The document provides instructions for installing a swing drive on an excavator model M315D. It lists the required tools and parts. The procedure involves 28 steps, including installing bearings, seals, gears, and other components into the swing drive housing. Specific torque specifications and dimensional checks are listed to ensure proper assembly. Installation is completed by positioning the swing drive in the swing brake housing and securing it with bolts.
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...Autohaus Service and Sales
Learn what "PARKTRONIC Inoperative, See Owner's Manual" means for your Mercedes-Benz. This message indicates a malfunction in the parking assistance system, potentially due to sensor issues or electrical faults. Prompt attention is crucial to ensure safety and functionality. Follow steps outlined for diagnosis and repair in the owner's manual.
Things to remember while upgrading the brakes of your carjennifermiller8137
Upgrading the brakes of your car? Keep these things in mind before doing so. Additionally, start using an OBD 2 GPS tracker so that you never miss a vehicle maintenance appointment. On top of this, a car GPS tracker will also let you master good driving habits that will let you increase the operational life of your car’s brakes.
Symptoms like intermittent starting and key recognition errors signal potential problems with your Mercedes’ EIS. Use diagnostic steps like error code checks and spare key tests. Professional diagnosis and solutions like EIS replacement ensure safe driving. Consult a qualified technician for accurate diagnosis and repair.
Ever been troubled by the blinking sign and didn’t know what to do?
Here’s a handy guide to dashboard symbols so that you’ll never be confused again!
Save them for later and save the trouble!
"Trans Failsafe Prog" on your BMW X5 indicates potential transmission issues requiring immediate action. This safety feature activates in response to abnormalities like low fluid levels, leaks, faulty sensors, electrical or mechanical failures, and overheating.
Fleet management these days is next to impossible without connected vehicle solutions. Why? Well, fleet trackers and accompanying connected vehicle management solutions tend to offer quite a few hard-to-ignore benefits to fleet managers and businesses alike. Let’s check them out!
Comprehensive program for Agricultural Finance, the Automotive Sector, and Empowerment . We will define the full scope and provide a detailed two-week plan for identifying strategic partners in each area within Limpopo, including target areas.:
1. Agricultural : Supporting Primary and Secondary Agriculture
• Scope: Provide support solutions to enhance agricultural productivity and sustainability.
• Target Areas: Polokwane, Tzaneen, Thohoyandou, Makhado, and Giyani.
2. Automotive Sector: Partnerships with Mechanics and Panel Beater Shops
• Scope: Develop collaborations with automotive service providers to improve service quality and business operations.
• Target Areas: Polokwane, Lephalale, Mokopane, Phalaborwa, and Bela-Bela.
3. Empowerment : Focusing on Women Empowerment
• Scope: Provide business support support and training to women-owned businesses, promoting economic inclusion.
• Target Areas: Polokwane, Thohoyandou, Musina, Burgersfort, and Louis Trichardt.
We will also prioritize Industrial Economic Zone areas and their priorities.
Sign up on https://profilesmes.online/welcome/
To be eligible:
1. You must have a registered business and operate in Limpopo
2. Generate revenue
3. Sectors : Agriculture ( primary and secondary) and Automative
Women and Youth are encouraged to apply even if you don't fall in those sectors.
What Exactly Is The Common Rail Direct Injection System & How Does It WorkMotor Cars International
Learn about Common Rail Direct Injection (CRDi) - the revolutionary technology that has made diesel engines more efficient. Explore its workings, advantages like enhanced fuel efficiency and increased power output, along with drawbacks such as complexity and higher initial cost. Compare CRDi with traditional diesel engines and discover why it's the preferred choice for modern engines.
In this presentation, we have discussed a very important feature of BMW X5 cars… the Comfort Access. Things that can significantly limit its functionality. And things that you can try to restore the functionality of such a convenient feature of your vehicle.
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Hyundai Motor Group
What’s the force behind Hyundai Motor Group's EV performance and quality?
Maximized driving performance and quick charging time through high-density battery pack and fast charging technology and applicable to various vehicle types!
Discover more about Hyundai Motor Group’s EV platform ‘E-GMP’!
Why Is Your BMW X3 Hood Not Responding To Release CommandsDart Auto
Experiencing difficulty opening your BMW X3's hood? This guide explores potential issues like mechanical obstruction, hood release mechanism failure, electrical problems, and emergency release malfunctions. Troubleshooting tips include basic checks, clearing obstructions, applying pressure, and using the emergency release.
