This document provides disassembly instructions for a final drive on an excavator model 330D L. It outlines 32 steps to fully disassemble the final drive. Key steps include removing the final drive cover, gears, carrier assemblies, planetary gear assemblies, and ring gear. Proper safety equipment and lifting devices are required due to the heavy weights involved, such as the 550 kg weight of the entire final drive assembly. Cleanliness is important to prevent dirt from entering during disassembly.
Caterpillar Cat 330D and 330D L Excavator (Prefix NBD) Service Repair Manual ...f8uejkdkdmm3e
The document provides disassembly instructions for a final drive on an excavator model 330D L. It outlines 32 steps to fully disassemble the final drive. Key components that are disassembled include the drive housing, three planetary gear assemblies, carrier assemblies, ring gear, and other internal gears, shafts, seals and bearings. Special tools are required for pressing, pulling, and removing components. Proper lifting devices and safety precautions are noted due to the heavy weights of components ranging from 32 to 550 kg.
Caterpillar Cat 330D and 330D L Excavator (Prefix NBD) Service Repair Manual ...f89siekkmdmm2w
This document provides disassembly instructions for a final drive on excavator models 330D and 330D L. The procedure involves 32 steps and requires various tools. Key steps include removing the final drive cover, gears, carrier assembly, planetary gear assembly, and housing components. Disassembly of the planetary gear assembly requires pressing out shafts and removing individual parts like springs pins, washers, bearings, and gears. Cleanliness is important during disassembly to prevent dirt from entering internal mechanisms.
The document provides disassembly instructions for a final drive on an excavator model 330D L. It outlines 32 steps to fully disassemble the final drive. Key components that are disassembled include the drive housing, three planetary gear assemblies, carrier assemblies, ring gear, and other internal gears, shafts, seals and bearings. Special tools are required for pressing, pulling, and removing components. Proper lifting devices and safety precautions are noted due to the heavy weights of components ranging from 32 to 550 kg.
This document provides disassembly instructions for a final drive on excavator models 330D and 330D L. The procedure involves 32 steps and requires various tools. Key steps include removing the final drive cover, gears, carrier assembly, planetary gear assembly, and housing components. Disassembly of the planetary gear assembly requires pressing out shafts and removing washers, bearings, and gears. Cleanliness is important during disassembly to prevent dirt from entering internal mechanisms.
Caterpillar Cat 330D L Excavator (Prefix NBD) Service Repair Manual (NBD00001...fujsekmd9idd
The document provides disassembly instructions for a final drive on an excavator model 330D L. It outlines 32 steps to fully disassemble the final drive. Key components that are disassembled include the drive housing, three planetary gear assemblies, carrier assemblies, ring gear, and other internal gears, shafts, seals and bearings. Special tools are required for pressing, pulling, and removing components. Proper lifting devices and safety precautions are noted due to the heavy weights of components ranging from 32 to 550 kg.
Caterpillar Cat 330D L Excavator (Prefix NBD) Service Repair Manual (NBD00001...fuusejkddmmd3e
This document provides disassembly instructions for a final drive on excavator models 330D and 330D L. The procedure involves 32 steps and requires various tools. Key steps include removing the final drive cover, gears, carrier assembly, planetary gear assembly, and housing components. Disassembly of the planetary gear assembly requires pressing out shafts and removing washers, bearings, and gears. Cleanliness is important during disassembly to prevent dirt from entering internal mechanisms.
Caterpillar Cat 330D and 330D L Excavator (Prefix NBD) Service Repair Manual ...shibi1322
The document provides disassembly instructions for a final drive on an excavator model 330D L. It outlines 32 steps to fully disassemble the final drive. Key components that are disassembled include the drive housing, three planetary gear assemblies, carrier assemblies, ring gear, and other internal gears, shafts, seals and bearings. Special tools are required for pressing, pulling, and removing components. Proper lifting devices and safety precautions are noted due to the heavy weights of components ranging from 32 to 550 kg.
Caterpillar cat 330 d excavator (prefix nbd) service repair manual (nbd00001 ...diskdkkdmmd
This document provides disassembly instructions for a final drive on excavator models 330D and 330D L. The procedure involves 32 steps and requires various tools. Key steps include removing the final drive cover, gears, carrier assembly, planetary gear assembly, and housing components. Disassembly of the planetary gear assembly requires pressing out shafts and removing individual parts like springs pins, washers, bearings, and gears. Cleanliness is important during disassembly to prevent dirt from entering internal mechanisms.
Caterpillar Cat 330D and 330D L Excavator (Prefix NBD) Service Repair Manual ...f8uejkdkdmm3e
The document provides disassembly instructions for a final drive on an excavator model 330D L. It outlines 32 steps to fully disassemble the final drive. Key components that are disassembled include the drive housing, three planetary gear assemblies, carrier assemblies, ring gear, and other internal gears, shafts, seals and bearings. Special tools are required for pressing, pulling, and removing components. Proper lifting devices and safety precautions are noted due to the heavy weights of components ranging from 32 to 550 kg.
Caterpillar Cat 330D and 330D L Excavator (Prefix NBD) Service Repair Manual ...f89siekkmdmm2w
This document provides disassembly instructions for a final drive on excavator models 330D and 330D L. The procedure involves 32 steps and requires various tools. Key steps include removing the final drive cover, gears, carrier assembly, planetary gear assembly, and housing components. Disassembly of the planetary gear assembly requires pressing out shafts and removing individual parts like springs pins, washers, bearings, and gears. Cleanliness is important during disassembly to prevent dirt from entering internal mechanisms.
