This document provides information on the M.B.A. program for the University Department for the 2010-11 academic year. It outlines the scheme of examinations including course titles, credits, instruction hours, internal continuous assessment details and examinations for each semester. There are 4 semesters in the program. The core courses in the first 2 semesters cover subjects like management principles, organizational behavior, managerial economics, financial statement analysis, and quantitative methods. The 3rd semester includes courses in business ethics and electives. The 4th semester focuses on strategic management and more electives. A list of elective subjects is provided for semesters 3 and 4 across various domains like marketing, finance, human resources etc. The document
This document provides an overview of Module 1 of an MP407 Total Quality Management course. It includes:
1) An introduction to the need for quality and the evolution and definition of quality.
2) An overview of the basic concepts of total quality management (TQM), including the definition of TQM and TQM framework.
3) A discussion of the contributions of quality experts such as Deming, Juran, and Crosby, and barriers to implementing TQM.
The document outlines the key topics that will be covered in Module 1 of the course on total quality management.
Quality Circles are small groups of employees who voluntarily meet regularly to identify, analyze, and provide solutions to work-related problems. The goals of Quality Circles include improving quality, productivity, and morale. They utilize techniques like brainstorming, control charts, flowcharts and checksheets to solve problems. Quality Circles require management support, appropriate training, and well-defined roles for leaders, facilitators, coordinators and members. Organizations that have implemented Quality Circles successfully include Xerox, United Airlines, and BHEL in India. Quality Circles provide both tangible benefits like cost savings and quality improvements as well as intangible benefits such as increased motivation, skills development and better communication.
This document is a project report submitted by Mr. A. Nagasudhakar to Jawaharlal Nehru Technological University in partial fulfillment of the requirements for a Master of Business Administration degree. The report focuses on quality circles at Bharat Heavy Electricals Limited (BHEL). It provides background information on quality circles, including their history and implementation in India. It also describes BHEL's quality circle program and covers common problem solving techniques used by quality circles such as brainstorming, data collection, and cause-and-effect diagrams.
Quality circles are small groups of employees that voluntarily meet regularly to identify, analyze, and solve technical and manual problems in their work. This technique aims to increase productive problem solving among employees from all levels of an organization's hierarchy. While quality circles have been successful in Japanese companies, their implementation in construction companies faces some challenges due to the unique nature of each construction project, variable workforces, long durations, influence of subcontractors and owners, and typical hierarchical structures. However, Japanese construction companies have implemented quality circles successfully by overcoming these challenges.
This two-volume handbook provides guidance on implementing Total Quality Management (TQM) and Quality Control Circles (QCC). Volume I is intended for managers and explains the concepts and benefits of TQM and QCC. It also provides guidance on installing and implementing TQM and QCC programs in organizations. Volume II is a practical guide for starting QCC programs. It provides guidance for facilitators and circle leaders on carrying out daily QCC activities and solving common problems. The handbook aims to explain TQM and QCC at a level appropriate for different readers, from top managers to frontline employees.
The document discusses concepts related to continuous quality improvement in manufacturing, including Just-in-Time (JIT) production, kaizen, gemba, and muda. JIT aims to increase efficiency by reducing waste of materials, time and effort. Kaizen refers to ongoing, incremental improvements involving employees. Gemba means the real workplace or production floor where value is added. Muda means any non-value adding waste that should be eliminated, such as overproduction or unnecessary motion. Quality circles, employee involvement, and eliminating waste are emphasized as part of an overall philosophy of continuous improvement.
The document discusses continuous organizational improvement at ASDA, a British supermarket chain. It identifies several areas for improvement, including using new technologies like e-procurement and RFID to make operations more efficient. Introducing changes requires senior leadership commitment, a culture of continuous learning and innovation, and a focus on customer needs. Proposed changes are assessed for their impact and how well they align activities with strategic goals. Determining the required changes involves stakeholder agreement and establishing an environment where people can facilitate ongoing improvement.
Lundbeck is transitioning from a European single-product company to a global multiple product company. It aims to expand into new markets, deliver its late-stage pipeline, execute new product launches, and diversify its portfolio.
Over eight years, Lundbeck underwent a cultural transformation to embed operational excellence principles. It progressed through four phases - "Better for Less" focused on lean tools, "Create Results Together" developed leadership, "Own the Future" empowered employees, and the current "Principle-Driven Culture".
As a result, Lundbeck improved delivery performance, quality, costs and productivity over time. It also received the Shingo Silver Medallion, recognizing its progress in establishing a culture
This document provides an overview of Module 1 of an MP407 Total Quality Management course. It includes:
1) An introduction to the need for quality and the evolution and definition of quality.
2) An overview of the basic concepts of total quality management (TQM), including the definition of TQM and TQM framework.
3) A discussion of the contributions of quality experts such as Deming, Juran, and Crosby, and barriers to implementing TQM.
The document outlines the key topics that will be covered in Module 1 of the course on total quality management.
Quality Circles are small groups of employees who voluntarily meet regularly to identify, analyze, and provide solutions to work-related problems. The goals of Quality Circles include improving quality, productivity, and morale. They utilize techniques like brainstorming, control charts, flowcharts and checksheets to solve problems. Quality Circles require management support, appropriate training, and well-defined roles for leaders, facilitators, coordinators and members. Organizations that have implemented Quality Circles successfully include Xerox, United Airlines, and BHEL in India. Quality Circles provide both tangible benefits like cost savings and quality improvements as well as intangible benefits such as increased motivation, skills development and better communication.
This document is a project report submitted by Mr. A. Nagasudhakar to Jawaharlal Nehru Technological University in partial fulfillment of the requirements for a Master of Business Administration degree. The report focuses on quality circles at Bharat Heavy Electricals Limited (BHEL). It provides background information on quality circles, including their history and implementation in India. It also describes BHEL's quality circle program and covers common problem solving techniques used by quality circles such as brainstorming, data collection, and cause-and-effect diagrams.
Quality circles are small groups of employees that voluntarily meet regularly to identify, analyze, and solve technical and manual problems in their work. This technique aims to increase productive problem solving among employees from all levels of an organization's hierarchy. While quality circles have been successful in Japanese companies, their implementation in construction companies faces some challenges due to the unique nature of each construction project, variable workforces, long durations, influence of subcontractors and owners, and typical hierarchical structures. However, Japanese construction companies have implemented quality circles successfully by overcoming these challenges.
This two-volume handbook provides guidance on implementing Total Quality Management (TQM) and Quality Control Circles (QCC). Volume I is intended for managers and explains the concepts and benefits of TQM and QCC. It also provides guidance on installing and implementing TQM and QCC programs in organizations. Volume II is a practical guide for starting QCC programs. It provides guidance for facilitators and circle leaders on carrying out daily QCC activities and solving common problems. The handbook aims to explain TQM and QCC at a level appropriate for different readers, from top managers to frontline employees.
The document discusses concepts related to continuous quality improvement in manufacturing, including Just-in-Time (JIT) production, kaizen, gemba, and muda. JIT aims to increase efficiency by reducing waste of materials, time and effort. Kaizen refers to ongoing, incremental improvements involving employees. Gemba means the real workplace or production floor where value is added. Muda means any non-value adding waste that should be eliminated, such as overproduction or unnecessary motion. Quality circles, employee involvement, and eliminating waste are emphasized as part of an overall philosophy of continuous improvement.
The document discusses continuous organizational improvement at ASDA, a British supermarket chain. It identifies several areas for improvement, including using new technologies like e-procurement and RFID to make operations more efficient. Introducing changes requires senior leadership commitment, a culture of continuous learning and innovation, and a focus on customer needs. Proposed changes are assessed for their impact and how well they align activities with strategic goals. Determining the required changes involves stakeholder agreement and establishing an environment where people can facilitate ongoing improvement.
Lundbeck is transitioning from a European single-product company to a global multiple product company. It aims to expand into new markets, deliver its late-stage pipeline, execute new product launches, and diversify its portfolio.
Over eight years, Lundbeck underwent a cultural transformation to embed operational excellence principles. It progressed through four phases - "Better for Less" focused on lean tools, "Create Results Together" developed leadership, "Own the Future" empowered employees, and the current "Principle-Driven Culture".
As a result, Lundbeck improved delivery performance, quality, costs and productivity over time. It also received the Shingo Silver Medallion, recognizing its progress in establishing a culture
Quality circles originated in Japan as a way to improve quality and productivity by empowering employees. Quality circles involve small voluntary groups of 6-12 employees who meet regularly to identify and solve work-related problems using proven techniques. The objectives are to develop a problem-solving culture, improve teamwork and motivation, and enhance the skills of employees. For quality circles to be successful, management must support the philosophy of participatory decision-making and employees must receive proper training in the concepts and processes involved.
