Geo
technical Engineeri
ng
Structural Enginee
ring
T
ransportation Engin
eering
W
ater Resources Engin
eering
E
nvironmental Engin
eering
MISSION
VISION
To contribute to India and the world through excellence in
scientific and technical education and research; to serve as a
valuable resource to remain a source of pride for all Indians.
To generate new knowledge by engaging in cutting-edge research
and to promote academic growth by offering state-of-the-art
undergraduate, postgraduate and doctoral programmes.
To identify, based on an informed perception of Indian, regional and
global needs, areas of specialisation upon which the Institute can
concentrate.
To undertake collaborative projects which offer opportunities for
long-term interaction with academia and industry.
To develop human potential to its fullest extent so that intellectually
capable and imaginatively gifted leaders can emerge in a range of
professions.
•	 Academic integrity and accountability
•	 Respect and tolerance for the views of every individual
•	 Attention to issues of national relevance as well as of global 		
	 concern
•	 Breadth of understanding, including knowledge of the human 	
	 sciences
•	 Appreciation of intellectual excellence and creativity
•	 An unfettered spirit of exploration, rationality and enterprise
Vision
Mission
PAGE @
Values
May, 2012
No part of this publication may be reproduced in any form or by any means
without the prior written permission of the publisher.
Design and Production: silverlinecomm@gmail.com
©
VISION
MISSION
VALUESVALUES
Message from Head of the Department.......................................................
Evolution of the Civil Engineering Department at IIT Delhi..................
Academic and Research Programmes...........................................................
Laboratory and Testing Facilities....................................................................
Publications...........................................................................................................
Sponsored Research and Consultancy Projects..........................................
Faculty Profile.......................................................................................................
Laurels to the Department................................................................................
Continuing Education Programmes...............................................................
Conferences and Training Programmes........................................................
Civil Engineering Society...................................................................................
Student Placement..............................................................................................
Department Alumni............................................................................................
Future Goals..........................................................................................................
Contents
7
9
10
11
12
13
14
20
23
24
26
27
28
30
PAGE @
Prof. A. K. Gosain
Head, Department of Civil
Engineering, IIT Delhi
Message from Head of the Department
We have just concluded the Golden Jubilee Celebrations of the Institute with a sense
of achievement and accomplishment. Since the Civil Engineering Department has all along
contributed not only in providing the academic excellence but also in building the basic
infrastructure of this great Institute; therefore, there would not be a better time to engage
in introspection and put together our achievements as well as our resolve to engage with
the challenges of future in view of rapidly changing needs and environment of our society.
This brief information brochure is an attempt in this direction.
The Department has always been able to attract and nurture faculty that is equivalent
to the best as per international standards. They have always been engaging with the
cutting edge research in their respective areas and contributed not only at the national
but also international level. They have always been deeply involved in moulding our
young bright undergraduate and graduate students into technologists, technocrats and
researchers who are capable of providing best of solutions to the societal problems.
I can vouch on behalf of my faculty colleagues and staff that we will continue to
strive for greater heights in teaching and research that is relevant and shall help in nation
building. I am very happy to present a brief account of our engagements, achievements and
aspirations in the following pages.
Message from Head of the Department
PAGE @
DepartmentofCivilEngineering-
PerformingovertheYears
8 9
DepartmentofCivilEngineering-
PerformingovertheYears
EvolutionoftheCivilEngineering
DepartmentatIITDelhi
EvolutionoftheCivilEngineering
DepartmentatIITDelhi
T
he Civil Engineering Department is one of the oldest
departments of the Institute and was established
along with the inception of the Institute in 1961.
Starting with a regular five year bachelor’s degree in Civil
Engineering, the Department has grown leaps and bounds
in offering seven different specialised Institute M.Tech.
Programmes along with a host of industry sponsored
M.Tech./PG Diploma Programmes. The Department also
offers M.S. (Research) and Ph.D. Programmes in different
frontier areas of research in Civil Engineering.
The Department which housed in a tiny shed in 1961,
moved through the corridors of Block I, before finally
settling in its present location at Block IV and V occupying
nearly 4500 m2
of covered area on the campus.
The Department also excels in industry sponsored
research and consultancy activities. This journey,
however, has not been overnight; it’s been a result of
hard work put in by the faculty, the laboratory staff,
the students and has thoroughly been backed by the
administration at all levels through the times.
In the formative stages: Prof. R. N. Dogra, the founding director, IIT Delhi
detailing the model of the Institute’sbuilding
The main cantilever entrance gate of IIT Delhi The majestic main building of the Institute
DepartmentofCivilEngineering-
PerformingovertheYears
10 11
DepartmentofCivilEngineering-
PerformingovertheYears
Laboratory and Testing FacilitiesLaboratory and Testing Facilities
Academic and Research ProgrammesAcademic and Research Programmes
Bachelor of Technology in Civil
Engineering
The Department offers B.Tech. degree to eligible
candidates, which is a four year undergraduate
programme. The students have a wide variety of
core and elective courses to choose from. After
completing the broad based core courses, each
student chooses an elective course in his/her
area of special interest from amongst the streams
of Construction Engineering and Mangement,
Environmental Engineering, Geotechnical
Engineering, Structural Engineering, Transportation
Engineering and Water Resources Engineering.
The students undergo field trips, industry oriented
practical training and colloquium and final year
project as a part of the undergraduate programme.
Each year more than 110 students join this
prestigious programme.
Master of Technology in Civil
Engineering
The Department offers seven postgraduate
programmes to eligible candidates, which are
of two year duration each leading to M.Tech.
degree in a specialised field (as given in the table
alongside). In each programme, students acquire
knowledge in broad-based core courses followed
by electives which provide in-depth and specialised
knowledge in areas of special interest to them. Like
the undergraduate students, they also undergo
field trips and industry oriented practical training.
A major project is also to be undertaken as a part
of the curriculum in the final two semesters which
involves research or design and development.
Around 244 students enroll for these M.Tech.
programmes every year. The Department also
offers M.Tech. in Construction Technology and
Management sponsored by Larsen & Toubro and
one year PG Diploma in Metro Rail Transport:
Technology and Management sponsored by DMRC
which is open to industry sponsored candidates
only. The Department also offers few M.Tech.
programmes to universities abroad through the
two-way video conferencing mode since 2009.
Research Programmes (Doctor of
Philosophy, Master of Science)
The Department offers Ph.D. degree to postgraduate
students who have attained M.Tech./M.E. degree
and also to a few exceptionally bright B.Tech.
students. At any instance, we have more than 150
students who are full-time, faculty who pursue
their Ph.D. under the QIP (Quality Improvement
Programme), part-time students who are basically
from industry or nearby engineering colleges.
The Department also offers Master of Science
(Research) in all the areas of Civil Engineering to
bright undergraduate students.
A
bout three-fourths of the Department
area is occupied by the state-of-the-
art laboratories, namely:
l	 Advanced Dynamics Laboratory
l 	 Computational Geotechnics 		
		 Laboratory
l 	 Concrete Structures Laboratory
l 	 Construction Simulation Laboratory
l 	 Construction Technology Laboratory
l 	 Departmental Computational Laboratory
l 	 Engineering Geology Laboratory
l 	 Environmental Engineering Laboratory
l 	 Foundation Engineering Laboratory
l 	 Geoenvironmental Engineering 		
		 Laboratory
l	 Geographical Information System 	
		 (GIS) Laboratory
l 	 Heavy Structures Laboratory
l 	 Materials Research Laboratory
l	 Multi-Hazard Protective Structures 	
		 Laboratory
l 	 Rock Mechanics Laboratory
l 	 Simulation Laboratory
l 	 Smart Structures and Dynamics 		
		 Laboratory
l 	 Soil Mechanics Laboratory
l 	 Soil Research Laboratory (Constant 	
		 Temperature)
l 	 Structural Analysis Laboratory
l 	 Structural Simulation Laboratory
l 	 Surveying Laboratory
l 	 Traffic Engineering Laboratory
l 	 Transportation Engineering Laboratory
B.Tech. in Civil Engineering
Ph.D. in Civil Engineering
Master of Science by Research in
Civil Engineering
DepartmentofCivilEngineering-
PerformingovertheYears
12 13
DepartmentofCivilEngineering-
PerformingovertheYears
Sponsored Research and Consultancy ProjectsSponsored Research and Consultancy ProjectsPublicationsPublications
T
he faculty are always enthusiastic in publishing books/book chapters, journal papers and conference papers both at the
national and international levels on a variety of topics. In recent years (2007-2012) 361 journal papers, 527 conference
papers and 42 book/book chapters have been published. The faculty also actively take part in editing and reviewing books,
journal papers, conference papers/proceedings, journal issues, technical articles, masters and doctorate theses.
B
ecause of the proficiency of the Department in Civil Engineering, various
government divisions, Public Sector Undertakings and industries in the private
sector approach the learned faculty for undertaking various research and
consultancy projects.
Complex design, construction and maintenance problems of the infrastructure sector are
resolved through the intervention of the expert faculty of the Civil Engineering Department.
The consultancy projects are undertaken for arriving at practical solutions to problems
of special nature. The sponsoring agencies include, among others, Ministry of HRD,
Ministry of Water Resources, Ministry of Earth Sciences, Ministry of Environment and
Forests, DST, BRNS, CSIR, ONGC, EIL, CWC. To name a few organisations which
took consultancy on various projects from the Department include DDA, DJB, NDMC,
MCD, Northern Railways, NTPC, BSES, Power Grid Corporation, Unitech, Konkan
Railways, Grasim, L&T, IRCON, RITES and others.
Books/book chapters published year-wise Papers presented in national/international conferences Papers published in national/international journals Value of research projects (in lacs INR)
Value of consultancy projects (in lacs INR)
7
8
8
2
8
9
Partial
DepartmentofCivilEngineering-
PerformingovertheYears
14 15
Deb S. K.
skdeb@civil.iitd.ac.in
Transportation Engineering,
Urban Engineering,
Fuzzy System Modelling and
Airways, Sustainable City
Datta Manoj
mdatta@civil.iitd.ac.in
Geoenvironment, Landfills,
Ash Ponds, Tailings, Ground Improvement,
Slope Stability, Dams, Offshore Geotechnology
Datta T. K.
tkdatta@civil.iitd.ac.in
Earthquake Engineering, Wind Engineering,
Offshore Dynamics, Structural Control
Ganguli Abhijit
abhijit.ganguli@civil.iitd.ac.in
Non-Destructive Evaluation of Structures,
Subsurface Imaging, Ultrasonics,
Wave Scattering Problems, Structural Dynamics,
Active Control of Structural Vibration, Mechatronics
Garg N. K.
nkgarg@civil.iitd.ac.in
Water Resources Systems,
Finite Element Watershed Modelling,
Irrigation Management, CAD
Gosain A. K.
gosain@civil.iitd.ac.in
Integrated Watershed Modelling,
GIS, Hydrological Modelling,
Irrigation Management, Climate Change,
Environmental Impact Assessment
Chakraborty Tanusree
tanusree@civiI.iitd.ac.in
Foundation Engineering, Blast Loading in Soil,
Soil Plasticity and Constitutive Modeling,
Soil-Structure Interaction and
Underground Construction in Soil and Rock
Dhanya C. T.
dhanya@civil.iitd.ac.in
Hydroclimatological Modelling, Nonlinear Dynamics
and Chaos Theory, Stochastic Hydrology, Optimisation
in Water Resource Systems, Data Mining in Hydrology,
Water Resources Management
Basha B. Munwar
basha@civiI.iitd.ac.in
Computational Geomechanics, Soil Dynamics,
Earthquake Resistant Design of Retaining Structures,
Performance-Based/Reliability-Based Designs in
Geotechnical and Geoenvironmental Engineering
Alappat B. J.