The document provides disassembly instructions for a final drive on an excavator model 330D L. It outlines 32 steps to fully disassemble the final drive. Key components that are disassembled include the drive housing, three planetary gear assemblies, carrier assemblies, ring gear, and other internal gears, shafts, seals and bearings. Special tools are required for pressing, pulling, and removing components. Proper lifting devices and safety precautions are noted due to the heavy weights of components ranging from 32 to 550 kg.
This document provides disassembly instructions for a final drive on excavator models 330D and 330D L. The procedure involves 32 steps and requires various tools. Key steps include removing the final drive cover, gears, carrier assembly, planetary gear assembly, and housing components. Disassembly of the planetary gear assembly requires pressing out shafts and removing washers, bearings, and gears. Cleanliness is important during disassembly to prevent dirt from entering internal mechanisms.
Caterpillar Cat 330D L Excavator (Prefix NBD) Service Repair Manual (NBD00001...fujsekmd9idd
The document provides disassembly instructions for a final drive on an excavator model 330D L. It outlines 32 steps to fully disassemble the final drive. Key components that are disassembled include the drive housing, three planetary gear assemblies, carrier assemblies, ring gear, and other internal gears, shafts, seals and bearings. Special tools are required for pressing, pulling, and removing components. Proper lifting devices and safety precautions are noted due to the heavy weights of components ranging from 32 to 550 kg.
Caterpillar Cat 330D L Excavator (Prefix NBD) Service Repair Manual (NBD00001...fuusejkddmmd3e
This document provides disassembly instructions for a final drive on excavator models 330D and 330D L. The procedure involves 32 steps and requires various tools. Key steps include removing the final drive cover, gears, carrier assembly, planetary gear assembly, and housing components. Disassembly of the planetary gear assembly requires pressing out shafts and removing washers, bearings, and gears. Cleanliness is important during disassembly to prevent dirt from entering internal mechanisms.
Caterpillar Cat 330D and 330D L Excavator (Prefix NBD) Service Repair Manual ...shibi1322
The document provides disassembly instructions for a final drive on an excavator model 330D L. It outlines 32 steps to fully disassemble the final drive. Key components that are disassembled include the drive housing, three planetary gear assemblies, carrier assemblies, ring gear, and other internal gears, shafts, seals and bearings. Special tools are required for pressing, pulling, and removing components. Proper lifting devices and safety precautions are noted due to the heavy weights of components ranging from 32 to 550 kg.
Caterpillar cat 330 d excavator (prefix nbd) service repair manual (nbd00001 ...diskdkkdmmd
This document provides disassembly instructions for a final drive on excavator models 330D and 330D L. The procedure involves 32 steps and requires various tools. Key steps include removing the final drive cover, gears, carrier assembly, planetary gear assembly, and housing components. Disassembly of the planetary gear assembly requires pressing out shafts and removing individual parts like springs pins, washers, bearings, and gears. Cleanliness is important during disassembly to prevent dirt from entering internal mechanisms.
The document provides disassembly instructions for a final drive on an excavator model 330D L. It outlines 32 steps to fully disassemble the final drive. Key components that are disassembled include the drive housing, planetary gear assemblies, ring gear, carrier assemblies, and individual planet gears. Tools required include link brackets and forcing bolts to remove components. Safety notes are provided to mark parts for reassembly and use lifting devices due to component weights up to 550 kg.
Caterpillar Cat 330D L Excavator (Prefix NBD) Service Repair Manual (NBD00001...jdksmmdmdd
The document provides disassembly instructions for a final drive on an excavator model 330D L. It outlines 32 steps to fully disassemble the final drive. Key components that are disassembled include the drive housing, three planetary gear assemblies, carrier assemblies, ring gear, and other internal gears, shafts, seals and bearings. Special tools are required for removal of some components, and safety notes are provided about cleanliness and using lifting devices due to component weights up to 550 kg.
Caterpillar cat 330 d l excavator (prefix nbd) service repair manual (nbd0000...diskdkkdmmd
This document provides disassembly instructions for a final drive on excavator models 330D and 330D L. The procedure involves 32 steps and requires various tools. Key steps include removing the final drive cover, gears, carrier assembly, planetary gear assembly, and housing components. Disassembly of the planetary gear assembly requires pressing out shafts and removing individual parts like springs pins, washers, bearings, and gears. Cleanliness is important during disassembly to prevent dirt from entering internal mechanisms.
Caterpillar Cat 330D L Excavator (Prefix NBD) Service Repair Manual (NBD00001...fujkse9didkke3
This document provides disassembly instructions for a final drive on excavator models 330D and 330D L. The procedure involves 32 steps and requires various tools. Key steps include removing the final drive cover, gears, carrier assembly, planetary gear assembly, and housing components. Disassembly of the planetary gear assembly requires pressing out shafts and removing washers, bearings, and gears. Cleanliness is important during disassembly to prevent dirt from entering internal mechanisms.
This document provides disassembly instructions for a final drive on excavator models 330D and 330D L. The procedure involves 32 steps and requires various tools. Key steps include removing the final drive cover, gears, carrier assembly, planetary gear assembly, and housing components. Disassembly of the planetary gear assembly requires pressing out shafts and removing individual parts like springs pins, washers, bearings, and gears. Cleanliness is important during disassembly to prevent dirt from entering internal mechanisms.
