The document provides instructions to disassemble a final drive for excavator models 325D and 325D L. It involves 33 steps including removing bolts, gears, seals, carriers, shafts, washers and bearings. Cleanliness is important to prevent dirt entering during reassembly. Tools include a transmission repair stand, link brackets, retaining ring pliers, and a slide hammer puller. The procedure separates the final drive into individual components for repair or replacement.
Discover the innovative and creative projects that highlight my journey throu...dylandmeas
Discover the innovative and creative projects that highlight my journey through Full Sail University. Below, you’ll find a collection of my work showcasing my skills and expertise in digital marketing, event planning, and media production.
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...BBPMedia1
Marvin neemt je in deze presentatie mee in de voordelen van non-endemic advertising op retail media netwerken. Hij brengt ook de uitdagingen in beeld die de markt op dit moment heeft op het gebied van retail media voor niet-leveranciers.
Retail media wordt gezien als het nieuwe advertising-medium en ook mediabureaus richten massaal retail media-afdelingen op. Merken die niet in de betreffende winkel liggen staan ook nog niet in de rij om op de retail media netwerken te adverteren. Marvin belicht de uitdagingen die er zijn om echt aansluiting te vinden op die markt van non-endemic advertising.
Falcon stands out as a top-tier P2P Invoice Discounting platform in India, bridging esteemed blue-chip companies and eager investors. Our goal is to transform the investment landscape in India by establishing a comprehensive destination for borrowers and investors with diverse profiles and needs, all while minimizing risk. What sets Falcon apart is the elimination of intermediaries such as commercial banks and depository institutions, allowing investors to enjoy higher yields.
Improving profitability for small businessBen Wann
In this comprehensive presentation, we will explore strategies and practical tips for enhancing profitability in small businesses. Tailored to meet the unique challenges faced by small enterprises, this session covers various aspects that directly impact the bottom line. Attendees will learn how to optimize operational efficiency, manage expenses, and increase revenue through innovative marketing and customer engagement techniques.
Memorandum Of Association Constitution of Company.pptseri bangash
www.seribangash.com
A Memorandum of Association (MOA) is a legal document that outlines the fundamental principles and objectives upon which a company operates. It serves as the company's charter or constitution and defines the scope of its activities. Here's a detailed note on the MOA:
Contents of Memorandum of Association:
Name Clause: This clause states the name of the company, which should end with words like "Limited" or "Ltd." for a public limited company and "Private Limited" or "Pvt. Ltd." for a private limited company.
https://seribangash.com/article-of-association-is-legal-doc-of-company/
Registered Office Clause: It specifies the location where the company's registered office is situated. This office is where all official communications and notices are sent.
Objective Clause: This clause delineates the main objectives for which the company is formed. It's important to define these objectives clearly, as the company cannot undertake activities beyond those mentioned in this clause.
www.seribangash.com
Liability Clause: It outlines the extent of liability of the company's members. In the case of companies limited by shares, the liability of members is limited to the amount unpaid on their shares. For companies limited by guarantee, members' liability is limited to the amount they undertake to contribute if the company is wound up.
https://seribangash.com/promotors-is-person-conceived-formation-company/
Capital Clause: This clause specifies the authorized capital of the company, i.e., the maximum amount of share capital the company is authorized to issue. It also mentions the division of this capital into shares and their respective nominal value.
Association Clause: It simply states that the subscribers wish to form a company and agree to become members of it, in accordance with the terms of the MOA.
Importance of Memorandum of Association:
Legal Requirement: The MOA is a legal requirement for the formation of a company. It must be filed with the Registrar of Companies during the incorporation process.
Constitutional Document: It serves as the company's constitutional document, defining its scope, powers, and limitations.
Protection of Members: It protects the interests of the company's members by clearly defining the objectives and limiting their liability.
External Communication: It provides clarity to external parties, such as investors, creditors, and regulatory authorities, regarding the company's objectives and powers.
https://seribangash.com/difference-public-and-private-company-law/
Binding Authority: The company and its members are bound by the provisions of the MOA. Any action taken beyond its scope may be considered ultra vires (beyond the powers) of the company and therefore void.
Amendment of MOA:
While the MOA lays down the company's fundamental principles, it is not entirely immutable. It can be amended, but only under specific circumstances and in compliance with legal procedures. Amendments typically require shareholder
Implicitly or explicitly all competing businesses employ a strategy to select a mix
of marketing resources. Formulating such competitive strategies fundamentally
involves recognizing relationships between elements of the marketing mix (e.g.,
price and product quality), as well as assessing competitive and market conditions
(i.e., industry structure in the language of economics).