alappat@civil.iitd.ac.in
Environmental Engineering,
Solid Waste Management, Incineration,
Fluidised Bed Operations
Ayothiraman R.
araman@civiI.iitd.ac.in
Soil Dynamics and Earthquake Engineering,
Pile Foundations, Deep Excavations in Urban Areas,
Problematic Soils and Ground Improvement
Benipal G. S.
gurmail@civil.iitd.ac.in
Concrete Mechanics, Constitutive Modelling,
Non-Linear Elasto-Dynamics and Stability
Faculty ProfileFaculty Profile Faculty ProfileFaculty Profile
DepartmentofCivilEngineering-
PerformingovertheYears
Bhalla S.
sbhalla@civil.iitd.ac.in
Smart Material and Structures,
Structural Health Monitoring,
Non-Destructive Evaluation, Bio-Mechanics,
Engineered Bamboo Structures
Bhattacharjee B.
bishwa@civil.iitd.ac.in
Durability of Concrete, Rebar Corrosion,
Cement Based Composites,
Construction Technology, Building Science
Bishnoi S.
shashank.bishnoi@civil.iitd.ac.in
Experimental and Numerical Studies into
Hydration of Cement and Supplementary
Cementitious Materials, Sustainability, Durability,
Repair and Life-Cycle Costs of Concrete Structures
Chahar B. R.
chahar@civil.iitd.ac.in
Seepage, Drainage, Canal Design
DepartmentofCivilEngineering-
PerformingovertheYears
16 17
Iyer K. C.
kciyer@civil.iitd.ac.in
Financial Management, Project Risks,
Legal Issues in Business, Infrastructure
Project Management
Kaushal D. R.
kaushal@civil.iitd.ac.in
Hydraulic and Water Resources Engineering, Fluid
Mechanics, Sediment Transport, Hydraulic Structures,
Multiphase Flows, Slurry Pipeline and Flume,
Computational Fluid Dynamics, Flow Instrumentation
Kumar Arun
arunku@civil.iitd.ac.in
Human Health Risk Assessment,
Nanoparticles, Water Treatment,
Uncertainty Analysis
Jain A. K.
akjain@civil.iitd.ac.in
Earthquake Resistant Analysis of Structures,
Wind Load Analysis of Structures,
Dynamic Behaviour of Offshore Structures
Jha K. N.
knjha@civil.iitd.ac.in
Construction Project Management,
Project Success Factor, Asset Management,
Schedule Cost, Quality and Safety
Kalaga Ramachandra Rao
rrkalaga@civil.iitd.ac.in
Mass Transit Planning, Traffic Flow Modelling
and Traffic Safety
Keshari A. K.
keshari@civil.iitd.ac.in
Hydrological and Environmental Modelling, Sustainable
Development, Remote Sensing and GIS, FEM, Waste
Management and Sewerage System, Policy Analysis and
Risk Assessment, Snow and Avalanche
Khare Mukesh
mukeshk@civil.iitd.ac.in
Air and Vehicular Pollution Modelling,
Indoor Air Pollution
Khosa Rakesh
rkhosa@civil.iitd.ac.in
Water Resources Systems,
Stochastic Processes,
Conflict Resolution and Hydrologic
Modelling of Large River Basin
Madan Alok
madan@civil.iitd.ac.in
Structural Engineering, Nonlinear Structural
Dynamics, Concrete Structures,
Computing in Structural Engineering,
Structural Masonry
Maheswari J. U.
umapauI@civil.iitd.ac.in
Design Management, Matrix-Based Management,
Tools, Project Mangement,
Automation in Design and Construction
Manna Bappaditya
bmanna@civil.iitd.ac.in
Dynamic Soil-Pile Interaction,
Pile Foundation, Machine Foundation,
Stability of Reinforced Slopes
DepartmentofCivilEngineering-
PerformingovertheYears
Gupta Ashok
ashokg@civil.iitd.ac.in
Structural Engineering,
Artificial Intelligence,
Technology Enhanced Learning,
Web-Based Courses
Gupta K. K.
kkg@civil.iitd.ac.in
Soil Mechanics, Rock Mechanics,
Foundation Engineering, Geosynthetics,
Ash Pond, Landfill, Mine Tailings
Gupta Supratic
supratic@civil.iitd.ac.in
Concrete Mechanics, Self-Compacting Concrete,
Constitutive Modelling, Analytical and Experimental
Research of RC and Prestressed Concrete Bridges,
Bamboo Concrete Composites
Habib Gazala
gazala@civil.iitd.ac.in
Aerosol Monitoring Characterisation
and Modelling, Local Air Quality,
Health and Climate Effects
Faculty ProfileFaculty Profile Faculty ProfileFaculty Profile
DepartmentofCivilEngineering-
PerformingovertheYears
18 19
Nema A. K.
aknema@civil.iitd.ac.in
Environmental Engineering, Modelling,
Simulation and Optimisation of Environmental Systems,
Integrated Waste Management,
Environmental Impact Assessment
Sahoo Dipti Ranjan
drsahoo@civil.iitd.ac.in
Earthquake Engineering, Large Scale Testing,
Supplemental Damping and Energy Dissipation Devices,
Performance-Based Seismic Design,
Steel-Fibre Reinforced Concrete
Sharma K. G.
kgsharma@civil.iitd.ac.in
Rock Mechanics, Soil and Foundation Engineering,
Constitutive Modelling, Dam Foundations,
Underground Structures, Slope Stability,
Computational Methods
Ramana G. V.
ramana@civil.iitd.ac.in
Geoenvironmental Engineering,
Geotechnical Earthquake Engineering,
Waste Mechanics, Ground Improvement
Rao K. S.
raoks@civil.iitd.ac.in
Rock Mechanics and Rock Engineering, Geotechnical
Engineering, Engineering Geology, Seismic
Microzonation, Physical and Numerical Modelling,
Underfround Structures and Stability of Slopes
Rao M. M.
manepali@civil.iitd.ac.in
ANN Control of Building Frames, MIS,
System Administration,
Development of Applications Software
Sawhney Anil
asawhney@civil.iitd.ac.in
Building Information Modelling,
Construction Project Management,
Modelling and Simulation
Shahu J. T.
shahu@civil.iitd.ac.in
Geotechnology for Roads and Railway Tracks,
Numerical Modelling of Soil Behaviour,
Ground Improvement, Soil Dynamics, Geosynthetics
Swamy A. K.
akswamy@civil.iitd.ac.in
Modelling Behaviour of Asphaltic Materials,
Continuum Damage Modelling, Pavement Engineering,
Rheology, Recycling of Pavement Materials
Tewari Geetam
geetamt@civil.iitd.ac.in
Transport Planning and Policy, Traffic Safety,
Public Transport and NMV Planning
DepartmentofCivilEngineering-
PerformingovertheYears
Mathur Shashi
smathur@civil.iitd.ac.in
Groundwater Contamination, Bioremediation of Soils,
Flow through Porous Media, Phyto-Remediation,
Biodegradation in Landfills
Matsagar Vasant
matsagar@civil.iitd.ac.in
Multi-Hazard Protection of Structures,
Earthquake, Wind, Blast and Fire Engineering,
Fibre Reinforced Polymer Composites
Mittal A. K.
akmittal@civil.iitd.ac.in
Emerging Contaminants, Environmental Microbiology,
Wastewater Treatment, Benchmarking Utility,
Environmental Management in Construction Projects
Nagpal A. K.
aknagpal@civil.iitd.ac.in
Structural Engineering, Tall Buildings,
Bridges, Earthquake Engineering
Faculty ProfileFaculty Profile Faculty ProfileFaculty Profile
DepartmentofCivilEngineering-
PerformingovertheYears
20 21
15th
Khwarizmi International Award
Awarded to Dr. Datta T. K.
Adlerbretska Guest Professorship in
Sustainable Transport at the Chalmers
University of Technology (2007 to Present)
Awarded to Dr. Tewari G.
AICTE Career Award for Young Teacher
Awarded to Dr. Chahar B. R.
American Society for Engineering
Education Best Poster Award, 2000
Awarded to Dr. Sawhney A.
Best Paper Award in 3rd
Young
Geotechnical Engineers Conference,
New Delhi, 2011
Awarded to Dr. Basha M.
Best Poster, Indian Association of
Aerosol Science and Technology, 2004
Awarded to Dr. Habib G.
Best Technical Paper, Institution of
Naval Architects, 2009
Awarded to Dr. Iyer K. C.
DAAD Research Ambassador by
German Academic Exchange Services
Awarded to Dr. Matsagar V.
DAE Young Scientist Award by
Department of Atomic Energy, 2011
Awarded to Dr. Matsagar V.
Distinguished Capital IRTE and Prince
Michael International Road Safety Award
Awarded to Dr. Tewari G.
DST Young Scientist Award by
Department of Science and Technology
Awarded to Dr. Basha M., Dr. Bishnoi S.,
Dr. Chahar B. R., Dr. Chakraborty T.,
Dr. Ganguli A., Dr. Kalaga R. R.,
Dr. Kumar A., Dr. Manna B.,
Dr. Matsagar V., Dr. Sahoo D. R.
Elected President of Indian Geotechnical
Society (IGS)
Dr. Rao K. S.
Fellow of Indian National Academy of
Engineering (INAE)
Dr. Datta T. K.
Fellow of Indian Association of
Hydrologists (IAH)
Dr. Gosain A. K.
Fellow: Institution of Engineers (India);
Instititution of Surveyors (India)
Dr. Iyer K. C.
Fellow of Royal Institution of Chartered
Surveyors
Dr. Sahwney A.
Fellow: Wessex Institute of Great Britain;
Institution of Engineers; Indian Society of
Wind Engineering
Dr. Khare M.
Golden Jubilee Mentorship Award, IIT Delhi
Awarded to Dr. Datta T. K.
Honorary Fellow, Indian Association of
Structural Engineers
Dr. Bhattacharjee B.
Honorary Patron, Planet Earth Institute,
London
Dr. Khare M.
IBC Award of Excellence in Built
Environment by Indian Building Congress
Awarded to Dr. Matsagar V.
IGS Annual Lecture Award, Indian
Geotechnical Society, 2008
Awarded to Dr. Sharma K. G.
IGS Delhi Chapter Leadership Award,
2011
Awarded to Dr. Shahu J. T.
IGS‑HEICO Award for Best Journal
Paper, 1987
Awarded to Dr. Sharma K. G.
Independent Director, National
Building Construction Corporation Ltd.,
2010
Dr. Iyer K. C.
Indian Society for Rock Mechanics and
Tunnelling Technology Award for Best
Journal Paper, 2002
Awarded to Dr. Sharma K. G.
Indo-US Science and Technology
Foundation Fellow, 2008
Dr. Kalaga R. R.
International Association for
Computer Methods and Advances in
Geomechanics Excellent Journal
Paper Award, 2008
Awarded to Dr. Sharma K. G.
DepartmentofCivilEngineering-
PerformingovertheYears
Laurels to the DepartmentLaurels to the DepartmentLaurels to the DepartmentLaurels to the Department
DepartmentofCivilEngineering-
PerformingovertheYears
22 23
International Velocity Falco
Lecture Prize, Barcelona, Spain
Awarded to Dr. Tewari G.