Caterpillar Cat 330D and 330D L Excavator (Prefix NBD) Service Repair Manual ...yin9niaojiao
The document provides disassembly instructions for a final drive on an excavator model 330D L. It outlines 32 steps to fully disassemble the final drive. Key components that are disassembled include the drive housing, three planetary gear assemblies, carrier assemblies, ring gear, and other internal gears, shafts, seals and bearings. Special tools are required for pressing, pulling, and removing components. Proper lifting devices and safety precautions are noted due to the heavy weights of components ranging from 32 to 550 kg.
This document provides assembly instructions for a piston pump used in a wheeled excavator model M320F. It consists of 50 steps to assemble the various components of the pump in the correct order. The components include springs, retainers, seals, valves, plates, bushings, shafts, and other parts. Precautions are provided for parts that are spring loaded to prevent injury during assembly.
The document provides instructions for disassembling and assembling the final drive carriers, hubs, and brakes of a M320F wheeled excavator. It lists the required tools and gives step-by-step procedures for removing and installing components such as the carrier housing, planetary gears, brake discs, seals, and bearings. Clearances for the brake discs are also specified to ensure proper functioning.
This document provides assembly instructions for an M318 excavator transmission. It lists required tools and parts, and provides step-by-step instructions to assemble the transmission components, including gears, shafts, seals, bearings, and housing. Proper end play is checked at several steps. Lubricants are specified, and cleanliness during assembly is emphasized.
Caterpillar Cat M315 Excavator (Prefix 7ML) Service Repair Manual (7ML00001-0...orrf0370383
This document provides instructions for removing and installing a swing motor and swing drive on an M315 excavator. It describes releasing hydraulic pressure, draining oil, disconnecting hoses, and removing and installing various components like bolts, seals, and motors. Safety precautions are provided regarding containing fluids, releasing pressure, and preventing personal injury. Detailed step-by-step instructions are given for disassembly and reassembly.
The document provides removal and installation instructions for a precooler, water temperature regulator housing, water pump, and other engine components. It includes notices about containing fluids, keeping parts clean, and lists required tools. The step-by-step instructions describe disconnecting hoses and electrical connections, removing mounting bolts and components, and installing parts in reverse order while applying sealant compounds as needed. Illustrations show the component locations and part numbers.
This document provides instructions for installing and removing components of the front gear group of a C18 industrial engine. It describes:
1. Cleaning and inspecting components before installation and removing components in reverse order of installation.
2. Installing the front plate and gears, including adjusting backlash between gears.
3. Lubricating and torquing fasteners to specified values.
This document provides instructions for removing and installing a flywheel housing on a C18 Industrial Engine WJB. It is a 3-page service manual excerpt that describes:
1) Required tools and safety notices
2) Removal procedure which includes supporting the engine, removing bolts and lifting the housing off
3) Installation procedure which includes cleaning, applying sealant, positioning the housing and tightening bolts in a specific sequence and torque.
The document provides instructions for installing an engine oil filter base which includes:
1. Lubricating the O-rings and installing them on the engine oil filter base.
2. Positioning the engine oil filter base and installing bolts to secure it.
3. Reconnecting any disconnected tubes.
The instructions are intended for technicians and include safety warnings for containing fluids and wearing protective equipment when working with pressurized parts.
1) The document provides disassembly and assembly instructions for removing and installing various components of a C18 industrial engine, including the power take-off drive group, vibration damper and pulley, crankshaft front seal, and front cover.
2) The instructions include lists of required tools and detailed step-by-step procedures with accompanying illustrations.
3) Special notes are provided regarding keeping parts clean, inspecting components, and not using lubricants during certain installation procedures.
The document provides instructions for removing and installing various fuel system components on a C18 Industrial Engine, including:
- Removing and installing the fuel priming pump.
- Removing the fuel filter base and disassembling/assembling its components.
- Removing and installing the fuel transfer pump.
- Removing the electronic unit injectors.
The summaries provide concise overviews of the removal and installation procedures for each component in 3 sentences or less.
This document provides instructions for removing and installing various fuel system components on a Caterpillar C18 Industrial Engine, including:
1) Removing and installing the fuel priming pump, fuel filter base, fuel transfer pump, and electronic unit injectors.
2) Disassembling and assembling the fuel filter base to replace seals and fittings.
3) Procedures include disconnecting fuel lines and electrical connections, marking parts for reinstallation, and applying thread lock compounds. Safety notices advise containing fluids and preventing contamination.
This service repair manual provides instructions for removing and installing inlet and exhaust valves, valve guides, valve seat inserts, and the engine oil filter base on a Caterpillar C11 industrial engine. The procedures describe using various tools to remove and install components in a specific sequence, and include notices about keeping parts clean and containing fluids.
This document provides instructions for removing and installing various engine components on a Caterpillar C11 Industrial Engine. It describes procedures for removing and installing inlet and exhaust valves, valve guides, valve seat inserts, the engine oil filter base, and the engine oil cooler. The document contains illustrations and lists required tools for each procedure.
This document provides instructions for removing and installing a unit injector, unit injector sleeve, and turbocharger from a C9.3 Industrial Engine. The unit injector removal procedure involves disconnecting electrical and fuel lines, loosening mounting bolts, and extracting the injector. Installation requires cleaning, lubricating seals, and tightening bolts. The sleeve procedure includes draining coolant, cutting threads to remove the old sleeve, cleaning the bore, applying retaining compound to the new sleeve, and installing with a hammer and driver. The turbocharger removal involves disconnecting coolant and air lines and removing mounting nuts. Installation requires applying anti-seize to bolts and tightening clamps and nuts.
