2024 State of Marketing Report – by HubspotMarius Sescu
https://www.hubspot.com/state-of-marketing
· Scaling relationships and proving ROI
· Social media is the place for search, sales, and service
· Authentic influencer partnerships fuel brand growth
· The strongest connections happen via call, click, chat, and camera.
· Time saved with AI leads to more creative work
· Seeking: A single source of truth
· TLDR; Get on social, try AI, and align your systems.
· More human marketing, powered by robots
ChatGPT is a revolutionary addition to the world since its introduction in 2022. A big shift in the sector of information gathering and processing happened because of this chatbot. What is the story of ChatGPT? How is the bot responding to prompts and generating contents? Swipe through these slides prepared by Expeed Software, a web development company regarding the development and technical intricacies of ChatGPT!
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
The realm of product design is a constantly changing environment where technology and style intersect. Every year introduces fresh challenges and exciting trends that mold the future of this captivating art form. In this piece, we delve into the significant trends set to influence the look and functionality of product design in the year 2024.
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
Mental health has been in the news quite a bit lately. Dozens of U.S. states are currently suing Meta for contributing to the youth mental health crisis by inserting addictive features into their products, while the U.S. Surgeon General is touring the nation to bring awareness to the growing epidemic of loneliness and isolation. The country has endured periods of low national morale, such as in the 1970s when high inflation and the energy crisis worsened public sentiment following the Vietnam War. The current mood, however, feels different. Gallup recently reported that national mental health is at an all-time low, with few bright spots to lift spirits.
To better understand how Americans are feeling and their attitudes towards mental health in general, ThinkNow conducted a nationally representative quantitative survey of 1,500 respondents and found some interesting differences among ethnic, age and gender groups.
Technology
For example, 52% agree that technology and social media have a negative impact on mental health, but when broken out by race, 61% of Whites felt technology had a negative effect, and only 48% of Hispanics thought it did.
While technology has helped us keep in touch with friends and family in faraway places, it appears to have degraded our ability to connect in person. Staying connected online is a double-edged sword since the same news feed that brings us pictures of the grandkids and fluffy kittens also feeds us news about the wars in Israel and Ukraine, the dysfunction in Washington, the latest mass shooting and the climate crisis.
Hispanics may have a built-in defense against the isolation technology breeds, owing to their large, multigenerational households, strong social support systems, and tendency to use social media to stay connected with relatives abroad.
Age and Gender
When asked how individuals rate their mental health, men rate it higher than women by 11 percentage points, and Baby Boomers rank it highest at 83%, saying it’s good or excellent vs. 57% of Gen Z saying the same.
Gen Z spends the most amount of time on social media, so the notion that social media negatively affects mental health appears to be correlated. Unfortunately, Gen Z is also the generation that’s least comfortable discussing mental health concerns with healthcare professionals. Only 40% of them state they’re comfortable discussing their issues with a professional compared to 60% of Millennials and 65% of Boomers.
Race Affects Attitudes
As seen in previous research conducted by ThinkNow, Asian Americans lag other groups when it comes to awareness of mental health issues. Twenty-four percent of Asian Americans believe that having a mental health issue is a sign of weakness compared to the 16% average for all groups. Asians are also considerably less likely to be aware of mental health services in their communities (42% vs. 55%) and most likely to seek out information on social media (51% vs. 35%).
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
This article is all about what AI trends will emerge in the field of creative operations in 2024. All the marketers and brand builders should be aware of these trends for their further use and save themselves some time!
2024 State of Marketing Report – by HubspotMarius Sescu
https://www.hubspot.com/state-of-marketing
· Scaling relationships and proving ROI
· Social media is the place for search, sales, and service
· Authentic influencer partnerships fuel brand growth
· The strongest connections happen via call, click, chat, and camera.
· Time saved with AI leads to more creative work
· Seeking: A single source of truth
· TLDR; Get on social, try AI, and align your systems.
· More human marketing, powered by robots
ChatGPT is a revolutionary addition to the world since its introduction in 2022. A big shift in the sector of information gathering and processing happened because of this chatbot. What is the story of ChatGPT? How is the bot responding to prompts and generating contents? Swipe through these slides prepared by Expeed Software, a web development company regarding the development and technical intricacies of ChatGPT!
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
The realm of product design is a constantly changing environment where technology and style intersect. Every year introduces fresh challenges and exciting trends that mold the future of this captivating art form. In this piece, we delve into the significant trends set to influence the look and functionality of product design in the year 2024.
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
Mental health has been in the news quite a bit lately. Dozens of U.S. states are currently suing Meta for contributing to the youth mental health crisis by inserting addictive features into their products, while the U.S. Surgeon General is touring the nation to bring awareness to the growing epidemic of loneliness and isolation. The country has endured periods of low national morale, such as in the 1970s when high inflation and the energy crisis worsened public sentiment following the Vietnam War. The current mood, however, feels different. Gallup recently reported that national mental health is at an all-time low, with few bright spots to lift spirits.
To better understand how Americans are feeling and their attitudes towards mental health in general, ThinkNow conducted a nationally representative quantitative survey of 1,500 respondents and found some interesting differences among ethnic, age and gender groups.
Technology
For example, 52% agree that technology and social media have a negative impact on mental health, but when broken out by race, 61% of Whites felt technology had a negative effect, and only 48% of Hispanics thought it did.
While technology has helped us keep in touch with friends and family in faraway places, it appears to have degraded our ability to connect in person. Staying connected online is a double-edged sword since the same news feed that brings us pictures of the grandkids and fluffy kittens also feeds us news about the wars in Israel and Ukraine, the dysfunction in Washington, the latest mass shooting and the climate crisis.
Hispanics may have a built-in defense against the isolation technology breeds, owing to their large, multigenerational households, strong social support systems, and tendency to use social media to stay connected with relatives abroad.
Age and Gender
When asked how individuals rate their mental health, men rate it higher than women by 11 percentage points, and Baby Boomers rank it highest at 83%, saying it’s good or excellent vs. 57% of Gen Z saying the same.
Gen Z spends the most amount of time on social media, so the notion that social media negatively affects mental health appears to be correlated. Unfortunately, Gen Z is also the generation that’s least comfortable discussing mental health concerns with healthcare professionals. Only 40% of them state they’re comfortable discussing their issues with a professional compared to 60% of Millennials and 65% of Boomers.
Race Affects Attitudes
As seen in previous research conducted by ThinkNow, Asian Americans lag other groups when it comes to awareness of mental health issues. Twenty-four percent of Asian Americans believe that having a mental health issue is a sign of weakness compared to the 16% average for all groups. Asians are also considerably less likely to be aware of mental health services in their communities (42% vs. 55%) and most likely to seek out information on social media (51% vs. 35%).
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
This article is all about what AI trends will emerge in the field of creative operations in 2024. All the marketers and brand builders should be aware of these trends for their further use and save themselves some time!
A report by thenetworkone and Kurio.
The contributing experts and agencies are (in an alphabetical order): Sylwia Rytel, Social Media Supervisor, 180heartbeats + JUNG v MATT (PL), Sharlene Jenner, Vice President - Director of Engagement Strategy, Abelson Taylor (USA), Alex Casanovas, Digital Director, Atrevia (ES), Dora Beilin, Senior Social Strategist, Barrett Hoffher (USA), Min Seo, Campaign Director, Brand New Agency (KR), Deshé M. Gully, Associate Strategist, Day One Agency (USA), Francesca Trevisan, Strategist, Different (IT), Trevor Crossman, CX and Digital Transformation Director; Olivia Hussey, Strategic Planner; Simi Srinarula, Social Media Manager, The Hallway (AUS), James Hebbert, Managing Director, Hylink (CN / UK), Mundy Álvarez, Planning Director; Pedro Rojas, Social Media Manager; Pancho González, CCO, Inbrax (CH), Oana Oprea, Head of Digital Planning, Jam Session Agency (RO), Amy Bottrill, Social Account Director, Launch (UK), Gaby Arriaga, Founder, Leonardo1452 (MX), Shantesh S Row, Creative Director, Liwa (UAE), Rajesh Mehta, Chief Strategy Officer; Dhruv Gaur, Digital Planning Lead; Leonie Mergulhao, Account Supervisor - Social Media & PR, Medulla (IN), Aurelija Plioplytė, Head of Digital & Social, Not Perfect (LI), Daiana Khaidargaliyeva, Account Manager, Osaka Labs (UK / USA), Stefanie Söhnchen, Vice President Digital, PIABO Communications (DE), Elisabeth Winiartati, Managing Consultant, Head of Global Integrated Communications; Lydia Aprina, Account Manager, Integrated Marketing and Communications; Nita Prabowo, Account Manager, Integrated Marketing and Communications; Okhi, Web Developer, PNTR Group (ID), Kei Obusan, Insights Director; Daffi Ranandi, Insights Manager, Radarr (SG), Gautam Reghunath, Co-founder & CEO, Talented (IN), Donagh Humphreys, Head of Social and Digital Innovation, THINKHOUSE (IRE), Sarah Yim, Strategy Director, Zulu Alpha Kilo (CA).
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
The search marketing landscape is evolving rapidly with new technologies, and professionals, like you, rely on innovative paid search strategies to meet changing demands.
It’s important that you’re ready to implement new strategies in 2024.
Check this out and learn the top trends in paid search advertising that are expected to gain traction, so you can drive higher ROI more efficiently in 2024.
You’ll learn:
- The latest trends in AI and automation, and what this means for an evolving paid search ecosystem.
- New developments in privacy and data regulation.
- Emerging ad formats that are expected to make an impact next year.
Watch Sreekant Lanka from iQuanti and Irina Klein from OneMain Financial as they dive into the future of paid search and explore the trends, strategies, and technologies that will shape the search marketing landscape.
If you’re looking to assess your paid search strategy and design an industry-aligned plan for 2024, then this webinar is for you.
5 Public speaking tips from TED - Visualized summarySpeakerHub
From their humble beginnings in 1984, TED has grown into the world’s most powerful amplifier for speakers and thought-leaders to share their ideas. They have over 2,400 filmed talks (not including the 30,000+ TEDx videos) freely available online, and have hosted over 17,500 events around the world.
With over one billion views in a year, it’s no wonder that so many speakers are looking to TED for ideas on how to share their message more effectively.
The article “5 Public-Speaking Tips TED Gives Its Speakers”, by Carmine Gallo for Forbes, gives speakers five practical ways to connect with their audience, and effectively share their ideas on stage.
Whether you are gearing up to get on a TED stage yourself, or just want to master the skills that so many of their speakers possess, these tips and quotes from Chris Anderson, the TED Talks Curator, will encourage you to make the most impactful impression on your audience.
See the full article and more summaries like this on SpeakerHub here: https://speakerhub.com/blog/5-presentation-tips-ted-gives-its-speakers
See the original article on Forbes here:
http://www.forbes.com/forbes/welcome/?toURL=http://www.forbes.com/sites/carminegallo/2016/05/06/5-public-speaking-tips-ted-gives-its-speakers/&refURL=&referrer=#5c07a8221d9b
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
Everyone is in agreement that ChatGPT (and other generative AI tools) will shape the future of work. Yet there is little consensus on exactly how, when, and to what extent this technology will change our world.
Businesses that extract maximum value from ChatGPT will use it as a collaborative tool for everything from brainstorming to technical maintenance.
For individuals, now is the time to pinpoint the skills the future professional will need to thrive in the AI age.
Check out this presentation to understand what ChatGPT is, how it will shape the future of work, and how you can prepare to take advantage.
A brief introduction to DataScience with explaining of the concepts, algorithms, machine learning, supervised and unsupervised learning, clustering, statistics, data preprocessing, real-world applications etc.
It's part of a Data Science Corner Campaign where I will be discussing the fundamentals of DataScience, AIML, Statistics etc.
Time Management & Productivity - Best PracticesVit Horky
Here's my presentation on by proven best practices how to manage your work time effectively and how to improve your productivity. It includes practical tips and how to use tools such as Slack, Google Apps, Hubspot, Google Calendar, Gmail and others.
The six step guide to practical project managementMindGenius
The six step guide to practical project management
If you think managing projects is too difficult, think again.
We’ve stripped back project management processes to the
basics – to make it quicker and easier, without sacrificing
the vital ingredients for success.
“If you’re looking for some real-world guidance, then The Six Step Guide to Practical Project Management will help.”
Dr Andrew Makar, Tactical Project Management
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Applitools
During this webinar, Anand Bagmar demonstrates how AI tools such as ChatGPT can be applied to various stages of the software development life cycle (SDLC) using an eCommerce application case study. Find the on-demand recording and more info at https://applitools.info/b59
Key takeaways:
• Learn how to use ChatGPT to add AI power to your testing and test automation
• Understand the limitations of the technology and where human expertise is crucial
• Gain insight into different AI-based tools
• Adopt AI-based tools to stay relevant and optimize work for developers and testers
* ChatGPT and OpenAI belong to OpenAI, L.L.C.
More than Just Lines on a Map: Best Practices for U.S Bike Routes
This session highlights best practices and lessons learned for U.S. Bike Route System designation, as well as how and why these routes should be integrated into bicycle planning at the local and regional level.
Presenters:
Presenter: Kevin Luecke Toole Design Group
Co-Presenter: Virginia Sullivan Adventure Cycling Association
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...DevGAMM Conference
Has your project been caught in a storm of deadlines, clashing requirements, and the need to change course halfway through? If yes, then check out how the administration team navigated through all of this, relocating 160 people from 3 countries and opening 2 offices during the most turbulent time in the last 20 years. Belka Games’ Chief Administrative Officer, Katerina Rudko, will share universal approaches and life hacks that can help your project survive unstable periods when there seem to be too many tasks and a lack of time and people.
This presentation was designed to provide strategic recommendations for a brand in decline. The deck also incorporates a situational assessment, including a brand identity, positioning, architecture, and portfolio strategy for the Brand.
Presentation originally created for NYU Stern's Brand Strategy course. Design by Erica Santiago & Chris Alexander.
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellSaba Software
According to the latest State of the American Manager report from Gallup, employees who have regular meetings with their managers are almost three times as likely to be engaged as those who don’t. These regular check-ins keep managers and employees in sync and aligned. Want to see better manager/employee relationships in your organisation? Then make an all-in commitment to 1:1 meetings. Not sure how? You’ve come to the right place.
In this webinar with Jamie Resker, Founder and Practice Leader for Employee Performance Solutions (EPS), and Teala Wilson, Talent Management Consultant at Saba Software, you’ll get the inside track on how to hold effective 1:1 meetings, including tips for getting managers on board.
• Go beyond discussing the status of everyday work to higher level topics, including recognition, performance, development, and career aspirations
• Learn how to decide meeting frequency, what to cover, as well as roles and responsibilities of the manager and employee
• Understand how managers can build trust and make it comfortable for employees to provide upward feedback
• Unite your organisation with a unified approach to 1:1 meetings
Join us for this 1-hour webinar to get practical tips for building better manager-employee relationships with intention and purpose.
About the Speakers
Jamie Resker - Founder and Practice Leader for Employee Performance Solutions (EPS)
Jamie Resker, Practice Leader and Founder of Employee Performance Solutions, is a recognized innovator in performance management. She is the originator of the-the Performance Continuum Feedback Method® and Conversations to Optimize Employee Performance training program; tools and training that reshape communications between managers and employees to drive and align performance. Jamie is on the faculty for the Northeast Human Resources Association, is a contributor to Halogen Software's Talent Space Blog, and is an editorial advisory board member for HR Examiner.
Teala Wilson - Senior Consultant, Strategic Services, Saba Software
Teala is a Talent Management Consultant at Halogen Software, now a part of Saba Software. She has worked with teams on a national and global level supporting human resources in areas such as performance management, recruitment, employee benefit programs, training and talent development, workforce planning and internal communications. Teala also has a personal passion for visual arts and design.
Want to learn more? Join us for an upcoming Product Tour!
http://bit.ly/2yitfqu
This video by Simplilearn will explain to you Introduction to C Programming Language. Introduction to C Programming Language Tutorial For Beginners will explain to you the C language's history, C's importance, its features, real-world applications, and some of its advantages and disadvantages.
00:00 Introduction to C
1:42-History of C language
Dennis Ritchie, a computer scientist, could identify the gaps and tap out the best features from both B and BCPL languages to invent a new hybrid.