𝘼𝙣𝙩𝙞𝙦𝙪𝙚 𝙋𝙡𝙖𝙨𝙩𝙞𝙘 𝙏𝙧𝙖𝙙𝙚𝙧𝙨 𝙞𝙨 𝙫𝙚𝙧𝙮 𝙛𝙖𝙢𝙤𝙪𝙨 𝙛𝙤𝙧 𝙢𝙖𝙣𝙪𝙛𝙖𝙘𝙩𝙪𝙧𝙞𝙣𝙜 𝙩𝙝𝙚𝙞𝙧 𝙥𝙧𝙤𝙙𝙪𝙘𝙩𝙨. 𝙒𝙚 𝙝𝙖𝙫𝙚 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙥𝙡𝙖𝙨𝙩𝙞𝙘 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙪𝙨𝙚𝙙 𝙞𝙣 𝙖𝙪𝙩𝙤𝙢𝙤𝙩𝙞𝙫𝙚 𝙖𝙣𝙙 𝙖𝙪𝙩𝙤 𝙥𝙖𝙧𝙩𝙨 𝙖𝙣𝙙 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙛𝙖𝙢𝙤𝙪𝙨 𝙘𝙤𝙢𝙥𝙖𝙣𝙞𝙚𝙨 𝙗𝙪𝙮 𝙩𝙝𝙚 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙛𝙧𝙤𝙢 𝙪𝙨.
Over the 10 years, we have gained a strong foothold in the market due to our range's high quality, competitive prices, and time-lined delivery schedules.
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs AttentionBertini's German Motors
IBS monitors and manages your BMW’s battery performance. If it malfunctions, you will have to deal with an array of electrical issues in your vehicle. Recognize warning signs like dimming headlights, frequent battery replacements, and electrical malfunctions to address potential IBS issues promptly.
2. Shutdown SIS
Previous Screen
Product: WHEELED EXCAVATOR
Model: M315D WHEELED EXCAVATOR J5B
Configuration: M315D Excavator J5B00001-UP (MACHINE) POWERED BY C4.4 Engine
Disassembly and Assembly
M315D, M315D Series 2, M315D2, M317D Series 2 and M317D2 Wheeled Excavators
Machine Systems
Media Number -KENR6028-05 Publication Date -01/07/2015 Date Updated -08/07/2015
i03484340
Swing Drive - Assemble
SMCS - 5459-016
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 138-7575 Link Bracket 2
B 1P-0510 Driver Gp 1
C 1U-8759 Plier Tips 1
D 5P-4758 Retaining Ring Pliers 1
E 1P-1859 Retaining Ring Pliers 1
F 1P-1855 Retaining Ring Pliers 1
H 1P-1863 Retaining Ring Pliers 1
J
305-4538 Spanner Socket(1)
1
240-8274 Insert(2)
1
174-9465 Spanner Socket(3)
1
K 1P-0520 Driver Gp 1
L 2S-3230 Bearing Lubricant 1
M 8T-5096 Dial Indicator Gp 1
N 7H-1680 Lubrication Hand Pump 1
1/12(W)
w
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/siswe...
3. (1)
Used on the part number 152-7372 Swing Drive Gp
(2)
Used on the part number 152-7372 Swing Drive Gp
(3)
Used on the part number 152-7375 Swing Drive Gp
Note: Replace all O-ring seals and all gaskets. Apply a light film of "10W" oil to all components
before assembly.
Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned
in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts.
Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are
worn or damaged, use new parts for replacement.
Illustration 1 g01027198
1. Lower the temperature of bearing cup (39). Use Tooling (K) to install bearing cup (39) in
swing drive housing (33A).
Illustration 2 g00906881
2. Lower the temperature of bearing cup (36). Use Tooling (K) to install bearing cup (36).
3. Use Tooling (B) to install lip seal (35). Install seal (34). Install tooling (L) to seal (34).
2/12(W)
w
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/siswe...
4. Illustration 3 g01026650
4. Raise the temperature of bearing cone (37). Install washer (38) and bearing cone (37) on
pinion (33).
Illustration 4 g01027078
Illustration 5 g01026558
5. The following steps should be used on machines that are equipped with the part number 152
-7372 Swing Drive Gp.
a. Apply 80 grams of Tooling (L) to the bearing cone on pinion (33). Install pinion (33)
in swing drive housing (33A).
3/12(W)
w
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/siswe...