This document provides instructions for disassembling and assembling the freewheel stator component of a torque converter. The disassembly process involves using various tools to remove over 30 individual parts in a specific sequence. Cleanliness is emphasized. The assembly process reverses the disassembly steps and provides additional details like proper orientation and torque specifications for reinstalling components.
This document provides instructions for disassembling and assembling the torque converter of a 966H wheel loader. It begins with required tools and safety notices. The disassembly instructions describe removing over 30 individual parts in multiple steps, including the torque converter housing, impeller, stator, carrier shaft, and turbine. The assembly section then lists the components and provides the reverse steps for reassembling the torque converter. Cleanliness is emphasized as important during disassembly and assembly.
More Related Content
Similar to Caterpillar Cat 330D L Excavator (Prefix ERN) Service Repair Manual (ERN00001 and up).pdf
The document provides disassembly instructions for a final drive on an excavator model 330D L. It outlines 32 steps to fully disassemble the final drive. Key components that are disassembled include the drive housing, planetary gear assemblies, ring gear, carrier assemblies, and individual planet gears. Tools required include link brackets and forcing bolts to remove components. Safety notes are provided to mark parts for reassembly and use lifting devices due to component weights up to 550 kg.
Caterpillar Cat 330D L Excavator (Prefix NBD) Service Repair Manual (NBD00001...jdksmmdmdd
The document provides disassembly instructions for a final drive on an excavator model 330D L. It outlines 32 steps to fully disassemble the final drive. Key components that are disassembled include the drive housing, three planetary gear assemblies, carrier assemblies, ring gear, and other internal gears, shafts, seals and bearings. Special tools are required for removal of some components, and safety notes are provided about cleanliness and using lifting devices due to component weights up to 550 kg.
Caterpillar cat 330 d l excavator (prefix nbd) service repair manual (nbd0000...diskdkkdmmd
This document provides disassembly instructions for a final drive on excavator models 330D and 330D L. The procedure involves 32 steps and requires various tools. Key steps include removing the final drive cover, gears, carrier assembly, planetary gear assembly, and housing components. Disassembly of the planetary gear assembly requires pressing out shafts and removing individual parts like springs pins, washers, bearings, and gears. Cleanliness is important during disassembly to prevent dirt from entering internal mechanisms.
Caterpillar Cat 330D L Excavator (Prefix NBD) Service Repair Manual (NBD00001...fujkse9didkke3
This document provides disassembly instructions for a final drive on excavator models 330D and 330D L. The procedure involves 32 steps and requires various tools. Key steps include removing the final drive cover, gears, carrier assembly, planetary gear assembly, and housing components. Disassembly of the planetary gear assembly requires pressing out shafts and removing washers, bearings, and gears. Cleanliness is important during disassembly to prevent dirt from entering internal mechanisms.
This document provides disassembly instructions for a final drive on excavator models 330D and 330D L. The procedure involves 32 steps and requires various tools. Key steps include removing the final drive cover, gears, carrier assembly, planetary gear assembly, and housing components. Disassembly of the planetary gear assembly requires pressing out shafts and removing individual parts like springs pins, washers, bearings, and gears. Cleanliness is important during disassembly to prevent dirt from entering internal mechanisms.
Caterpillar Cat 330D and 330D L Excavator (Prefix NBD) Service Repair Manual ...yin9niaojiao
The document provides disassembly instructions for a final drive on an excavator model 330D L. It outlines 32 steps to fully disassemble the final drive. Key components that are disassembled include the drive housing, three planetary gear assemblies, carrier assemblies, ring gear, and other internal gears, shafts, seals and bearings. Special tools are required for pressing, pulling, and removing components. Proper lifting devices and safety precautions are noted due to the heavy weights of components ranging from 32 to 550 kg.
Similar to Caterpillar Cat 330D L Excavator (Prefix ERN) Service Repair Manual (ERN00001 and up).pdf (6)
This document provides assembly instructions for a piston pump used in a wheeled excavator model M320F. It consists of 50 steps to assemble the various components of the pump in the correct order. The components include springs, retainers, seals, valves, plates, bushings, shafts, and other parts. Precautions are provided for parts that are spring loaded to prevent injury during assembly.
The document provides instructions for disassembling and assembling the final drive carriers, hubs, and brakes of a M320F wheeled excavator. It lists the required tools and gives step-by-step procedures for removing and installing components such as the carrier housing, planetary gears, brake discs, seals, and bearings. Clearances for the brake discs are also specified to ensure proper functioning.
This document provides assembly instructions for an M318 excavator transmission. It lists required tools and parts, and provides step-by-step instructions to assemble the transmission components, including gears, shafts, seals, bearings, and housing. Proper end play is checked at several steps. Lubricants are specified, and cleanliness during assembly is emphasized.
Caterpillar Cat M315 Excavator (Prefix 7ML) Service Repair Manual (7ML00001-0...orrf0370383
This document provides instructions for removing and installing a swing motor and swing drive on an M315 excavator. It describes releasing hydraulic pressure, draining oil, disconnecting hoses, and removing and installing various components like bolts, seals, and motors. Safety precautions are provided regarding containing fluids, releasing pressure, and preventing personal injury. Detailed step-by-step instructions are given for disassembly and reassembly.