Hence, C was born in 1972 at Bell Laboratories. A remarkably simple and highly readable programming language resulted in groundbreaking advancements in the IT industry.
2:48-Importance and unraveling the powerful capabilities of C,
The widespread use of C started to take over the IT industry. Unraveling the potential of C, the designers began to discover new possibilities that led them to focus on the big picture.
3:56-C's cutting-edge features
The designers at Bell Laboratories ensured that their programming language solved the issues with B and BCPL and the ones they had foreseen.
6:35-The popular real-world applications of C
-UNIX operating system
-google file system
-Mozilla
-Graphical user interface
8:30-The advantages and disadvantages of C
10:34-The popular IT companies and their domains that employ C
· MasterCard
· IBM
· Flipkart
· Dell
· Twitter
· GitHub and twitch
11:09-First c program.
🔥 Explore our FREE courses with completion certificates: https://www.simplilearn.com/skillup-f...
✅Subscribe to our Channel to learn more about the top Technologies: https://bit.ly/2VT4WtH
⏩ Check out the C++ Programming training videos: https://www.youtube.com/playlist?list...
#IntroductiontoCProgrammingLanguage #CLanguage #CProgramming #CProgram #CProgrammingLanguage #LearnCProgramming #HowToCodeInCForBeginners #CTutorialForBeginners #LearnCProgramming #Simplilearn
Dennis Ritchie, a computer scientist, was able to identify the gaps and tap out the best features from both B and BCPL languages to invent a new hybrid.
Hence, C was born in 1972 at Bell Laboratories. A remarkably simple and highly readable programming language resulted in groundbreaking advancements in the IT industry.
✅What is C++ Programming?
C++ is an enhanced and extended version of C programming language, developed by Bjarne Stroustrup in 1979 as part of his Ph.D. project. Bjarne developed what he called ‘C with Classes’ (later renamed C++) because he felt limited by the existing programming languages that were not ideal for large scale projects. He used C to build what he wanted because C was already a general-purpose language that was efficient and fast in its operations.
✅C++ Career Prospects:
With just C++ programming expertise, you will have excellent job opportunities, salaries, and career prospects. However, for a career based on programming languages such as Java and Python (which are in more demand than C++) or for careers based on front-end, back-end, and full-stack
A report by thenetworkone and Kurio.
The contributing experts and agencies are (in an alphabetical order): Sylwia Rytel, Social Media Supervisor, 180heartbeats + JUNG v MATT (PL), Sharlene Jenner, Vice President - Director of Engagement Strategy, Abelson Taylor (USA), Alex Casanovas, Digital Director, Atrevia (ES), Dora Beilin, Senior Social Strategist, Barrett Hoffher (USA), Min Seo, Campaign Director, Brand New Agency (KR), Deshé M. Gully, Associate Strategist, Day One Agency (USA), Francesca Trevisan, Strategist, Different (IT), Trevor Crossman, CX and Digital Transformation Director; Olivia Hussey, Strategic Planner; Simi Srinarula, Social Media Manager, The Hallway (AUS), James Hebbert, Managing Director, Hylink (CN / UK), Mundy Álvarez, Planning Director; Pedro Rojas, Social Media Manager; Pancho González, CCO, Inbrax (CH), Oana Oprea, Head of Digital Planning, Jam Session Agency (RO), Amy Bottrill, Social Account Director, Launch (UK), Gaby Arriaga, Founder, Leonardo1452 (MX), Shantesh S Row, Creative Director, Liwa (UAE), Rajesh Mehta, Chief Strategy Officer; Dhruv Gaur, Digital Planning Lead; Leonie Mergulhao, Account Supervisor - Social Media & PR, Medulla (IN), Aurelija Plioplytė, Head of Digital & Social, Not Perfect (LI), Daiana Khaidargaliyeva, Account Manager, Osaka Labs (UK / USA), Stefanie Söhnchen, Vice President Digital, PIABO Communications (DE), Elisabeth Winiartati, Managing Consultant, Head of Global Integrated Communications; Lydia Aprina, Account Manager, Integrated Marketing and Communications; Nita Prabowo, Account Manager, Integrated Marketing and Communications; Okhi, Web Developer, PNTR Group (ID), Kei Obusan, Insights Director; Daffi Ranandi, Insights Manager, Radarr (SG), Gautam Reghunath, Co-founder & CEO, Talented (IN), Donagh Humphreys, Head of Social and Digital Innovation, THINKHOUSE (IRE), Sarah Yim, Strategy Director, Zulu Alpha Kilo (CA).
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
The search marketing landscape is evolving rapidly with new technologies, and professionals, like you, rely on innovative paid search strategies to meet changing demands.
It’s important that you’re ready to implement new strategies in 2024.
Check this out and learn the top trends in paid search advertising that are expected to gain traction, so you can drive higher ROI more efficiently in 2024.
You’ll learn:
- The latest trends in AI and automation, and what this means for an evolving paid search ecosystem.
- New developments in privacy and data regulation.
- Emerging ad formats that are expected to make an impact next year.
Watch Sreekant Lanka from iQuanti and Irina Klein from OneMain Financial as they dive into the future of paid search and explore the trends, strategies, and technologies that will shape the search marketing landscape.
If you’re looking to assess your paid search strategy and design an industry-aligned plan for 2024, then this webinar is for you.
5 Public speaking tips from TED - Visualized summarySpeakerHub
From their humble beginnings in 1984, TED has grown into the world’s most powerful amplifier for speakers and thought-leaders to share their ideas. They have over 2,400 filmed talks (not including the 30,000+ TEDx videos) freely available online, and have hosted over 17,500 events around the world.
With over one billion views in a year, it’s no wonder that so many speakers are looking to TED for ideas on how to share their message more effectively.
The article “5 Public-Speaking Tips TED Gives Its Speakers”, by Carmine Gallo for Forbes, gives speakers five practical ways to connect with their audience, and effectively share their ideas on stage.
Whether you are gearing up to get on a TED stage yourself, or just want to master the skills that so many of their speakers possess, these tips and quotes from Chris Anderson, the TED Talks Curator, will encourage you to make the most impactful impression on your audience.
See the full article and more summaries like this on SpeakerHub here: https://speakerhub.com/blog/5-presentation-tips-ted-gives-its-speakers
See the original article on Forbes here:
http://www.forbes.com/forbes/welcome/?toURL=http://www.forbes.com/sites/carminegallo/2016/05/06/5-public-speaking-tips-ted-gives-its-speakers/&refURL=&referrer=#5c07a8221d9b
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
Everyone is in agreement that ChatGPT (and other generative AI tools) will shape the future of work. Yet there is little consensus on exactly how, when, and to what extent this technology will change our world.
Businesses that extract maximum value from ChatGPT will use it as a collaborative tool for everything from brainstorming to technical maintenance.
For individuals, now is the time to pinpoint the skills the future professional will need to thrive in the AI age.
Check out this presentation to understand what ChatGPT is, how it will shape the future of work, and how you can prepare to take advantage.
A brief introduction to DataScience with explaining of the concepts, algorithms, machine learning, supervised and unsupervised learning, clustering, statistics, data preprocessing, real-world applications etc.
It's part of a Data Science Corner Campaign where I will be discussing the fundamentals of DataScience, AIML, Statistics etc.
Time Management & Productivity - Best PracticesVit Horky
Here's my presentation on by proven best practices how to manage your work time effectively and how to improve your productivity. It includes practical tips and how to use tools such as Slack, Google Apps, Hubspot, Google Calendar, Gmail and others.
The six step guide to practical project managementMindGenius
The six step guide to practical project management
If you think managing projects is too difficult, think again.
We’ve stripped back project management processes to the
basics – to make it quicker and easier, without sacrificing
the vital ingredients for success.
“If you’re looking for some real-world guidance, then The Six Step Guide to Practical Project Management will help.”
Dr Andrew Makar, Tactical Project Management
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Applitools
During this webinar, Anand Bagmar demonstrates how AI tools such as ChatGPT can be applied to various stages of the software development life cycle (SDLC) using an eCommerce application case study. Find the on-demand recording and more info at https://applitools.info/b59
Key takeaways:
• Learn how to use ChatGPT to add AI power to your testing and test automation
• Understand the limitations of the technology and where human expertise is crucial
• Gain insight into different AI-based tools
• Adopt AI-based tools to stay relevant and optimize work for developers and testers
* ChatGPT and OpenAI belong to OpenAI, L.L.C.
More than Just Lines on a Map: Best Practices for U.S Bike Routes
This session highlights best practices and lessons learned for U.S. Bike Route System designation, as well as how and why these routes should be integrated into bicycle planning at the local and regional level.
Presenters:
Presenter: Kevin Luecke Toole Design Group
Co-Presenter: Virginia Sullivan Adventure Cycling Association
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...DevGAMM Conference
Has your project been caught in a storm of deadlines, clashing requirements, and the need to change course halfway through? If yes, then check out how the administration team navigated through all of this, relocating 160 people from 3 countries and opening 2 offices during the most turbulent time in the last 20 years. Belka Games’ Chief Administrative Officer, Katerina Rudko, will share universal approaches and life hacks that can help your project survive unstable periods when there seem to be too many tasks and a lack of time and people.
This presentation was designed to provide strategic recommendations for a brand in decline. The deck also incorporates a situational assessment, including a brand identity, positioning, architecture, and portfolio strategy for the Brand.
Presentation originally created for NYU Stern's Brand Strategy course. Design by Erica Santiago & Chris Alexander.
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellSaba Software
According to the latest State of the American Manager report from Gallup, employees who have regular meetings with their managers are almost three times as likely to be engaged as those who don’t. These regular check-ins keep managers and employees in sync and aligned. Want to see better manager/employee relationships in your organisation? Then make an all-in commitment to 1:1 meetings. Not sure how? You’ve come to the right place.
In this webinar with Jamie Resker, Founder and Practice Leader for Employee Performance Solutions (EPS), and Teala Wilson, Talent Management Consultant at Saba Software, you’ll get the inside track on how to hold effective 1:1 meetings, including tips for getting managers on board.
• Go beyond discussing the status of everyday work to higher level topics, including recognition, performance, development, and career aspirations
• Learn how to decide meeting frequency, what to cover, as well as roles and responsibilities of the manager and employee
• Understand how managers can build trust and make it comfortable for employees to provide upward feedback
• Unite your organisation with a unified approach to 1:1 meetings
Join us for this 1-hour webinar to get practical tips for building better manager-employee relationships with intention and purpose.
About the Speakers
Jamie Resker - Founder and Practice Leader for Employee Performance Solutions (EPS)
Jamie Resker, Practice Leader and Founder of Employee Performance Solutions, is a recognized innovator in performance management. She is the originator of the-the Performance Continuum Feedback Method® and Conversations to Optimize Employee Performance training program; tools and training that reshape communications between managers and employees to drive and align performance. Jamie is on the faculty for the Northeast Human Resources Association, is a contributor to Halogen Software's Talent Space Blog, and is an editorial advisory board member for HR Examiner.
Teala Wilson - Senior Consultant, Strategic Services, Saba Software
Teala is a Talent Management Consultant at Halogen Software, now a part of Saba Software. She has worked with teams on a national and global level supporting human resources in areas such as performance management, recruitment, employee benefit programs, training and talent development, workforce planning and internal communications. Teala also has a personal passion for visual arts and design.
Want to learn more? Join us for an upcoming Product Tour!
http://bit.ly/2yitfqu
This video by Simplilearn will explain to you Introduction to C Programming Language. Introduction to C Programming Language Tutorial For Beginners will explain to you the C language's history, C's importance, its features, real-world applications, and some of its advantages and disadvantages.
00:00 Introduction to C
1:42-History of C language
Dennis Ritchie, a computer scientist, could identify the gaps and tap out the best features from both B and BCPL languages to invent a new hybrid.
Hence, C was born in 1972 at Bell Laboratories. A remarkably simple and highly readable programming language resulted in groundbreaking advancements in the IT industry.
2:48-Importance and unraveling the powerful capabilities of C,
The widespread use of C started to take over the IT industry. Unraveling the potential of C, the designers began to discover new possibilities that led them to focus on the big picture.
3:56-C's cutting-edge features
The designers at Bell Laboratories ensured that their programming language solved the issues with B and BCPL and the ones they had foreseen.
6:35-The popular real-world applications of C
-UNIX operating system
-google file system
-Mozilla
-Graphical user interface
8:30-The advantages and disadvantages of C
10:34-The popular IT companies and their domains that employ C
· MasterCard
· IBM
· Flipkart
· Dell
· Twitter
· GitHub and twitch
11:09-First c program.
🔥 Explore our FREE courses with completion certificates: https://www.simplilearn.com/skillup-f...
✅Subscribe to our Channel to learn more about the top Technologies: https://bit.ly/2VT4WtH
⏩ Check out the C++ Programming training videos: https://www.youtube.com/playlist?list...
#IntroductiontoCProgrammingLanguage #CLanguage #CProgramming #CProgram #CProgrammingLanguage #LearnCProgramming #HowToCodeInCForBeginners #CTutorialForBeginners #LearnCProgramming #Simplilearn
Dennis Ritchie, a computer scientist, was able to identify the gaps and tap out the best features from both B and BCPL languages to invent a new hybrid.
Hence, C was born in 1972 at Bell Laboratories. A remarkably simple and highly readable programming language resulted in groundbreaking advancements in the IT industry.
✅What is C++ Programming?
C++ is an enhanced and extended version of C programming language, developed by Bjarne Stroustrup in 1979 as part of his Ph.D. project. Bjarne developed what he called ‘C with Classes’ (later renamed C++) because he felt limited by the existing programming languages that were not ideal for large scale projects. He used C to build what he wanted because C was already a general-purpose language that was efficient and fast in its operations.
