The document provides updates on the construction and development of a new corporate office and production facility for PrimeNet Direct Marketing Solutions over the course of several months. It details the construction of various areas in the new building including production floors, data centers, offices, conference rooms, and the installation of new printing presses. Photos show the construction progress including framing, electrical work, concrete pouring, and other details of the facility being prepared for occupancy.
The document provides updates on the construction progress of a new corporate office and production facility over the course of several months. Construction included framing the front offices and break room, demolishing existing areas, installing fire alarms, cutting cement for new printing presses, building walls for the data center out of insulating concrete forms, pouring cement for the printing press footings, installing ductwork and wiring, and assembling furniture. Offices, production areas, and departments were taking shape throughout the construction process.
The document provides updates on the construction and build out of a new corporate office and production facility for PrimeNet Direct Marketing Solutions over the course of several months. Key areas being constructed include a data center, production floor, offices, conference rooms, and cubicles for account management. Construction includes installing walls, ceilings, wiring, furniture and equipment.
Uşak is a city in Turkey with a population of 335,860 people. It has several shopping centers, sports centers, cinemas, and ponds. Major events in Uşak include the strawberry festival and carpet festival. Turkey has a population of 73.5 million people, with Ankara as its capital. It borders several countries and its official language is Turkish. Recep Tayyip Erdoğan and Abdullah Gül currently serve as Turkey's prime minister and president, respectively.
The document summarizes findings from a retail trade study on dairy products conducted among retailers in Delhi. It found that Mother Dairy was the most stocked and highest selling brand due to perceptions of quality, taste and popularity. While Paras had higher margins, some retailers mentioned quality issues with Paras milk. Retailers perceived little difference between consumers of different brands. Most wanted companies to offer better schemes and margins to help increase sales.
The document discusses establishing a dairy farm business in Varanasi, India. It provides details on the production, marketing, financials, operations, and human resource management of the dairy farm. Key points include producing over 125,000 liters of milk annually, earning over Rs. 30 lakhs in revenue, employing 7 people, and involving milking cows twice daily.
The document provides updates on the construction and build out of a new corporate office and production facility for PrimeNet Direct Marketing Solutions over the course of several months. Key areas being constructed include a data center, production floor, offices, conference rooms, and cubicles for account management. Updates include installing walls, ceilings, floors, furniture and equipment as the facility is prepared for operations.
This document provides an introduction to web design and the components that make up the web. It discusses the history of the web and how Tim Berners-Lee invented the World Wide Web in 1989 while working at CERN. It also summarizes the main components of the web including clients and servers, internet service providers, web hosting services, domain names and URLs, and registrars. Finally, it provides an overview of HTML and some basic HTML tags for formatting text, links, lists, tables and more.
The document discusses integrating an Excel spreadsheet into a Microsoft Access database. It describes the tools used, including Microsoft Access 2007, 2010, and Excel 2007 and 2010. Some common problems that can occur during import are discussed, such as missing column headings, empty spaces, and formatting errors with dates and times. Solutions for resolving these problems, such as manual corrections and using Access 2010 features, are provided. A live demonstration of the integration process is also included.
The document provides updates on the construction progress of a new corporate office and production facility over the course of several months. Construction included framing the front offices and break room, demolishing existing areas, installing fire alarms, cutting cement for new printing presses, building walls for the data center out of insulating concrete forms, pouring cement for the printing press footings, installing ductwork and wiring, and assembling furniture. Offices, production areas, and departments were taking shape throughout the construction process.
The document provides updates on the construction and build out of a new corporate office and production facility for PrimeNet Direct Marketing Solutions over the course of several months. Key areas being constructed include a data center, production floor, offices, conference rooms, and cubicles for account management. Construction includes installing walls, ceilings, wiring, furniture and equipment.
Uşak is a city in Turkey with a population of 335,860 people. It has several shopping centers, sports centers, cinemas, and ponds. Major events in Uşak include the strawberry festival and carpet festival. Turkey has a population of 73.5 million people, with Ankara as its capital. It borders several countries and its official language is Turkish. Recep Tayyip Erdoğan and Abdullah Gül currently serve as Turkey's prime minister and president, respectively.
The document summarizes findings from a retail trade study on dairy products conducted among retailers in Delhi. It found that Mother Dairy was the most stocked and highest selling brand due to perceptions of quality, taste and popularity. While Paras had higher margins, some retailers mentioned quality issues with Paras milk. Retailers perceived little difference between consumers of different brands. Most wanted companies to offer better schemes and margins to help increase sales.
