The document summarizes the construction progress of a new corporate office and production facility over several months. Updates include framing of front offices and break room in March, demolition beginning later that month, cutting cement in April for new printing presses, walls going up for the data center throughout April, and various areas like accounting offices, training room, and laser room being installed through June. The facility is preparing to house expanded production, accounting, creative services, and data processing operations.
The document provides updates on the construction progress of a new corporate office and production facility over the course of several months. Construction included framing the front offices and break room, demolishing existing areas, installing fire alarms, cutting cement for new printing presses, building walls for the data center out of insulating concrete forms, pouring cement for the printing press footings, installing ductwork and wiring, and assembling furniture. Offices, production areas, and departments were taking shape throughout the construction process.
The document provides updates on the construction and build out of a new corporate office and production facility for PrimeNet Direct Marketing Solutions over the course of several months. Key areas being constructed include a data center, production floor, offices, conference rooms, and cubicles for account management. Construction includes installing walls, ceilings, wiring, furniture and equipment.
The document provides updates on the construction and build out of a new corporate office and production facility for PrimeNet Direct Marketing Solutions over the course of several months. Key areas being constructed include a data center, production floor, offices, conference rooms, and cubicles for account management. Updates include installing walls, ceilings, floors, furniture and equipment as the facility is prepared for operations.
The document provides updates on the construction and development of a new corporate office and production facility for PrimeNet Direct Marketing Solutions over the course of several months. It details the construction of various areas in the new building including production floors, data centers, offices, conference rooms, and the installation of new printing presses. Photos show the construction progress including framing, electrical work, concrete pouring, and other details of the facility being prepared for occupancy.
The document outlines a marketing plan to promote new products using social media. Key elements of the plan include creating a Facebook page and using incentives to promote products, putting videos on YouTube and promoting on Facebook, listening to feedback on social media, holding launch events for customers to try products, and creating games on Facebook for consumers to play and win products. The plan will measure success based on numbers of Facebook likes, sales increases, customer registrations, social media comments, and game participation. It also includes allowing different age groups to trial products for a month and providing feedback to improve the products.
Mi familia consiste en mis padres y mis dos hermanos menores. Vivimos todos juntos en una casa en las afueras de la ciudad. Somos una familia unida que nos apoyamos los unos a los otros.
The document provides updates on the construction and development of a new corporate office and production facility for PrimeNet Direct Marketing Solutions over the course of several months. It details the construction of various areas in the new building including production floors, data centers, offices, conference rooms, and more. Photos show the construction progress including framing, electrical work, concrete pouring, and other details of readying the new space for occupancy.
The document provides updates on the construction progress of a new corporate office and production facility over the course of several months. Construction included framing the front offices and break room, demolishing existing areas, installing fire alarms, cutting cement for new printing presses, building walls for the data center out of insulating concrete forms, pouring cement for the printing press footings, installing ductwork and wiring, and assembling furniture. Offices, production areas, and departments were taking shape throughout the construction process.
The document provides updates on the construction and build out of a new corporate office and production facility for PrimeNet Direct Marketing Solutions over the course of several months. Key areas being constructed include a data center, production floor, offices, conference rooms, and cubicles for account management. Construction includes installing walls, ceilings, wiring, furniture and equipment.
The document provides updates on the construction and build out of a new corporate office and production facility for PrimeNet Direct Marketing Solutions over the course of several months. Key areas being constructed include a data center, production floor, offices, conference rooms, and cubicles for account management. Updates include installing walls, ceilings, floors, furniture and equipment as the facility is prepared for operations.
The document provides updates on the construction and development of a new corporate office and production facility for PrimeNet Direct Marketing Solutions over the course of several months. It details the construction of various areas in the new building including production floors, data centers, offices, conference rooms, and the installation of new printing presses. Photos show the construction progress including framing, electrical work, concrete pouring, and other details of the facility being prepared for occupancy.
The document outlines a marketing plan to promote new products using social media. Key elements of the plan include creating a Facebook page and using incentives to promote products, putting videos on YouTube and promoting on Facebook, listening to feedback on social media, holding launch events for customers to try products, and creating games on Facebook for consumers to play and win products. The plan will measure success based on numbers of Facebook likes, sales increases, customer registrations, social media comments, and game participation. It also includes allowing different age groups to trial products for a month and providing feedback to improve the products.