The document summarizes an internship report on the training and development programs at Larsen & Toubro Infotech in Bangalore. It includes an introduction and sections on the company profile, objectives of the study, research methodology, data analysis, findings, suggestions and conclusions. The key findings are that training is important to the company, programs are generally effective but could better align individual learning to organizational goals through new technologies and hands-on training. Suggestions include improving awareness, education, infrastructure and coordination to enhance the impact of training programs.
This document discusses quality circles, which are small voluntary groups of employees that meet regularly to identify and solve work-related problems. It describes how quality circles originated in Japan after World War II to improve quality and productivity. The key aspects of quality circles discussed include their definition, characteristics, objectives, basic problem-solving techniques used, and the process of operation. Charts and diagrams are also included to illustrate factors that can lead to waste and how causes are determined.
Chapter two literature revie2 last but not listberhanu taye
This part of research deals with some conceptual, theoretical and historical background of the issues related to the kaizen training implementation management.
Educational Administration Practices with Total Quality Management (TQM)Timothy Wooi
This program focus on Quality Assurance and managing Organizational Change through Total Quality Management (TQM) and its application in a School setting; to provide and equip Participants with a better understanding of TQM and its practices.
to adopt TQM principles and practices to ensure best Quality delivered to customers.
to use quantitative methods to continuously improve organization’s processes, products and services.
Course Content
Quality Assurance and managing Organizational Change
TQM and its Application in School settings
Tools and Techniques for Total Quality Management
Steps in TQM Implementation building the Dream School
Advanced Standards for Quality School Systems
Introducing ISO 9001 International Quality Assurance and Lean Six Sigma
Kaizen is a Japanese philosophy of continuous improvement. It was introduced to Japan in 1951 through a film to improve Japanese management. Kaizen focuses on teamwork, discipline, morale, quality circles, and suggestions for improvement. Employees work as a team toward common goals. Discipline and good working conditions improve morale. Quality circles allow employees to share ideas and resources. Suggestions are welcomed from all employees to encourage continuous improvement. Kaizen has been adopted by many Indian companies and state governments to improve practices in industries like manufacturing, healthcare, and services.
Quality circles originated in Japan in the 1960s and involve voluntary groups of employees who meet regularly to identify, analyze, and solve work-related problems. By the 1970s, quality circles had spread widely in Japan with over 1 million circles and 10 million participating employees. While also gaining popularity in other East Asian countries, quality circles were not as successfully implemented in the United States. Quality circles can help improve quality, productivity, motivation and develop employee skills through participation and problem solving. They utilize various tools like fishbone diagrams and involve members, leaders, facilitators and steering committees.
This document discusses workforce management and high performance work systems. It covers classification of workforce management theories including hierarchy of needs and expectancy theory. It also discusses empowering employees, types of teams including management and project teams, and skills for developing and engaging teams such as conflict resolution, decision making, and communication. The final section compares the workforce focus of Baldrige criteria, ISO 9000, and Six Sigma approach.
The document discusses a case study of adopting agile practices for a critical business project at an oil exploration company. The project faced tight timelines to develop a new employee appraisal system. By demonstrating delivered business value through continuous collaboration, personal ownership, and retrospectives, the project was successfully delivered on time despite the challenges. The case study highlights how agile practices can aid adoption for waterfall-oriented organizations when business needs require faster delivery.
Quality Circles are small groups of employees that voluntarily meet regularly to identify, analyze, and solve work-related problems. They aim to improve quality, productivity, and morale. Quality Circles utilize people's potential for improvement and create an environment that stimulates commitment to excellence. They follow a structured problem-solving process that involves identifying issues, analyzing causes, generating solutions, implementing the best solution, and presenting results to management.
Kaizen is a Japanese philosophy of continuous improvement involving everyone in an organization. It is based on the premise that processes can always be improved. The document discusses the key principles and tools of Kaizen, including the three pillars of housekeeping, waste elimination, and standardization. Housekeeping involves organizing and cleaning the workplace using the 5S methodology. Waste elimination aims to remove non-value adding activities. Standardization helps sustain improvements through visual controls and ongoing training. Kaizen promotes problem-solving through cross-functional teams and aims for continuous, incremental improvements through disciplined use of tools like process mapping and statistical analysis.
Scientific management means the application of science and scientific techniques in management. According to Taylor, “scientific management means knowing exactly what you want men to do and seeing that they do it in the best and cheapest way.”
Principles of scientific Management by F.W Taylor
Principles of scientific Management by Fayol
Quality circles are small groups of employees who voluntarily meet regularly to identify, analyze, and resolve work-related problems. The goal is to improve quality, productivity, and employee morale. Quality circles originated in Japan and were successful in improving productivity. They involve employees analyzing problems and developing solutions to aid self-development, increase quality awareness, develop leadership skills, and improve processes. Examples show quality circles being implemented across various organizations in India with benefits like improved quality, cooperation and participative management.
The document provides an overview of quality management concepts including:
- Definitions of quality from different perspectives including consumers and producers
- Dimensions of quality for manufactured products and services
- Total quality management principles including customer focus, leadership, and continuous improvement
- Contributions of quality gurus like Deming, Juran, and Crosby
- Tools for quality improvement like quality circles, Deming's PDCA cycle, and Six Sigma
- Implications of quality management for strategy, employees, information technology, and costs
This document discusses the concept of continuous improvement (Kaizen) through Kaizen philosophy and strategies. It provides an overview of Kaizen, emphasizing that it is a never-ending journey of incremental improvement involving everyone in the organization. Key aspects covered include the roles and responsibilities of different levels of management in implementing Kaizen, how it relates to quality management, and strategies like setting stretch goals and benchmarking to drive breakthrough performance improvements. The document also identifies common barriers to improvement efforts through a "Wet Blanket List" of excuses managers may use to reject change proposals.
Total quality management english socioeducational projectLorena Tapia
This document provides an overview of 16 lessons on quality management. It discusses key concepts like quality definitions, competitive advantage, quality philosophies from Deming, Juran and Crosby. It also covers topics like ISO 9000 standards, total quality management principles and evolution, contributions to TQM, Just-in-Time manufacturing, seven quality tools and techniques, measurement and analytical tools, improvement tools like quality circles, and control tools like Gantt charts. The document serves as a guide for teaching quality management concepts across multiple lessons.
This document provides an overview of quality management theories and tools. It discusses the history and development of quality management from inspection to total quality management. Key figures that contributed theories and models include Deming, Juran, Ishikawa and Crosby. The document also summarizes total quality management principles and covers quality tools like check sheets, control charts and Kaizen. Process improvement methods and developing people/teams are also addressed.
A working definition for total quality management (tqm) researchers Luong Tien Dat
This document provides a working definition for total quality management (TQM) by developing a definition that incorporates key points from leading thinkers on the topic. [The summary develops a definition of TQM in 3 steps: 1) It examines existing definitions and their limitations, 2) It analyzes the key concept of "quality" by reviewing perspectives from major TQM experts like Deming, and 3) It proposes developing a comprehensive definition by building on common elements from experts while addressing different perspectives.] The goal is to create a definition that is broad enough to be universally acceptable yet specific enough to accurately represent the complex concept of TQM.
This document summarizes several theories of Total Quality Management (TQM). It discusses Deming's theory which focuses on 14 points of management and the Shewhart cycle. It also discusses Crosby's theory which has 4 absolutes of quality management and 14 steps for improvement. Joseph Juran's theory focuses on quality planning, improvement, and control using 10 steps. The EFQM framework uses 9 criteria including results, customers, leadership and learning. Ishikawa's theory emphasizes 7 tools for quality improvement including Pareto analysis, cause-and-effect diagrams and control charts. The document concludes that companies should use guidelines from multiple theories and commit to consistent steps for improving quality.
This document provides an overview of quality circles and their implementation. Some key points:
1. Quality circles are small groups of employees who voluntarily meet regularly to identify, analyze, and solve work-related problems and recommend solutions to management.
2. They originated in Japan after World War II to improve productivity and quality standards. Their use spread globally as an effective participative management technique.
3. Examples of quality circle implementations are provided for organizations like the Public Works Department of Maharashtra government, Tata Memorial Hospital, Toyota, and Vodafone.
The document provides details about the MBA Marketing Management programme offered through distance education at Alagappa University. It discusses the programme's mission and objectives which are to provide exposure to business subjects and equip students with skills for industry jobs. It aims to contribute to the economic development of the country, in line with the university's vision of providing high quality education. The target group for the programme includes working professionals, entrepreneurs, academics and government officials. The 2-year programme consists of 8 semesters with courses covering topics such as marketing, finance, human resources and research methods.
The document provides details about the MBA Marketing Management programme offered through distance education at Alagappa University. It discusses the programme's mission and objectives which are to provide exposure to business subjects and equip students with skills for industry jobs. It aims to contribute to the economic development of the country, in line with the university's vision of providing high quality education. The target group for the programme includes working professionals, entrepreneurs, academics and government officials. The 2-year programme consists of 8 semesters with courses covering topics such as marketing, finance, human resources and research methods.
