SlideShare a Scribd company logo
Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL,
EN EL SUB LOTE Nº01 – MZ ''M'', SECTOR ''V'' SAN IGNACIO –
DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
01 ESTRUCTURAS
01.01 OBRAS PROVISIONALES
01.01.01 CONSTRUCCIONES PROVISIONALES
01.01.01.01 ALMACEN DE MATERIALES m2 50.00 125.36 6,268.00 100.00% 6,268.00
01.01.02 INSTALACIONES PROVISIONALES
01.01.02.01 AGUA PARA LA CONSTRUCCION mes 6.00 407.29 2,443.74 100.00% 2,443.74
01.01.02.02 ENERGIA ELECTRICA mes 6.00 400.00 2,400.00 100.00% 2,400.00
01.02 TRABAJOS PRELIMINARES
01.02.01 LIMPIEZA DEL TERRENO
01.02.01.01 LIMPIEZA DEL TERRENO m2 321.74 3.01 968.44 100.00% 968.44
01.02.01.02 LIMPIEZA PERMANENTE DE OBRA m2 321.74 0.80 257.39 100.00% 257.39
01.02.02 TRAZO , NIVELES Y REPLANTEO
01.02.02.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 321.74 1.71 550.18 100.00% 550.18
01.03 MOVIMIENTO DE TIERRAS
01.03.01 NIVELACION DE TERRENO
01.03.01.01 NIVELACION DE TERRENO m2 321.74 0.86 276.70 100.00% 276.70
01.03.02 RELLENOS
01.03.02.01 RELLENO Y COMP. MANUAL- MAT. DE PRESTAMO m3 56.50 89.06 5,031.89 100.00% 5,031.89
01.03.03 ELIMINACION DE MATERIAL EXCEDENTE
01.03.03.01
ELIMINACION DE MATERIAL EXCEDENTE DE
EXCAVACIONES C/MAQUINARIA
m3 116.15 8.28 961.72
100.00%
961.72
01.04 OBRAS DE CONCRETO SIMPLE
01.04.01 CONCRETO SIMPLE
01.04.01.01
SOLADO PARA CIMIENTOS REFORZADO E=8", MEZCLA C:H
1:10
m2 193.15 12.75 2,462.66
100.00%
2,462.66
01.04.01.02 SOLADO PARA ZAPATAS: MEZCLA, C:H, 1:10, E=4" m2 25.16 19.60 493.14 100.00% 493.14
01.04.01.03 FALSO PISO DE 4": MEZCLA 1:8 (C:H) m2 321.74 48.88 15,726.65 100.00% 15,726.65
01.04.01.04 FALSA ZAPATA: CONCRETO FC´= 175 KG/CM2 + 50%PG m3 56.19 174.56 9,808.53
100.00%
9,808.53
01.05 OBRAS DE CONCRETO ARMADO
01.05.01 ZAPATAS
01.05.01.01 CONCRETO PREMEZCLADO EN ZAPATAS F'c=280KG/CM2 m3 96.52 540.31 52,150.72
100.00%
52,150.72
01.05.01.02 ACERO DE REFUERZO F'y=4200KG/CM2 EN ZAPATAS kg 3,487.50 4.38 15,275.25 100.00% 15,275.25
01.05.02 VIGAS DE CIMENTACION
01.05.02.01
CONCRETO PREMEZCLADO EN VIGAS DE CIMENTACION
F'c=280KG/CM2
m3 32.16 551.53 17,737.20
100.00%
17,737.20
01.05.02.02
ENCOFRADO Y DESENCOFRADO EN VIGAS DE
CIMENTACION
m2 126.45 39.72 5,022.59
100.00%
5,022.59
01.05.02.03
ACERO DE REFUERZO F'y=4200KG/CM2 EN VIGAS DE
CIMENTACION
kg 4,561.29 4.38 19,978.45
100.00%
19,978.45
01.05.03 COLUMNAS
01.05.03.01 CONCRETO PREMEZCLADO EN COLUMNAS F'c=280KG/CM2 m3 138.12 369.71 51,064.35
20.00%
10,212.87
20.00%
10,212.87
20.00%
10,212.87
20.00%
10,212.87
20.00%
10,212.87
01.05.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 622.37 47.52 29,575.02 20.00% 5,915.00 20.00% 5,915.00 20.00% 5,915.00 20.00% 5,915.00 20.00% 5,915.00
01.05.03.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN COLUMNAS kg 10,246.53 4.38 44,879.80
20.00%
8,975.96
20.00%
8,975.96
20.00%
8,975.96
20.00%
8,975.96
20.00%
8,975.96
01.05.04 PLACAS
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
01.05.04.01 CONCRETO PREMEZCLADO EN PLACAS F'c=280KG/CM2 m3 75.62 486.35 36,777.79
20.00%
7,355.56
20.00%
7,355.56
20.00%
7,355.56
20.00%
7,355.56
20.00%
7,355.56
01.05.04.02 ENCOFRADO Y DESENCOFRADO EN PLACAS m2 1,263.12 28.65 36,188.39 20.00% 7,237.68 20.00% 7,237.68 20.00% 7,237.68 20.00% 7,237.68 20.00% 7,237.68
01.05.04.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN PLACAS kg 3,592.18 4.38 15,733.75 20.00% 3,146.75 20.00% 3,146.75 20.00% 3,146.75 20.00% 3,146.75 20.00% 3,146.75
01.05.05 VIGAS
01.05.05.01 CONCRETO PREMEZCLADO EN VIGAS F'c=280KG/CM2 m3 126.59 488.79 61,875.93 20.00% 12,375.19 20.00% 12,375.19 20.00% 12,375.19 20.00% 12,375.19 20.00% 12,375.19
01.05.05.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 654.19 65.11 42,594.31 20.00% 8,518.86 20.00% 8,518.86 20.00% 8,518.86 20.00% 8,518.86 20.00% 8,518.86
01.05.05.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN VIGAS kg 15,672.34 4.38 68,644.85 20.00% 13,728.97 20.00% 13,728.97 20.00% 13,728.97 20.00% 13,728.97 20.00% 13,728.97
01.05.06 LOSAS ALIGERADAS
01.05.06.01
CONCRETO PREMEZCLADO EN LOSAS ALIGERADAS
F'c=280 KG/CM2
m3 128.27 485.24 62,241.73
25.00%
15,560.43
25.00%
15,560.43
25.00%
15,560.43
25.00%
15,560.43
01.05.06.02
ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS
CON VIGUETAS PREFABRICADAS
m2 963.50 31.92 30,754.92
25.00%
7,688.73
25.00%
7,688.73
25.00%
7,688.73
25.00%
7,688.73
01.05.06.03
ACERO DE REFUERZO F'y=4200KG/CM2 EN LOSAS
ALIGERADAS PREFABRICADAS
kg 15,648.29 4.38 68,539.51
25.00%
17,134.88
25.00%
17,134.88
25.00%
17,134.88
25.00%
17,134.88
01.05.07 ESCALERAS
01.05.07.01 CONCRETO PREMEZCLADO EN ESCALERAS F'c=280KG/CM2 m3 25.91 506.39 13,120.56
25.00%
3,280.14
25.00%
3,280.14
25.00%
3,280.14
25.00%
3,280.14
01.05.07.02 ESCALERAS: ENCOFRADO Y DESENCOFRADO m2 123.69 53.18 6,577.83 25.00% 1,644.46 25.00% 1,644.46 25.00% 1,644.46 25.00% 1,644.46
01.05.07.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN ESCALERAS kg 3,956.18 4.51 17,842.37
25.00%
4,460.59
25.00%
4,460.59
25.00%
4,460.59
25.00%
4,460.59
01.05.08 CUARTO DE CAJA DE ESCALERAS
01.05.08.01 COLUMNAS
01.05.08.01.01
CONCRETO PREMEZCLADO EN COLUMNAS
F'c=280KG/CM2
m3 6.16 369.71 2,277.41
25.00%
569.35
25.00%
569.35
25.00%
569.35
25.00%
569.35
01.05.08.01.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 65.08 47.52 3,092.60 25.00% 773.15 25.00% 773.15 25.00% 773.15 25.00% 773.15
01.05.08.01.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN COLUMNAS kg 779.94 4.38 3,416.14
25.00%
854.04
25.00%
854.04
25.00%
854.04
25.00%
854.04
01.05.08.02 VIGAS
01.05.08.02.01 CONCRETO PREMEZCLADO EN VIGAS F'c=280KG/CM2 m3 6.88 488.79 3,362.88
25.00%
840.72
25.00%
840.72
25.00%
840.72
25.00%
840.72
01.05.08.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 71.09 65.11 4,628.67 25.00% 1,157.17 25.00% 1,157.17 25.00% 1,157.17 25.00% 1,157.17
01.05.08.02.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN VIGAS kg 791.57 4.38 3,467.08 25.00% 866.77 25.00% 866.77 25.00% 866.77 25.00% 866.77
01.05.08.03 LOSAS MACIZAS
01.05.08.03.01
CONCRETO PREMEZCLADO EN LOSAS MACIZAS F'c=280
KG/CM2
m3 13.74 567.18 7,793.05
33.33%
2,597.68
33.33%
2,597.68
33.33%
2,597.69
01.05.08.03.02 ENCOFRADO Y DESENCOFRADO EN LOSAS MACIZAS m2 68.68 36.42 2,501.33
33.33%
833.78
33.33%
833.78
33.33%
833.79
01.05.08.03.03
ACERO DE REFUERZO F'y=4200KG/CM2 EN LOSAS
MACIZAS
kg 1,757.59 4.38 7,698.24
33.33%
2,566.08
33.33%
2,566.08
33.33%
2,566.08
01.06 TANQUE - CISTERNA
01.06.01 TRABAJOS PRELIMINARES
01.06.01.01 LIMPIEZA DE TERRENO MANUAL m2 55.25 3.28 181.22 100.00% 181.22
01.06.01.02 ELIMINACION DE MATERIAL ACUMULADO m3 5.53 19.18 106.07 100.00% 106.07
01.06.02 TRAZO , NIVELES Y REPLANTEO
01.06.02.01 TRAZO Y REPLANTEO m2 55.25 1.97 108.84 100.00% 108.84
01.06.03 MOVIMIENTO DE TIERRAS
01.06.03.01 CORTE Y EXCAVACION C/MAQUINARIA (Terreno Normal) m3 207.19 14.19 2,940.03
100.00%
2,940.03
01.06.03.02
ELIMINACION DE MATERIAL EXCEDENTE DE
EXCAVACIONES C/MAQUINARIA
m3 269.35 8.28 2,230.22
100.00%
2,230.22
01.06.04 OBRAS DE CONCRETO SIMPLE
01.06.04.01 SOLADO PARA PLATEA: MEZCLA, C:H, 1:10, E=4" m2 55.25 30.36 1,677.39 100.00% 1,677.39
Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
01.06.04.02 SOBRECIMIENTOS: CONCRETO F'C=140 KG/CM2 m3 1.38 236.64 326.56 100.00% 326.56
01.06.05 OBRAS DE CONCRETO ARMADO
01.06.05.01 LOSA DE CIMENTACION
01.06.05.01.01
CONCRETO PREMEZCLADO EN LOSA DE CIMENTACION
F'c=280KG/CM2
m3 13.81 508.39 7,020.87
100.00%
7,020.87
01.06.05.01.02
ACERO DE REFUERZO F'y=4200KG/CM2 EN LOSAS DE
CIMENTACION
kg 1,357.11 4.38 5,944.14
100.00%
5,944.14
01.06.05.02 COLUMNAS
01.06.05.02.01
CONCRETO PREMEZCLADO EN COLUMNAS
F'c=280KG/CM2
m3 2.86 369.71 1,057.37
25.00%
264.34
25.00%
264.34
25.00%
264.34
25.00%
264.34
01.06.05.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 3.93 47.52 186.75 25.00% 46.69 25.00% 46.69 25.00% 46.69 25.00% 46.69
01.06.05.02.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN COLUMNAS kg 759.68 4.38 3,327.40
25.00%
831.85
25.00%
831.85
25.00%
831.85
25.00%
831.85
01.06.05.03 VIGAS
01.06.05.03.01 CONCRETO PREMEZCLADO EN VIGAS F'c=280KG/CM2 m3 2.91 488.79 1,422.38
25.00%
355.60
25.00%
355.60
25.00%
355.60
25.00%
355.60
01.06.05.03.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 26.20 65.11 1,705.88 25.00% 426.47 25.00% 426.47 25.00% 426.47 25.00% 426.47
01.06.05.03.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN VIGAS kg 362.04 4.38 1,585.74 25.00% 396.44 25.00% 396.44 25.00% 396.44 25.00% 396.44
01.06.05.04 LOSAS MACIZAS
01.06.05.04.01
CONCRETO PREMEZCLADO EN LOSAS MACIZAS F'c=280
KG/CM2
m3 4.91 567.18 2,784.85
25.00%
696.21
25.00%
696.21
25.00%
696.21
25.00%
696.21
01.06.05.04.02 ENCOFRADO Y DESENCOFRADO EN LOSAS MACIZAS m2 55.25 36.42 2,012.21
25.00%
503.05
25.00%
503.05
25.00%
503.05
25.00%
503.05
01.06.05.04.03
ACERO DE REFUERZO F'y=4200KG/CM2 EN LOSAS
MACIZAS
kg 537.49 4.38 2,354.21
25.00%
588.55
25.00%
588.55
25.00%
588.55
25.00%
588.55
01.07 SISTEMA DE PROTECCION DE AGUAS SUBTERRANEAS
01.07.01
WATER STOP DE NEOPRENE DE 10". PROVISION Y
COLOCADO DE JUNTA
m 136.50 28.86 3,939.39
100.00%
3,939.39
02 ARQUITECTURA
02.01 MUROS Y TABIQUES DE ALBAÑILERIA
02.01.01
MURO DE LADRILLO KING KONG MECANIZADO (CABEZA),
J=2cm
m2 368.25 113.86 41,928.95
25.00%
10,482.24
25.00%
10,482.24
25.00%
10,482.24
25.00%
10,482.24
02.01.02
MURO DE LADRILLO KING KONG MECANIZADO (SOGA),
J=2cm
m2 1,094.35 70.62 77,283.00
25.00%
19,320.75
25.00%
19,320.75
25.00%
19,320.75
25.00%
19,320.75
02.01.03 TABIQUE SISTEMA DRYWALL GYPLAC RH DE 1/2" m2 653.84 61.52 40,224.24 25.00% 10,056.06 25.00% 10,056.06 25.00% 10,056.06 25.00% 10,056.06
02.02 REVOQUES, ENLUCIDOS Y MOLDURAS
02.02.01 TARRAJEO PRIMARIO O RAYADO (Mezcla C:A 1:5, E=1.5cm) m2 863.15 12.02 10,375.06
25.00%
2,593.77
25.00%
2,593.77
25.00%
2,593.77
25.00%
2,593.77
02.02.02 TARRAJEO EN INTERIORES (Mezcla C:A 1:4, E=2cm) m2 1,957.89 20.57 40,273.80 25.00% 10,068.45 25.00% 10,068.45 25.00% 10,068.45 25.00% 10,068.45
02.02.03 TARRAJEO EN EXTERIORES (Mezcla C:A 1:4, E=2cm) m2 491.41 26.93 13,233.67 25.00% 3,308.42 25.00% 3,308.42 25.00% 3,308.42 25.00% 3,308.42
02.02.04 VESTIDURA DE DERRAMES (Mezcla C:A 1:5, E=2cm, A=15cm) m 514.72 8.02 4,128.05
25.00%
1,032.01
25.00%
1,032.01
25.00%
1,032.01
25.00%
1,032.01
02.02.05 BRUÑAS E=1cm m 761.40 4.47 3,403.46 25.00% 850.87 25.00% 850.87 25.00% 850.87 25.00% 850.87
02.02.06 BRUÑAS E=5cm m 1,199.35 5.35 6,416.52 25.00% 1,604.13 25.00% 1,604.13 25.00% 1,604.13 25.00% 1,604.13
02.02.07 BRUÑAS E=10 cm m 313.95 6.91 2,169.39 25.00% 542.35 25.00% 542.35 25.00% 542.35 25.00% 542.35
02.03 CIELORRASOS
02.03.01 CIELO RASO HORIZONTAL (Mezcla C:A 1:4, E=2.5cm) m2 436.98 54.39 23,767.34 25.00% 5,941.84 25.00% 5,941.84 25.00% 5,941.84 25.00% 5,941.84
02.03.02
CIELO RASO SUSPENDIDO (BALDOSA ACUSTICA DE FIBRA
MINERAL DE 0.61X0.61 E=5/8")
m2 811.64 50.40 40,906.66
25.00%
10,226.67
25.00%
10,226.67
25.00%
10,226.67
25.00%
10,226.67
02.03.03
TARRAJEO DE SUPERFICIES EN FONDO DE ESCALERAS
(Mezcla C:A 1:5, E=1.5cm)
m2 570.69 28.01 15,985.03
25.00%
3,996.26
25.00%
3,996.26
25.00%
3,996.26
25.00%
3,996.26
02.03.04 VESTIDURA DE ARISTAS EN FONDO DE ESCALERAS m 672.25 7.75 5,209.94 25.00% 1,302.49 25.00% 1,302.49 25.00% 1,302.49 25.00% 1,302.49
02.04 PISOS Y PAVIMENTOS
Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
02.04.01 CONTRAPISO DE 48mm (Mezcla C:A, Base 1:5, Acabado 1:2) m2 1,264.83 20.23 25,587.51
25.00%
6,396.88
25.00%
6,396.88
25.00%
6,396.88
25.00%
6,396.88
02.04.02
PISO DE CERAMICO ANTIDESLIZANTE COLOR BLANCO 40 x
40 cm.
m2 228.19 48.43 11,051.24
25.00%
2,762.81
25.00%
2,762.81
25.00%
2,762.81
25.00%
2,762.81
02.04.03 PISO DE PORCELANATO COLOR BLANCO 60X60 CM. m2 399.47 67.49 26,960.23 25.00% 6,740.06 25.00% 6,740.06 25.00% 6,740.06 25.00% 6,740.06
02.04.04 PISO DE PORCELANATO COLOR BEIGE 60X60 CM. m2 424.19 67.49 28,628.58 25.00% 7,157.15 25.00% 7,157.15 25.00% 7,157.15 25.00% 7,157.15
02.04.05 PISO DE PARQUETON VETEADO m2 135.46 79.05 10,708.11 25.00% 2,677.03 25.00% 2,677.03 25.00% 2,677.03 25.00% 2,677.03
02.04.06
PISO DE CEMENTO PULIDO COLOREADO Y BRUÑADO 1.00 X
1.00
m2 204.63 24.65 5,044.13
25.00%
1,261.03
25.00%
1,261.03
25.00%
1,261.03
25.00%
1,261.03
02.04.07 PISOS DE ADOQUIN DE CONCRETO 10 X 20 CM. m2 50.90 88.83 4,521.45 25.00% 1,130.36 25.00% 1,130.36 25.00% 1,130.36 25.00% 1,130.36
02.04.08 VEREDA DE E= 4", ACABADO MEZCLA 1:5 (C:H) m2 73.48 46.58 3,422.70 25.00% 855.68 25.00% 855.68 25.00% 855.68 25.00% 855.68
02.05 CONTRAZOCALOS
02.05.01 CONTRAZOCALO DE MADERA CEDRO 3/4"x4" (Incluye Rodón) m 344.10 15.16 5,216.56
33.33%
1,738.85
33.33%
1,738.85
33.33%
1,738.85
02.05.02
CONTRAZOCALO DE PORCELANATO COLOR BLANCO, H=0.10
M
m 128.10 28.71 3,677.75
33.33%
1,225.92
33.33%
1,225.92
33.33%
1,225.92
02.05.03 CONTRAZOCALO DE PORCELANATO COLOR BEIGE, H=0.10 M m 285.70 28.71 8,202.45
33.33%
2,734.15
33.33%
2,734.15
33.33%
2,734.15
02.06 ZOCALOS
02.06.01 ZOCALO DE CERAMICO COLOR BLANCO DE 40 X 40 CM. m2 308.51 59.58 18,381.03 33.33% 6,127.01 33.33% 6,127.01 33.33% 6,127.01
02.07 REVESTIMIENTO DE GRADAS Y ESCALERAS
02.07.01
REVESTIMIENTO DE GRADAS Y PELDAÑOS CON
PORCELANATO COLOR BLANCO
m2 96.31 89.84 8,652.49
33.33%
2,884.16
33.33%
2,884.16
33.33%
2,884.16
02.07.02 REVESTIMIENTO DE DESCANSOS CON PORCELANATO m2 102.56 73.69 7,557.65 33.33% 2,519.22 33.33% 2,519.22 33.33% 2,519.22
02.07.03 CANTONERA DE ALUMINIO 2"X11/2" CON ANCLAJE m 339.60 10.01 3,399.40 33.33% 1,133.13 33.33% 1,133.13 33.33% 1,133.13
02.08 REVESTIMIENTOS ESPECIALES
02.08.01 REVESTIMIENTO CON PIEDRA KALA GRIS m2 174.19 198.98 34,660.33 33.33% 11,553.44 33.33% 11,553.44 33.33% 11,553.44
02.08.02
REVESTIMIENTO DE MESONES CON CERAMICO COLOR
BLANCO 0.30X0.30M
m2 37.59 52.64 1,978.74
33.33%
659.58
33.33%
659.58
33.33%
659.58
02.09 CARPINTERIA DE MADERA
02.09.01
PUERTAS CONTRAPLACADAS CON MDF 4MM REVESTIDAS
CON FORMICA (Incluye Marco)
m2 63.42 196.60 12,468.37
33.33%
4,156.12
33.33%
4,156.12
33.33%
4,156.12
02.09.02
BARANDA DE MADERA D=3" CON TUBO ELECTROSOLDADO 1
1/2"
m 88.20 135.71 11,969.62
33.33%
3,989.87
33.33%
3,989.87
33.33%
3,989.87
02.10 CARPINTERIA METALICA Y HERRERIA
02.10.01
PUERTA METALICA ANTIFUEGO P-5 (INCL. SUMINISTRO Y
COLOCACION)
und 3.00 4,200.00 12,600.00
50.00%
6,300.00
50.00%
6,300.00
02.10.02
PUERTA METALICA ANTIFUEGO P-7 (INCL. SUMINISTRO Y
COLOCACION)
und 1.00 6,750.00 6,750.00
50.00%
3,375.00
50.00%
3,375.00
02.10.03 PUERTA METALICA CON REJILLA P-5 und 1.00 220.00 220.00 50.00% 110.00 50.00% 110.00
02.10.04 BARANDA 02 METALICA EN ESCALERAS m 79.50 84.05 6,681.98 50.00% 3,340.99 50.00% 3,340.99
02.10.05
BARRA DE APOYO DE F°G°, D=1 1/2" EN SS.HH.
DISCAPACITADOS
und 15.00 64.51 967.65
50.00%
483.83
50.00%
483.83
02.10.06 TAPA METALICA EN BOTADERO DE BASURA und 15.00 40.00 600.00 50.00% 300.00 50.00% 300.00
02.10.07 VENTANA METALICA APERSIANADA V-23 und 1.00 35.00 35.00 50.00% 17.50 50.00% 17.50
02.10.08 VENTANA METALICA APERSIANADA V-25 und 14.00 50.00 700.00 50.00% 350.00 50.00% 350.00
02.11 CARPINTERIA DE MELAMINA
02.11.01 PUERTAS DE MELAMINA Y METAL (INCLUYE CERRAJERIA) m2 119.60 84.28 10,079.89
50.00%
5,039.95
50.00%
5,039.95
02.11.02
SEPARADORES DE MELAMINA Y METAL PARA SERVICIOS
HIGIENICOS
m2 135.42 108.21 14,653.80
50.00%
7,326.90
50.00%
7,326.90
02.11.03
SEPARADORES DE MELAMINA Y FIERRO ANGULAR PARA
URINARIOS
m2 16.00 55.86 893.76
50.00%
446.88
50.00%
446.88
Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
02.11.04
MOBILIARIO DE MELAMINA GALAXIA COLOR BLANCO PARA
KITCHENETTE
GLB 1.00 1,750.00 1,750.00
50.00%
875.00
50.00%
875.00
02.12 CERRAJERIA
02.12.01 BISAGRAS CAPUCHINAS ALUMINIZADAS 4" pza 1,095.00 7.68 8,409.60 50.00% 4,204.80 50.00% 4,204.80
02.12.02 CERRADURA PARA PUERTAS INTERIORES 02 GOLPES pza 249.00 65.29 16,257.21 50.00% 8,128.61 50.00% 8,128.61
02.12.03 CERRADURA TIPO BOLA PARA SS.HH. pza 47.00 47.29 2,222.63 50.00% 1,111.32 50.00% 1,111.32
02.12.04 PICAPORTE DE ALUMINIO 6" pza 142.00 19.64 2,788.88 50.00% 1,394.44 50.00% 1,394.44
02.13 VIDRIOS, CRISTALES Y SIMILARES
02.13.01
CRISTAL TEMPLADO TRANSPARENTE E=6MM SIST.
