Capacity Calculating
Calculating Bucket Elevator Capacity
STEP 1: Multiply the CAPACITY of the bucket times the NUMBER OF BUCKETS per foot (12 divided by spacing) times the
NUMBER OF ROWS of buckets. This will give the capacity in cubic inches of each running foot of the belt or chain.
STEP 2: Multiply the answer times the SPEED of the belt or chain in FPM for the capacity discharged per minute.
STEP 3: Then multiply by 60 minutes to get cubic inches per hour.
CONVERT CUBIC INCHES PER HOUR AS FOLLOWS:
BUSHELS: Divide by 2,150 to convert to bushels.
CUBIC FEET: Divide by 1,728 to convert to cubic feet.
SHORT TONS: Multiply cubic feet capacity times weight of product per cubic foot and divide by 2,000.
METRIC TONS: Multiply cubic feet capacity times weight of product per cubic foot and divide by 2,204.62.
For engineering purposes, Maxi-Lift recommends using water level capacity as the basis for calculation. Actual bucket fill
will vary depending on the product and operational conditions.
cu.in. / hour cu. in. / bushel BPH
cu.ft./ hr. weight of product / lbs. / hour lbs. / ton tons / hr.
cu. ft.
For BUSHELS Per Hour
For CUBIC FEET Per Hour
For SHORT TONS Per Hour
For METRIC TONS Per Hour
First determine cubic ft/hr. at water level using above formula then proceed as follows
Firstdeterminecubicft/hr.atwaterlevelusingaboveformulathenproceedasfollows
ENGINEERING:CALCULATINGCAPACITY
÷
x =
=
CALCULATING HORSEPOWER
W x H
HP (at head Shaft) = H = Vertical Lift In Feet
33,000
The above formula will result in the theoretical horsepower necessary. It is recommended that an additional 25%
minimum be added for drive losses and up to 15% for elevator friction and cup digging through the boot.
CAPACITY of the bucket at
water level (Cubic Inches)
NUMBER OF BUCKETS per
foot (12 ÷ spacing in Inches)
NUMBER OF ROWS of
buckets on the belt
SPEED of the belt or chain
FPM (Feet Per Minute)
CUBIC IN. PER HOUR
SEE BELOW FOR CONVERSION
_____________ X _____________ X ______________ X _____________ X 60
MINUTES
= ÷
2,150
2,000
cu.ft./ hr. weight of product / lbs. / hour lbs./ metric tons / hr.
cu. ft. metric ton
x == ÷
2,204.62
head pulley RPM in. / feet feet / min.
diameter (in.)
For FEET Per Minute
x ÷ =
123.1416
x
W =
lbs. / hour
60 minutes
cu.in. / hour cu. in. / cu. ft. cu. ft. / hour
÷ =
1728

More Related Content

Similar to Calculation

Watertaxi-3rd project presentation-BUET
Watertaxi-3rd project presentation-BUETWatertaxi-3rd project presentation-BUET
Watertaxi-3rd project presentation-BUETshisalsunny
 
Yarn calculations-130804183138-phpapp02
Yarn calculations-130804183138-phpapp02Yarn calculations-130804183138-phpapp02
Yarn calculations-130804183138-phpapp02
Md Rakibuzzaman
 
Kope winder or friction winder ppt
Kope winder or friction winder pptKope winder or friction winder ppt
Kope winder or friction winder ppt
AMIT SAHU
 
Yarn calculations By Samrat Dewan
Yarn calculations By Samrat DewanYarn calculations By Samrat Dewan
Yarn calculations By Samrat Dewan
Samrat Dewan
 
Basic E&Mcalculations for a coal mining project
Basic E&Mcalculations for a coal mining projectBasic E&Mcalculations for a coal mining project
Basic E&Mcalculations for a coal mining project
Singareni Collieries Company Limited
 
Coiled Tubing Introduction and Basics.pdf
Coiled Tubing Introduction and Basics.pdfCoiled Tubing Introduction and Basics.pdf
Coiled Tubing Introduction and Basics.pdf
salem123gmaal
 