The document provides removal and installation instructions for a precooler, water temperature regulator housing, water pump, and other engine components. It includes notices about containing fluids, keeping parts clean, and lists required tools. The step-by-step instructions describe disconnecting hoses and electrical connections, removing mounting bolts and components, and installing parts in reverse order while applying sealant compounds as needed. Illustrations show the component locations and part numbers.
This document provides instructions for installing and removing components of the front gear group of a C18 industrial engine. It describes:
1. Cleaning and inspecting components before installation and removing components in reverse order of installation.
2. Installing the front plate and gears, including adjusting backlash between gears.
3. Lubricating and torquing fasteners to specified values.
This document provides instructions for removing and installing a flywheel housing on a C18 Industrial Engine WJB. It is a 3-page service manual excerpt that describes:
1) Required tools and safety notices
2) Removal procedure which includes supporting the engine, removing bolts and lifting the housing off
3) Installation procedure which includes cleaning, applying sealant, positioning the housing and tightening bolts in a specific sequence and torque.
The document provides instructions for installing an engine oil filter base which includes:
1. Lubricating the O-rings and installing them on the engine oil filter base.
2. Positioning the engine oil filter base and installing bolts to secure it.
3. Reconnecting any disconnected tubes.
The instructions are intended for technicians and include safety warnings for containing fluids and wearing protective equipment when working with pressurized parts.
1) The document provides disassembly and assembly instructions for removing and installing various components of a C18 industrial engine, including the power take-off drive group, vibration damper and pulley, crankshaft front seal, and front cover.
2) The instructions include lists of required tools and detailed step-by-step procedures with accompanying illustrations.
3) Special notes are provided regarding keeping parts clean, inspecting components, and not using lubricants during certain installation procedures.
The document provides instructions for removing and installing various fuel system components on a C18 Industrial Engine, including:
- Removing and installing the fuel priming pump.
- Removing the fuel filter base and disassembling/assembling its components.
- Removing and installing the fuel transfer pump.
- Removing the electronic unit injectors.
The summaries provide concise overviews of the removal and installation procedures for each component in 3 sentences or less.
This document provides instructions for removing and installing various fuel system components on a Caterpillar C18 Industrial Engine, including:
1) Removing and installing the fuel priming pump, fuel filter base, fuel transfer pump, and electronic unit injectors.
2) Disassembling and assembling the fuel filter base to replace seals and fittings.
3) Procedures include disconnecting fuel lines and electrical connections, marking parts for reinstallation, and applying thread lock compounds. Safety notices advise containing fluids and preventing contamination.
This service repair manual provides instructions for removing and installing inlet and exhaust valves, valve guides, valve seat inserts, and the engine oil filter base on a Caterpillar C11 industrial engine. The procedures describe using various tools to remove and install components in a specific sequence, and include notices about keeping parts clean and containing fluids.
This document provides instructions for removing and installing various engine components on a Caterpillar C11 Industrial Engine. It describes procedures for removing and installing inlet and exhaust valves, valve guides, valve seat inserts, the engine oil filter base, and the engine oil cooler. The document contains illustrations and lists required tools for each procedure.
This document provides instructions for removing and installing a unit injector, unit injector sleeve, and turbocharger from a C9.3 Industrial Engine. The unit injector removal procedure involves disconnecting electrical and fuel lines, loosening mounting bolts, and extracting the injector. Installation requires cleaning, lubricating seals, and tightening bolts. The sleeve procedure includes draining coolant, cutting threads to remove the old sleeve, cleaning the bore, applying retaining compound to the new sleeve, and installing with a hammer and driver. The turbocharger removal involves disconnecting coolant and air lines and removing mounting nuts. Installation requires applying anti-seize to bolts and tightening clamps and nuts.
This document provides instructions for disassembling and assembling the freewheel stator component of a torque converter. The disassembly process involves using various tools to remove over 30 individual parts in a specific sequence. Cleanliness is emphasized. The assembly process reverses the disassembly steps and provides additional details like proper orientation and torque specifications for reinstalling components.
This document provides instructions for disassembling and assembling the torque converter of a 966H wheel loader. It begins with required tools and safety notices. The disassembly instructions describe removing over 30 individual parts in multiple steps, including the torque converter housing, impeller, stator, carrier shaft, and turbine. The assembly section then lists the components and provides the reverse steps for reassembling the torque converter. Cleanliness is emphasized as important during disassembly and assembly.
This document provides instructions for removing and installing the rear gear group and flywheel on a Caterpillar C11 engine. The removal procedure involves using various tools to remove 12 different components in 11 steps. The installation procedure involves 14 steps of reinstalling components and includes notes about matching dimensions and applying threadlock. Tools, torque specifications, and cautions are provided.
This document provides instructions for disassembling and assembling the piston pump of the steering system on a Caterpillar 962K wheel loader. The disassembly procedure outlines 28 steps to remove components like bolts, valves, spools, springs, and bearings. The assembly procedure describes 34 steps and cautions to install these components in reverse order and ensure proper spring tension, seals, and shaft clearance. Precautions are included to prevent injury from released spring forces.
This document provides instructions for assembling and disassembling parts of a 962K wheel loader. It includes 37 steps to assemble a piston pump, with diagrams showing each step. It also provides procedures for removing and installing a main control valve and electrohydraulic control components, with warnings about releasing pressure before servicing hydraulic systems.