MODUGLASS
p2 489.12 17.85 8,730.79
50.00%
4,365.40
50.00%
4,365.40
02.13.02
CRISTAL TEMPLADO TRANSPARENTE E=10MM SIST.
MODUGLASS
p2 445.94 25.73 11,474.04
50.00%
5,737.02
50.00%
5,737.02
02.13.03
CRISTAL TEMPLADO COLOR GRISS E=6MM SIST.
MODUGLASS
p2 390.02 19.43 7,578.09
50.00%
3,789.05
50.00%
3,789.05
02.13.04
CRISTAL TEMPLADO GRISS E=6MM. SISTEMA MURO
CORTINA
p2 752.15 24.50 18,427.68
50.00%
9,213.84
50.00%
9,213.84
02.13.05 PANEL DE ALUMINIO E=6MM, SITEMA MURO CORTINA p2 726.49 22.00 15,982.78 50.00% 7,991.39 50.00% 7,991.39
02.13.06 ESPEJO CORRIDO EMPOTRADO PARA SS.HH. p2 166.60 7.56 1,259.50 50.00% 629.75 50.00% 629.75
02.14 PINTURA
02.14.01
PINTURA LATEX EN CIELO RASO (Incluye Vigas y Fondo de
Escaleras)
m2 607.26 7.84 4,760.92
50.00%
2,380.46
50.00%
2,380.46
02.14.02
PINTURA EN MUROS INTERIORES (Incluye Columnas y
Derrames)
m2 168.94 165.62 27,979.84
50.00%
13,989.92
50.00%
13,989.92
02.14.03
PINTURA EN MUROS EXTERIORES (Incluye Columnas y
Derrames)
m2 95.97 169.34 16,251.56
50.00%
8,125.78
50.00%
8,125.78
02.14.04 PINTURA BARNIZ EN CONTRAZOCALOS DE MADERA m 224.41 4.08 915.59 50.00% 457.80 50.00% 457.80
02.14.05 PINTURA BARNIZ EN PUERTAS DE MADERA m2 643.40 9.13 5,874.24 50.00% 2,937.12 50.00% 2,937.12
02.14.06
PINTURA ANTICORROSIVA EN BARANDAS, PASAMANOS Y
MARCOS
m 46.19 160.57 7,416.73
50.00%
3,708.37
50.00%
3,708.37
02.15 TANQUE CISTERNA
02.15.01 REVOQUES ENLUCIDOS Y MOLDURAS
02.15.01.01 TARRAJEO EN INTERIORES (Mezcla C:A 1:4, E=2cm) m2 70.60 20.57 1,452.24 50.00% 726.12 50.00% 726.12
02.15.01.02 TARRAJEO EN EXTERIORES (Mezcla C:A 1:4, E=2cm) m2 76.69 26.93 2,065.26 50.00% 1,032.63 50.00% 1,032.63
02.15.01.03
TARRAJEO CON IMPERMEABILIZANTES (Mezcla C:A 1:4,
E=2cm)
m2 111.02 24.25 2,692.24
50.00%
1,346.12
50.00%
1,346.12
02.15.02 CIELORRASOS
02.15.02.01
CIELO RASO HORIZONTAL CON IMPERMEABILIZANTE
(Mezcla C:A 1:4, E=2.5cm)
m2 48.00 56.75 2,724.00
50.00%
1,362.00
50.00%
1,362.00
02.15.03 PISOS Y PAVIMENTOS
02.15.03.01 PISO DE CEMENTO PULIDO CON IMPERMEABILIZANTE m2 133.35 24.16 3,221.74 50.00% 1,610.87 50.00% 1,610.87
03 INSTALACIONES SANITARIAS
03.01
SUMINISTRO E INSTALACION DE APARATOS Y ACCESORIOS
SANITARIOS
03.01.01 IINODORO FLUXOMETRO DE DESCARGA REDUCIDA pza 36.00 450.00 16,200.00 50.00% 8,100.00 50.00% 8,100.00
03.01.02 LAVATORIO OVALIN EMPOTRADO PARA AGUA FRIA pza 38.00 110.00 4,180.00 50.00% 2,090.00 50.00% 2,090.00
03.01.03 LAVATORIO OVALIN PEDESTAL AGUA FRIA pza 6.00 120.00 720.00 50.00% 360.00 50.00% 360.00
03.01.04 URINARIO FLUXOMETRO DE DESCARGA REDUCIDA pza 15.00 300.00 4,500.00 50.00% 2,250.00 50.00% 2,250.00
03.01.05 LAVADERO DE ACERO INOXIDABLE C/ACCES. pza 2.00 150.00 300.00 50.00% 150.00 50.00% 150.00
03.01.06 JABONERA DE LOSA COLOR BLANCO und 50.00 50.00 2,500.00 50.00% 1,250.00 50.00% 1,250.00
03.01.07 PAPELERA DE LOSA Y BARRA PLASTICA, COLOR BLANCO und 50.00 37.50 1,875.00
50.00%
937.50
50.00%
937.50
03.01.08 COLOCACION DE APARATOS SANITARIOS pza 125.00 17.83 2,228.75 50.00% 1,114.38 50.00% 1,114.38
03.01.09 COLOCACION DE ACCESORIOS SANITARIOS pza 125.00 13.40 1,675.00 50.00% 837.50 50.00% 837.50
Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
03.02 SISTEMA DE DESAGUE
03.02.01 SALIDAS
03.02.01.01 SALIDA DE DESAGUE PVC SAL 2" pto 36.00 33.59 1,209.24 20.00% 241.85 20.00% 241.85 20.00% 241.85 20.00% 241.85 20.00% 241.85
03.02.01.02 SALIDA DE DESAGUE PVC SAL 4" pto 23.00 38.46 884.58 20.00% 176.92 20.00% 176.92 20.00% 176.92 20.00% 176.92 20.00% 176.92
03.02.02 REDES COLECTORAS
03.02.02.01 REDES COLECTORAS: TUBERIA PVC SAL 6" COLGADA m 6.35 30.45 193.36 20.00% 38.67 20.00% 38.67 20.00% 38.67 20.00% 38.67 20.00% 38.67
03.02.02.02 REDES COLECTORAS: TUBERIA PVC SAL 6" EN MONTANTE m 63.00 23.25 1,464.75
20.00%
292.95
20.00%
292.95
20.00%
292.95
20.00%
292.95
20.00%
292.95
03.02.02.03 REDES COLECTORAS: TUBERIA PVC SAL DE 2" COLGADA m 43.15 16.79 724.49
20.00%
144.90
20.00%
144.90
20.00%
144.90
20.00%
144.90
20.00%
144.90
03.02.02.04 REDES COLECTORAS: TUBERIA PVC SAL 4" COLGADA m 37.46 20.21 757.07 20.00% 151.41 20.00% 151.41 20.00% 151.41 20.00% 151.41 20.00% 151.41
03.02.03 ACCESORIOS DE REDES
03.02.03.01 ACCESORIOS DE REDES: CODOS PVC SAL 2"x45° pza 29.00 12.87 373.23 20.00% 74.65 20.00% 74.65 20.00% 74.65 20.00% 74.65 20.00% 74.65
03.02.03.02 ACCESORIOS DE REDES: CODOS PVC SAL 2"x90° pza 46.00 11.67 536.82 20.00% 107.36 20.00% 107.36 20.00% 107.36 20.00% 107.36 20.00% 107.36
03.02.03.03 ACCESORIOS DE REDES: CODOS PVC SAL 4"x45° pza 57.00 15.37 876.09 20.00% 175.22 20.00% 175.22 20.00% 175.22 20.00% 175.22 20.00% 175.22
03.02.03.04
ACCESORIO DE REDES: CODO CON VENTILACION PVC SAL
4"x2"x90°
pza 33.00 19.10 630.30
20.00%
126.06
20.00%
126.06
20.00%
126.06
20.00%
126.06
20.00%
126.06
03.02.03.05 ACCESORIOS DE REDES: REDUCCION PVC C-10 DE 4" a 2" pza 32.00 5.82 186.24
20.00%
37.25
20.00%
37.25
20.00%
37.25
20.00%
37.25
20.00%
37.25
03.02.03.06 ACCESORIOS DE REDES: REDUCCION PVC C-10 DE 6" a 4" pza 8.00 8.02 64.16
20.00%
12.83
20.00%
12.83
20.00%
12.83
20.00%
12.83
20.00%
12.83
03.02.03.07 ACCESORIOS DE REDES: TAPON PVC SAL 4" pza 12.00 14.69 176.28 20.00% 35.26 20.00% 35.26 20.00% 35.26 20.00% 35.26 20.00% 35.26
03.02.03.08 ACCESORIOS DE REDES: TEES SANITARIO PVC SAL 2" pza 46.00 12.67 582.82 20.00% 116.56 20.00% 116.56 20.00% 116.56 20.00% 116.56 20.00% 116.56
03.02.03.09 ACCESORIOS DE REDES: TEES SANITARIO PVC SAL 6" pza 8.00 20.89 167.12 20.00% 33.42 20.00% 33.42 20.00% 33.42 20.00% 33.42 20.00% 33.42
03.02.03.10 ACCESORIOS DE REDES: TRAMPA "P" PVC SAL 2" pza 19.00 13.89 263.91 20.00% 52.78 20.00% 52.78 20.00% 52.78 20.00% 52.78 20.00% 52.78
03.02.03.11 ACCESORIOS DE REDES: YEES PVC SAL 4"x2" pza 63.00 15.67 987.21 20.00% 197.44 20.00% 197.44 20.00% 197.44 20.00% 197.44 20.00% 197.44
03.02.03.12 ACCESORIOS DE REDES: YEES DOBLES PVC SAL 4" pza 15.00 19.89 298.35 20.00% 59.67 20.00% 59.67 20.00% 59.67 20.00% 59.67 20.00% 59.67
03.02.03.13 ACCESORIOS DE REDES: YEES PVC SAL 2" pza 12.00 12.67 152.04 20.00% 30.41 20.00% 30.41 20.00% 30.41 20.00% 30.41 20.00% 30.41
03.02.03.14 ACCESORIOS DE REDES: YEES PVC SAL 4" pza 45.00 18.67 840.15 20.00% 168.03 20.00% 168.03 20.00% 168.03 20.00% 168.03 20.00% 168.03
03.02.04
TUBERIA Y ACCESORIOS EN INODORO FLUXOMETRO
DESCARGA REDUCIDA
03.02.04.01 TEE PVC-SAP 1 1/4" und 93.00 18.60 1,729.80 20.00% 345.96 20.00% 345.96 20.00% 345.96 20.00% 345.96 20.00% 345.96
03.02.04.02 TAPON HEMBRA PVC SAP 1 1/4" pza 93.00 14.07 1,308.51 20.00% 261.70 20.00% 261.70 20.00% 261.70 20.00% 261.70 20.00% 261.70
03.02.04.03 REDUCCIONES PVC-SAP 1 1/4" A 1" und 93.00 16.72 1,554.96 20.00% 310.99 20.00% 310.99 20.00% 310.99 20.00% 310.99 20.00% 310.99
03.02.04.04 UNION SIMPLE PVC SAP ø 1" C/ROSCA pza 43.00 128.53 5,526.79 20.00% 1,105.36 20.00% 1,105.36 20.00% 1,105.36 20.00% 1,105.36 20.00% 1,105.36
03.02.04.05 TUBERIA PVC SAP R-10 1 1/4" (CAMARA DE AIRE) m 46.50 18.53 861.65 20.00% 172.33 20.00% 172.33 20.00% 172.33 20.00% 172.33 20.00% 172.33
03.02.04.06 TAPON HEMBRA C /ROSCA PVC SAP 1" pza 93.00 11.89 1,105.77 20.00% 221.15 20.00% 221.15 20.00% 221.15 20.00% 221.15 20.00% 221.15
03.02.04.07 KIT DE DESCARGA INDIRECTA D=1" PARA INODORO und 93.00 25.58 2,378.94 20.00% 475.79 20.00% 475.79 20.00% 475.79 20.00% 475.79 20.00% 475.79
03.02.05
TUBERIA Y ACCESORIOS EN URINARIO FLUXOMETRO
DESCARGA REDUCIDA
03.02.05.01 TEE PVC-SAP 1" und 15.00 15.60 234.00 20.00% 46.80 20.00% 46.80 20.00% 46.80 20.00% 46.80 20.00% 46.80
03.02.05.02 TAPON HEMBRA PVC SAP 1" pza 15.00 11.87 178.05 20.00% 35.61 20.00% 35.61 20.00% 35.61 20.00% 35.61 20.00% 35.61
03.02.05.03 REDUCCIONES PVC-SAP 1" A 3/4" pza 5.00 15.72 78.60 20.00% 15.72 20.00% 15.72 20.00% 15.72 20.00% 15.72 20.00% 15.72
03.02.05.04
ADAPTADOR UNION PRESION ROSCA PVC SAP ø 3/4"
C/ROSCA
pza 15.00 129.15 1,937.25
20.00%
387.45
20.00%
387.45
20.00%
387.45
20.00%
387.45
20.00%
387.45
03.02.05.05 TUBERIA PVC SAP R-10 1" (CAMARA DE AIRE) m 20.01 12.76 255.33 20.00% 51.07 20.00% 51.07 20.00% 51.07 20.00% 51.07 20.00% 51.07
03.02.05.06 TAPON HEMBRA C/ROSCA PVC SAP 3/4" pza 15.00 11.39 170.85 20.00% 34.17 20.00% 34.17 20.00% 34.17 20.00% 34.17 20.00% 34.17
03.02.05.07 KIT DE DESCARGA INDIRECTA D=3/4" PARA URINARIO und 15.00 23.58 353.70 20.00% 70.74 20.00% 70.74 20.00% 70.74 20.00% 70.74 20.00% 70.74
03.02.06 ADITAMENTOS VARIOS
03.02.06.01
ADITAMENTOS VARIOS: REGISTRO ROSCADO DE BRONCE
4"
pza 33.00 34.77 1,147.41
20.00%
229.48
20.00%
229.48
20.00%
229.48
20.00%
229.48
20.00%
229.48
03.02.06.02 ADITAMENTOS VARIOS: SUMIDEROS DE BRONCE 2" pza 49.00 26.42 1,294.58 20.00% 258.92 20.00% 258.92 20.00% 258.92 20.00% 258.92 20.00% 258.92
Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
03.02.06.03
SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO
4"
pza 108.00 18.29 1,975.32
20.00%
395.06
20.00%
395.06
20.00%
395.06
20.00%
395.06
20.00%
395.06
03.02.06.04
SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO
2"
pza 80.00 21.29 1,703.20
20.00%
340.64
20.00%
340.64
20.00%
340.64
20.00%
340.64
20.00%
340.64
03.02.06.05
SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO
6"
pza 3.00 23.29 69.87
19.99%
13.97
19.99%
13.97
19.99%
13.97
19.99%
13.97
19.99%
13.97
03.02.06.06 SOMBRERO DE VENTILACION PVC SAL 6" pza 1.00 20.63 20.63 20.02% 4.13 20.02% 4.13 20.02% 4.13 20.02% 4.13 20.02% 4.13
03.02.06.07
ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y
DOS OREJAS TORNILLOS, 6"
pza 21.00 17.49 367.29
20.00%
73.46
20.00%
73.46
20.00%
73.46
20.00%
73.46
20.00%
73.46
03.02.07 SISTEMA DE REDES DE COLECCION
03.02.07.01 TRABAJOS PRELIMINARES
03.02.07.01.01 LIMPIEZA DE TERRENO MANUAL m 12.20 3.28 40.02 19.99% 8.00 19.99% 8.00 19.99% 8.00 19.99% 8.00 19.99% 8.00
03.02.07.01.02 TRAZO Y REPLANTEO m 12.20 1.03 12.57 19.97% 2.51 19.97% 2.51 19.97% 2.51 19.97% 2.51 19.97% 2.51
03.02.07.01.03 SEÑALIZACION PARA SEGURIDAD EN OBRA m 20.00 24.09 481.80 20.00% 96.36 20.00% 96.36 20.00% 96.36 20.00% 96.36 20.00% 96.36
03.02.07.02 MOVIMIENTO DE TIERRAS
03.02.07.02.01
EXCAVACION DE ZANJA, Hprom.=0.80 TERRENO
SEMIROCOSO
m3 4.88 23.79 116.10
20.00%
23.22
20.00%
23.22
20.00%
23.22
20.00%
23.22
20.00%
23.22
03.02.07.02.02
EXCAVACION DE CAJA REGISTRO H=PROM. 0.80M.
18"X24", TERRENO SEMIROCOSO
m 1.25 9.40 11.75
20.00%
2.35
20.00%
2.35
20.00%
2.35
20.00%
2.35
20.00%
2.35
03.02.07.02.03 REFINE Y NIVELACION ZANJA TERR.SEMIROCOSO m 12.20 2.93 35.75 20.00% 7.15 20.00% 7.15 20.00% 7.15 20.00% 7.15 20.00% 7.15
03.02.07.02.04 CAMA DE APOYO PARA TUBERIA m 12.20 10.58 129.08 20.00% 25.82 20.00% 25.82 20.00% 25.82 20.00% 25.82 20.00% 25.82
03.02.07.02.05
RELLENO Y COMPACTADO CON MATERIAL
SELECCIONADO
m3 4.58 29.07 133.14
20.00%
26.63
20.00%
26.63
20.00%
26.63
20.00%
26.63
20.00%
26.63
03.02.07.02.06 ACARREO DE MATERIAL EXCEDENTE D=30m m3 0.39 6.54 2.55 20.00% 0.51 20.00% 0.51 20.00% 0.51 20.00% 0.51 20.00% 0.51
03.02.07.03 SUMINISTRO E INSTALACION DE TUBERIA
03.02.07.03.01 TUBERIA DE PVC SAL 6" m 12.20 37.62 458.96 20.00% 91.79 20.00% 91.79 20.00% 91.79 20.00% 91.79 20.00% 91.79
03.02.08 CAJAS DE REGISTRO
03.02.08.01
CAJA DE REGISTRO DE DESAGUE 18" X 24"Hprom.=0.80,
CON TAPA DE CONCRETO
und 3.00 203.30 609.90
20.00%
121.98
20.00%
121.98
20.00%
121.98
20.00%
121.98
20.00%
121.98
03.02.09 SISTEMA DE VENTILACION
03.02.09.01 SALIDAS
03.02.09.01.01 SALIDA DE VENTILACION EN TECHO PVC SAL 8" pto 1.00 27.62 27.62 19.99% 5.52 19.99% 5.52 19.99% 5.52 19.99% 5.52 19.99% 5.52
03.02.09.02 REDES COLECTORAS
03.02.09.02.01 TUBERIA DE PVC SAL 3" EMPOTRADA m 44.80 13.77 616.90 20.00% 123.38 20.00% 123.38 20.00% 123.38 20.00% 123.38 20.00% 123.38
03.02.09.02.02
REDES COLECTORAS: TUBERIA PVC SAL DE 2"
EMPOTRADA
m 48.91 7.02 343.35
20.00%
68.67
20.00%
68.67
20.00%
68.67
20.00%
68.67
20.00%
68.67
03.02.09.02.03
REDES COLECTORAS: TUBERIA PVC SAL 8" EN
MONTANTE
m 63.80 7.05 449.79
20.00%
89.96
20.00%
89.96
20.00%
89.96
20.00%
89.96
20.00%
89.96
03.02.09.02.04 REDES COLECTORAS: TUBERIA PVC SAL DE 3", COLGADA m 42.00 11.57 485.94
20.00%
97.19
20.00%
97.19
20.00%
97.19
20.00%
97.19
20.00%
97.19
03.02.09.02.05 REDES COLECTORAS: TUBERIA PVC SAL DE 2" COLGADA m 55.97 16.79 939.74
20.00%
187.95
20.00%
187.95
20.00%
187.95
20.00%
187.95
20.00%
187.95
03.02.10 ACCESORIOS DE REDES
03.02.10.01 ACCESORIOS DE REDES: CODOS PVC SAL 2"x90° pza 278.00 11.67 3,244.26 20.00% 648.85 20.00% 648.85 20.00% 648.85 20.00% 648.85 20.00% 648.85
03.02.10.02 ACCESORIOS DE REDES: TEES PVC SAL 2" pza 158.00 10.89 1,720.62 20.00% 344.12 20.00% 344.12 20.00% 344.12 20.00% 344.12 20.00% 344.12
03.02.10.03 ACCESORIOS DE REDES: REDUCCION PVC SAL DE 3" a 2" pza 42.00 7.21 302.82
20.00%
60.56
20.00%
60.56
20.00%
60.56
20.00%
60.56
20.00%
60.56
03.02.10.04 ACCESORIOS DE REDES: TEES SANITARIO PVC SAL 3" pza 28.00 13.89 388.92 20.00% 77.78 20.00% 77.78 20.00% 77.78 20.00% 77.78 20.00% 77.78
03.02.10.05 ACCESORIOS DE REDES: CODOS PVC SAL 3"x90° pza 14.00 12.89 180.46 20.00% 36.09 20.00% 36.09 20.00% 36.09 20.00% 36.09 20.00% 36.09
03.02.10.06 ACCESORIOS DE REDES: TEES PVC SAL 3"X2" pza 14.00 8.89 124.46 20.00% 24.89 20.00% 24.89 20.00% 24.89 20.00% 24.89 20.00% 24.89
03.02.10.07 ACCESORIOS DE REDES: TEES SANITARIO PVC SAL 8" a 4" pza 14.00 8.89 124.46
20.00%
24.89
20.00%
24.89
20.00%
24.89
20.00%
24.89
20.00%
24.89
Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
03.02.10.08 ACCESORIOS DE REDES: REDUCCION PVC SAL DE 4" a 3" pza 14.00 4.71 65.94
20.00%
13.19
20.00%
13.19
20.00%
13.19
20.00%
13.19
20.00%
13.19
03.02.11 ADITAMENTOS VARIOS
03.02.11.01
SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO
3"
pza 43.00 34.54 1,485.22
20.00%
297.04
20.00%
297.04
20.00%
297.04
20.00%
297.04
20.00%
297.04
03.02.11.02
SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO
2"
pza 107.00 21.29 2,278.03
20.00%
455.61
20.00%
455.61
20.00%
455.61
20.00%
455.61
20.00%
455.61
03.02.11.03 SOMBRERO DE VENTILACION PVC SAL 8" pza 1.00 5.63 5.63 20.07% 1.13 20.07% 1.13 20.07% 1.13 20.07% 1.13 20.07% 1.13
03.02.11.04
ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y
DOS OREJAS TORNILLOS, 8"
pza 23.00 79.59 1,830.57
20.00%
366.11
20.00%
366.11
20.00%
366.11
20.00%
366.11
20.00%
366.11
03.03 SISTEMA DE AGUA FRIA
03.03.01 SALIDAS
03.03.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 45.00 41.31 1,858.95 20.00% 371.79 20.00% 371.79 20.00% 371.79 20.00% 371.79 20.00% 371.79
03.03.01.02 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1" pto 31.00 47.04 1,458.24 20.00% 291.65 20.00% 291.65 20.00% 291.65 20.00% 291.65 20.00% 291.65
03.03.01.03 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1 1/4" pto 43.00 54.04 2,323.72
20.00%
464.74
20.00%
464.74
20.00%
464.74
20.00%
464.74
20.00%
464.74
03.03.02 REDES DE DISTRIBUCION
03.03.02.01 RED DE DISTRIBUCION: TUBERIA PVC CLASE 10 R 1/2" m 71.58 7.85 561.90 20.00% 112.38 20.00% 112.38 20.00% 112.38 20.00% 112.38 20.00% 112.38
03.03.02.02 RED DE DISTRIBUCION: TUBERIA PVC CLASE 10 R 3/4" m 40.10 7.32 293.53 20.00% 58.71 20.00% 58.71 20.00% 58.71 20.00% 58.71 20.00% 58.71
03.03.02.03 RED DE DISTRIBUCION: TUBERIA PVC CLASE 10 R 1" m 59.83 8.71 521.12 20.00% 104.22 20.00% 104.22 20.00% 104.22 20.00% 104.22 20.00% 104.22
03.03.02.04 RED DE DISTRIBUCION: TUBERIA PVC CLASE 10 R 1 1/4" m 251.11 12.17 3,056.01
20.00%
611.20
20.00%
611.20
20.00%
611.20
20.00%
611.20
20.00%
611.20
03.03.02.05 RED DE DISTRIBUCION: TUBERIA PVC CLASE 10 R 1 1/2" m 263.65 13.85 3,651.55
20.00%
730.31
20.00%
730.31
20.00%
730.31
20.00%
730.31
20.00%
730.31
03.03.03 ACCESORIOS DE REDES
03.03.03.01
ADAPTADOR UNION PRESION ROSCA PVC SAP ø 1 1/2"
C/ROSCA
pza 54.00 83.24 4,494.96
20.00%
898.99
20.00%
898.99
20.00%
898.99
20.00%
898.99
20.00%
898.99
03.03.03.02
ADAPTADOR UNION PRESION ROSCA PVC SAP ø 1 1/4"
C/ROSCA
pza 4.00 85.24 340.96
20.00%
68.19
20.00%
68.19
20.00%
68.19
20.00%
68.19
20.00%
68.19
03.03.03.03
ADAPTADOR UNION PRESION ROSCA PVC SAP ø 1"
C/ROSCA
pza 2.00 82.24 164.48
20.00%
32.90
20.00%
32.90
20.00%
32.90
20.00%
32.90
20.00%
32.90
03.03.03.04 ACCESORIOS DE REDES:CODOS PVC C-10 DE 1/2" x 90° pza 95.00 5.71 542.45
20.00%
108.49
20.00%
108.49
20.00%
108.49
20.00%
108.49
20.00%
108.49
03.03.03.05 ACCESORIOS DE REDES:CODOS PVC C-10 DE 1 1/2" x 90° pza 109.00 7.21 785.89
