SlideShare a Scribd company logo
Pallet Recovery at 75%
  Situation
•	 A retailer was buying as many as 50,000 new pallets a year for two locations because pallets
   were disappearing. What’s more, the pallets it was receiving were inconsistent and wouldn’t
   always work with the retailer’s pallet jacks.
  Solution
•	 Millwood took over management of pallet pool.  Using the Pallet  Design System (PDS)
   software program, Millwood created an improved specification that increases the life
   expectancy of each pallet.
  Results
•	 Over time, the retailer has upgraded the pool so that every pallet will work with a pallet
   jack. What’s more, with Millwood managing the recovery of pallets, the retailer is getting
   75 to 80% of its pallets returned, significantly reducing the number of pallets that have to be
   replaced each year.




3708 International Boulevard | Vienna, OH 44473
Toll-Free: 877-891-9663 | P: 330-393-4400 | F: 330-393-4401
millwoodinc.com

More Related Content

Viewers also liked (11)

Finalaya featured result_13dec2012
Finalaya featured result_13dec2012Finalaya featured result_13dec2012
Finalaya featured result_13dec2012
 
A ii 1924 artisoo -
A ii 1924  artisoo -A ii 1924  artisoo -
A ii 1924 artisoo -
 
A. Nickell Resume
A. Nickell ResumeA. Nickell Resume
A. Nickell Resume
 
Programma
ProgrammaProgramma
Programma
 
Nature is wise
Nature is wiseNature is wise
Nature is wise
 
Mapa conceptual siglo 18
Mapa conceptual siglo 18Mapa conceptual siglo 18
Mapa conceptual siglo 18
 
Inpiración de la biblia
Inpiración de la bibliaInpiración de la biblia
Inpiración de la biblia
 
UCP600
UCP600UCP600
UCP600
 
Rapport d'atelier
Rapport d'atelierRapport d'atelier
Rapport d'atelier
 
COMPANIES CUSTOMERS
COMPANIES  CUSTOMERSCOMPANIES  CUSTOMERS
COMPANIES CUSTOMERS
 
Procesador de textos
Procesador de textosProcesador de textos
Procesador de textos
 

Similar to Case Study: Pallet Recovery at 75%

Case Study: Redesign Meets Performance Criteria
Case Study: Redesign Meets Performance CriteriaCase Study: Redesign Meets Performance Criteria
Case Study: Redesign Meets Performance Criteria
Jen Brawner
 
Wiswall farm budgets made simple
Wiswall farm budgets made simpleWiswall farm budgets made simple
Wiswall farm budgets made simple
acornorganic
 
Githunguri Rotary Presentation
Githunguri Rotary PresentationGithunguri Rotary Presentation
Githunguri Rotary Presentation
folkjur
 
Lesson-1-Supply-Chain-Management-Introduction.ppt
Lesson-1-Supply-Chain-Management-Introduction.pptLesson-1-Supply-Chain-Management-Introduction.ppt
Lesson-1-Supply-Chain-Management-Introduction.ppt
qadeer36
 
Lesson-1-Supply-Chain-Management-Introduction.ppt
Lesson-1-Supply-Chain-Management-Introduction.pptLesson-1-Supply-Chain-Management-Introduction.ppt
Lesson-1-Supply-Chain-Management-Introduction.ppt
qadeer36
 
27 mini dairy plant at dairy farms
27 mini dairy plant at dairy farms27 mini dairy plant at dairy farms
27 mini dairy plant at dairy farms
John Anthonius
 

Similar to Case Study: Pallet Recovery at 75% (20)

Case Study: Redesign Meets Performance Criteria
Case Study: Redesign Meets Performance CriteriaCase Study: Redesign Meets Performance Criteria
Case Study: Redesign Meets Performance Criteria
 
Inventory Models.pptx
Inventory Models.pptxInventory Models.pptx
Inventory Models.pptx
 
Wiswall farm budgets made simple
Wiswall farm budgets made simpleWiswall farm budgets made simple
Wiswall farm budgets made simple
 