Lucknow Management Association
Woman’s Achiever Award, 2010
Awarded to Dr. Tewari G.
Member Academic Advisory Board in
Engineering Sciences at TERI, 2009-2010
Dr. Bhattacharjee B.
Natwarlal Harilal Bhagawati Charity
Trust Prize, IIT Bombay
Awarded to Dr. Ganguli A.
Outstanding Young Faculty Fellowship
by IIT Delhi
Awarded to Dr. Ayothiraman R.,
Dr. Bhalla S., Dr. Ganguli A., Dr. Kumar A.,
Dr. Maheswari J. U., Dr. Manna B.,
Dr. Matsagar V., Dr. Sahoo D. R.
Research Council Member of CBRI and
NCCBM
Dr. Bhattacharjee B.
Residential Biofuels in South Asia:
Journal Article Recognised by ABC News,
NVTimes and Hindustan Times
Dr. Habib G.
Young Engineer Award by Indian
National Academy of Engineering (INAE)
Dr. Keshari A. K. (2000),
Dr. Madan A. (2001)
Young Professional Award by
World Federation of Professional
Organisations
Awarded to Dr. Matsagar V.
Young Research Fellowship Award,
2nd
MIT Conference of Computational
Fluid and Solid Mechanics, MIT, USA
Awarded to Dr. Bhalla S.
Teaching Excellence Award 2011 for
Structural Analysis, IIT Delhi
Awarded to Dr. Bhalla S.
Teaching Excellence Award 2012 for
Quantitative Methods in Construction
Management, IIT Delhi
Awarded to Dr. Iyer K. C.
The 11th
MAUSAM Award by Indian
Meteorological Department
Awarded to Dr. Gosain A. K.
The Stockholm Partnership Award for
Local Impact, Innovative Thinking
Awarded to Dr. Tewari G.
Vice-President, North India Chapter,
EWRI of AACE
Dr. Chahar B. R.
Vishwakarma Award for Outstanding
Academician by Construction Industry
Development Council, 2010
Awarded to Dr. Iyer K. C.
Young Engineers Award by Institution of
Engineers (India)
Awarded to Dr. Matsagar V. (2009),
Dr. Ayothiraman R. (2010)
DepartmentofCivilEngineering-
PerformingovertheYears
Laurels to the DepartmentLaurels to the Department Continuing Education ProgrammesContinuing Education Programmes
l 	 Practices in Mathematical Modelling, 		
	 Dr. H. S. Gupta, QIP, 2005-2006
l 	 Application of Modern Analytical Tools 		
	 and Numerical Analysis in Engineering 		
	 and Science, Dr. S. K. Deb and Dr. S. 		
	 Bhalla, QIP, 2005-2006
l 	 Planning and Design of Bus Transportation 	
	 Systems, Dr. R. R. Kalaga, QIP, 2006-2007
l	Modern Concrete Construction Process, 		
	 Prof. B. Bhattacharjee and
	 Dr. K. N. Jha, QIP, 2006-2007
l 	 Pavement Engineering with
	 Geosynthetics, Prof. G. V. Rao and
	 Prof. K. S. Rao, QIP, 2006-2007
l 	 Advance Experimental Methodologies 		
	 in Water and Air Pollution, Prof. M. Khare 	
	 and Prof. A. K. Mittal, CEP, 2006-2007
l 	 Emerging Technologies for
	 Environmental Management,
	 Dr. A. K. Nema, QIP, 2006-2007
l 	 Modelling Conceptual and Mathematical 	
	 Modelling of Urban Systems and its
	 Subsystems, Dr. S. K. Deb and Dr. Suresh 	
	 Chandra, MA, QIP, 2006-2007
l 	 Advancements in Solid Waste Management, 	
	 Prof. B. J. Alappat, QIP, 2007-2008
Short Term Courses and Workshops under Continuing Education Programme (CEP) and Quality
Improvement Programme (QIP) mode have been organised every year in a variety of topics to benefit the
academicians all over the country. The list below shows the wide range of topics covered in the past decade.
l 	 Rock Investigation for Power Grid
	 Corporation, Prof. K. S. Rao and
	 Prof. K. K. Gupta, CEP, 2002-2003
l 	 Mathematical Modelling Concepts and 		
	 Application, Dr. H. S. Gupta, QIP, 		
	 2003-2004
l	Workshop on NPEEE (National Programme 	
	 on Earthquake Engineering), Prof. T. K. 		
	 Datta, Prof. A. K. Jain, CEP, 2003-2004
l	 National Programme for Capacity 			
	 Building of Engineers in Earthquake Risk 		
	 Management, Prof. A. K. Jain and Prof. 		
	 K. S. Rao, 2004
l	Advances in Groundwater Research, 		
	 Prof. A. K. Keshari, QIP, 2004-2005
l	Mathematical Modelling of Engineering 		
	 Systems, Dr. H. S. Gupta, QIP, 2004-2005
l	 Rehabilitation and Retrofitting of 		
	 Structures, under NPEEE (National 		
	 Programme on Earthquake Enginering 		
	 Education), Prof. T. K. Datta and Dr. S. 		
	 Bhalla, 2004-2005
l 	 Recent Development in Geotechnical 		
	 Engineering: Geoenvironmental
	 Engineering and Landfills, Prof. Manoj 		
	 Datta and Prof. G. V. Ramana, 2005-2006
l 	 Modern Construction Project Management, 	
	 Prof. B. Bhattacharjee and Dr. K. N. Jha, 		
	 QIP, 2007-2008
l 	 Advance Technique for Water Resources 		
	 Planning and Management, Prof. A. K. Keshari 	
	 and Dr. B. R. Chahar, QIP, 2007-2008
l 	 Mathematical Modelling and Mathematics, 	
	 Dr. H. S. Gupta, QIP, 2007-2008
l 	 Advances in Concrete Construction 		
	 Processes, Prof. B. Bhattacharjee and
	 Dr. K. N. Jha, QIP, 2008-2009
l	 Workshop on Recycle of Sewage Waste 		
	 using MBR Technology, Prof. A. K. Mittal 		
	 and Dr. K. N. Jha, QIP, 2008-2009
l 	 Safety and Environmental Management 		
	 of Construction Projects, Dr. K. N. Jha 		
	 and Prof. A. K. Mittal, QIP, 2009-2010
l 	 Theory and Practices in Construction Project 	
	 Management, Dr. K. N. Jha, QIP, 2010-2011
l 	 Aerosol Properties: Health Regional, Air 		
	 Quality and Climate, Dr. Gazala Habib, 		
	 QIP and CEP, 2010-2011
l 	 Safety and Environmental, Dr. K. N. Jha 		
	 and Prof. A. K. Mittal, QIP, 2011-2012
23
DepartmentofCivilEngineering-
PerformingovertheYears
DepartmentofCivilEngineering-
PerformingovertheYears
24 25
DepartmentofCivilEngineering-
PerformingovertheYears
Conferences and Training ProgrammesConferences and Training Programmes
National Workshop on GPS and
RWC-PRISM
12th
to 15th
July, 2004
Prof. A. K. Gosain
Sponsored by Rice-Wheat Consortium
for the Indo-Gangetic Plains, New Delhi
NATCOM Consultative Meeting
on Impacts of Climate Change on
Water Resources
22th
July, 2005
Prof. A. K. Gosain
Sponsored by Winrock International
India, New Delhi
SWAT/ADAPT Modelling for
Integrated Water Resource
Management in lndia
20th
-30th
August, 2007
Prof. A. K. Gosain
Sponsored by INDO-US Science and
Technology Forum, New Delhi
Short course on Analysis, Design
and Construction of Structures
23rd
December, 2007
Dr. S. Bhalla, Prof. B. Bhattacharjee
Landfills-Design, Construction
and Operation
16th
to 18th
July, 2004
Prof. Manoj Datta, Prof. G. V. Rao
Sponsored by Mumbai Waste
Management Ltd., Maharashtra
Construction Practices and
Management-1
24th
-26th
April, 2007
Dr. K. N. Jha, Prof. B. Bhattacharjee
Sponsored by Nagarjuna Construction
Company Ltd., Hyderabad
Construction Management for
Operational Efficiencies
19th
to 21st
June, 2007
Dr. K. N. Jha, Prof. B. Bhattacharjee
Sponsored by Nagarjuna Construction
Company Ltd., Hyderabad
Computer Aided Scheduling
Resource Leveling, Tracking
and Reporting for a Construction
Project
14th
to 15th
March, 2008
Dr. K. N. Jha, Dr. S. K. Deb
2nd
Global Land Cover Network
Workshop
3rd
April, 2006
Prof. A. K. Gosain
Sponsored by the Food and Agriculture
Organisation of the UN, New Delhi
Training on Water Pollution and
Waterborne Diseases for CPCB
30th
August to 1st
September, 2007
Prof. A. K. Mittal
Sponsored by Central Pollution
Control Board, New Delhi
Management of Construction for
Enhanced Operational Efficiency
22nd
to 24th
April, 2008
Dr. K. N. Jha
Sponsored by Nagarjuna Construction
Company Ltd., Hyderabad
Remote Sensing and GIS Applications
in Hydroelectric Projects
19th
to 22nd
August, 2008
Prof. A. K. Gosain, Prof. A. K. Keshari
Sponsored by People Enhancement
Solutions, New Delhi
Training of Indian Railways Services
of Engineers (IRSE Officers)
18th
to 29th
May, 2009
Dr. K. N. Jha
Sponsored by Indian Railways Institute
of Civil Engineering, Pune
Supervisory Development
Programme
18th
to 24th
April, 2010
Dr. K. N. Jha
Sponsored by L&T Ltd., Chennai
Improving Project Performance
using Virtual Design and
Construction
1st
May, 2010
Prof. K. C. Iyer, Prof. Anil Sawhney
Fire Performance of Steel and
Concrete Structures
28th
June, 2010 and
13th
December, 2011
Dr. Vasant Matsagar
SWAT Workshops in India
12th
to 16th
July, 2010
Prof. A. K. Gosain
Short Course on Artificial
Neural Networks in Seismic
Control of Structures
17th
– 18th
February, 2012
Dr. M. M. Rao
Short Course on Advanced Sensing
Technology for Civil Engineers
17th
to 19th
July, 2009 and
14th
to 16th
May, 2010
Dr. S. Bhalla
CPCB Residential Training Programme
on Environment Mointoring and
Latest Trends and Guideliens for
EnvironmentalImpactAssessmentStudies
15th
to 17th
January, 2010
Dr. A. K. Nema
Sponsored by CPCB, New Delhi
Short Course on Advances in
Earthquake Engineering
1) 30th
to 31st
July, 2010
Dr. Vasant Matsagar
2) 28th
to 29th
October, 2011
Dr. Dipti Ranjan Sahoo
Training Programme for Civil
Engineers on IS 800 (2007)
for L&T
1st
and 2nd
April, 2011
Dr. Vasant Matsagar
Sponsored by L&T, Faridabad
UKIERI Concrete Congress
8th
to 10th
March, 2012
Dr. Shashank Bishnoi, Dr. S. Bhalla and
Prof. B. Bhattacharjee
Short Term Course on Slurry
Pipeline Design
28th
to 31st
May, 2010
Dr. Deo Raj Kaushal
Sponsored by Sociedade De Fomrnto
Industrial Pvt. Ltd., Goa
20 II I-BIM Student Competition
1st
August to 14th
October, 2011
Prof. K. C. Iyer, Prof. Anil Sawhney
Sponsored by Autodesk India Pvt. Ltd.,
Bangalore
One Day Seminar on Urban
Challenges in the Context of Climate
Change
20th
April, 2012
Dr. A. K. Nema and Dr. Arun Kumar
Sponsored by Liberty Institute, New Delhi
Training Programme on GIS and
Its Application in Civil Engineering
27th
November to 11th
December, 2007
Prof. A. K. Gosain
Sponsored by L. D. College of
Engineering, Ahmedabad
DepartmentofCivilEngineering-
PerformingovertheYears
26 27
DepartmentofCivilEngineering-
PerformingovertheYears
T
he Civil Engineering Society (CES)
is a non-registered, non-profit
organisation within the Department
of Civil Engineering at Indian Institute of
Technology Delhi.