✅C++ Career Prospects:
With just C++ programming expertise, you will have excellent job opportunities, salaries, and career prospects. However, for a career based on programming languages such as Java and Python (which are in more demand than C++) or for careers based on front-end, back-end, and full-stack
1. Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL,
EN EL SUB LOTE Nº01 – MZ ''M'', SECTOR ''V'' SAN IGNACIO –
DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
01 ESTRUCTURAS
01.01 OBRAS PROVISIONALES
01.01.01 CONSTRUCCIONES PROVISIONALES
01.01.01.01 ALMACEN DE MATERIALES m2 50.00 125.36 6,268.00 100.00% 6,268.00
01.01.02 INSTALACIONES PROVISIONALES
01.01.02.01 AGUA PARA LA CONSTRUCCION mes 6.00 407.29 2,443.74 100.00% 2,443.74
01.01.02.02 ENERGIA ELECTRICA mes 6.00 400.00 2,400.00 100.00% 2,400.00
01.02 TRABAJOS PRELIMINARES
01.02.01 LIMPIEZA DEL TERRENO
01.02.01.01 LIMPIEZA DEL TERRENO m2 321.74 3.01 968.44 100.00% 968.44
01.02.01.02 LIMPIEZA PERMANENTE DE OBRA m2 321.74 0.80 257.39 100.00% 257.39
01.02.02 TRAZO , NIVELES Y REPLANTEO
01.02.02.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 321.74 1.71 550.18 100.00% 550.18
01.03 MOVIMIENTO DE TIERRAS
01.03.01 NIVELACION DE TERRENO
01.03.01.01 NIVELACION DE TERRENO m2 321.74 0.86 276.70 100.00% 276.70
01.03.02 RELLENOS
01.03.02.01 RELLENO Y COMP. MANUAL- MAT. DE PRESTAMO m3 56.50 89.06 5,031.89 100.00% 5,031.89
01.03.03 ELIMINACION DE MATERIAL EXCEDENTE
01.03.03.01
ELIMINACION DE MATERIAL EXCEDENTE DE
EXCAVACIONES C/MAQUINARIA
m3 116.15 8.28 961.72
100.00%
961.72
01.04 OBRAS DE CONCRETO SIMPLE
01.04.01 CONCRETO SIMPLE
01.04.01.01
SOLADO PARA CIMIENTOS REFORZADO E=8", MEZCLA C:H
1:10
m2 193.15 12.75 2,462.66
100.00%
2,462.66
01.04.01.02 SOLADO PARA ZAPATAS: MEZCLA, C:H, 1:10, E=4" m2 25.16 19.60 493.14 100.00% 493.14
01.04.01.03 FALSO PISO DE 4": MEZCLA 1:8 (C:H) m2 321.74 48.88 15,726.65 100.00% 15,726.65
01.04.01.04 FALSA ZAPATA: CONCRETO FC´= 175 KG/CM2 + 50%PG m3 56.19 174.56 9,808.53
100.00%
9,808.53
01.05 OBRAS DE CONCRETO ARMADO
01.05.01 ZAPATAS
01.05.01.01 CONCRETO PREMEZCLADO EN ZAPATAS F'c=280KG/CM2 m3 96.52 540.31 52,150.72
100.00%
52,150.72
01.05.01.02 ACERO DE REFUERZO F'y=4200KG/CM2 EN ZAPATAS kg 3,487.50 4.38 15,275.25 100.00% 15,275.25
01.05.02 VIGAS DE CIMENTACION
01.05.02.01
CONCRETO PREMEZCLADO EN VIGAS DE CIMENTACION
F'c=280KG/CM2
m3 32.16 551.53 17,737.20
100.00%
17,737.20
01.05.02.02
ENCOFRADO Y DESENCOFRADO EN VIGAS DE
CIMENTACION
m2 126.45 39.72 5,022.59
100.00%
5,022.59
01.05.02.03
ACERO DE REFUERZO F'y=4200KG/CM2 EN VIGAS DE
CIMENTACION
kg 4,561.29 4.38 19,978.45
100.00%
19,978.45
01.05.03 COLUMNAS
01.05.03.01 CONCRETO PREMEZCLADO EN COLUMNAS F'c=280KG/CM2 m3 138.12 369.71 51,064.35
20.00%
10,212.87
20.00%
10,212.87
20.00%
10,212.87
20.00%
10,212.87
20.00%
10,212.87
01.05.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 622.37 47.52 29,575.02 20.00% 5,915.00 20.00% 5,915.00 20.00% 5,915.00 20.00% 5,915.00 20.00% 5,915.00
01.05.03.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN COLUMNAS kg 10,246.53 4.38 44,879.80
20.00%
8,975.96
20.00%
8,975.96
20.00%
8,975.96
20.00%
8,975.96
20.00%
8,975.96
01.05.04 PLACAS
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
2. Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
01.05.04.01 CONCRETO PREMEZCLADO EN PLACAS F'c=280KG/CM2 m3 75.62 486.35 36,777.79
20.00%
7,355.56
20.00%
7,355.56
20.00%
7,355.56
20.00%
7,355.56
20.00%
7,355.56
01.05.04.02 ENCOFRADO Y DESENCOFRADO EN PLACAS m2 1,263.12 28.65 36,188.39 20.00% 7,237.68 20.00% 7,237.68 20.00% 7,237.68 20.00% 7,237.68 20.00% 7,237.68
01.05.04.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN PLACAS kg 3,592.18 4.38 15,733.75 20.00% 3,146.75 20.00% 3,146.75 20.00% 3,146.75 20.00% 3,146.75 20.00% 3,146.75
01.05.05 VIGAS
01.05.05.01 CONCRETO PREMEZCLADO EN VIGAS F'c=280KG/CM2 m3 126.59 488.79 61,875.93 20.00% 12,375.19 20.00% 12,375.19 20.00% 12,375.19 20.00% 12,375.19 20.00% 12,375.19
01.05.05.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 654.19 65.11 42,594.31 20.00% 8,518.86 20.00% 8,518.86 20.00% 8,518.86 20.00% 8,518.86 20.00% 8,518.86
01.05.05.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN VIGAS kg 15,672.34 4.38 68,644.85 20.00% 13,728.97 20.00% 13,728.97 20.00% 13,728.97 20.00% 13,728.97 20.00% 13,728.97
01.05.06 LOSAS ALIGERADAS
01.05.06.01
CONCRETO PREMEZCLADO EN LOSAS ALIGERADAS
F'c=280 KG/CM2
m3 128.27 485.24 62,241.73
25.00%
15,560.43
25.00%
15,560.43
25.00%
15,560.43
25.00%
15,560.43
01.05.06.02
ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS
CON VIGUETAS PREFABRICADAS
m2 963.50 31.92 30,754.92
25.00%
7,688.73
25.00%
7,688.73
25.00%
7,688.73
25.00%
7,688.73
01.05.06.03
ACERO DE REFUERZO F'y=4200KG/CM2 EN LOSAS
ALIGERADAS PREFABRICADAS
kg 15,648.29 4.38 68,539.51
25.00%
17,134.88
25.00%
17,134.88
25.00%
17,134.88
25.00%
17,134.88
01.05.07 ESCALERAS
01.05.07.01 CONCRETO PREMEZCLADO EN ESCALERAS F'c=280KG/CM2 m3 25.91 506.39 13,120.56
25.00%
3,280.14
25.00%
3,280.14
25.00%
3,280.14
25.00%
3,280.14
01.05.07.02 ESCALERAS: ENCOFRADO Y DESENCOFRADO m2 123.69 53.18 6,577.83 25.00% 1,644.46 25.00% 1,644.46 25.00% 1,644.46 25.00% 1,644.46
01.05.07.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN ESCALERAS kg 3,956.18 4.51 17,842.37
25.00%
4,460.59
25.00%
4,460.59
25.00%
4,460.59
25.00%
4,460.59
01.05.08 CUARTO DE CAJA DE ESCALERAS
01.05.08.01 COLUMNAS
01.05.08.01.01
CONCRETO PREMEZCLADO EN COLUMNAS
F'c=280KG/CM2
m3 6.16 369.71 2,277.41
25.00%
569.35
25.00%
569.35
25.00%
569.35
25.00%
569.35
01.05.08.01.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 65.08 47.52 3,092.60 25.00% 773.15 25.00% 773.15 25.00% 773.15 25.00% 773.15
01.05.08.01.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN COLUMNAS kg 779.94 4.38 3,416.14
25.00%
854.04
25.00%
854.04
25.00%
854.04
25.00%
854.04
01.05.08.02 VIGAS
01.05.08.02.01 CONCRETO PREMEZCLADO EN VIGAS F'c=280KG/CM2 m3 6.88 488.79 3,362.88
25.00%
840.72
25.00%
840.72
25.00%
840.72
25.00%
840.72
01.05.08.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 71.09 65.11 4,628.67 25.00% 1,157.17 25.00% 1,157.17 25.00% 1,157.17 25.00% 1,157.17
01.05.08.02.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN VIGAS kg 791.57 4.38 3,467.08 25.00% 866.77 25.00% 866.77 25.00% 866.77 25.00% 866.77
01.05.08.03 LOSAS MACIZAS
01.05.08.03.01
CONCRETO PREMEZCLADO EN LOSAS MACIZAS F'c=280
KG/CM2
m3 13.74 567.18 7,793.05
33.33%
2,597.68
33.33%
2,597.68
33.33%
2,597.69
01.05.08.03.02 ENCOFRADO Y DESENCOFRADO EN LOSAS MACIZAS m2 68.68 36.42 2,501.33
33.33%
833.78
33.33%
833.78
33.33%
833.79
01.05.08.03.03
ACERO DE REFUERZO F'y=4200KG/CM2 EN LOSAS
MACIZAS
kg 1,757.59 4.38 7,698.24
33.33%
2,566.08
33.33%
2,566.08
33.33%
2,566.08
01.06 TANQUE - CISTERNA
01.06.01 TRABAJOS PRELIMINARES
01.06.01.01 LIMPIEZA DE TERRENO MANUAL m2 55.25 3.28 181.22 100.00% 181.22
01.06.01.02 ELIMINACION DE MATERIAL ACUMULADO m3 5.53 19.18 106.07 100.00% 106.07
01.06.02 TRAZO , NIVELES Y REPLANTEO
01.06.02.01 TRAZO Y REPLANTEO m2 55.25 1.97 108.84 100.00% 108.84
01.06.03 MOVIMIENTO DE TIERRAS
01.06.03.01 CORTE Y EXCAVACION C/MAQUINARIA (Terreno Normal) m3 207.19 14.19 2,940.03
100.00%
2,940.03
01.06.03.02
ELIMINACION DE MATERIAL EXCEDENTE DE
EXCAVACIONES C/MAQUINARIA
m3 269.35 8.28 2,230.22
100.00%
2,230.22
01.06.04 OBRAS DE CONCRETO SIMPLE
01.06.04.01 SOLADO PARA PLATEA: MEZCLA, C:H, 1:10, E=4" m2 55.25 30.36 1,677.39 100.00% 1,677.39
3. Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
01.06.04.02 SOBRECIMIENTOS: CONCRETO F'C=140 KG/CM2 m3 1.38 236.64 326.56 100.00% 326.56
01.06.05 OBRAS DE CONCRETO ARMADO
01.06.05.01 LOSA DE CIMENTACION
01.06.05.01.01
CONCRETO PREMEZCLADO EN LOSA DE CIMENTACION
F'c=280KG/CM2
m3 13.81 508.39 7,020.87
100.00%
7,020.87
01.06.05.01.02
ACERO DE REFUERZO F'y=4200KG/CM2 EN LOSAS DE
CIMENTACION
kg 1,357.11 4.38 5,944.14
100.00%
5,944.14
01.06.05.02 COLUMNAS
01.06.05.02.01
CONCRETO PREMEZCLADO EN COLUMNAS
F'c=280KG/CM2
m3 2.86 369.71 1,057.37
25.00%
264.34
25.00%
264.34
25.00%
264.34
25.00%
264.34
01.06.05.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 3.93 47.52 186.75 25.00% 46.69 25.00% 46.69 25.00% 46.69 25.00% 46.69
01.06.05.02.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN COLUMNAS kg 759.68 4.38 3,327.40
25.00%
831.85
25.00%
831.85
25.00%
831.85
25.00%
831.85
01.06.05.03 VIGAS
01.06.05.03.01 CONCRETO PREMEZCLADO EN VIGAS F'c=280KG/CM2 m3 2.91 488.79 1,422.38
25.00%
355.60
25.00%
355.60
25.00%
355.60
25.00%
355.60
01.06.05.03.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 26.20 65.11 1,705.88 25.00% 426.47 25.00% 426.47 25.00% 426.47 25.00% 426.47
01.06.05.03.03 ACERO DE REFUERZO F'y=4200KG/CM2 EN VIGAS kg 362.04 4.38 1,585.74 25.00% 396.44 25.00% 396.44 25.00% 396.44 25.00% 396.44
01.06.05.04 LOSAS MACIZAS
01.06.05.04.01
CONCRETO PREMEZCLADO EN LOSAS MACIZAS F'c=280
KG/CM2
m3 4.91 567.18 2,784.85
25.00%
696.21
25.00%
696.21
25.00%
696.21
25.00%
696.21
01.06.05.04.02 ENCOFRADO Y DESENCOFRADO EN LOSAS MACIZAS m2 55.25 36.42 2,012.21
25.00%
503.05
25.00%
503.05
25.00%
503.05
25.00%
503.05
01.06.05.04.03
ACERO DE REFUERZO F'y=4200KG/CM2 EN LOSAS
MACIZAS
kg 537.49 4.38 2,354.21
25.00%
588.55
25.00%
588.55
25.00%
588.55
25.00%
588.55
01.07 SISTEMA DE PROTECCION DE AGUAS SUBTERRANEAS
01.07.01
WATER STOP DE NEOPRENE DE 10". PROVISION Y
COLOCADO DE JUNTA
m 136.50 28.86 3,939.39
100.00%
3,939.39
02 ARQUITECTURA
02.01 MUROS Y TABIQUES DE ALBAÑILERIA
02.01.01
MURO DE LADRILLO KING KONG MECANIZADO (CABEZA),
J=2cm
m2 368.25 113.86 41,928.95
25.00%
10,482.24
25.00%
10,482.24
25.00%
10,482.24
25.00%
10,482.24
02.01.02
MURO DE LADRILLO KING KONG MECANIZADO (SOGA),
J=2cm
m2 1,094.35 70.62 77,283.00
25.00%
19,320.75
25.00%
19,320.75
25.00%
19,320.75
25.00%
19,320.75
02.01.03 TABIQUE SISTEMA DRYWALL GYPLAC RH DE 1/2" m2 653.84 61.52 40,224.24 25.00% 10,056.06 25.00% 10,056.06 25.00% 10,056.06 25.00% 10,056.06
02.02 REVOQUES, ENLUCIDOS Y MOLDURAS
02.02.01 TARRAJEO PRIMARIO O RAYADO (Mezcla C:A 1:5, E=1.5cm) m2 863.15 12.02 10,375.06
25.00%
2,593.77
25.00%
2,593.77
25.00%
2,593.77
25.00%
2,593.77
02.02.02 TARRAJEO EN INTERIORES (Mezcla C:A 1:4, E=2cm) m2 1,957.89 20.57 40,273.80 25.00% 10,068.45 25.00% 10,068.45 25.00% 10,068.45 25.00% 10,068.45
02.02.03 TARRAJEO EN EXTERIORES (Mezcla C:A 1:4, E=2cm) m2 491.41 26.93 13,233.67 25.00% 3,308.42 25.00% 3,308.42 25.00% 3,308.42 25.00% 3,308.42
02.02.04 VESTIDURA DE DERRAMES (Mezcla C:A 1:5, E=2cm, A=15cm) m 514.72 8.02 4,128.05
25.00%
1,032.01
25.00%
1,032.01
25.00%
1,032.01
25.00%
1,032.01
02.02.05 BRUÑAS E=1cm m 761.40 4.47 3,403.46 25.00% 850.87 25.00% 850.87 25.00% 850.87 25.00% 850.87
02.02.06 BRUÑAS E=5cm m 1,199.35 5.35 6,416.52 25.00% 1,604.13 25.00% 1,604.13 25.00% 1,604.13 25.00% 1,604.13
02.02.07 BRUÑAS E=10 cm m 313.95 6.91 2,169.39 25.00% 542.35 25.00% 542.35 25.00% 542.35 25.00% 542.35
02.03 CIELORRASOS
02.03.01 CIELO RASO HORIZONTAL (Mezcla C:A 1:4, E=2.5cm) m2 436.98 54.39 23,767.34 25.00% 5,941.84 25.00% 5,941.84 25.00% 5,941.84 25.00% 5,941.84
02.03.02
CIELO RASO SUSPENDIDO (BALDOSA ACUSTICA DE FIBRA
MINERAL DE 0.61X0.61 E=5/8")
m2 811.64 50.40 40,906.66
25.00%
10,226.67
25.00%
10,226.67
25.00%
10,226.67
25.00%
10,226.67
02.03.03
TARRAJEO DE SUPERFICIES EN FONDO DE ESCALERAS
(Mezcla C:A 1:5, E=1.5cm)
m2 570.69 28.01 15,985.03
25.00%
3,996.26
25.00%
3,996.26
25.00%
3,996.26
25.00%
3,996.26
02.03.04 VESTIDURA DE ARISTAS EN FONDO DE ESCALERAS m 672.25 7.75 5,209.94 25.00% 1,302.49 25.00% 1,302.49 25.00% 1,302.49 25.00% 1,302.49
02.04 PISOS Y PAVIMENTOS
4. Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
02.04.01 CONTRAPISO DE 48mm (Mezcla C:A, Base 1:5, Acabado 1:2) m2 1,264.83 20.23 25,587.51
25.00%
6,396.88
25.00%
6,396.88
25.00%
6,396.88
25.00%
6,396.88
02.04.02
PISO DE CERAMICO ANTIDESLIZANTE COLOR BLANCO 40 x
40 cm.