Mi familia consiste en mis padres y mis dos hermanos menores. Vivimos todos juntos en una casa en las afueras de la ciudad. Somos una familia unida que nos apoyamos los unos a los otros.
The document provides updates on the construction and development of a new corporate office and production facility for PrimeNet Direct Marketing Solutions over the course of several months. It details the construction of various areas in the new building including production floors, data centers, offices, conference rooms, and more. Photos show the construction progress including framing, electrical work, concrete pouring, and other details of readying the new space for occupancy.
This document describes a web tool called GPDEF that assists users in writing software development specifications through an online wizard. The wizard guides users through various steps to develop their project's specification, including defining project information, keywords, organization, menus, risks, and more. Registration for the tool is free for the first month. The tool aims to simplify the specification writing process and provides multilingual support and secure sharing capabilities.
The document describes the ongoing construction of a new corporate office and production facility for PrimeNet Direct Marketing Solutions over the period of March 2011 to June 2011. Updates are provided on the construction of various areas of the new building including the production floor, data center, offices, and installation of new printing presses. The final sections provide photos of areas that have been completed including the break room, training room, laser room, and the new Heidelberg printing press that is ready for use.
This document summarizes a 1-hour course on how to read head CT scans for emergency physicians. The course aims to help physicians improve their ability to interpret cranial CT scans by explaining the physics of CT scanning, reviewing normal brain anatomy, and presenting cases of pathologies commonly missed on scans. These pathologies include fractures, hemorrhages, infarcts, edema, hygromas, and shear injuries. Methods for avoiding interpretation errors will also be discussed.
The document contains definitions and diagrams related to concepts in microeconomics, macroeconomics, and economic growth. It includes definitions of cost theory, revenue theory, profit theory, and other microeconomic concepts. It also defines macroeconomic terms like GDP, GNP, aggregate demand, aggregate supply, and business cycles. Finally, it outlines different economic perspectives like neoclassical and Keynesian and includes diagrams to illustrate macroeconomic concepts such as the multiplier effect, crowding-out effect, and the Phillips curve.
This document provides a 4-step process for exporting contacts from the C21 website: navigate to the website and login, click the Export Contacts button, click the Begin Export button, and save the resulting .csv file to your computer. The .csv file containing the contact list can then be opened in Excel or similar program. The document closes by reminding the user to save their contact lists regularly since they are important.
You want your software project development to be successful ?
Our experience in project management show us that most of failed projects had a bad scope definition.
GPDef is a result of 20 years experience in project management using well-known methodologies mixed with our own way to define and understand project definition.
This tool assists you in editing system requirement to drive your sofware development project to success.
Through 10 steps, GPDef helps you to cope with a wide set of issues related to any software development. GPDef is designed to allow several people to work together on a shared project at any time and any step. The global and detailed system requirement released will allow any professional developer to bring the right answers to your needs.
1. Tooth impaction occurs when a tooth fails to erupt into its normal functional position due to a physical barrier or ectopic position. Maxillary and mandibular third molars are most commonly impacted.
2. Factors that can cause impaction include lack of space, abnormal tooth angulation, obstruction of the eruption pathway, late tooth mineralization, and genetic/systemic conditions.
3. Impacted mandibular third molars pose surgical challenges due to their location near important anatomical structures like the inferior alveolar nerve. Their position must be carefully evaluated radiographically prior to removal.
Collagen sutures are made from bovine or equine collagen. They are absorbable and elicit a mild foreign body reaction. Collagen sutures are absorbed slowly by the body over 60-90 days as the collagen is broken down. They have good handling properties and knot security. Common uses include skin closure and plastic surgery procedures.
http://inarocket.com
Learn BEM fundamentals as fast as possible. What is BEM (Block, element, modifier), BEM syntax, how it works with a real example, etc.
How to Build a Dynamic Social Media PlanPost Planner
Stop guessing and wasting your time on networks and strategies that don’t work!
Join Rebekah Radice and Katie Lance to learn how to optimize your social networks, the best kept secrets for hot content, top time management tools, and much more!