20.00%
157.18
20.00%
157.18
20.00%
157.18
20.00%
157.18
20.00%
157.18
03.03.03.06 ACCESORIOS DE REDES:CODOS PVC C-10 DE 1 1/4" x 90° pza 80.00 8.21 656.80
20.00%
131.36
20.00%
131.36
20.00%
131.36
20.00%
131.36
20.00%
131.36
03.03.03.07 ACCESORIOS DE REDES:CODOS PVC C-10 DE 1" x 90° pza 66.00 6.21 409.86 20.00% 81.97 20.00% 81.97 20.00% 81.97 20.00% 81.97 20.00% 81.97
03.03.03.08 ACCESORIOS DE REDES:CODOS PVC C-10 DE 3/4" x 90° pza 68.00 6.71 456.28
20.00%
91.26
20.00%
91.26
20.00%
91.26
20.00%
91.26
20.00%
91.26
03.03.03.09 ACCESORIOS DE REDES:CODOS PVC C-10 DE 1/2" x 90° pza 47.00 5.71 268.37
20.00%
53.67
20.00%
53.67
20.00%
53.67
20.00%
53.67
20.00%
53.67
03.03.03.10
ACCESORIOS DE REDES: NIPLES ROSCADO DE FºGº 1 1/2" x
4"
pza 12.00 101.29 1,215.48
20.00%
243.10
20.00%
243.10
20.00%
243.10
20.00%
243.10
20.00%
243.10
03.03.03.11
ACCESORIOS DE REDES: NIPLES ROSCADO DE FºGº 1 1/4" x
4"
pza 4.00 96.29 385.16
20.00%
77.03
20.00%
77.03
20.00%
77.03
20.00%
77.03
20.00%
77.03
03.03.03.12 ACCESORIOS DE REDES: NIPLES ROSCADO DE FºGº 1" x 4" pza 2.00 104.41 208.82
20.00%
41.76
20.00%
41.76
20.00%
41.76
20.00%
41.76
20.00%
41.76
03.03.03.13 REDUCCIONES PVC-SAP 1 1/2" A 1 1/4" pza 33.00 15.72 518.76 20.00% 103.75 20.00% 103.75 20.00% 103.75 20.00% 103.75 20.00% 103.75
03.03.03.14 REDUCCIONES PVC-SAP 1 1/2" A 1" pza 15.00 15.72 235.80 20.00% 47.16 20.00% 47.16 20.00% 47.16 20.00% 47.16 20.00% 47.16
03.03.03.15 REDUCCIONES PVC-SAP 1 1/2" A 1/2" pza 1.00 16.72 16.72 19.98% 3.34 19.98% 3.34 19.98% 3.34 19.98% 3.34 19.98% 3.34
03.03.03.16 REDUCCIONES PVC-SAP 1 1/2" A 3/4" pza 17.00 16.72 284.24 20.00% 56.85 20.00% 56.85 20.00% 56.85 20.00% 56.85 20.00% 56.85
03.03.03.17 REDUCCIONES PVC-SAP 1 1/4" A 1" und 2.00 16.72 33.44 20.01% 6.69 20.01% 6.69 20.01% 6.69 20.01% 6.69 20.01% 6.69
Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
03.03.03.18 REDUCCIONES PVC-SAP 1 1/4" A 1/2" pza 2.00 18.72 37.44 20.01% 7.49 20.01% 7.49 20.01% 7.49 20.01% 7.49 20.01% 7.49
03.03.03.19 REDUCCIONES PVC-SAP 1 1/4" A 3/4" pza 15.00 18.72 280.80 20.00% 56.16 20.00% 56.16 20.00% 56.16 20.00% 56.16 20.00% 56.16
03.03.03.20 REDUCCIONES PVC-SAP 1" A 1/2" pza 2.00 14.72 29.44 20.01% 5.89 20.01% 5.89 20.01% 5.89 20.01% 5.89 20.01% 5.89
03.03.03.21 REDUCCIONES PVC-SAP 2 1/2" A 1 1/2" pza 5.00 25.72 128.60 20.00% 25.72 20.00% 25.72 20.00% 25.72 20.00% 25.72 20.00% 25.72
03.03.03.22 REDUCCIONES PVC-SAP 2" A 1 1/2" pza 14.00 18.72 262.08 20.00% 52.42 20.00% 52.42 20.00% 52.42 20.00% 52.42 20.00% 52.42
03.03.03.23 REDUCCIONES PVC-SAP 3/4" A 1/2" pza 63.00 14.22 895.86 20.00% 179.17 20.00% 179.17 20.00% 179.17 20.00% 179.17 20.00% 179.17
03.03.03.24 TAPON HEMBRA C/ROSCA PVC SAP 1/2" pza 95.00 10.89 1,034.55 20.00% 206.91 20.00% 206.91 20.00% 206.91 20.00% 206.91 20.00% 206.91
03.03.03.25 TEE PVC-SAP 1 1/2" und 52.00 20.60 1,071.20 20.00% 214.24 20.00% 214.24 20.00% 214.24 20.00% 214.24 20.00% 214.24
03.03.03.26 TEE PVC-SAP 1 1/4" und 79.00 18.60 1,469.40 20.00% 293.88 20.00% 293.88 20.00% 293.88 20.00% 293.88 20.00% 293.88
03.03.03.27 TEE PVC-SAP 1" und 16.00 15.60 249.60 20.00% 49.92 20.00% 49.92 20.00% 49.92 20.00% 49.92 20.00% 49.92
03.03.03.28 TEE PVC-SAP 1/2" und 30.00 13.10 393.00 20.00% 78.60 20.00% 78.60 20.00% 78.60 20.00% 78.60 20.00% 78.60
03.03.03.29 TEE PVC-SAP 2 1/2" und 5.00 30.60 153.00 20.00% 30.60 20.00% 30.60 20.00% 30.60 20.00% 30.60 20.00% 30.60
03.03.03.30 TEE PVC-SAP 2" und 14.00 36.15 506.10 20.00% 101.22 20.00% 101.22 20.00% 101.22 20.00% 101.22 20.00% 101.22
03.03.03.31 TEE PVC-SAP 3/4" und 22.00 14.60 321.20 20.00% 64.24 20.00% 64.24 20.00% 64.24 20.00% 64.24 20.00% 64.24
03.03.03.32 UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1 1/2" und 2.00 110.31 220.62 20.00% 44.12 20.00% 44.12 20.00% 44.12 20.00% 44.12 20.00% 44.12
03.03.03.33 UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1 1/4" und 4.00 105.31 421.24 20.00% 84.25 20.00% 84.25 20.00% 84.25 20.00% 84.25 20.00% 84.25
03.03.03.34 UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1" und 2.00 100.31 200.62 20.00% 40.12 20.00% 40.12 20.00% 40.12 20.00% 40.12 20.00% 40.12
03.03.04 VALVULAS
03.03.04.01 VALVULA COMPUERTA DE BRONCE 1 1/2" pza 46.00 67.12 3,087.52 20.00% 617.50 20.00% 617.50 20.00% 617.50 20.00% 617.50 20.00% 617.50
03.03.04.02 VALVULA COMPUERTA DE BRONCE 1 1/4" pza 2.00 62.12 124.24 20.00% 24.85 20.00% 24.85 20.00% 24.85 20.00% 24.85 20.00% 24.85
03.03.04.03 VALVULA COMPUERTA DE BRONCE 1" pza 1.00 63.58 63.58 20.01% 12.72 20.01% 12.72 20.01% 12.72 20.01% 12.72 20.01% 12.72
03.03.04.04
VALVULA REDUCTORA DE PRESION ROSCADA 2 1/2",
ACERO INOXIDABLE, PN 40
pza 2.00 163.59 327.18
20.00%
65.44
20.00%
65.44
20.00%
65.44
20.00%
65.44
20.00%
65.44
03.03.05 ADITAMENTOS VARIOS
03.03.05.01 VALVULA COMPUERTA DE BRONCE 2 1/2" pza 4.00 107.12 428.48 20.00% 85.70 20.00% 85.70 20.00% 85.70 20.00% 85.70 20.00% 85.70
03.03.05.02 REDUCCION PVC SAP CL. 10, 2 1/2" A 2" pza 2.00 101.46 202.92 20.00% 40.58 20.00% 40.58 20.00% 40.58 20.00% 40.58 20.00% 40.58
03.03.05.03 TEE PVC-SAP 2 1/2" und 2.00 30.60 61.20 20.00% 12.24 20.00% 12.24 20.00% 12.24 20.00% 12.24 20.00% 12.24
03.03.05.04 CODO PVC SAP C-10, 2 1/2" pza 2.00 16.15 32.30 20.00% 6.46 20.00% 6.46 20.00% 6.46 20.00% 6.46 20.00% 6.46
03.03.05.05
ADAPTADOR UNION PRESION ROSCA PVC SAP C-10, Ø 2
1/2"
pza 4.00 102.46 409.84
20.00%
81.97
20.00%
81.97
20.00%
81.97
20.00%
81.97
20.00%
81.97
03.03.05.06 UNION UNIVERSAL DE FIERRO GALVANIZADO DE 2 1/2" pza 8.00 139.46 1,115.68 20.00% 223.14 20.00% 223.14 20.00% 223.14 20.00% 223.14 20.00% 223.14
03.03.05.07
ACCESORIOS DE REDES:NIPLES ROSCADO DE FºGº 2 1/2" x
6"
pza 8.00 125.46 1,003.68
20.00%
200.74
20.00%
200.74
20.00%
200.74
20.00%
200.74
20.00%
200.74
03.03.05.08
ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y
DOS OREJAS TORNILLOS, 1 1/2"
pza 4.00 38.20 152.80
20.00%
30.56
20.00%
30.56
20.00%
30.56
20.00%
30.56
20.00%
30.56
03.03.05.09
ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y
DOS OREJAS TORNILLOS, 2"
pza 12.00 35.17 422.04
20.00%
84.41
20.00%
84.41
20.00%
84.41
20.00%
84.41
20.00%
84.41
03.03.05.10
ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y
DOS OREJAS TORNILLOS, 2 1/2"
pza 7.00 31.63 221.41
20.00%
44.28
20.00%
44.28
20.00%
44.28
20.00%
44.28
20.00%
44.28
03.03.06 PRUEBAS HIDRAULICAS Y DESINFECCION DE TUBERIAS
03.03.06.01 PRUEBA HIDRAULICA Y DESINFECCION DE REDES DE AGUAm 686.27 10.36 7,109.76
100.00%
7,109.76
03.04 SISTEMA DE AGUA PARA RIEGO
03.04.01 SALIDAS
03.04.01.01 SALIDA DE AGUA P/RIEGO TUBERIA DE PVC-SAP 1/2" pto 4.00 48.96 195.84 20.00% 39.17 20.00% 39.17 20.00% 39.17 20.00% 39.17 20.00% 39.17
03.04.02 REDES DE DISTRIBUCION
03.04.02.01 RED DE DISTRIBUCION: TUBERIA PVC CLASE 10 R 1 1/2" m 19.65 13.85 272.15
20.00%
54.43
20.00%
54.43
20.00%
54.43
20.00%
54.43
20.00%
54.43
03.04.02.02 RED DE DISTRIBUCION: TUBERIA PVC CLASE 10 R 3/4" m 40.60 7.32 297.19 20.00% 59.44 20.00% 59.44 20.00% 59.44 20.00% 59.44 20.00% 59.44
03.04.03 ACCESORIOS DE REDES
03.04.03.01 CODO PVC SAL CL. 10, 1/2" x 90º pza 2.00 10.85 21.70 20.00% 4.34 20.00% 4.34 20.00% 4.34 20.00% 4.34 20.00% 4.34
03.04.03.02 REDUCCION PVC SAP CL. 10, 1 1/2" A 3/4" pza 2.00 88.22 176.44 20.00% 35.29 20.00% 35.29 20.00% 35.29 20.00% 35.29 20.00% 35.29
03.04.03.03 CODO PVC SAL CL. 10, 3/4" x 90º pza 2.00 11.85 23.70 20.00% 4.74 20.00% 4.74 20.00% 4.74 20.00% 4.74 20.00% 4.74
Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
03.04.03.04 TEE PVC-SAP CL. 10 3/4" pza 2.00 14.60 29.20 20.00% 5.84 20.00% 5.84 20.00% 5.84 20.00% 5.84 20.00% 5.84
03.04.03.05 REDUCCION PVC SAP CL. 10, 3/4" A 1/2" pza 3.00 9.00 27.00 20.00% 5.40 20.00% 5.40 20.00% 5.40 20.00% 5.40 20.00% 5.40
03.04.03.06 GRIFO P/RIEGO DE BRONCE Ø 1/2" pza 4.00 54.87 219.48 20.00% 43.90 20.00% 43.90 20.00% 43.90 20.00% 43.90 20.00% 43.90
03.04.03.07
ACCESORIOS DE REDES: NIPLES ROSCADO DE FºGº 1/2" x
2"
pza 4.00 94.22 376.88
20.00%
75.38
20.00%
75.38
20.00%
75.38
20.00%
75.38
20.00%
75.38
03.04.03.08 ACCESORIOS DE REDES: CODOS F°G° DE 1/2" x 90° pza 4.00 20.23 80.92 20.00% 16.18 20.00% 16.18 20.00% 16.18 20.00% 16.18 20.00% 16.18
03.05 SISTEMA DE RECOLECCION DE AGUA DE LLUVIA
03.05.01 SUMINISTRO E INSTALACION DE TUBERIA
03.05.01.01 TUBERIA DE PVC SAL 6" MONTANTE m 63.00 19.02 1,198.26 25.00% 299.57 25.00% 299.57 25.00% 299.57 25.00% 299.57
03.05.01.02 TUBERIA DE PVC SAL 6" COLGADA m 13.40 19.02 254.87 25.00% 63.72 25.00% 63.72 25.00% 63.72 25.00% 63.72
03.05.01.03 TUBERIA DE PVC SAL 4" COLGADA m 31.35 14.96 469.00 25.00% 117.25 25.00% 117.25 25.00% 117.25 25.00% 117.25
03.05.02 ACCESORIOS DE REDES
03.05.02.01 TRAMPA "P" DE P.V.C. SAL 4" und 4.00 87.24 348.96 25.00% 87.24 25.00% 87.24 25.00% 87.24 25.00% 87.24
03.05.02.02 CODO PVC SAL 4"X45° pza 8.00 18.36 146.88 25.00% 36.72 25.00% 36.72 25.00% 36.72 25.00% 36.72
03.05.02.03 YEE PVC SAL 4" pza 6.00 18.25 109.50 25.00% 27.38 25.00% 27.38 25.00% 27.38 25.00% 27.38
03.05.02.04 TAPON PVC SAL 4" pza 4.00 14.69 58.76 25.00% 14.69 25.00% 14.69 25.00% 14.69 25.00% 14.69
03.05.02.05 REDUCCION PVC SAP 6" A 4" pza 2.00 118.74 237.48 25.00% 59.37 25.00% 59.37 25.00% 59.37 25.00% 59.37
03.05.02.06 CODO PVC SAL 6"X90° pza 2.00 44.61 89.22 25.01% 22.31 25.01% 22.31 25.01% 22.31 25.01% 22.31
03.05.02.07 ACCESORIOS DE REDES: TEES SANITARIO PVC SAL 6" pza 1.00 20.89 20.89 24.99% 5.22 24.99% 5.22 24.99% 5.22 24.99% 5.22
03.05.02.08 SOMBRERO DE VENTILACION PVC SAL 6" pza 1.00 20.63 20.63 25.01% 5.16 25.01% 5.16 25.01% 5.16 25.01% 5.16
03.05.03 ADITAMENTOS VARIOS
03.05.03.01
SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO
6"
pza 4.00 23.29 93.16
25.00%
23.29
25.00%
23.29
25.00%
23.29
25.00%
23.29
03.05.03.02
ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y
DOS OREJAS TORNILLOS, 8"
pza 21.00 79.59 1,671.39
25.00%
417.85
25.00%
417.85
25.00%
417.85
25.00%
417.85
03.05.03.03 CHARNELA ACERO INOXD. 6" pza 1.00 17.49 17.49 24.99% 4.37 24.99% 4.37 24.99% 4.37 24.99% 4.37
03.06 LINEA DE ADUCCION AGUA POTABLE
03.06.01 TRABAJOS PRELIMINARES
03.06.01.01 LIMPIEZA DE TERRENO MANUAL LINEA DE ADUCCION m 60.00 3.28 196.80 20.00% 39.36 20.00% 39.36 20.00% 39.36 20.00% 39.36 20.00% 39.36
03.06.01.02
TRAZO, NIVELES Y REPLANTEO PRELIMINAR LINEA DE
ADUCCION
m 60.00 1.39 83.40
20.00%
16.68
20.00%
16.68
20.00%
16.68
20.00%
16.68
20.00%
16.68
03.06.02 MOVIMIENTO DE TIERRAS
03.06.02.01 EXCAVACION DE ZANJA,TERRENO SEMIROCOSO m3 30.00 11.61 348.30 20.00% 69.66 20.00% 69.66 20.00% 69.66 20.00% 69.66 20.00% 69.66
03.06.02.02 REFINE Y NIVELACION ZANJA TERR.SEMIROCOSO m 60.00 2.93 175.80 20.00% 35.16 20.00% 35.16 20.00% 35.16 20.00% 35.16 20.00% 35.16
03.06.02.03 CAMA DE APOYO PARA TUBERIA m 60.00 10.58 634.80 20.00% 126.96 20.00% 126.96 20.00% 126.96 20.00% 126.96 20.00% 126.96
03.06.02.04 RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO m3 24.00 29.07 697.68
20.00%
139.54
20.00%
139.54
20.00%
139.54
20.00%
139.54
20.00%
139.54
03.06.02.05 ACARREO DE MATERIAL EXCEDENTE D=30m m3 7.80 6.54 51.01 20.00% 10.20 20.00% 10.20 20.00% 10.20 20.00% 10.20 20.00% 10.20
03.06.03 OBRAS DE CONCRETO SIMPLE
03.06.03.01 DADO DE ANCLAJE EN TUBERIAS F´c=175KG/CM2 m3 0.16 300.42 48.07 19.99% 9.61 19.99% 9.61 19.99% 9.61 19.99% 9.61 19.99% 9.61
03.06.04 TUBERIAS
03.06.04.01 TUBERIA PVC SAP Ø 3" CLASE-7.5 m 59.60 15.29 911.28 20.00% 182.26 20.00% 182.26 20.00% 182.26 20.00% 182.26 20.00% 182.26
03.06.05 ACCESORIOS
03.06.05.01 ACCESORIOS DE REDES:CODOS PVC C-7.5 DE 3" x 90° pza 1.00 29.71 29.71 19.99% 5.94 19.99% 5.94 19.99% 5.94 19.99% 5.94 19.99% 5.94
03.06.05.02 ACCESORIOS DE REDES:CODOS PVC C-7.5 DE 3" x 45° pza 3.00 29.71 89.13 20.00% 17.83 20.00% 17.83 20.00% 17.83 20.00% 17.83 20.00% 17.83
03.06.05.03 ACCESORIOS DE REDES:CODOS PVC C-7.5 DE 3" x 22.5º pza 4.00 34.71 138.84
20.00%
27.77
20.00%
27.77
20.00%
27.77
20.00%
27.77
20.00%
27.77
03.06.05.04 UNION SOQUET (ROSCA HEMBRA) 3" pza 1.00 120.31 120.31 20.00% 24.06 20.00% 24.06 20.00% 24.06 20.00% 24.06 20.00% 24.06
03.06.06 PRUEBAS HIDRAULICAS
03.06.06.01 PRUEBA HIDRAULICA Y DESINFECCION DE REDES DE AGUAm 60.00 10.36 621.60
20.00%
124.32
20.00%
124.32
20.00%
124.32
20.00%
124.32
20.00%
124.32
03.07 CISTERNA SEMI ENTERRADA Y CASETA DE BOMBEO
03.07.01 TRABAJOS PRELIMINARES
Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
03.07.01.01 LIMPIEZA DE TERRENO MANUAL m2 14.75 3.28 48.38 20.01% 9.68 20.01% 9.68 20.01% 9.68 20.01% 9.68 20.01% 9.68
03.07.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 14.75 1.71 25.22 19.98% 5.04 19.98% 5.04 19.98% 5.04 19.98% 5.04 19.98% 5.04
03.07.02 MOVIMIENTO DE TIERRAS
03.07.02.01 EXCAVACION DE ZANJA,TERRENO SEMIROCOSO m3 13.28 11.61 154.18 20.00% 30.84 20.00% 30.84 20.00% 30.84 20.00% 30.84 20.00% 30.84
03.07.02.02
EXCAVACION DE ZANJA,TERRENO SEMIROCOSO, TUBERIA
6"
m3 8.92 11.61 103.56
20.00%
20.71
20.00%
20.71
20.00%
20.71
20.00%
20.71
20.00%
20.71
03.07.02.03
REFINE Y NIVELACION ZANJA TERR.SEMIROCOSO
CANALETA
m 14.75 2.93 43.22
19.99%
8.64
19.99%
8.64
19.99%
8.64
19.99%
8.64
19.99%
8.64
03.07.02.04 REFINE Y NIVELACION ZANJA TERR.SEMIROCOSO TUBERIA m 27.90 2.93 81.75
20.00%
16.35
20.00%
16.35
20.00%
16.35
20.00%
16.35
20.00%
16.35
03.07.02.05 CAMA DE APOYO PARA TUBERIA m 27.90 10.58 295.18 20.00% 59.04 20.00% 59.04 20.00% 59.04 20.00% 59.04 20.00% 59.04
03.07.02.06
RELLENO COMPACTADO C/MATERIAL SELECCIONADO
P/TUBERIA
m3 7.14 54.39 388.34
20.00%
77.67
20.00%
77.67
20.00%
77.67
20.00%
77.67
20.00%
77.67
03.07.02.07 ACARREO DE MATERIAL EXCEDENTE D=30m m3 15.59 6.54 101.96 20.00% 20.39 20.00% 20.39 20.00% 20.39 20.00% 20.39 20.00% 20.39
03.07.03 TUBERIAS
03.07.03.01 TUBERIA FIERRO GALVANIZADO Ø 3" m 5.00 204.65 1,023.25 20.00% 204.65 20.00% 204.65 20.00% 204.65 20.00% 204.65 20.00% 204.65
03.07.03.02
TUBERIA PVC SAP Ø 2 1/2" CLASE-10 LINEA DE IMPULSION
AGUA POTABLE
m 99.60 15.29 1,522.88
20.00%
304.58
20.00%
304.58
20.00%
304.58
20.00%
304.58
20.00%
304.58
03.07.03.03
TUBERIA DE PVC UF S-25 ISO 4435 Q6" EMPALME CAJA
DRENAJE
m 27.90 41.12 1,147.25
20.00%
229.45
20.00%
229.45
20.00%
229.45
20.00%
229.45
20.00%
229.45
03.07.04 OBRAS DE CONCRETO SIMPLE
03.07.04.01 CANAL DE CONCRETO F'C=210 KG/CM2 A=0.90m m3 3.24 282.65 915.79 20.00% 183.16 20.00% 183.16 20.00% 183.16 20.00% 183.16 20.00% 183.16
03.07.04.02 ACERO FY=4200 KG/CM2 kg 35.53 4.04 143.54 20.00% 28.71 20.00% 28.71 20.00% 28.71 20.00% 28.71 20.00% 28.71
03.07.04.03 CANAL DE CONCRETO F'C=210 KG/CM2 A=0.50m m3 1.85 279.95 517.91 20.00% 103.58 20.00% 103.58 20.00% 103.58 20.00% 103.58 20.00% 103.58
03.07.04.04 ACERO FY=4200 KG/CM2 kg 31.37 4.04 126.73 20.00% 25.35 20.00% 25.35 20.00% 25.35 20.00% 25.35 20.00% 25.35
03.07.04.05 ENCOFRADO Y DESENCOFRADO CANALES m2 85.85 46.14 3,961.12 20.00% 792.22 20.00% 792.22 20.00% 792.22 20.00% 792.22 20.00% 792.22
03.07.04.06 CONCRETO F'C=210 KG/CM2, PARA CAJA DE REBOSE m3 0.11 258.57 28.44 20.01% 5.69 20.01% 5.69 20.01% 5.69 20.01% 5.69 20.01% 5.69
03.07.04.07 ENCOFRADO Y DESENCOFRADO DE CAJAS REBOSES m2 4.48 46.14 206.71 20.00% 41.34 20.00% 41.34 20.00% 41.34 20.00% 41.34 20.00% 41.34
03.07.05 TAPA METALICA
03.07.05.01
TAPA METALICA (0.60x0.60) + MARCO METALICO
SUMINISTRO E INSTALACION
pza 1.00 259.87 259.87
20.00%
51.97
20.00%
51.97
20.00%
51.97
20.00%
51.97
20.00%
51.97
03.07.05.02 PINTURA ANTICORROSIVA EN ESMALTE P/METALES m2 0.72 5.88 4.23 20.09% 0.85 20.09% 0.85 20.09% 0.85 20.09% 0.85 20.09% 0.85
03.07.05.03
REJILLA METALICA CON PLATINA DE 1/4" A=0.50m CAJA
REBOSE
pza 2.00 66.22 132.44
20.00%
26.49
20.00%
26.49
20.00%
26.49
20.00%
26.49
20.00%
26.49
03.07.06 FILTROS
03.07.06.01 FILTRO DE GRAVA C/DREN CRIBADO m3 0.22 209.34 46.05 20.00% 9.21 20.00% 9.21 20.00% 9.21 20.00% 9.21 20.00% 9.21
03.07.07 ADITAMENTOS VARIOS
03.07.07.01
BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DE 4"
P/ANCLAJE
pza 1.00 159.74 159.74
20.00%
31.95
20.00%
31.95
20.00%
31.95
20.00%
31.95
20.00%
31.95
03.07.07.02 TUBERIA DE PVC SAL 4" VENTILACION pza 2.00 14.87 29.74 20.01% 5.95 20.01% 5.95 20.01% 5.95 20.01% 5.95 20.01% 5.95
03.07.07.03 ESCALERA TIPO MARINERA ALT. 2.0M und 1.00 443.94 443.94 20.00% 88.79 20.00% 88.79 20.00% 88.79 20.00% 88.79 20.00% 88.79