m2 228.19 48.43 11,051.24
25.00%
2,762.81
25.00%
2,762.81
25.00%
2,762.81
25.00%
2,762.81
02.04.03 PISO DE PORCELANATO COLOR BLANCO 60X60 CM. m2 399.47 67.49 26,960.23 25.00% 6,740.06 25.00% 6,740.06 25.00% 6,740.06 25.00% 6,740.06
02.04.04 PISO DE PORCELANATO COLOR BEIGE 60X60 CM. m2 424.19 67.49 28,628.58 25.00% 7,157.15 25.00% 7,157.15 25.00% 7,157.15 25.00% 7,157.15
02.04.05 PISO DE PARQUETON VETEADO m2 135.46 79.05 10,708.11 25.00% 2,677.03 25.00% 2,677.03 25.00% 2,677.03 25.00% 2,677.03
02.04.06
PISO DE CEMENTO PULIDO COLOREADO Y BRUÑADO 1.00 X
1.00
m2 204.63 24.65 5,044.13
25.00%
1,261.03
25.00%
1,261.03
25.00%
1,261.03
25.00%
1,261.03
02.04.07 PISOS DE ADOQUIN DE CONCRETO 10 X 20 CM. m2 50.90 88.83 4,521.45 25.00% 1,130.36 25.00% 1,130.36 25.00% 1,130.36 25.00% 1,130.36
02.04.08 VEREDA DE E= 4", ACABADO MEZCLA 1:5 (C:H) m2 73.48 46.58 3,422.70 25.00% 855.68 25.00% 855.68 25.00% 855.68 25.00% 855.68
02.05 CONTRAZOCALOS
02.05.01 CONTRAZOCALO DE MADERA CEDRO 3/4"x4" (Incluye Rodón) m 344.10 15.16 5,216.56
33.33%
1,738.85
33.33%
1,738.85
33.33%
1,738.85
02.05.02
CONTRAZOCALO DE PORCELANATO COLOR BLANCO, H=0.10
M
m 128.10 28.71 3,677.75
33.33%
1,225.92
33.33%
1,225.92
33.33%
1,225.92
02.05.03 CONTRAZOCALO DE PORCELANATO COLOR BEIGE, H=0.10 M m 285.70 28.71 8,202.45
33.33%
2,734.15
33.33%
2,734.15
33.33%
2,734.15
02.06 ZOCALOS
02.06.01 ZOCALO DE CERAMICO COLOR BLANCO DE 40 X 40 CM. m2 308.51 59.58 18,381.03 33.33% 6,127.01 33.33% 6,127.01 33.33% 6,127.01
02.07 REVESTIMIENTO DE GRADAS Y ESCALERAS
02.07.01
REVESTIMIENTO DE GRADAS Y PELDAÑOS CON
PORCELANATO COLOR BLANCO
m2 96.31 89.84 8,652.49
33.33%
2,884.16
33.33%
2,884.16
33.33%
2,884.16
02.07.02 REVESTIMIENTO DE DESCANSOS CON PORCELANATO m2 102.56 73.69 7,557.65 33.33% 2,519.22 33.33% 2,519.22 33.33% 2,519.22
02.07.03 CANTONERA DE ALUMINIO 2"X11/2" CON ANCLAJE m 339.60 10.01 3,399.40 33.33% 1,133.13 33.33% 1,133.13 33.33% 1,133.13
02.08 REVESTIMIENTOS ESPECIALES
02.08.01 REVESTIMIENTO CON PIEDRA KALA GRIS m2 174.19 198.98 34,660.33 33.33% 11,553.44 33.33% 11,553.44 33.33% 11,553.44
02.08.02
REVESTIMIENTO DE MESONES CON CERAMICO COLOR
BLANCO 0.30X0.30M
m2 37.59 52.64 1,978.74
33.33%
659.58
33.33%
659.58
33.33%
659.58
02.09 CARPINTERIA DE MADERA
02.09.01
PUERTAS CONTRAPLACADAS CON MDF 4MM REVESTIDAS
CON FORMICA (Incluye Marco)
m2 63.42 196.60 12,468.37
33.33%
4,156.12
33.33%
4,156.12
33.33%
4,156.12
02.09.02
BARANDA DE MADERA D=3" CON TUBO ELECTROSOLDADO 1
1/2"
m 88.20 135.71 11,969.62
33.33%
3,989.87
33.33%
3,989.87
33.33%
3,989.87
02.10 CARPINTERIA METALICA Y HERRERIA
02.10.01
PUERTA METALICA ANTIFUEGO P-5 (INCL. SUMINISTRO Y
COLOCACION)
und 3.00 4,200.00 12,600.00
50.00%
6,300.00
50.00%
6,300.00
02.10.02
PUERTA METALICA ANTIFUEGO P-7 (INCL. SUMINISTRO Y
COLOCACION)
und 1.00 6,750.00 6,750.00
50.00%
3,375.00
50.00%
3,375.00
02.10.03 PUERTA METALICA CON REJILLA P-5 und 1.00 220.00 220.00 50.00% 110.00 50.00% 110.00
02.10.04 BARANDA 02 METALICA EN ESCALERAS m 79.50 84.05 6,681.98 50.00% 3,340.99 50.00% 3,340.99
02.10.05
BARRA DE APOYO DE F°G°, D=1 1/2" EN SS.HH.
DISCAPACITADOS
und 15.00 64.51 967.65
50.00%
483.83
50.00%
483.83
02.10.06 TAPA METALICA EN BOTADERO DE BASURA und 15.00 40.00 600.00 50.00% 300.00 50.00% 300.00
02.10.07 VENTANA METALICA APERSIANADA V-23 und 1.00 35.00 35.00 50.00% 17.50 50.00% 17.50
02.10.08 VENTANA METALICA APERSIANADA V-25 und 14.00 50.00 700.00 50.00% 350.00 50.00% 350.00
02.11 CARPINTERIA DE MELAMINA
02.11.01 PUERTAS DE MELAMINA Y METAL (INCLUYE CERRAJERIA) m2 119.60 84.28 10,079.89
50.00%
5,039.95
50.00%
5,039.95
02.11.02
SEPARADORES DE MELAMINA Y METAL PARA SERVICIOS
HIGIENICOS
m2 135.42 108.21 14,653.80
50.00%
7,326.90
50.00%
7,326.90
02.11.03
SEPARADORES DE MELAMINA Y FIERRO ANGULAR PARA
URINARIOS
m2 16.00 55.86 893.76
50.00%
446.88
50.00%
446.88
5. Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
02.11.04
MOBILIARIO DE MELAMINA GALAXIA COLOR BLANCO PARA
KITCHENETTE
GLB 1.00 1,750.00 1,750.00
50.00%
875.00
50.00%
875.00
02.12 CERRAJERIA
02.12.01 BISAGRAS CAPUCHINAS ALUMINIZADAS 4" pza 1,095.00 7.68 8,409.60 50.00% 4,204.80 50.00% 4,204.80
02.12.02 CERRADURA PARA PUERTAS INTERIORES 02 GOLPES pza 249.00 65.29 16,257.21 50.00% 8,128.61 50.00% 8,128.61
02.12.03 CERRADURA TIPO BOLA PARA SS.HH. pza 47.00 47.29 2,222.63 50.00% 1,111.32 50.00% 1,111.32
02.12.04 PICAPORTE DE ALUMINIO 6" pza 142.00 19.64 2,788.88 50.00% 1,394.44 50.00% 1,394.44
02.13 VIDRIOS, CRISTALES Y SIMILARES
02.13.01
CRISTAL TEMPLADO TRANSPARENTE E=6MM SIST.
MODUGLASS
p2 489.12 17.85 8,730.79
50.00%
4,365.40
50.00%
4,365.40
02.13.02
CRISTAL TEMPLADO TRANSPARENTE E=10MM SIST.
MODUGLASS
p2 445.94 25.73 11,474.04
50.00%
5,737.02
50.00%
5,737.02
02.13.03
CRISTAL TEMPLADO COLOR GRISS E=6MM SIST.
MODUGLASS
p2 390.02 19.43 7,578.09
50.00%
3,789.05
50.00%
3,789.05
02.13.04
CRISTAL TEMPLADO GRISS E=6MM. SISTEMA MURO
CORTINA
p2 752.15 24.50 18,427.68
50.00%
9,213.84
50.00%
9,213.84
02.13.05 PANEL DE ALUMINIO E=6MM, SITEMA MURO CORTINA p2 726.49 22.00 15,982.78 50.00% 7,991.39 50.00% 7,991.39
02.13.06 ESPEJO CORRIDO EMPOTRADO PARA SS.HH. p2 166.60 7.56 1,259.50 50.00% 629.75 50.00% 629.75
02.14 PINTURA
02.14.01
PINTURA LATEX EN CIELO RASO (Incluye Vigas y Fondo de
Escaleras)
m2 607.26 7.84 4,760.92
50.00%
2,380.46
50.00%
2,380.46
02.14.02
PINTURA EN MUROS INTERIORES (Incluye Columnas y
Derrames)
m2 168.94 165.62 27,979.84
50.00%
13,989.92
50.00%
13,989.92
02.14.03
PINTURA EN MUROS EXTERIORES (Incluye Columnas y
Derrames)
m2 95.97 169.34 16,251.56
50.00%
8,125.78
50.00%
8,125.78
02.14.04 PINTURA BARNIZ EN CONTRAZOCALOS DE MADERA m 224.41 4.08 915.59 50.00% 457.80 50.00% 457.80
02.14.05 PINTURA BARNIZ EN PUERTAS DE MADERA m2 643.40 9.13 5,874.24 50.00% 2,937.12 50.00% 2,937.12
02.14.06
PINTURA ANTICORROSIVA EN BARANDAS, PASAMANOS Y
MARCOS
m 46.19 160.57 7,416.73
50.00%
3,708.37
50.00%
3,708.37
02.15 TANQUE CISTERNA
02.15.01 REVOQUES ENLUCIDOS Y MOLDURAS
02.15.01.01 TARRAJEO EN INTERIORES (Mezcla C:A 1:4, E=2cm) m2 70.60 20.57 1,452.24 50.00% 726.12 50.00% 726.12
02.15.01.02 TARRAJEO EN EXTERIORES (Mezcla C:A 1:4, E=2cm) m2 76.69 26.93 2,065.26 50.00% 1,032.63 50.00% 1,032.63
02.15.01.03
TARRAJEO CON IMPERMEABILIZANTES (Mezcla C:A 1:4,
E=2cm)
m2 111.02 24.25 2,692.24
50.00%
1,346.12
50.00%
1,346.12
02.15.02 CIELORRASOS
02.15.02.01
CIELO RASO HORIZONTAL CON IMPERMEABILIZANTE
(Mezcla C:A 1:4, E=2.5cm)
m2 48.00 56.75 2,724.00
50.00%
1,362.00
50.00%
1,362.00
02.15.03 PISOS Y PAVIMENTOS
02.15.03.01 PISO DE CEMENTO PULIDO CON IMPERMEABILIZANTE m2 133.35 24.16 3,221.74 50.00% 1,610.87 50.00% 1,610.87
03 INSTALACIONES SANITARIAS
03.01
SUMINISTRO E INSTALACION DE APARATOS Y ACCESORIOS
SANITARIOS
03.01.01 IINODORO FLUXOMETRO DE DESCARGA REDUCIDA pza 36.00 450.00 16,200.00 50.00% 8,100.00 50.00% 8,100.00
03.01.02 LAVATORIO OVALIN EMPOTRADO PARA AGUA FRIA pza 38.00 110.00 4,180.00 50.00% 2,090.00 50.00% 2,090.00
03.01.03 LAVATORIO OVALIN PEDESTAL AGUA FRIA pza 6.00 120.00 720.00 50.00% 360.00 50.00% 360.00
03.01.04 URINARIO FLUXOMETRO DE DESCARGA REDUCIDA pza 15.00 300.00 4,500.00 50.00% 2,250.00 50.00% 2,250.00
03.01.05 LAVADERO DE ACERO INOXIDABLE C/ACCES. pza 2.00 150.00 300.00 50.00% 150.00 50.00% 150.00
03.01.06 JABONERA DE LOSA COLOR BLANCO und 50.00 50.00 2,500.00 50.00% 1,250.00 50.00% 1,250.00
03.01.07 PAPELERA DE LOSA Y BARRA PLASTICA, COLOR BLANCO und 50.00 37.50 1,875.00
50.00%
937.50
50.00%
937.50
03.01.08 COLOCACION DE APARATOS SANITARIOS pza 125.00 17.83 2,228.75 50.00% 1,114.38 50.00% 1,114.38
03.01.09 COLOCACION DE ACCESORIOS SANITARIOS pza 125.00 13.40 1,675.00 50.00% 837.50 50.00% 837.50
6. Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
03.02 SISTEMA DE DESAGUE
03.02.01 SALIDAS
03.02.01.01 SALIDA DE DESAGUE PVC SAL 2" pto 36.00 33.59 1,209.24 20.00% 241.85 20.00% 241.85 20.00% 241.85 20.00% 241.85 20.00% 241.85
03.02.01.02 SALIDA DE DESAGUE PVC SAL 4" pto 23.00 38.46 884.58 20.00% 176.92 20.00% 176.92 20.00% 176.92 20.00% 176.92 20.00% 176.92
03.02.02 REDES COLECTORAS
03.02.02.01 REDES COLECTORAS: TUBERIA PVC SAL 6" COLGADA m 6.35 30.45 193.36 20.00% 38.67 20.00% 38.67 20.00% 38.67 20.00% 38.67 20.00% 38.67
03.02.02.02 REDES COLECTORAS: TUBERIA PVC SAL 6" EN MONTANTE m 63.00 23.25 1,464.75
20.00%
292.95
20.00%
292.95
20.00%
292.95
20.00%
292.95
20.00%
292.95
03.02.02.03 REDES COLECTORAS: TUBERIA PVC SAL DE 2" COLGADA m 43.15 16.79 724.49
20.00%
144.90
20.00%
144.90
20.00%
144.90
20.00%
144.90
20.00%
144.90
03.02.02.04 REDES COLECTORAS: TUBERIA PVC SAL 4" COLGADA m 37.46 20.21 757.07 20.00% 151.41 20.00% 151.41 20.00% 151.41 20.00% 151.41 20.00% 151.41
03.02.03 ACCESORIOS DE REDES
03.02.03.01 ACCESORIOS DE REDES: CODOS PVC SAL 2"x45° pza 29.00 12.87 373.23 20.00% 74.65 20.00% 74.65 20.00% 74.65 20.00% 74.65 20.00% 74.65
03.02.03.02 ACCESORIOS DE REDES: CODOS PVC SAL 2"x90° pza 46.00 11.67 536.82 20.00% 107.36 20.00% 107.36 20.00% 107.36 20.00% 107.36 20.00% 107.36
03.02.03.03 ACCESORIOS DE REDES: CODOS PVC SAL 4"x45° pza 57.00 15.37 876.09 20.00% 175.22 20.00% 175.22 20.00% 175.22 20.00% 175.22 20.00% 175.22
03.02.03.04
ACCESORIO DE REDES: CODO CON VENTILACION PVC SAL
4"x2"x90°
pza 33.00 19.10 630.30
20.00%
126.06
20.00%
126.06
20.00%
126.06
20.00%
126.06
20.00%
126.06
03.02.03.05 ACCESORIOS DE REDES: REDUCCION PVC C-10 DE 4" a 2" pza 32.00 5.82 186.24
20.00%
37.25
20.00%
37.25
20.00%
37.25
20.00%
37.25
20.00%
37.25
03.02.03.06 ACCESORIOS DE REDES: REDUCCION PVC C-10 DE 6" a 4" pza 8.00 8.02 64.16
20.00%
12.83
20.00%
12.83
20.00%
12.83
20.00%
12.83
20.00%
12.83
03.02.03.07 ACCESORIOS DE REDES: TAPON PVC SAL 4" pza 12.00 14.69 176.28 20.00% 35.26 20.00% 35.26 20.00% 35.26 20.00% 35.26 20.00% 35.26
03.02.03.08 ACCESORIOS DE REDES: TEES SANITARIO PVC SAL 2" pza 46.00 12.67 582.82 20.00% 116.56 20.00% 116.56 20.00% 116.56 20.00% 116.56 20.00% 116.56
03.02.03.09 ACCESORIOS DE REDES: TEES SANITARIO PVC SAL 6" pza 8.00 20.89 167.12 20.00% 33.42 20.00% 33.42 20.00% 33.42 20.00% 33.42 20.00% 33.42
03.02.03.10 ACCESORIOS DE REDES: TRAMPA "P" PVC SAL 2" pza 19.00 13.89 263.91 20.00% 52.78 20.00% 52.78 20.00% 52.78 20.00% 52.78 20.00% 52.78