Quality circles originated in Japan as a way to improve quality and productivity by empowering employees. Quality circles involve small voluntary groups of 6-12 employees who meet regularly to identify and solve work-related problems using proven techniques. The objectives are to develop a problem-solving culture, improve teamwork and motivation, and enhance the skills of employees. For quality circles to be successful, management must support the philosophy of participatory decision-making and employees must receive proper training in the concepts and processes involved.
The document summarizes an internship report on the training and development programs at Larsen & Toubro Infotech in Bangalore. It includes an introduction and sections on the company profile, objectives of the study, research methodology, data analysis, findings, suggestions and conclusions. The key findings are that training is important to the company, programs are generally effective but could better align individual learning to organizational goals through new technologies and hands-on training. Suggestions include improving awareness, education, infrastructure and coordination to enhance the impact of training programs.
This document discusses quality circles, which are small voluntary groups of employees that meet regularly to identify and solve work-related problems. It describes how quality circles originated in Japan after World War II to improve quality and productivity. The key aspects of quality circles discussed include their definition, characteristics, objectives, basic problem-solving techniques used, and the process of operation. Charts and diagrams are also included to illustrate factors that can lead to waste and how causes are determined.
Chapter two literature revie2 last but not listberhanu taye
This part of research deals with some conceptual, theoretical and historical background of the issues related to the kaizen training implementation management.
Educational Administration Practices with Total Quality Management (TQM)Timothy Wooi
This program focus on Quality Assurance and managing Organizational Change through Total Quality Management (TQM) and its application in a School setting; to provide and equip Participants with a better understanding of TQM and its practices.
to adopt TQM principles and practices to ensure best Quality delivered to customers.
to use quantitative methods to continuously improve organization’s processes, products and services.
Course Content
Quality Assurance and managing Organizational Change
TQM and its Application in School settings
Tools and Techniques for Total Quality Management
Steps in TQM Implementation building the Dream School
Advanced Standards for Quality School Systems
Introducing ISO 9001 International Quality Assurance and Lean Six Sigma
Kaizen is a Japanese philosophy of continuous improvement. It was introduced to Japan in 1951 through a film to improve Japanese management. Kaizen focuses on teamwork, discipline, morale, quality circles, and suggestions for improvement. Employees work as a team toward common goals. Discipline and good working conditions improve morale. Quality circles allow employees to share ideas and resources. Suggestions are welcomed from all employees to encourage continuous improvement. Kaizen has been adopted by many Indian companies and state governments to improve practices in industries like manufacturing, healthcare, and services.
Quality circles originated in Japan in the 1960s and involve voluntary groups of employees who meet regularly to identify, analyze, and solve work-related problems. By the 1970s, quality circles had spread widely in Japan with over 1 million circles and 10 million participating employees. While also gaining popularity in other East Asian countries, quality circles were not as successfully implemented in the United States. Quality circles can help improve quality, productivity, motivation and develop employee skills through participation and problem solving. They utilize various tools like fishbone diagrams and involve members, leaders, facilitators and steering committees.
This document discusses workforce management and high performance work systems. It covers classification of workforce management theories including hierarchy of needs and expectancy theory. It also discusses empowering employees, types of teams including management and project teams, and skills for developing and engaging teams such as conflict resolution, decision making, and communication. The final section compares the workforce focus of Baldrige criteria, ISO 9000, and Six Sigma approach.
The document discusses a case study of adopting agile practices for a critical business project at an oil exploration company. The project faced tight timelines to develop a new employee appraisal system. By demonstrating delivered business value through continuous collaboration, personal ownership, and retrospectives, the project was successfully delivered on time despite the challenges. The case study highlights how agile practices can aid adoption for waterfall-oriented organizations when business needs require faster delivery.
Quality Circles are small groups of employees that voluntarily meet regularly to identify, analyze, and solve work-related problems. They aim to improve quality, productivity, and morale. Quality Circles utilize people's potential for improvement and create an environment that stimulates commitment to excellence. They follow a structured problem-solving process that involves identifying issues, analyzing causes, generating solutions, implementing the best solution, and presenting results to management.
Kaizen is a Japanese philosophy of continuous improvement involving everyone in an organization. It is based on the premise that processes can always be improved. The document discusses the key principles and tools of Kaizen, including the three pillars of housekeeping, waste elimination, and standardization. Housekeeping involves organizing and cleaning the workplace using the 5S methodology. Waste elimination aims to remove non-value adding activities. Standardization helps sustain improvements through visual controls and ongoing training. Kaizen promotes problem-solving through cross-functional teams and aims for continuous, incremental improvements through disciplined use of tools like process mapping and statistical analysis.
Scientific management means the application of science and scientific techniques in management. According to Taylor, “scientific management means knowing exactly what you want men to do and seeing that they do it in the best and cheapest way.”
Principles of scientific Management by F.W Taylor
Principles of scientific Management by Fayol
Quality circles are small groups of employees who voluntarily meet regularly to identify, analyze, and resolve work-related problems. The goal is to improve quality, productivity, and employee morale. Quality circles originated in Japan and were successful in improving productivity. They involve employees analyzing problems and developing solutions to aid self-development, increase quality awareness, develop leadership skills, and improve processes. Examples show quality circles being implemented across various organizations in India with benefits like improved quality, cooperation and participative management.
The document provides an overview of quality management concepts including:
- Definitions of quality from different perspectives including consumers and producers
- Dimensions of quality for manufactured products and services
- Total quality management principles including customer focus, leadership, and continuous improvement
- Contributions of quality gurus like Deming, Juran, and Crosby
- Tools for quality improvement like quality circles, Deming's PDCA cycle, and Six Sigma
- Implications of quality management for strategy, employees, information technology, and costs
This document discusses the concept of continuous improvement (Kaizen) through Kaizen philosophy and strategies. It provides an overview of Kaizen, emphasizing that it is a never-ending journey of incremental improvement involving everyone in the organization. Key aspects covered include the roles and responsibilities of different levels of management in implementing Kaizen, how it relates to quality management, and strategies like setting stretch goals and benchmarking to drive breakthrough performance improvements. The document also identifies common barriers to improvement efforts through a "Wet Blanket List" of excuses managers may use to reject change proposals.
Total quality management english socioeducational projectLorena Tapia
This document provides an overview of 16 lessons on quality management. It discusses key concepts like quality definitions, competitive advantage, quality philosophies from Deming, Juran and Crosby. It also covers topics like ISO 9000 standards, total quality management principles and evolution, contributions to TQM, Just-in-Time manufacturing, seven quality tools and techniques, measurement and analytical tools, improvement tools like quality circles, and control tools like Gantt charts. The document serves as a guide for teaching quality management concepts across multiple lessons.
This document provides an overview of quality management theories and tools. It discusses the history and development of quality management from inspection to total quality management. Key figures that contributed theories and models include Deming, Juran, Ishikawa and Crosby. The document also summarizes total quality management principles and covers quality tools like check sheets, control charts and Kaizen. Process improvement methods and developing people/teams are also addressed.
A working definition for total quality management (tqm) researchers Luong Tien Dat
This document provides a working definition for total quality management (TQM) by developing a definition that incorporates key points from leading thinkers on the topic. [The summary develops a definition of TQM in 3 steps: 1) It examines existing definitions and their limitations, 2) It analyzes the key concept of "quality" by reviewing perspectives from major TQM experts like Deming, and 3) It proposes developing a comprehensive definition by building on common elements from experts while addressing different perspectives.] The goal is to create a definition that is broad enough to be universally acceptable yet specific enough to accurately represent the complex concept of TQM.
This document summarizes several theories of Total Quality Management (TQM). It discusses Deming's theory which focuses on 14 points of management and the Shewhart cycle. It also discusses Crosby's theory which has 4 absolutes of quality management and 14 steps for improvement. Joseph Juran's theory focuses on quality planning, improvement, and control using 10 steps. The EFQM framework uses 9 criteria including results, customers, leadership and learning. Ishikawa's theory emphasizes 7 tools for quality improvement including Pareto analysis, cause-and-effect diagrams and control charts. The document concludes that companies should use guidelines from multiple theories and commit to consistent steps for improving quality.
This document provides an overview of quality circles and their implementation. Some key points:
1. Quality circles are small groups of employees who voluntarily meet regularly to identify, analyze, and solve work-related problems and recommend solutions to management.
2. They originated in Japan after World War II to improve productivity and quality standards. Their use spread globally as an effective participative management technique.
3. Examples of quality circle implementations are provided for organizations like the Public Works Department of Maharashtra government, Tata Memorial Hospital, Toyota, and Vodafone.