The members of the society include the
undergraduate and postgraduate students,
faculty, scientists and research engineers of
the Department. The CES has been quite
active in providing its members, particularly
thestudentmembers,aplatformtoshowcase
and sharpen their talents, and medium
for interaction with eminent scientists and
professionals through a variety of activities
planned throughout the year.
Aspartoftheendeavourtoinspireyoungminds
towards science and research, engineering
ethics and values, talks and presentations
are regularly organised by the CES wherein
distinguished scientists, experts from different
walks of life present their scholarly work,
thoughts and activities to the students.
A Glimpse of Activities:
l Technical Magazine (Nirmaan)
l Seminars by National and 		
International Experts
l Technical Events
l Cultural and Sporting Events
l Educational Trips
l Encouragement to Innovation and 	
Learning
l Freshers’ Welcome and Orientation
l Farewell to Graduating Students
DIMENSIONS - Civil Department 	
Annual Cultural Festival
l Technical Talks
l Alumni Meet
l Tensegrity Quiz
l Bulls and Bears
l Tennis Ball Cricket
l Sudoku and Dumb-Charades
Prof. A. K. Gosain
President (CES)
Dr. Vasant Matsagar
Vice-President (CES)
http://cesociety.iitd.ac.in.
Student PlacementStudent Placement
Since the beginning of its inception, the Department has always been instrumental in producing academicians
and practitioners with knowledge of the various aspects of Civil Engineering. The students of our Department are
always eager to learn and they get placed before they receive their degree. The past three batches of the students
are presently serving at various positions and levels in the following companies and universities among others:
l	 ALSTOM Power Ltd.
l	 AXIOM Education Pvt. Ltd.
l	 Adventity Global Services Pvt. Ltd.
l	 Bharat Heavy Electricals Ltd. (BHEL)
l	 Beacon Advisory Services
l 	 Bain and Company
l 	 BGR Energy Systems
l	 Brainmatics Solutions Pvt. Ltd.
l	 Coal India Ltd.
l	 Credit Suisse
l 	 Consulting Engineering Services (India) 	
	 Pvt. Ltd.
l	 Council of Scientific and Industrial 	
	 Research Labortories
l	 DE Shaw India Software Pvt. Ltd.
l	 Dar Al Handasah
l	 Deloitte Consulting
l	 Dunnhumby
l 	 Ecosense Sustainable Solutions Pvt. Ltd.
l 	 Egis India Consulting Engineers Pvt. Ltd.
l	 Energo Engineering Projects Ltd.
l 	 Fluor Daniel
l 	 EPA Infrastructure Ltd.
l	 Flipkart Online Services Pvt. Ltd.
l	 Eperium Business Solutions
l	 Futures First Info Services Pvt. Ltd.
l	 Evalueserve.com Pvt. Ltd.
l	 Gabion Technologies India Pvt. Ltd.
l	 Geometric Ltd.
l 	 GLA University, Mathura
l	 Global Analytics India Pvt. Ltd.
l	 Globrin
l	 Grail Research India Pvt. Ltd.
l	 Halcrow Consulting India Pvt. Ltd.
l	 i3 Consulting Pvt. Ltd.
l	 Indian Oil Corporation Ltd.
l 	 Indus Valley Partner India Pvt. Ltd.
l	 Itaas India Pvt. Ltd.
l 	 IRCON
l 	 ISGEC John Thompson
l 	 ITC
l 	 Jaypee (India) Capital Services Ltd.
l 	 Jindal Steel and Power Ltd.
l 	 KiiT University
l 	 K L University
l 	 Konkan Railway Corporation Ltd.
l 	 KPMG Advisory Services Pvt. Ltd.
l 	 Larsen & Toubro, Chennai
l 	 L&T Ramboll Consulting Engineers Ltd.
l 	 Leighton Contractors (India) Pvt. Ltd.
l 	 Lovely Professional University
l 	 McKinsey and Company
l 	 Mewar University
l 	 Midas India
l 	 Moserbaer Solar Ltd.
l 	 MphasiS
l 	 National Council for Cement and 	
	 Building Materials (NCB)
l 	 National Thermal Power Corporation Ltd.
l 	 NCB India
l 	 NKG Infrastructure Ltd.
l 	 Opera Solutions
l 	 Oracle India Pvt. Ltd.
l 	 Paramount Group
l 	 Polaris Software Lab Ltd.
l 	 Price Waterhouse Coopers Pvt. Ltd.
l 	 Rajiv Gandhi University of Knowledge 	
	 Technologies
l 	 RBS India Development Centre Pvt. Ltd.
l 	 Reliance Power Ltd.
l	 Reliance Infrastructure
l 	 RITES
l 	 Schlumberger
l 	 Sharda Group of Institutions
l 	 Shell Technology India Pvt. Ltd.
l 	 Shimizu Corporation
l 	 Shinghania University
l 	 SMEC India Pvt. Ltd.
l 	 Soma Enterprise Ltd.
l 	 Steel Authority of India Ltd. (SAIL)
l 	 TCE Consulting Engineers Ltd.
l 	 The Boston Consulting Group (India) 	
	 Pvt. Ltd. (B.C.G.)
l 	 The Icfai Institute of Science and 	
	 Technology (IcfaiTech)
l 	 The Parthenon Group
l 	 The Stellar Group of Companies
l	 Unitech Ltd.
l 	 Verity Knowledge Solutions Pvt. Ltd. 	
	 (UBS Affiliate)
l 	 Wyvil Systems
l	 WAPCOS Ltd.
l 	 WNS Research and Analytics Services
l 	 Zinnov
l 	 ZS Associates India Pvt. Ltd.
Civil Engineering SocietyCivil Engineering Society
DepartmentofCivilEngineering-
PerformingovertheYears
28 29
(1966, B.Tech.) Mr. Ramesh C. Gupta,
Executive Director - Engineering,
Airport Authority of India, New Delhi, India.
(1966, B.Tech.) Mr. Santokh Singh Sethi,
Joint Director, Bureau of Indian
Standards, New Delhi, India.
(1967, B.Tech.) Mr. Dinesh Sikand,
Director General,
Military Engineering Services, India.
(1968, B.Tech.) Mr. Parameshwaran R.,
Director General, Survey of India,
Dehradun, India.
(1969, B.Tech.) Mr. Rajvir Singh Kadan,
Managing Director, Tata Limited, London, UK.
(1972, B.Tech.) Mr. Arun Bhardwaj,
Director General,
National Water Development Agency,
Government of India.
(1972, B.Tech.) Mr. Nirmal Jot Singh,
Director, Central Water Commission,
Ministry of Water Resources,
Government of India.
(1972, B.Tech.) Mr. S. K. Banerjee,
Director, Central Water Commission,
Ministry of Water Resources,
Government of India.
(1972, B.Tech.) Mr. Suresh Kumar Puri,
Director, Indian Roads Congress,
New Delhi, India.
(1979, B.Tech.) Mr. Jawala Bar Bhandari,
Chief Engineer,
Indian Railways, New Delhi, India.
(1979, B.Tech.) Mr. Rajiv Goel,
General Manager,
Airport Authority of India,
New Delhi, India.
(1981, B.Tech.) Mr. Ashok V.,
First Secretary, Ministry of External Affairs,
Government of India.
(1982, B.Tech.) Mr. Ashwani Gupta,
Scientist-G,
Department of Scientific and Industrial
Research (DSIR), Ministry of Science and
Technology, Government of India.
(1982, B.Tech.) Mr. Rajesh Agarwal,
Chief Engineer,
Oil and Natural Gas Corporation
Limited, India.
(1984, B.Tech.) Mr. Amrendra Singh,
Central Water Commission,
Ministry of Water Resources,
Government of India.
(1985, B.Tech.) Mr. Arvind Kumar Singh,
Deputy Chief Engineer,
Indian Railways, Lucknow, India.
(1985, B.Tech.) Mr. Girish Kumar,
Director, Military Engineering Services,
Ministry of Defense, Government of India.
(1985, B.Tech.) Mr. Siddhi Nath Roy,
Chief Secretary,
Government of Haryana.
(1986, B.Tech.) Mr. Bhopal Singh,
Director, Central Water Commission,
Ministry of Water Resources,
Government of India.
(1986, B.Tech.) Mr. Munesh Kumar,
Director, Ministry of Finance,
Government of India.
(1986, B.Tech.) Mr. Ravinesh Kumar,
Chief Vigilance Officer,
National Buildings Construction
Corporation,
Ministry of Urban Development,
Government of India; and
Director, Railway Board,
Ministry of Railways, Government of India.
(1987, M.Tech.) Mr. Binod Bihari Lal,
Chief Engineer, Border Roads
Organisation, Government of India.
Dr. P. S. Rana (1970, B.Tech.)
IIT Delhi Distinguished
Alumni Award (2006).
Prof. Manoj Datta, (1977,
B.Tech.) Director, Panjab
Engineering College,
Chandigarh.
Prof. Pradipta Banerji,
(1981, B.Tech.) Director,
Indian Institute of
Technology (IIT) Roorkee.
Mr. Nirmal Kumar Tiwari,
(1971, B.Tech.) Bid Manager,
Balfour Beatty Ground
Engineering Limited, UK.
Dr. Shyam Sunder, (1977, B.Tech.)
Director, National Institute of
Standards and Technology (NIST),
Gaithersburg, USA.
Mr. Mukesh Kumar Jain, (1985,
B.Tech.) General Manager
(Technical), National Highways
Authority of India (NHAI),
Lucknow, India.
Mr. Nawal Kishore Sharma, (1985,
B.Tech.) Joint Director (Planning),
Military Engineer Services (MES),
Ministry of Defense, Government
of India.
Mr. Sanjeev Kumar Lohia, (1986,
B.Tech.) Director (Urban Transport),
Ministry of Urban Development,
Government of India.
Dr. Vijay Mohan Sharma, (1985,
Ph.D.) Former Director, Central
Soil and Materials Research
Station, New Delhi, India.
Mr. Vishal Modgil, (1989,
B.Tech.) General Manager,
Larsen and Toubro (L&T),
Faridabad, India.
(1987, B.Tech.) Mr. Upendra Nath Mishra,
Deputy Director,
Survey of India, Shillong, India.
(1988, B.Tech.) Mr. Amit Kumar Manuwal,
Director,
Research Design and Standards
Organisation, Ministry of Railways,
Government of India.
(1988, B.Tech.) Mr. Trilok Kothari,
Director, Ministry of Railways,
Government of India.
(1989, B.Tech.) Mr. Shyam Singh,
Deputy Chief Engineer,
Indian Railways, Government of India.
(1994, B.Tech.) Mr. Ashwani Kumar,
Director, Ministry of Railways,
Government of India.