03.02.03.11 ACCESORIOS DE REDES: YEES PVC SAL 4"x2" pza 63.00 15.67 987.21 20.00% 197.44 20.00% 197.44 20.00% 197.44 20.00% 197.44 20.00% 197.44
03.02.03.12 ACCESORIOS DE REDES: YEES DOBLES PVC SAL 4" pza 15.00 19.89 298.35 20.00% 59.67 20.00% 59.67 20.00% 59.67 20.00% 59.67 20.00% 59.67
03.02.03.13 ACCESORIOS DE REDES: YEES PVC SAL 2" pza 12.00 12.67 152.04 20.00% 30.41 20.00% 30.41 20.00% 30.41 20.00% 30.41 20.00% 30.41
03.02.03.14 ACCESORIOS DE REDES: YEES PVC SAL 4" pza 45.00 18.67 840.15 20.00% 168.03 20.00% 168.03 20.00% 168.03 20.00% 168.03 20.00% 168.03
03.02.04
TUBERIA Y ACCESORIOS EN INODORO FLUXOMETRO
DESCARGA REDUCIDA
03.02.04.01 TEE PVC-SAP 1 1/4" und 93.00 18.60 1,729.80 20.00% 345.96 20.00% 345.96 20.00% 345.96 20.00% 345.96 20.00% 345.96
03.02.04.02 TAPON HEMBRA PVC SAP 1 1/4" pza 93.00 14.07 1,308.51 20.00% 261.70 20.00% 261.70 20.00% 261.70 20.00% 261.70 20.00% 261.70
03.02.04.03 REDUCCIONES PVC-SAP 1 1/4" A 1" und 93.00 16.72 1,554.96 20.00% 310.99 20.00% 310.99 20.00% 310.99 20.00% 310.99 20.00% 310.99
03.02.04.04 UNION SIMPLE PVC SAP ø 1" C/ROSCA pza 43.00 128.53 5,526.79 20.00% 1,105.36 20.00% 1,105.36 20.00% 1,105.36 20.00% 1,105.36 20.00% 1,105.36
03.02.04.05 TUBERIA PVC SAP R-10 1 1/4" (CAMARA DE AIRE) m 46.50 18.53 861.65 20.00% 172.33 20.00% 172.33 20.00% 172.33 20.00% 172.33 20.00% 172.33
03.02.04.06 TAPON HEMBRA C /ROSCA PVC SAP 1" pza 93.00 11.89 1,105.77 20.00% 221.15 20.00% 221.15 20.00% 221.15 20.00% 221.15 20.00% 221.15
03.02.04.07 KIT DE DESCARGA INDIRECTA D=1" PARA INODORO und 93.00 25.58 2,378.94 20.00% 475.79 20.00% 475.79 20.00% 475.79 20.00% 475.79 20.00% 475.79
03.02.05
TUBERIA Y ACCESORIOS EN URINARIO FLUXOMETRO
DESCARGA REDUCIDA
03.02.05.01 TEE PVC-SAP 1" und 15.00 15.60 234.00 20.00% 46.80 20.00% 46.80 20.00% 46.80 20.00% 46.80 20.00% 46.80
03.02.05.02 TAPON HEMBRA PVC SAP 1" pza 15.00 11.87 178.05 20.00% 35.61 20.00% 35.61 20.00% 35.61 20.00% 35.61 20.00% 35.61
03.02.05.03 REDUCCIONES PVC-SAP 1" A 3/4" pza 5.00 15.72 78.60 20.00% 15.72 20.00% 15.72 20.00% 15.72 20.00% 15.72 20.00% 15.72
03.02.05.04
ADAPTADOR UNION PRESION ROSCA PVC SAP ø 3/4"
C/ROSCA
pza 15.00 129.15 1,937.25
20.00%
387.45
20.00%
387.45
20.00%
387.45
20.00%
387.45
20.00%
387.45
03.02.05.05 TUBERIA PVC SAP R-10 1" (CAMARA DE AIRE) m 20.01 12.76 255.33 20.00% 51.07 20.00% 51.07 20.00% 51.07 20.00% 51.07 20.00% 51.07
03.02.05.06 TAPON HEMBRA C/ROSCA PVC SAP 3/4" pza 15.00 11.39 170.85 20.00% 34.17 20.00% 34.17 20.00% 34.17 20.00% 34.17 20.00% 34.17
03.02.05.07 KIT DE DESCARGA INDIRECTA D=3/4" PARA URINARIO und 15.00 23.58 353.70 20.00% 70.74 20.00% 70.74 20.00% 70.74 20.00% 70.74 20.00% 70.74
03.02.06 ADITAMENTOS VARIOS
03.02.06.01
ADITAMENTOS VARIOS: REGISTRO ROSCADO DE BRONCE
4"
pza 33.00 34.77 1,147.41
20.00%
229.48
20.00%
229.48
20.00%
229.48
20.00%
229.48
20.00%
229.48
03.02.06.02 ADITAMENTOS VARIOS: SUMIDEROS DE BRONCE 2" pza 49.00 26.42 1,294.58 20.00% 258.92 20.00% 258.92 20.00% 258.92 20.00% 258.92 20.00% 258.92
7. Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
03.02.06.03
SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO
4"
pza 108.00 18.29 1,975.32
20.00%
395.06
20.00%
395.06
20.00%
395.06
20.00%
395.06
20.00%
395.06
03.02.06.04
SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO
2"
pza 80.00 21.29 1,703.20
20.00%
340.64
20.00%
340.64
20.00%
340.64
20.00%
340.64
20.00%
340.64
03.02.06.05
SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO
6"
pza 3.00 23.29 69.87
19.99%
13.97
19.99%
13.97
19.99%
13.97
19.99%
13.97
19.99%
13.97
03.02.06.06 SOMBRERO DE VENTILACION PVC SAL 6" pza 1.00 20.63 20.63 20.02% 4.13 20.02% 4.13 20.02% 4.13 20.02% 4.13 20.02% 4.13
03.02.06.07
ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y
DOS OREJAS TORNILLOS, 6"
pza 21.00 17.49 367.29
20.00%
73.46
20.00%
73.46
20.00%
73.46
20.00%
73.46
20.00%
73.46
03.02.07 SISTEMA DE REDES DE COLECCION
03.02.07.01 TRABAJOS PRELIMINARES
03.02.07.01.01 LIMPIEZA DE TERRENO MANUAL m 12.20 3.28 40.02 19.99% 8.00 19.99% 8.00 19.99% 8.00 19.99% 8.00 19.99% 8.00
03.02.07.01.02 TRAZO Y REPLANTEO m 12.20 1.03 12.57 19.97% 2.51 19.97% 2.51 19.97% 2.51 19.97% 2.51 19.97% 2.51
03.02.07.01.03 SEÑALIZACION PARA SEGURIDAD EN OBRA m 20.00 24.09 481.80 20.00% 96.36 20.00% 96.36 20.00% 96.36 20.00% 96.36 20.00% 96.36
03.02.07.02 MOVIMIENTO DE TIERRAS
03.02.07.02.01
EXCAVACION DE ZANJA, Hprom.=0.80 TERRENO
SEMIROCOSO
m3 4.88 23.79 116.10
20.00%
23.22
20.00%
23.22
20.00%
23.22
20.00%
23.22
20.00%
23.22
03.02.07.02.02
EXCAVACION DE CAJA REGISTRO H=PROM. 0.80M.
18"X24", TERRENO SEMIROCOSO
m 1.25 9.40 11.75
20.00%
2.35
20.00%
2.35
20.00%
2.35
20.00%
2.35
20.00%
2.35
03.02.07.02.03 REFINE Y NIVELACION ZANJA TERR.SEMIROCOSO m 12.20 2.93 35.75 20.00% 7.15 20.00% 7.15 20.00% 7.15 20.00% 7.15 20.00% 7.15
03.02.07.02.04 CAMA DE APOYO PARA TUBERIA m 12.20 10.58 129.08 20.00% 25.82 20.00% 25.82 20.00% 25.82 20.00% 25.82 20.00% 25.82
03.02.07.02.05
RELLENO Y COMPACTADO CON MATERIAL
SELECCIONADO
m3 4.58 29.07 133.14
20.00%
26.63
20.00%
26.63
20.00%
26.63
20.00%
26.63
20.00%
26.63
03.02.07.02.06 ACARREO DE MATERIAL EXCEDENTE D=30m m3 0.39 6.54 2.55 20.00% 0.51 20.00% 0.51 20.00% 0.51 20.00% 0.51 20.00% 0.51
03.02.07.03 SUMINISTRO E INSTALACION DE TUBERIA
03.02.07.03.01 TUBERIA DE PVC SAL 6" m 12.20 37.62 458.96 20.00% 91.79 20.00% 91.79 20.00% 91.79 20.00% 91.79 20.00% 91.79
03.02.08 CAJAS DE REGISTRO
03.02.08.01
CAJA DE REGISTRO DE DESAGUE 18" X 24"Hprom.=0.80,
CON TAPA DE CONCRETO
und 3.00 203.30 609.90
20.00%
121.98
20.00%
121.98
20.00%
121.98
20.00%
121.98
20.00%
121.98
03.02.09 SISTEMA DE VENTILACION
03.02.09.01 SALIDAS
03.02.09.01.01 SALIDA DE VENTILACION EN TECHO PVC SAL 8" pto 1.00 27.62 27.62 19.99% 5.52 19.99% 5.52 19.99% 5.52 19.99% 5.52 19.99% 5.52
03.02.09.02 REDES COLECTORAS
03.02.09.02.01 TUBERIA DE PVC SAL 3" EMPOTRADA m 44.80 13.77 616.90 20.00% 123.38 20.00% 123.38 20.00% 123.38 20.00% 123.38 20.00% 123.38
03.02.09.02.02
REDES COLECTORAS: TUBERIA PVC SAL DE 2"
EMPOTRADA
m 48.91 7.02 343.35
20.00%
68.67
20.00%
68.67
20.00%
68.67
20.00%
68.67
20.00%
68.67
03.02.09.02.03
REDES COLECTORAS: TUBERIA PVC SAL 8" EN
MONTANTE
m 63.80 7.05 449.79
20.00%
89.96
20.00%
89.96
20.00%
89.96
20.00%
89.96
20.00%
89.96
03.02.09.02.04 REDES COLECTORAS: TUBERIA PVC SAL DE 3", COLGADA m 42.00 11.57 485.94
20.00%
97.19
20.00%
97.19
20.00%
97.19
20.00%
97.19
20.00%
97.19
03.02.09.02.05 REDES COLECTORAS: TUBERIA PVC SAL DE 2" COLGADA m 55.97 16.79 939.74
20.00%
187.95
20.00%
187.95
20.00%
187.95
20.00%
187.95
20.00%
187.95
03.02.10 ACCESORIOS DE REDES
03.02.10.01 ACCESORIOS DE REDES: CODOS PVC SAL 2"x90° pza 278.00 11.67 3,244.26 20.00% 648.85 20.00% 648.85 20.00% 648.85 20.00% 648.85 20.00% 648.85
03.02.10.02 ACCESORIOS DE REDES: TEES PVC SAL 2" pza 158.00 10.89 1,720.62 20.00% 344.12 20.00% 344.12 20.00% 344.12 20.00% 344.12 20.00% 344.12
03.02.10.03 ACCESORIOS DE REDES: REDUCCION PVC SAL DE 3" a 2" pza 42.00 7.21 302.82
20.00%
60.56
20.00%
60.56
20.00%
60.56
20.00%
60.56
20.00%
60.56
03.02.10.04 ACCESORIOS DE REDES: TEES SANITARIO PVC SAL 3" pza 28.00 13.89 388.92 20.00% 77.78 20.00% 77.78 20.00% 77.78 20.00% 77.78 20.00% 77.78
03.02.10.05 ACCESORIOS DE REDES: CODOS PVC SAL 3"x90° pza 14.00 12.89 180.46 20.00% 36.09 20.00% 36.09 20.00% 36.09 20.00% 36.09 20.00% 36.09
03.02.10.06 ACCESORIOS DE REDES: TEES PVC SAL 3"X2" pza 14.00 8.89 124.46 20.00% 24.89 20.00% 24.89 20.00% 24.89 20.00% 24.89 20.00% 24.89
03.02.10.07 ACCESORIOS DE REDES: TEES SANITARIO PVC SAL 8" a 4" pza 14.00 8.89 124.46
20.00%
24.89
20.00%
24.89
20.00%
24.89
20.00%
24.89
20.00%
24.89
8. Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
03.02.10.08 ACCESORIOS DE REDES: REDUCCION PVC SAL DE 4" a 3" pza 14.00 4.71 65.94
20.00%
13.19
20.00%
13.19
20.00%
13.19
20.00%
13.19
20.00%
13.19
03.02.11 ADITAMENTOS VARIOS
03.02.11.01
SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO
3"
pza 43.00 34.54 1,485.22
20.00%
297.04
20.00%
297.04
20.00%
297.04
20.00%
297.04
20.00%
297.04
03.02.11.02
SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO
2"
pza 107.00 21.29 2,278.03
20.00%
455.61
20.00%
455.61
20.00%
455.61
20.00%
455.61
20.00%
455.61
03.02.11.03 SOMBRERO DE VENTILACION PVC SAL 8" pza 1.00 5.63 5.63 20.07% 1.13 20.07% 1.13 20.07% 1.13 20.07% 1.13 20.07% 1.13
03.02.11.04
ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y
DOS OREJAS TORNILLOS, 8"
pza 23.00 79.59 1,830.57
20.00%
366.11
20.00%
366.11
20.00%
366.11
20.00%
366.11
20.00%
366.11
03.03 SISTEMA DE AGUA FRIA
03.03.01 SALIDAS
03.03.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 45.00 41.31 1,858.95 20.00% 371.79 20.00% 371.79 20.00% 371.79 20.00% 371.79 20.00% 371.79
03.03.01.02 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1" pto 31.00 47.04 1,458.24 20.00% 291.65 20.00% 291.65 20.00% 291.65 20.00% 291.65 20.00% 291.65
03.03.01.03 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1 1/4" pto 43.00 54.04 2,323.72
20.00%
464.74
20.00%
464.74
20.00%
464.74
20.00%
464.74
20.00%
464.74
03.03.02 REDES DE DISTRIBUCION
03.03.02.01 RED DE DISTRIBUCION: TUBERIA PVC CLASE 10 R 1/2" m 71.58 7.85 561.90 20.00% 112.38 20.00% 112.38 20.00% 112.38 20.00% 112.38 20.00% 112.38
03.03.02.02 RED DE DISTRIBUCION: TUBERIA PVC CLASE 10 R 3/4" m 40.10 7.32 293.53 20.00% 58.71 20.00% 58.71 20.00% 58.71 20.00% 58.71 20.00% 58.71
03.03.02.03 RED DE DISTRIBUCION: TUBERIA PVC CLASE 10 R 1" m 59.83 8.71 521.12 20.00% 104.22 20.00% 104.22 20.00% 104.22 20.00% 104.22 20.00% 104.22
03.03.02.04 RED DE DISTRIBUCION: TUBERIA PVC CLASE 10 R 1 1/4" m 251.11 12.17 3,056.01
20.00%
611.20
20.00%
611.20
20.00%
611.20
20.00%
611.20
20.00%
611.20
03.03.02.05 RED DE DISTRIBUCION: TUBERIA PVC CLASE 10 R 1 1/2" m 263.65 13.85 3,651.55
20.00%
730.31
20.00%
730.31
20.00%
730.31
20.00%
730.31
20.00%
730.31
03.03.03 ACCESORIOS DE REDES
03.03.03.01
ADAPTADOR UNION PRESION ROSCA PVC SAP ø 1 1/2"
C/ROSCA
pza 54.00 83.24 4,494.96
20.00%
898.99
20.00%
898.99
20.00%
898.99
20.00%
898.99
20.00%
898.99
03.03.03.02