The document provides details about the MBA Marketing Management programme offered through distance education at Alagappa University. It discusses the programme's mission and objectives which are to provide exposure to business subjects and equip students with skills for industry jobs. It aims to contribute to the economic development of the country, in line with the university's vision of providing high quality education. The target group for the programme includes working professionals, entrepreneurs, academics and government officials. The 2-year programme consists of 8 semesters with courses covering topics such as marketing, finance, human resources and research methods.
The document provides details about the MBA Marketing Management programme offered through distance education at Alagappa University. It discusses the programme's mission and objectives which are to provide exposure to business subjects and equip students with skills for industry jobs. It aims to contribute to the economic development of the country, in line with the university's vision of providing high quality education. The target group for the programme includes working professionals, entrepreneurs, academics and government officials. The 2-year programme consists of 8 semesters with courses covering topics such as marketing, finance, human resources and research methods.
anna university syllabus M.b.a. affiliated( ft & pt)Best Ksk
This document outlines the curriculum and syllabus for a Master of Business Administration (MBA) program at Anna University in Chennai, India. It provides the course codes, titles, credit hours, and scheduling over 8 semesters (4 years) for full-time students and 6 semesters (3 years) for part-time students. The core courses cover topics such as principles of management, statistics, economics, finance, marketing, operations, and strategy. Students also complete electives, practical skills courses, summer internships, and a final project. The document lists the regulations that govern the MBA program and provides details on course requirements to earn the 96 credit hours required to complete the degree.
MBA Common 1st Year Syllabus 2020_July.pdfMrSushilMaurya
This document outlines the revised curriculum for the MBA program at Dr. A.P.J. Abdul Kalam Technical University in Uttar Pradesh, India. The curriculum follows the AICTE Model Curriculum and is effective starting in the 2020-21 academic session.
The first year of the MBA program includes 8 courses per semester, covering topics such as management concepts, organizational behavior, managerial economics, financial accounting, business statistics, and communication skills. Courses include lectures, tutorials, practical sessions, projects, and labs. Student performance is evaluated through internal assessments and end-of-term exams.
This document outlines the course objectives, content, and materials for several MBA courses, including Principles of Management, Microeconomics for Managers, Quantitative Methods I, and Financial Accounting for Managers. The courses cover fundamental concepts in their respective areas through lectures, assignments, projects, and other pedagogical methods. Evaluation involves continuous internal assessment and semester-end exams. Required and reference textbooks and materials are also listed for each course.
This document provides an overview of a conference session on performance management in higher education. It discusses the death of the collegiate system and introduces a framework for analyzing performance management systems consisting of 12 questions. References are provided on performance management trends, codes of conduct, and performance indicators in UK higher education. Contact information is given for two representatives from Lancaster University to discuss the topics further.
This document provides a course syllabus for a Master's level class on Organization and Management. The 3-page syllabus outlines the following key details:
1) The course aims to help students understand organization and management concepts to effectively manage organizations. 2) Over 12 chapters, the course will cover topics such as organizational design, management functions, leadership, decision-making, and conflict management. 3) Assessment will include attendance, presentations, case studies, and developing an organizational plan. The syllabus provides objectives, content outlines, teaching methods, and requirements for the class.
This course on Organizational Theory & Management provides 4 credit units and aims to impart a complete understanding of organizational theory, its historical roots of management, and changing paradigms of individual-organizational fit. The course covers topics such as schools of management, managing organizations, organizational structure and design, organizational culture, and human resource management. It examines organizations from multiple perspectives including systems theory, power and politics, and decision making. The course aims to provide students with knowledge of organizational realities and why organizations fail or succeed.
This document outlines the course curriculum for the first year, first semester of a management program. It includes 6 core courses: 1) Perspective Management, 2) Financial Accounting, 3) Managerial Economics, 4) Operations Management, 5) Organization Behavior, and 6) Business Mathematics. Each course is allotted marks and includes topics to be covered, reference texts, and in some cases software to be used. The core courses aim to provide foundational knowledge across management functions including accounting, economics, operations, organizational behavior, and quantitative methods.
This document outlines the course curriculum for the first year, first semester of a management program. It includes 6 core courses: 1) Perspective Management, 2) Financial Accounting, 3) Managerial Economics, 4) Operations Management, 5) Organization Behavior, and 6) Business Mathematics. Each course is allotted marks and includes topics to be covered, reference texts, and in some cases software to be used. The core courses aim to provide foundational knowledge across management functions including accounting, economics, operations, organizational behavior, and quantitative methods.
This document provides an overview of topics related to management and entrepreneurship development that will be covered in a lecture series. It discusses evaluation schemes, the history and concepts of management, definitions of management, the roles and functions of managers, and principles of management including planning, organizing, staffing, leading, and controlling. It also outlines human resource development topics like manpower planning, recruitment, selection, and performance appraisal that will be addressed. The goal is to give students a foundation in the basics of management and entrepreneurship.
This course provides a summary of 4 courses for BBA students in their third year, sixth semester:
1. Entrepreneurship - The course teaches fundamental concepts of entrepreneurship and developing a business plan.
2. International Business - Students learn about international trade theories, the global business environment, and international strategic management.
3. Operations Management - Core concepts of operations management are covered including forecasting, capacity planning, quality management, and inventory systems.
4. Human Resource Management - Key HR functions like recruitment, training, compensation and performance management are addressed.
Management involves planning, organizing, directing, and controlling the work of others to accomplish organizational goals. The key aspects of effective management include decision making, coordinating activities, utilizing resources, and adapting to changing environments. Management principles have evolved over time based on scientific experimentation and practical experience. Modern management approaches emphasize both the science of planning and measurement as well as the art of leadership and creativity. Effective management is important for organizations to function efficiently and achieve their objectives.
Business management is a rigorous IB subject that examines how businesses are organized and operate. The aims of the course are to encourage holistic and strategic thinking about business issues from various cultural perspectives, promote awareness of environmental and ethical factors, and understand the importance of innovation. The course covers theories like motivation theories and tools like SWOT analysis. Key concepts examined are change, culture, ethics, globalization, innovation, and strategy, through case studies and examples. There are distinctions between the SL and HL levels in terms of hours, depth, and assessment. TOK and CAS opportunities also exist through examining business issues from different perspectives and undertaking related projects.
The document provides information on the program educational objectives and outcomes of a Department of Management Studies.
The educational objectives aim to have graduates achieve specific accomplishments within 3-5 years such as practicing their profession with innovative and managerial skills, problem solving in international environments, excellent communication skills, and adapting to continuous learning.
The program outcomes are what students will be able to do upon completion, such as apply finance and quantitative methods, recruit and train human resources, design systems to meet needs considering constraints, function on teams, identify and solve problems, communicate effectively, engage in lifelong learning, and employ current business techniques.
A mapping shows how the program objectives align with the outcomes for areas like innovation, problem solving, communication
MBA Program (Bangalore University) syllabus courseDepesh Banik
This document outlines the syllabus for a Master of Business Administration program. It includes:
- An overview of course credits and how they are calculated.
- A course matrix that lists the subjects covered in each semester, their credits, and assessment details. Core subjects include managerial communication, accounting, organizational behavior, and economics.
- Descriptions of some sample courses, including objectives, topics covered in each module, and recommended reading materials.
- Information on specializations that can be pursued, elective subjects, lesson plans, and additional non-credit courses aimed at enhancing soft skills.
The syllabus provides a comprehensive outline of the subjects, structure, and requirements of the MBA program.
The document outlines the syllabus for a Master of Business Administration program. It includes:
1. An overview of the course structure across 4 semesters, including basic subjects, core subjects, specializations, and electives.
2. Details of the credits system and assessments. Each subject is worth a certain number of credits based on contact hours. Students are assessed internally and through exams.
3. Sample subjects from the first semester like Managerial Communication, Accounting for Managers, and Organizational Behavior. Objectives and modules are provided for some subjects.
4. Additional requirements like internships, dissertations, and self-development courses to enhance soft skills.
This document outlines the syllabus for Class 12 Business Studies for the 2023-24 academic year. It is divided into three parts: Principles and Functions of Management (50 marks), Business Finance and Marketing (30 marks), and a Project (20 marks). Part A covers 8 units on management principles, business environment, planning, organizing, staffing, directing, controlling. Part B covers 2 units on financial management, financial markets, and 2 units on marketing. The syllabus provides details on the concepts and topics covered in each unit. It also specifies the marks allocation and guidelines for the optional project work component.
Simplified Syllabus Business Studies 12 (2023-24).pdfcommerceatease
This document outlines the syllabus for Class 12 Business Studies for the 2023-24 academic year. It is divided into three parts: Principles and Functions of Management (50 marks), Business Finance and Marketing (30 marks), and a Project (20 marks). Part A covers 8 units on management principles, business environment, planning, organizing, staffing, directing, controlling. Part B covers 2 units on financial management, financial markets, and 2 units on marketing. The syllabus provides details on the concepts and topics covered in each unit. It also specifies the marks allocation and guidelines for the optional project work component.