Pump station design manual
Pump station design manualPump station design manual
Pump station design manual
Francis Mitchell
 
Design and development of hst transmission system @tafe
Design and development of hst transmission system @tafeDesign and development of hst transmission system @tafe
Design and development of hst transmission system @tafeAbhimanyu Jayakanth
 
Track and Minimize Pump Energy Consumption Using Variable Frequency Drives, F...
Track and Minimize Pump Energy Consumption Using Variable Frequency Drives, F...Track and Minimize Pump Energy Consumption Using Variable Frequency Drives, F...
Track and Minimize Pump Energy Consumption Using Variable Frequency Drives, F...
Jim Mimlitz, P.E.
 
Truk sampah heil dp python
Truk sampah heil dp pythonTruk sampah heil dp python
Truk sampah heil dp python
Prayitno Tarakan
 
Lec18 pipeline
Lec18 pipelineLec18 pipeline
Lec18 pipeline
GRajendra
 
MODULE 04 HYDRAULIC CALCULATION.pdf
MODULE 04 HYDRAULIC CALCULATION.pdfMODULE 04 HYDRAULIC CALCULATION.pdf
MODULE 04 HYDRAULIC CALCULATION.pdf
ssuser0aa2d5
 
Textile Calculations and Equations
Textile  Calculations and EquationsTextile  Calculations and Equations
Textile Calculations and Equations
Md. Mazadul Hasan Shishir
 
Determining equipment design parameters for overhead conveyors
Determining equipment design parameters for overhead conveyorsDetermining equipment design parameters for overhead conveyors
Determining equipment design parameters for overhead conveyorsphysics101
 
trainingonchp-170107190647.pdf
trainingonchp-170107190647.pdftrainingonchp-170107190647.pdf
trainingonchp-170107190647.pdf
DINESHRANJANPAL
 
Particle Technology- Centrifugal Separation
Particle Technology- Centrifugal SeparationParticle Technology- Centrifugal Separation
Particle Technology- Centrifugal Separation
The Engineering Centre for Excellence in Teaching and Learning
 
CHP
CHP CHP

Similar to Calculation (20)

Watertaxi-3rd project presentation-BUET
Watertaxi-3rd project presentation-BUETWatertaxi-3rd project presentation-BUET
Watertaxi-3rd project presentation-BUET
 
Yarn calculations-130804183138-phpapp02
Yarn calculations-130804183138-phpapp02Yarn calculations-130804183138-phpapp02
Yarn calculations-130804183138-phpapp02
 
Kope winder or friction winder ppt
Kope winder or friction winder pptKope winder or friction winder ppt
Kope winder or friction winder ppt
 
Yarn calculations By Samrat Dewan
Yarn calculations By Samrat DewanYarn calculations By Samrat Dewan
Yarn calculations By Samrat Dewan
 
SOME 2015-Mizan
SOME 2015-MizanSOME 2015-Mizan
SOME 2015-Mizan
 
Basic E&Mcalculations for a coal mining project
Basic E&Mcalculations for a coal mining projectBasic E&Mcalculations for a coal mining project
Basic E&Mcalculations for a coal mining project
 
Coiled Tubing Introduction and Basics.pdf
Coiled Tubing Introduction and Basics.pdfCoiled Tubing Introduction and Basics.pdf
Coiled Tubing Introduction and Basics.pdf
 
99 digmix
99 digmix99 digmix
99 digmix
 
Pump station design manual
Pump station design manualPump station design manual
Pump station design manual
 
Design and development of hst transmission system @tafe
Design and development of hst transmission system @tafeDesign and development of hst transmission system @tafe
Design and development of hst transmission system @tafe
 
Track and Minimize Pump Energy Consumption Using Variable Frequency Drives, F...
Track and Minimize Pump Energy Consumption Using Variable Frequency Drives, F...Track and Minimize Pump Energy Consumption Using Variable Frequency Drives, F...
Track and Minimize Pump Energy Consumption Using Variable Frequency Drives, F...
 
