Control Room Critical Situation and Emergency ACTIVITY REPORT
A6
ACTIVITY REPORT
Evidence Ref.
No.
A6
DESCRIPTIONOF TASKS:
Take part in a Control Room Critical Situation and
Emergency
Name: Bryar Fariq Hamma
Date:5/4/2015 Page 1 of
SYSTEM SKETCH
MAIN HEADINGS FOR ACTIVITIES EQUIPMENT
INTRODUCTION
Control Room
Simulation,
Radios
ACTIONS
SUMMARY
HEALTH & SAFETY:
1. Proper communications and safe systems of work,
2. Good housekeeping standards.
INSTRUCTOR/ASSESSOR/VALIDATOR COMMENTS:
Control Room Critical Situation and Emergency ACTIVITY REPORT
A6
Bryar fariq
Before I start we’re given an introduction on the system by the instructor, a short and
understandable brief about all the different visual aids which mounted around the room and
how to recognize the differentmodules of that platform called ‘’Generic Alfa’’ the platform was
divided into 6 modules which are: process module, well bay, utilities, power module, gas
treatment, water injection module and main deck. In addition with accommodation block. After
I realized that I can familiarize myself with the modules and the system in other way to get into
with the system more and also to adopt with the critical and emergency situation the instructor
called me for practicing. At first I had to identify the status and the location of an alarm on the
platform, the first alarm was sounded was a low gas alarm so that I radioed through to the
Tech Ops 1 and asked them to investigate it, TechOps 1 confirmed the received the message
and stated they were going to take Tech Ops 2 with them. When they arrived the exact
location they reported that the pipe in the module had burst and gas was escaping from it. The
situation then became an explosion in the process module. Multiple alarm in each corner of
the process module went off showed high gas, I gave an order for the Tech Ops team to get
out from the process module and get to the nearest master point, however I had no response
from them. With the potential to have casualties I decided the best action to make is the
complete shut down and blow down of the system. After the shutdown initiated, I activated the
general platform alarm (GPG) and put an announcement for all personnel to go to the master
points. The dumpers inside the process module were then activated to contain the fire within
the process module. And the deluge system was set off in an attempt to extinguish the fire in
the process module.
Called to ‘’Grampian warrior’’ the stand by boat, informed about the situation and he called
back that he received my message and stated that he was going to adopt with a new position
around the area and wait for further instruction.
The OIM was the phoned and after I updated him about the entire situation and the action that
had been taken. Then radioed to the master checker to find out if we have any missing
personnel, I was given 2 names, so I put an announcement over PA system for 2 individuals
to join their nearest master point, but unfortunately I received no answer.
Contact radio was made with the emergency response team (ERT) and briefed them about
the situation, they radioed back and stated that they are fully prepared and waiting for any
command. Then OIM once again called and told him the (ERT) were standing by and waiting
for any action. But watching that the blow down was not yet complete so the OIM refused to
let the (ERT) to inter the process module until the blow down was complete.
Radioed to the medic just to stand by and be ready for any potential casualties that may be
presentin the area, they reported back and stated that their full team are ready and wait for
command.After that i looked on the screennoticed that blow down has beencomplete and
tow of the high gas alarms disappeared only two low gas was left. Contacted to OIM and
updated the situation for any action to be taken, He instructed me to give the permissionto
the ERT to set up a forward control point and asked me to keep an eye on the screenonce
another low gas disappeared (only one left) give the full permissionto the emergency
Control Room Critical Situation and Emergency ACTIVITY REPORT
A6
response team (ERT) to inter the area, they Radioed and stated they are ready with BA
apparatus and set up a control forward in the designated location and wait for the command.
After the processmodule became clear and the was no gas alarm left and gave permissionto
ERT to inter the area then i waited them to radio me and give me an update about the area
and missing persons.Aftera short while the ERT team leader radioed and said they’ve
located the missing persons and need an immediate help, seeing that the medic team was
necessaryi contacted to OIM if he allow the medic team to get the area to treat casualties or
no, i got yes from OIM and radioed once to the medic to make their way immediatelyto FCP.
Grampian warrior then contacted and beentold that the situation is under control and it’s safe
to get back to their original place. I then received confirmation from them that warrior had
obtained the message and relocate to their original location around Generic Alfa.
It was at this point the instructor said exercise is over, complete recordings showing the
alarms that have been sounded and the response time for each action can be found in the
page below.