The document discusses establishing a dairy farm business in Varanasi, India. It provides details on the production, marketing, financials, operations, and human resource management of the dairy farm. Key points include producing over 125,000 liters of milk annually, earning over Rs. 30 lakhs in revenue, employing 7 people, and involving milking cows twice daily.
The document provides updates on the construction and build out of a new corporate office and production facility for PrimeNet Direct Marketing Solutions over the course of several months. Key areas being constructed include a data center, production floor, offices, conference rooms, and cubicles for account management. Updates include installing walls, ceilings, floors, furniture and equipment as the facility is prepared for operations.
This document provides an introduction to web design and the components that make up the web. It discusses the history of the web and how Tim Berners-Lee invented the World Wide Web in 1989 while working at CERN. It also summarizes the main components of the web including clients and servers, internet service providers, web hosting services, domain names and URLs, and registrars. Finally, it provides an overview of HTML and some basic HTML tags for formatting text, links, lists, tables and more.
The document discusses integrating an Excel spreadsheet into a Microsoft Access database. It describes the tools used, including Microsoft Access 2007, 2010, and Excel 2007 and 2010. Some common problems that can occur during import are discussed, such as missing column headings, empty spaces, and formatting errors with dates and times. Solutions for resolving these problems, such as manual corrections and using Access 2010 features, are provided. A live demonstration of the integration process is also included.
Swiss pass chapter deck - zurich - april 2011Charley Hanania
The Swiss PASS Chapter meeting in April focused on PowerPivot. The agenda included welcome and introductions, refreshments and networking, and two sessions - the first on how database administrators can use PowerPivot for performance tuning and troubleshooting, and the second on how the new BI Semantic Model in SQL Server Denali will impact BI solution design. Both sessions included demos and discussions. The meeting provided an opportunity for SQL professionals to learn and network.
The document is a curriculum vitae for Pasquale Vaira. It summarizes his work experience over 20 years developing ETL procedures and data warehousing solutions using tools like Informatica Powercenter, Oracle Data Integrator, DataStage, and Teradata. His experience includes roles at companies in industries like energy & utilities, telecommunications, banking, and manufacturing.
Abilitics-Microsoft Days 11-Case Ctudy: Where SharePoint, Silverlight & BI me...Veselin Georgiev
This document outlines a solution that brings together SharePoint, Silverlight, and business intelligence (BI) technologies to enable sales pipeline management and project management automation. It describes how Excel data can be imported into SharePoint lists, a custom Silverlight application can be used for data management, and documents can be generated from templates. The solution architecture diagram shows how data from multiple sources is organized into multidimensional cubes for reporting in Excel, Excel Services and PerformancePoint Services.
Giancarlo Ronci has over 15 years of experience in business intelligence, data warehousing, and ETL. He has worked on numerous projects for companies like Unicredit, Telecom, and Vodafone, taking on roles like project manager, technical analyst, developer, and team lead. His technical skills include Teradata, SAS, Oracle, IBM DB2, and Datastage.
Constructive Workspace provides various interior design, space planning, and facilities management services. They aim to create inspirational and sustainable work environments that support business strategy. The document discusses a case study of Constructive renovating and optimizing the workspace for Charities Aid Foundation, including reconfiguring furniture for increased efficiency while maintaining the building's character. It also discusses preliminary concepts and analyses for potential projects with St. John Ambulance and Pharo Management that would involve refurbishing or relocating to new premises.
Slides from the annual Charities & Not For Profit Best Practice Forum. The Forum highlighted the pro & con\'s of relocation verses refurbishment whilst in situ.
This document provides a summary of a presentation about getting up to speed with Microsoft Office 2007. It discusses new features in Word 2007 like new file formats, graphics capabilities, zoom controls, and collaboration tools. Excel 2007's new features include views, pivot tables, conditional formatting and online templates. OneNote 2007 allows for gathering notes in a digital notebook with powerful search and sharing capabilities. SharePoint Designer 2007 provides tools for building custom SharePoint sites without coding. The presentation covers these Office applications over three sessions and provides links for further information.
This document provides an introduction to web design and web components. It discusses clients and servers, internet service providers, web hosting services, domain names, URLs and IPs, and registrars. It also covers HTML fundamentals like tags, headings, lists, tables, frames, colors and screen compatibility. The goal is to explain the basic building blocks of designing and developing a website.