Watch the replay here: bit.ly/socialmedia-plan
The document discusses how personalization and dynamic content are becoming increasingly important on websites. It notes that 52% of marketers see content personalization as critical and 75% of consumers like it when brands personalize their content. However, personalization can create issues for search engine optimization as dynamic URLs and content are more difficult for search engines to index than static pages. The document provides tips for SEOs to help address these personalization and SEO challenges, such as using static URLs when possible and submitting accurate sitemaps.
Lightning Talk #9: How UX and Data Storytelling Can Shape Policy by Mika Aldabaux singapore
How can we take UX and Data Storytelling out of the tech context and use them to change the way government behaves?
Showcasing the truth is the highest goal of data storytelling. Because the design of a chart can affect the interpretation of data in a major way, one must wield visual tools with care and deliberation. Using quantitative facts to evoke an emotional response is best achieved with the combination of UX and data storytelling.
This document summarizes a study of CEO succession events among the largest 100 U.S. corporations between 2005-2015. The study analyzed executives who were passed over for the CEO role ("succession losers") and their subsequent careers. It found that 74% of passed over executives left their companies, with 30% eventually becoming CEOs elsewhere. However, companies led by succession losers saw average stock price declines of 13% over 3 years, compared to gains for companies whose CEO selections remained unchanged. The findings suggest that boards generally identify the most qualified CEO candidates, though differences between internal and external hires complicate comparisons.
This document provides an introduction to web design and the components that make up the web. It discusses the history of the web and how Tim Berners-Lee invented the World Wide Web in 1989 while working at CERN. It also summarizes the main components of the web including clients and servers, internet service providers, web hosting services, domain names and URLs, and registrars. Finally, it provides an overview of HTML and some basic HTML tags for formatting text, links, lists, tables and more.
The document discusses integrating an Excel spreadsheet into a Microsoft Access database. It describes the tools used, including Microsoft Access 2007, 2010, and Excel 2007 and 2010. Some common problems that can occur during import are discussed, such as missing column headings, empty spaces, and formatting errors with dates and times. Solutions for resolving these problems, such as manual corrections and using Access 2010 features, are provided. A live demonstration of the integration process is also included.
Swiss pass chapter deck - zurich - april 2011Charley Hanania
The Swiss PASS Chapter meeting in April focused on PowerPivot. The agenda included welcome and introductions, refreshments and networking, and two sessions - the first on how database administrators can use PowerPivot for performance tuning and troubleshooting, and the second on how the new BI Semantic Model in SQL Server Denali will impact BI solution design. Both sessions included demos and discussions. The meeting provided an opportunity for SQL professionals to learn and network.
The document is a curriculum vitae for Pasquale Vaira. It summarizes his work experience over 20 years developing ETL procedures and data warehousing solutions using tools like Informatica Powercenter, Oracle Data Integrator, DataStage, and Teradata. His experience includes roles at companies in industries like energy & utilities, telecommunications, banking, and manufacturing.
Abilitics-Microsoft Days 11-Case Ctudy: Where SharePoint, Silverlight & BI me...Veselin Georgiev
This document outlines a solution that brings together SharePoint, Silverlight, and business intelligence (BI) technologies to enable sales pipeline management and project management automation. It describes how Excel data can be imported into SharePoint lists, a custom Silverlight application can be used for data management, and documents can be generated from templates. The solution architecture diagram shows how data from multiple sources is organized into multidimensional cubes for reporting in Excel, Excel Services and PerformancePoint Services.
Giancarlo Ronci has over 15 years of experience in business intelligence, data warehousing, and ETL. He has worked on numerous projects for companies like Unicredit, Telecom, and Vodafone, taking on roles like project manager, technical analyst, developer, and team lead. His technical skills include Teradata, SAS, Oracle, IBM DB2, and Datastage.
Constructive Workspace provides various interior design, space planning, and facilities management services. They aim to create inspirational and sustainable work environments that support business strategy. The document discusses a case study of Constructive renovating and optimizing the workspace for Charities Aid Foundation, including reconfiguring furniture for increased efficiency while maintaining the building's character. It also discusses preliminary concepts and analyses for potential projects with St. John Ambulance and Pharo Management that would involve refurbishing or relocating to new premises.
Slides from the annual Charities & Not For Profit Best Practice Forum. The Forum highlighted the pro & con\'s of relocation verses refurbishment whilst in situ.
