SlideShare a Scribd company logo
ECONOMISERS AND FLUE GAS COOLERS
We design, manufacture, supply spares and services for economisers
and flue gas coolers for industrial uses, power stations and marine
vessels to help them to improve efficiency, reduce fuel consumption,
lower emissions and cut costs.
How are economisers and flue gas coolers used?
Power stations, whether they are coal fired, waste to energy or biomass
plants, benefit from increased efficiency by using Green’s economisers
and flue gas coolers to produce more electricity or reduce their fuel
consumption.
Industrial plants such as pulp and paper or steel mills, chemical pro-
ducers and food processors use our economisers to preheat water to
produce hot water or steam for various on-site uses such
as drying ovens, kilns, heating, sterilisation, cooking and electricity
generation for their own use or to export to the grid as an additional
revenue stream.
We manufacture economisers and flue gas coolers with
the following parameters using smooth tube, spiral tube &
H-fin designs:
• Water pressure: 10 – 320 bar
• Water flowrate: 10 – 2800 t/h
• Thermal duty: 1 – 100 MW
• Tube length: up to 20 m
• Module size WxLxH: from 1m x 3m x 1m to 6m x 20m x 4 m
• Module weight: 15 – 150 tonnes
*Other sizes are available, please contact us with your specific requirements
What are economisers and flue gas coolers?
Economisers and flue gas coolers enable the waste heat generated by
boilers to be captured for a range of applications.
We design and fabricate economisers in our factory in Wakefield,
where we’ve been manufacturing since 1845 when our founder
Edward Green patented his design. Every one of them is bespoke to
meet our customers’ specific needs and operational requirements.
A common application of economisers in steam power plants is to
capture the waste heat from boiler stack gases (sometimes known
as flue gas) and transfer it to the boiler feedwater. This raises the
temperature of the boiler feedwater, lowering the needed energy input,
in turn reducing the firing rates needed for the rated boiler output.
Economisers lower stack temperatures which may cause condensation
of acidic combustion gases and serious equipment corrosion damage
if care is not taken in their design and material selection.
Flue gas coolers have a similar role, but water heated in them is used
for various applications in the plant rather than being evaporated in
the boiler. To avoid these problems, we carefully select materials of
construction and recommend regular inspections so that potential
problems are identified and rectified before they become performance
issues which affect operational efficiency.
Drax Power Station Amagerværket BIO4 Segheza Packaging
Green’s Head Office: Unit 3, Calder Vale Road, Wakefield WF1 5PH. United Kingdom
T: + 44 (0)1924 203970 F: +44 (0)1924 332921 E: sales@greenspower.co.uk www.greenspower.co.uk
Green’s is part of Heat Exchange Group and is one of Europe’s largest providers of
boiler equipment and services including repairs, inspections, installation and spares.
We help companies in the energy, industrial and marine sectors to recover waste heat
efficiently, maximise energy usage and cut costs by designing and manufacturing
products from our certificated UK factory for installation worldwide.
Information about our other products and services including:
• Design engineering
• High performance boiler tube bending machine
• Industrial and marine boiler services
• Spares
• Steel fabrication
• Waste heat and exhaust gas boilers
is available from www.greenspower.co.uk/downloads
PREVIOUS WORK
Green’s Head Office: Unit 3, Calder Vale Road, Wakefield WF1 5PH. United Kingdom
T: + 44 (0)1924 203970 F: +44 (0)1924 332921 E: sales@greenspower.co.uk www.greenspower.co.uk
Power generation – coal to biomass conversion
Project:
Drax Power Station, Selby, UK
3 Economisers
Background:
6 x 660 MW largest, cleanest and most efficient power plant in the UK. Green’s first
supplied economisers for this site in the 1960s. Green’s provided a replacement of
one of the economisers when the station started converting from coal to biomass.
Building upon this success, Green’s was asked to replace two further economisers.
Services provided:
Design, manufacture and delivery
Combined heat and power - biomass
Project:
Bio4 Amagerværket heat and power plant, Copenhagen, Denmark
12 Economisers
Background:
Economiser for a 500 MWf CFB boiler; the district heat capacity
415 MJ/s. The power plant’s net electricity production capacity is 150 MW
Services provided:
Design, manufacture and delivery
Largest contract to date
Power generation – energy from waste
Project:
LondonEnergy
Replacement of 5 existing economisers with Green’s design ‘H’ Fin economisers for
improved performance and maintenance
Background:
One in four energy from waste stations serving UK’s capital city
Services provided:
Design, manufacture and installation