5. b. Raise the temperature of bearing cone (32A). Install bearing cone (32A).
c. Install nut (32). Use Tooling (J) in order to tighten nut (32) until a slight increase in
rolling torque is obtained. Loosen nut (32) by approximately 60 degrees. Strike pinion
(33) with a soft hammer in order to release the bearing preload.
d. Determine the initial rolling torque of pinion (33). The specified rolling torque is
8 N·m (71 lb in) to 15 N·m (133 lb in). Record this value as Rolling Torque (Y).
e. As you tighten nut (32) rotate swing drive housing (33A) in order to ensure that the
bearings are seated properly. Use Tooling (J) in order to tighten nut (32) to a torque of
300 N·m (221 lb ft). Loosen nut (32) by 30 degrees to 60 degrees.
f. Install ring (31).
g. Install nut (30). Use Tooling (J) in order to tighten nut (30) to a torque of
1000 ± 100 N·m (738 ± 74 lb ft).
h. Determine the rolling torque of pinion (33). The specified rolling torque is Rolling
Torque (Y) plus 3 N·m (27 lb in) to 9 N·m (80 lb in).
6. The following steps should be used on machines that are equipped with the part number 152
-7375 Swing Drive Gp.
a. Apply 80 grams of Tooling (L) to the bearing cone on pinion (33). Install pinion (33)
in swing drive housing (33A).
b. Raise the temperature of bearing cone (32A). Install bearing cone (32A).
c. Install nut (32). Use Tooling (J) in order to tighten nut (32) until a slight increase in
rolling torque is obtained. Loosen nut (32) by approximately 60 degrees. Strike pinion
(33) with a soft hammer in order to release the bearing preload.
d. Determine the initial rolling torque of pinion (33). The specified rolling torque is
6 N·m (53 lb in) to 8 N·m (71 lb in). Record this value as Rolling Torque (Y).
e. As you tighten nut (32) rotate swing drive housing (33A) in order to ensure that the
bearings are seated properly. Use Tooling (J) in order to tighten nut (32) to a torque of
250 ± 50 N·m (184 ± 37 lb ft). Loosen nut (32) by 15 degrees to 30 degrees.
f. Install ring (31).
g. Install nut (30). Use Tooling (J) in order to tighten nut (30) to a torque of
700 ± 50 N·m (516 ± 37 lb ft).
h. Determine the rolling torque of pinion (33). The specified rolling torque is Rolling
Torque (Y) plus 2 N·m (18 lb in) to 5 N·m (44 lb in).
4/12(W)
w
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/siswe...
6. Illustration 6 g00907108
Illustration 7 g00907110
Illustration 8 g01027098
7. Install carrier (27A).
8. Install shim (28). Use Tooling (H) to install retaining ring (27).
9. Raise temperature of bearing race (29). Install bearing race (29) and needle bearings (26).
10. Apply Tooling (L) to the rollers. Install the rollers on bearing race (29). Install gears (25)
over bearing race (29) and the rollers.
5/12(W)
w
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/siswe...
7. 11. Install retaining ring (23) and bearing (24).
Illustration 9 g00906330
12. Install washers (22) and sun gear (21) onto top carrier (11).
Illustration 10 g00906329
13. Use Tooling (E) to install retaining ring (20) onto top carrier (11).
Illustration 11 g00906327
14. Install needle bearings (16), washers (17) and (18), gears (15), and pins (19).
6/12(W)
w
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/siswe...
8. Illustration 12 g00906325
15. Use Tooling (F) to install retaining ring (14). Install bearing (13).
Illustration 13 g00906324
16. Install top carrier (11) and shaft (10) in shaft drive (12).
Illustration 14 g00906322
17. Install seals (9) in the swing brake assembly.
7/12(W)
w
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/siswe...
9. Illustration 15 g00909400
18. Use Tooling (B) to install piston (8) in swing brake assembly (2).
Illustration 16 g00906319
19. If equipped, install ring (7).
Illustration 17 g00909004
8/12(W)
w
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/siswe...
10. Improper assembly of parts that are spring loaded can cause bodily
injury.
To prevent possible injury, follow the established assembly procedure
and wear protective equipment.
20. Install spring (6A) and the shim.
21. Use Tooling (K) and a suitable press in order to compress spring (6A). Use Tooling (D) in
order to install retaining ring (6). Rotate the opening in retaining ring (6) by approximately
180 degrees from the notch in swing brake assembly (2).
Illustration 18 g00906314
22. Install discs and plates (5) into swing brake assembly (2).
Illustration 19 g00906313
23. Install plate (4).
9/12(W)
w
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/siswe...
11. Illustration 20 g00906311
Illustration 21 g00909003
Improper assembly of parts that are spring loaded can cause bodily
injury.
To prevent possible injury, follow the established assembly procedure
and wear protective equipment.
24. Use Tooling (B) and a suitable press in order to compress the spring. Use Tooling (C) to
install retaining ring (3).
10/12(W)
w
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/siswe...