Easily Verify Compliance and Security with Binance KYCAny kyc Account
Use our simple KYC verification guide to make sure your Binance account is safe and compliant. Discover the fundamentals, appreciate the significance of KYC, and trade on one of the biggest cryptocurrency exchanges with confidence.
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...my Pandit
Dive into the steadfast world of the Taurus Zodiac Sign. Discover the grounded, stable, and logical nature of Taurus individuals, and explore their key personality traits, important dates, and horoscope insights. Learn how the determination and patience of the Taurus sign make them the rock-steady achievers and anchors of the zodiac.
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Tastemy Pandit
Know what your zodiac sign says about your taste in food! Explore how the 12 zodiac signs influence your culinary preferences with insights from MyPandit. Dive into astrology and flavors!
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.AnnySerafinaLove
This letter, written by Kellen Harkins, Course Director at Full Sail University, commends Anny Love's exemplary performance in the Video Sharing Platforms class. It highlights her dedication, willingness to challenge herself, and exceptional skills in production, editing, and marketing across various video platforms like YouTube, TikTok, and Instagram.
IMPACT Silver is a pure silver zinc producer with over $260 million in revenue since 2008 and a large 100% owned 210km Mexico land package - 2024 catalysts includes new 14% grade zinc Plomosas mine and 20,000m of fully funded exploration drilling.
Structural Design Process: Step-by-Step Guide for BuildingsChandresh Chudasama
The structural design process is explained: Follow our step-by-step guide to understand building design intricacies and ensure structural integrity. Learn how to build wonderful buildings with the help of our detailed information. Learn how to create structures with durability and reliability and also gain insights on ways of managing structures.
How to Implement a Real Estate CRM SoftwareSalesTown
To implement a CRM for real estate, set clear goals, choose a CRM with key real estate features, and customize it to your needs. Migrate your data, train your team, and use automation to save time. Monitor performance, ensure data security, and use the CRM to enhance marketing. Regularly check its effectiveness to improve your business.
How to Implement a Strategy: Transform Your Strategy with BSC Designer's Comp...Aleksey Savkin
The Strategy Implementation System offers a structured approach to translating stakeholder needs into actionable strategies using high-level and low-level scorecards. It involves stakeholder analysis, strategy decomposition, adoption of strategic frameworks like Balanced Scorecard or OKR, and alignment of goals, initiatives, and KPIs.
Key Components:
- Stakeholder Analysis
- Strategy Decomposition
- Adoption of Business Frameworks
- Goal Setting
- Initiatives and Action Plans
- KPIs and Performance Metrics
- Learning and Adaptation
- Alignment and Cascading of Scorecards
Benefits:
- Systematic strategy formulation and execution.
- Framework flexibility and automation.
- Enhanced alignment and strategic focus across the organization.
Industrial Tech SW: Category Renewal and CreationChristian Dahlen
Every industrial revolution has created a new set of categories and a new set of players.
Multiple new technologies have emerged, but Samsara and C3.ai are only two companies which have gone public so far.
Manufacturing startups constitute the largest pipeline share of unicorns and IPO candidates in the SF Bay Area, and software startups dominate in Germany.
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesHolger Mueller
Holger Mueller of Constellation Research shares his key takeaways from SAP's Sapphire confernece, held in Orlando, June 3rd till 5th 2024, in the Orange Convention Center.
Understanding User Needs and Satisfying ThemAggregage
https://www.productmanagementtoday.com/frs/26903918/understanding-user-needs-and-satisfying-them
We know we want to create products which our customers find to be valuable. Whether we label it as customer-centric or product-led depends on how long we've been doing product management. There are three challenges we face when doing this. The obvious challenge is figuring out what our users need; the non-obvious challenges are in creating a shared understanding of those needs and in sensing if what we're doing is meeting those needs.
In this webinar, we won't focus on the research methods for discovering user-needs. We will focus on synthesis of the needs we discover, communication and alignment tools, and how we operationalize addressing those needs.
Industry expert Scott Sehlhorst will:
• Introduce a taxonomy for user goals with real world examples
• Present the Onion Diagram, a tool for contextualizing task-level goals
• Illustrate how customer journey maps capture activity-level and task-level goals
• Demonstrate the best approach to selection and prioritization of user-goals to address
• Highlight the crucial benchmarks, observable changes, in ensuring fulfillment of customer needs
[To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
This presentation is a curated compilation of PowerPoint diagrams and templates designed to illustrate 20 different digital transformation frameworks and models. These frameworks are based on recent industry trends and best practices, ensuring that the content remains relevant and up-to-date.
Key highlights include Microsoft's Digital Transformation Framework, which focuses on driving innovation and efficiency, and McKinsey's Ten Guiding Principles, which provide strategic insights for successful digital transformation. Additionally, Forrester's framework emphasizes enhancing customer experiences and modernizing IT infrastructure, while IDC's MaturityScape helps assess and develop organizational digital maturity. MIT's framework explores cutting-edge strategies for achieving digital success.
These materials are perfect for enhancing your business or classroom presentations, offering visual aids to supplement your insights. Please note that while comprehensive, these slides are intended as supplementary resources and may not be complete for standalone instructional purposes.
Frameworks/Models included:
Microsoft’s Digital Transformation Framework
McKinsey’s Ten Guiding Principles of Digital Transformation
Forrester’s Digital Transformation Framework
IDC’s Digital Transformation MaturityScape
MIT’s Digital Transformation Framework
Gartner’s Digital Transformation Framework
Accenture’s Digital Strategy & Enterprise Frameworks
Deloitte’s Digital Industrial Transformation Framework
Capgemini’s Digital Transformation Framework
PwC’s Digital Transformation Framework
Cisco’s Digital Transformation Framework
Cognizant’s Digital Transformation Framework
DXC Technology’s Digital Transformation Framework
The BCG Strategy Palette
McKinsey’s Digital Transformation Framework
Digital Transformation Compass
Four Levels of Digital Maturity
Design Thinking Framework
Business Model Canvas
Customer Journey Map
Company Valuation webinar series - Tuesday, 4 June 2024FelixPerez547899
This session provided an update as to the latest valuation data in the UK and then delved into a discussion on the upcoming election and the impacts on valuation. We finished, as always with a Q&A
The Genesis of BriansClub.cm Famous Dark WEb PlatformSabaaSudozai
BriansClub.cm, a famous platform on the dark web, has become one of the most infamous carding marketplaces, specializing in the sale of stolen credit card data.
The Genesis of BriansClub.cm Famous Dark WEb Platform
Bhu syllabus
1. M.B.A. -2010-11 –UD.
Page 1 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
M.B.A. (Master of Business Administration)
(for University Department during the academic year 2010-11 & onwards)
SCHEME OF EXAMINATIONS : CBCS Pattern
Dur.Hrs
CIA
Marks
Total
3
3
3
3
3
3
-
3
3
3
3
3
3
-
25
25
25
25
25
25
-
75
75
75
75
75
75
-
100
100
100
100
100
100
-
4
4
4
4
4
4
-
3
3
3
3
3
3
3
3
3
3
3
3
25
25
25
25
25
25
75
75
75
75
75
75
100
100
100
100
100
100
4
4
4
4
4
4
3
3
40
60
100
4
SEMESTER – III
3.1. Business Ethics and Global Business Environment
3.2. Management Information System
3.3. Elective
3.4. Elective
3.5. Elective
3.6. Elective
3.7. Summer Placement Project Report & Viva-Voce
3
3
3
3
3
3
-
3
3
3
3
3
3
-
25
25
25
25
25
25
20
75
75
75
75
75
75
80
100
100
100
100
100
100
100
4
4
4
4
4
4
4
SEMESTER – IV
4.1. Strategic Management : Indian Global Context
4.2. Elective
4.3. Elective
4.4. Elective
4.5. Elective
3
3
3
3
3
3
3
3
3
3
25
25
25
25
25
75
75
75
75
75
100
100
100
100
100
4
4
4
4
4
-
-
-
-
2500
100
Course Title
SEMESTER – I
1.1. Management Principles and Practice
1.2. Organizational Behaviour
1.3. Managerial Economics
1.4. Financial Statement Analysis
1.5. Quantitative Methods for Management
1.6. Corporate Communication
1.7. Computer Applications in Management using SAP*
SEMESTER –II
2.1. Operations Management
2.2. Marketing Management
2.3. Financial Management
2.4. Human Resource Management
2.5. Quantitative Techniques
2.6. Research Methods for Management
2.7. Computer Applications in Management using SAP*
- Practical
TOTAL
* The course will be taught during I and II semester.
Credits
Ins.hrs/ week
Examinations
2. M.B.A. -2010-11 –UD.
Page 2 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
Electives for III Semester : (Students can choose any four of the following) :
A. MARKETING
1.
2.
3.
4.