DepartmentofCivilEngineering-
PerformingovertheYears
Department AlumniDepartment Alumni
DepartmentofCivilEngineering-
PerformingovertheYears
30
Future GoalsFuture Goals
DepartmentofCivilEngineering-
PerformingovertheYears
30
The focus of the faculty at the Department is to enhance their potentials in the cutting-
edge research and to create world-class laboratories for teaching and research. Future
thrust areas identified by the faculty include:
l 	 Sophisticated Structural Protection 	
	 Technologies
l	 Futuristic Sensing Technologies for 	
	 Damage Detection and Structural 	
	 Health Monitoring
l 	 Making Buildings and Structures more 	
	 Sustainable and Eco-Friendly
l 	 Virtual Construction Process including 	
	 Evolving Policy Framework, Claim 	
	 Management and Dispute Resolution 	
	 in a Scientific Way Facilitating Faster 	
	 and Economical Construction
l	 Multi-Scale Modelling
l	 Nano-Composites in Structures
l	 Application of IT in Transport and 	
	 Modelling Freight Traffic
l 	 Sub-Surface Drainage
l 	 Geo-Informatics in Sustainable Water 	
	 Resources Management
l 	 Hydrodynamic and Water Quality 	
	 Modelling
l 	 Multi-Objective Analysis of Water
	 Resources Systems
l 	 Hydraulics of Water Distribution
	 Systems
l 	 Phyto-Remediation and
	 Bio-Remediation of Soils
l 	 Flow through Natural Barriers in
	 Land	Fills
l	 Geoenvironmental and Geohazards
l	 Physical-Mechanical-Thermal
	 Behaviour of Rocks
l 	 Dynamic Effects on Foundations
l	 Energy Geotechnology
l 	 Reliability-Based Design
l	 Performance-Based Seismic Design
l 	 Nuclear Waste Repositories
l 	 Urban Infrastructure Environment
l 	 Sustainable Materials
l 	 Advanced Construction Technologies
l 	 Sustainable Building Design
l	 Modern Construction Project
	 Management
l	 Structural Seismic Strengthening and 	
	 Rehabiliation
l	 Continuum Mechanics
Department of Civil Engineering
Indian Institute of Technology Delhi
Hauz Khas, New Delhi - 110 016 India
Tel.: +91-11-2659 1241
Fax: +91-11-2658 1117
E-Mail: hodcivil@admin.iitd.ac.in
Website: http://civil.iitd.ac.in

Brochure

  • 1.
    Geo technical Engineeri ng Structural Enginee ring T ransportationEngin eering W ater Resources Engin eering E nvironmental Engin eering
  • 2.
    MISSION VISION To contribute toIndia and the world through excellence in scientific and technical education and research; to serve as a valuable resource to remain a source of pride for all Indians. To generate new knowledge by engaging in cutting-edge research and to promote academic growth by offering state-of-the-art undergraduate, postgraduate and doctoral programmes. To identify, based on an informed perception of Indian, regional and global needs, areas of specialisation upon which the Institute can concentrate. To undertake collaborative projects which offer opportunities for long-term interaction with academia and industry. To develop human potential to its fullest extent so that intellectually capable and imaginatively gifted leaders can emerge in a range of professions. • Academic integrity and accountability • Respect and tolerance for the views of every individual • Attention to issues of national relevance as well as of global concern • Breadth of understanding, including knowledge of the human sciences • Appreciation of intellectual excellence and creativity • An unfettered spirit of exploration, rationality and enterprise Vision Mission PAGE @ Values May, 2012 No part of this publication may be reproduced in any form or by any means without the prior written permission of the publisher. Design and Production: silverlinecomm@gmail.com © VISION MISSION VALUESVALUES
  • 3.
    Message from Headof the Department....................................................... Evolution of the Civil Engineering Department at IIT Delhi.................. Academic and Research Programmes........................................................... Laboratory and Testing Facilities.................................................................... Publications........................................................................................................... Sponsored Research and Consultancy Projects.......................................... Faculty Profile....................................................................................................... Laurels to the Department................................................................................ Continuing Education Programmes............................................................... Conferences and Training Programmes........................................................ Civil Engineering Society................................................................................... Student Placement.............................................................................................. Department Alumni............................................................................................ Future Goals.......................................................................................................... Contents 7 9 10 11 12 13 14 20 23 24 26 27 28 30 PAGE @
  • 4.
    Prof. A. K.Gosain Head, Department of Civil Engineering, IIT Delhi Message from Head of the Department We have just concluded the Golden Jubilee Celebrations of the Institute with a sense of achievement and accomplishment. Since the Civil Engineering Department has all along contributed not only in providing the academic excellence but also in building the basic infrastructure of this great Institute; therefore, there would not be a better time to engage in introspection and put together our achievements as well as our resolve to engage with the challenges of future in view of rapidly changing needs and environment of our society. This brief information brochure is an attempt in this direction. The Department has always been able to attract and nurture faculty that is equivalent to the best as per international standards. They have always been engaging with the cutting edge research in their respective areas and contributed not only at the national but also international level. They have always been deeply involved in moulding our young bright undergraduate and graduate students into technologists, technocrats and researchers who are capable of providing best of solutions to the societal problems. I can vouch on behalf of my faculty colleagues and staff that we will continue to strive for greater heights in teaching and research that is relevant and shall help in nation building. I am very happy to present a brief account of our engagements, achievements and aspirations in the following pages. Message from Head of the Department PAGE @
  • 5.
    DepartmentofCivilEngineering- PerformingovertheYears 8 9 DepartmentofCivilEngineering- PerformingovertheYears EvolutionoftheCivilEngineering DepartmentatIITDelhi EvolutionoftheCivilEngineering DepartmentatIITDelhi T he CivilEngineering Department is one of the oldest departments of the Institute and was established along with the inception of the Institute in 1961. Starting with a regular five year bachelor’s degree in Civil Engineering, the Department has grown leaps and bounds in offering seven different specialised Institute M.Tech. Programmes along with a host of industry sponsored M.Tech./PG Diploma Programmes. The Department also offers M.S. (Research) and Ph.D. Programmes in different frontier areas of research in Civil Engineering. The Department which housed in a tiny shed in 1961, moved through the corridors of Block I, before finally settling in its present location at Block IV and V occupying nearly 4500 m2 of covered area on the campus. The Department also excels in industry sponsored research and consultancy activities. This journey, however, has not been overnight; it’s been a result of hard work put in by the faculty, the laboratory staff, the students and has thoroughly been backed by the administration at all levels through the times. In the formative stages: Prof. R. N. Dogra, the founding director, IIT Delhi detailing the model of the Institute’sbuilding The main cantilever entrance gate of IIT Delhi The majestic main building of the Institute
  • 6.
    DepartmentofCivilEngineering- PerformingovertheYears 10 11 DepartmentofCivilEngineering- PerformingovertheYears Laboratory andTesting FacilitiesLaboratory and Testing Facilities Academic and Research ProgrammesAcademic and Research Programmes Bachelor of Technology in Civil Engineering The Department offers B.Tech. degree to eligible candidates, which is a four year undergraduate programme. The students have a wide variety of core and elective courses to choose from. After completing the broad based core courses, each student chooses an elective course in his/her area of special interest from amongst the streams of Construction Engineering and Mangement, Environmental Engineering, Geotechnical Engineering, Structural Engineering, Transportation Engineering and Water Resources Engineering. The students undergo field trips, industry oriented practical training and colloquium and final year project as a part of the undergraduate programme. Each year more than 110 students join this prestigious programme. Master of Technology in Civil Engineering The Department offers seven postgraduate programmes to eligible candidates, which are of two year duration each leading to M.Tech. degree in a specialised field (as given in the table alongside). In each programme, students acquire knowledge in broad-based core courses followed by electives which provide in-depth and specialised knowledge in areas of special interest to them. Like the undergraduate students, they also undergo field trips and industry oriented practical training. A major project is also to be undertaken as a part of the curriculum in the final two semesters which involves research or design and development. Around 244 students enroll for these M.Tech. programmes every year. The Department also offers M.Tech. in Construction Technology and Management sponsored by Larsen & Toubro and one year PG Diploma in Metro Rail Transport: Technology and Management sponsored by DMRC which is open to industry sponsored candidates only. The Department also offers few M.Tech. programmes to universities abroad through the two-way video conferencing mode since 2009. Research Programmes (Doctor of Philosophy, Master of Science) The Department offers Ph.D. degree to postgraduate students who have attained M.Tech./M.E. degree and also to a few exceptionally bright B.Tech. students. At any instance, we have more than 150 students who are full-time, faculty who pursue their Ph.D. under the QIP (Quality Improvement Programme), part-time students who are basically from industry or nearby engineering colleges. The Department also offers Master of Science (Research) in all the areas of Civil Engineering to bright undergraduate students. A bout three-fourths of the Department area is occupied by the state-of-the- art laboratories, namely: l Advanced Dynamics Laboratory l Computational Geotechnics Laboratory l Concrete Structures Laboratory l Construction Simulation Laboratory l Construction Technology Laboratory l Departmental Computational Laboratory l Engineering Geology Laboratory l Environmental Engineering Laboratory l Foundation Engineering Laboratory l Geoenvironmental Engineering Laboratory l Geographical Information System (GIS) Laboratory l Heavy Structures Laboratory l Materials Research Laboratory l Multi-Hazard Protective Structures Laboratory l Rock Mechanics Laboratory l Simulation Laboratory l Smart Structures and Dynamics Laboratory l Soil Mechanics Laboratory l Soil Research Laboratory (Constant Temperature) l Structural Analysis Laboratory l Structural Simulation Laboratory l Surveying Laboratory l Traffic Engineering Laboratory l Transportation Engineering Laboratory B.Tech. in Civil Engineering Ph.D. in Civil Engineering Master of Science by Research in Civil Engineering
  • 7.
    DepartmentofCivilEngineering- PerformingovertheYears 12 13 DepartmentofCivilEngineering- PerformingovertheYears Sponsored Researchand Consultancy ProjectsSponsored Research and Consultancy ProjectsPublicationsPublications T he faculty are always enthusiastic in publishing books/book chapters, journal papers and conference papers both at the national and international levels on a variety of topics. In recent years (2007-2012) 361 journal papers, 527 conference papers and 42 book/book chapters have been published. The faculty also actively take part in editing and reviewing books, journal papers, conference papers/proceedings, journal issues, technical articles, masters and doctorate theses. B ecause of the proficiency of the Department in Civil Engineering, various government divisions, Public Sector Undertakings and industries in the private sector approach the learned faculty for undertaking various research and consultancy projects. Complex design, construction and maintenance problems of the infrastructure sector are resolved through the intervention of the expert faculty of the Civil Engineering Department. The consultancy projects are undertaken for arriving at practical solutions to problems of special nature. The sponsoring agencies include, among others, Ministry of HRD, Ministry of Water Resources, Ministry of Earth Sciences, Ministry of Environment and Forests, DST, BRNS, CSIR, ONGC, EIL, CWC. To name a few organisations which took consultancy on various projects from the Department include DDA, DJB, NDMC, MCD, Northern Railways, NTPC, BSES, Power Grid Corporation, Unitech, Konkan Railways, Grasim, L&T, IRCON, RITES and others. Books/book chapters published year-wise Papers presented in national/international conferences Papers published in national/international journals Value of research projects (in lacs INR) Value of consultancy projects (in lacs INR) 7 8 8 2 8 9 Partial
  • 8.