03.07.07.04 SISTEMA DE LLENADO P/CAMION CISTERNA Q 4" und 1.00 948.22 948.22 20.00% 189.64 20.00% 189.64 20.00% 189.64 20.00% 189.64 20.00% 189.64
03.07.07.05
CONEXION SIAMESA P/LLENADO POR COMPAÑIA DE
BOMBEROS
und 1.00 1,599.74 1,599.74
20.00%
319.95
20.00%
319.95
20.00%
319.95
20.00%
319.95
20.00%
319.95
03.07.07.06 VALVULA FLOTADORA C/BOYA DE COBRE Q3" pza 1.00 74.62 74.62 19.99% 14.92 19.99% 14.92 19.99% 14.92 19.99% 14.92 19.99% 14.92
03.07.07.07 TRANSICION DE FIERRO FUNDIDO A PVC SAP pza 1.00 114.74 114.74 20.00% 22.95 20.00% 22.95 20.00% 22.95 20.00% 22.95 20.00% 22.95
03.07.07.08
SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO
2 1/2"
pza 4.00 31.29 125.16
20.00%
25.03
20.00%
25.03
20.00%
25.03
20.00%
25.03
20.00%
25.03
03.07.07.09
ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y
DOS OREJAS TORNILLOS, 2 1/2"
pza 26.00 31.63 822.38
20.00%
164.48
20.00%
164.48
20.00%
164.48
20.00%
164.48
20.00%
164.48
03.08 SISTEMA DE DESAGUE, REVOSE Y AGUA PLUVIAL
03.08.01 TUBERIAS
03.08.01.01 TUBERIA DE PVC SAL 4" COLGADA m 10.60 14.96 158.58 25.00% 39.65 25.00% 39.65 25.00% 39.65 25.00% 39.65
Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
03.08.01.02 TUBERIA DE PVC SAL 4" ADOSADA A PARED m 3.60 14.96 53.86 25.01% 13.47 25.01% 13.47 25.01% 13.47 25.01% 13.47
03.08.01.03 TUBERIA DE PVC SAL 6" PROTEGIDA EN CONCRETO m 9.90 19.02 188.30 25.00% 47.08 25.00% 47.08 25.00% 47.08 25.00% 47.08
03.08.02 ACCESORIOS
03.08.02.01 TRAMPA "P" DE P.V.C. SAL 4" und 2.00 87.24 174.48 25.00% 43.62 25.00% 43.62 25.00% 43.62 25.00% 43.62
03.08.02.02 CODO PVC SAL 4"X45° pza 5.00 18.36 91.80 25.00% 22.95 25.00% 22.95 25.00% 22.95 25.00% 22.95
03.08.02.03 YEE PVC SAL 4" pza 1.00 18.25 18.25 24.99% 4.56 24.99% 4.56 24.99% 4.56 24.99% 4.56
03.08.02.04 REDUCCION PVC SAP 6" A 4" pza 1.00 118.74 118.74 25.00% 29.69 25.00% 29.69 25.00% 29.69 25.00% 29.69
03.08.02.05 CODO PVC SAL 4"X90° pza 2.00 18.36 36.72 25.00% 9.18 25.00% 9.18 25.00% 9.18 25.00% 9.18
03.08.03 ADITAMENTOS VARIOS
03.08.03.01 CANALETA DE FºGº P/DESAGUE DE LLUVIAS Q4" m 8.50 28.25 240.13 25.00% 60.03 25.00% 60.03 25.00% 60.03 25.00% 60.03
03.08.03.02
BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DE 6"
(150MM)
und 2.00 199.74 399.48
25.00%
99.87
25.00%
99.87
25.00%
99.87
25.00%
99.87
03.08.03.03 SUMIDERO DE BRONCE 4" PROVISION Y COLOCACION und 2.00 54.89 109.78 25.00% 27.45 25.00% 27.45 25.00% 27.45 25.00% 27.45
03.08.03.04
SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO
4"
pza 8.00 18.29 146.32
25.00%
36.58
25.00%
36.58
25.00%
36.58
25.00%
36.58
03.08.03.05 REBOSE TANQUE CISTERNA FºGº Q6" und 2.00 153.22 306.44 25.00% 76.61 25.00% 76.61 25.00% 76.61 25.00% 76.61
03.08.03.06
ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y
DOS OREJAS TORNILLOS, 4"
pza 3.00 27.77 83.31
25.00%
20.83
25.00%
20.83
25.00%
20.83
25.00%
20.83
03.09 SISTEMA DE BOMBEO DE AGUA POTABLE
03.09.01 EQUIPO MOTOR BOMBA AGUA POTABLE
03.09.01.01
EQUIPO DE BOMBEO CENTRIFUGO VERTICAL MULTIETAPA
P/AGUA HP=12.5, HDT=90 MCA INSTALACION ESPECIALIZADA
und 1.00 32,190.74 32,190.74
25.00%
8,047.69
25.00%
8,047.69
25.00%
8,047.69
25.00%
8,047.69
03.09.02
SUMINISTRO E INSTALACION DE TUBERIAS, VALVULAS Y
ACCESORIOS
03.09.02.01
MANOMETRO DOBLE LECTURA C/RANGO 0-300 LB/PULG2
INCL.ACCESORI
und 2.00 114.74 229.48
25.00%
57.37
25.00%
57.37
25.00%
57.37
25.00%
57.37
03.09.02.02 UNION FLEXIBLE TIPO DRESSER DN 80 pza 4.00 199.74 798.96 25.00% 199.74 25.00% 199.74 25.00% 199.74 25.00% 199.74
03.09.02.03 VALVULA CONTROL RETENCION ACTIVA DN 80 pza 3.00 319.74 959.22 25.00% 239.81 25.00% 239.81 25.00% 239.81 25.00% 239.81
03.09.02.04 VALVULA MARIPOSA TIPO WAFER DN 80 pza 2.00 299.74 599.48 25.00% 149.87 25.00% 149.87 25.00% 149.87 25.00% 149.87
03.09.02.05 BRIDA DE FIERRO FUNDIDO DUCTIL DN 80 pza 1.00 239.74 239.74 25.00% 59.94 25.00% 59.94 25.00% 59.94 25.00% 59.94
03.09.02.06 CODO DE FIERRO FUNDIDO DUCTIL BRIDADO DN80 x45º pza 2.00 129.74 259.48
25.00%
64.87
25.00%
64.87
25.00%
64.87
25.00%
64.87
03.09.02.07 CODO DE FIERRO FUNDIDO DUCTIL BRIDADO DN80 x90º pza 1.00 119.74 119.74
25.00%
29.94
25.00%
29.94
25.00%
29.94
25.00%
29.94
03.09.02.08 YEE DE FIERRO FUNDIDO BRIDADO DN80 pza 2.00 199.74 399.48 25.00% 99.87 25.00% 99.87 25.00% 99.87 25.00% 99.87
03.09.02.09 VALVULA DE ALIVIO DE PRESION pza 1.00 139.74 139.74 25.00% 34.94 25.00% 34.94 25.00% 34.94 25.00% 34.94
03.09.02.10 VALVULA DE AIRE COMBINADA BRIDADA, DN 50 PN 16 pza 1.00 159.74 159.74 25.00% 39.94 25.00% 39.94 25.00% 39.94 25.00% 39.94
03.09.02.11 TUBERIA FIE.FUNDIDO DUCTIL DN80 m 1.00 142.01 142.01 25.00% 35.50 25.00% 35.50 25.00% 35.50 25.00% 35.50
03.09.02.12 TEE C/REDUCCION BRIDADA DN80 A DN50 pza 1.00 99.94 99.94 25.01% 24.99 25.01% 24.99 25.01% 24.99 25.01% 24.99
03.09.02.13 VALVULA DE AIRE DOBLE EFECTO 2" C/ROSCA MACHO pza 1.00 159.74 159.74
25.00%
39.94
25.00%
39.94
25.00%
39.94
25.00%
39.94
04 INSTALACIONES ELECTRICAS
04.01 INTERRUPTOR TERMOMAGNETICO
04.01.01 INTERRUPTOR THERMOMAGNETICO 3x25 A x220V und 16.00 53.91 862.56 25.00% 215.64 25.00% 215.64 25.00% 215.64 25.00% 215.64
04.01.02 INTERRUPTOR THERMOMAGNETICA 3x30 A x220V und 23.00 66.52 1,529.96 25.00% 382.49 25.00% 382.49 25.00% 382.49 25.00% 382.49
04.01.03 INTERRUPTOR THERMOMAGNETICA 3x35 A x220V und 8.00 71.52 572.16 25.00% 143.04 25.00% 143.04 25.00% 143.04 25.00% 143.04
04.01.04 INTERRUPTOR THERMOMAGNETICA 3x50 A x220V und 2.00 81.52 163.04 25.00% 40.76 25.00% 40.76 25.00% 40.76 25.00% 40.76
04.01.05 INTERRUPTOR THERMOMAGNETICA 3x70 A x220V und 26.00 91.52 2,379.52 25.00% 594.88 25.00% 594.88 25.00% 594.88 25.00% 594.88
04.01.06 INTERRUPTOR THERMOMAGNETICO 2x10 A x 220 V und 119.00 41.52 4,940.88 25.00% 1,235.22 25.00% 1,235.22 25.00% 1,235.22 25.00% 1,235.22
04.01.07 INTERRUPTOR THERMOMAGNETICO 2x15 A x 220 V und 128.00 41.52 5,314.56 25.00% 1,328.64 25.00% 1,328.64 25.00% 1,328.64 25.00% 1,328.64
04.01.08 INTERRUPTOR THERMOMAGNETICO 2x20 A x240V und 120.00 41.52 4,982.40 25.00% 1,245.60 25.00% 1,245.60 25.00% 1,245.60 25.00% 1,245.60
04.01.09 INTERRUPTOR THERMOMAGNETICO 2x25 A x220V und 73.00 41.52 3,030.96 25.00% 757.74 25.00% 757.74 25.00% 757.74 25.00% 757.74
Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
04.01.10 INTERRUPTOR THERMOMAGNETICO 2x30 A x220V und 56.00 41.52 2,325.12 25.00% 581.28 25.00% 581.28 25.00% 581.28 25.00% 581.28
04.02 TABLEROS DE DISTRIBUCION
04.02.01
TABLERO DE DISTRIBUCION (T.D.), 20 POLOS, TRIFASICO 220
V
und 1.00 478.22 478.22
25.00%
119.56
25.00%
119.56
25.00%
119.56
25.00%
119.56
04.02.02
TABLERO DE DISTRIBUCION (T.D.), 12 POLOS, TRIFASICO 220
V
und 1.00 428.22 428.22
25.00%
107.06
25.00%
107.06
25.00%
107.06
25.00%
107.06
04.02.03
TABLERO DE DISTRIBUCION (T.D.), 10 POLOS, TRIFASICO 220
V
und 1.00 378.22 378.22
25.00%
94.56
25.00%
94.56
25.00%
94.56
25.00%
94.56
04.02.04
TABLERO DE DISTRIBUCION (T.D.), 8 POLOS, TRIFASICO 220
V
und 1.00 378.22 378.22
25.00%
94.56
25.00%
94.56
25.00%
94.56
25.00%
94.56
04.02.05
TABLERO DE DISTRIBUCION (T.D.), 20 POLOS, MONOFASICO
220 V
und 1.00 278.22 278.22
25.00%
69.56
25.00%
69.56
25.00%
69.56
25.00%
69.56
04.02.06
TABLERO DE DISTRIBUCION (T.D.), 12 POLOS, MONOFASICO
220 V
und 18.00 398.22 7,167.96
25.00%
1,791.99
25.00%
1,791.99
25.00%
1,791.99
25.00%
1,791.99
04.02.07
TABLERO DE DISTRIBUCION (T.D.), 10 POLOS, MONOFASICO
220 V
und 4.00 298.22 1,192.88
25.00%
298.22
25.00%
298.22
25.00%
298.22
25.00%
298.22
04.02.08
TABLERO DE DISTRIBUCION (T.D.), 8 POLOS, MONOFASICO
220 V
und 11.00 278.22 3,060.42
25.00%
765.11
25.00%
765.11
25.00%
765.11
25.00%
765.11
04.02.09
TABLERO DE DISTRIBUCION (T.D.), 6 POLOS, MONOFASICO
220 V
und 15.00 278.22 4,173.30
25.00%
1,043.33
25.00%
1,043.33
25.00%
1,043.33
25.00%
1,043.33
04.03 POZOS A TIERRA
04.03.01 POZO DE PUESTA A TIERRA GLB 2.00 1,435.59 2,871.18 25.00% 717.80 25.00% 717.80 25.00% 717.80 25.00% 717.80
04.04 RED ESTABILIZADA
04.04.01 INSTALACIONES ELECTRICAS
04.04.01.01 INSTALACION DE CAJAS OCTOGONALES und 1,815.00 8.91 16,171.65 25.00% 4,042.91 25.00% 4,042.91 25.00% 4,042.91 25.00% 4,042.91
04.04.01.02 INSTALACION DE CAJAS RECTANGULARES und 357.00 9.91 3,537.87 25.00% 884.47 25.00% 884.47 25.00% 884.47 25.00% 884.47
04.04.01.03
INSTALACION DE TOMACORRIENTES DOBLES CON TOMA A
TIERRA
und 66.00 11.91 786.06
25.00%
196.52
25.00%
196.52
25.00%
196.52
25.00%
196.52
04.04.01.04
INSTALACION DE TOMACORRIENTES CON TOMA A TIERRA
MODULAR EMPOTRADO A MUEBLE
und 260.00 21.91 5,696.60
25.00%
1,424.15
25.00%
1,424.15
25.00%
1,424.15
25.00%
1,424.15
04.04.01.05 INSTALACION DE CAJAS DE PASO und 156.00 26.21 4,088.76 25.00% 1,022.19 25.00% 1,022.19 25.00% 1,022.19 25.00% 1,022.19
04.04.02 CANALIZACIONES Y/O TUBERIAS
04.04.02.01 TUBERIA DE PVC SEL Q 18.75mm m 1,278.68 6.52 8,336.99 25.00% 2,084.25 25.00% 2,084.25 25.00% 2,084.25 25.00% 2,084.25
04.04.02.02 CURVA PVC SEL Q 3/4" und 256.34 5.05 1,294.52 25.00% 323.63 25.00% 323.63 25.00% 323.63 25.00% 323.63
04.04.03 CONDUCTORES Y/O CABLES
04.04.03.01 CABLEADO CONDUCTOR 4 mm2 NH80 m 3,330.00 3.41 11,355.30 25.00% 2,838.83 25.00% 2,838.83 25.00% 2,838.83 25.00% 2,838.83
04.04.03.02 CABLEADO CONDUCTOR 2.5 mm2 NH80 m 1,300.00 2.79 3,627.00 25.00% 906.75 25.00% 906.75 25.00% 906.75 25.00% 906.75
04.05 ALUMBRADO DORMITORIO
04.05.01 INSTALACIONES ELECTRICAS
04.05.01.01 INSTALACION DE CAJAS OCTOGONALES und 2,217.00 8.91 19,753.47 25.00% 4,938.37 25.00% 4,938.37 25.00% 4,938.37 25.00% 4,938.37
04.05.01.02 INSTALACION DE CAJAS RECTANGULARES und 857.00 9.91 8,492.87 25.00% 2,123.22 25.00% 2,123.22 25.00% 2,123.22 25.00% 2,123.22
04.05.01.03 INSTALACION DE INTERRUPTOR SIMPLE und 261.00 9.91 2,586.51 25.00% 646.63 25.00% 646.63 25.00% 646.63 25.00% 646.63
04.05.01.04 INSTALACION DE INTERRUPTOR DOBLE und 79.00 10.91 861.89 25.00% 215.47 25.00% 215.47 25.00% 215.47 25.00% 215.47
04.05.01.05
INSTALACION DE INTERRUPTOR CONMUTADOR 3 VIAS
SIMPLE
und 17.00 21.91 372.47
25.00%
93.12
25.00%
93.12
25.00%
93.12
25.00%
93.12
04.05.01.06
INSTALACION DE INTERRUPTOR CONMUTADOR 3 VIAS
DOBLE
und 128.00 25.91 3,316.48
25.00%
829.12
25.00%
829.12
25.00%
829.12
25.00%
829.12
04.05.01.07 INSTALACION DE TAPAS CIEGAS CIRCULARES und 49.00 3.96 194.04 25.00% 48.51 25.00% 48.51 25.00% 48.51 25.00% 48.51
04.05.02 CANALIZACIONES Y/O TUBERIAS
04.05.02.01 TUBERIA DE PVC SEL Q 18.75mm m 1,546.29 6.52 10,081.81 25.00% 2,520.45 25.00% 2,520.45 25.00% 2,520.45 25.00% 2,520.45
04.05.02.02 CURVA PVC SEL Q 3/4" und 568.00 5.05 2,868.40 25.00% 717.10 25.00% 717.10 25.00% 717.10 25.00% 717.10
04.05.03 CONDUCTORES Y/O CABLES
04.05.03.01 CABLEADO CONDUCTOR 4 mm2 NH80 m 4,890.00 3.41 16,674.90 25.00% 4,168.73 25.00% 4,168.73 25.00% 4,168.73 25.00% 4,168.73
Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
04.06 ARTEFACTOS
04.06.01
LUMINARIA TIPO REJILLA ALUMINIZADA C/03 LAMPARA
FLUORESCENTE RECTO 4x28 W SYNTO LRC (EMPOTRADO)
und 80.00 197.13 15,770.40
50.00%
7,885.20
50.00%
7,885.20
04.06.02
SPOT LIGHT CIRCULAR ALUMINIZADO C/VIDRIO
SERIGRAFIADO 4mm C/01 LAMPARA FLUORESCENTE COMPACTA
1x18 W
und 352.00 41.73 14,688.96
50.00%
7,344.48
50.00%
7,344.48
04.06.03
LUMINARIA C/DIFUSOR PRISMATICO TRANSPARENTE C/02
LAMPARA FLUORESCENTE 2x36 W
und 14.00 197.13 2,759.82
50.00%
1,379.91
50.00%
1,379.91
04.06.04
LUMINARIA DE EMERGENCIA EQUIPO C/02 LAMPARAS DE 20
W
und 39.00 197.13 7,688.07
50.00%
3,844.04
50.00%
3,844.04
04.06.05
SPOT LIGHT CIRCULAR ALUMINIZADO C/VIDRIO
SERIGRAFIADO 4mm C/02 LAMPARA FLUORESCENTE COMPACTA
2x26 W
und 10.00 56.73 567.30
50.00%
283.65
50.00%
283.65
04.06.06
SPOT LIGHT CIRCULAR ALUMINIZADO C/VIDRIO
SERIGRAFIADO 4mm C/02 LAMPARA FLUORESCENTE COMPACTA
2x18 W
und 73.00 56.73 4,141.29
50.00%
2,070.65
50.00%
2,070.65
04.06.07 REFLECTOR ADOSADO C/LAMPARA T-150 W und 22.00 136.80 3,009.60 50.00% 1,504.80 50.00% 1,504.80
04.06.08
LUMINARIA DECORATIVA LAMPARA AHORRADORA
COMPACTA 20 W
und 20.00 97.13 1,942.60
50.00%
971.30
50.00%
971.30
04.07 CONDUCTORES Y/O CABLES
04.07.01 CABLEADO CONDUCTOR 6 mm2 NH80 m 852.00 3.40 2,896.80 50.00% 1,448.40 50.00% 1,448.40
04.07.02 CABLEADO CONDUCTOR 10 mm2 NH80 m 1,354.00 6.00 8,124.00 50.00% 4,062.00 50.00% 4,062.00
04.07.03 CABLEADO CONDUCTOR 16 mm2 NH80 m 800.00 8.30 6,640.00 50.00% 3,320.00 50.00% 3,320.00
04.07.04 CABLEADO CONDUCTOR 25 mm2 NH80 m 550.00 13.30 7,315.00 50.00% 3,657.50 50.00% 3,657.50
04.07.05 CABLEADO CONDUCTOR 35 mm2 NH80 m 100.00 18.80 1,880.00 50.00% 940.00 50.00% 940.00
04.08 VARIOS
04.08.01 SECADOR AUTOMATICO DE MANOS und 20.00 281.40 5,628.00 50.00% 2,814.00 50.00% 2,814.00
COSTO DIRECTO 2,053,292.16 278,575.64 222,965.12 327,963.11 366,684.56 537,508.75 319,594.98
GASTOS GENERALES (10.00%) 205,329.22 27,857.56 22,296.51 32,796.31 36,668.46 53,750.87 31,959.51
UTILIDAD (5.00%) 102,664.61 13,928.78 11,148.26 16,398.16 18,334.23 26,875.44 15,979.74
==========================
SUPERVISION (5.00%) 102,664.61 13,928.78 11,148.26 16,398.16 18,334.23 26,875.44 15,979.74
ESTUDIO TECNICO (2.50%) 51,332.30 51,332.30
==========================
TOTAL PRESUPUESTO 2,515,282.90 385,623.06 267,558.15 393,555.74 440,021.48 645,010.50 383513.97
% DE AVANCE 15.33% 10.64% 15.65% 17.49% 25.64% 15.25%
% DE AVANCE ACUMULADO 25.97% 41.62% 59.11% 84.75% 100.00%

More Related Content

Featured

How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
SpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Lily Ray
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
Rajiv Jayarajah, MAppComm, ACC
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
Christy Abraham Joy
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
Vit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
MindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Applitools
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
GetSmarter
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
Project for Public Spaces & National Center for Biking and Walking
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
DevGAMM Conference
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy Presentation
Erica Santiago
 
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellGood Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Saba Software
 
Introduction to C Programming Language
Introduction to C Programming LanguageIntroduction to C Programming Language
Introduction to C Programming Language
Simplilearn
 

Featured (20)

How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy Presentation
 
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellGood Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
 
Introduction to C Programming Language
Introduction to C Programming LanguageIntroduction to C Programming Language
Introduction to C Programming Language
 

CALENDARIO VALORIZADO.pdf