Integrated Marketing Communication
Export Management
Consumer Behaviour
Retail Management
B. HUMAN RESOURCE
5. Performance Management
6. Managing of Interpersonal Effectiveness
7. Staffing in organizations
C. FINANCE
8. Financial Services
9. Equity Research & Portfolio Management
D. SYSTEM
10. Business Analytics
E. PRODUCTION
11. Advanced Production Management
12. Integrated Materials Management
F. GENERAL
13. International Tourism Management
14. Cross Cultural Management
15. Training and Development – Enhancing Communication and Leadership Skills
Electives for IV Semester : (Students can choose any four of the following) :
A. MARKETING
1. Services Marketing
2. Brand Management
3. Distribution Management
4. Rural Marketing
B. HUMAN RESOURCE
4. Organizational Development
5. Labour Welfare and Industrial Relations (Legislations)
6. Employee Training and Development
C. FINANCE
7. International Financial Management
8. Insurance Management
9. Cost Management
D. SYSTEM
9. Software Project Management
10. E- Marketing
11. Enterprise Resource Planning
E. PRODUCTION
12. Total Quality Management
13. Supply Chain Management
F. GENERAL
14. Event Management
15. Micro-Finance and Perspectives and Operations
16. Disaster Management
17. International Business
----------------------------------------------
3. M.B.A. -2010-11 –UD.
Page 3 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
1.1 MANAGEMENT PRINCIPLES AND PRACTICE
Subject Description :
This course presents the Principles of Management, emphasizing managerial functions,
explaining internal management of organizations and behavioural concepts as applied to
practical management problems.
Goals:
To enable the students to learn the basic functions, principles and concepts of management.
Objectives:
On successful completion of the course the students should have:
Understood management functions and principles.
Learnt the scientific decision making process and problem solving techniques.
Learnt the modern trends in management process.
Unit I
Management : Science, Theory and Practice - The Evolution of Management Thought and the
Patterns of Management Analysis - Management and Society : The External Environment,
Social Responsibility and Ethics - Global and Comparative Management - The Basis of
Global Management.
Unit II
The Nature and Purpose of Planning - Objectives - Strategies, Policies and Planning Premises
- Decision Making - Global Planning.
Unit III
The Nature of Organizing and Entrepreneuring - Organizational Structure : Departmentation Line/Staff Authority and Decentralization - Effective Organizing and Organizational Culture
- Global Organizing.
Unit IV
Co-ordination functions in Organisation - Human Factors and Motivation - Leadership Committees and group Decision Making - Communication - Global Leading.
Unit V
The System and Process of Controlling - Control Techniques and Information Technology Productivity and Operations Management - Overall Control and toward the Future through
Preventive Control - Global Controlling and Global Challenges.
References :
1. Koontz & Weirich, Essentials of Management, Tata McGraw Hill.
2. VSP Rao, V Hari Krishna – Management: Text and Cases, Excel Books, I Edition, 2004
3. Stoner & Wankai, Management, PHI.
4. Robert Krcitner, Management, ATTBS.
5. Weirich & Koontz, Management - A Global perspective, McGraw Hill.
6. Helliregarl, Management, Thomson Learning, 2002.
7. Robbins. S.P., Fundamentals of Management, Pearson, 2003.
4. M.B.A. -2010-11 –UD.
Page 4 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
1.2. ORGANISATIONAL BEHAVIOUR
Unit: 1
Organizations as Work Settings, Organizational Behavior and Management‟ Learning About
Organizational Behavior Current Issues in Organizational Behavior:
High Performance Organizations, Multiculturalism and Diversity, Ethics and Social
Responsibility, Issues and Transitions in the New Workplace
Organizational Behavior across Cultures Global Context of Organizational Behavior
Cultures and Cross-Cultural Understanding Cultural Diversity and People at Work A Global
View of Organizational Learning
Unit: 2
Individual Behavior and Performance: Personality and Individual Differences
Personality, Personality Differences, Values and Attitudes Individual Differences and
Diversity. Cognitive abilities: Intelligence Creativity and Problem solving
The Perception Process, Common Perceptual Distortions, Managing Perceptions
Attribution Theory. Motivation: Content and Process Theories of work motivation,
Reinforcement: Classical Operant and Social learning theories
Unit: 3
Group Dynamics and Teamwork: How Groups Work, Groups in Organizations, Stages of
Group, Foundations of Group Performance, Decision Making in Groups. Teams and
Teamwork. Team Building, Improving Team Processes, Teams in the High Performance
Workplace Leadership: Theories and Emerging Leadership Perspectives
Power and Politics: Power and Influence, Power. Formal Authority and Obedience
Empowerment, Organizational Politics
Unit: 4
Conflict and Negotiation Conflict in Organizations, Conflict Management, Negotiation:
Negotiation Strategies, How to be an effective negotiator, Manager as a negotiator
Change in Organizations Planned Change Strategies Resistance to Change Over coming
resistance to change Innovation in Organizations Dynamics of Stress and managing Job
stress.
Unit: 5
Organizational Structure and Design: Strategy and Goals of Organizations
Basic Attributes of Organizations, Organizing and Coordinating Work, Bureaucracy and
Beyond, Strategy and Organizational Design, Information Technology and Organizational
Design, Environment and Organizational Design
Organizational Culture Understanding Organizational Cultures, Managing Organizational
Culture, Organizational Development: Nature scope objectives and intervention strategies
REFERENCE BOOK
1. Schermerhorn et.al “Organizational Behaviour”, Wiley India - 9th student edition.
SUGGESTED READINGS
1. Newstrom Organizational Behaviour:Human behavior at work 12th edn.Tata McGraw Hill 2007
2. Robbins et.al Organizational Behaviour Prentice Hall India 12th edition.
3. Luthans Fred et.al Organizational Behaviour Tata McGraw Hill India 10th edition.
4. Helliregal Slocum, Woodman, Organisational Behaviour, IX edn., Thomson learning.
5. Umasekaran, Organisational Behaviour, Tata McGraw Hill.
6. Robbins S.P., Concepts contrivances and applications, Prentice Hall.
7. McShane & Glinow, Organisational Behaviour, Tata McGraw Hill.
5. M.B.A. -2010-11 –UD.
Page 5 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
1.3. MANAGERIAL ECONOMICS
Subject Description :
Managerial economics emphasize on the influence on micro and macro economics on
managerial decision making, explaining the supply, demand and cost functions, its relative
impact on the economy and the company correlating to profit and investment analysis.
Goals:
To enable the students to learn the application of the economic principles and policies on
managerial decision making.
Objectives:
On successful completion of the course the students should have:
Understood the economic principles and policies on managerial decision making.
Learn demand, supply, cost and profit concepts and functions along with its applications.
To learn profit policies, planning and problem solving techniques.
To learn inflation, deflation and balance of payment on national income.
UNIT I : Managerial Economics - meaning, nature and scope - Managerial Economics and
business decision making - Role of Managerial Economist - Fundamental concepts of
Managerial Economics.
Demand Analysis - meaning, determinants and types of demand - Elasticity of demand.
UNIT II : Supply meaning and determinants - production decisions - production functions Isoquants, Expansion path - Cobb-Douglas function.
Cost concepts - cost - output relationship - Economies and diseconomies of scale - cost
functions.
UNIT III : Market structure - characteristics - Pricing and output decisions - methods of
pricing - differential pricing - Government intervention and pricing.
UNIT IV: Profit - Meaning and nature - Profit policies - Profit planning and forecasting Cost volume profit analysis - Investment analysis.
UNIT V : National Income - Business cycle - inflation and deflation - balance of payments Monetary and Fiscal Policies
References :
1.
2.
3.
4.
5.
Joel Dean - Managerial Economics, Prentice Hall/Pearson.
Rangarajan - Principles of Macro Economics, Tata McGraw Hill.
Atmanand, Managerial Economics, Excel, 2001.
Athmanand.R., Managerial Economics, Excel, 2002, New Delhi.
Mankar.V.G., Business Economics, Macmillan, Business Book, 1999.
6. M.B.A. -2010-11 –UD.
Page 6 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
1.4. FINANCIAL STATEMENT ANALYSIS
UNIT I: Financial Accounting: Definition-Concept and conventions- Contents of profit and
loss account and Balance Sheet of companies – Depreciation: Concept and methods (theory)
– Preparation of final accounts (simple problems)
UNIT II: Financial Statement Analysis- Meaning – Objectives- Rearranging Financial
Statements for Analysis – Techniques of Financial Statement Analysis : Comparative
Statement Analysis, Common Size Statements, Trend Analysis – Ratio Analysis –
Classification of Ratio – Problems on computation and interpretation of Accounting Ratios –
Du Pont Analysis – Advantages – Disadvantages of Ratio Analysis .