This document describes a web tool called GPDEF that assists users in writing software development specifications through an online wizard. The wizard guides users through various steps to develop their project's specification, including defining project information, keywords, organization, menus, risks, and more. Registration for the tool is free for the first month. The tool aims to simplify the specification writing process and provides multilingual support and secure sharing capabilities.
The document describes the ongoing construction of a new corporate office and production facility for PrimeNet Direct Marketing Solutions over the period of March 2011 to June 2011. Updates are provided on the construction of various areas of the new building including the production floor, data center, offices, and installation of new printing presses. The final sections provide photos of areas that have been completed including the break room, training room, laser room, and the new Heidelberg printing press that is ready for use.
This document summarizes a 1-hour course on how to read head CT scans for emergency physicians. The course aims to help physicians improve their ability to interpret cranial CT scans by explaining the physics of CT scanning, reviewing normal brain anatomy, and presenting cases of pathologies commonly missed on scans. These pathologies include fractures, hemorrhages, infarcts, edema, hygromas, and shear injuries. Methods for avoiding interpretation errors will also be discussed.
The document contains definitions and diagrams related to concepts in microeconomics, macroeconomics, and economic growth. It includes definitions of cost theory, revenue theory, profit theory, and other microeconomic concepts. It also defines macroeconomic terms like GDP, GNP, aggregate demand, aggregate supply, and business cycles. Finally, it outlines different economic perspectives like neoclassical and Keynesian and includes diagrams to illustrate macroeconomic concepts such as the multiplier effect, crowding-out effect, and the Phillips curve.
This document provides a 4-step process for exporting contacts from the C21 website: navigate to the website and login, click the Export Contacts button, click the Begin Export button, and save the resulting .csv file to your computer. The .csv file containing the contact list can then be opened in Excel or similar program. The document closes by reminding the user to save their contact lists regularly since they are important.
You want your software project development to be successful ?
Our experience in project management show us that most of failed projects had a bad scope definition.
GPDef is a result of 20 years experience in project management using well-known methodologies mixed with our own way to define and understand project definition.
This tool assists you in editing system requirement to drive your sofware development project to success.
Through 10 steps, GPDef helps you to cope with a wide set of issues related to any software development. GPDef is designed to allow several people to work together on a shared project at any time and any step. The global and detailed system requirement released will allow any professional developer to bring the right answers to your needs.
1. Tooth impaction occurs when a tooth fails to erupt into its normal functional position due to a physical barrier or ectopic position. Maxillary and mandibular third molars are most commonly impacted.
2. Factors that can cause impaction include lack of space, abnormal tooth angulation, obstruction of the eruption pathway, late tooth mineralization, and genetic/systemic conditions.
3. Impacted mandibular third molars pose surgical challenges due to their location near important anatomical structures like the inferior alveolar nerve. Their position must be carefully evaluated radiographically prior to removal.
Collagen sutures are made from bovine or equine collagen. They are absorbable and elicit a mild foreign body reaction. Collagen sutures are absorbed slowly by the body over 60-90 days as the collagen is broken down. They have good handling properties and knot security. Common uses include skin closure and plastic surgery procedures.
http://inarocket.com
Learn BEM fundamentals as fast as possible. What is BEM (Block, element, modifier), BEM syntax, how it works with a real example, etc.
How to Build a Dynamic Social Media PlanPost Planner
Stop guessing and wasting your time on networks and strategies that don’t work!
Join Rebekah Radice and Katie Lance to learn how to optimize your social networks, the best kept secrets for hot content, top time management tools, and much more!
Watch the replay here: bit.ly/socialmedia-plan
The document discusses how personalization and dynamic content are becoming increasingly important on websites. It notes that 52% of marketers see content personalization as critical and 75% of consumers like it when brands personalize their content. However, personalization can create issues for search engine optimization as dynamic URLs and content are more difficult for search engines to index than static pages. The document provides tips for SEOs to help address these personalization and SEO challenges, such as using static URLs when possible and submitting accurate sitemaps.
Lightning Talk #9: How UX and Data Storytelling Can Shape Policy by Mika Aldabaux singapore
How can we take UX and Data Storytelling out of the tech context and use them to change the way government behaves?
Showcasing the truth is the highest goal of data storytelling. Because the design of a chart can affect the interpretation of data in a major way, one must wield visual tools with care and deliberation. Using quantitative facts to evoke an emotional response is best achieved with the combination of UX and data storytelling.