More Related Content

Similar to Boiler Economiser .pdf

RGS_Folder_thermagy
RGS_Folder_thermagyRGS_Folder_thermagy
RGS_Folder_thermagy
Maarten Den Heijer
 
2010_COLEMAN_COMPANY_CASE_STUDY
2010_COLEMAN_COMPANY_CASE_STUDY2010_COLEMAN_COMPANY_CASE_STUDY
2010_COLEMAN_COMPANY_CASE_STUDY
AAKASH AMATYA
 
GC - Alder Hey
GC - Alder HeyGC - Alder Hey
GC - Alder Hey
Samuel Wright
 
Dickinson Group of Companies Furnace & Industrial Services
Dickinson Group of Companies   Furnace & Industrial ServicesDickinson Group of Companies   Furnace & Industrial Services
Dickinson Group of Companies Furnace & Industrial Services
Trevor Dickinson
 
BASET High-Technology Equipment for Power and Petroleum Industries from the M...
BASET High-Technology Equipment for Power and Petroleum Industries from the M...BASET High-Technology Equipment for Power and Petroleum Industries from the M...
BASET High-Technology Equipment for Power and Petroleum Industries from the M...
Trade Representation of Russian Federation in Spain
 
Steam Turbine - biomass
Steam Turbine - biomassSteam Turbine - biomass
Steam Turbine - biomass
Olivier De Block
 
VPI-CO-0001
VPI-CO-0001VPI-CO-0001
VPI-CO-0001
Chris Paul
 
GI Energy - Rehau PowerPoint June 2015
GI Energy - Rehau PowerPoint June 2015GI Energy - Rehau PowerPoint June 2015
GI Energy - Rehau PowerPoint June 2015
GI Energy
 
Gi Energy Renewable Energy Opportunities with Infrastructure Projects June 2015
Gi Energy Renewable Energy Opportunities with Infrastructure Projects June 2015Gi Energy Renewable Energy Opportunities with Infrastructure Projects June 2015
Gi Energy Renewable Energy Opportunities with Infrastructure Projects June 2015
GI Energy
 
Fidvi Refrigeration Corporate Profile
Fidvi Refrigeration Corporate ProfileFidvi Refrigeration Corporate Profile
Fidvi Refrigeration Corporate Profile
Fidvi Refrigeration Industries
 
DESMI District Energy Brochure 2015
DESMI District Energy Brochure 2015DESMI District Energy Brochure 2015
DESMI District Energy Brochure 2015
Jorn Urup Nielsen
 
Gi energy renewable energy opportunities with infrastructure projects june ...
Gi energy   renewable energy opportunities with infrastructure projects june ...Gi energy   renewable energy opportunities with infrastructure projects june ...
Gi energy renewable energy opportunities with infrastructure projects june ...
GI Energy
 
Coal firing
Coal firingCoal firing
Coal firing
ABDUL RAZZAQ SHAHID
 
Thermax_Corporate Bro_V11_25th Feb 2015_FINAL
Thermax_Corporate Bro_V11_25th Feb 2015_FINALThermax_Corporate Bro_V11_25th Feb 2015_FINAL
Thermax_Corporate Bro_V11_25th Feb 2015_FINAL
Sarwo Budiyono
 
Hydrogen Heat to Power.pdf
Hydrogen Heat to Power.pdfHydrogen Heat to Power.pdf
Hydrogen Heat to Power.pdf
Daniel Donatelli
 
Energy Capital - Tyseley Energy Park - Prospectus
Energy Capital - Tyseley Energy Park - ProspectusEnergy Capital - Tyseley Energy Park - Prospectus
Energy Capital - Tyseley Energy Park - Prospectus
Gavin Harper
 
AD ENER-G BROCHURE 140313
AD ENER-G BROCHURE 140313AD ENER-G BROCHURE 140313
AD ENER-G BROCHURE 140313
Scott Tamplin
 
O2E Wood Recycling
O2E Wood RecyclingO2E Wood Recycling
O2E Wood Recycling
O2E Recycling Technologies
 
Waste to Energy Technical Study
Waste to Energy Technical StudyWaste to Energy Technical Study
Waste to Energy Technical Study
IBD CleanTech, Inc
 