    DepartmentofCivilEngineering- PerformingovertheYears 14 15 Deb S.K. skdeb@civil.iitd.ac.in Transportation Engineering, Urban Engineering, Fuzzy System Modelling and Airways, Sustainable City Datta Manoj mdatta@civil.iitd.ac.in Geoenvironment, Landfills, Ash Ponds, Tailings, Ground Improvement, Slope Stability, Dams, Offshore Geotechnology Datta T. K. tkdatta@civil.iitd.ac.in Earthquake Engineering, Wind Engineering, Offshore Dynamics, Structural Control Ganguli Abhijit abhijit.ganguli@civil.iitd.ac.in Non-Destructive Evaluation of Structures, Subsurface Imaging, Ultrasonics, Wave Scattering Problems, Structural Dynamics, Active Control of Structural Vibration, Mechatronics Garg N. K. nkgarg@civil.iitd.ac.in Water Resources Systems, Finite Element Watershed Modelling, Irrigation Management, CAD Gosain A. K. gosain@civil.iitd.ac.in Integrated Watershed Modelling, GIS, Hydrological Modelling, Irrigation Management, Climate Change, Environmental Impact Assessment Chakraborty Tanusree tanusree@civiI.iitd.ac.in Foundation Engineering, Blast Loading in Soil, Soil Plasticity and Constitutive Modeling, Soil-Structure Interaction and Underground Construction in Soil and Rock Dhanya C. T. dhanya@civil.iitd.ac.in Hydroclimatological Modelling, Nonlinear Dynamics and Chaos Theory, Stochastic Hydrology, Optimisation in Water Resource Systems, Data Mining in Hydrology, Water Resources Management Basha B. Munwar basha@civiI.iitd.ac.in Computational Geomechanics, Soil Dynamics, Earthquake Resistant Design of Retaining Structures, Performance-Based/Reliability-Based Designs in Geotechnical and Geoenvironmental Engineering Alappat B. J. alappat@civil.iitd.ac.in Environmental Engineering, Solid Waste Management, Incineration, Fluidised Bed Operations Ayothiraman R. araman@civiI.iitd.ac.in Soil Dynamics and Earthquake Engineering, Pile Foundations, Deep Excavations in Urban Areas, Problematic Soils and Ground Improvement Benipal G. S. gurmail@civil.iitd.ac.in Concrete Mechanics, Constitutive Modelling, Non-Linear Elasto-Dynamics and Stability Faculty ProfileFaculty Profile Faculty ProfileFaculty Profile DepartmentofCivilEngineering- PerformingovertheYears Bhalla S. sbhalla@civil.iitd.ac.in Smart Material and Structures, Structural Health Monitoring, Non-Destructive Evaluation, Bio-Mechanics, Engineered Bamboo Structures Bhattacharjee B. bishwa@civil.iitd.ac.in Durability of Concrete, Rebar Corrosion, Cement Based Composites, Construction Technology, Building Science Bishnoi S. shashank.bishnoi@civil.iitd.ac.in Experimental and Numerical Studies into Hydration of Cement and Supplementary Cementitious Materials, Sustainability, Durability, Repair and Life-Cycle Costs of Concrete Structures Chahar B. R. chahar@civil.iitd.ac.in Seepage, Drainage, Canal Design
  • 9.
    DepartmentofCivilEngineering- PerformingovertheYears 16 17 Iyer K.C. kciyer@civil.iitd.ac.in Financial Management, Project Risks, Legal Issues in Business, Infrastructure Project Management Kaushal D. R. kaushal@civil.iitd.ac.in Hydraulic and Water Resources Engineering, Fluid Mechanics, Sediment Transport, Hydraulic Structures, Multiphase Flows, Slurry Pipeline and Flume, Computational Fluid Dynamics, Flow Instrumentation Kumar Arun arunku@civil.iitd.ac.in Human Health Risk Assessment, Nanoparticles, Water Treatment, Uncertainty Analysis Jain A. K. akjain@civil.iitd.ac.in Earthquake Resistant Analysis of Structures, Wind Load Analysis of Structures, Dynamic Behaviour of Offshore Structures Jha K. N. knjha@civil.iitd.ac.in Construction Project Management, Project Success Factor, Asset Management, Schedule Cost, Quality and Safety Kalaga Ramachandra Rao rrkalaga@civil.iitd.ac.in Mass Transit Planning, Traffic Flow Modelling and Traffic Safety Keshari A. K. keshari@civil.iitd.ac.in Hydrological and Environmental Modelling, Sustainable Development, Remote Sensing and GIS, FEM, Waste Management and Sewerage System, Policy Analysis and Risk Assessment, Snow and Avalanche Khare Mukesh mukeshk@civil.iitd.ac.in Air and Vehicular Pollution Modelling, Indoor Air Pollution Khosa Rakesh rkhosa@civil.iitd.ac.in Water Resources Systems, Stochastic Processes, Conflict Resolution and Hydrologic Modelling of Large River Basin Madan Alok madan@civil.iitd.ac.in Structural Engineering, Nonlinear Structural Dynamics, Concrete Structures, Computing in Structural Engineering, Structural Masonry Maheswari J. U. umapauI@civil.iitd.ac.in Design Management, Matrix-Based Management, Tools, Project Mangement, Automation in Design and Construction Manna Bappaditya bmanna@civil.iitd.ac.in Dynamic Soil-Pile Interaction, Pile Foundation, Machine Foundation, Stability of Reinforced Slopes DepartmentofCivilEngineering- PerformingovertheYears Gupta Ashok ashokg@civil.iitd.ac.in Structural Engineering, Artificial Intelligence, Technology Enhanced Learning, Web-Based Courses Gupta K. K. kkg@civil.iitd.ac.in Soil Mechanics, Rock Mechanics, Foundation Engineering, Geosynthetics, Ash Pond, Landfill, Mine Tailings Gupta Supratic supratic@civil.iitd.ac.in Concrete Mechanics, Self-Compacting Concrete, Constitutive Modelling, Analytical and Experimental Research of RC and Prestressed Concrete Bridges, Bamboo Concrete Composites Habib Gazala gazala@civil.iitd.ac.in Aerosol Monitoring Characterisation and Modelling, Local Air Quality, Health and Climate Effects Faculty ProfileFaculty Profile Faculty ProfileFaculty Profile
  • 10.
    DepartmentofCivilEngineering- PerformingovertheYears 18 19 Nema A.K. aknema@civil.iitd.ac.in Environmental Engineering, Modelling, Simulation and Optimisation of Environmental Systems, Integrated Waste Management, Environmental Impact Assessment Sahoo Dipti Ranjan drsahoo@civil.iitd.ac.in Earthquake Engineering, Large Scale Testing, Supplemental Damping and Energy Dissipation Devices, Performance-Based Seismic Design, Steel-Fibre Reinforced Concrete Sharma K. G. kgsharma@civil.iitd.ac.in Rock Mechanics, Soil and Foundation Engineering, Constitutive Modelling, Dam Foundations, Underground Structures, Slope Stability, Computational Methods Ramana G. V. ramana@civil.iitd.ac.in Geoenvironmental Engineering, Geotechnical Earthquake Engineering, Waste Mechanics, Ground Improvement Rao K. S. raoks@civil.iitd.ac.in Rock Mechanics and Rock Engineering, Geotechnical Engineering, Engineering Geology, Seismic Microzonation, Physical and Numerical Modelling, Underfround Structures and Stability of Slopes Rao M. M. manepali@civil.iitd.ac.in ANN Control of Building Frames, MIS, System Administration, Development of Applications Software Sawhney Anil asawhney@civil.iitd.ac.in Building Information Modelling, Construction Project Management, Modelling and Simulation Shahu J. T. shahu@civil.iitd.ac.in Geotechnology for Roads and Railway Tracks, Numerical Modelling of Soil Behaviour, Ground Improvement, Soil Dynamics, Geosynthetics Swamy A. K. akswamy@civil.iitd.ac.in Modelling Behaviour of Asphaltic Materials, Continuum Damage Modelling, Pavement Engineering, Rheology, Recycling of Pavement Materials Tewari Geetam geetamt@civil.iitd.ac.in Transport Planning and Policy, Traffic Safety, Public Transport and NMV Planning DepartmentofCivilEngineering- PerformingovertheYears Mathur Shashi smathur@civil.iitd.ac.in Groundwater Contamination, Bioremediation of Soils, Flow through Porous Media, Phyto-Remediation, Biodegradation in Landfills Matsagar Vasant matsagar@civil.iitd.ac.in Multi-Hazard Protection of Structures, Earthquake, Wind, Blast and Fire Engineering, Fibre Reinforced Polymer Composites Mittal A. K. akmittal@civil.iitd.ac.in Emerging Contaminants, Environmental Microbiology, Wastewater Treatment, Benchmarking Utility, Environmental Management in Construction Projects Nagpal A. K. aknagpal@civil.iitd.ac.in Structural Engineering, Tall Buildings, Bridges, Earthquake Engineering Faculty ProfileFaculty Profile Faculty ProfileFaculty Profile
  • 11.
    DepartmentofCivilEngineering- PerformingovertheYears 20 21 15th Khwarizmi InternationalAward Awarded to Dr. Datta T. K. Adlerbretska Guest Professorship in Sustainable Transport at the Chalmers University of Technology (2007 to Present) Awarded to Dr. Tewari G. AICTE Career Award for Young Teacher Awarded to Dr. Chahar B. R. American Society for Engineering Education Best Poster Award, 2000 Awarded to Dr. Sawhney A. Best Paper Award in 3rd Young Geotechnical Engineers Conference, New Delhi, 2011 Awarded to Dr. Basha M. Best Poster, Indian Association of Aerosol Science and Technology, 2004 Awarded to Dr. Habib G. Best Technical Paper, Institution of Naval Architects, 2009 Awarded to Dr. Iyer K. C. DAAD Research Ambassador by German Academic Exchange Services Awarded to Dr. Matsagar V. DAE Young Scientist Award by Department of Atomic Energy, 2011 Awarded to Dr. Matsagar V. Distinguished Capital IRTE and Prince Michael International Road Safety Award Awarded to Dr. Tewari G. DST Young Scientist Award by Department of Science and Technology Awarded to Dr. Basha M., Dr. Bishnoi S., Dr. Chahar B. R., Dr. Chakraborty T., Dr. Ganguli A., Dr. Kalaga R. R., Dr. Kumar A., Dr. Manna B., Dr. Matsagar V., Dr. Sahoo D. R. Elected President of Indian Geotechnical Society (IGS) Dr. Rao K. S. Fellow of Indian National Academy of Engineering (INAE) Dr. Datta T. K. Fellow of Indian Association of Hydrologists (IAH) Dr. Gosain A. K. Fellow: Institution of Engineers (India); Instititution of Surveyors (India) Dr. Iyer K. C. Fellow of Royal Institution of Chartered Surveyors Dr. Sahwney A. Fellow: Wessex Institute of Great Britain; Institution of Engineers; Indian Society of Wind Engineering Dr. Khare M. Golden Jubilee Mentorship Award, IIT Delhi Awarded to Dr. Datta T. K. Honorary Fellow, Indian Association of Structural Engineers Dr. Bhattacharjee B. Honorary Patron, Planet Earth Institute, London Dr. Khare M. IBC Award of Excellence in Built Environment by Indian Building Congress Awarded to Dr. Matsagar V. IGS Annual Lecture Award, Indian Geotechnical Society, 2008 Awarded to Dr. Sharma K. G. IGS Delhi Chapter Leadership Award, 2011 Awarded to Dr. Shahu J. T. IGS‑HEICO Award for Best Journal Paper, 1987 Awarded to Dr. Sharma K. G. Independent Director, National Building Construction Corporation Ltd., 2010 Dr. Iyer K. C. Indian Society for Rock Mechanics and Tunnelling Technology Award for Best Journal Paper, 2002 Awarded to Dr. Sharma K. G. Indo-US Science and Technology Foundation Fellow, 2008 Dr. Kalaga R. R. International Association for Computer Methods and Advances in Geomechanics Excellent Journal Paper Award, 2008 Awarded to Dr. Sharma K. G. DepartmentofCivilEngineering- PerformingovertheYears Laurels to the DepartmentLaurels to the DepartmentLaurels to the DepartmentLaurels to the Department
  • 12.