ADAPTADOR UNION PRESION ROSCA PVC SAP ø 1 1/4"
C/ROSCA
pza 4.00 85.24 340.96
20.00%
68.19
20.00%
68.19
20.00%
68.19
20.00%
68.19
20.00%
68.19
03.03.03.03
ADAPTADOR UNION PRESION ROSCA PVC SAP ø 1"
C/ROSCA
pza 2.00 82.24 164.48
20.00%
32.90
20.00%
32.90
20.00%
32.90
20.00%
32.90
20.00%
32.90
03.03.03.04 ACCESORIOS DE REDES:CODOS PVC C-10 DE 1/2" x 90° pza 95.00 5.71 542.45
20.00%
108.49
20.00%
108.49
20.00%
108.49
20.00%
108.49
20.00%
108.49
03.03.03.05 ACCESORIOS DE REDES:CODOS PVC C-10 DE 1 1/2" x 90° pza 109.00 7.21 785.89
20.00%
157.18
20.00%
157.18
20.00%
157.18
20.00%
157.18
20.00%
157.18
03.03.03.06 ACCESORIOS DE REDES:CODOS PVC C-10 DE 1 1/4" x 90° pza 80.00 8.21 656.80
20.00%
131.36
20.00%
131.36
20.00%
131.36
20.00%
131.36
20.00%
131.36
03.03.03.07 ACCESORIOS DE REDES:CODOS PVC C-10 DE 1" x 90° pza 66.00 6.21 409.86 20.00% 81.97 20.00% 81.97 20.00% 81.97 20.00% 81.97 20.00% 81.97
03.03.03.08 ACCESORIOS DE REDES:CODOS PVC C-10 DE 3/4" x 90° pza 68.00 6.71 456.28
20.00%
91.26
20.00%
91.26
20.00%
91.26
20.00%
91.26
20.00%
91.26
03.03.03.09 ACCESORIOS DE REDES:CODOS PVC C-10 DE 1/2" x 90° pza 47.00 5.71 268.37
20.00%
53.67
20.00%
53.67
20.00%
53.67
20.00%
53.67
20.00%
53.67
03.03.03.10
ACCESORIOS DE REDES: NIPLES ROSCADO DE FºGº 1 1/2" x
4"
pza 12.00 101.29 1,215.48
20.00%
243.10
20.00%
243.10
20.00%
243.10
20.00%
243.10
20.00%
243.10
03.03.03.11
ACCESORIOS DE REDES: NIPLES ROSCADO DE FºGº 1 1/4" x
4"
pza 4.00 96.29 385.16
20.00%
77.03
20.00%
77.03
20.00%
77.03
20.00%
77.03
20.00%
77.03
03.03.03.12 ACCESORIOS DE REDES: NIPLES ROSCADO DE FºGº 1" x 4" pza 2.00 104.41 208.82
20.00%
41.76
20.00%
41.76
20.00%
41.76
20.00%
41.76
20.00%
41.76
03.03.03.13 REDUCCIONES PVC-SAP 1 1/2" A 1 1/4" pza 33.00 15.72 518.76 20.00% 103.75 20.00% 103.75 20.00% 103.75 20.00% 103.75 20.00% 103.75
03.03.03.14 REDUCCIONES PVC-SAP 1 1/2" A 1" pza 15.00 15.72 235.80 20.00% 47.16 20.00% 47.16 20.00% 47.16 20.00% 47.16 20.00% 47.16
03.03.03.15 REDUCCIONES PVC-SAP 1 1/2" A 1/2" pza 1.00 16.72 16.72 19.98% 3.34 19.98% 3.34 19.98% 3.34 19.98% 3.34 19.98% 3.34
03.03.03.16 REDUCCIONES PVC-SAP 1 1/2" A 3/4" pza 17.00 16.72 284.24 20.00% 56.85 20.00% 56.85 20.00% 56.85 20.00% 56.85 20.00% 56.85
03.03.03.17 REDUCCIONES PVC-SAP 1 1/4" A 1" und 2.00 16.72 33.44 20.01% 6.69 20.01% 6.69 20.01% 6.69 20.01% 6.69 20.01% 6.69
9. Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
03.03.03.18 REDUCCIONES PVC-SAP 1 1/4" A 1/2" pza 2.00 18.72 37.44 20.01% 7.49 20.01% 7.49 20.01% 7.49 20.01% 7.49 20.01% 7.49
03.03.03.19 REDUCCIONES PVC-SAP 1 1/4" A 3/4" pza 15.00 18.72 280.80 20.00% 56.16 20.00% 56.16 20.00% 56.16 20.00% 56.16 20.00% 56.16
03.03.03.20 REDUCCIONES PVC-SAP 1" A 1/2" pza 2.00 14.72 29.44 20.01% 5.89 20.01% 5.89 20.01% 5.89 20.01% 5.89 20.01% 5.89
03.03.03.21 REDUCCIONES PVC-SAP 2 1/2" A 1 1/2" pza 5.00 25.72 128.60 20.00% 25.72 20.00% 25.72 20.00% 25.72 20.00% 25.72 20.00% 25.72
03.03.03.22 REDUCCIONES PVC-SAP 2" A 1 1/2" pza 14.00 18.72 262.08 20.00% 52.42 20.00% 52.42 20.00% 52.42 20.00% 52.42 20.00% 52.42
03.03.03.23 REDUCCIONES PVC-SAP 3/4" A 1/2" pza 63.00 14.22 895.86 20.00% 179.17 20.00% 179.17 20.00% 179.17 20.00% 179.17 20.00% 179.17
03.03.03.24 TAPON HEMBRA C/ROSCA PVC SAP 1/2" pza 95.00 10.89 1,034.55 20.00% 206.91 20.00% 206.91 20.00% 206.91 20.00% 206.91 20.00% 206.91
03.03.03.25 TEE PVC-SAP 1 1/2" und 52.00 20.60 1,071.20 20.00% 214.24 20.00% 214.24 20.00% 214.24 20.00% 214.24 20.00% 214.24
03.03.03.26 TEE PVC-SAP 1 1/4" und 79.00 18.60 1,469.40 20.00% 293.88 20.00% 293.88 20.00% 293.88 20.00% 293.88 20.00% 293.88
03.03.03.27 TEE PVC-SAP 1" und 16.00 15.60 249.60 20.00% 49.92 20.00% 49.92 20.00% 49.92 20.00% 49.92 20.00% 49.92
03.03.03.28 TEE PVC-SAP 1/2" und 30.00 13.10 393.00 20.00% 78.60 20.00% 78.60 20.00% 78.60 20.00% 78.60 20.00% 78.60
03.03.03.29 TEE PVC-SAP 2 1/2" und 5.00 30.60 153.00 20.00% 30.60 20.00% 30.60 20.00% 30.60 20.00% 30.60 20.00% 30.60
03.03.03.30 TEE PVC-SAP 2" und 14.00 36.15 506.10 20.00% 101.22 20.00% 101.22 20.00% 101.22 20.00% 101.22 20.00% 101.22
03.03.03.31 TEE PVC-SAP 3/4" und 22.00 14.60 321.20 20.00% 64.24 20.00% 64.24 20.00% 64.24 20.00% 64.24 20.00% 64.24
03.03.03.32 UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1 1/2" und 2.00 110.31 220.62 20.00% 44.12 20.00% 44.12 20.00% 44.12 20.00% 44.12 20.00% 44.12
03.03.03.33 UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1 1/4" und 4.00 105.31 421.24 20.00% 84.25 20.00% 84.25 20.00% 84.25 20.00% 84.25 20.00% 84.25
03.03.03.34 UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1" und 2.00 100.31 200.62 20.00% 40.12 20.00% 40.12 20.00% 40.12 20.00% 40.12 20.00% 40.12
03.03.04 VALVULAS
03.03.04.01 VALVULA COMPUERTA DE BRONCE 1 1/2" pza 46.00 67.12 3,087.52 20.00% 617.50 20.00% 617.50 20.00% 617.50 20.00% 617.50 20.00% 617.50
03.03.04.02 VALVULA COMPUERTA DE BRONCE 1 1/4" pza 2.00 62.12 124.24 20.00% 24.85 20.00% 24.85 20.00% 24.85 20.00% 24.85 20.00% 24.85
03.03.04.03 VALVULA COMPUERTA DE BRONCE 1" pza 1.00 63.58 63.58 20.01% 12.72 20.01% 12.72 20.01% 12.72 20.01% 12.72 20.01% 12.72
03.03.04.04
VALVULA REDUCTORA DE PRESION ROSCADA 2 1/2",
ACERO INOXIDABLE, PN 40
pza 2.00 163.59 327.18
20.00%
65.44
20.00%
65.44
20.00%
65.44
20.00%
65.44
20.00%
65.44
03.03.05 ADITAMENTOS VARIOS
03.03.05.01 VALVULA COMPUERTA DE BRONCE 2 1/2" pza 4.00 107.12 428.48 20.00% 85.70 20.00% 85.70 20.00% 85.70 20.00% 85.70 20.00% 85.70
03.03.05.02 REDUCCION PVC SAP CL. 10, 2 1/2" A 2" pza 2.00 101.46 202.92 20.00% 40.58 20.00% 40.58 20.00% 40.58 20.00% 40.58 20.00% 40.58
03.03.05.03 TEE PVC-SAP 2 1/2" und 2.00 30.60 61.20 20.00% 12.24 20.00% 12.24 20.00% 12.24 20.00% 12.24 20.00% 12.24
03.03.05.04 CODO PVC SAP C-10, 2 1/2" pza 2.00 16.15 32.30 20.00% 6.46 20.00% 6.46 20.00% 6.46 20.00% 6.46 20.00% 6.46
03.03.05.05
ADAPTADOR UNION PRESION ROSCA PVC SAP C-10, Ø 2
1/2"
pza 4.00 102.46 409.84
20.00%
81.97
20.00%
81.97
20.00%
81.97
20.00%
81.97
20.00%
81.97
03.03.05.06 UNION UNIVERSAL DE FIERRO GALVANIZADO DE 2 1/2" pza 8.00 139.46 1,115.68 20.00% 223.14 20.00% 223.14 20.00% 223.14 20.00% 223.14 20.00% 223.14
03.03.05.07
ACCESORIOS DE REDES:NIPLES ROSCADO DE FºGº 2 1/2" x
6"
pza 8.00 125.46 1,003.68
20.00%
200.74
20.00%
200.74
20.00%
200.74
20.00%
200.74
20.00%
200.74
03.03.05.08
ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y
DOS OREJAS TORNILLOS, 1 1/2"
pza 4.00 38.20 152.80
20.00%
30.56
20.00%
30.56
20.00%
30.56
20.00%
30.56
20.00%
30.56
03.03.05.09
ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y
DOS OREJAS TORNILLOS, 2"
pza 12.00 35.17 422.04
20.00%
84.41
20.00%
84.41
20.00%
84.41
20.00%
84.41
20.00%
84.41
03.03.05.10
ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y
DOS OREJAS TORNILLOS, 2 1/2"
pza 7.00 31.63 221.41
20.00%
44.28
20.00%
44.28
20.00%
44.28
20.00%
44.28
20.00%
44.28
03.03.06 PRUEBAS HIDRAULICAS Y DESINFECCION DE TUBERIAS
03.03.06.01 PRUEBA HIDRAULICA Y DESINFECCION DE REDES DE AGUAm 686.27 10.36 7,109.76
100.00%
7,109.76
03.04 SISTEMA DE AGUA PARA RIEGO
03.04.01 SALIDAS
03.04.01.01 SALIDA DE AGUA P/RIEGO TUBERIA DE PVC-SAP 1/2" pto 4.00 48.96 195.84 20.00% 39.17 20.00% 39.17 20.00% 39.17 20.00% 39.17 20.00% 39.17
03.04.02 REDES DE DISTRIBUCION
03.04.02.01 RED DE DISTRIBUCION: TUBERIA PVC CLASE 10 R 1 1/2" m 19.65 13.85 272.15
20.00%
54.43
20.00%
54.43
20.00%
54.43
20.00%
54.43
20.00%
54.43
03.04.02.02 RED DE DISTRIBUCION: TUBERIA PVC CLASE 10 R 3/4" m 40.60 7.32 297.19 20.00% 59.44 20.00% 59.44 20.00% 59.44 20.00% 59.44 20.00% 59.44
03.04.03 ACCESORIOS DE REDES
03.04.03.01 CODO PVC SAL CL. 10, 1/2" x 90º pza 2.00 10.85 21.70 20.00% 4.34 20.00% 4.34 20.00% 4.34 20.00% 4.34 20.00% 4.34
03.04.03.02 REDUCCION PVC SAP CL. 10, 1 1/2" A 3/4" pza 2.00 88.22 176.44 20.00% 35.29 20.00% 35.29 20.00% 35.29 20.00% 35.29 20.00% 35.29
03.04.03.03 CODO PVC SAL CL. 10, 3/4" x 90º pza 2.00 11.85 23.70 20.00% 4.74 20.00% 4.74 20.00% 4.74 20.00% 4.74 20.00% 4.74
10. Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
03.04.03.04 TEE PVC-SAP CL. 10 3/4" pza 2.00 14.60 29.20 20.00% 5.84 20.00% 5.84 20.00% 5.84 20.00% 5.84 20.00% 5.84
03.04.03.05 REDUCCION PVC SAP CL. 10, 3/4" A 1/2" pza 3.00 9.00 27.00 20.00% 5.40 20.00% 5.40 20.00% 5.40 20.00% 5.40 20.00% 5.40
03.04.03.06 GRIFO P/RIEGO DE BRONCE Ø 1/2" pza 4.00 54.87 219.48 20.00% 43.90 20.00% 43.90 20.00% 43.90 20.00% 43.90 20.00% 43.90
03.04.03.07
ACCESORIOS DE REDES: NIPLES ROSCADO DE FºGº 1/2" x
2"
pza 4.00 94.22 376.88
20.00%
75.38
20.00%
75.38
20.00%
75.38
20.00%
75.38
20.00%
75.38
03.04.03.08 ACCESORIOS DE REDES: CODOS F°G° DE 1/2" x 90° pza 4.00 20.23 80.92 20.00% 16.18 20.00% 16.18 20.00% 16.18 20.00% 16.18 20.00% 16.18
03.05 SISTEMA DE RECOLECCION DE AGUA DE LLUVIA
03.05.01 SUMINISTRO E INSTALACION DE TUBERIA
03.05.01.01 TUBERIA DE PVC SAL 6" MONTANTE m 63.00 19.02 1,198.26 25.00% 299.57 25.00% 299.57 25.00% 299.57 25.00% 299.57
03.05.01.02 TUBERIA DE PVC SAL 6" COLGADA m 13.40 19.02 254.87 25.00% 63.72 25.00% 63.72 25.00% 63.72 25.00% 63.72
03.05.01.03 TUBERIA DE PVC SAL 4" COLGADA m 31.35 14.96 469.00 25.00% 117.25 25.00% 117.25 25.00% 117.25 25.00% 117.25
03.05.02 ACCESORIOS DE REDES
03.05.02.01 TRAMPA "P" DE P.V.C. SAL 4" und 4.00 87.24 348.96 25.00% 87.24 25.00% 87.24 25.00% 87.24 25.00% 87.24
03.05.02.02 CODO PVC SAL 4"X45° pza 8.00 18.36 146.88 25.00% 36.72 25.00% 36.72 25.00% 36.72 25.00% 36.72
03.05.02.03 YEE PVC SAL 4" pza 6.00 18.25 109.50 25.00% 27.38 25.00% 27.38 25.00% 27.38 25.00% 27.38
03.05.02.04 TAPON PVC SAL 4" pza 4.00 14.69 58.76 25.00% 14.69 25.00% 14.69 25.00% 14.69 25.00% 14.69
03.05.02.05 REDUCCION PVC SAP 6" A 4" pza 2.00 118.74 237.48 25.00% 59.37 25.00% 59.37 25.00% 59.37 25.00% 59.37
03.05.02.06 CODO PVC SAL 6"X90° pza 2.00 44.61 89.22 25.01% 22.31 25.01% 22.31 25.01% 22.31 25.01% 22.31
03.05.02.07 ACCESORIOS DE REDES: TEES SANITARIO PVC SAL 6" pza 1.00 20.89 20.89 24.99% 5.22 24.99% 5.22 24.99% 5.22 24.99% 5.22
03.05.02.08 SOMBRERO DE VENTILACION PVC SAL 6" pza 1.00 20.63 20.63 25.01% 5.16 25.01% 5.16 25.01% 5.16 25.01% 5.16
03.05.03 ADITAMENTOS VARIOS
03.05.03.01
SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO
6"
pza 4.00 23.29 93.16
25.00%
23.29
25.00%
23.29
25.00%
23.29
25.00%
23.29
03.05.03.02
ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y
DOS OREJAS TORNILLOS, 8"
pza 21.00 79.59 1,671.39
25.00%
417.85
25.00%
417.85
25.00%
417.85
25.00%
417.85
03.05.03.03 CHARNELA ACERO INOXD. 6" pza 1.00 17.49 17.49 24.99% 4.37 24.99% 4.37 24.99% 4.37 24.99% 4.37
03.06 LINEA DE ADUCCION AGUA POTABLE
03.06.01 TRABAJOS PRELIMINARES
03.06.01.01 LIMPIEZA DE TERRENO MANUAL LINEA DE ADUCCION m 60.00 3.28 196.80 20.00% 39.36 20.00% 39.36 20.00% 39.36 20.00% 39.36 20.00% 39.36
03.06.01.02
TRAZO, NIVELES Y REPLANTEO PRELIMINAR LINEA DE
ADUCCION
m 60.00 1.39 83.40
20.00%
16.68
20.00%
16.68
20.00%
16.68
20.00%
16.68
20.00%
16.68
03.06.02 MOVIMIENTO DE TIERRAS
03.06.02.01 EXCAVACION DE ZANJA,TERRENO SEMIROCOSO m3 30.00 11.61 348.30 20.00% 69.66 20.00% 69.66 20.00% 69.66 20.00% 69.66 20.00% 69.66
03.06.02.02 REFINE Y NIVELACION ZANJA TERR.SEMIROCOSO m 60.00 2.93 175.80 20.00% 35.16 20.00% 35.16 20.00% 35.16 20.00% 35.16 20.00% 35.16
03.06.02.03 CAMA DE APOYO PARA TUBERIA m 60.00 10.58 634.80 20.00% 126.96 20.00% 126.96 20.00% 126.96 20.00% 126.96 20.00% 126.96
03.06.02.04 RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO m3 24.00 29.07 697.68
20.00%
139.54
20.00%
139.54
20.00%
139.54
20.00%
139.54
20.00%
139.54
03.06.02.05 ACARREO DE MATERIAL EXCEDENTE D=30m m3 7.80 6.54 51.01 20.00% 10.20 20.00% 10.20 20.00% 10.20 20.00% 10.20 20.00% 10.20
03.06.03 OBRAS DE CONCRETO SIMPLE
03.06.03.01 DADO DE ANCLAJE EN TUBERIAS F´c=175KG/CM2 m3 0.16 300.42 48.07 19.99% 9.61 19.99% 9.61 19.99% 9.61 19.99% 9.61 19.99% 9.61
03.06.04 TUBERIAS
03.06.04.01 TUBERIA PVC SAP Ø 3" CLASE-7.5 m 59.60 15.29 911.28 20.00% 182.26 20.00% 182.26 20.00% 182.26 20.00% 182.26 20.00% 182.26
03.06.05 ACCESORIOS
03.06.05.01 ACCESORIOS DE REDES:CODOS PVC C-7.5 DE 3" x 90° pza 1.00 29.71 29.71 19.99% 5.94 19.99% 5.94 19.99% 5.94 19.99% 5.94 19.99% 5.94
03.06.05.02 ACCESORIOS DE REDES:CODOS PVC C-7.5 DE 3" x 45° pza 3.00 29.71 89.13 20.00% 17.83 20.00% 17.83 20.00% 17.83 20.00% 17.83 20.00% 17.83
03.06.05.03 ACCESORIOS DE REDES:CODOS PVC C-7.5 DE 3" x 22.5º pza 4.00 34.71 138.84
20.00%
27.77
20.00%
27.77
20.00%
27.77
20.00%
27.77
20.00%
27.77
03.06.05.04 UNION SOQUET (ROSCA HEMBRA) 3" pza 1.00 120.31 120.31 20.00% 24.06 20.00% 24.06 20.00% 24.06 20.00% 24.06 20.00% 24.06
03.06.06 PRUEBAS HIDRAULICAS
03.06.06.01 PRUEBA HIDRAULICA Y DESINFECCION DE REDES DE AGUAm 60.00 10.36 621.60
20.00%
124.32
20.00%
124.32
20.00%
124.32
20.00%
124.32
20.00%
124.32
03.07 CISTERNA SEMI ENTERRADA Y CASETA DE BOMBEO
03.07.01 TRABAJOS PRELIMINARES
11. Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
03.07.01.01 LIMPIEZA DE TERRENO MANUAL m2 14.75 3.28 48.38 20.01% 9.68 20.01% 9.68 20.01% 9.68 20.01% 9.68 20.01% 9.68
03.07.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 14.75 1.71 25.22 19.98% 5.04 19.98% 5.04 19.98% 5.04 19.98% 5.04 19.98% 5.04
03.07.02 MOVIMIENTO DE TIERRAS
03.07.02.01 EXCAVACION DE ZANJA,TERRENO SEMIROCOSO m3 13.28 11.61 154.18 20.00% 30.84 20.00% 30.84 20.00% 30.84 20.00% 30.84 20.00% 30.84
03.07.02.02
EXCAVACION DE ZANJA,TERRENO SEMIROCOSO, TUBERIA
6"
m3 8.92 11.61 103.56
20.00%
20.71
20.00%
20.71
20.00%
20.71
20.00%
20.71
20.00%
20.71
03.07.02.03
REFINE Y NIVELACION ZANJA TERR.SEMIROCOSO
CANALETA
m 14.75 2.93 43.22
19.99%
8.64
19.99%
8.64
19.99%
8.64
19.99%
8.64
19.99%
8.64
03.07.02.04 REFINE Y NIVELACION ZANJA TERR.SEMIROCOSO TUBERIA m 27.90 2.93 81.75
20.00%
16.35
20.00%
16.35
20.00%
16.35
20.00%
16.35
20.00%
16.35
03.07.02.05 CAMA DE APOYO PARA TUBERIA m 27.90 10.58 295.18 20.00% 59.04 20.00% 59.04 20.00% 59.04 20.00% 59.04 20.00% 59.04
03.07.02.06
RELLENO COMPACTADO C/MATERIAL SELECCIONADO
P/TUBERIA
m3 7.14 54.39 388.34
20.00%
77.67
20.00%
77.67
20.00%
77.67
20.00%
77.67
20.00%
77.67
03.07.02.07 ACARREO DE MATERIAL EXCEDENTE D=30m m3 15.59 6.54 101.96 20.00% 20.39 20.00% 20.39 20.00% 20.39 20.00% 20.39 20.00% 20.39
03.07.03 TUBERIAS
03.07.03.01 TUBERIA FIERRO GALVANIZADO Ø 3" m 5.00 204.65 1,023.25 20.00% 204.65 20.00% 204.65 20.00% 204.65 20.00% 204.65 20.00% 204.65
03.07.03.02
TUBERIA PVC SAP Ø 2 1/2" CLASE-10 LINEA DE IMPULSION
AGUA POTABLE
m 99.60 15.29 1,522.88
20.00%
304.58
20.00%
304.58
20.00%
304.58
20.00%
304.58
20.00%
304.58
03.07.03.03
TUBERIA DE PVC UF S-25 ISO 4435 Q6" EMPALME CAJA
DRENAJE
m 27.90 41.12 1,147.25
20.00%
229.45
20.00%
229.45
20.00%
229.45
20.00%
229.45
20.00%
229.45
03.07.04 OBRAS DE CONCRETO SIMPLE
03.07.04.01 CANAL DE CONCRETO F'C=210 KG/CM2 A=0.90m m3 3.24 282.65 915.79 20.00% 183.16 20.00% 183.16 20.00% 183.16 20.00% 183.16 20.00% 183.16
03.07.04.02 ACERO FY=4200 KG/CM2 kg 35.53 4.04 143.54 20.00% 28.71 20.00% 28.71 20.00% 28.71 20.00% 28.71 20.00% 28.71
03.07.04.03 CANAL DE CONCRETO F'C=210 KG/CM2 A=0.50m m3 1.85 279.95 517.91 20.00% 103.58 20.00% 103.58 20.00% 103.58 20.00% 103.58 20.00% 103.58
03.07.04.04 ACERO FY=4200 KG/CM2 kg 31.37 4.04 126.73 20.00% 25.35 20.00% 25.35 20.00% 25.35 20.00% 25.35 20.00% 25.35
03.07.04.05 ENCOFRADO Y DESENCOFRADO CANALES m2 85.85 46.14 3,961.12 20.00% 792.22 20.00% 792.22 20.00% 792.22 20.00% 792.22 20.00% 792.22
03.07.04.06 CONCRETO F'C=210 KG/CM2, PARA CAJA DE REBOSE m3 0.11 258.57 28.44 20.01% 5.69 20.01% 5.69 20.01% 5.69 20.01% 5.69 20.01% 5.69
03.07.04.07 ENCOFRADO Y DESENCOFRADO DE CAJAS REBOSES m2 4.48 46.14 206.71 20.00% 41.34 20.00% 41.34 20.00% 41.34 20.00% 41.34 20.00% 41.34
03.07.05 TAPA METALICA
03.07.05.01
TAPA METALICA (0.60x0.60) + MARCO METALICO
SUMINISTRO E INSTALACION
pza 1.00 259.87 259.87
20.00%
51.97
20.00%
51.97
20.00%
51.97
20.00%
51.97
20.00%
51.97
03.07.05.02 PINTURA ANTICORROSIVA EN ESMALTE P/METALES m2 0.72 5.88 4.23 20.09% 0.85 20.09% 0.85 20.09% 0.85 20.09% 0.85 20.09% 0.85
03.07.05.03
REJILLA METALICA CON PLATINA DE 1/4" A=0.50m CAJA
REBOSE
pza 2.00 66.22 132.44
20.00%
26.49
20.00%
26.49
20.00%
26.49
20.00%
26.49
20.00%
26.49
03.07.06 FILTROS
03.07.06.01 FILTRO DE GRAVA C/DREN CRIBADO m3 0.22 209.34 46.05 20.00% 9.21 20.00% 9.21 20.00% 9.21 20.00% 9.21 20.00% 9.21
03.07.07 ADITAMENTOS VARIOS
03.07.07.01
BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DE 4"
P/ANCLAJE
pza 1.00 159.74 159.74
20.00%
31.95
20.00%
31.95
20.00%
31.95
20.00%
31.95
20.00%
31.95
03.07.07.02 TUBERIA DE PVC SAL 4" VENTILACION pza 2.00 14.87 29.74 20.01% 5.95 20.01% 5.95 20.01% 5.95 20.01% 5.95 20.01% 5.95
03.07.07.03 ESCALERA TIPO MARINERA ALT. 2.0M und 1.00 443.94 443.94 20.00% 88.79 20.00% 88.79 20.00% 88.79 20.00% 88.79 20.00% 88.79
03.07.07.04 SISTEMA DE LLENADO P/CAMION CISTERNA Q 4" und 1.00 948.22 948.22 20.00% 189.64 20.00% 189.64 20.00% 189.64 20.00% 189.64 20.00% 189.64
03.07.07.05
CONEXION SIAMESA P/LLENADO POR COMPAÑIA DE
BOMBEROS
und 1.00 1,599.74 1,599.74
20.00%
319.95
20.00%
319.95
20.00%
319.95
20.00%
319.95
20.00%
319.95
03.07.07.06 VALVULA FLOTADORA C/BOYA DE COBRE Q3" pza 1.00 74.62 74.62 19.99% 14.92 19.99% 14.92 19.99% 14.92 19.99% 14.92 19.99% 14.92
03.07.07.07 TRANSICION DE FIERRO FUNDIDO A PVC SAP pza 1.00 114.74 114.74 20.00% 22.95 20.00% 22.95 20.00% 22.95 20.00% 22.95 20.00% 22.95
03.07.07.08
SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO
2 1/2"
pza 4.00 31.29 125.16
20.00%
25.03
20.00%
25.03
20.00%
25.03
20.00%
25.03
20.00%
25.03
03.07.07.09
ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y
DOS OREJAS TORNILLOS, 2 1/2"
pza 26.00 31.63 822.38
20.00%
164.48
20.00%
164.48
20.00%
164.48
20.00%
164.48
20.00%
164.48
03.08 SISTEMA DE DESAGUE, REVOSE Y AGUA PLUVIAL
03.08.01 TUBERIAS
03.08.01.01 TUBERIA DE PVC SAL 4" COLGADA m 10.60 14.96 158.58 25.00% 39.65 25.00% 39.65 25.00% 39.65 25.00% 39.65
12. Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
03.08.01.02 TUBERIA DE PVC SAL 4" ADOSADA A PARED m 3.60 14.96 53.86 25.01% 13.47 25.01% 13.47 25.01% 13.47 25.01% 13.47
03.08.01.03 TUBERIA DE PVC SAL 6" PROTEGIDA EN CONCRETO m 9.90 19.02 188.30 25.00% 47.08 25.00% 47.08 25.00% 47.08 25.00% 47.08
03.08.02 ACCESORIOS
03.08.02.01 TRAMPA "P" DE P.V.C. SAL 4" und 2.00 87.24 174.48 25.00% 43.62 25.00% 43.62 25.00% 43.62 25.00% 43.62
03.08.02.02 CODO PVC SAL 4"X45° pza 5.00 18.36 91.80 25.00% 22.95 25.00% 22.95 25.00% 22.95 25.00% 22.95
03.08.02.03 YEE PVC SAL 4" pza 1.00 18.25 18.25 24.99% 4.56 24.99% 4.56 24.99% 4.56 24.99% 4.56
03.08.02.04 REDUCCION PVC SAP 6" A 4" pza 1.00 118.74 118.74 25.00% 29.69 25.00% 29.69 25.00% 29.69 25.00% 29.69
03.08.02.05 CODO PVC SAL 4"X90° pza 2.00 18.36 36.72 25.00% 9.18 25.00% 9.18 25.00% 9.18 25.00% 9.18
03.08.03 ADITAMENTOS VARIOS
03.08.03.01 CANALETA DE FºGº P/DESAGUE DE LLUVIAS Q4" m 8.50 28.25 240.13 25.00% 60.03 25.00% 60.03 25.00% 60.03 25.00% 60.03
03.08.03.02
BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DE 6"
(150MM)
und 2.00 199.74 399.48
25.00%
99.87
25.00%
99.87
25.00%
99.87
25.00%
99.87
03.08.03.03 SUMIDERO DE BRONCE 4" PROVISION Y COLOCACION und 2.00 54.89 109.78 25.00% 27.45 25.00% 27.45 25.00% 27.45 25.00% 27.45
03.08.03.04
SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO
4"
pza 8.00 18.29 146.32
25.00%
36.58
25.00%
36.58
25.00%
36.58
25.00%
36.58
03.08.03.05 REBOSE TANQUE CISTERNA FºGº Q6" und 2.00 153.22 306.44 25.00% 76.61 25.00% 76.61 25.00% 76.61 25.00% 76.61
03.08.03.06
ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y
DOS OREJAS TORNILLOS, 4"
pza 3.00 27.77 83.31
25.00%
20.83
25.00%
20.83
25.00%
20.83
25.00%
20.83
03.09 SISTEMA DE BOMBEO DE AGUA POTABLE
03.09.01 EQUIPO MOTOR BOMBA AGUA POTABLE
03.09.01.01
EQUIPO DE BOMBEO CENTRIFUGO VERTICAL MULTIETAPA
P/AGUA HP=12.5, HDT=90 MCA INSTALACION ESPECIALIZADA
und 1.00 32,190.74 32,190.74
25.00%
8,047.69
25.00%
8,047.69
25.00%
8,047.69
25.00%
8,047.69
03.09.02
SUMINISTRO E INSTALACION DE TUBERIAS, VALVULAS Y
ACCESORIOS
03.09.02.01
MANOMETRO DOBLE LECTURA C/RANGO 0-300 LB/PULG2
INCL.ACCESORI
und 2.00 114.74 229.48
25.00%
57.37
25.00%
57.37
25.00%
57.37
25.00%
57.37
03.09.02.02 UNION FLEXIBLE TIPO DRESSER DN 80 pza 4.00 199.74 798.96 25.00% 199.74 25.00% 199.74 25.00% 199.74 25.00% 199.74