  • 1. Obra: Departamento CAJAMARCA Provincia SAN IGNACIO Distrito SAN IGNACIO Fecha Dic- 2023 Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6 UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO ''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'', SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA'' 01 ESTRUCTURAS 01.01 OBRAS PROVISIONALES 01.01.01 CONSTRUCCIONES PROVISIONALES 01.01.01.01 ALMACEN DE MATERIALES m2 50.00 125.36 6,268.00 100.00% 6,268.00 01.01.02 INSTALACIONES PROVISIONALES 01.01.02.01 AGUA PARA LA CONSTRUCCION mes 6.00 407.29 2,443.74 100.00% 2,443.74 01.01.02.02 ENERGIA ELECTRICA mes 6.00 400.00 2,400.00 100.00% 2,400.00 01.02 TRABAJOS PRELIMINARES 01.02.01 LIMPIEZA DEL TERRENO 01.02.01.01 LIMPIEZA DEL TERRENO m2 321.74 3.01 968.44 100.00% 968.44 01.02.01.02 LIMPIEZA PERMANENTE DE OBRA m2 321.74 0.80 257.39 100.00% 257.39 01.02.02 TRAZO , NIVELES Y REPLANTEO 01.02.02.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 321.74 1.71 550.18 100.00% 550.18 01.03 MOVIMIENTO DE TIERRAS 01.03.01 NIVELACION DE TERRENO 01.03.01.01 NIVELACION DE TERRENO m2 321.74 0.86 276.70 100.00% 276.70 01.03.02 RELLENOS 01.03.02.01 RELLENO Y COMP. MANUAL- MAT. DE PRESTAMO m3 56.50 89.06 5,031.89 100.00% 5,031.89 01.03.03 ELIMINACION DE MATERIAL EXCEDENTE 01.03.03.01 ELIMINACION DE MATERIAL EXCEDENTE DE EXCAVACIONES C/MAQUINARIA m3 116.15 8.28 961.72 100.00% 961.72 01.04 OBRAS DE CONCRETO SIMPLE 01.04.01 CONCRETO SIMPLE 01.04.01.01 SOLADO PARA CIMIENTOS REFORZADO E=8", MEZCLA C:H 1:10 m2 193.15 12.75 2,462.66 100.00% 2,462.66 01.04.01.02 SOLADO PARA ZAPATAS: MEZCLA, C:H, 1:10, E=4" m2 25.16 19.60 493.14 100.00% 493.14 01.04.01.03 FALSO PISO DE 4": MEZCLA 1:8 (C:H) m2 321.74 48.88 15,726.65 100.00% 15,726.65 01.04.01.04 FALSA ZAPATA: CONCRETO FC´= 175 KG/CM2 + 50%PG m3 56.19 174.56 9,808.53 100.00% 9,808.53 01.05 OBRAS DE CONCRETO ARMADO 01.05.01 ZAPATAS 01.05.01.01 CONCRETO PREMEZCLADO EN ZAPATAS F'c=280KG/CM2 m3 96.52 540.31 52,150.72 100.00% 52,150.72 01.05.01.02 ACERO DE REFUERZO F'y=4200KG/CM2 EN ZAPATAS kg 3,487.50 4.38 15,275.25 100.00% 15,275.25 01.05.02 VIGAS DE CIMENTACION 01.05.02.01 CONCRETO PREMEZCLADO EN VIGAS DE CIMENTACION F'c=280KG/CM2 m3 32.16 551.53 17,737.20 100.00% 17,737.20 01.05.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION m2 126.45 39.72 5,022.59 100.00% 5,022.59 01.05.02.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN VIGAS DE CIMENTACION kg 4,561.29 4.38 19,978.45 100.00% 19,978.45 01.05.03 COLUMNAS 01.05.03.01 CONCRETO PREMEZCLADO EN COLUMNAS F'c=280KG/CM2 m3 138.12 369.71 51,064.35 20.00% 10,212.87 20.00% 10,212.87 20.00% 10,212.87 20.00% 10,212.87 20.00% 10,212.87 01.05.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 622.37 47.52 29,575.02 20.00% 5,915.00 20.00% 5,915.00 20.00% 5,915.00 20.00% 5,915.00 20.00% 5,915.00 01.05.03.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN COLUMNAS kg 10,246.53 4.38 44,879.80 20.00% 8,975.96 20.00% 8,975.96 20.00% 8,975.96 20.00% 8,975.96 20.00% 8,975.96 01.05.04 PLACAS ''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'', SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA'' CRONOGRAMA DE EJECUCIÒN VALORIZADO
  • 2. Obra: Departamento CAJAMARCA Provincia SAN IGNACIO Distrito SAN IGNACIO Fecha Dic- 2023 Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6 UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO ''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'', SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA'' CRONOGRAMA DE EJECUCIÒN VALORIZADO 01.05.04.01 CONCRETO PREMEZCLADO EN PLACAS F'c=280KG/CM2 m3 75.62 486.35 36,777.79 20.00% 7,355.56 20.00% 7,355.56 20.00% 7,355.56 20.00% 7,355.56 20.00% 7,355.56 01.05.04.02 ENCOFRADO Y DESENCOFRADO EN PLACAS m2 1,263.12 28.65 36,188.39 20.00% 7,237.68 20.00% 7,237.68 20.00% 7,237.68 20.00% 7,237.68 20.00% 7,237.68 01.05.04.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN PLACAS kg 3,592.18 4.38 15,733.75 20.00% 3,146.75 20.00% 3,146.75 20.00% 3,146.75 20.00% 3,146.75 20.00% 3,146.75 01.05.05 VIGAS 01.05.05.01 CONCRETO PREMEZCLADO EN VIGAS F'c=280KG/CM2 m3 126.59 488.79 61,875.93 20.00% 12,375.19 20.00% 12,375.19 20.00% 12,375.19 20.00% 12,375.19 20.00% 12,375.19 01.05.05.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 654.19 65.11 42,594.31 20.00% 8,518.86 20.00% 8,518.86 20.00% 8,518.86 20.00% 8,518.86 20.00% 8,518.86 01.05.05.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN VIGAS kg 15,672.34 4.38 68,644.85 20.00% 13,728.97 20.00% 13,728.97 20.00% 13,728.97 20.00% 13,728.97 20.00% 13,728.97 01.05.06 LOSAS ALIGERADAS 01.05.06.01 CONCRETO PREMEZCLADO EN LOSAS ALIGERADAS F'c=280 KG/CM2 m3 128.27 485.24 62,241.73 25.00% 15,560.43 25.00% 15,560.43 25.00% 15,560.43 25.00% 15,560.43 01.05.06.02 ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS CON VIGUETAS PREFABRICADAS m2 963.50 31.92 30,754.92 25.00% 7,688.73 25.00% 7,688.73 25.00% 7,688.73 25.00% 7,688.73 01.05.06.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN LOSAS ALIGERADAS PREFABRICADAS kg 15,648.29 4.38 68,539.51 25.00% 17,134.88 25.00% 17,134.88 25.00% 17,134.88 25.00% 17,134.88 01.05.07 ESCALERAS 01.05.07.01 CONCRETO PREMEZCLADO EN ESCALERAS F'c=280KG/CM2 m3 25.91 506.39 13,120.56 25.00% 3,280.14 25.00% 3,280.14 25.00% 3,280.14 25.00% 3,280.14 01.05.07.02 ESCALERAS: ENCOFRADO Y DESENCOFRADO m2 123.69 53.18 6,577.83 25.00% 1,644.46 25.00% 1,644.46 25.00% 1,644.46 25.00% 1,644.46 01.05.07.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN ESCALERAS kg 3,956.18 4.51 17,842.37 25.00% 4,460.59 25.00% 4,460.59 25.00% 4,460.59 25.00% 4,460.59 01.05.08 CUARTO DE CAJA DE ESCALERAS 01.05.08.01 COLUMNAS 01.05.08.01.01 CONCRETO PREMEZCLADO EN COLUMNAS F'c=280KG/CM2 m3 6.16 369.71 2,277.41 25.00% 569.35 25.00% 569.35 25.00% 569.35 25.00% 569.35 01.05.08.01.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 65.08 47.52 3,092.60 25.00% 773.15 25.00% 773.15 25.00% 773.15 25.00% 773.15 01.05.08.01.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN COLUMNAS kg 779.94 4.38 3,416.14 25.00% 854.04 25.00% 854.04 25.00% 854.04 25.00% 854.04 01.05.08.02 VIGAS 01.05.08.02.01 CONCRETO PREMEZCLADO EN VIGAS F'c=280KG/CM2 m3 6.88 488.79 3,362.88 25.00% 840.72 25.00% 840.72 25.00% 840.72 25.00% 840.72 01.05.08.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 71.09 65.11 4,628.67 25.00% 1,157.17 25.00% 1,157.17 25.00% 1,157.17 25.00% 1,157.17 01.05.08.02.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN VIGAS kg 791.57 4.38 3,467.08 25.00% 866.77 25.00% 866.77 25.00% 866.77 25.00% 866.77 01.05.08.03 LOSAS MACIZAS 01.05.08.03.01 CONCRETO PREMEZCLADO EN LOSAS MACIZAS F'c=280 KG/CM2 m3 13.74 567.18 7,793.05 33.33% 2,597.68 33.33% 2,597.68 33.33% 2,597.69 01.05.08.03.02 ENCOFRADO Y DESENCOFRADO EN LOSAS MACIZAS m2 68.68 36.42 2,501.33 33.33% 833.78 33.33% 833.78 33.33% 833.79 01.05.08.03.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN LOSAS MACIZAS kg 1,757.59 4.38 7,698.24 33.33% 2,566.08 33.33% 2,566.08 33.33% 2,566.08 01.06 TANQUE - CISTERNA 01.06.01 TRABAJOS PRELIMINARES 01.06.01.01 LIMPIEZA DE TERRENO MANUAL m2 55.25 3.28 181.22 100.00% 181.22 01.06.01.02 ELIMINACION DE MATERIAL ACUMULADO m3 5.53 19.18 106.07 100.00% 106.07 01.06.02 TRAZO , NIVELES Y REPLANTEO 01.06.02.01 TRAZO Y REPLANTEO m2 55.25 1.97 108.84 100.00% 108.84 01.06.03 MOVIMIENTO DE TIERRAS 01.06.03.01 CORTE Y EXCAVACION C/MAQUINARIA (Terreno Normal) m3 207.19 14.19 2,940.03 100.00% 2,940.03 01.06.03.02 ELIMINACION DE MATERIAL EXCEDENTE DE EXCAVACIONES C/MAQUINARIA m3 269.35 8.28 2,230.22 100.00% 2,230.22 01.06.04 OBRAS DE CONCRETO SIMPLE 01.06.04.01 SOLADO PARA PLATEA: MEZCLA, C:H, 1:10, E=4" m2 55.25 30.36 1,677.39 100.00% 1,677.39
  • 3. Obra: Departamento CAJAMARCA Provincia SAN IGNACIO Distrito SAN IGNACIO Fecha Dic- 2023 Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6 UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO ''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'', SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA'' CRONOGRAMA DE EJECUCIÒN VALORIZADO 01.06.04.02 SOBRECIMIENTOS: CONCRETO F'C=140 KG/CM2 m3 1.38 236.64 326.56 100.00% 326.56 01.06.05 OBRAS DE CONCRETO ARMADO 01.06.05.01 LOSA DE CIMENTACION 01.06.05.01.01 CONCRETO PREMEZCLADO EN LOSA DE CIMENTACION F'c=280KG/CM2 m3 13.81 508.39 7,020.87 100.00% 7,020.87 01.06.05.01.02 ACERO DE REFUERZO F'y=4200KG/CM2 EN LOSAS DE CIMENTACION kg 1,357.11 4.38 5,944.14 100.00% 5,944.14 01.06.05.02 COLUMNAS 01.06.05.02.01 CONCRETO PREMEZCLADO EN COLUMNAS F'c=280KG/CM2 m3 2.86 369.71 1,057.37 25.00% 264.34 25.00% 264.34 25.00% 264.34 25.00% 264.34 01.06.05.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 3.93 47.52 186.75 25.00% 46.69 25.00% 46.69 25.00% 46.69 25.00% 46.69 01.06.05.02.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN COLUMNAS kg 759.68 4.38 3,327.40 25.00% 831.85 25.00% 831.85 25.00% 831.85 25.00% 831.85 01.06.05.03 VIGAS 01.06.05.03.01 CONCRETO PREMEZCLADO EN VIGAS F'c=280KG/CM2 m3 2.91 488.79 1,422.38 25.00% 355.60 25.00% 355.60 25.00% 355.60 25.00% 355.60 01.06.05.03.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 26.20 65.11 1,705.88 25.00% 426.47 25.00% 426.47 25.00% 426.47 25.00% 426.47 01.06.05.03.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN VIGAS kg 362.04 4.38 1,585.74 25.00% 396.44 25.00% 396.44 25.00% 396.44 25.00% 396.44 01.06.05.04 LOSAS MACIZAS 01.06.05.04.01 CONCRETO PREMEZCLADO EN LOSAS MACIZAS F'c=280 KG/CM2 m3 4.91 567.18 2,784.85 25.00% 696.21 25.00% 696.21 25.00% 696.21 25.00% 696.21 01.06.05.04.02 ENCOFRADO Y DESENCOFRADO EN LOSAS MACIZAS m2 55.25 36.42 2,012.21 25.00% 503.05 25.00% 503.05 25.00% 503.05 25.00% 503.05 01.06.05.04.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN LOSAS MACIZAS kg 537.49 4.38 2,354.21 25.00% 588.55 25.00% 588.55 25.00% 588.55 25.00% 588.55 01.07 SISTEMA DE PROTECCION DE AGUAS SUBTERRANEAS 01.07.01 WATER STOP DE NEOPRENE DE 10". PROVISION Y COLOCADO DE JUNTA m 136.50 28.86 3,939.39 100.00% 3,939.39 02 ARQUITECTURA 02.01 MUROS Y TABIQUES DE ALBAÑILERIA 02.01.01 MURO DE LADRILLO KING KONG MECANIZADO (CABEZA), J=2cm m2 368.25 113.86 41,928.95 25.00% 10,482.24 25.00% 10,482.24 25.00% 10,482.24 25.00% 10,482.24 02.01.02 MURO DE LADRILLO KING KONG MECANIZADO (SOGA), J=2cm m2 1,094.35 70.62 77,283.00 25.00% 19,320.75 25.00% 19,320.75 25.00% 19,320.75 25.00% 19,320.75 02.01.03 TABIQUE SISTEMA DRYWALL GYPLAC RH DE 1/2" m2 653.84 61.52 40,224.24 25.00% 10,056.06 25.00% 10,056.06 25.00% 10,056.06 25.00% 10,056.06 02.02 REVOQUES, ENLUCIDOS Y MOLDURAS 02.02.01 TARRAJEO PRIMARIO O RAYADO (Mezcla C:A 1:5, E=1.5cm) m2 863.15 12.02 10,375.06 25.00% 2,593.77 25.00% 2,593.77 25.00% 2,593.77 25.00% 2,593.77 02.02.02 TARRAJEO EN INTERIORES (Mezcla C:A 1:4, E=2cm) m2 1,957.89 20.57 40,273.80 25.00% 10,068.45 25.00% 10,068.45 25.00% 10,068.45 25.00% 10,068.45 02.02.03 TARRAJEO EN EXTERIORES (Mezcla C:A 1:4, E=2cm) m2 491.41 26.93 13,233.67 25.00% 3,308.42 25.00% 3,308.42 25.00% 3,308.42 25.00% 3,308.42 02.02.04 VESTIDURA DE DERRAMES (Mezcla C:A 1:5, E=2cm, A=15cm) m 514.72 8.02 4,128.05 25.00% 1,032.01 25.00% 1,032.01 25.00% 1,032.01 25.00% 1,032.01 02.02.05 BRUÑAS E=1cm m 761.40 4.47 3,403.46 25.00% 850.87 25.00% 850.87 25.00% 850.87 25.00% 850.87 02.02.06 BRUÑAS E=5cm m 1,199.35 5.35 6,416.52 25.00% 1,604.13 25.00% 1,604.13 25.00% 1,604.13 25.00% 1,604.13 02.02.07 BRUÑAS E=10 cm m 313.95 6.91 2,169.39 25.00% 542.35 25.00% 542.35 25.00% 542.35 25.00% 542.35 02.03 CIELORRASOS 02.03.01 CIELO RASO HORIZONTAL (Mezcla C:A 1:4, E=2.5cm) m2 436.98 54.39 23,767.34 25.00% 5,941.84 25.00% 5,941.84 25.00% 5,941.84 25.00% 5,941.84 02.03.02 CIELO RASO SUSPENDIDO (BALDOSA ACUSTICA DE FIBRA MINERAL DE 0.61X0.61 E=5/8") m2 811.64 50.40 40,906.66 25.00% 10,226.67 25.00% 10,226.67 25.00% 10,226.67 25.00% 10,226.67 02.03.03 TARRAJEO DE SUPERFICIES EN FONDO DE ESCALERAS (Mezcla C:A 1:5, E=1.5cm) m2 570.69 28.01 15,985.03 25.00% 3,996.26 25.00% 3,996.26 25.00% 3,996.26 25.00% 3,996.26 02.03.04 VESTIDURA DE ARISTAS EN FONDO DE ESCALERAS m 672.25 7.75 5,209.94 25.00% 1,302.49 25.00% 1,302.49 25.00% 1,302.49 25.00% 1,302.49 02.04 PISOS Y PAVIMENTOS
  • 4. Obra: Departamento CAJAMARCA Provincia SAN IGNACIO Distrito SAN IGNACIO Fecha Dic- 2023 Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6 UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO ''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'', SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA'' CRONOGRAMA DE EJECUCIÒN VALORIZADO 02.04.01 CONTRAPISO DE 48mm (Mezcla C:A, Base 1:5, Acabado 1:2) m2 1,264.83 20.23 25,587.51 25.00% 6,396.88 25.00% 6,396.88 25.00% 6,396.88 25.00% 6,396.88 02.04.02 PISO DE CERAMICO ANTIDESLIZANTE COLOR BLANCO 40 x 40 cm. m2 228.19 48.43 11,051.24 25.00% 2,762.81 25.00% 2,762.81 25.00% 2,762.81 25.00% 2,762.81 02.04.03 PISO DE PORCELANATO COLOR BLANCO 60X60 CM. m2 399.47 67.49 26,960.23 25.00% 6,740.06 25.00% 6,740.06 25.00% 6,740.06 25.00% 6,740.06 02.04.04 PISO DE PORCELANATO COLOR BEIGE 60X60 CM. m2 424.19 67.49 28,628.58 25.00% 7,157.15 25.00% 7,157.15 25.00% 7,157.15 25.00% 7,157.15 02.04.05 PISO DE PARQUETON VETEADO m2 135.46 79.05 10,708.11 25.00% 2,677.03 25.00% 2,677.03 25.00% 2,677.03 25.00% 2,677.03 02.04.06 PISO DE CEMENTO PULIDO COLOREADO Y BRUÑADO 1.00 X 1.00 m2 204.63 24.65 5,044.13 25.00% 1,261.03 25.00% 1,261.03 25.00% 1,261.03 25.00% 1,261.03 02.04.07 PISOS DE ADOQUIN DE CONCRETO 10 X 20 CM. m2 50.90 88.83 4,521.45 25.00% 1,130.36 25.00% 1,130.36 25.00% 1,130.36 25.00% 1,130.36 02.04.08 VEREDA DE E= 4", ACABADO MEZCLA 1:5 (C:H) m2 73.48 46.58 3,422.70 25.00% 855.68 25.00% 855.68 25.00% 855.68 25.00% 855.68 02.05 CONTRAZOCALOS 02.05.01 CONTRAZOCALO DE MADERA CEDRO 3/4"x4" (Incluye Rodón) m 344.10 15.16 5,216.56 33.33% 1,738.85 33.33% 1,738.85 33.33% 1,738.85 02.05.02 CONTRAZOCALO DE PORCELANATO COLOR BLANCO, H=0.10 M m 128.10 28.71 3,677.75 33.33% 1,225.92 33.33% 1,225.92 33.33% 1,225.92 02.05.03 CONTRAZOCALO DE PORCELANATO COLOR BEIGE, H=0.10 M m 285.70 28.71 8,202.45 33.33% 2,734.15 33.33% 2,734.15 33.33% 2,734.15 02.06 ZOCALOS 02.06.01 ZOCALO DE CERAMICO COLOR BLANCO DE 40 X 40 CM. m2 308.51 59.58 18,381.03 33.33% 6,127.01 33.33% 6,127.01 33.33% 6,127.01 02.07 REVESTIMIENTO DE GRADAS Y ESCALERAS 02.07.01 REVESTIMIENTO DE GRADAS Y PELDAÑOS CON PORCELANATO COLOR BLANCO m2 96.31 89.84 8,652.49 33.33% 2,884.16 33.33% 2,884.16 33.33% 2,884.16 02.07.02 REVESTIMIENTO DE DESCANSOS CON PORCELANATO m2 102.56 73.69 7,557.65 33.33% 2,519.22 33.33% 2,519.22 33.33% 2,519.22 02.07.03 CANTONERA DE ALUMINIO 2"X11/2" CON ANCLAJE m 339.60 10.01 3,399.40 33.33% 1,133.13 33.33% 1,133.13 33.33% 1,133.13 02.08 REVESTIMIENTOS ESPECIALES 02.08.01 REVESTIMIENTO CON PIEDRA KALA GRIS m2 174.19 198.98 34,660.33 33.33% 11,553.44 33.33% 11,553.44 33.33% 11,553.44 02.08.02 REVESTIMIENTO DE MESONES CON CERAMICO COLOR BLANCO 0.30X0.30M m2 37.59 52.64 1,978.74 33.33% 659.58 33.33% 659.58 33.33% 659.58 02.09 CARPINTERIA DE MADERA 02.09.01 PUERTAS CONTRAPLACADAS CON MDF 4MM REVESTIDAS CON FORMICA (Incluye Marco) m2 63.42 196.60 12,468.37 33.33% 4,156.12 33.33% 4,156.12 33.33% 4,156.12 02.09.02 BARANDA DE MADERA D=3" CON TUBO ELECTROSOLDADO 1 1/2" m 88.20 135.71 11,969.62 33.33% 3,989.87 33.33% 3,989.87 33.33% 3,989.87 02.10 CARPINTERIA METALICA Y HERRERIA 02.10.01 PUERTA METALICA ANTIFUEGO P-5 (INCL. SUMINISTRO Y COLOCACION) und 3.00 4,200.00 12,600.00 50.00% 6,300.00 50.00% 6,300.00 02.10.02 PUERTA METALICA ANTIFUEGO P-7 (INCL. SUMINISTRO Y COLOCACION) und 1.00 6,750.00 6,750.00 50.00% 3,375.00 50.00% 3,375.00 02.10.03 PUERTA METALICA CON REJILLA P-5 und 1.00 220.00 220.00 50.00% 110.00 50.00% 110.00 02.10.04 BARANDA 02 METALICA EN ESCALERAS m 79.50 84.05 6,681.98 50.00% 3,340.99 50.00% 3,340.99 02.10.05 BARRA DE APOYO DE F°G°, D=1 1/2" EN SS.HH. DISCAPACITADOS und 15.00 64.51 967.65 50.00% 483.83 50.00% 483.83 02.10.06 TAPA METALICA EN BOTADERO DE BASURA und 15.00 40.00 600.00 50.00% 300.00 50.00% 300.00 02.10.07 VENTANA METALICA APERSIANADA V-23 und 1.00 35.00 35.00 50.00% 17.50 50.00% 17.50 02.10.08 VENTANA METALICA APERSIANADA V-25 und 14.00 50.00 700.00 50.00% 350.00 50.00% 350.00 02.11 CARPINTERIA DE MELAMINA 02.11.01 PUERTAS DE MELAMINA Y METAL (INCLUYE CERRAJERIA) m2 119.60 84.28 10,079.89 50.00% 5,039.95 50.00% 5,039.95 02.11.02 SEPARADORES DE MELAMINA Y METAL PARA SERVICIOS HIGIENICOS m2 135.42 108.21 14,653.80 50.00% 7,326.90 50.00% 7,326.90 02.11.03 SEPARADORES DE MELAMINA Y FIERRO ANGULAR PARA URINARIOS m2 16.00 55.86 893.76 50.00% 446.88 50.00% 446.88