Heating and Hot Water Refurbishment at St Paul’s Cathedral
Heating and Hot Water Refurbishment at St Paul’s CathedralHeating and Hot Water Refurbishment at St Paul’s Cathedral
Heating and Hot Water Refurbishment at St Paul’s Cathedral
EMEX
 

Similar to Boiler Economiser .pdf (20)

RGS_Folder_thermagy
RGS_Folder_thermagyRGS_Folder_thermagy
RGS_Folder_thermagy
 
2010_COLEMAN_COMPANY_CASE_STUDY
2010_COLEMAN_COMPANY_CASE_STUDY2010_COLEMAN_COMPANY_CASE_STUDY
2010_COLEMAN_COMPANY_CASE_STUDY
 
GC - Alder Hey
GC - Alder HeyGC - Alder Hey
GC - Alder Hey
 
Dickinson Group of Companies Furnace & Industrial Services
Dickinson Group of Companies   Furnace & Industrial ServicesDickinson Group of Companies   Furnace & Industrial Services
Dickinson Group of Companies Furnace & Industrial Services
 
BASET High-Technology Equipment for Power and Petroleum Industries from the M...
BASET High-Technology Equipment for Power and Petroleum Industries from the M...BASET High-Technology Equipment for Power and Petroleum Industries from the M...
BASET High-Technology Equipment for Power and Petroleum Industries from the M...
 
Steam Turbine - biomass
Steam Turbine - biomassSteam Turbine - biomass
Steam Turbine - biomass
 
VPI-CO-0001
VPI-CO-0001VPI-CO-0001
VPI-CO-0001
 
GI Energy - Rehau PowerPoint June 2015
GI Energy - Rehau PowerPoint June 2015GI Energy - Rehau PowerPoint June 2015
GI Energy - Rehau PowerPoint June 2015
 
Gi Energy Renewable Energy Opportunities with Infrastructure Projects June 2015
Gi Energy Renewable Energy Opportunities with Infrastructure Projects June 2015Gi Energy Renewable Energy Opportunities with Infrastructure Projects June 2015
Gi Energy Renewable Energy Opportunities with Infrastructure Projects June 2015
 
Fidvi Refrigeration Corporate Profile
Fidvi Refrigeration Corporate ProfileFidvi Refrigeration Corporate Profile
Fidvi Refrigeration Corporate Profile
 
DESMI District Energy Brochure 2015
DESMI District Energy Brochure 2015DESMI District Energy Brochure 2015
DESMI District Energy Brochure 2015
 
Gi energy renewable energy opportunities with infrastructure projects june ...
Gi energy   renewable energy opportunities with infrastructure projects june ...Gi energy   renewable energy opportunities with infrastructure projects june ...
Gi energy renewable energy opportunities with infrastructure projects june ...
 
Coal firing
Coal firingCoal firing
Coal firing
 
Thermax_Corporate Bro_V11_25th Feb 2015_FINAL
Thermax_Corporate Bro_V11_25th Feb 2015_FINALThermax_Corporate Bro_V11_25th Feb 2015_FINAL
Thermax_Corporate Bro_V11_25th Feb 2015_FINAL
 
Hydrogen Heat to Power.pdf
Hydrogen Heat to Power.pdfHydrogen Heat to Power.pdf
Hydrogen Heat to Power.pdf
 
Energy Capital - Tyseley Energy Park - Prospectus
Energy Capital - Tyseley Energy Park - ProspectusEnergy Capital - Tyseley Energy Park - Prospectus
Energy Capital - Tyseley Energy Park - Prospectus
 
AD ENER-G BROCHURE 140313
AD ENER-G BROCHURE 140313AD ENER-G BROCHURE 140313
AD ENER-G BROCHURE 140313
 
O2E Wood Recycling
O2E Wood RecyclingO2E Wood Recycling
O2E Wood Recycling
 
Waste to Energy Technical Study
Waste to Energy Technical StudyWaste to Energy Technical Study
Waste to Energy Technical Study
 
Heating and Hot Water Refurbishment at St Paul’s Cathedral
Heating and Hot Water Refurbishment at St Paul’s CathedralHeating and Hot Water Refurbishment at St Paul’s Cathedral
Heating and Hot Water Refurbishment at St Paul’s Cathedral
 

Recently uploaded

KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
PuktoonEngr
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
Mukeshwaran Balu
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
Divyam548318
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 