3.0 Project 2_ Developing My Brand Identity Kit.pptxtanyjahb
A personal brand exploration presentation summarizes an individual's unique qualities and goals, covering strengths, values, passions, and target audience. It helps individuals understand what makes them stand out, their desired image, and how they aim to achieve it.
Skye Residences | Extended Stay Residences Near Toronto Airportmarketingjdass
Experience unparalleled EXTENDED STAY and comfort at Skye Residences located just minutes from Toronto Airport. Discover sophisticated accommodations tailored for discerning travelers.
Website Link :
https://skyeresidences.com/
https://skyeresidences.com/about-us/
https://skyeresidences.com/gallery/
https://skyeresidences.com/rooms/
https://skyeresidences.com/near-by-attractions/
https://skyeresidences.com/commute/
https://skyeresidences.com/contact/
https://skyeresidences.com/queen-suite-with-sofa-bed/
https://skyeresidences.com/queen-suite-with-sofa-bed-and-balcony/
https://skyeresidences.com/queen-suite-with-sofa-bed-accessible/
https://skyeresidences.com/2-bedroom-deluxe-queen-suite-with-sofa-bed/
https://skyeresidences.com/2-bedroom-deluxe-king-queen-suite-with-sofa-bed/
https://skyeresidences.com/2-bedroom-deluxe-queen-suite-with-sofa-bed-accessible/
#Skye Residences Etobicoke, #Skye Residences Near Toronto Airport, #Skye Residences Toronto, #Skye Hotel Toronto, #Skye Hotel Near Toronto Airport, #Hotel Near Toronto Airport, #Near Toronto Airport Accommodation, #Suites Near Toronto Airport, #Etobicoke Suites Near Airport, #Hotel Near Toronto Pearson International Airport, #Toronto Airport Suite Rentals, #Pearson Airport Hotel Suites
Affordable Stationery Printing Services in Jaipur | Navpack n PrintNavpack & Print
Looking for professional printing services in Jaipur? Navpack n Print offers high-quality and affordable stationery printing for all your business needs. Stand out with custom stationery designs and fast turnaround times. Contact us today for a quote!
Enterprise Excellence is Inclusive Excellence.pdfKaiNexus
Enterprise excellence and inclusive excellence are closely linked, and real-world challenges have shown that both are essential to the success of any organization. To achieve enterprise excellence, organizations must focus on improving their operations and processes while creating an inclusive environment that engages everyone. In this interactive session, the facilitator will highlight commonly established business practices and how they limit our ability to engage everyone every day. More importantly, though, participants will likely gain increased awareness of what we can do differently to maximize enterprise excellence through deliberate inclusion.
What is Enterprise Excellence?
Enterprise Excellence is a holistic approach that's aimed at achieving world-class performance across all aspects of the organization.
What might I learn?
A way to engage all in creating Inclusive Excellence. Lessons from the US military and their parallels to the story of Harry Potter. How belt systems and CI teams can destroy inclusive practices. How leadership language invites people to the party. There are three things leaders can do to engage everyone every day: maximizing psychological safety to create environments where folks learn, contribute, and challenge the status quo.
Who might benefit? Anyone and everyone leading folks from the shop floor to top floor.
Dr. William Harvey is a seasoned Operations Leader with extensive experience in chemical processing, manufacturing, and operations management. At Michelman, he currently oversees multiple sites, leading teams in strategic planning and coaching/practicing continuous improvement. William is set to start his eighth year of teaching at the University of Cincinnati where he teaches marketing, finance, and management. William holds various certifications in change management, quality, leadership, operational excellence, team building, and DiSC, among others.
Kseniya Leshchenko: Shared development support service model as the way to ma...Lviv Startup Club
Kseniya Leshchenko: Shared development support service model as the way to make small projects with small budgets profitable for the company (UA)
Kyiv PMDay 2024 Summer
Website – www.pmday.org
Youtube – https://www.youtube.com/startuplviv
FB – https://www.facebook.com/pmdayconference
2. Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Transmission Repair Stand 1
B 138-7573 Link Bracket 2
C 154-6181 Forcing Screw 1
D 138-7574 Link Bracket 2
E
5F-7366 Forcing Screw 1
1P-5546 Crossblock 1
1U-9889 Crossblock 1
1P-0520 Driver Group 1
6V-7888 Puller Leg 2
1H-3112 Puller Assembly 1
1P-5551 Adjustable Screw Assembly 1
F 1U-8846 Gasket Sealant 1
Start By:
a. Remove the final drive. Refer to Disassembly and Assembly, "Final Drive - Remove".
Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of
the component should be thoroughly cleaned. This will prevent dirt from entering the
internal mechanism.
1. Put an alignment mark across the sections of the final drive for assembly purposes. The
parts must be reinstalled in the part's original locations.
Illustration 1 g00708089
2. Fasten the final drive to Tooling (A), as shown. The combined weight of the final drive and
final drive sprocket is approximately 312 kg (688 lb).
3/12
325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/24
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. 3. Remove bolts (1) and the washers that hold the cover in position.
Illustration 2 g00708090
4. Remove the setscrews from the cover. Fasten Tooling (B) and a suitable lifting device to
cover (2), as shown. The weight of cover (2) is approximately 32 kg (70 lb). Remove cover
(2).
Illustration 3 g00708091
5. Remove thrust plate (3) from cover (2).
6. Remove plugs (4) from cover (2).
4/12
325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/24
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. Illustration 4 g00708235
7. Remove O-ring seals (5) from both plugs (4) that were in the cover.
Illustration 5 g00708092
8. Remove spacer (6) from carrier assembly (7).
9. Remove sun gear (8) from carrier assembly (7).
10. Remove carrier assembly (7) by lifting the carrier assembly straight up. The weight of
carrier assembly (7) is approximately 14 kg (30 lb).
Illustration 6 g01304883
11. Disassemble carrier assembly (7), as follows.
a. Drive spring pin (10) into planetary shaft (9) with a hammer and a punch.
5/12
325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/24
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Illustration 7 g00708144
b. Remove planetary shaft (9) with spring pin (10) from the carrier assembly.
c. Remove spring pin (10) from planetary shaft (9) with a hammer and a punch.
Illustration 8 g00708218
d. Remove thrust washers (11) and planetary gear (13) from the carrier assembly.
e. Remove bearing (12) from planetary gear (13).
12. Repeat Steps 11.a through 11.e in order to remove the remaining planetary gears from the
carrier assembly.
6/12
325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/24
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. Illustration 9 g00708162
13. Remove sun gear (14) from carrier assembly (15).
Illustration 10 g00708325
14. Remove spacer (16).
Illustration 11 g00708184
Note: It will be necessary to pry ring gears (17) away from main housing (18) in order to
install the lifting slings.
15. Fasten a suitable lifting device to ring gears (17), as shown. Remove the ring gears from
main housing (18). The weight of ring gears (17) is approximately 45 kg (100 lb).
7/12
325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/24
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Illustration 12 g00708360
16. Use a screwdriver or a chisel in order to separate the two ring gears (17).
Note: The two ring gears are held together with Tooling (F). It may be necessary to heat the
ring gears in order to soften the sealant. Do not heat over 135 °C (275 °F) for more than
thirty minutes.
Illustration 13 g00708172
17. Position a 12.7 mm (0.50 inch) shackle under carrier assembly (15).
18. Fasten a suitable lifting device to the shackle.
19. Slowly lift carrier assembly (15) from the final drive. The weight of carrier assembly (15) is
approximately 39 kg (85 lb).
20. Disassemble carrier assembly (15), as follows.
Illustration 14 g00708175
a. Drive spring pin (20) into planetary shaft (19) with a hammer and a punch.
8/12
325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/24
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. Illustration 15 g00708370
Illustration 16 g00708220
b. Remove planetary shaft (19) with spring pin (20) from the carrier assembly.
c. Remove spring pin (20) from planetary shaft (19) with a hammer and a punch.
d. Remove thrust washers (21) and planetary gear (23) from the carrier assembly.
e. Remove bearings (22) from planetary gear (23).
21. Repeat Steps 20.a through 20.e in order to remove the remaining planetary gears from the
carrier.
9/12
325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/24
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. Illustration 17 g00708186
22. Remove O-ring seal (24) from main housing (18).
Illustration 18 g00708187
23. Remove bolts (25) from gear (26).
Illustration 19 g00708202
24. Use Tooling (C) in order to remove gear (26) from main housing (18).
Note: The motor housing will separate from the main housing (18) once gear (26) is
removed. Make sure that the motor housing is supported.
10/12
325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engi...
2020/6/24
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. Illustration 20 g00708211
25. Remove shims (27) from the main housing.
Illustration 21 g00708212
26. Fasten Tooling (D) and a suitable lifting device to main housing (18), as shown.
27. Use a hammer and a punch in order to separate main housing (18) and the final drive
sprocket from the motor housing (28). The combined weight of main housing (18) and the
final drive sprocket is approximately 82 kg (180 lb).