This document provides a professional profile and career summary for Simon Teff, a SAS environment consultant with over 10 years of experience working with SAS software. Teff's experience includes applying changes to data warehouses, monitoring environments, software support, performance enhancements, administration, coding in SAS, and various migration projects. He has worked as a systems consultant at The AA PLC since 2011 and has prior experience as a SAS developer and programmer in various roles since 2001.
1. General Mills used SharePoint 2010 to rewrite their custom-built electronic lab notebook (ELN) application to reduce support requirements and leverage new SharePoint features.
2. The ELN application was used by R&D employees to store experimental data, invention records, and other documentation in a secure and compliant manner.
3. By building the new ELN within SharePoint 2010, General Mills was able to utilize features like document sets, metadata, workflows and Office Web Apps while improving organization, search, and usability.
BDW16 London - John Belchamber, Telefonica - New Data, New Strategies, New Op...Big Data Week
Through the experiences of supporting a Multi-Country roll out using data to drive more effective Network capability, we will explain how we have:
Created new internal capability to support local countries, developed skill sets in the country and provided technical infrastucture, algorithms and visualisations to drive the data culture and big data strategies across Telefonica business units.
Through this framework, we will explain how to blend technical and business needs to maximise the benefits and drive better business performance.
Space Codesign's presentation to TandemLaunch with intro to electronics design technology (CAD), EDA industry history and career insights startup versus corporate!
Space Codesign at TandemLaunch Lunch & Learn 20150414Gary Dare
Space Codesign 's presentation by Gary Dare to Montreal TandemLaunch hardware-oriented startup incubator (accelerator) on April 14, 2015. This is a more general presentation on electronics design technology and history of the EDA industry which originated as startups around 1980. Not a product pitch but highlights of SpaceStudio innovation is included. The intended audience is general rather than just electronics and software engineers, and technical management.
Swiss pass chapter deck - zurich - april 2011Charley Hanania
The Swiss PASS Chapter meeting in April focused on PowerPivot. The agenda included welcome and introductions, refreshments and networking, and two sessions - the first on how database administrators can use PowerPivot for performance tuning and troubleshooting, and the second on how the new BI Semantic Model in SQL Server Denali will impact BI solution design. Both sessions included demos and discussions. The meeting provided an opportunity for SQL professionals to learn and network.
The document is a curriculum vitae for Pasquale Vaira. It summarizes his work experience over 20 years developing ETL procedures and data warehousing solutions using tools like Informatica Powercenter, Oracle Data Integrator, DataStage, and Teradata. His experience includes roles at companies in industries like energy & utilities, telecommunications, banking, and manufacturing.
Abilitics-Microsoft Days 11-Case Ctudy: Where SharePoint, Silverlight & BI me...Veselin Georgiev
This document outlines a solution that brings together SharePoint, Silverlight, and business intelligence (BI) technologies to enable sales pipeline management and project management automation. It describes how Excel data can be imported into SharePoint lists, a custom Silverlight application can be used for data management, and documents can be generated from templates. The solution architecture diagram shows how data from multiple sources is organized into multidimensional cubes for reporting in Excel, Excel Services and PerformancePoint Services.
Giancarlo Ronci has over 15 years of experience in business intelligence, data warehousing, and ETL. He has worked on numerous projects for companies like Unicredit, Telecom, and Vodafone, taking on roles like project manager, technical analyst, developer, and team lead. His technical skills include Teradata, SAS, Oracle, IBM DB2, and Datastage.
Constructive Workspace provides various interior design, space planning, and facilities management services. They aim to create inspirational and sustainable work environments that support business strategy. The document discusses a case study of Constructive renovating and optimizing the workspace for Charities Aid Foundation, including reconfiguring furniture for increased efficiency while maintaining the building's character. It also discusses preliminary concepts and analyses for potential projects with St. John Ambulance and Pharo Management that would involve refurbishing or relocating to new premises.
Slides from the annual Charities & Not For Profit Best Practice Forum. The Forum highlighted the pro & con\'s of relocation verses refurbishment whilst in situ.
This document provides a summary of a presentation about getting up to speed with Microsoft Office 2007. It discusses new features in Word 2007 like new file formats, graphics capabilities, zoom controls, and collaboration tools. Excel 2007's new features include views, pivot tables, conditional formatting and online templates. OneNote 2007 allows for gathering notes in a digital notebook with powerful search and sharing capabilities. SharePoint Designer 2007 provides tools for building custom SharePoint sites without coding. The presentation covers these Office applications over three sessions and provides links for further information.