Recently uploaded (20)

KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 

Boiler Economiser .pdf

  • 1. ECONOMISERS AND FLUE GAS COOLERS We design, manufacture, supply spares and services for economisers and flue gas coolers for industrial uses, power stations and marine vessels to help them to improve efficiency, reduce fuel consumption, lower emissions and cut costs. How are economisers and flue gas coolers used? Power stations, whether they are coal fired, waste to energy or biomass plants, benefit from increased efficiency by using Green’s economisers and flue gas coolers to produce more electricity or reduce their fuel consumption. Industrial plants such as pulp and paper or steel mills, chemical pro- ducers and food processors use our economisers to preheat water to produce hot water or steam for various on-site uses such as drying ovens, kilns, heating, sterilisation, cooking and electricity generation for their own use or to export to the grid as an additional revenue stream. We manufacture economisers and flue gas coolers with the following parameters using smooth tube, spiral tube & H-fin designs: • Water pressure: 10 – 320 bar • Water flowrate: 10 – 2800 t/h • Thermal duty: 1 – 100 MW • Tube length: up to 20 m • Module size WxLxH: from 1m x 3m x 1m to 6m x 20m x 4 m • Module weight: 15 – 150 tonnes *Other sizes are available, please contact us with your specific requirements What are economisers and flue gas coolers? Economisers and flue gas coolers enable the waste heat generated by boilers to be captured for a range of applications. We design and fabricate economisers in our factory in Wakefield, where we’ve been manufacturing since 1845 when our founder Edward Green patented his design. Every one of them is bespoke to meet our customers’ specific needs and operational requirements. A common application of economisers in steam power plants is to capture the waste heat from boiler stack gases (sometimes known as flue gas) and transfer it to the boiler feedwater. This raises the temperature of the boiler feedwater, lowering the needed energy input, in turn reducing the firing rates needed for the rated boiler output. Economisers lower stack temperatures which may cause condensation of acidic combustion gases and serious equipment corrosion damage if care is not taken in their design and material selection. Flue gas coolers have a similar role, but water heated in them is used for various applications in the plant rather than being evaporated in the boiler. To avoid these problems, we carefully select materials of construction and recommend regular inspections so that potential problems are identified and rectified before they become performance issues which affect operational efficiency. Drax Power Station Amagerværket BIO4 Segheza Packaging Green’s Head Office: Unit 3, Calder Vale Road, Wakefield WF1 5PH. United Kingdom T: + 44 (0)1924 203970 F: +44 (0)1924 332921 E: sales@greenspower.co.uk www.greenspower.co.uk Green’s is part of Heat Exchange Group and is one of Europe’s largest providers of boiler equipment and services including repairs, inspections, installation and spares. We help companies in the energy, industrial and marine sectors to recover waste heat efficiently, maximise energy usage and cut costs by designing and manufacturing products from our certificated UK factory for installation worldwide. Information about our other products and services including: • Design engineering • High performance boiler tube bending machine • Industrial and marine boiler services • Spares • Steel fabrication • Waste heat and exhaust gas boilers is available from www.greenspower.co.uk/downloads
  • 2. PREVIOUS WORK Green’s Head Office: Unit 3, Calder Vale Road, Wakefield WF1 5PH. United Kingdom T: + 44 (0)1924 203970 F: +44 (0)1924 332921 E: sales@greenspower.co.uk www.greenspower.co.uk Power generation – coal to biomass conversion Project: Drax Power Station, Selby, UK 3 Economisers Background: 6 x 660 MW largest, cleanest and most efficient power plant in the UK. Green’s first supplied economisers for this site in the 1960s. Green’s provided a replacement of one of the economisers when the station started converting from coal to biomass. Building upon this success, Green’s was asked to replace two further economisers. Services provided: Design, manufacture and delivery Combined heat and power - biomass Project: Bio4 Amagerværket heat and power plant, Copenhagen, Denmark 12 Economisers Background: Economiser for a 500 MWf CFB boiler; the district heat capacity 415 MJ/s. The power plant’s net electricity production capacity is 150 MW Services provided: Design, manufacture and delivery Largest contract to date Power generation – energy from waste Project: LondonEnergy Replacement of 5 existing economisers with Green’s design ‘H’ Fin economisers for improved performance and maintenance Background: One in four energy from waste stations serving UK’s capital city Services provided: Design, manufacture and installation