UNIT III: Fund Flow Statement Analysis – Preparation of Statement of change in working
capital – Computation of fund from operation and preparation of fund flow statement – Cash
flow statement: computation of cash from operations – Preparation of cash flow statementDistinction between Fund flow statements and cash flow statement- Advantages of Fund flow
statement and Cash flow statement
UNIT IV: Cost Accounting – Distinction of Financial Accounting and Cost Accounting –
Cost Terminology: Cost, Cost centre, Cost unit – Elements of cost – Preparation of Cost
Sheet – Marginal Costing: Concepts – Break Even Point Analysis, Contribution, PV Ratio,
Margin of Safety – Problems on Applications of Break Even concept.
UNIT V: Budget – Budgeting and budget control – Types of Budgets – Preparation of
Flexible and fixed budgets, Master budget and Cash budget.
Questions: 60% of the questions shall be problems
40% of the questions shall be theory based
REFERENCE:
1. Ramachandran.N., Ram Kumar Kakan, “Financial Accounting for Management”, The
TATA Mc Graw Hill Publishing Company Ltd, New Delhi, 2006
2. Ronald W Hilton, Michael N Maher, Frank H Shelto, “Cost Management strategies
for Business Decision” The TATA Mcgraw Hill Publishing Company Ltd, New
Delhi, 2004
3. .Maheswari.S.N, “Principles of Management Accounting”, Sulton Chand and sons
Limited, New Delhi
4. Gerald I White, Ashinpaul C.Sondhi, Dov Fried, “The Analysis and Use Financial
Statements”, Wiley Student Edition, Third Edition, new Delhi 2004
7. M.B.A. -2010-11 –UD.
Page 7 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
1.5 QUANTITATIVE METHODS FOR MANAGEMENT
Subject Description :
To enable students to acquire the knowledge of mathematics & statistics and their use in
business decision making.
UNIT I
Linear, Non-Linear functions – graphical representation of functions, Constants, Variables –
notion of Mathematical models – concept of trade off – notion of constants – concept of
Interest. Basic Concept of differentiation – integration – optimisation concepts – use of
differentiation for optimization of business problem
UNIT II
Data Analysis – Uni-Variate – ungrouped and grouped data measures of central Tendencies,
measures of dispersion – C V percentages (problem related to business applications).
Bivariate – correlation and regression – problems related to business applications
UNIT III
Probability – definitions – addition and multiplication Rules (only statements) – simple
business application problems – probability distribution – expected value concept –
theoretical probability distributions – Binomial, Poison and Normal – Simple problems
applied to business.
UNIT IV
Basic concept of index numbers – simple and weighted index numbers – concept of weights types of index numbers – Business index number – CPT, WPI, Sensex, Niffy, Production
Index, Time series – variations in Time Series for business forecasting.
UNIT V
Hypothesis testing of Proportion and Mean – single and two tailed tests – errors in
Hypothesis Testing – Measuring the power of Hypothesis test. Chi-Square Tests
References :
Statistics for Management – Richard L Levin & Daid S Rubin
Statistical Methods – S P Gupta
Statistics for Business and Economics – R P Hoods – MacMillan India Limited
David M.Levine, Timothy C.Krehbiel and Mark L.Berenson
“Business Statistics: A First Course” , Pearson Education Asia
5. Amir D. Aczel, Complete Business Statistics, 5th edition, Irwin McGraw-Hill.
1.
2.
3.
4.
Questions
: 80% of the questions shall be problems
20% of the questions shall be theory based.
8. M.B.A. -2010-11 –UD.
Page 8 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
1.6. CORPORATE COMMUNICATION
Subject Description :
To enable the students to learn the basic communication skills and the usage of
communication technology in the modern workplace.
Unit 1:
Communication basics – Business Communication – components – Types – formal
communication network – Work team communication – variables – goal – conflict
resoulation – non – verbal communication – Cross cultural communication – Business
meetings – Business Etiquette.
Unit 2:
Understanding Corporate Communication – Employee Communication – Managing
Government Relations – Writing for Media and Media Relations
Unit 3:
Corporate Communication in Brand Promotion – Financial Communication – Crises
Communication.
Unit 4:
Report writing: Characterizing & business reports – Types and forms & reports – Project
proposals – collection of data – tables constitution – charts – writing the report –
documenting the sources – proof reading.
Unit 5:
Business Presentation: Written and oral presentation – work – team presentation – Delivering
the business presentation visual aids – slides – electronic presentation – hand-outs –
delivering the presentation – career planning – preparing Resume – job applications –
preparation for a job interview – employment interviews – follow-up.
Suggested Readings:
1. Scot Ober, Contemporary business communication, fifth edition, biztantra.
2. Lesiler &Flat lay, Basic Business communication. Tata Mc Graw Hill.
3. Jaishri Jethwaney, Corporate Communication Principles and Practice, Oxford
Publications Ltd., 2010
9. M.B.A. -2010-11 –UD.
Page 9 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
1.7. COMPUTER APPLICATIONS IN MANAGEMENT USING SAP – (Practical)
Aim: To introduce the concepts of information technology and their application in
management decision making.
Components of a Computer - Hardware and Software – Operations Systems – Directories
and File properties.
MS OFFICE – Introduction to WORD, EXCEL and POWERPOINT
WORD – Creating a new document with templates & Wizard – Creating own document –
Opening/modifying a saved document – converting files to and from other document formats
– Using keyboard short-cuts & mouse – Adding symbols & pictures to documents – header
and footers – Finding and replacing text – spell check and Grammar check – Formatting text paragraph formats - adjusting margins, line space – character space – Changing font type,
size – Bullets and numbering – Tables – Adding, editing, deleting tables – Working within
tables – Adding, deleting, modifying rows and columns – merging & splitting cells.
EXCEL – Working with worksheets – cells – Entering, editing, moving, copying, cutting,
pasting, transforming data – Inserting and deleting of cells, rows & columns – Working with
multiple worksheets – switching between worksheets – moving, copying, inserting & deleting
worksheets – Using formulas for quick Calculations – Working & entering a Formula –
Formatting a worksheet – Creating and editing charts – elements of an Excel Chart –
Selecting data to a chart – Types of chart – chart wizard – Formatting chart elements –
Editing a chart – Printing charts.
POWERPOINT – Creating new presentations – Auto content wizard – Using template –
Blank presentation – Opening existing presentations – Adding, editing, deleting, copying ,
hiding slides – Presentations – Applying new design – Adding graphics – Using headers and
footers – Animations text – Special effects to create transition slides – Controlling the
transition speed – Adding sounds to slides – Using action buttons.
TALLY – Introduction and Installation, Required Hardware, Preparation for installation of
Tally software, installation, Working in Tally: Opening new company, Safety of Accounts or
Password, Characteristics, Making Ledger Accounts, Writing voucher, voucher entry,
Making different types of vouchers, Correcting sundry debtors and sundry creditors accounts,
Preparation of Trial Balance, Books of Accounts, Cash Book, Bank Books, Ledger Accounts,
Group summary, Sales Register and Purchase Register, Journal Register, Statement of
Accounts & Balance Sheet.
ERP & SAP : Introduction – Need for ERP – Advantages – Major ERP Packages – SAP:
Features – ABAP: Logon to SAP Environment – ABAP Dictionary – Functions – Objects –
Managing SAP Application
Practicals: Simple problems to be done in WORD, EXCEL and POWERPOINT using all the
above mentioned topics.
References:
OFFICE 2000 Complete – BPB
Windows 98 Complete – BPB
Windows 98 6 in one by Jane Calabria and Dorothy Burke – PHI
Using Microsoft Office 2000 by Ed, Bott – PHI
Enterprise Resource planning (ERP): Text and case studies by Murthy, C S V, HPH
Teach yourself SAP in 24 hours by George Anderson; Danielle Larocca - Pearson Education
10. M.B.A. -2010-11 –UD.
Page 10 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
2.1 OPERATIONS MANAGEMENT
Subject Description :
To focuses on key analytical methods and provide practical insight for operations
management.
UNIT I : Operations Management – Meaning – Importance – historical contributions –
System view of OM - Operation strategy and competitiveness - Functions of OM – types of
production systems
UNIT II : Product design and process selection – Evaluation and Selection of appropriate
Production and Operations technology. Product Design and process selection.
Types of layout – analysis and selection of layout – Product and / or Process layout, Cellular,
Lean and Agile manufacturing systems – Computer Integrated Manufacturing Systems Assembly line balancing.
UNIT III : Production planning and control – meaning – functions – aggregate
master production schedule (MPS) – Material requirement planning (MRP)
Capacity requirement planning (CRP) – Techniques – problems in MRP and
introduction to MRP II and ERP – Business Process Re-engineering - Total
Maintenance (TPM)
planning –
– BOM –
CRP – an
Productive
UNIT IV : Materials management – functions – material planning and budgeting – Value
Analysis - purchase functions and procedure - inventory control – types of inventory – safety
stock – order point – service level – inventory control systems – perpetual – periodic – JIT –
KANBAN.