Truk sampah heil dp python
Truk sampah heil dp pythonTruk sampah heil dp python
Truk sampah heil dp python
 
Lec18 pipeline
Lec18 pipelineLec18 pipeline
Lec18 pipeline
 
MODULE 04 HYDRAULIC CALCULATION.pdf
MODULE 04 HYDRAULIC CALCULATION.pdfMODULE 04 HYDRAULIC CALCULATION.pdf
MODULE 04 HYDRAULIC CALCULATION.pdf
 
Textile Calculations and Equations
Textile  Calculations and EquationsTextile  Calculations and Equations
Textile Calculations and Equations
 
Determining equipment design parameters for overhead conveyors
Determining equipment design parameters for overhead conveyorsDetermining equipment design parameters for overhead conveyors
Determining equipment design parameters for overhead conveyors
 
trainingonchp-170107190647.pdf
trainingonchp-170107190647.pdftrainingonchp-170107190647.pdf
trainingonchp-170107190647.pdf
 
Unscrambler Project
Unscrambler ProjectUnscrambler Project
Unscrambler Project
 
Particle Technology- Centrifugal Separation
Particle Technology- Centrifugal SeparationParticle Technology- Centrifugal Separation
Particle Technology- Centrifugal Separation
 
CHP
CHP CHP
CHP
 

Calculation

  • 1. 57 Call: 1-800-527-0657 or Visit Us Online at: www.maxilift.com 16400 Midway Rd Dallas, TX 75001 • Ph: (972)735-8855 Fx: (972)735-8896 • info@maxilift.com Capacity Calculating Calculating Bucket Elevator Capacity STEP 1: Multiply the CAPACITY of the bucket times the NUMBER OF BUCKETS per foot (12 divided by spacing) times the NUMBER OF ROWS of buckets. This will give the capacity in cubic inches of each running foot of the belt or chain. STEP 2: Multiply the answer times the SPEED of the belt or chain in FPM for the capacity discharged per minute. STEP 3: Then multiply by 60 minutes to get cubic inches per hour. CONVERT CUBIC INCHES PER HOUR AS FOLLOWS: BUSHELS: Divide by 2,150 to convert to bushels. CUBIC FEET: Divide by 1,728 to convert to cubic feet. SHORT TONS: Multiply cubic feet capacity times weight of product per cubic foot and divide by 2,000. METRIC TONS: Multiply cubic feet capacity times weight of product per cubic foot and divide by 2,204.62. For engineering purposes, Maxi-Lift recommends using water level capacity as the basis for calculation. Actual bucket fill will vary depending on the product and operational conditions. cu.in. / hour cu. in. / bushel BPH cu.ft./ hr. weight of product / lbs. / hour lbs. / ton tons / hr. cu. ft. For BUSHELS Per Hour For CUBIC FEET Per Hour For SHORT TONS Per Hour For METRIC TONS Per Hour First determine cubic ft/hr. at water level using above formula then proceed as follows Firstdeterminecubicft/hr.atwaterlevelusingaboveformulathenproceedasfollows ENGINEERING:CALCULATINGCAPACITY ÷ x = = CALCULATING HORSEPOWER W x H HP (at head Shaft) = H = Vertical Lift In Feet 33,000 The above formula will result in the theoretical horsepower necessary. It is recommended that an additional 25% minimum be added for drive losses and up to 15% for elevator friction and cup digging through the boot. CAPACITY of the bucket at water level (Cubic Inches) NUMBER OF BUCKETS per foot (12 ÷ spacing in Inches) NUMBER OF ROWS of buckets on the belt SPEED of the belt or chain FPM (Feet Per Minute) CUBIC IN. PER HOUR SEE BELOW FOR CONVERSION _____________ X _____________ X ______________ X _____________ X 60 MINUTES = ÷ 2,150 2,000 cu.ft./ hr. weight of product / lbs. / hour lbs./ metric tons / hr. cu. ft. metric ton x == ÷ 2,204.62 head pulley RPM in. / feet feet / min. diameter (in.) For FEET Per Minute x ÷ = 123.1416 x W = lbs. / hour 60 minutes cu.in. / hour cu. in. / cu. ft. cu. ft. / hour ÷ = 1728