The document provides instructions for removing and installing a secondary steering pump and electric motor on a Caterpillar 962K wheel loader. It outlines 28 steps for disassembly of the pump which includes removing valves, spools, plugs, springs, and other internal components. The assembly section details 34 steps for reinstalling these parts in the reverse order and adjusting axial shaft end play.
Implementing ELDs or Electronic Logging Devices is slowly but surely becoming the norm in fleet management. Why? Well, integrating ELDs and associated connected vehicle solutions like fleet tracking devices lets businesses and their in-house fleet managers reap several benefits. Check out the post below to learn more.
Welcome to ASP Cranes, your trusted partner for crane solutions in Raipur, Chhattisgarh! With years of experience and a commitment to excellence, we offer a comprehensive range of crane services tailored to meet your lifting and material handling needs.
At ASP Cranes, we understand the importance of reliable and efficient crane operations in various industries, from construction and manufacturing to logistics and infrastructure development. That's why we strive to deliver top-notch solutions that enhance productivity, safety, and cost-effectiveness for our clients.
Our services include:
Crane Rental: Whether you need a crawler crane for heavy lifting or a hydraulic crane for versatile operations, we have a diverse fleet of well-maintained cranes available for rent. Our rental options are flexible and can be customized to suit your project requirements.
Crane Sales: Looking to invest in a crane for your business? We offer a wide selection of new and used cranes from leading manufacturers, ensuring you find the perfect equipment to match your needs and budget.
Crane Maintenance and Repair: To ensure optimal performance and safety, regular maintenance and timely repairs are essential for cranes. Our team of skilled technicians provides comprehensive maintenance and repair services to keep your equipment running smoothly and minimize downtime.
Crane Operator Training: Proper training is crucial for safe and efficient crane operation. We offer specialized training programs conducted by certified instructors to equip operators with the skills and knowledge they need to handle cranes effectively.
Custom Solutions: We understand that every project is unique, which is why we offer custom crane solutions tailored to your specific requirements. Whether you need modifications, attachments, or specialized equipment, we can design and implement solutions that meet your needs.
At ASP Cranes, customer satisfaction is our top priority. We are dedicated to delivering reliable, cost-effective, and innovative crane solutions that exceed expectations. Contact us today to learn more about our services and how we can support your project in Raipur, Chhattisgarh, and beyond. Let ASP Cranes be your trusted partner for all your crane needs!
Charging Fueling & Infrastructure (CFI) Program by Kevin MillerForth
Kevin Miller, Senior Advisor, Business Models of the Joint Office of Energy and Transportation gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
Understanding Catalytic Converter Theft:
What is a Catalytic Converter?: Learn about the function of catalytic converters in vehicles and why they are targeted by thieves.
Why are They Stolen?: Discover the valuable metals inside catalytic converters (such as platinum, palladium, and rhodium) that make them attractive to criminals.
Steps to Prevent Catalytic Converter Theft:
Parking Strategies: Tips on where and how to park your vehicle to reduce the risk of theft, such as parking in well-lit areas or secure garages.
Protective Devices: Overview of various anti-theft devices available, including catalytic converter locks, shields, and alarms.
Etching and Marking: The benefits of etching your vehicle’s VIN on the catalytic converter or using a catalytic converter marking kit to make it traceable and less appealing to thieves.
Surveillance and Monitoring: Recommendations for using security cameras and motion-sensor lights to deter thieves.
Statistics and Insights:
Theft Rates by Borough: Analysis of data to determine which borough in NYC experiences the highest rate of catalytic converter thefts.
Recent Trends: Current trends and patterns in catalytic converter thefts to help you stay aware of emerging hotspots and tactics used by thieves.
Benefits of This Presentation:
Awareness: Increase your awareness about catalytic converter theft and its impact on vehicle owners.
Practical Tips: Gain actionable insights and tips to effectively prevent catalytic converter theft.
Local Insights: Understand the specific risks in different NYC boroughs, helping you take targeted preventive measures.
This presentation aims to equip you with the knowledge and tools needed to protect your vehicle from catalytic converter theft, ensuring you are prepared and proactive in safeguarding your property.
EV Charging at MFH Properties by Whitaker JamiesonForth
Whitaker Jamieson, Senior Specialist at Forth, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
Charging Fueling & Infrastructure (CFI) Program Resources by Cat PleinForth
Cat Plein, Development & Communications Director of Forth, gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
Charging and Fueling Infrastructure Grant: Round 2 by Brandt HertensteinForth
Brandt Hertenstein, Program Manager of the Electrification Coalition gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
Expanding Access to Affordable At-Home EV Charging by Vanessa WarheitForth
Vanessa Warheit, Co-Founder of EV Charging for All, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
2. Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Transmission Repair Stand 1
B 138-7573 Link Bracket 2
C 1P-1863 Retaining Ring Pliers 1
D 208-6033 Spanner Socket 1
E 138-7574 Link Bracket 2
F
5F-7366 Forcing Screw 1
1P-5546 Crossblock 1
1U-9889 Crossblock 1
1P-0520 Driver Group 1
6V-7888 Puller Leg 2
1H-3112 Puller Assembly 1
1P-5551 Adjustable Screw Assembly 1
G
1U-7600 Slide Hammer Puller Gp 1
8T-0266 Bolt 1
Start By:
A. Remove the final drive. Refer to Disassembly and Assembly, "Final Drive - Remove".
Note: Cleanliness is an important factor. Before the disassembly procedure, the thoroughly
clean the exterior of the component. This will prevent dirt from entering the internal
mechanism.
