12. SAMPLES FOR BIM COORDINATED 2D&3D CLASHES &
DISCREPENCIES And COORDINATION MEETINGS
ASUMPTIONS WITH STAKEHOLDERS.
13. BIM Discrepancy Description: References: Status
There is a conflict in the location of (BWO) at the
structure drawings (SM.103A.18) and the arch.
Ceiling (CLG-02) at the Arch. drawings
(AM1.413.18) in (MC.18.03.B21).
SM.103A.18
AM1.413.18
Revit Model
New
ID: AR-FF-347 Page 1/1
Active-BOJV D
Active-BIM
Zone: MU_L3
Active-PMC
Resolved
Stage Description By Date
BIM Team Assumption: Postponed Michael 16-Jul-2013
Coordination Meeting
Action 1:
Refer to dwg no. 280136 Silvia (TO) - Enji 25-Feb-2014
Coordination Meeting
Action 2:
Coordination Meeting
Action 3:
.
14. Stage Description By Date
BIM Team Assumption: Follow arch drawing and reduce the height of the structural beam. MOHAB MAGDY 20-Nov-2013
Coordination Meeting
Action 1:
Follow RFI no. (405076-1750) Ashraf Mounir -
Enji
15-Jan-2014
Coordination Meeting
Action 2:
Refer to RFI – 405076-1750 rev A Abram Mohsen 17-Sep-2014
15. BIM Discrepancy
Description: References: Status
Conflict Between Arch DWG
AM1.103.13 And Structural DWG
SM1.103.13 in (MS.13.03.001)
AM1.103.13
SM1.103.13
New
ID: C0-CD- Page1 Active-BOJV
Active-BIM D
Zon MU-L3 Active-PMC
Resolved
Stage Description By Date
BIM Team Assumption: mohab 05-Dec-2014
Coordination Meeting
Action 1:
Issue to be solved between HVAC & Structure as discussed with Francois and
Juan.
surnda-TO 26-Nov-2014
Coordination Meeting
Action 2:
Check the openings with MEP since we will maintain only the ones needed (and in
reasonable locations).
Ahmed amin .
16. BIM Discrepancy
Description: References: Status
conflict between the structure drawings
(SM2.322.03) and the roller shutter detail
(AM6.955) at MP.12.03.002 ,
MP.13.03.003 , MP.13.03.001
SM2.322.03
SM2.324.03
AM6.955
AM6.954
New
ID: C0-CD-310 Page1 Active-BOJV TO D
Active-BIM Team
Zon MU-L3 Active-PMC
Resolved
Stage Description By Date
BIM Team Assumption: Postponed mohab 24-Feb-2013
Coordination Meeting
Action 1: - -
The
actual
concrete
beam
17. BIM Discrepancy
Description: References: Status
Conflict in concrete level between structural plan
DWG ( SM1.103)(+47.4) with the arch section
(AM2.344)(+49.4)At the gridline ( S23)
( fall arrest missing in design )
AM1.103
SM1.103
AM2.344
New
ID: C0-CD-308 Page2/2 Active-BOJV TO
Active-BIM Team
Zone MU-L3 Active-PMC D
Resolved
Stage Description By Date
BIM Team Assumption: Follow structural Level and if follow arch DWG we must put handrail in N elev. because different level 1.50m M.Magdy 29-Nov-2013
Coordination Meeting Action
1:
RFI-285062-1926 Dina – Salam– Mary (TO) 07-Jan-2015
Coordination Meeting Action
2:
.
19. Coding Discrepancy
Description: References: Status
Missing item in BOQ
No foundation with 700mm thickness
in the BOQ
Book 2A – Bill 2 Part 1 - 2/1/2
SM1.10G.19
Element ID: 4045565 New
ID:
001
Pag
e
Active-BOJV
Active-BIM
Zone
:
BOQ
Active-PMC
Resolved
Stage Description By Date
BIM Team Assumption: Assumed to be classified as ‘pad foundation’ (2/1/2/M) mohab 30-Apr-2013
Coordination Meeting
Action 1:
Confirmed samer 13-Jun-2014
Coordination Meeting
Action 2:
-
Coordination Meeting
Action 3:
-
20. Coding Discrepancy
Description: References: Status
Missing item in BOQ
No foundation with 2000mm
thickness in BOQ
Book 2A – Bill 2 Part 1 - 2/1/2
SM5.451
Revit Element ID: 3632958 New
ID:
002
Pag
e
Active-BOJV
Active-BIM
Zone
:
BOQ
Active-PMC
Resolved
Stage Description By Date
BIM Team Assumption: Assumed to be ‘mat foundationof 1900mm’ (2/1/2/L) Mariam 30-Apr-2012
Coordination Meeting
Action 1:
Confirmed MOHAB 13-Jun-2014
Coordination Meeting
Action 2:
-
Coordination Meeting
Action 3:
-
21. SAMPLES FOR MANUAL COORDINATION USING 2D
COORDINATION TECHINQUE USING XREF FILES IN
AUTOCAD AND LINKED TO REVIT.