  • 5. Obra: Departamento CAJAMARCA Provincia SAN IGNACIO Distrito SAN IGNACIO Fecha Dic- 2023 Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6 UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO ''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'', SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA'' CRONOGRAMA DE EJECUCIÒN VALORIZADO 02.11.04 MOBILIARIO DE MELAMINA GALAXIA COLOR BLANCO PARA KITCHENETTE GLB 1.00 1,750.00 1,750.00 50.00% 875.00 50.00% 875.00 02.12 CERRAJERIA 02.12.01 BISAGRAS CAPUCHINAS ALUMINIZADAS 4" pza 1,095.00 7.68 8,409.60 50.00% 4,204.80 50.00% 4,204.80 02.12.02 CERRADURA PARA PUERTAS INTERIORES 02 GOLPES pza 249.00 65.29 16,257.21 50.00% 8,128.61 50.00% 8,128.61 02.12.03 CERRADURA TIPO BOLA PARA SS.HH. pza 47.00 47.29 2,222.63 50.00% 1,111.32 50.00% 1,111.32 02.12.04 PICAPORTE DE ALUMINIO 6" pza 142.00 19.64 2,788.88 50.00% 1,394.44 50.00% 1,394.44 02.13 VIDRIOS, CRISTALES Y SIMILARES 02.13.01 CRISTAL TEMPLADO TRANSPARENTE E=6MM SIST. MODUGLASS p2 489.12 17.85 8,730.79 50.00% 4,365.40 50.00% 4,365.40 02.13.02 CRISTAL TEMPLADO TRANSPARENTE E=10MM SIST. MODUGLASS p2 445.94 25.73 11,474.04 50.00% 5,737.02 50.00% 5,737.02 02.13.03 CRISTAL TEMPLADO COLOR GRISS E=6MM SIST. MODUGLASS p2 390.02 19.43 7,578.09 50.00% 3,789.05 50.00% 3,789.05 02.13.04 CRISTAL TEMPLADO GRISS E=6MM. SISTEMA MURO CORTINA p2 752.15 24.50 18,427.68 50.00% 9,213.84 50.00% 9,213.84 02.13.05 PANEL DE ALUMINIO E=6MM, SITEMA MURO CORTINA p2 726.49 22.00 15,982.78 50.00% 7,991.39 50.00% 7,991.39 02.13.06 ESPEJO CORRIDO EMPOTRADO PARA SS.HH. p2 166.60 7.56 1,259.50 50.00% 629.75 50.00% 629.75 02.14 PINTURA 02.14.01 PINTURA LATEX EN CIELO RASO (Incluye Vigas y Fondo de Escaleras) m2 607.26 7.84 4,760.92 50.00% 2,380.46 50.00% 2,380.46 02.14.02 PINTURA EN MUROS INTERIORES (Incluye Columnas y Derrames) m2 168.94 165.62 27,979.84 50.00% 13,989.92 50.00% 13,989.92 02.14.03 PINTURA EN MUROS EXTERIORES (Incluye Columnas y Derrames) m2 95.97 169.34 16,251.56 50.00% 8,125.78 50.00% 8,125.78 02.14.04 PINTURA BARNIZ EN CONTRAZOCALOS DE MADERA m 224.41 4.08 915.59 50.00% 457.80 50.00% 457.80 02.14.05 PINTURA BARNIZ EN PUERTAS DE MADERA m2 643.40 9.13 5,874.24 50.00% 2,937.12 50.00% 2,937.12 02.14.06 PINTURA ANTICORROSIVA EN BARANDAS, PASAMANOS Y MARCOS m 46.19 160.57 7,416.73 50.00% 3,708.37 50.00% 3,708.37 02.15 TANQUE CISTERNA 02.15.01 REVOQUES ENLUCIDOS Y MOLDURAS 02.15.01.01 TARRAJEO EN INTERIORES (Mezcla C:A 1:4, E=2cm) m2 70.60 20.57 1,452.24 50.00% 726.12 50.00% 726.12 02.15.01.02 TARRAJEO EN EXTERIORES (Mezcla C:A 1:4, E=2cm) m2 76.69 26.93 2,065.26 50.00% 1,032.63 50.00% 1,032.63 02.15.01.03 TARRAJEO CON IMPERMEABILIZANTES (Mezcla C:A 1:4, E=2cm) m2 111.02 24.25 2,692.24 50.00% 1,346.12 50.00% 1,346.12 02.15.02 CIELORRASOS 02.15.02.01 CIELO RASO HORIZONTAL CON IMPERMEABILIZANTE (Mezcla C:A 1:4, E=2.5cm) m2 48.00 56.75 2,724.00 50.00% 1,362.00 50.00% 1,362.00 02.15.03 PISOS Y PAVIMENTOS 02.15.03.01 PISO DE CEMENTO PULIDO CON IMPERMEABILIZANTE m2 133.35 24.16 3,221.74 50.00% 1,610.87 50.00% 1,610.87 03 INSTALACIONES SANITARIAS 03.01 SUMINISTRO E INSTALACION DE APARATOS Y ACCESORIOS SANITARIOS 03.01.01 IINODORO FLUXOMETRO DE DESCARGA REDUCIDA pza 36.00 450.00 16,200.00 50.00% 8,100.00 50.00% 8,100.00 03.01.02 LAVATORIO OVALIN EMPOTRADO PARA AGUA FRIA pza 38.00 110.00 4,180.00 50.00% 2,090.00 50.00% 2,090.00 03.01.03 LAVATORIO OVALIN PEDESTAL AGUA FRIA pza 6.00 120.00 720.00 50.00% 360.00 50.00% 360.00 03.01.04 URINARIO FLUXOMETRO DE DESCARGA REDUCIDA pza 15.00 300.00 4,500.00 50.00% 2,250.00 50.00% 2,250.00 03.01.05 LAVADERO DE ACERO INOXIDABLE C/ACCES. pza 2.00 150.00 300.00 50.00% 150.00 50.00% 150.00 03.01.06 JABONERA DE LOSA COLOR BLANCO und 50.00 50.00 2,500.00 50.00% 1,250.00 50.00% 1,250.00 03.01.07 PAPELERA DE LOSA Y BARRA PLASTICA, COLOR BLANCO und 50.00 37.50 1,875.00 50.00% 937.50 50.00% 937.50 03.01.08 COLOCACION DE APARATOS SANITARIOS pza 125.00 17.83 2,228.75 50.00% 1,114.38 50.00% 1,114.38 03.01.09 COLOCACION DE ACCESORIOS SANITARIOS pza 125.00 13.40 1,675.00 50.00% 837.50 50.00% 837.50
  • 6. Obra: Departamento CAJAMARCA Provincia SAN IGNACIO Distrito SAN IGNACIO Fecha Dic- 2023 Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6 UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO ''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'', SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA'' CRONOGRAMA DE EJECUCIÒN VALORIZADO 03.02 SISTEMA DE DESAGUE 03.02.01 SALIDAS 03.02.01.01 SALIDA DE DESAGUE PVC SAL 2" pto 36.00 33.59 1,209.24 20.00% 241.85 20.00% 241.85 20.00% 241.85 20.00% 241.85 20.00% 241.85 03.02.01.02 SALIDA DE DESAGUE PVC SAL 4" pto 23.00 38.46 884.58 20.00% 176.92 20.00% 176.92 20.00% 176.92 20.00% 176.92 20.00% 176.92 03.02.02 REDES COLECTORAS 03.02.02.01 REDES COLECTORAS: TUBERIA PVC SAL 6" COLGADA m 6.35 30.45 193.36 20.00% 38.67 20.00% 38.67 20.00% 38.67 20.00% 38.67 20.00% 38.67 03.02.02.02 REDES COLECTORAS: TUBERIA PVC SAL 6" EN MONTANTE m 63.00 23.25 1,464.75 20.00% 292.95 20.00% 292.95 20.00% 292.95 20.00% 292.95 20.00% 292.95 03.02.02.03 REDES COLECTORAS: TUBERIA PVC SAL DE 2" COLGADA m 43.15 16.79 724.49 20.00% 144.90 20.00% 144.90 20.00% 144.90 20.00% 144.90 20.00% 144.90 03.02.02.04 REDES COLECTORAS: TUBERIA PVC SAL 4" COLGADA m 37.46 20.21 757.07 20.00% 151.41 20.00% 151.41 20.00% 151.41 20.00% 151.41 20.00% 151.41 03.02.03 ACCESORIOS DE REDES 03.02.03.01 ACCESORIOS DE REDES: CODOS PVC SAL 2"x45° pza 29.00 12.87 373.23 20.00% 74.65 20.00% 74.65 20.00% 74.65 20.00% 74.65 20.00% 74.65 03.02.03.02 ACCESORIOS DE REDES: CODOS PVC SAL 2"x90° pza 46.00 11.67 536.82 20.00% 107.36 20.00% 107.36 20.00% 107.36 20.00% 107.36 20.00% 107.36 03.02.03.03 ACCESORIOS DE REDES: CODOS PVC SAL 4"x45° pza 57.00 15.37 876.09 20.00% 175.22 20.00% 175.22 20.00% 175.22 20.00% 175.22 20.00% 175.22 03.02.03.04 ACCESORIO DE REDES: CODO CON VENTILACION PVC SAL 4"x2"x90° pza 33.00 19.10 630.30 20.00% 126.06 20.00% 126.06 20.00% 126.06 20.00% 126.06 20.00% 126.06 03.02.03.05 ACCESORIOS DE REDES: REDUCCION PVC C-10 DE 4" a 2" pza 32.00 5.82 186.24 20.00% 37.25 20.00% 37.25 20.00% 37.25 20.00% 37.25 20.00% 37.25 03.02.03.06 ACCESORIOS DE REDES: REDUCCION PVC C-10 DE 6" a 4" pza 8.00 8.02 64.16 20.00% 12.83 20.00% 12.83 20.00% 12.83 20.00% 12.83 20.00% 12.83 03.02.03.07 ACCESORIOS DE REDES: TAPON PVC SAL 4" pza 12.00 14.69 176.28 20.00% 35.26 20.00% 35.26 20.00% 35.26 20.00% 35.26 20.00% 35.26 03.02.03.08 ACCESORIOS DE REDES: TEES SANITARIO PVC SAL 2" pza 46.00 12.67 582.82 20.00% 116.56 20.00% 116.56 20.00% 116.56 20.00% 116.56 20.00% 116.56 03.02.03.09 ACCESORIOS DE REDES: TEES SANITARIO PVC SAL 6" pza 8.00 20.89 167.12 20.00% 33.42 20.00% 33.42 20.00% 33.42 20.00% 33.42 20.00% 33.42 03.02.03.10 ACCESORIOS DE REDES: TRAMPA "P" PVC SAL 2" pza 19.00 13.89 263.91 20.00% 52.78 20.00% 52.78 20.00% 52.78 20.00% 52.78 20.00% 52.78 03.02.03.11 ACCESORIOS DE REDES: YEES PVC SAL 4"x2" pza 63.00 15.67 987.21 20.00% 197.44 20.00% 197.44 20.00% 197.44 20.00% 197.44 20.00% 197.44 03.02.03.12 ACCESORIOS DE REDES: YEES DOBLES PVC SAL 4" pza 15.00 19.89 298.35 20.00% 59.67 20.00% 59.67 20.00% 59.67 20.00% 59.67 20.00% 59.67 03.02.03.13 ACCESORIOS DE REDES: YEES PVC SAL 2" pza 12.00 12.67 152.04 20.00% 30.41 20.00% 30.41 20.00% 30.41 20.00% 30.41 20.00% 30.41 03.02.03.14 ACCESORIOS DE REDES: YEES PVC SAL 4" pza 45.00 18.67 840.15 20.00% 168.03 20.00% 168.03 20.00% 168.03 20.00% 168.03 20.00% 168.03 03.02.04 TUBERIA Y ACCESORIOS EN INODORO FLUXOMETRO DESCARGA REDUCIDA 03.02.04.01 TEE PVC-SAP 1 1/4" und 93.00 18.60 1,729.80 20.00% 345.96 20.00% 345.96 20.00% 345.96 20.00% 345.96 20.00% 345.96 03.02.04.02 TAPON HEMBRA PVC SAP 1 1/4" pza 93.00 14.07 1,308.51 20.00% 261.70 20.00% 261.70 20.00% 261.70 20.00% 261.70 20.00% 261.70 03.02.04.03 REDUCCIONES PVC-SAP 1 1/4" A 1" und 93.00 16.72 1,554.96 20.00% 310.99 20.00% 310.99 20.00% 310.99 20.00% 310.99 20.00% 310.99 03.02.04.04 UNION SIMPLE PVC SAP ø 1" C/ROSCA pza 43.00 128.53 5,526.79 20.00% 1,105.36 20.00% 1,105.36 20.00% 1,105.36 20.00% 1,105.36 20.00% 1,105.36 03.02.04.05 TUBERIA PVC SAP R-10 1 1/4" (CAMARA DE AIRE) m 46.50 18.53 861.65 20.00% 172.33 20.00% 172.33 20.00% 172.33 20.00% 172.33 20.00% 172.33 03.02.04.06 TAPON HEMBRA C /ROSCA PVC SAP 1" pza 93.00 11.89 1,105.77 20.00% 221.15 20.00% 221.15 20.00% 221.15 20.00% 221.15 20.00% 221.15 03.02.04.07 KIT DE DESCARGA INDIRECTA D=1" PARA INODORO und 93.00 25.58 2,378.94 20.00% 475.79 20.00% 475.79 20.00% 475.79 20.00% 475.79 20.00% 475.79 03.02.05 TUBERIA Y ACCESORIOS EN URINARIO FLUXOMETRO DESCARGA REDUCIDA 03.02.05.01 TEE PVC-SAP 1" und 15.00 15.60 234.00 20.00% 46.80 20.00% 46.80 20.00% 46.80 20.00% 46.80 20.00% 46.80 03.02.05.02 TAPON HEMBRA PVC SAP 1" pza 15.00 11.87 178.05 20.00% 35.61 20.00% 35.61 20.00% 35.61 20.00% 35.61 20.00% 35.61 03.02.05.03 REDUCCIONES PVC-SAP 1" A 3/4" pza 5.00 15.72 78.60 20.00% 15.72 20.00% 15.72 20.00% 15.72 20.00% 15.72 20.00% 15.72 03.02.05.04 ADAPTADOR UNION PRESION ROSCA PVC SAP ø 3/4" C/ROSCA pza 15.00 129.15 1,937.25 20.00% 387.45 20.00% 387.45 20.00% 387.45 20.00% 387.45 20.00% 387.45 03.02.05.05 TUBERIA PVC SAP R-10 1" (CAMARA DE AIRE) m 20.01 12.76 255.33 20.00% 51.07 20.00% 51.07 20.00% 51.07 20.00% 51.07 20.00% 51.07 03.02.05.06 TAPON HEMBRA C/ROSCA PVC SAP 3/4" pza 15.00 11.39 170.85 20.00% 34.17 20.00% 34.17 20.00% 34.17 20.00% 34.17 20.00% 34.17 03.02.05.07 KIT DE DESCARGA INDIRECTA D=3/4" PARA URINARIO und 15.00 23.58 353.70 20.00% 70.74 20.00% 70.74 20.00% 70.74 20.00% 70.74 20.00% 70.74 03.02.06 ADITAMENTOS VARIOS 03.02.06.01 ADITAMENTOS VARIOS: REGISTRO ROSCADO DE BRONCE 4" pza 33.00 34.77 1,147.41 20.00% 229.48 20.00% 229.48 20.00% 229.48 20.00% 229.48 20.00% 229.48 03.02.06.02 ADITAMENTOS VARIOS: SUMIDEROS DE BRONCE 2" pza 49.00 26.42 1,294.58 20.00% 258.92 20.00% 258.92 20.00% 258.92 20.00% 258.92 20.00% 258.92
  • 7. Obra: Departamento CAJAMARCA Provincia SAN IGNACIO Distrito SAN IGNACIO Fecha Dic- 2023 Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6 UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO ''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'', SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA'' CRONOGRAMA DE EJECUCIÒN VALORIZADO 03.02.06.03 SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO 4" pza 108.00 18.29 1,975.32 20.00% 395.06 20.00% 395.06 20.00% 395.06 20.00% 395.06 20.00% 395.06 03.02.06.04 SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO 2" pza 80.00 21.29 1,703.20 20.00% 340.64 20.00% 340.64 20.00% 340.64 20.00% 340.64 20.00% 340.64 03.02.06.05 SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO 6" pza 3.00 23.29 69.87 19.99% 13.97 19.99% 13.97 19.99% 13.97 19.99% 13.97 19.99% 13.97 03.02.06.06 SOMBRERO DE VENTILACION PVC SAL 6" pza 1.00 20.63 20.63 20.02% 4.13 20.02% 4.13 20.02% 4.13 20.02% 4.13 20.02% 4.13 03.02.06.07 ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y DOS OREJAS TORNILLOS, 6" pza 21.00 17.49 367.29 20.00% 73.46 20.00% 73.46 20.00% 73.46 20.00% 73.46 20.00% 73.46 03.02.07 SISTEMA DE REDES DE COLECCION 03.02.07.01 TRABAJOS PRELIMINARES 03.02.07.01.01 LIMPIEZA DE TERRENO MANUAL m 12.20 3.28 40.02 19.99% 8.00 19.99% 8.00 19.99% 8.00 19.99% 8.00 19.99% 8.00 03.02.07.01.02 TRAZO Y REPLANTEO m 12.20 1.03 12.57 19.97% 2.51 19.97% 2.51 19.97% 2.51 19.97% 2.51 19.97% 2.51 03.02.07.01.03 SEÑALIZACION PARA SEGURIDAD EN OBRA m 20.00 24.09 481.80 20.00% 96.36 20.00% 96.36 20.00% 96.36 20.00% 96.36 20.00% 96.36 03.02.07.02 MOVIMIENTO DE TIERRAS 03.02.07.02.01 EXCAVACION DE ZANJA, Hprom.=0.80 TERRENO SEMIROCOSO m3 4.88 23.79 116.10 20.00% 23.22 20.00% 23.22 20.00% 23.22 20.00% 23.22 20.00% 23.22 03.02.07.02.02 EXCAVACION DE CAJA REGISTRO H=PROM. 0.80M. 18"X24", TERRENO SEMIROCOSO m 1.25 9.40 11.75 20.00% 2.35 20.00% 2.35 20.00% 2.35 20.00% 2.35 20.00% 2.35 03.02.07.02.03 REFINE Y NIVELACION ZANJA TERR.SEMIROCOSO m 12.20 2.93 35.75 20.00% 7.15 20.00% 7.15 20.00% 7.15 20.00% 7.15 20.00% 7.15 03.02.07.02.04 CAMA DE APOYO PARA TUBERIA m 12.20 10.58 129.08 20.00% 25.82 20.00% 25.82 20.00% 25.82 20.00% 25.82 20.00% 25.82 03.02.07.02.05 RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO m3 4.58 29.07 133.14 20.00% 26.63 20.00% 26.63 20.00% 26.63 20.00% 26.63 20.00% 26.63 03.02.07.02.06 ACARREO DE MATERIAL EXCEDENTE D=30m m3 0.39 6.54 2.55 20.00% 0.51 20.00% 0.51 20.00% 0.51 20.00% 0.51 20.00% 0.51 03.02.07.03 SUMINISTRO E INSTALACION DE TUBERIA 03.02.07.03.01 TUBERIA DE PVC SAL 6" m 12.20 37.62 458.96 20.00% 91.79 20.00% 91.79 20.00% 91.79 20.00% 91.79 20.00% 91.79 03.02.08 CAJAS DE REGISTRO 03.02.08.01 CAJA DE REGISTRO DE DESAGUE 18" X 24"Hprom.=0.80, CON TAPA DE CONCRETO und 3.00 203.30 609.90 20.00% 121.98 20.00% 121.98 20.00% 121.98 20.00% 121.98 20.00% 121.98 03.02.09 SISTEMA DE VENTILACION 03.02.09.01 SALIDAS 03.02.09.01.01 SALIDA DE VENTILACION EN TECHO PVC SAL 8" pto 1.00 27.62 27.62 19.99% 5.52 19.99% 5.52 19.99% 5.52 19.99% 5.52 19.99% 5.52 03.02.09.02 REDES COLECTORAS 03.02.09.02.01 TUBERIA DE PVC SAL 3" EMPOTRADA m 44.80 13.77 616.90 20.00% 123.38 20.00% 123.38 20.00% 123.38 20.00% 123.38 20.00% 123.38 03.02.09.02.02 REDES COLECTORAS: TUBERIA PVC SAL DE 2" EMPOTRADA m 48.91 7.02 343.35 20.00% 68.67 20.00% 68.67 20.00% 68.67 20.00% 68.67 20.00% 68.67 03.02.09.02.03 REDES COLECTORAS: TUBERIA PVC SAL 8" EN MONTANTE m 63.80 7.05 449.79 20.00% 89.96 20.00% 89.96 20.00% 89.96 20.00% 89.96 20.00% 89.96 03.02.09.02.04 REDES COLECTORAS: TUBERIA PVC SAL DE 3", COLGADA m 42.00 11.57 485.94 20.00% 97.19 20.00% 97.19 20.00% 97.19 20.00% 97.19 20.00% 97.19 03.02.09.02.05 REDES COLECTORAS: TUBERIA PVC SAL DE 2" COLGADA m 55.97 16.79 939.74 20.00% 187.95 20.00% 187.95 20.00% 187.95 20.00% 187.95 20.00% 187.95 03.02.10 ACCESORIOS DE REDES 03.02.10.01 ACCESORIOS DE REDES: CODOS PVC SAL 2"x90° pza 278.00 11.67 3,244.26 20.00% 648.85 20.00% 648.85 20.00% 648.85 20.00% 648.85 20.00% 648.85 03.02.10.02 ACCESORIOS DE REDES: TEES PVC SAL 2" pza 158.00 10.89 1,720.62 20.00% 344.12 20.00% 344.12 20.00% 344.12 20.00% 344.12 20.00% 344.12 03.02.10.03 ACCESORIOS DE REDES: REDUCCION PVC SAL DE 3" a 2" pza 42.00 7.21 302.82 20.00% 60.56 20.00% 60.56 20.00% 60.56 20.00% 60.56 20.00% 60.56 03.02.10.04 ACCESORIOS DE REDES: TEES SANITARIO PVC SAL 3" pza 28.00 13.89 388.92 20.00% 77.78 20.00% 77.78 20.00% 77.78 20.00% 77.78 20.00% 77.78 03.02.10.05 ACCESORIOS DE REDES: CODOS PVC SAL 3"x90° pza 14.00 12.89 180.46 20.00% 36.09 20.00% 36.09 20.00% 36.09 20.00% 36.09 20.00% 36.09 03.02.10.06 ACCESORIOS DE REDES: TEES PVC SAL 3"X2" pza 14.00 8.89 124.46 20.00% 24.89 20.00% 24.89 20.00% 24.89 20.00% 24.89 20.00% 24.89 03.02.10.07 ACCESORIOS DE REDES: TEES SANITARIO PVC SAL 8" a 4" pza 14.00 8.89 124.46 20.00% 24.89 20.00% 24.89 20.00% 24.89 20.00% 24.89 20.00% 24.89
