division
Directorate Directorate 7th Street, Shopping Centre,
Shanti Niketan, New Delhi
1 DL/DLH/08_B0
2
DL/DEL/08_B02 DL/DEL/08/D/DEL
/Leg-Com
42 Delhi Delhi Director General of
Safeguards
Directorate Directorate Bhai vir Singh sahitya sadan,
Bhai V.S Marg, Gole Market,
New Delhi.
1 DL/DLH/11_B0
2
DL/DEL/11_B02 DL/DEL/11/D/DEL
/Saf
Return to Slide no 2 Return to Slide no 20