    DepartmentofCivilEngineering- PerformingovertheYears 22 23 International VelocityFalco Lecture Prize, Barcelona, Spain Awarded to Dr. Tewari G. Lucknow Management Association Woman’s Achiever Award, 2010 Awarded to Dr. Tewari G. Member Academic Advisory Board in Engineering Sciences at TERI, 2009-2010 Dr. Bhattacharjee B. Natwarlal Harilal Bhagawati Charity Trust Prize, IIT Bombay Awarded to Dr. Ganguli A. Outstanding Young Faculty Fellowship by IIT Delhi Awarded to Dr. Ayothiraman R., Dr. Bhalla S., Dr. Ganguli A., Dr. Kumar A., Dr. Maheswari J. U., Dr. Manna B., Dr. Matsagar V., Dr. Sahoo D. R. Research Council Member of CBRI and NCCBM Dr. Bhattacharjee B. Residential Biofuels in South Asia: Journal Article Recognised by ABC News, NVTimes and Hindustan Times Dr. Habib G. Young Engineer Award by Indian National Academy of Engineering (INAE) Dr. Keshari A. K. (2000), Dr. Madan A. (2001) Young Professional Award by World Federation of Professional Organisations Awarded to Dr. Matsagar V. Young Research Fellowship Award, 2nd MIT Conference of Computational Fluid and Solid Mechanics, MIT, USA Awarded to Dr. Bhalla S. Teaching Excellence Award 2011 for Structural Analysis, IIT Delhi Awarded to Dr. Bhalla S. Teaching Excellence Award 2012 for Quantitative Methods in Construction Management, IIT Delhi Awarded to Dr. Iyer K. C. The 11th MAUSAM Award by Indian Meteorological Department Awarded to Dr. Gosain A. K. The Stockholm Partnership Award for Local Impact, Innovative Thinking Awarded to Dr. Tewari G. Vice-President, North India Chapter, EWRI of AACE Dr. Chahar B. R. Vishwakarma Award for Outstanding Academician by Construction Industry Development Council, 2010 Awarded to Dr. Iyer K. C. Young Engineers Award by Institution of Engineers (India) Awarded to Dr. Matsagar V. (2009), Dr. Ayothiraman R. (2010) DepartmentofCivilEngineering- PerformingovertheYears Laurels to the DepartmentLaurels to the Department Continuing Education ProgrammesContinuing Education Programmes l Practices in Mathematical Modelling, Dr. H. S. Gupta, QIP, 2005-2006 l Application of Modern Analytical Tools and Numerical Analysis in Engineering and Science, Dr. S. K. Deb and Dr. S. Bhalla, QIP, 2005-2006 l Planning and Design of Bus Transportation Systems, Dr. R. R. Kalaga, QIP, 2006-2007 l Modern Concrete Construction Process, Prof. B. Bhattacharjee and Dr. K. N. Jha, QIP, 2006-2007 l Pavement Engineering with Geosynthetics, Prof. G. V. Rao and Prof. K. S. Rao, QIP, 2006-2007 l Advance Experimental Methodologies in Water and Air Pollution, Prof. M. Khare and Prof. A. K. Mittal, CEP, 2006-2007 l Emerging Technologies for Environmental Management, Dr. A. K. Nema, QIP, 2006-2007 l Modelling Conceptual and Mathematical Modelling of Urban Systems and its Subsystems, Dr. S. K. Deb and Dr. Suresh Chandra, MA, QIP, 2006-2007 l Advancements in Solid Waste Management, Prof. B. J. Alappat, QIP, 2007-2008 Short Term Courses and Workshops under Continuing Education Programme (CEP) and Quality Improvement Programme (QIP) mode have been organised every year in a variety of topics to benefit the academicians all over the country. The list below shows the wide range of topics covered in the past decade. l Rock Investigation for Power Grid Corporation, Prof. K. S. Rao and Prof. K. K. Gupta, CEP, 2002-2003 l Mathematical Modelling Concepts and Application, Dr. H. S. Gupta, QIP, 2003-2004 l Workshop on NPEEE (National Programme on Earthquake Engineering), Prof. T. K. Datta, Prof. A. K. Jain, CEP, 2003-2004 l National Programme for Capacity Building of Engineers in Earthquake Risk Management, Prof. A. K. Jain and Prof. K. S. Rao, 2004 l Advances in Groundwater Research, Prof. A. K. Keshari, QIP, 2004-2005 l Mathematical Modelling of Engineering Systems, Dr. H. S. Gupta, QIP, 2004-2005 l Rehabilitation and Retrofitting of Structures, under NPEEE (National Programme on Earthquake Enginering Education), Prof. T. K. Datta and Dr. S. Bhalla, 2004-2005 l Recent Development in Geotechnical Engineering: Geoenvironmental Engineering and Landfills, Prof. Manoj Datta and Prof. G. V. Ramana, 2005-2006 l Modern Construction Project Management, Prof. B. Bhattacharjee and Dr. K. N. Jha, QIP, 2007-2008 l Advance Technique for Water Resources Planning and Management, Prof. A. K. Keshari and Dr. B. R. Chahar, QIP, 2007-2008 l Mathematical Modelling and Mathematics, Dr. H. S. Gupta, QIP, 2007-2008 l Advances in Concrete Construction Processes, Prof. B. Bhattacharjee and Dr. K. N. Jha, QIP, 2008-2009 l Workshop on Recycle of Sewage Waste using MBR Technology, Prof. A. K. Mittal and Dr. K. N. Jha, QIP, 2008-2009 l Safety and Environmental Management of Construction Projects, Dr. K. N. Jha and Prof. A. K. Mittal, QIP, 2009-2010 l Theory and Practices in Construction Project Management, Dr. K. N. Jha, QIP, 2010-2011 l Aerosol Properties: Health Regional, Air Quality and Climate, Dr. Gazala Habib, QIP and CEP, 2010-2011 l Safety and Environmental, Dr. K. N. Jha and Prof. A. K. Mittal, QIP, 2011-2012 23 DepartmentofCivilEngineering- PerformingovertheYears
  • 13.
    DepartmentofCivilEngineering- PerformingovertheYears 24 25 DepartmentofCivilEngineering- PerformingovertheYears Conferences andTraining ProgrammesConferences and Training Programmes National Workshop on GPS and RWC-PRISM 12th to 15th July, 2004 Prof. A. K. Gosain Sponsored by Rice-Wheat Consortium for the Indo-Gangetic Plains, New Delhi NATCOM Consultative Meeting on Impacts of Climate Change on Water Resources 22th July, 2005 Prof. A. K. Gosain Sponsored by Winrock International India, New Delhi SWAT/ADAPT Modelling for Integrated Water Resource Management in lndia 20th -30th August, 2007 Prof. A. K. Gosain Sponsored by INDO-US Science and Technology Forum, New Delhi Short course on Analysis, Design and Construction of Structures 23rd December, 2007 Dr. S. Bhalla, Prof. B. Bhattacharjee Landfills-Design, Construction and Operation 16th to 18th July, 2004 Prof. Manoj Datta, Prof. G. V. Rao Sponsored by Mumbai Waste Management Ltd., Maharashtra Construction Practices and Management-1 24th -26th April, 2007 Dr. K. N. Jha, Prof. B. Bhattacharjee Sponsored by Nagarjuna Construction Company Ltd., Hyderabad Construction Management for Operational Efficiencies 19th to 21st June, 2007 Dr. K. N. Jha, Prof. B. Bhattacharjee Sponsored by Nagarjuna Construction Company Ltd., Hyderabad Computer Aided Scheduling Resource Leveling, Tracking and Reporting for a Construction Project 14th to 15th March, 2008 Dr. K. N. Jha, Dr. S. K. Deb 2nd Global Land Cover Network Workshop 3rd April, 2006 Prof. A. K. Gosain Sponsored by the Food and Agriculture Organisation of the UN, New Delhi Training on Water Pollution and Waterborne Diseases for CPCB 30th August to 1st September, 2007 Prof. A. K. Mittal Sponsored by Central Pollution Control Board, New Delhi Management of Construction for Enhanced Operational Efficiency 22nd to 24th April, 2008 Dr. K. N. Jha Sponsored by Nagarjuna Construction Company Ltd., Hyderabad Remote Sensing and GIS Applications in Hydroelectric Projects 19th to 22nd August, 2008 Prof. A. K. Gosain, Prof. A. K. Keshari Sponsored by People Enhancement Solutions, New Delhi Training of Indian Railways Services of Engineers (IRSE Officers) 18th to 29th May, 2009 Dr. K. N. Jha Sponsored by Indian Railways Institute of Civil Engineering, Pune Supervisory Development Programme 18th to 24th April, 2010 Dr. K. N. Jha Sponsored by L&T Ltd., Chennai Improving Project Performance using Virtual Design and Construction 1st May, 2010 Prof. K. C. Iyer, Prof. Anil Sawhney Fire Performance of Steel and Concrete Structures 28th June, 2010 and 13th December, 2011 Dr. Vasant Matsagar SWAT Workshops in India 12th to 16th July, 2010 Prof. A. K. Gosain Short Course on Artificial Neural Networks in Seismic Control of Structures 17th – 18th February, 2012 Dr. M. M. Rao Short Course on Advanced Sensing Technology for Civil Engineers 17th to 19th July, 2009 and 14th to 16th May, 2010 Dr. S. Bhalla CPCB Residential Training Programme on Environment Mointoring and Latest Trends and Guideliens for EnvironmentalImpactAssessmentStudies 15th to 17th January, 2010 Dr. A. K. Nema Sponsored by CPCB, New Delhi Short Course on Advances in Earthquake Engineering 1) 30th to 31st July, 2010 Dr. Vasant Matsagar 2) 28th to 29th October, 2011 Dr. Dipti Ranjan Sahoo Training Programme for Civil Engineers on IS 800 (2007) for L&T 1st and 2nd April, 2011 Dr. Vasant Matsagar Sponsored by L&T, Faridabad UKIERI Concrete Congress 8th to 10th March, 2012 Dr. Shashank Bishnoi, Dr. S. Bhalla and Prof. B. Bhattacharjee Short Term Course on Slurry Pipeline Design 28th to 31st May, 2010 Dr. Deo Raj Kaushal Sponsored by Sociedade De Fomrnto Industrial Pvt. Ltd., Goa 20 II I-BIM Student Competition 1st August to 14th October, 2011 Prof. K. C. Iyer, Prof. Anil Sawhney Sponsored by Autodesk India Pvt. Ltd., Bangalore One Day Seminar on Urban Challenges in the Context of Climate Change 20th April, 2012 Dr. A. K. Nema and Dr. Arun Kumar Sponsored by Liberty Institute, New Delhi Training Programme on GIS and Its Application in Civil Engineering 27th November to 11th December, 2007 Prof. A. K. Gosain Sponsored by L. D. College of Engineering, Ahmedabad
  • 14.