  • 8. Obra: Departamento CAJAMARCA Provincia SAN IGNACIO Distrito SAN IGNACIO Fecha Dic- 2023 Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6 UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO ''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'', SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA'' CRONOGRAMA DE EJECUCIÒN VALORIZADO 03.02.10.08 ACCESORIOS DE REDES: REDUCCION PVC SAL DE 4" a 3" pza 14.00 4.71 65.94 20.00% 13.19 20.00% 13.19 20.00% 13.19 20.00% 13.19 20.00% 13.19 03.02.11 ADITAMENTOS VARIOS 03.02.11.01 SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO 3" pza 43.00 34.54 1,485.22 20.00% 297.04 20.00% 297.04 20.00% 297.04 20.00% 297.04 20.00% 297.04 03.02.11.02 SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO 2" pza 107.00 21.29 2,278.03 20.00% 455.61 20.00% 455.61 20.00% 455.61 20.00% 455.61 20.00% 455.61 03.02.11.03 SOMBRERO DE VENTILACION PVC SAL 8" pza 1.00 5.63 5.63 20.07% 1.13 20.07% 1.13 20.07% 1.13 20.07% 1.13 20.07% 1.13 03.02.11.04 ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y DOS OREJAS TORNILLOS, 8" pza 23.00 79.59 1,830.57 20.00% 366.11 20.00% 366.11 20.00% 366.11 20.00% 366.11 20.00% 366.11 03.03 SISTEMA DE AGUA FRIA 03.03.01 SALIDAS 03.03.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 45.00 41.31 1,858.95 20.00% 371.79 20.00% 371.79 20.00% 371.79 20.00% 371.79 20.00% 371.79 03.03.01.02 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1" pto 31.00 47.04 1,458.24 20.00% 291.65 20.00% 291.65 20.00% 291.65 20.00% 291.65 20.00% 291.65 03.03.01.03 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1 1/4" pto 43.00 54.04 2,323.72 20.00% 464.74 20.00% 464.74 20.00% 464.74 20.00% 464.74 20.00% 464.74 03.03.02 REDES DE DISTRIBUCION 03.03.02.01 RED DE DISTRIBUCION: TUBERIA PVC CLASE 10 R 1/2" m 71.58 7.85 561.90 20.00% 112.38 20.00% 112.38 20.00% 112.38 20.00% 112.38 20.00% 112.38 03.03.02.02 RED DE DISTRIBUCION: TUBERIA PVC CLASE 10 R 3/4" m 40.10 7.32 293.53 20.00% 58.71 20.00% 58.71 20.00% 58.71 20.00% 58.71 20.00% 58.71 03.03.02.03 RED DE DISTRIBUCION: TUBERIA PVC CLASE 10 R 1" m 59.83 8.71 521.12 20.00% 104.22 20.00% 104.22 20.00% 104.22 20.00% 104.22 20.00% 104.22 03.03.02.04 RED DE DISTRIBUCION: TUBERIA PVC CLASE 10 R 1 1/4" m 251.11 12.17 3,056.01 20.00% 611.20 20.00% 611.20 20.00% 611.20 20.00% 611.20 20.00% 611.20 03.03.02.05 RED DE DISTRIBUCION: TUBERIA PVC CLASE 10 R 1 1/2" m 263.65 13.85 3,651.55 20.00% 730.31 20.00% 730.31 20.00% 730.31 20.00% 730.31 20.00% 730.31 03.03.03 ACCESORIOS DE REDES 03.03.03.01 ADAPTADOR UNION PRESION ROSCA PVC SAP ø 1 1/2" C/ROSCA pza 54.00 83.24 4,494.96 20.00% 898.99 20.00% 898.99 20.00% 898.99 20.00% 898.99 20.00% 898.99 03.03.03.02 ADAPTADOR UNION PRESION ROSCA PVC SAP ø 1 1/4" C/ROSCA pza 4.00 85.24 340.96 20.00% 68.19 20.00% 68.19 20.00% 68.19 20.00% 68.19 20.00% 68.19 03.03.03.03 ADAPTADOR UNION PRESION ROSCA PVC SAP ø 1" C/ROSCA pza 2.00 82.24 164.48 20.00% 32.90 20.00% 32.90 20.00% 32.90 20.00% 32.90 20.00% 32.90 03.03.03.04 ACCESORIOS DE REDES:CODOS PVC C-10 DE 1/2" x 90° pza 95.00 5.71 542.45 20.00% 108.49 20.00% 108.49 20.00% 108.49 20.00% 108.49 20.00% 108.49 03.03.03.05 ACCESORIOS DE REDES:CODOS PVC C-10 DE 1 1/2" x 90° pza 109.00 7.21 785.89 20.00% 157.18 20.00% 157.18 20.00% 157.18 20.00% 157.18 20.00% 157.18 03.03.03.06 ACCESORIOS DE REDES:CODOS PVC C-10 DE 1 1/4" x 90° pza 80.00 8.21 656.80 20.00% 131.36 20.00% 131.36 20.00% 131.36 20.00% 131.36 20.00% 131.36 03.03.03.07 ACCESORIOS DE REDES:CODOS PVC C-10 DE 1" x 90° pza 66.00 6.21 409.86 20.00% 81.97 20.00% 81.97 20.00% 81.97 20.00% 81.97 20.00% 81.97 03.03.03.08 ACCESORIOS DE REDES:CODOS PVC C-10 DE 3/4" x 90° pza 68.00 6.71 456.28 20.00% 91.26 20.00% 91.26 20.00% 91.26 20.00% 91.26 20.00% 91.26 03.03.03.09 ACCESORIOS DE REDES:CODOS PVC C-10 DE 1/2" x 90° pza 47.00 5.71 268.37 20.00% 53.67 20.00% 53.67 20.00% 53.67 20.00% 53.67 20.00% 53.67 03.03.03.10 ACCESORIOS DE REDES: NIPLES ROSCADO DE FºGº 1 1/2" x 4" pza 12.00 101.29 1,215.48 20.00% 243.10 20.00% 243.10 20.00% 243.10 20.00% 243.10 20.00% 243.10 03.03.03.11 ACCESORIOS DE REDES: NIPLES ROSCADO DE FºGº 1 1/4" x 4" pza 4.00 96.29 385.16 20.00% 77.03 20.00% 77.03 20.00% 77.03 20.00% 77.03 20.00% 77.03 03.03.03.12 ACCESORIOS DE REDES: NIPLES ROSCADO DE FºGº 1" x 4" pza 2.00 104.41 208.82 20.00% 41.76 20.00% 41.76 20.00% 41.76 20.00% 41.76 20.00% 41.76 03.03.03.13 REDUCCIONES PVC-SAP 1 1/2" A 1 1/4" pza 33.00 15.72 518.76 20.00% 103.75 20.00% 103.75 20.00% 103.75 20.00% 103.75 20.00% 103.75 03.03.03.14 REDUCCIONES PVC-SAP 1 1/2" A 1" pza 15.00 15.72 235.80 20.00% 47.16 20.00% 47.16 20.00% 47.16 20.00% 47.16 20.00% 47.16 03.03.03.15 REDUCCIONES PVC-SAP 1 1/2" A 1/2" pza 1.00 16.72 16.72 19.98% 3.34 19.98% 3.34 19.98% 3.34 19.98% 3.34 19.98% 3.34 03.03.03.16 REDUCCIONES PVC-SAP 1 1/2" A 3/4" pza 17.00 16.72 284.24 20.00% 56.85 20.00% 56.85 20.00% 56.85 20.00% 56.85 20.00% 56.85 03.03.03.17 REDUCCIONES PVC-SAP 1 1/4" A 1" und 2.00 16.72 33.44 20.01% 6.69 20.01% 6.69 20.01% 6.69 20.01% 6.69 20.01% 6.69
  • 9. Obra: Departamento CAJAMARCA Provincia SAN IGNACIO Distrito SAN IGNACIO Fecha Dic- 2023 Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6 UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO ''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'', SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA'' CRONOGRAMA DE EJECUCIÒN VALORIZADO 03.03.03.18 REDUCCIONES PVC-SAP 1 1/4" A 1/2" pza 2.00 18.72 37.44 20.01% 7.49 20.01% 7.49 20.01% 7.49 20.01% 7.49 20.01% 7.49 03.03.03.19 REDUCCIONES PVC-SAP 1 1/4" A 3/4" pza 15.00 18.72 280.80 20.00% 56.16 20.00% 56.16 20.00% 56.16 20.00% 56.16 20.00% 56.16 03.03.03.20 REDUCCIONES PVC-SAP 1" A 1/2" pza 2.00 14.72 29.44 20.01% 5.89 20.01% 5.89 20.01% 5.89 20.01% 5.89 20.01% 5.89 03.03.03.21 REDUCCIONES PVC-SAP 2 1/2" A 1 1/2" pza 5.00 25.72 128.60 20.00% 25.72 20.00% 25.72 20.00% 25.72 20.00% 25.72 20.00% 25.72 03.03.03.22 REDUCCIONES PVC-SAP 2" A 1 1/2" pza 14.00 18.72 262.08 20.00% 52.42 20.00% 52.42 20.00% 52.42 20.00% 52.42 20.00% 52.42 03.03.03.23 REDUCCIONES PVC-SAP 3/4" A 1/2" pza 63.00 14.22 895.86 20.00% 179.17 20.00% 179.17 20.00% 179.17 20.00% 179.17 20.00% 179.17 03.03.03.24 TAPON HEMBRA C/ROSCA PVC SAP 1/2" pza 95.00 10.89 1,034.55 20.00% 206.91 20.00% 206.91 20.00% 206.91 20.00% 206.91 20.00% 206.91 03.03.03.25 TEE PVC-SAP 1 1/2" und 52.00 20.60 1,071.20 20.00% 214.24 20.00% 214.24 20.00% 214.24 20.00% 214.24 20.00% 214.24 03.03.03.26 TEE PVC-SAP 1 1/4" und 79.00 18.60 1,469.40 20.00% 293.88 20.00% 293.88 20.00% 293.88 20.00% 293.88 20.00% 293.88 03.03.03.27 TEE PVC-SAP 1" und 16.00 15.60 249.60 20.00% 49.92 20.00% 49.92 20.00% 49.92 20.00% 49.92 20.00% 49.92 03.03.03.28 TEE PVC-SAP 1/2" und 30.00 13.10 393.00 20.00% 78.60 20.00% 78.60 20.00% 78.60 20.00% 78.60 20.00% 78.60 03.03.03.29 TEE PVC-SAP 2 1/2" und 5.00 30.60 153.00 20.00% 30.60 20.00% 30.60 20.00% 30.60 20.00% 30.60 20.00% 30.60 03.03.03.30 TEE PVC-SAP 2" und 14.00 36.15 506.10 20.00% 101.22 20.00% 101.22 20.00% 101.22 20.00% 101.22 20.00% 101.22 03.03.03.31 TEE PVC-SAP 3/4" und 22.00 14.60 321.20 20.00% 64.24 20.00% 64.24 20.00% 64.24 20.00% 64.24 20.00% 64.24 03.03.03.32 UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1 1/2" und 2.00 110.31 220.62 20.00% 44.12 20.00% 44.12 20.00% 44.12 20.00% 44.12 20.00% 44.12 03.03.03.33 UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1 1/4" und 4.00 105.31 421.24 20.00% 84.25 20.00% 84.25 20.00% 84.25 20.00% 84.25 20.00% 84.25 03.03.03.34 UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1" und 2.00 100.31 200.62 20.00% 40.12 20.00% 40.12 20.00% 40.12 20.00% 40.12 20.00% 40.12 03.03.04 VALVULAS 03.03.04.01 VALVULA COMPUERTA DE BRONCE 1 1/2" pza 46.00 67.12 3,087.52 20.00% 617.50 20.00% 617.50 20.00% 617.50 20.00% 617.50 20.00% 617.50 03.03.04.02 VALVULA COMPUERTA DE BRONCE 1 1/4" pza 2.00 62.12 124.24 20.00% 24.85 20.00% 24.85 20.00% 24.85 20.00% 24.85 20.00% 24.85 03.03.04.03 VALVULA COMPUERTA DE BRONCE 1" pza 1.00 63.58 63.58 20.01% 12.72 20.01% 12.72 20.01% 12.72 20.01% 12.72 20.01% 12.72 03.03.04.04 VALVULA REDUCTORA DE PRESION ROSCADA 2 1/2", ACERO INOXIDABLE, PN 40 pza 2.00 163.59 327.18 20.00% 65.44 20.00% 65.44 20.00% 65.44 20.00% 65.44 20.00% 65.44 03.03.05 ADITAMENTOS VARIOS 03.03.05.01 VALVULA COMPUERTA DE BRONCE 2 1/2" pza 4.00 107.12 428.48 20.00% 85.70 20.00% 85.70 20.00% 85.70 20.00% 85.70 20.00% 85.70 03.03.05.02 REDUCCION PVC SAP CL. 10, 2 1/2" A 2" pza 2.00 101.46 202.92 20.00% 40.58 20.00% 40.58 20.00% 40.58 20.00% 40.58 20.00% 40.58 03.03.05.03 TEE PVC-SAP 2 1/2" und 2.00 30.60 61.20 20.00% 12.24 20.00% 12.24 20.00% 12.24 20.00% 12.24 20.00% 12.24 03.03.05.04 CODO PVC SAP C-10, 2 1/2" pza 2.00 16.15 32.30 20.00% 6.46 20.00% 6.46 20.00% 6.46 20.00% 6.46 20.00% 6.46 03.03.05.05 ADAPTADOR UNION PRESION ROSCA PVC SAP C-10, Ø 2 1/2" pza 4.00 102.46 409.84 20.00% 81.97 20.00% 81.97 20.00% 81.97 20.00% 81.97 20.00% 81.97 03.03.05.06 UNION UNIVERSAL DE FIERRO GALVANIZADO DE 2 1/2" pza 8.00 139.46 1,115.68 20.00% 223.14 20.00% 223.14 20.00% 223.14 20.00% 223.14 20.00% 223.14 03.03.05.07 ACCESORIOS DE REDES:NIPLES ROSCADO DE FºGº 2 1/2" x 6" pza 8.00 125.46 1,003.68 20.00% 200.74 20.00% 200.74 20.00% 200.74 20.00% 200.74 20.00% 200.74 03.03.05.08 ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y DOS OREJAS TORNILLOS, 1 1/2" pza 4.00 38.20 152.80 20.00% 30.56 20.00% 30.56 20.00% 30.56 20.00% 30.56 20.00% 30.56 03.03.05.09 ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y DOS OREJAS TORNILLOS, 2" pza 12.00 35.17 422.04 20.00% 84.41 20.00% 84.41 20.00% 84.41 20.00% 84.41 20.00% 84.41 03.03.05.10 ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y DOS OREJAS TORNILLOS, 2 1/2" pza 7.00 31.63 221.41 20.00% 44.28 20.00% 44.28 20.00% 44.28 20.00% 44.28 20.00% 44.28 03.03.06 PRUEBAS HIDRAULICAS Y DESINFECCION DE TUBERIAS 03.03.06.01 PRUEBA HIDRAULICA Y DESINFECCION DE REDES DE AGUAm 686.27 10.36 7,109.76 100.00% 7,109.76 03.04 SISTEMA DE AGUA PARA RIEGO 03.04.01 SALIDAS 03.04.01.01 SALIDA DE AGUA P/RIEGO TUBERIA DE PVC-SAP 1/2" pto 4.00 48.96 195.84 20.00% 39.17 20.00% 39.17 20.00% 39.17 20.00% 39.17 20.00% 39.17 03.04.02 REDES DE DISTRIBUCION 03.04.02.01 RED DE DISTRIBUCION: TUBERIA PVC CLASE 10 R 1 1/2" m 19.65 13.85 272.15 20.00% 54.43 20.00% 54.43 20.00% 54.43 20.00% 54.43 20.00% 54.43 03.04.02.02 RED DE DISTRIBUCION: TUBERIA PVC CLASE 10 R 3/4" m 40.60 7.32 297.19 20.00% 59.44 20.00% 59.44 20.00% 59.44 20.00% 59.44 20.00% 59.44 03.04.03 ACCESORIOS DE REDES 03.04.03.01 CODO PVC SAL CL. 10, 1/2" x 90º pza 2.00 10.85 21.70 20.00% 4.34 20.00% 4.34 20.00% 4.34 20.00% 4.34 20.00% 4.34 03.04.03.02 REDUCCION PVC SAP CL. 10, 1 1/2" A 3/4" pza 2.00 88.22 176.44 20.00% 35.29 20.00% 35.29 20.00% 35.29 20.00% 35.29 20.00% 35.29 03.04.03.03 CODO PVC SAL CL. 10, 3/4" x 90º pza 2.00 11.85 23.70 20.00% 4.74 20.00% 4.74 20.00% 4.74 20.00% 4.74 20.00% 4.74
  • 10. Obra: Departamento CAJAMARCA Provincia SAN IGNACIO Distrito SAN IGNACIO Fecha Dic- 2023 Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6 UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO ''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'', SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA'' CRONOGRAMA DE EJECUCIÒN VALORIZADO 03.04.03.04 TEE PVC-SAP CL. 10 3/4" pza 2.00 14.60 29.20 20.00% 5.84 20.00% 5.84 20.00% 5.84 20.00% 5.84 20.00% 5.84 03.04.03.05 REDUCCION PVC SAP CL. 10, 3/4" A 1/2" pza 3.00 9.00 27.00 20.00% 5.40 20.00% 5.40 20.00% 5.40 20.00% 5.40 20.00% 5.40 03.04.03.06 GRIFO P/RIEGO DE BRONCE Ø 1/2" pza 4.00 54.87 219.48 20.00% 43.90 20.00% 43.90 20.00% 43.90 20.00% 43.90 20.00% 43.90 03.04.03.07 ACCESORIOS DE REDES: NIPLES ROSCADO DE FºGº 1/2" x 2" pza 4.00 94.22 376.88 20.00% 75.38 20.00% 75.38 20.00% 75.38 20.00% 75.38 20.00% 75.38 03.04.03.08 ACCESORIOS DE REDES: CODOS F°G° DE 1/2" x 90° pza 4.00 20.23 80.92 20.00% 16.18 20.00% 16.18 20.00% 16.18 20.00% 16.18 20.00% 16.18 03.05 SISTEMA DE RECOLECCION DE AGUA DE LLUVIA 03.05.01 SUMINISTRO E INSTALACION DE TUBERIA 03.05.01.01 TUBERIA DE PVC SAL 6" MONTANTE m 63.00 19.02 1,198.26 25.00% 299.57 25.00% 299.57 25.00% 299.57 25.00% 299.57 03.05.01.02 TUBERIA DE PVC SAL 6" COLGADA m 13.40 19.02 254.87 25.00% 63.72 25.00% 63.72 25.00% 63.72 25.00% 63.72 03.05.01.03 TUBERIA DE PVC SAL 4" COLGADA m 31.35 14.96 469.00 25.00% 117.25 25.00% 117.25 25.00% 117.25 25.00% 117.25 03.05.02 ACCESORIOS DE REDES 03.05.02.01 TRAMPA "P" DE P.V.C. SAL 4" und 4.00 87.24 348.96 25.00% 87.24 25.00% 87.24 25.00% 87.24 25.00% 87.24 03.05.02.02 CODO PVC SAL 4"X45° pza 8.00 18.36 146.88 25.00% 36.72 25.00% 36.72 25.00% 36.72 25.00% 36.72 03.05.02.03 YEE PVC SAL 4" pza 6.00 18.25 109.50 25.00% 27.38 25.00% 27.38 25.00% 27.38 25.00% 27.38 03.05.02.04 TAPON PVC SAL 4" pza 4.00 14.69 58.76 25.00% 14.69 25.00% 14.69 25.00% 14.69 25.00% 14.69 03.05.02.05 REDUCCION PVC SAP 6" A 4" pza 2.00 118.74 237.48 25.00% 59.37 25.00% 59.37 25.00% 59.37 25.00% 59.37 03.05.02.06 CODO PVC SAL 6"X90° pza 2.00 44.61 89.22 25.01% 22.31 25.01% 22.31 25.01% 22.31 25.01% 22.31 03.05.02.07 ACCESORIOS DE REDES: TEES SANITARIO PVC SAL 6" pza 1.00 20.89 20.89 24.99% 5.22 24.99% 5.22 24.99% 5.22 24.99% 5.22 03.05.02.08 SOMBRERO DE VENTILACION PVC SAL 6" pza 1.00 20.63 20.63 25.01% 5.16 25.01% 5.16 25.01% 5.16 25.01% 5.16 03.05.03 ADITAMENTOS VARIOS 03.05.03.01 SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO 6" pza 4.00 23.29 93.16 25.00% 23.29 25.00% 23.29 25.00% 23.29 25.00% 23.29 03.05.03.02 ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y DOS OREJAS TORNILLOS, 8" pza 21.00 79.59 1,671.39 25.00% 417.85 25.00% 417.85 25.00% 417.85 25.00% 417.85 03.05.03.03 CHARNELA ACERO INOXD. 6" pza 1.00 17.49 17.49 24.99% 4.37 24.99% 4.37 24.99% 4.37 24.99% 4.37 03.06 LINEA DE ADUCCION AGUA POTABLE 03.06.01 TRABAJOS PRELIMINARES 03.06.01.01 LIMPIEZA DE TERRENO MANUAL LINEA DE ADUCCION m 60.00 3.28 196.80 20.00% 39.36 20.00% 39.36 20.00% 39.36 20.00% 39.36 20.00% 39.36 03.06.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR LINEA DE ADUCCION m 60.00 1.39 83.40 20.00% 16.68 20.00% 16.68 20.00% 16.68 20.00% 16.68 20.00% 16.68 03.06.02 MOVIMIENTO DE TIERRAS 03.06.02.01 EXCAVACION DE ZANJA,TERRENO SEMIROCOSO m3 30.00 11.61 348.30 20.00% 69.66 20.00% 69.66 20.00% 69.66 20.00% 69.66 20.00% 69.66 03.06.02.02 REFINE Y NIVELACION ZANJA TERR.SEMIROCOSO m 60.00 2.93 175.80 20.00% 35.16 20.00% 35.16 20.00% 35.16 20.00% 35.16 20.00% 35.16 03.06.02.03 CAMA DE APOYO PARA TUBERIA m 60.00 10.58 634.80 20.00% 126.96 20.00% 126.96 20.00% 126.96 20.00% 126.96 20.00% 126.96 03.06.02.04 RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO m3 24.00 29.07 697.68 20.00% 139.54 20.00% 139.54 20.00% 139.54 20.00% 139.54 20.00% 139.54 03.06.02.05 ACARREO DE MATERIAL EXCEDENTE D=30m m3 7.80 6.54 51.01 20.00% 10.20 20.00% 10.20 20.00% 10.20 20.00% 10.20 20.00% 10.20 03.06.03 OBRAS DE CONCRETO SIMPLE 03.06.03.01 DADO DE ANCLAJE EN TUBERIAS F´c=175KG/CM2 m3 0.16 300.42 48.07 19.99% 9.61 19.99% 9.61 19.99% 9.61 19.99% 9.61 19.99% 9.61 03.06.04 TUBERIAS 03.06.04.01 TUBERIA PVC SAP Ø 3" CLASE-7.5 m 59.60 15.29 911.28 20.00% 182.26 20.00% 182.26 20.00% 182.26 20.00% 182.26 20.00% 182.26 03.06.05 ACCESORIOS 03.06.05.01 ACCESORIOS DE REDES:CODOS PVC C-7.5 DE 3" x 90° pza 1.00 29.71 29.71 19.99% 5.94 19.99% 5.94 19.99% 5.94 19.99% 5.94 19.99% 5.94 03.06.05.02 ACCESORIOS DE REDES:CODOS PVC C-7.5 DE 3" x 45° pza 3.00 29.71 89.13 20.00% 17.83 20.00% 17.83 20.00% 17.83 20.00% 17.83 20.00% 17.83 03.06.05.03 ACCESORIOS DE REDES:CODOS PVC C-7.5 DE 3" x 22.5º pza 4.00 34.71 138.84 20.00% 27.77 20.00% 27.77 20.00% 27.77 20.00% 27.77 20.00% 27.77 03.06.05.04 UNION SOQUET (ROSCA HEMBRA) 3" pza 1.00 120.31 120.31 20.00% 24.06 20.00% 24.06 20.00% 24.06 20.00% 24.06 20.00% 24.06 03.06.06 PRUEBAS HIDRAULICAS 03.06.06.01 PRUEBA HIDRAULICA Y DESINFECCION DE REDES DE AGUAm 60.00 10.36 621.60 20.00% 124.32 20.00% 124.32 20.00% 124.32 20.00% 124.32 20.00% 124.32 03.07 CISTERNA SEMI ENTERRADA Y CASETA DE BOMBEO 03.07.01 TRABAJOS PRELIMINARES