This document summarizes a study of CEO succession events among the largest 100 U.S. corporations between 2005-2015. The study analyzed executives who were passed over for the CEO role ("succession losers") and their subsequent careers. It found that 74% of passed over executives left their companies, with 30% eventually becoming CEOs elsewhere. However, companies led by succession losers saw average stock price declines of 13% over 3 years, compared to gains for companies whose CEO selections remained unchanged. The findings suggest that boards generally identify the most qualified CEO candidates, though differences between internal and external hires complicate comparisons.
This document provides an introduction to web design and the components that make up the web. It discusses the history of the web and how Tim Berners-Lee invented the World Wide Web in 1989 while working at CERN. It also summarizes the main components of the web including clients and servers, internet service providers, web hosting services, domain names and URLs, and registrars. Finally, it provides an overview of HTML and some basic HTML tags for formatting text, links, lists, tables and more.
The document discusses integrating an Excel spreadsheet into a Microsoft Access database. It describes the tools used, including Microsoft Access 2007, 2010, and Excel 2007 and 2010. Some common problems that can occur during import are discussed, such as missing column headings, empty spaces, and formatting errors with dates and times. Solutions for resolving these problems, such as manual corrections and using Access 2010 features, are provided. A live demonstration of the integration process is also included.
Swiss pass chapter deck - zurich - april 2011Charley Hanania
The Swiss PASS Chapter meeting in April focused on PowerPivot. The agenda included welcome and introductions, refreshments and networking, and two sessions - the first on how database administrators can use PowerPivot for performance tuning and troubleshooting, and the second on how the new BI Semantic Model in SQL Server Denali will impact BI solution design. Both sessions included demos and discussions. The meeting provided an opportunity for SQL professionals to learn and network.
The document is a curriculum vitae for Pasquale Vaira. It summarizes his work experience over 20 years developing ETL procedures and data warehousing solutions using tools like Informatica Powercenter, Oracle Data Integrator, DataStage, and Teradata. His experience includes roles at companies in industries like energy & utilities, telecommunications, banking, and manufacturing.
Abilitics-Microsoft Days 11-Case Ctudy: Where SharePoint, Silverlight & BI me...Veselin Georgiev
This document outlines a solution that brings together SharePoint, Silverlight, and business intelligence (BI) technologies to enable sales pipeline management and project management automation. It describes how Excel data can be imported into SharePoint lists, a custom Silverlight application can be used for data management, and documents can be generated from templates. The solution architecture diagram shows how data from multiple sources is organized into multidimensional cubes for reporting in Excel, Excel Services and PerformancePoint Services.
Giancarlo Ronci has over 15 years of experience in business intelligence, data warehousing, and ETL. He has worked on numerous projects for companies like Unicredit, Telecom, and Vodafone, taking on roles like project manager, technical analyst, developer, and team lead. His technical skills include Teradata, SAS, Oracle, IBM DB2, and Datastage.
Constructive Workspace provides various interior design, space planning, and facilities management services. They aim to create inspirational and sustainable work environments that support business strategy. The document discusses a case study of Constructive renovating and optimizing the workspace for Charities Aid Foundation, including reconfiguring furniture for increased efficiency while maintaining the building's character. It also discusses preliminary concepts and analyses for potential projects with St. John Ambulance and Pharo Management that would involve refurbishing or relocating to new premises.
Slides from the annual Charities & Not For Profit Best Practice Forum. The Forum highlighted the pro & con\'s of relocation verses refurbishment whilst in situ.
This document provides a summary of a presentation about getting up to speed with Microsoft Office 2007. It discusses new features in Word 2007 like new file formats, graphics capabilities, zoom controls, and collaboration tools. Excel 2007's new features include views, pivot tables, conditional formatting and online templates. OneNote 2007 allows for gathering notes in a digital notebook with powerful search and sharing capabilities. SharePoint Designer 2007 provides tools for building custom SharePoint sites without coding. The presentation covers these Office applications over three sessions and provides links for further information.
This document provides an introduction to web design and web components. It discusses clients and servers, internet service providers, web hosting services, domain names, URLs and IPs, and registrars. It also covers HTML fundamentals like tags, headings, lists, tables, frames, colors and screen compatibility. The goal is to explain the basic building blocks of designing and developing a website.