03.09.02.03 VALVULA CONTROL RETENCION ACTIVA DN 80 pza 3.00 319.74 959.22 25.00% 239.81 25.00% 239.81 25.00% 239.81 25.00% 239.81
03.09.02.04 VALVULA MARIPOSA TIPO WAFER DN 80 pza 2.00 299.74 599.48 25.00% 149.87 25.00% 149.87 25.00% 149.87 25.00% 149.87
03.09.02.05 BRIDA DE FIERRO FUNDIDO DUCTIL DN 80 pza 1.00 239.74 239.74 25.00% 59.94 25.00% 59.94 25.00% 59.94 25.00% 59.94
03.09.02.06 CODO DE FIERRO FUNDIDO DUCTIL BRIDADO DN80 x45º pza 2.00 129.74 259.48
25.00%
64.87
25.00%
64.87
25.00%
64.87
25.00%
64.87
03.09.02.07 CODO DE FIERRO FUNDIDO DUCTIL BRIDADO DN80 x90º pza 1.00 119.74 119.74
25.00%
29.94
25.00%
29.94
25.00%
29.94
25.00%
29.94
03.09.02.08 YEE DE FIERRO FUNDIDO BRIDADO DN80 pza 2.00 199.74 399.48 25.00% 99.87 25.00% 99.87 25.00% 99.87 25.00% 99.87
03.09.02.09 VALVULA DE ALIVIO DE PRESION pza 1.00 139.74 139.74 25.00% 34.94 25.00% 34.94 25.00% 34.94 25.00% 34.94
03.09.02.10 VALVULA DE AIRE COMBINADA BRIDADA, DN 50 PN 16 pza 1.00 159.74 159.74 25.00% 39.94 25.00% 39.94 25.00% 39.94 25.00% 39.94
03.09.02.11 TUBERIA FIE.FUNDIDO DUCTIL DN80 m 1.00 142.01 142.01 25.00% 35.50 25.00% 35.50 25.00% 35.50 25.00% 35.50
03.09.02.12 TEE C/REDUCCION BRIDADA DN80 A DN50 pza 1.00 99.94 99.94 25.01% 24.99 25.01% 24.99 25.01% 24.99 25.01% 24.99
03.09.02.13 VALVULA DE AIRE DOBLE EFECTO 2" C/ROSCA MACHO pza 1.00 159.74 159.74
25.00%
39.94
25.00%
39.94
25.00%
39.94
25.00%
39.94
04 INSTALACIONES ELECTRICAS
04.01 INTERRUPTOR TERMOMAGNETICO
04.01.01 INTERRUPTOR THERMOMAGNETICO 3x25 A x220V und 16.00 53.91 862.56 25.00% 215.64 25.00% 215.64 25.00% 215.64 25.00% 215.64
04.01.02 INTERRUPTOR THERMOMAGNETICA 3x30 A x220V und 23.00 66.52 1,529.96 25.00% 382.49 25.00% 382.49 25.00% 382.49 25.00% 382.49
04.01.03 INTERRUPTOR THERMOMAGNETICA 3x35 A x220V und 8.00 71.52 572.16 25.00% 143.04 25.00% 143.04 25.00% 143.04 25.00% 143.04
04.01.04 INTERRUPTOR THERMOMAGNETICA 3x50 A x220V und 2.00 81.52 163.04 25.00% 40.76 25.00% 40.76 25.00% 40.76 25.00% 40.76
04.01.05 INTERRUPTOR THERMOMAGNETICA 3x70 A x220V und 26.00 91.52 2,379.52 25.00% 594.88 25.00% 594.88 25.00% 594.88 25.00% 594.88
04.01.06 INTERRUPTOR THERMOMAGNETICO 2x10 A x 220 V und 119.00 41.52 4,940.88 25.00% 1,235.22 25.00% 1,235.22 25.00% 1,235.22 25.00% 1,235.22
04.01.07 INTERRUPTOR THERMOMAGNETICO 2x15 A x 220 V und 128.00 41.52 5,314.56 25.00% 1,328.64 25.00% 1,328.64 25.00% 1,328.64 25.00% 1,328.64
04.01.08 INTERRUPTOR THERMOMAGNETICO 2x20 A x240V und 120.00 41.52 4,982.40 25.00% 1,245.60 25.00% 1,245.60 25.00% 1,245.60 25.00% 1,245.60
04.01.09 INTERRUPTOR THERMOMAGNETICO 2x25 A x220V und 73.00 41.52 3,030.96 25.00% 757.74 25.00% 757.74 25.00% 757.74 25.00% 757.74
13. Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
04.01.10 INTERRUPTOR THERMOMAGNETICO 2x30 A x220V und 56.00 41.52 2,325.12 25.00% 581.28 25.00% 581.28 25.00% 581.28 25.00% 581.28
04.02 TABLEROS DE DISTRIBUCION
04.02.01
TABLERO DE DISTRIBUCION (T.D.), 20 POLOS, TRIFASICO 220
V
und 1.00 478.22 478.22
25.00%
119.56
25.00%
119.56
25.00%
119.56
25.00%
119.56
04.02.02
TABLERO DE DISTRIBUCION (T.D.), 12 POLOS, TRIFASICO 220
V
und 1.00 428.22 428.22
25.00%
107.06
25.00%
107.06
25.00%
107.06
25.00%
107.06
04.02.03
TABLERO DE DISTRIBUCION (T.D.), 10 POLOS, TRIFASICO 220
V
und 1.00 378.22 378.22
25.00%
94.56
25.00%
94.56
25.00%
94.56
25.00%
94.56
04.02.04
TABLERO DE DISTRIBUCION (T.D.), 8 POLOS, TRIFASICO 220
V
und 1.00 378.22 378.22
25.00%
94.56
25.00%
94.56
25.00%
94.56
25.00%
94.56
04.02.05
TABLERO DE DISTRIBUCION (T.D.), 20 POLOS, MONOFASICO
220 V
und 1.00 278.22 278.22
25.00%
69.56
25.00%
69.56
25.00%
69.56
25.00%
69.56
04.02.06
TABLERO DE DISTRIBUCION (T.D.), 12 POLOS, MONOFASICO
220 V
und 18.00 398.22 7,167.96
25.00%
1,791.99
25.00%
1,791.99
25.00%
1,791.99
25.00%
1,791.99
04.02.07
TABLERO DE DISTRIBUCION (T.D.), 10 POLOS, MONOFASICO
220 V
und 4.00 298.22 1,192.88
25.00%
298.22
25.00%
298.22
25.00%
298.22
25.00%
298.22
04.02.08
TABLERO DE DISTRIBUCION (T.D.), 8 POLOS, MONOFASICO
220 V
und 11.00 278.22 3,060.42
25.00%
765.11
25.00%
765.11
25.00%
765.11
25.00%
765.11
04.02.09
TABLERO DE DISTRIBUCION (T.D.), 6 POLOS, MONOFASICO
220 V
und 15.00 278.22 4,173.30
25.00%
1,043.33
25.00%
1,043.33
25.00%
1,043.33
25.00%
1,043.33
04.03 POZOS A TIERRA
04.03.01 POZO DE PUESTA A TIERRA GLB 2.00 1,435.59 2,871.18 25.00% 717.80 25.00% 717.80 25.00% 717.80 25.00% 717.80
04.04 RED ESTABILIZADA
04.04.01 INSTALACIONES ELECTRICAS
04.04.01.01 INSTALACION DE CAJAS OCTOGONALES und 1,815.00 8.91 16,171.65 25.00% 4,042.91 25.00% 4,042.91 25.00% 4,042.91 25.00% 4,042.91
04.04.01.02 INSTALACION DE CAJAS RECTANGULARES und 357.00 9.91 3,537.87 25.00% 884.47 25.00% 884.47 25.00% 884.47 25.00% 884.47
04.04.01.03
INSTALACION DE TOMACORRIENTES DOBLES CON TOMA A
TIERRA
und 66.00 11.91 786.06
25.00%
196.52
25.00%
196.52
25.00%
196.52
25.00%
196.52
04.04.01.04
INSTALACION DE TOMACORRIENTES CON TOMA A TIERRA
MODULAR EMPOTRADO A MUEBLE
und 260.00 21.91 5,696.60
25.00%
1,424.15
25.00%
1,424.15
25.00%
1,424.15
25.00%
1,424.15
04.04.01.05 INSTALACION DE CAJAS DE PASO und 156.00 26.21 4,088.76 25.00% 1,022.19 25.00% 1,022.19 25.00% 1,022.19 25.00% 1,022.19
04.04.02 CANALIZACIONES Y/O TUBERIAS
04.04.02.01 TUBERIA DE PVC SEL Q 18.75mm m 1,278.68 6.52 8,336.99 25.00% 2,084.25 25.00% 2,084.25 25.00% 2,084.25 25.00% 2,084.25
04.04.02.02 CURVA PVC SEL Q 3/4" und 256.34 5.05 1,294.52 25.00% 323.63 25.00% 323.63 25.00% 323.63 25.00% 323.63
04.04.03 CONDUCTORES Y/O CABLES
04.04.03.01 CABLEADO CONDUCTOR 4 mm2 NH80 m 3,330.00 3.41 11,355.30 25.00% 2,838.83 25.00% 2,838.83 25.00% 2,838.83 25.00% 2,838.83
04.04.03.02 CABLEADO CONDUCTOR 2.5 mm2 NH80 m 1,300.00 2.79 3,627.00 25.00% 906.75 25.00% 906.75 25.00% 906.75 25.00% 906.75
04.05 ALUMBRADO DORMITORIO
04.05.01 INSTALACIONES ELECTRICAS
04.05.01.01 INSTALACION DE CAJAS OCTOGONALES und 2,217.00 8.91 19,753.47 25.00% 4,938.37 25.00% 4,938.37 25.00% 4,938.37 25.00% 4,938.37
04.05.01.02 INSTALACION DE CAJAS RECTANGULARES und 857.00 9.91 8,492.87 25.00% 2,123.22 25.00% 2,123.22 25.00% 2,123.22 25.00% 2,123.22
04.05.01.03 INSTALACION DE INTERRUPTOR SIMPLE und 261.00 9.91 2,586.51 25.00% 646.63 25.00% 646.63 25.00% 646.63 25.00% 646.63
04.05.01.04 INSTALACION DE INTERRUPTOR DOBLE und 79.00 10.91 861.89 25.00% 215.47 25.00% 215.47 25.00% 215.47 25.00% 215.47
04.05.01.05
INSTALACION DE INTERRUPTOR CONMUTADOR 3 VIAS
SIMPLE
und 17.00 21.91 372.47
25.00%
93.12
25.00%
93.12
25.00%
93.12
25.00%
93.12
04.05.01.06
INSTALACION DE INTERRUPTOR CONMUTADOR 3 VIAS
DOBLE
und 128.00 25.91 3,316.48
25.00%
829.12
25.00%
829.12
25.00%
829.12
25.00%
829.12
04.05.01.07 INSTALACION DE TAPAS CIEGAS CIRCULARES und 49.00 3.96 194.04 25.00% 48.51 25.00% 48.51 25.00% 48.51 25.00% 48.51
04.05.02 CANALIZACIONES Y/O TUBERIAS
04.05.02.01 TUBERIA DE PVC SEL Q 18.75mm m 1,546.29 6.52 10,081.81 25.00% 2,520.45 25.00% 2,520.45 25.00% 2,520.45 25.00% 2,520.45
04.05.02.02 CURVA PVC SEL Q 3/4" und 568.00 5.05 2,868.40 25.00% 717.10 25.00% 717.10 25.00% 717.10 25.00% 717.10
04.05.03 CONDUCTORES Y/O CABLES
04.05.03.01 CABLEADO CONDUCTOR 4 mm2 NH80 m 4,890.00 3.41 16,674.90 25.00% 4,168.73 25.00% 4,168.73 25.00% 4,168.73 25.00% 4,168.73
14. Obra:
Departamento CAJAMARCA
Provincia SAN IGNACIO
Distrito SAN IGNACIO
Fecha Dic- 2023
Nº PARTIDA UND METRADO PRECIO PARCIAL Mes 1 Mes 2 Mes 3 Mes 4 Mes 5 Mes 6
UNITARIO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO % AVANCE MONTO
''CREACION DE EDIFICACION LOCALES COMERCIALES -HOTEL, EN EL SUB LOTE Nº01 – MZ ''M'',
SECTOR ''V'' SAN IGNACIO – DISTRITO Y PROVINCIA DE SAN IGNACIO – REGION CAJAMARCA''
CRONOGRAMA DE EJECUCIÒN VALORIZADO
04.06 ARTEFACTOS
04.06.01
LUMINARIA TIPO REJILLA ALUMINIZADA C/03 LAMPARA
FLUORESCENTE RECTO 4x28 W SYNTO LRC (EMPOTRADO)
und 80.00 197.13 15,770.40
50.00%
7,885.20
50.00%
7,885.20
04.06.02
SPOT LIGHT CIRCULAR ALUMINIZADO C/VIDRIO
SERIGRAFIADO 4mm C/01 LAMPARA FLUORESCENTE COMPACTA
1x18 W
und 352.00 41.73 14,688.96
50.00%
7,344.48
50.00%
7,344.48
04.06.03
LUMINARIA C/DIFUSOR PRISMATICO TRANSPARENTE C/02
LAMPARA FLUORESCENTE 2x36 W
und 14.00 197.13 2,759.82
50.00%
1,379.91
50.00%
1,379.91
04.06.04
LUMINARIA DE EMERGENCIA EQUIPO C/02 LAMPARAS DE 20
W
und 39.00 197.13 7,688.07
50.00%
3,844.04
50.00%
3,844.04
04.06.05
SPOT LIGHT CIRCULAR ALUMINIZADO C/VIDRIO
SERIGRAFIADO 4mm C/02 LAMPARA FLUORESCENTE COMPACTA
2x26 W
und 10.00 56.73 567.30
50.00%
283.65
50.00%
283.65
04.06.06
SPOT LIGHT CIRCULAR ALUMINIZADO C/VIDRIO
SERIGRAFIADO 4mm C/02 LAMPARA FLUORESCENTE COMPACTA
2x18 W
und 73.00 56.73 4,141.29
50.00%
2,070.65
50.00%
2,070.65
04.06.07 REFLECTOR ADOSADO C/LAMPARA T-150 W und 22.00 136.80 3,009.60 50.00% 1,504.80 50.00% 1,504.80
04.06.08
LUMINARIA DECORATIVA LAMPARA AHORRADORA
COMPACTA 20 W
und 20.00 97.13 1,942.60
50.00%
971.30
50.00%
971.30
04.07 CONDUCTORES Y/O CABLES
04.07.01 CABLEADO CONDUCTOR 6 mm2 NH80 m 852.00 3.40 2,896.80 50.00% 1,448.40 50.00% 1,448.40
04.07.02 CABLEADO CONDUCTOR 10 mm2 NH80 m 1,354.00 6.00 8,124.00 50.00% 4,062.00 50.00% 4,062.00
04.07.03 CABLEADO CONDUCTOR 16 mm2 NH80 m 800.00 8.30 6,640.00 50.00% 3,320.00 50.00% 3,320.00
04.07.04 CABLEADO CONDUCTOR 25 mm2 NH80 m 550.00 13.30 7,315.00 50.00% 3,657.50 50.00% 3,657.50
04.07.05 CABLEADO CONDUCTOR 35 mm2 NH80 m 100.00 18.80 1,880.00 50.00% 940.00 50.00% 940.00
04.08 VARIOS
04.08.01 SECADOR AUTOMATICO DE MANOS und 20.00 281.40 5,628.00 50.00% 2,814.00 50.00% 2,814.00
COSTO DIRECTO 2,053,292.16 278,575.64 222,965.12 327,963.11 366,684.56 537,508.75 319,594.98
GASTOS GENERALES (10.00%) 205,329.22 27,857.56 22,296.51 32,796.31 36,668.46 53,750.87 31,959.51
UTILIDAD (5.00%) 102,664.61 13,928.78 11,148.26 16,398.16 18,334.23 26,875.44 15,979.74
==========================
SUPERVISION (5.00%) 102,664.61 13,928.78 11,148.26 16,398.16 18,334.23 26,875.44 15,979.74
ESTUDIO TECNICO (2.50%) 51,332.30 51,332.30
==========================
TOTAL PRESUPUESTO 2,515,282.90 385,623.06 267,558.15 393,555.74 440,021.48 645,010.50 383513.97
% DE AVANCE 15.33% 10.64% 15.65% 17.49% 25.64% 15.25%
% DE AVANCE ACUMULADO 25.97% 41.62% 59.11% 84.75% 100.00%