  • 11. Obra: Departamento CAJAMARCA Provincia SAN IGNACIO Distrito SAN IGNACIO Fecha Dic- 2023 Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6 UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO ''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'', SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA'' CRONOGRAMA DE EJECUCIÒN VALORIZADO 03.07.01.01 LIMPIEZA DE TERRENO MANUAL m2 14.75 3.28 48.38 20.01% 9.68 20.01% 9.68 20.01% 9.68 20.01% 9.68 20.01% 9.68 03.07.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 14.75 1.71 25.22 19.98% 5.04 19.98% 5.04 19.98% 5.04 19.98% 5.04 19.98% 5.04 03.07.02 MOVIMIENTO DE TIERRAS 03.07.02.01 EXCAVACION DE ZANJA,TERRENO SEMIROCOSO m3 13.28 11.61 154.18 20.00% 30.84 20.00% 30.84 20.00% 30.84 20.00% 30.84 20.00% 30.84 03.07.02.02 EXCAVACION DE ZANJA,TERRENO SEMIROCOSO, TUBERIA 6" m3 8.92 11.61 103.56 20.00% 20.71 20.00% 20.71 20.00% 20.71 20.00% 20.71 20.00% 20.71 03.07.02.03 REFINE Y NIVELACION ZANJA TERR.SEMIROCOSO CANALETA m 14.75 2.93 43.22 19.99% 8.64 19.99% 8.64 19.99% 8.64 19.99% 8.64 19.99% 8.64 03.07.02.04 REFINE Y NIVELACION ZANJA TERR.SEMIROCOSO TUBERIA m 27.90 2.93 81.75 20.00% 16.35 20.00% 16.35 20.00% 16.35 20.00% 16.35 20.00% 16.35 03.07.02.05 CAMA DE APOYO PARA TUBERIA m 27.90 10.58 295.18 20.00% 59.04 20.00% 59.04 20.00% 59.04 20.00% 59.04 20.00% 59.04 03.07.02.06 RELLENO COMPACTADO C/MATERIAL SELECCIONADO P/TUBERIA m3 7.14 54.39 388.34 20.00% 77.67 20.00% 77.67 20.00% 77.67 20.00% 77.67 20.00% 77.67 03.07.02.07 ACARREO DE MATERIAL EXCEDENTE D=30m m3 15.59 6.54 101.96 20.00% 20.39 20.00% 20.39 20.00% 20.39 20.00% 20.39 20.00% 20.39 03.07.03 TUBERIAS 03.07.03.01 TUBERIA FIERRO GALVANIZADO Ø 3" m 5.00 204.65 1,023.25 20.00% 204.65 20.00% 204.65 20.00% 204.65 20.00% 204.65 20.00% 204.65 03.07.03.02 TUBERIA PVC SAP Ø 2 1/2" CLASE-10 LINEA DE IMPULSION AGUA POTABLE m 99.60 15.29 1,522.88 20.00% 304.58 20.00% 304.58 20.00% 304.58 20.00% 304.58 20.00% 304.58 03.07.03.03 TUBERIA DE PVC UF S-25 ISO 4435 Q6" EMPALME CAJA DRENAJE m 27.90 41.12 1,147.25 20.00% 229.45 20.00% 229.45 20.00% 229.45 20.00% 229.45 20.00% 229.45 03.07.04 OBRAS DE CONCRETO SIMPLE 03.07.04.01 CANAL DE CONCRETO F'C=210 KG/CM2 A=0.90m m3 3.24 282.65 915.79 20.00% 183.16 20.00% 183.16 20.00% 183.16 20.00% 183.16 20.00% 183.16 03.07.04.02 ACERO FY=4200 KG/CM2 kg 35.53 4.04 143.54 20.00% 28.71 20.00% 28.71 20.00% 28.71 20.00% 28.71 20.00% 28.71 03.07.04.03 CANAL DE CONCRETO F'C=210 KG/CM2 A=0.50m m3 1.85 279.95 517.91 20.00% 103.58 20.00% 103.58 20.00% 103.58 20.00% 103.58 20.00% 103.58 03.07.04.04 ACERO FY=4200 KG/CM2 kg 31.37 4.04 126.73 20.00% 25.35 20.00% 25.35 20.00% 25.35 20.00% 25.35 20.00% 25.35 03.07.04.05 ENCOFRADO Y DESENCOFRADO CANALES m2 85.85 46.14 3,961.12 20.00% 792.22 20.00% 792.22 20.00% 792.22 20.00% 792.22 20.00% 792.22 03.07.04.06 CONCRETO F'C=210 KG/CM2, PARA CAJA DE REBOSE m3 0.11 258.57 28.44 20.01% 5.69 20.01% 5.69 20.01% 5.69 20.01% 5.69 20.01% 5.69 03.07.04.07 ENCOFRADO Y DESENCOFRADO DE CAJAS REBOSES m2 4.48 46.14 206.71 20.00% 41.34 20.00% 41.34 20.00% 41.34 20.00% 41.34 20.00% 41.34 03.07.05 TAPA METALICA 03.07.05.01 TAPA METALICA (0.60x0.60) + MARCO METALICO SUMINISTRO E INSTALACION pza 1.00 259.87 259.87 20.00% 51.97 20.00% 51.97 20.00% 51.97 20.00% 51.97 20.00% 51.97 03.07.05.02 PINTURA ANTICORROSIVA EN ESMALTE P/METALES m2 0.72 5.88 4.23 20.09% 0.85 20.09% 0.85 20.09% 0.85 20.09% 0.85 20.09% 0.85 03.07.05.03 REJILLA METALICA CON PLATINA DE 1/4" A=0.50m CAJA REBOSE pza 2.00 66.22 132.44 20.00% 26.49 20.00% 26.49 20.00% 26.49 20.00% 26.49 20.00% 26.49 03.07.06 FILTROS 03.07.06.01 FILTRO DE GRAVA C/DREN CRIBADO m3 0.22 209.34 46.05 20.00% 9.21 20.00% 9.21 20.00% 9.21 20.00% 9.21 20.00% 9.21 03.07.07 ADITAMENTOS VARIOS 03.07.07.01 BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DE 4" P/ANCLAJE pza 1.00 159.74 159.74 20.00% 31.95 20.00% 31.95 20.00% 31.95 20.00% 31.95 20.00% 31.95 03.07.07.02 TUBERIA DE PVC SAL 4" VENTILACION pza 2.00 14.87 29.74 20.01% 5.95 20.01% 5.95 20.01% 5.95 20.01% 5.95 20.01% 5.95 03.07.07.03 ESCALERA TIPO MARINERA ALT. 2.0M und 1.00 443.94 443.94 20.00% 88.79 20.00% 88.79 20.00% 88.79 20.00% 88.79 20.00% 88.79 03.07.07.04 SISTEMA DE LLENADO P/CAMION CISTERNA Q 4" und 1.00 948.22 948.22 20.00% 189.64 20.00% 189.64 20.00% 189.64 20.00% 189.64 20.00% 189.64 03.07.07.05 CONEXION SIAMESA P/LLENADO POR COMPAÑIA DE BOMBEROS und 1.00 1,599.74 1,599.74 20.00% 319.95 20.00% 319.95 20.00% 319.95 20.00% 319.95 20.00% 319.95 03.07.07.06 VALVULA FLOTADORA C/BOYA DE COBRE Q3" pza 1.00 74.62 74.62 19.99% 14.92 19.99% 14.92 19.99% 14.92 19.99% 14.92 19.99% 14.92 03.07.07.07 TRANSICION DE FIERRO FUNDIDO A PVC SAP pza 1.00 114.74 114.74 20.00% 22.95 20.00% 22.95 20.00% 22.95 20.00% 22.95 20.00% 22.95 03.07.07.08 SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO 2 1/2" pza 4.00 31.29 125.16 20.00% 25.03 20.00% 25.03 20.00% 25.03 20.00% 25.03 20.00% 25.03 03.07.07.09 ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y DOS OREJAS TORNILLOS, 2 1/2" pza 26.00 31.63 822.38 20.00% 164.48 20.00% 164.48 20.00% 164.48 20.00% 164.48 20.00% 164.48 03.08 SISTEMA DE DESAGUE, REVOSE Y AGUA PLUVIAL 03.08.01 TUBERIAS 03.08.01.01 TUBERIA DE PVC SAL 4" COLGADA m 10.60 14.96 158.58 25.00% 39.65 25.00% 39.65 25.00% 39.65 25.00% 39.65
  • 12. Obra: Departamento CAJAMARCA Provincia SAN IGNACIO Distrito SAN IGNACIO Fecha Dic- 2023 Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6 UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO ''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'', SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA'' CRONOGRAMA DE EJECUCIÒN VALORIZADO 03.08.01.02 TUBERIA DE PVC SAL 4" ADOSADA A PARED m 3.60 14.96 53.86 25.01% 13.47 25.01% 13.47 25.01% 13.47 25.01% 13.47 03.08.01.03 TUBERIA DE PVC SAL 6" PROTEGIDA EN CONCRETO m 9.90 19.02 188.30 25.00% 47.08 25.00% 47.08 25.00% 47.08 25.00% 47.08 03.08.02 ACCESORIOS 03.08.02.01 TRAMPA "P" DE P.V.C. SAL 4" und 2.00 87.24 174.48 25.00% 43.62 25.00% 43.62 25.00% 43.62 25.00% 43.62 03.08.02.02 CODO PVC SAL 4"X45° pza 5.00 18.36 91.80 25.00% 22.95 25.00% 22.95 25.00% 22.95 25.00% 22.95 03.08.02.03 YEE PVC SAL 4" pza 1.00 18.25 18.25 24.99% 4.56 24.99% 4.56 24.99% 4.56 24.99% 4.56 03.08.02.04 REDUCCION PVC SAP 6" A 4" pza 1.00 118.74 118.74 25.00% 29.69 25.00% 29.69 25.00% 29.69 25.00% 29.69 03.08.02.05 CODO PVC SAL 4"X90° pza 2.00 18.36 36.72 25.00% 9.18 25.00% 9.18 25.00% 9.18 25.00% 9.18 03.08.03 ADITAMENTOS VARIOS 03.08.03.01 CANALETA DE FºGº P/DESAGUE DE LLUVIAS Q4" m 8.50 28.25 240.13 25.00% 60.03 25.00% 60.03 25.00% 60.03 25.00% 60.03 03.08.03.02 BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DE 6" (150MM) und 2.00 199.74 399.48 25.00% 99.87 25.00% 99.87 25.00% 99.87 25.00% 99.87 03.08.03.03 SUMIDERO DE BRONCE 4" PROVISION Y COLOCACION und 2.00 54.89 109.78 25.00% 27.45 25.00% 27.45 25.00% 27.45 25.00% 27.45 03.08.03.04 SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO 4" pza 8.00 18.29 146.32 25.00% 36.58 25.00% 36.58 25.00% 36.58 25.00% 36.58 03.08.03.05 REBOSE TANQUE CISTERNA FºGº Q6" und 2.00 153.22 306.44 25.00% 76.61 25.00% 76.61 25.00% 76.61 25.00% 76.61 03.08.03.06 ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y DOS OREJAS TORNILLOS, 4" pza 3.00 27.77 83.31 25.00% 20.83 25.00% 20.83 25.00% 20.83 25.00% 20.83 03.09 SISTEMA DE BOMBEO DE AGUA POTABLE 03.09.01 EQUIPO MOTOR BOMBA AGUA POTABLE 03.09.01.01 EQUIPO DE BOMBEO CENTRIFUGO VERTICAL MULTIETAPA P/AGUA HP=12.5, HDT=90 MCA INSTALACION ESPECIALIZADA und 1.00 32,190.74 32,190.74 25.00% 8,047.69 25.00% 8,047.69 25.00% 8,047.69 25.00% 8,047.69 03.09.02 SUMINISTRO E INSTALACION DE TUBERIAS, VALVULAS Y ACCESORIOS 03.09.02.01 MANOMETRO DOBLE LECTURA C/RANGO 0-300 LB/PULG2 INCL.ACCESORI und 2.00 114.74 229.48 25.00% 57.37 25.00% 57.37 25.00% 57.37 25.00% 57.37 03.09.02.02 UNION FLEXIBLE TIPO DRESSER DN 80 pza 4.00 199.74 798.96 25.00% 199.74 25.00% 199.74 25.00% 199.74 25.00% 199.74 03.09.02.03 VALVULA CONTROL RETENCION ACTIVA DN 80 pza 3.00 319.74 959.22 25.00% 239.81 25.00% 239.81 25.00% 239.81 25.00% 239.81 03.09.02.04 VALVULA MARIPOSA TIPO WAFER DN 80 pza 2.00 299.74 599.48 25.00% 149.87 25.00% 149.87 25.00% 149.87 25.00% 149.87 03.09.02.05 BRIDA DE FIERRO FUNDIDO DUCTIL DN 80 pza 1.00 239.74 239.74 25.00% 59.94 25.00% 59.94 25.00% 59.94 25.00% 59.94 03.09.02.06 CODO DE FIERRO FUNDIDO DUCTIL BRIDADO DN80 x45º pza 2.00 129.74 259.48 25.00% 64.87 25.00% 64.87 25.00% 64.87 25.00% 64.87 03.09.02.07 CODO DE FIERRO FUNDIDO DUCTIL BRIDADO DN80 x90º pza 1.00 119.74 119.74 25.00% 29.94 25.00% 29.94 25.00% 29.94 25.00% 29.94 03.09.02.08 YEE DE FIERRO FUNDIDO BRIDADO DN80 pza 2.00 199.74 399.48 25.00% 99.87 25.00% 99.87 25.00% 99.87 25.00% 99.87 03.09.02.09 VALVULA DE ALIVIO DE PRESION pza 1.00 139.74 139.74 25.00% 34.94 25.00% 34.94 25.00% 34.94 25.00% 34.94 03.09.02.10 VALVULA DE AIRE COMBINADA BRIDADA, DN 50 PN 16 pza 1.00 159.74 159.74 25.00% 39.94 25.00% 39.94 25.00% 39.94 25.00% 39.94 03.09.02.11 TUBERIA FIE.FUNDIDO DUCTIL DN80 m 1.00 142.01 142.01 25.00% 35.50 25.00% 35.50 25.00% 35.50 25.00% 35.50 03.09.02.12 TEE C/REDUCCION BRIDADA DN80 A DN50 pza 1.00 99.94 99.94 25.01% 24.99 25.01% 24.99 25.01% 24.99 25.01% 24.99 03.09.02.13 VALVULA DE AIRE DOBLE EFECTO 2" C/ROSCA MACHO pza 1.00 159.74 159.74 25.00% 39.94 25.00% 39.94 25.00% 39.94 25.00% 39.94 04 INSTALACIONES ELECTRICAS 04.01 INTERRUPTOR TERMOMAGNETICO 04.01.01 INTERRUPTOR THERMOMAGNETICO 3x25 A x220V und 16.00 53.91 862.56 25.00% 215.64 25.00% 215.64 25.00% 215.64 25.00% 215.64 04.01.02 INTERRUPTOR THERMOMAGNETICA 3x30 A x220V und 23.00 66.52 1,529.96 25.00% 382.49 25.00% 382.49 25.00% 382.49 25.00% 382.49 04.01.03 INTERRUPTOR THERMOMAGNETICA 3x35 A x220V und 8.00 71.52 572.16 25.00% 143.04 25.00% 143.04 25.00% 143.04 25.00% 143.04 04.01.04 INTERRUPTOR THERMOMAGNETICA 3x50 A x220V und 2.00 81.52 163.04 25.00% 40.76 25.00% 40.76 25.00% 40.76 25.00% 40.76 04.01.05 INTERRUPTOR THERMOMAGNETICA 3x70 A x220V und 26.00 91.52 2,379.52 25.00% 594.88 25.00% 594.88 25.00% 594.88 25.00% 594.88 04.01.06 INTERRUPTOR THERMOMAGNETICO 2x10 A x 220 V und 119.00 41.52 4,940.88 25.00% 1,235.22 25.00% 1,235.22 25.00% 1,235.22 25.00% 1,235.22 04.01.07 INTERRUPTOR THERMOMAGNETICO 2x15 A x 220 V und 128.00 41.52 5,314.56 25.00% 1,328.64 25.00% 1,328.64 25.00% 1,328.64 25.00% 1,328.64 04.01.08 INTERRUPTOR THERMOMAGNETICO 2x20 A x240V und 120.00 41.52 4,982.40 25.00% 1,245.60 25.00% 1,245.60 25.00% 1,245.60 25.00% 1,245.60 04.01.09 INTERRUPTOR THERMOMAGNETICO 2x25 A x220V und 73.00 41.52 3,030.96 25.00% 757.74 25.00% 757.74 25.00% 757.74 25.00% 757.74
  • 13. Obra: Departamento CAJAMARCA Provincia SAN IGNACIO Distrito SAN IGNACIO Fecha Dic- 2023 Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6 UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO ''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'', SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA'' CRONOGRAMA DE EJECUCIÒN VALORIZADO 04.01.10 INTERRUPTOR THERMOMAGNETICO 2x30 A x220V und 56.00 41.52 2,325.12 25.00% 581.28 25.00% 581.28 25.00% 581.28 25.00% 581.28 04.02 TABLEROS DE DISTRIBUCION 04.02.01 TABLERO DE DISTRIBUCION (T.D.), 20 POLOS, TRIFASICO 220 V und 1.00 478.22 478.22 25.00% 119.56 25.00% 119.56 25.00% 119.56 25.00% 119.56 04.02.02 TABLERO DE DISTRIBUCION (T.D.), 12 POLOS, TRIFASICO 220 V und 1.00 428.22 428.22 25.00% 107.06 25.00% 107.06 25.00% 107.06 25.00% 107.06 04.02.03 TABLERO DE DISTRIBUCION (T.D.), 10 POLOS, TRIFASICO 220 V und 1.00 378.22 378.22 25.00% 94.56 25.00% 94.56 25.00% 94.56 25.00% 94.56 04.02.04 TABLERO DE DISTRIBUCION (T.D.), 8 POLOS, TRIFASICO 220 V und 1.00 378.22 378.22 25.00% 94.56 25.00% 94.56 25.00% 94.56 25.00% 94.56 04.02.05 TABLERO DE DISTRIBUCION (T.D.), 20 POLOS, MONOFASICO 220 V und 1.00 278.22 278.22 25.00% 69.56 25.00% 69.56 25.00% 69.56 25.00% 69.56 04.02.06 TABLERO DE DISTRIBUCION (T.D.), 12 POLOS, MONOFASICO 220 V und 18.00 398.22 7,167.96 25.00% 1,791.99 25.00% 1,791.99 25.00% 1,791.99 25.00% 1,791.99 04.02.07 TABLERO DE DISTRIBUCION (T.D.), 10 POLOS, MONOFASICO 220 V und 4.00 298.22 1,192.88 25.00% 298.22 25.00% 298.22 25.00% 298.22 25.00% 298.22 04.02.08 TABLERO DE DISTRIBUCION (T.D.), 8 POLOS, MONOFASICO 220 V und 11.00 278.22 3,060.42 25.00% 765.11 25.00% 765.11 25.00% 765.11 25.00% 765.11 04.02.09 TABLERO DE DISTRIBUCION (T.D.), 6 POLOS, MONOFASICO 220 V und 15.00 278.22 4,173.30 25.00% 1,043.33 25.00% 1,043.33 25.00% 1,043.33 25.00% 1,043.33 04.03 POZOS A TIERRA 04.03.01 POZO DE PUESTA A TIERRA GLB 2.00 1,435.59 2,871.18 25.00% 717.80 25.00% 717.80 25.00% 717.80 25.00% 717.80 04.04 RED ESTABILIZADA 04.04.01 INSTALACIONES ELECTRICAS 04.04.01.01 INSTALACION DE CAJAS OCTOGONALES und 1,815.00 8.91 16,171.65 25.00% 4,042.91 25.00% 4,042.91 25.00% 4,042.91 25.00% 4,042.91 04.04.01.02 INSTALACION DE CAJAS RECTANGULARES und 357.00 9.91 3,537.87 25.00% 884.47 25.00% 884.47 25.00% 884.47 25.00% 884.47 04.04.01.03 INSTALACION DE TOMACORRIENTES DOBLES CON TOMA A TIERRA und 66.00 11.91 786.06 25.00% 196.52 25.00% 196.52 25.00% 196.52 25.00% 196.52 04.04.01.04 INSTALACION DE TOMACORRIENTES CON TOMA A TIERRA MODULAR EMPOTRADO A MUEBLE und 260.00 21.91 5,696.60 25.00% 1,424.15 25.00% 1,424.15 25.00% 1,424.15 25.00% 1,424.15 04.04.01.05 INSTALACION DE CAJAS DE PASO und 156.00 26.21 4,088.76 25.00% 1,022.19 25.00% 1,022.19 25.00% 1,022.19 25.00% 1,022.19 04.04.02 CANALIZACIONES Y/O TUBERIAS 04.04.02.01 TUBERIA DE PVC SEL Q 18.75mm m 1,278.68 6.52 8,336.99 25.00% 2,084.25 25.00% 2,084.25 25.00% 2,084.25 25.00% 2,084.25 04.04.02.02 CURVA PVC SEL Q 3/4" und 256.34 5.05 1,294.52 25.00% 323.63 25.00% 323.63 25.00% 323.63 25.00% 323.63 04.04.03 CONDUCTORES Y/O CABLES 04.04.03.01 CABLEADO CONDUCTOR 4 mm2 NH80 m 3,330.00 3.41 11,355.30 25.00% 2,838.83 25.00% 2,838.83 25.00% 2,838.83 25.00% 2,838.83 04.04.03.02 CABLEADO CONDUCTOR 2.5 mm2 NH80 m 1,300.00 2.79 3,627.00 25.00% 906.75 25.00% 906.75 25.00% 906.75 25.00% 906.75 04.05 ALUMBRADO DORMITORIO 04.05.01 INSTALACIONES ELECTRICAS 04.05.01.01 INSTALACION DE CAJAS OCTOGONALES und 2,217.00 8.91 19,753.47 25.00% 4,938.37 25.00% 4,938.37 25.00% 4,938.37 25.00% 4,938.37 04.05.01.02 INSTALACION DE CAJAS RECTANGULARES und 857.00 9.91 8,492.87 25.00% 2,123.22 25.00% 2,123.22 25.00% 2,123.22 25.00% 2,123.22 04.05.01.03 INSTALACION DE INTERRUPTOR SIMPLE und 261.00 9.91 2,586.51 25.00% 646.63 25.00% 646.63 25.00% 646.63 25.00% 646.63 04.05.01.04 INSTALACION DE INTERRUPTOR DOBLE und 79.00 10.91 861.89 25.00% 215.47 25.00% 215.47 25.00% 215.47 25.00% 215.47 04.05.01.05 INSTALACION DE INTERRUPTOR CONMUTADOR 3 VIAS SIMPLE und 17.00 21.91 372.47 25.00% 93.12 25.00% 93.12 25.00% 93.12 25.00% 93.12 04.05.01.06 INSTALACION DE INTERRUPTOR CONMUTADOR 3 VIAS DOBLE und 128.00 25.91 3,316.48 25.00% 829.12 25.00% 829.12 25.00% 829.12 25.00% 829.12 04.05.01.07 INSTALACION DE TAPAS CIEGAS CIRCULARES und 49.00 3.96 194.04 25.00% 48.51 25.00% 48.51 25.00% 48.51 25.00% 48.51 04.05.02 CANALIZACIONES Y/O TUBERIAS 04.05.02.01 TUBERIA DE PVC SEL Q 18.75mm m 1,546.29 6.52 10,081.81 25.00% 2,520.45 25.00% 2,520.45 25.00% 2,520.45 25.00% 2,520.45 04.05.02.02 CURVA PVC SEL Q 3/4" und 568.00 5.05 2,868.40 25.00% 717.10 25.00% 717.10 25.00% 717.10 25.00% 717.10 04.05.03 CONDUCTORES Y/O CABLES 04.05.03.01 CABLEADO CONDUCTOR 4 mm2 NH80 m 4,890.00 3.41 16,674.90 25.00% 4,168.73 25.00% 4,168.73 25.00% 4,168.73 25.00% 4,168.73
  • 14. Obra: Departamento CAJAMARCA Provincia SAN IGNACIO Distrito SAN IGNACIO Fecha Dic- 2023 Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6 UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO ''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'', SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA'' CRONOGRAMA DE EJECUCIÒN VALORIZADO 04.06 ARTEFACTOS 04.06.01 LUMINARIA TIPO REJILLA ALUMINIZADA C/03 LAMPARA FLUORESCENTE RECTO 4x28 W SYNTO LRC (EMPOTRADO) und 80.00 197.13 15,770.40 50.00% 7,885.20 50.00% 7,885.20 04.06.02 SPOT LIGHT CIRCULAR ALUMINIZADO C/VIDRIO SERIGRAFIADO 4mm C/01 LAMPARA FLUORESCENTE COMPACTA 1x18 W und 352.00 41.73 14,688.96 50.00% 7,344.48 50.00% 7,344.48 04.06.03 LUMINARIA C/DIFUSOR PRISMATICO TRANSPARENTE C/02 LAMPARA FLUORESCENTE 2x36 W und 14.00 197.13 2,759.82 50.00% 1,379.91 50.00% 1,379.91 04.06.04 LUMINARIA DE EMERGENCIA EQUIPO C/02 LAMPARAS DE 20 W und 39.00 197.13 7,688.07 50.00% 3,844.04 50.00% 3,844.04 04.06.05 SPOT LIGHT CIRCULAR ALUMINIZADO C/VIDRIO SERIGRAFIADO 4mm C/02 LAMPARA FLUORESCENTE COMPACTA 2x26 W und 10.00 56.73 567.30 50.00% 283.65 50.00% 283.65 04.06.06 SPOT LIGHT CIRCULAR ALUMINIZADO C/VIDRIO SERIGRAFIADO 4mm C/02 LAMPARA FLUORESCENTE COMPACTA 2x18 W und 73.00 56.73 4,141.29 50.00% 2,070.65 50.00% 2,070.65 04.06.07 REFLECTOR ADOSADO C/LAMPARA T-150 W und 22.00 136.80 3,009.60 50.00% 1,504.80 50.00% 1,504.80 04.06.08 LUMINARIA DECORATIVA LAMPARA AHORRADORA COMPACTA 20 W und 20.00 97.13 1,942.60 50.00% 971.30 50.00% 971.30 04.07 CONDUCTORES Y/O CABLES 04.07.01 CABLEADO CONDUCTOR 6 mm2 NH80 m 852.00 3.40 2,896.80 50.00% 1,448.40 50.00% 1,448.40 04.07.02 CABLEADO CONDUCTOR 10 mm2 NH80 m 1,354.00 6.00 8,124.00 50.00% 4,062.00 50.00% 4,062.00 04.07.03 CABLEADO CONDUCTOR 16 mm2 NH80 m 800.00 8.30 6,640.00 50.00% 3,320.00 50.00% 3,320.00 04.07.04 CABLEADO CONDUCTOR 25 mm2 NH80 m 550.00 13.30 7,315.00 50.00% 3,657.50 50.00% 3,657.50 04.07.05 CABLEADO CONDUCTOR 35 mm2 NH80 m 100.00 18.80 1,880.00 50.00% 940.00 50.00% 940.00 04.08 VARIOS 04.08.01 SECADOR AUTOMATICO DE MANOS und 20.00 281.40 5,628.00 50.00% 2,814.00 50.00% 2,814.00 COSTO DIRECTO 2,053,292.16 278,575.64 222,965.12 327,963.11 366,684.56 537,508.75 319,594.98 GASTOS GENERALES (10.00%) 205,329.22 27,857.56 22,296.51 32,796.31 36,668.46 53,750.87 31,959.51 UTILIDAD (5.00%) 102,664.61 13,928.78 11,148.26 16,398.16 18,334.23 26,875.44 15,979.74 ========================== SUPERVISION (5.00%) 102,664.61 13,928.78 11,148.26 16,398.16 18,334.23 26,875.44 15,979.74 ESTUDIO TECNICO (2.50%) 51,332.30 51,332.30 ========================== TOTAL PRESUPUESTO 2,515,282.90 385,623.06 267,558.15 393,555.74 440,021.48 645,010.50 383513.97 % DE AVANCE 15.33% 10.64% 15.65% 17.49% 25.64% 15.25% % DE AVANCE ACUMULADO 25.97% 41.62% 59.11% 84.75% 100.00%