This document provides a professional profile and career summary for Simon Teff, a SAS environment consultant with over 10 years of experience working with SAS software. Teff's experience includes applying changes to data warehouses, monitoring environments, software support, performance enhancements, administration, coding in SAS, and various migration projects. He has worked as a systems consultant at The AA PLC since 2011 and has prior experience as a SAS developer and programmer in various roles since 2001.
1. General Mills used SharePoint 2010 to rewrite their custom-built electronic lab notebook (ELN) application to reduce support requirements and leverage new SharePoint features.
2. The ELN application was used by R&D employees to store experimental data, invention records, and other documentation in a secure and compliant manner.
3. By building the new ELN within SharePoint 2010, General Mills was able to utilize features like document sets, metadata, workflows and Office Web Apps while improving organization, search, and usability.
BDW16 London - John Belchamber, Telefonica - New Data, New Strategies, New Op...Big Data Week
Through the experiences of supporting a Multi-Country roll out using data to drive more effective Network capability, we will explain how we have:
Created new internal capability to support local countries, developed skill sets in the country and provided technical infrastucture, algorithms and visualisations to drive the data culture and big data strategies across Telefonica business units.
Through this framework, we will explain how to blend technical and business needs to maximise the benefits and drive better business performance.
Space Codesign's presentation to TandemLaunch with intro to electronics design technology (CAD), EDA industry history and career insights startup versus corporate!
Space Codesign at TandemLaunch Lunch & Learn 20150414Gary Dare
Space Codesign 's presentation by Gary Dare to Montreal TandemLaunch hardware-oriented startup incubator (accelerator) on April 14, 2015. This is a more general presentation on electronics design technology and history of the EDA industry which originated as startups around 1980. Not a product pitch but highlights of SpaceStudio innovation is included. The intended audience is general rather than just electronics and software engineers, and technical management.
Space Codesign at TandemLaunch Lunch & Learn 20150414
Bryan dairy progress 6-13-11
1. March 1, 2011 Future Corporate Office & Production Facility For PrimeNet Direct Marketing Solutions 7320 Bryan Dairy Road, Largo, FL 33777
2. March 9, 2011 Future Data Production Future Production Floor Future Home of Account Management Cubicles Future Production Floor Future Production Floor Future Data Center & Hand Assembly Areas
3. March 29, 2011 Future Front Entrance Front Office’s Have All Been Framed Break Room Parking Lot Break Room Front Office’s Have All Been Framed
4. March 29, 2011 Production Floor Secure Storage Area/Fulfillment/Machine Shop Fire Alarms – Have Been Installed Production Floor Production Floor Secure Storage Area/Fulfillment/Machine Shop
5. March 29, 2011 Demolition Begins Future Home of Receptionist Office Future Home of Training Room – Front Office Future Home of Prepress Department Front Office Corridor – Seen From Lobby Conference Room – Front Office
6. March 29, 2011 Demolition Continues Future Home of Data Processing & Laser Setup Future Home of Art Department Future Home of Account Management Cubicles Front Lobby Future Home of Art Department
7. April 4, 2011 Future Home of Client Conference Room Production Floor BuildBlocks for Data Center Break Room Hallway leading to Prepress, Art Department, Laser Offices & Production Production Floor – Future home of Heidelberg's
8. April 4, 2011 The new building is hurricane category 3 (CAT 3) certified. Inside of the building, we are using BuildBlock insulating concrete forms to build the data center, which will also be Cat 3 certified. It’s an enclosed structure within the Brian Dairy facility. The cement block walls and ceiling are reinforced by rebar and filled with a special waterproof material. Our state of the art Data Center will be made with
9. April 6, 2011 Future home of Heidelberg's BuildBlocks for Data Center New Heidelberg Offset Press Production Floor Production Floor BuildBlocks for Data Center
10. April 6, 2011 Future Home of Laser Production – 4 HLC Lasers Future Home of Data Processing & Laser Setup Marking The Locations Of The New Heidelberg Presses Future Home of Heidelberg Presses Production Floor Production Floor
11. April 13, 2011 Double Checking The Location Of The Two Heidelberg Presses The Cement Is Going To Be Cut To Put In Steel Rebar Footings To With Stand The Weight Of The Presses
12. April 13, 2011 Beginning To Cut The Cement For The New Presses Wetting The Cement For The Cut! The First Cut Has been Made!