Illustration 22 g00708214
28. Remove Duo-Cone seal (29) from motor housing (28).
29. Remove alignment pins (30).
11/12
325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engi...
2020/6/24
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Illustration 23 g00708215
Illustration 24 g00708216
30. Remove Duo-Cone seal (31) from main housing (18).
31. Use Tooling (E) in order to remove bearings (32) and (33) from the main housing.
32. If necessary, remove the final drive sprocket from the main housing.
33. Refer to Disassembly and Assembly, "Final Drive Sprocket - Remove and Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Wed Jun 24 14:02:39 UTC+0800 2020
12/12
325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engi...
2020/6/24
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 325D EXCAVATOR DBH
Configuration: 325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
324D, 325D, 326D and 329D Excavators and 329D MHPU Mobile Hydraulic Power
Unit Machine Systems
Media Number -RENR8646-22 Publication Date -01/02/2015 Date Updated -12/09/2018
i02783051
Final Drive - Disassemble
SMCS - 4050-015
S/N - A3R1-1021
S/N - AZP1-UP
S/N - DBH1-UP
S/N - EJC1-643
S/N - GBR1-UP
S/N - GPB1-801
S/N - JJG1-813
S/N - KBE1-UP
S/N - LAB1-415
S/N - LAL1-250
S/N - MCL1-201
S/N - NAC1-250
S/N - PAL1-UP
S/N - PKE1-814
S/N - SCR1-774
S/N - SYM1-617
1/13
325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/24
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. S/N - T2D1-322
S/N - T2S1-UP
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Transmission Repair Stand 1
B 138-7573 Link Bracket 2
C 1P-1863 Retaining Ring Pliers 1
D 194-3878 Spanner Socket 1
E 138-7574 Link Bracket 2
F
5F-7366 Forcing Screw 1
1P-5546 Crossblock 1
1U-9889 Crossblock 1
1P-0520 Driver Group 1
6V-7888 Puller Leg 2
1H-3112 Puller Assembly 1
1P-5551 Adjustable Screw Assembly 1
G
1U-7600 Slide Hammer Puller Gp 1
8T-0266 Bolt 1
Start By:
a. Remove the final drive. Refer to Disassembly and Assembly, "Final Drive - Remove".
Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of
the component should be thoroughly cleaned. This will prevent dirt from entering the
internal mechanism.
Note: Some of the images that are in this procedure do not show the sprocket assembly that
is attached to the final drive housing. If necessary, the weights that are given include the
weight of the sprocket assembly.
1. Put an alignment mark across the sections of the final drive for assembly purposes. The
parts must be reinstalled in the part's original locations.
2/13
325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/24
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. Illustration 1 g00708089
2. Fasten the final drive to Tooling (A), as shown. The weight of the final drive assembly is
approximately 312 kg (688 lb).
3. Remove bolts (1) and the washers that hold the cover in position.
Illustration 2 g00708090
4. Remove the setscrews from the cover. Fasten Tooling (B) and a suitable lifting device to
cover (2), as shown. Remove the cover. The weight of the cover is approximately 32 kg
(70 lb).
Illustration 3 g00879362
3/13
325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/24
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. 5. Remove bolts (3). Remove gear (5). Check plate (6). Replace plate (6) if wear is shown.
Remove plugs (4) from cover (2).
Illustration 4 g00879365
6. Remove O-ring seal (7) from plugs (4).
Illustration 5 g00780428
7. Remove gear (8). Remove spacer (9).
Illustration 6 g00780432
4/13
325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/24
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. 8. Remove retaining ring (10) with Tooling (C). Remove washer (11). Remove gear (12).
Remove bearing assembly (13). Remove second washer (11).
9. Repeat Step 8 for the remaining two gear assemblies.
Illustration 7 g00781401
10. Remove retaining ring (14).
Illustration 8 g00781407
11. Remove carrier assembly (15).
5/13
325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/24
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Illustration 9 g01389593
12. Use a suitable press in order to remove the shafts from carrier assembly (15).
Illustration 10 g00781412
13. Remove gear (16). Remove spacer (17).
Illustration 11 g00781466
6/13
325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/24
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. 14. Remove retaining ring (18).
15. Remove carrier assembly (19).
Illustration 12 g00879368
16. Disassemble carrier assembly (19), as follows.
a. Drive spring pin (20) into planetary shaft (21) with a hammer and a punch.
Illustration 13 g00781476
b. Remove planetary shaft (21).
c. Remove spring pin (20) from planetary shaft (21) with a hammer and a punch.
7/13
325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/24
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. Illustration 14 g00781516
d. Remove thrust washers (22) and planetary gear (24) from the carrier assembly.
e. Remove bearing (23) from planetary gear (24).