    DepartmentofCivilEngineering- PerformingovertheYears 26 27 DepartmentofCivilEngineering- PerformingovertheYears T he CivilEngineering Society (CES) is a non-registered, non-profit organisation within the Department of Civil Engineering at Indian Institute of Technology Delhi. The members of the society include the undergraduate and postgraduate students, faculty, scientists and research engineers of the Department. The CES has been quite active in providing its members, particularly thestudentmembers,aplatformtoshowcase and sharpen their talents, and medium for interaction with eminent scientists and professionals through a variety of activities planned throughout the year. Aspartoftheendeavourtoinspireyoungminds towards science and research, engineering ethics and values, talks and presentations are regularly organised by the CES wherein distinguished scientists, experts from different walks of life present their scholarly work, thoughts and activities to the students. A Glimpse of Activities: l Technical Magazine (Nirmaan) l Seminars by National and International Experts l Technical Events l Cultural and Sporting Events l Educational Trips l Encouragement to Innovation and Learning l Freshers’ Welcome and Orientation l Farewell to Graduating Students DIMENSIONS - Civil Department Annual Cultural Festival l Technical Talks l Alumni Meet l Tensegrity Quiz l Bulls and Bears l Tennis Ball Cricket l Sudoku and Dumb-Charades Prof. A. K. Gosain President (CES) Dr. Vasant Matsagar Vice-President (CES) http://cesociety.iitd.ac.in. Student PlacementStudent Placement Since the beginning of its inception, the Department has always been instrumental in producing academicians and practitioners with knowledge of the various aspects of Civil Engineering. The students of our Department are always eager to learn and they get placed before they receive their degree. The past three batches of the students are presently serving at various positions and levels in the following companies and universities among others: l ALSTOM Power Ltd. l AXIOM Education Pvt. Ltd. l Adventity Global Services Pvt. Ltd. l Bharat Heavy Electricals Ltd. (BHEL) l Beacon Advisory Services l Bain and Company l BGR Energy Systems l Brainmatics Solutions Pvt. Ltd. l Coal India Ltd. l Credit Suisse l Consulting Engineering Services (India) Pvt. Ltd. l Council of Scientific and Industrial Research Labortories l DE Shaw India Software Pvt. Ltd. l Dar Al Handasah l Deloitte Consulting l Dunnhumby l Ecosense Sustainable Solutions Pvt. Ltd. l Egis India Consulting Engineers Pvt. Ltd. l Energo Engineering Projects Ltd. l Fluor Daniel l EPA Infrastructure Ltd. l Flipkart Online Services Pvt. Ltd. l Eperium Business Solutions l Futures First Info Services Pvt. Ltd. l Evalueserve.com Pvt. Ltd. l Gabion Technologies India Pvt. Ltd. l Geometric Ltd. l GLA University, Mathura l Global Analytics India Pvt. Ltd. l Globrin l Grail Research India Pvt. Ltd. l Halcrow Consulting India Pvt. Ltd. l i3 Consulting Pvt. Ltd. l Indian Oil Corporation Ltd. l Indus Valley Partner India Pvt. Ltd. l Itaas India Pvt. Ltd. l IRCON l ISGEC John Thompson l ITC l Jaypee (India) Capital Services Ltd. l Jindal Steel and Power Ltd. l KiiT University l K L University l Konkan Railway Corporation Ltd. l KPMG Advisory Services Pvt. Ltd. l Larsen & Toubro, Chennai l L&T Ramboll Consulting Engineers Ltd. l Leighton Contractors (India) Pvt. Ltd. l Lovely Professional University l McKinsey and Company l Mewar University l Midas India l Moserbaer Solar Ltd. l MphasiS l National Council for Cement and Building Materials (NCB) l National Thermal Power Corporation Ltd. l NCB India l NKG Infrastructure Ltd. l Opera Solutions l Oracle India Pvt. Ltd. l Paramount Group l Polaris Software Lab Ltd. l Price Waterhouse Coopers Pvt. Ltd. l Rajiv Gandhi University of Knowledge Technologies l RBS India Development Centre Pvt. Ltd. l Reliance Power Ltd. l Reliance Infrastructure l RITES l Schlumberger l Sharda Group of Institutions l Shell Technology India Pvt. Ltd. l Shimizu Corporation l Shinghania University l SMEC India Pvt. Ltd. l Soma Enterprise Ltd. l Steel Authority of India Ltd. (SAIL) l TCE Consulting Engineers Ltd. l The Boston Consulting Group (India) Pvt. Ltd. (B.C.G.) l The Icfai Institute of Science and Technology (IcfaiTech) l The Parthenon Group l The Stellar Group of Companies l Unitech Ltd. l Verity Knowledge Solutions Pvt. Ltd. (UBS Affiliate) l Wyvil Systems l WAPCOS Ltd. l WNS Research and Analytics Services l Zinnov l ZS Associates India Pvt. Ltd. Civil Engineering SocietyCivil Engineering Society
  • 15.
    DepartmentofCivilEngineering- PerformingovertheYears 28 29 (1966, B.Tech.)Mr. Ramesh C. Gupta, Executive Director - Engineering, Airport Authority of India, New Delhi, India. (1966, B.Tech.) Mr. Santokh Singh Sethi, Joint Director, Bureau of Indian Standards, New Delhi, India. (1967, B.Tech.) Mr. Dinesh Sikand, Director General, Military Engineering Services, India. (1968, B.Tech.) Mr. Parameshwaran R., Director General, Survey of India, Dehradun, India. (1969, B.Tech.) Mr. Rajvir Singh Kadan, Managing Director, Tata Limited, London, UK. (1972, B.Tech.) Mr. Arun Bhardwaj, Director General, National Water Development Agency, Government of India. (1972, B.Tech.) Mr. Nirmal Jot Singh, Director, Central Water Commission, Ministry of Water Resources, Government of India. (1972, B.Tech.) Mr. S. K. Banerjee, Director, Central Water Commission, Ministry of Water Resources, Government of India. (1972, B.Tech.) Mr. Suresh Kumar Puri, Director, Indian Roads Congress, New Delhi, India. (1979, B.Tech.) Mr. Jawala Bar Bhandari, Chief Engineer, Indian Railways, New Delhi, India. (1979, B.Tech.) Mr. Rajiv Goel, General Manager, Airport Authority of India, New Delhi, India. (1981, B.Tech.) Mr. Ashok V., First Secretary, Ministry of External Affairs, Government of India. (1982, B.Tech.) Mr. Ashwani Gupta, Scientist-G, Department of Scientific and Industrial Research (DSIR), Ministry of Science and Technology, Government of India. (1982, B.Tech.) Mr. Rajesh Agarwal, Chief Engineer, Oil and Natural Gas Corporation Limited, India. (1984, B.Tech.) Mr. Amrendra Singh, Central Water Commission, Ministry of Water Resources, Government of India. (1985, B.Tech.) Mr. Arvind Kumar Singh, Deputy Chief Engineer, Indian Railways, Lucknow, India. (1985, B.Tech.) Mr. Girish Kumar, Director, Military Engineering Services, Ministry of Defense, Government of India. (1985, B.Tech.) Mr. Siddhi Nath Roy, Chief Secretary, Government of Haryana. (1986, B.Tech.) Mr. Bhopal Singh, Director, Central Water Commission, Ministry of Water Resources, Government of India. (1986, B.Tech.) Mr. Munesh Kumar, Director, Ministry of Finance, Government of India. (1986, B.Tech.) Mr. Ravinesh Kumar, Chief Vigilance Officer, National Buildings Construction Corporation, Ministry of Urban Development, Government of India; and Director, Railway Board, Ministry of Railways, Government of India. (1987, M.Tech.) Mr. Binod Bihari Lal, Chief Engineer, Border Roads Organisation, Government of India. Dr. P. S. Rana (1970, B.Tech.) IIT Delhi Distinguished Alumni Award (2006). Prof. Manoj Datta, (1977, B.Tech.) Director, Panjab Engineering College, Chandigarh. Prof. Pradipta Banerji, (1981, B.Tech.) Director, Indian Institute of Technology (IIT) Roorkee. Mr. Nirmal Kumar Tiwari, (1971, B.Tech.) Bid Manager, Balfour Beatty Ground Engineering Limited, UK. Dr. Shyam Sunder, (1977, B.Tech.) Director, National Institute of Standards and Technology (NIST), Gaithersburg, USA. Mr. Mukesh Kumar Jain, (1985, B.Tech.) General Manager (Technical), National Highways Authority of India (NHAI), Lucknow, India. Mr. Nawal Kishore Sharma, (1985, B.Tech.) Joint Director (Planning), Military Engineer Services (MES), Ministry of Defense, Government of India. Mr. Sanjeev Kumar Lohia, (1986, B.Tech.) Director (Urban Transport), Ministry of Urban Development, Government of India. Dr. Vijay Mohan Sharma, (1985, Ph.D.) Former Director, Central Soil and Materials Research Station, New Delhi, India. Mr. Vishal Modgil, (1989, B.Tech.) General Manager, Larsen and Toubro (L&T), Faridabad, India. (1987, B.Tech.) Mr. Upendra Nath Mishra, Deputy Director, Survey of India, Shillong, India. (1988, B.Tech.) Mr. Amit Kumar Manuwal, Director, Research Design and Standards Organisation, Ministry of Railways, Government of India. (1988, B.Tech.) Mr. Trilok Kothari, Director, Ministry of Railways, Government of India. (1989, B.Tech.) Mr. Shyam Singh, Deputy Chief Engineer, Indian Railways, Government of India. (1994, B.Tech.) Mr. Ashwani Kumar, Director, Ministry of Railways, Government of India. DepartmentofCivilEngineering- PerformingovertheYears Department AlumniDepartment Alumni
  • 16.
    DepartmentofCivilEngineering- PerformingovertheYears 30 Future GoalsFuture Goals DepartmentofCivilEngineering- PerformingovertheYears 30 Thefocus of the faculty at the Department is to enhance their potentials in the cutting- edge research and to create world-class laboratories for teaching and research. Future thrust areas identified by the faculty include: l Sophisticated Structural Protection Technologies l Futuristic Sensing Technologies for Damage Detection and Structural Health Monitoring l Making Buildings and Structures more Sustainable and Eco-Friendly l Virtual Construction Process including Evolving Policy Framework, Claim Management and Dispute Resolution in a Scientific Way Facilitating Faster and Economical Construction l Multi-Scale Modelling l Nano-Composites in Structures l Application of IT in Transport and Modelling Freight Traffic l Sub-Surface Drainage l Geo-Informatics in Sustainable Water Resources Management l Hydrodynamic and Water Quality Modelling l Multi-Objective Analysis of Water Resources Systems l Hydraulics of Water Distribution Systems l Phyto-Remediation and Bio-Remediation of Soils l Flow through Natural Barriers in Land Fills l Geoenvironmental and Geohazards l Physical-Mechanical-Thermal Behaviour of Rocks l Dynamic Effects on Foundations l Energy Geotechnology l Reliability-Based Design l Performance-Based Seismic Design l Nuclear Waste Repositories l Urban Infrastructure Environment l Sustainable Materials l Advanced Construction Technologies l Sustainable Building Design l Modern Construction Project Management l Structural Seismic Strengthening and Rehabiliation l Continuum Mechanics
  • 17.
    Department of CivilEngineering Indian Institute of Technology Delhi Hauz Khas, New Delhi - 110 016 India Tel.: +91-11-2659 1241 Fax: +91-11-2658 1117 E-Mail: hodcivil@admin.iitd.ac.in Website: http://civil.iitd.ac.in