A Presentation on PepsiCo
A Presentation on PepsiCoA Presentation on PepsiCo
A Presentation on PepsiCo
 
Kati Sr BUYER
Kati Sr BUYER Kati Sr BUYER
Kati Sr BUYER
 
Githunguri Rotary Presentation
Githunguri Rotary PresentationGithunguri Rotary Presentation
Githunguri Rotary Presentation
 
Product1 [4] capacity planning
Product1 [4]   capacity planningProduct1 [4]   capacity planning
Product1 [4] capacity planning
 
Products that Flow - Circular Business Models and Design Strategies for Fast ...
Products that Flow - Circular Business Models and Design Strategies for Fast ...Products that Flow - Circular Business Models and Design Strategies for Fast ...
Products that Flow - Circular Business Models and Design Strategies for Fast ...
 
Lesson-1-Supply-Chain-Management-Introduction.ppt
Lesson-1-Supply-Chain-Management-Introduction.pptLesson-1-Supply-Chain-Management-Introduction.ppt
Lesson-1-Supply-Chain-Management-Introduction.ppt
 
Lesson-1-Supply-Chain-Management-Introduction.ppt
Lesson-1-Supply-Chain-Management-Introduction.pptLesson-1-Supply-Chain-Management-Introduction.ppt
Lesson-1-Supply-Chain-Management-Introduction.ppt
 
Lesson-1-Supply-Chain-Management-Introduction.ppt
Lesson-1-Supply-Chain-Management-Introduction.pptLesson-1-Supply-Chain-Management-Introduction.ppt
Lesson-1-Supply-Chain-Management-Introduction.ppt
 
Lesson-1-Supply-Chain-Management-Introduction.ppt
Lesson-1-Supply-Chain-Management-Introduction.pptLesson-1-Supply-Chain-Management-Introduction.ppt
Lesson-1-Supply-Chain-Management-Introduction.ppt
 
27 mini dairy plant at dairy farms
27 mini dairy plant at dairy farms27 mini dairy plant at dairy farms
27 mini dairy plant at dairy farms
 
Supply Chain Analysis of Nestle
Supply Chain Analysis of NestleSupply Chain Analysis of Nestle
Supply Chain Analysis of Nestle
 
Supply Chain Analytics with Simulation
Supply Chain Analytics with SimulationSupply Chain Analytics with Simulation
Supply Chain Analytics with Simulation
 
Supply Chain Analytics with Simulation
Supply Chain Analytics with SimulationSupply Chain Analytics with Simulation
Supply Chain Analytics with Simulation
 
Improve warehouse productivity - business breakfast session
Improve warehouse productivity - business breakfast sessionImprove warehouse productivity - business breakfast session
Improve warehouse productivity - business breakfast session
 
Qualitex profile 05-feb-2014
Qualitex profile  05-feb-2014Qualitex profile  05-feb-2014
Qualitex profile 05-feb-2014
 
University of leeds the circular economy
University of leeds   the circular economyUniversity of leeds   the circular economy
University of leeds the circular economy
 
Farmers of tomorrow seoul presentation
Farmers of tomorrow   seoul presentationFarmers of tomorrow   seoul presentation
Farmers of tomorrow seoul presentation
 

Case Study: Pallet Recovery at 75%

  • 1. Pallet Recovery at 75% Situation • A retailer was buying as many as 50,000 new pallets a year for two locations because pallets were disappearing. What’s more, the pallets it was receiving were inconsistent and wouldn’t always work with the retailer’s pallet jacks. Solution • Millwood took over management of pallet pool. Using the Pallet Design System (PDS) software program, Millwood created an improved specification that increases the life expectancy of each pallet. Results • Over time, the retailer has upgraded the pool so that every pallet will work with a pallet jack. What’s more, with Millwood managing the recovery of pallets, the retailer is getting 75 to 80% of its pallets returned, significantly reducing the number of pallets that have to be replaced each year. 3708 International Boulevard | Vienna, OH 44473 Toll-Free: 877-891-9663 | P: 330-393-4400 | F: 330-393-4401 millwoodinc.com