13. April 19, 2011 The Cement Has Been Cut For The Future Home Of Our New Presses
14. April 19, 2011 Data Center Walls Have Arrived Lots Of BuildBlock For The Walls Of The Data Center Unpacking Of The Walls 1 st Five Feet Of Data Center Walls Are Going Up!
15. April 19, 2011 Account Management Cubicles New Heidelberg Press Steel Rebar Is In Place For The Footings Of The Cement For The Heidelberg Press Entrance to Offices From Production Floor
16. April 27, 2011 Future home for 2 Xerox iGen, 4 Xerox HLC printers Steel Rebar Is In Place To Secure The BuildBlocks Used To Build The Walls Of The Data Center Future Home of Data Center Offices The Cement Has Been Poured For The Heidelberg Presses.
17. April 27, 2011 Entrance To The Data Center Receiving Dock The 1 st Five Feet Of The Data Center Walls Are Stabilized Until The Cement Is Dry Laser
18. April 29, 2011 Old Data Center – Future Storage Inside Of The Data Center, The 2 nd 5 Feet of BuildBlocks Have Been Installed And Are Stabilized Until The Cement Is Dry. Account Management Data Center Offices
19. April 29, 2011 See The Cement IN The Walls Of The Data Center? Data Center Walls Data Processing & Laser Setup Data Center Walls Are Stabilized Until Cement Is Dry Laser Production – location of future HLC Printers
20. May 3, 2011 Data Center Interior 1 st Shift Production Supervisor Office Future Home of Hand Assembly Area USPS & Production Offices Data Center Interior Future Home of Hand Assembly Area
21. May 4, 2011 Heidelberg Slabs waiting for cement pour for wiring
22. May 11, 2011 View Of The Cement Data Center Walls USPS & Production Offices Getting The Ceiling Rods In Place To Finalized The Data Center Data Center
23. May 13, 2011 Account Management Cubicles Future home of Account Management Laser Department Production Looking At Hand Assembly Area Future Home of Training Room Outside of Data Center
24. May 13, 2011 Future Offices of Purchasing and Accounting Roof of Data Center
25. May 16, 2011 Data Production & Laser Setup Wood for Machine Shop Tables Hand Assembly Area Production Area Production Area Hand Assembly & Staging Areas
26. May 16, 2011 Outside of Data Room Next to Account Management Air Conditioning Duct Installation? Future Home of Account Management Data Center Construction Data Center Construction Entrance To Data Center
27. May 16, 2011 From Offices Corridor Flooring Tiles
28. May 17, 2011 Inside of Hand Assembly Area Account Management Hand Assembly Area Outside of Data Room before Hand Assembly Built Outside of Data Room before Hand Assembly Built Data Center Interior w/cuts for the UPC’s
29. May 20, 2011 Building Supplies Going Into Lettershop From Account Managers Area Hand Fulfillment Area Walls & Floor In Process Future Warehouse Area More Building Supplies Heidelberg Press Slab before concrete pour for wiring
30. May 20, 2011 Handroom Old Server Room Being Converted to Storage Data Center Data Center Account Management
31. May 24, 2011 Break Room Training Room Hand Assembly Looking into the training room and IT Installation of New Heidelberg Presses
32. May 24, 2011 Pipe Drain For Presses Data Center Training Room
34. June 1, 2011 New Heidelberg Press Air Pump For Press Secured Storage Area Wiring For Our House Compressed Air Air Distribution In Room Hallway Looking Into Laser
35. June 3, 2011 Break Room Front Entrance Accounting Office Getting Carpet Account Services Installation Sound Proofing The Ceiling Data Center Account Services
36. June 3, 2011 Voltage converter for new Heidelberg press Production Hand Room Hand Room Air Conditioning Into Data Center High Ceiling In Hand Room
37. June 3, 2011 Creative Services Pffice Laser Room Pre Press Production Floor Production Floor Data Production
38. June 3, 2011 Visitor Entrance Front Office Hallway Sales Conference Room Board Room Looking Into Visitor Lobby Board Room Data Production
39. June 3, 2011 Data Production Heidelberg Press Ready To Go President’s Office Laser Room Training Room Break Room