12. Illustration 22 g01822733
25. Position Tooling (M) in order to measure the travel of piston (8). Connect Tooling (N) to
Port (P). Use Tooling (N) in order to apply 3000 kPa (435 psi) at Port (P). Record the
measured travel of piston (8) as Dimension (X).
a. The recorded Dimension (X) should be 1.2 mm (0.05 inch) to 1.4 mm (0.06 inch) on
machines that are equipped with the part number 152-7372 Swing Drive Gp.
b. The recorded Dimension (X) should be 1.1 mm (0.04 inch) to 1.3 mm (0.05 inch) on
machines that are equipped with the part number 152-7375 Swing Drive Gp.
Note: Outer plate (5) is available in different thicknesses. Use the correct thickness of
plate (5) in order to obtain the correct Dimension (X).
Illustration 23 g01027113
26. Install Tooling (A) and a suitable lifting device to swing brake assembly (2). The weight of
swing brake assembly (2) is approximately 75 kg (165 lb).
27. Position swing brake assembly (2) in swing brake housing (2A).
11/12(W)
w
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/siswe...
13. 28. Install bolts (1).
End By:
a. Install the swing drive. Refer to Disassembly and Assembly, "Swing Drive - Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Mon May 4 10:54:53 UTC+0800 2020
12/12(W)
w
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/siswe...
14. Shutdown SIS
Previous Screen
Product: WHEELED EXCAVATOR
Model: M315D WHEELED EXCAVATOR J5B
Configuration: M315D Excavator J5B00001-UP (MACHINE) POWERED BY C4.4 Engine
Disassembly and Assembly
M315D, M315D Series 2, M315D2, M317D Series 2 and M317D2 Wheeled Excavators
Machine Systems
Media Number -KENR6028-05 Publication Date -01/07/2015 Date Updated -08/07/2015
i02814911
Swing Drive - Install
SMCS - 5459-012
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 138-7575 Link Bracket 2
Illustration 1 g01403894
1. Use Tooling (A) and a suitable lifting device in order to install swing drive (4). The weight
of swing drive (4) is approximately 75 kg (165 lb).
2. Install bolts (5). Tighten bolts (5) to a torque of 260 ± 20 N·m (190 ± 15 lb ft).
1/2(W)
w
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/siswe...
15. Illustration 2 g01403892
3. Connect hose assembly (3). Connect hose assembly (2). Connect fitting (1).
End By:
a. Install the swing motor. Refer to Disassembly and Assembly, "Swing Motor - Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Mon May 4 10:55:55 UTC+0800 2020
2/2(W)
w
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/siswe...
16. Shutdown SIS
Previous Screen
Product: WHEELED EXCAVATOR
Model: M315D WHEELED EXCAVATOR J5B
Configuration: M315D Excavator J5B00001-UP (MACHINE) POWERED BY C4.4 Engine
Disassembly and Assembly
M315D, M315D Series 2, M315D2, M317D Series 2 and M317D2 Wheeled Excavators
Machine Systems
Media Number -KENR6028-05 Publication Date -01/07/2015 Date Updated -08/07/2015
i02811431
Upper Frame and Undercarriage Frame - Separate
SMCS - 4150-076; 7051-076
Separation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A
4C-6486 Stand 1
8S-7641 Tube 1
8S-7625 Collar 1
8S-8048 Saddle 1
8S-7617 Pin 2
8S-7650 Cylinder As 1
4C-5809 Electric Hydraulic Pump Gp 1
B 155-3597 Wheel Chock 2
C 228-4532 Link 1
D FT-2765 Support Beam As 1
E 4C-6486 Stand 2
8S-7621 Tube 2
8S-7625 Collar 2
8S-7617 Pin 4
1/6(W)
w
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/siswe...
17. 4C-5809 Electric Hydraulic Pump Gp 1
8S-7650 Cylinder As 2
Start By:
a. Remove the work tool or the bucket. Refer to Disassembly and Assembly, "Bucket -
Remove".
Note: Put identification marks on all hose assemblies and on all tube assemblies for installation
purposes.
1. Park the machine on level ground. Turn the upper frame to a 90 degree angle from the
undercarriage.
Illustration 1 g01405800
2. Connect link (1).
Illustration 2 g01402377
3. Extend the boom. Fully retract stick (2). Position stick (2) onto Tooling (A).
4. Release the hydraulic system pressure. Refer to Disassembly and Assembly, "Hydraulic
System Pressure - Release".
2/6(W)
w
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/siswe...
18. Illustration 3 g01321403
5. Install Tooling (B) in order to secure the undercarriage. Release the parking brake. Refer to
Operation and Maintenance Manual, "Parking Brake - Release".