17. Repeat Steps 16.a through 16.e for the other two planetary.
Illustration 15 g00781529
18. Remove gear (25). Remove spacer (26).
Illustration 16 g00781559
19. Remove carrier assembly (27).
20. Use two people to remove carrier assembly (27). The weight of the carrier assembly is
approximately 38 kg (85 lb).
21. Disassemble carrier assembly (27), as follows.
8/13
325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/24
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. Illustration 17 g00781719
a. Drive spring pin (29) into planetary shaft (28) with a hammer and a punch.
Illustration 18 g00781601
b. Remove planetary shaft (28).
c. Remove spring pin (29) from planetary shaft (28) with a hammer and a punch.
Illustration 19 g00781607
d. Remove thrust washers (30) and planetary gear (32) from the carrier assembly.
e. Remove two bearings (31) from the planetary gear.
9/13
325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/24
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. 22. Repeat Steps 21.a through 21.e for the other two planetary gears.
Illustration 20 g00781730
23. Use two people to remove gear (33). The weight of gear is approximately 41 kg (90 lb).
Illustration 21 g00781807
24. Remove O-ring seal (34).
Illustration 22 g01147650
25. Remove bolts (35A) and plates (35B).
10/13
325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engi...
2020/6/24
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. Illustration 23 g01147651
26. Use Tooling (G) to remove dowel (37) from stopper plate (35).
Illustration 24 g01147759
27. Secure Tooling (D) to stopper plate (35). Use Tooling (D) to remove stopper plate (35).
Illustration 25 g01147930
28. Use Tooling (E) and a suitable lifting device to remove housing (36). The weight of housing
(36) is approximately 100 kg (220 lb).
11/13
325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engi...
2020/6/24
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. Illustration 26 g01147951
29. Remove Duo-Cone seal (39A) from housing (38).
Illustration 27 g01147975
Illustration 28 g01147934
30. Remove Duo-Cone seal (39B) from housing (36).
31. Use Tooling (F) in order to remove bearings (40) and (41) from housing (36).
32. If necessary, remove the final drive sprocket from the sprocket housing. Refer to
Disassembly and Assembly, "Final Drive Sprocket - Remove and Install".
12/13
325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engi...
2020/6/24
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
24. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 325D EXCAVATOR DBH
Configuration: 325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
324D, 325D, 326D and 329D Excavators and 329D MHPU Mobile Hydraulic Power
Unit Machine Systems
Media Number -RENR8646-22 Publication Date -01/02/2015 Date Updated -12/09/2018
i03508206
Final Drive - Disassemble
SMCS - 4050-015
S/N - A3R1022-UP
S/N - BFC1-UP
S/N - BYS1-UP
S/N - CYW1-UP
S/N - CZF1-UP
S/N - DBH380-UP
S/N - DJF1-UP
S/N - DTZ1-UP
S/N - EBM1-UP
S/N - EJC644-UP
S/N - GPB802-UP
S/N - J8D1-UP
S/N - J9D1-UP
S/N - JAT1-UP
S/N - JHJ1-UP
S/N - JJG814-UP
1/13
325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/24
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
26. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
27. Tool Part Number Part Description Qty
A 1P-2420 Transmission Repair Stand 1
B 138-7573 Link Bracket 2
C 1P-1863 Retaining Ring Pliers 1
D 138-7575 Link Bracket 3
E 4C-8359 Eyebolt 2
F 138-7574 Link Bracket 2
G 138-7576 Link Bracket 2
Start By:
a. Start by removing the final drive. Refer to Disassembly and Assembly, "Final Drive -
Remove".
Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of
the component should be thoroughly cleaned. This will prevent dirt from entering the
internal mechanism.
1. Put an alignment mark across the sections of the final drive for assembly purposes. The
parts must be reinstalled to the original locations.
Illustration 1 g00892878
2. Use Tooling (G) and a suitable lifting device to position the final drive assembly onto
Tooling (A). The weight of the final drive assembly is approximately 550 kg (1200 lb).
3. Remove bolts (1).
3/13
325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/24
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
28. Illustration 2 g00892883
4. Use Tooling (B) and a suitable lifting device to remove cover (2). The weight of cover (2) is
approximately 32 kg (70 lb).
Illustration 3 g00892888
5. Remove bolts (3) and gear (4). Check plate (6). Replace plate (6) if plate (6) is worn.
Remove plugs (5) from cover (2).
Illustration 4 g00892906
6. Remove O-ring seals (7) from plugs (5).
4/13
325D & 325D L Excavators DBH00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/24
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...