Note: Some of the images that are in this procedure do not show the sprocket assembly that
is attached to the final drive housing. If necessary, the weights that are given include the
weight of the sprocket assembly.
1. Put an alignment mark across the sections of the final drive for assembly purposes. The
parts must be reinstalled in the part's original locations.
2/14(W)
w
2020/8/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
3. Illustration 1 g00708089
2. Fasten the final drive to Tooling (A) , as shown. The weight of the final drive assembly is
approximately 312 kg (688 lb).
3. Remove bolts (1) and the washers that hold the cover in position.
Illustration 2 g00708090
4. Remove the setscrews from the cover. Fasten Tooling (B) and a suitable lifting device to
cover (2) , as shown. Remove the cover. The weight of the cover is approximately 32 kg (70
lb).
3/14(W)
w
2020/8/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
4. Illustration 3 g00879362
5. Remove bolts (3) . Remove gear (5) . Check plate (6) . Replace plate (6) if wear is shown.
Remove plugs (4) from cover (2) .
Illustration 4 g00879365
6. Remove O-ring seal (7) from plugs (4) .
Illustration 5 g00780428
4/14(W)
w
2020/8/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
5. 7. Remove gear (8) . Remove spacer (9) .
Illustration 6 g00780432
8. Remove retaining ring (10) with Tooling (C) . Remove washer (11) . Remove gear (12) .
Remove bearing assembly (13) . Remove second washer (11) .
9. Repeat Step 8 for the remaining two gear assemblies.
Illustration 7 g00781401
10. Remove retaining ring (14) .
5/14(W)
w
2020/8/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
6. Illustration 8 g00781407
11. Remove carrier assembly (15) .
Illustration 9 g01389593
12. Use a suitable press in order to remove the shafts from carrier assembly (15) .
6/14(W)
w
2020/8/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
8. 16. Disassemble carrier assembly (19) , as follows.
a. Drive spring pin (20) into planetary shaft (21) with a hammer and a punch.
Illustration 13 g00781476
b. Remove planetary shaft (21) .
c. Remove spring pin (20) from planetary shaft (21) with a hammer and a punch.
Illustration 14 g00781516
d. Remove thrust washers (22) and planetary gear (24) from the carrier assembly.
e. Remove bearing (23) from planetary gear (24) .
17. Repeat Steps 16.a through 16.e for the other two planetary.
8/14(W)
w
2020/8/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
9. Illustration 15 g00781529
18. Remove gear (25) . Remove spacer (26) .
Illustration 16 g00781559
19. Remove carrier assembly (27) .
20. Use two people to remove carrier assembly (27) . The weight of the carrier assembly is
approximately 38 kg (85 lb).
21. Disassemble carrier assembly (27) , as follows.
9/14(W)
w
2020/8/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
10. Illustration 17 g00781719
a. Drive spring pin (29) into planetary shaft (28) with a hammer and a punch.
Illustration 18 g00781601
b. Remove planetary shaft (28) .
c. Remove spring pin (29) from planetary shaft (28) with a hammer and a punch.
Illustration 19 g00781607
d. Remove thrust washers (30) and planetary gear (32) from the carrier assembly.
e. Remove two bearings (31) from the planetary gear.
22. Repeat Steps 21.a through 21.e for the other two planetary gears.
10/14(W)
w
2020/8/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
11. Illustration 20 g00781730
23. Use two people to remove gear (33) . The weight of gear is approximately 41 kg (90 lb).
Illustration 21 g00781807
24. Remove O-ring seal (34) .
Illustration 22 g01147650
25. Remove bolts (35A) and plates (35B) .
11/14(W)
w
2020/8/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
12. Illustration 23 g01147651
26. Use Tooling (G) to remove dowel (37) from stopper plate (35) .
Illustration 24 g01147759
27. Secure Tooling (D) to stopper plate (35) . Use Tooling (D) to remove stopper plate (35) .
12/14(W)
w
2020/8/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
13. Illustration 25 g01147930
28. Use Tooling (E) and a suitable lifting device to remove housing (36) . The weight of
housing (36) is approximately 100 kg (220 lb).
Illustration 26 g01147951
29. Remove Duo-Cone seal (39A) from housing (38) .
Illustration 27 g01147975
13/14(W)
w
2020/8/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
14. Illustration 28 g01147934
30. Remove Duo-Cone seal (39B) from housing (36) .
31. Use Tooling (F) in order to remove bearings (40) and (41) from housing (36) .
32. If necessary, remove the final drive sprocket from the sprocket housing. Refer to
Disassembly and Assembly, "Final Drive Sprocket - Remove and Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Mon Aug 17 14:05:20 UTC+0800 2020
14/14(W)
w
2020/8/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
15. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 330D L EXCAVATOR ERN
Configuration: 330D Excavator ERN00001-UP (MACHINE) POWERED BY C-9 Engine
Disassembly and Assembly
330D, 336D, 336D2, 340D and 340D2 Excavators and 336D MHPU Mobile Hydraulic
Power Unit Machine Systems
Media Number -RENR8648-30 Publication Date -01/03/2015 Date Updated -15/08/2018
i06252413
Final Drive - Disassemble - Type-Two
SMCS - 4050-015
S/N - B6H568-UP
S/N - DTS1-UP
S/N - EAH1-UP
S/N - EDX1-UP
S/N - EFT1-UP
S/N - ERN275-UP
S/N - FAR1-UP
S/N - FFK1-UP
S/N - GGE1-UP
S/N - GGH1-UP
S/N - HHK1-UP
S/N - J2F1-UP
S/N - JBT1-UP
S/N - JLP299-UP
S/N - JTN1-UP
S/N - JWR1-UP
1/19(W)
w
2020/8/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
17. S/N - XBH1-UP
S/N - YCF1-UP
S/N - ZCT1-UP
S/N - ZML1-UP
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description QTY
A 439-3940 Link Brackets 3
B 439-3939 Link Bracket 2
C 154-6183 Forcing Bolts 3
Start By:
A. Remove the final drive and the travel motor.
1. Put an alignment mark across the sections of the final drive for assembly purposes. The
parts must be reinstalled in the original locations.
Illustration 1 g02151790
Note: The weight of the entire final drive assembly is approximately 550 kg (1200 lb).
2. Attach Tooling (A) and a suitable lifting device to cover (2) . The weight of cover (2) is
approximately 32 kg (70 lb). Remove bolts (1) and cover (2) .
3/19(W)
w
2020/8/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
18. Illustration 2 g00879362
3. Remove bolts (3) . Remove gear (5) . Remove plate (6) . Remove plugs (4) from cover (2) .
Illustration 3 g00879365
4. Remove O-ring seal (7) from plugs (4) .
4/19(W)
w
2020/8/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
19. Illustration 4 g02151806
5. Remove sun gear (8) , spacer (9) , and planetary gear assembly (10) .
Illustration 5 g02151809
6. Remove retaining ring (11) , washer (12) , planetary gear (13) , roller bearing (15) , and
washer (16) from carrier assembly (17) .
7. Repeat Step 6 for the remaining two gear assemblies.
8. Remove retaining ring (14) and sun gear (18) from carrier assembly (17) .
5/19(W)
w
2020/8/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
20. Illustration 6 g02152150
9. Use a suitable press to remove the shafts from carrier assembly (17) .
Illustration 7 g02151813
10. Attach Tooling (A) and a suitable lifting device to planetary gear assembly (19) . The
weight of planetary gear assembly (19) is approximately 48 kg (105 lb). Remove planetary
gear assembly (19) .
11. Remove spacer (20) .
6/19(W)
w
2020/8/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
21. Illustration 8 g02151782
12. Drive spring pin (21) into planetary shaft (22) with a suitable hammer and a suitable punch.
13. Remove planetary shaft (22) , washer (24) , roller bearing (25) , planetary gear (26) , and
washer (27) from the planetary gear assembly (19) .
14. Remove spring pin (21) from planetary shaft (22) with a suitable hammer and a suitable
punch.
15. Remove retaining ring (23) and sun gear (28) from planetary gear assembly (19) .
Illustration 9 g02152208
7/19(W)
w
2020/8/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
22. 16. Attach Tooling (A) and a suitable lifting device to planetary gear assembly (29) . The
weight of planetary gear assembly (29) is approximately 38 kg (85 lb). Remove planetary
gear assembly (29) .
Illustration 10 g02152467
17. Drive spring pin (30) into planetary shaft (31) with a suitable hammer and a suitable punch.
18. Remove planetary shaft (31) , washer (32) , roller bearings (33) , planetary gear (34) , and
washer (35) from the planetary gear assembly (29) .
19. Remove spring pin (30) from planetary shaft (31) with a suitable hammer and a suitable
punch.
8/19(W)
w
2020/8/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
23. Illustration 11 g02152399
20. Attach Tooling (A) and a suitable lifting device to ring gear (36) . The weight of ring gear
(36) is approximately 66 kg (146 lb). Remove ring gear (36) .
21. Remove O-ring seal (37) from sprocket housing (38) .
Illustration 12 g02152525
Illustration 13 g02152528
Note: Mark the orientation of coupling gear (40) for assembly purposes.
22. Remove bolts (39) from coupling gear (40) . Use Tooling (C) in order to remove coupling
gear (40) from the motor housing.
9/19(W)
w
2020/8/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
24. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
25. Illustration 14 g02152546
23. Remove shims (41) from the motor housing.
Illustration 15 g02152552
Note: Upper bearing cone (42) and lower bearing cone (43) are a slip fit on the motor
housing. While you remove sprocket housing (38) from the motor housing, upper bearing
cone (42) may stay with the sprocket housing, or upper bearing cone (42) may stay on the
motor housing.
24. Attach Tooling (B) and a suitable lifting device to sprocket housing (38) . The weight of
sprocket housing (38) is approximately 109 kg (240 lb). Remove sprocket housing (38) and
upper bearing cone (42) .
10/19(W)
w
2020/8/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
26. Illustration 16 g02152595
25. Remove dowels (45) from the motor housing.
26. Remove Duo-Cone seal (44) from the motor housing.
27. If lower bearing cone (43) remained on the motor housing, then remove the lower bearing
cone.
Illustration 17 g02152598
28. Remove Duo-Cone seal (46) from the sprocket housing.
29. If upper bearing cone (42) remained on the sprocket housing, then remove the upper bearing
cone.
30. Remove the bearing cups from the sprocket housing.
(Type 1) Disassembly Procedure
Table 2
Required Tools
Tool Part Number Part Description Qty
11/19(W)
w
2020/8/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...