This document provides an introduction to web design and web components. It discusses clients and servers, internet service providers, web hosting services, domain names, URLs and IPs, and registrars. It also covers HTML fundamentals like tags, headings, lists, tables, frames, colors and screen compatibility. The goal is to explain the basic building blocks of designing and developing a website.
This document provides a professional profile and career summary for Simon Teff, a SAS environment consultant with over 10 years of experience working with SAS software. Teff's experience includes applying changes to data warehouses, monitoring environments, software support, performance enhancements, administration, coding in SAS, and various migration projects. He has worked as a systems consultant at The AA PLC since 2011 and has prior experience as a SAS developer and programmer in various roles since 2001.
1. General Mills used SharePoint 2010 to rewrite their custom-built electronic lab notebook (ELN) application to reduce support requirements and leverage new SharePoint features.
2. The ELN application was used by R&D employees to store experimental data, invention records, and other documentation in a secure and compliant manner.
3. By building the new ELN within SharePoint 2010, General Mills was able to utilize features like document sets, metadata, workflows and Office Web Apps while improving organization, search, and usability.
BDW16 London - John Belchamber, Telefonica - New Data, New Strategies, New Op...Big Data Week
Through the experiences of supporting a Multi-Country roll out using data to drive more effective Network capability, we will explain how we have:
Created new internal capability to support local countries, developed skill sets in the country and provided technical infrastucture, algorithms and visualisations to drive the data culture and big data strategies across Telefonica business units.
Through this framework, we will explain how to blend technical and business needs to maximise the benefits and drive better business performance.
Space Codesign's presentation to TandemLaunch with intro to electronics design technology (CAD), EDA industry history and career insights startup versus corporate!
Space Codesign at TandemLaunch Lunch & Learn 20150414Gary Dare
Space Codesign 's presentation by Gary Dare to Montreal TandemLaunch hardware-oriented startup incubator (accelerator) on April 14, 2015. This is a more general presentation on electronics design technology and history of the EDA industry which originated as startups around 1980. Not a product pitch but highlights of SpaceStudio innovation is included. The intended audience is general rather than just electronics and software engineers, and technical management.
Space Codesign at TandemLaunch Lunch & Learn 20150414
Bryan dairy progress 6-13-11
1. March 1, 2011 Future Corporate Office & Production Facility For PrimeNet Direct Marketing Solutions 7320 Bryan Dairy Road, Largo, FL 33777
2. March 9, 2011 Future Data Production Future Production Floor Future Home of Account Management Cubicles Future Production Floor Future Production Floor Future Data Center & Hand Assembly Areas
3. March 29, 2011 Future Front Entrance Front Office’s Have All Been Framed Break Room Parking Lot Break Room Front Office’s Have All Been Framed
4. March 29, 2011 Production Floor Secure Storage Area/Fulfillment/Machine Shop Fire Alarms – Have Been Installed Production Floor Production Floor Secure Storage Area/Fulfillment/Machine Shop
5. March 29, 2011 Demolition Begins Future Home of Receptionist Office Future Home of Training Room – Front Office Future Home of Prepress Department Front Office Corridor – Seen From Lobby Conference Room – Front Office
6. March 29, 2011 Demolition Continues Future Home of Data Processing & Laser Setup Future Home of Art Department Future Home of Account Management Cubicles Front Lobby Future Home of Art Department
7. April 4, 2011 Future Home of Client Conference Room Production Floor BuildBlocks for Data Center Break Room Hallway leading to Prepress, Art Department, Laser Offices & Production Production Floor – Future home of Heidelberg's
8. April 4, 2011 The new building is hurricane category 3 (CAT 3) certified. Inside of the building, we are using BuildBlock insulating concrete forms to build the data center, which will also be Cat 3 certified. It’s an enclosed structure within the Brian Dairy facility. The cement block walls and ceiling are reinforced by rebar and filled with a special waterproof material. Our state of the art Data Center will be made with
9. April 6, 2011 Future home of Heidelberg's BuildBlocks for Data Center New Heidelberg Offset Press Production Floor Production Floor BuildBlocks for Data Center
10. April 6, 2011 Future Home of Laser Production – 4 HLC Lasers Future Home of Data Processing & Laser Setup Marking The Locations Of The New Heidelberg Presses Future Home of Heidelberg Presses Production Floor Production Floor
11. April 13, 2011 Double Checking The Location Of The Two Heidelberg Presses The Cement Is Going To Be Cut To Put In Steel Rebar Footings To With Stand The Weight Of The Presses
12. April 13, 2011 Beginning To Cut The Cement For The New Presses Wetting The Cement For The Cut! The First Cut Has been Made!