More Related Content

Featured

Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
Skeleton Technologies
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
SpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Lily Ray
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
Rajiv Jayarajah, MAppComm, ACC
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
Christy Abraham Joy
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
Vit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
MindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Applitools
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
GetSmarter
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
Alireza Esmikhani
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
Project for Public Spaces & National Center for Biking and Walking
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
DevGAMM Conference
 

Featured (20)

Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
 

Bryar FariqEmergency Response

  • 1. Control Room Critical Situation and Emergency ACTIVITY REPORT A6 ACTIVITY REPORT Evidence Ref. No. A6 DESCRIPTIONOF TASKS: Take part in a Control Room Critical Situation and Emergency Name: Bryar Fariq Hamma Date:5/4/2015 Page 1 of SYSTEM SKETCH MAIN HEADINGS FOR ACTIVITIES EQUIPMENT INTRODUCTION Control Room Simulation, Radios ACTIONS SUMMARY HEALTH & SAFETY: 1. Proper communications and safe systems of work, 2. Good housekeeping standards. INSTRUCTOR/ASSESSOR/VALIDATOR COMMENTS:
  • 2. Control Room Critical Situation and Emergency ACTIVITY REPORT A6 Bryar fariq Before I start we’re given an introduction on the system by the instructor, a short and understandable brief about all the different visual aids which mounted around the room and how to recognize the differentmodules of that platform called ‘’Generic Alfa’’ the platform was divided into 6 modules which are: process module, well bay, utilities, power module, gas treatment, water injection module and main deck. In addition with accommodation block. After I realized that I can familiarize myself with the modules and the system in other way to get into with the system more and also to adopt with the critical and emergency situation the instructor called me for practicing. At first I had to identify the status and the location of an alarm on the platform, the first alarm was sounded was a low gas alarm so that I radioed through to the Tech Ops 1 and asked them to investigate it, TechOps 1 confirmed the received the message and stated they were going to take Tech Ops 2 with them. When they arrived the exact location they reported that the pipe in the module had burst and gas was escaping from it. The situation then became an explosion in the process module. Multiple alarm in each corner of the process module went off showed high gas, I gave an order for the Tech Ops team to get out from the process module and get to the nearest master point, however I had no response from them. With the potential to have casualties I decided the best action to make is the complete shut down and blow down of the system. After the shutdown initiated, I activated the general platform alarm (GPG) and put an announcement for all personnel to go to the master points. The dumpers inside the process module were then activated to contain the fire within the process module. And the deluge system was set off in an attempt to extinguish the fire in the process module. Called to ‘’Grampian warrior’’ the stand by boat, informed about the situation and he called back that he received my message and stated that he was going to adopt with a new position around the area and wait for further instruction. The OIM was the phoned and after I updated him about the entire situation and the action that had been taken. Then radioed to the master checker to find out if we have any missing personnel, I was given 2 names, so I put an announcement over PA system for 2 individuals to join their nearest master point, but unfortunately I received no answer. Contact radio was made with the emergency response team (ERT) and briefed them about the situation, they radioed back and stated that they are fully prepared and waiting for any command. Then OIM once again called and told him the (ERT) were standing by and waiting for any action. But watching that the blow down was not yet complete so the OIM refused to let the (ERT) to inter the process module until the blow down was complete. Radioed to the medic just to stand by and be ready for any potential casualties that may be presentin the area, they reported back and stated that their full team are ready and wait for command.After that i looked on the screennoticed that blow down has beencomplete and tow of the high gas alarms disappeared only two low gas was left. Contacted to OIM and updated the situation for any action to be taken, He instructed me to give the permissionto the ERT to set up a forward control point and asked me to keep an eye on the screenonce another low gas disappeared (only one left) give the full permissionto the emergency
  • 3. Control Room Critical Situation and Emergency ACTIVITY REPORT A6 response team (ERT) to inter the area, they Radioed and stated they are ready with BA apparatus and set up a control forward in the designated location and wait for the command. After the processmodule became clear and the was no gas alarm left and gave permissionto ERT to inter the area then i waited them to radio me and give me an update about the area and missing persons.Aftera short while the ERT team leader radioed and said they’ve located the missing persons and need an immediate help, seeing that the medic team was necessaryi contacted to OIM if he allow the medic team to get the area to treat casualties or no, i got yes from OIM and radioed once to the medic to make their way immediatelyto FCP. Grampian warrior then contacted and beentold that the situation is under control and it’s safe to get back to their original place. I then received confirmation from them that warrior had obtained the message and relocate to their original location around Generic Alfa. It was at this point the instructor said exercise is over, complete recordings showing the alarms that have been sounded and the response time for each action can be found in the page below.