6. Remove the swivel. Refer to Disassembly and Assembly, "Swivel - Remove".
7. Remove the right side boom cylinder. Refer to Disassembly and Assembly, "Boom Cylinder
- Remove and Install".
Illustration 4 g01402367
8. Use a suitable lifting device in order to install Tooling (C). The weight of Tooling (C) is
approximately 102 kg (225 lb).
3/6(W)
w
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/siswe...
19. Illustration 5 g01321423
9. Use a suitable lifting device to position Tooling (D) onto Tooling (E). The weight of
Tooling (D) is approximately 227 kg (500 lb).
Illustration 6 g01405812
4/6(W)
w
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/siswe...
20. Illustration 7 g01405815
Illustration 8 g01405810
10. Position Tooling (D) and Tooling (E) under upper structure (3).
11. Disconnect grease hose assembly (4).
12. Place an alignment mark on upper structure (3) and swing bearing (5) for assembly
purposes. Remove bolts (6).
13. Use Tooling (A), Tooling (D), and Tooling (E) in order to separate upper structure (3) from
undercarriage (7).
Note: Lift the upper structure in 1/4 inch increments. Ensure that the upper structure
remains level.
5/6(W)
w
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/siswe...
21. Illustration 9 g01321403
Illustration 10 g01402394
14. Remove Tooling (B).
15. Attach a suitable device to a properly rated machine in order to remove undercarriage (7).
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Mon May 4 10:56:58 UTC+0800 2020
6/6(W)
w
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/siswe...
22. Shutdown SIS
Previous Screen
Product: WHEELED EXCAVATOR
Model: M315D WHEELED EXCAVATOR J5B
Configuration: M315D Excavator J5B00001-UP (MACHINE) POWERED BY C4.4 Engine
Disassembly and Assembly
M315D, M315D Series 2, M315D2, M317D Series 2 and M317D2 Wheeled Excavators
Machine Systems
Media Number -KENR6028-05 Publication Date -01/07/2015 Date Updated -08/07/2015
i04640770
Upper Frame and Undercarriage Frame - Connect
SMCS - 4150-077; 7051-077
Connection Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A
4C-6486 Stand 1
8S-7641 Tube 1
8S-7625 Collar 1
8S-8048 Saddle 1
8S-7617 Pin 2
8S-7650 Cylinder As 1
4C-5809 Electric Hydraulic Pump Gp 1
B 155-3597 Wheel Chock 2
C 228-4532 Link 1
D FT-2765 Support Beam As 1
E 4C-6486 Stand 2
8S-7621 Tube 2
8S-7625 Collar 2
8S-7617 Pin 4
1/6(W)
w
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/siswe...
23. 4C-5809 Electric Hydraulic Pump Gp 1
8S-7650 Cylinder As 2
F 8C-8422 Sealant -
Illustration 1 g01402394
Illustration 2 g01405810
2/6(W)
w
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/siswe...
24. Illustration 3 g01405812
1. Use a suitable device in order to position undercarriage (7) below upper structure (3) .
Apply Tooling (F) to the mating surfaces of the swing gear, upper structure (3) , and
undercarriage (7) .
2. Use Tooling (A) , Tooling (D) , and Tooling (E) in order to position upper structure (3) onto
undercarriage (7) .
Illustration 4 g01405815
3. Align upper structure (3) and swing bearing (5) .
4. Install bolts (6) in order to connect upper structure (3) and undercarriage (7) . Tighten bolts
(6) to a torque of 300 + 30 - 0 N·m (221 + 22 - 0 lb ft).
5. Connect grease hose assembly (4) .
3/6(W)
w
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/siswe...
25. Illustration 5 g01321403
6. Position Tooling (B) .
Illustration 6 g01321423
7. Use a suitable lifting device in order to remove Tooling (D) from Tooling (E) . The weight
of Tooling (D) is approximately 227 kg (500 lb). Remove Tooling (E) .
4/6(W)
w
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/siswe...
26. Suggest:
If the above button click is invalid.
Please download this document
first, and then click the above link
to download the complete manual.
Thank you so much for reading
27. Illustration 7 g01402367
8. Use a suitable lifting device in order to remove Tooling (C) . The weight of Tooling (C) is
approximately 102 kg (225 lb).
9. Install the swivel. Refer to Disassembly and Assembly, "Swivel - Install".
10. Install the right side boom cylinder. Refer to Disassembly and Assembly, "Boom Cylinder -
Remove and Install".
Illustration 8 g01402377
11. Remove Tooling (A) from stick (2) . Retract the boom. Extend stick (2) and lower stick (2)
to the ground.
5/6(W)
w
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/siswe...