13. April 19, 2011 The Cement Has Been Cut For The Future Home Of Our New Presses
14. April 19, 2011 Data Center Walls Have Arrived Lots Of BuildBlock For The Walls Of The Data Center Unpacking Of The Walls 1 st Five Feet Of Data Center Walls Are Going Up!
15. April 19, 2011 Account Management Cubicles New Heidelberg Press Steel Rebar Is In Place For The Footings Of The Cement For The Heidelberg Press Entrance to Offices From Production Floor
16. April 27, 2011 Future home for 2 Xerox iGen, 4 Xerox HLC printers Steel Rebar Is In Place To Secure The BuildBlocks Used To Build The Walls Of The Data Center Future Home of Data Center Offices The Cement Has Been Poured For The Heidelberg Presses.
17. April 27, 2011 Entrance To The Data Center Receiving Dock The 1 st Five Feet Of The Data Center Walls Are Stabilized Until The Cement Is Dry Laser
18. April 29, 2011 Old Data Center – Future Storage Inside Of The Data Center, The 2 nd 5 Feet of BuildBlocks Have Been Installed And Are Stabilized Until The Cement Is Dry. Account Management Data Center Offices
19. April 29, 2011 See The Cement IN The Walls Of The Data Center? Data Center Walls Data Processing & Laser Setup Data Center Walls Are Stabilized Until Cement Is Dry Laser Production – location of future HLC Printers
20. May 3, 2011 Data Center Interior 1 st Shift Production Supervisor Office Future Home of Hand Assembly Area USPS & Production Offices Data Center Interior Future Home of Hand Assembly Area
21. May 4, 2011 Heidelberg Slabs waiting for cement pour for wiring
22. May 11, 2011 View Of The Cement Data Center Walls USPS & Production Offices Getting The Ceiling Rods In Place To Finalized The Data Center Data Center
23. May 13, 2011 Account Management Cubicles Future home of Account Management Laser Department Production Looking At Hand Assembly Area Future Home of Training Room Outside of Data Center
24. May 13, 2011 Future Offices of Purchasing and Accounting Roof of Data Center
25. May 16, 2011 Data Production & Laser Setup Wood for Machine Shop Tables Hand Assembly Area Production Area Production Area Hand Assembly & Staging Areas
26. May 16, 2011 Outside of Data Room Next to Account Management Air Conditioning Duct Installation? Future Home of Account Management Data Center Construction Data Center Construction Entrance To Data Center
27. May 16, 2011 From Offices Corridor Flooring Tiles
28. May 17, 2011 Inside of Hand Assembly Area Account Management Hand Assembly Area Outside of Data Room before Hand Assembly Built Outside of Data Room before Hand Assembly Built Data Center Interior w/cuts for the UPC’s
29. May 20, 2011 Building Supplies Going Into Lettershop From Account Managers Area Hand Fulfillment Area Walls & Floor In Process Future Warehouse Area More Building Supplies Heidelberg Press Slab before concrete pour for wiring
30. May 20, 2011 Handroom Old Server Room Being Converted to Storage Data Center Data Center Account Management
31. May 24, 2011 Break Room Training Room Hand Assembly Looking into the training room and IT Installation of New Heidelberg Presses
32. May 24, 2011 Pipe Drain For Presses Data Center Training Room
34. June 1, 2011 New Heidelberg Press Air Pump For Press Secured Storage Area Wiring For Our House Compressed Air Air Distribution In Room Hallway Looking Into Laser
35. June 3, 2011 Break Room Front Entrance Accounting Office Getting Carpet Account Services Installation Sound Proofing The Ceiling Data Center Account Services
36. June 3, 2011 Voltage converter for new Heidelberg press Production Hand Room Hand Room Air Conditioning Into Data Center High Ceiling In Hand Room
37. June 3, 2011 Creative Services Pffice Laser Room Pre Press Production Floor Production Floor Data Production
38. June 3, 2011 Visitor Entrance Front Office Hallway Sales Conference Room Board Room Looking Into Visitor Lobby Board Room Data Production
39. June 3, 2011 Data Production Heidelberg Press Ready To Go President’s Office Laser Room Training Room Break Room