UNIT V : Total Quality Management Concept - Statistical Quality Control for Acceptance
Sampling and Process Control – Concepts of O.C.C. Curve – Use of the O.C. Curve –
Concept of Type I and Type II error – Quality movement – Quality circles –– ISO Quality
Certifications and types – Quality assurance – Six Sigma concept.
References :
1.
2.
3.
4.
5.
6.
7.
8.
9.
Production and Operations Management – Everest E Adam & Ebert – PHI – publication
forth edition.
Operations Management (Theory and Problems ) – Joseph G Monks – McGraw Hill Intl.
Production and Operations Management – S N Chary – TMH Publications
Production and Operations Management – Pannerselvam, PHI
Lee J. Krajewski and Larry P. Ritzman, “Operations Management: Process and value
Chains”, 7th Edition, PHI, 2007
Hunawalla and Patil – production and Operations Management, Himalaya.
Modern Production and operations management – E.S Buffa.
Lee J. Krajewski and Larry P. Ritzman, “ Operations Management: Strategy and
Analysis”, Addison Wesley.
Chase, Aquilano & Jacobs “Production and Operations Management”,Tata McGraw
Hill.
Questions
: 40% of the questions shall be problems
60% of the questions shall be theory based.
11. M.B.A. -2010-11 –UD.
Page 11 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
2.2 MARKETING MANAGEMENT
Subject Description :
To enable the students to understand the market and marketing concepts, functions and
systems by emphasizing on strategies and global market.
Goals:
To enable the students to learn the basic functions, principles and concepts of marketing for
effective managerial function.
Objectives:
On successful completion of the course the students should have:
Understand the marketing concepts and tasks in the global economy.
To learn the buyer behaviour and factors influencing the buyer behaviour.
To understand the marketing communication process and mix along with the marketing
channels.
Unit I
Marketing Concepts and Tasks, Defining and delivering customer value and satisfaction Value chain - Delivery network, Marketing environment, Adapting marketing to new
liberalised economy - Digitalisation, Customisation, Changing marketing practices,
ebusiness - setting up websites; Marketing Information System, Strategic marketing planning
and organization.
Unit II
Buyer Behaviour, Market Segmentation and Targeting, Positioning and differentiation
strategies, Product life cycle strategies, New product development, Product Mix and Product
line decisions, Branding and Packaging, Price setting - objectives, factors and methods, Price
adapting policies, Initiating and responding to price changes.
Unit III
Marketing channel system - Functions and flows; Channel design, Channel management Selection, Training, Motivation and evaluation of channel members; Channel dynamics VMS, HMS, MMS; Market logistics decisions.
Unit IV
Integrated marketing communication process and Mix; Advertising, Sales promotion and
Public relation decisions. Direct marketing - Growth, Benefits and Channels; Telemarketing;
Salesforce objectives, structure, size and compensation.
Unit V
Identifying and analysing competitors, Designing competitive strategies for leaders,
challengers, followers and nichers : Customer Relationship marketing - Customer database,
Data warehousing and mining. Attracting and retaining customers, Customerism in India,
Controlling of marketing efforts.
Global Target market selection, standardization Vs adoptation, Product, Pricing, Distribution
and Promotional Policy.
[
References :
1. Marketing Management - Philip Kotler - Pearson Education/PHI 12th Edition, 2006.
2. Marketing Management - Rajan Saxena - Tata McGraw Hill, 2002.
3. Marketing Management: Planning, Implementation and Control: Global Perspective
Indian Context – VS Ramasamy & S. Namakumari - Macmilan India, 2009. 4th Edition
4. Marketing Management: A South Asian Perspective – Philip Kotler and Kevin Lane
Kotler, Pearson Education, 11th Edition, 2007.
5. Basic Marketing - Perreault and McGarthy - Tata McGraw Hill, 2002.
6. Case and Simulations in Marketing - Ramphal and Gupta - Golgatia, Delhi.
7. Case Studies in Marketing - R.Srinivasan - PHI.
8. Marketing concepts and cases – Michael J Etzel, Bruce J Walker, William J Stanton and
Ajay Pandit, TMH 13th Edition, New Delhi, 2007.
9. Marketing Management – S.Jayachandran - TMH, 2003.
12. M.B.A. -2010-11 –UD.
Page 12 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
2.3. FINANCIAL MANAGEMENT
UNIT I: Objectives and Functions of Financial Management – Role of Financial
Management in the organization – Risk-return relationship – Time value of money concepts –
Capital market instruments – Role of capital market in the economy
UNIT II: Basic of capital budgeting: capital budgeting process – methods of capital
expenditure appraisal: Payback period, Accounting rate of return, Net present value, Internal
rate of return, Profitability Index – Risk Analysis in Capital Budgeting
UNIT III: Cost of Capital – Factors affecting cost of capital – computation of cost of debt,
cost of preference shares, cost of equity, weighted average cost of capital
UNIT IV: Capital Structure Planning – EBIT-EPS analysis – MM Theory of Capital
structure – Dividend policy – types of dividend policy – Dividend policy and share valuation
UNIT V: Working Capital Management – Definition and objectives – working capital
policies – factors affecting working capital requirements – forecasting working capital
requirements (problems) – working capital financing approach
Questions: 60% of the questions shall be problems
40% of the questions shall be theory based
REFERENCE:
1. Eugene F Bridgham, Micheal C Ehrtardt, “Financial Management Text and Cases”
South Western Cengage Learning, 2009
2. Khan M.Y., Khan P.K., “Basics of Financial Management” Tata McGraw Hill
Publishing Limited, New Delhi, 2005
3. Lawerence J Gitman, “Principles of Managerial Finance” Pearson Education limited,
2003
4. James C Vanhorne, John M Wachowicz Jr, “Fundamentals of Financial
Management”, Pearson Education Limited, 2001
13. M.B.A. -2010-11 –UD.
Page 13 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
2.4 HUMAN RESOURCE MANAGEMENT
Unit I : Human Resource Function
Human Resource Philosophy - Changing environments of HRM - Strategic human resource
management - Using HRM to attain competitive advantage - Trends in HRM - Organisation
of HR departments - Line and staff functions - Role of HR Managers.
Unit II : Recruitment & Placement
Job analysis : Methods - IT and computerised skill inventory - Writing job specification - HR
and the responsive organisation.
Recruitment and selection process : Employment planning and forecasting - Building
employee commitment : Promotion from within - Sources, Developing and Using application
forms - IT and recruiting on the internet.
Employee Testing & selection : Selection process, basic testing concepts, types of test, work
samples & simulation, selection techniques, interview, common interviewing mistakes,
Designing & conducting the effective interview, small business applications, computer aided
interview.
Unit III : Training & Development
Orientation & Training : Orienting the employees, the training process, need analysis,
Training techniques, special purpose training, Training via the internet.
Developing Managers : Management Development - The responsive managers - On-the-job
and off-the-job Development techniques using HR to build a responsive organisation.
Management Developments and CD-Roms - Key factor for success.
Performance appraisal : Methods - Problem and solutions - MBO approach - The appraisal
interviews - Performance appraisal in practice.
Managing careers : Career planning and development - Managing promotions and transfers.
Unit IV : Compensation & Managing Quality
Establishing Pay plans : Basics of compensation - factors determining pay rate - Current
trends in compensation - Job evaluation - pricing managerial and professional jobs Computerised job evaluation.
Pay for performance and Financial incentives : Money and motivation - incentives for
operations employees and executives - Organisation wide incentive plans - Practices in Indian
organisations.
Benefits and services : Statutory benefits - non-statutory (voluntary) benefits - Insurance
benefits - retirement benefits and other welfare measures to build employee commitment.
Unit V : Labour relations and employee security
Industrial relation and collective bargaining : Trade unions - Collective bargaining - future of
trade unionism. Discipline administration - grievances handling - managing dismissals and
separation.
Labour Welfare : Importance & Implications of labour legislations - Employee health Auditing HR functions, Future of HRM function.
References:
1.
2.
3.
4.
5.
6.
7.
David A. DeCenzo & Stephen P.Robbins, Personnel/Human Resource Management, Third
edition, Wiley India. 2009.
Gary Dessler, "Human Resource Management", Seventh edition, Prentice-Hall of India P.Ltd.,
Pearson.
H.John Bernardin & Joyee E.A.Russel, Human Resource Management
- An experiential
approach, 4th Edition, McGraw-Hill International Edition., 2007
VSP Roa, Human Resource Management : Text and cases, First edition, Excel Books, New Delhi
- 2000.
Dr. R.Venkatapathy & Assissi Menacheri, Industrial Relations & Labour Welfare, Adithya
Publications, CBE, 2001.
Robert L.Gibson and Marianne H.Mitchell, Introduction to Counseling and Guidance,
VI
edition, PHI, 2005.
K. Prasad, Strategic Human Resource Management Text & Cases, Macmillan Publishers India
Ltd., 2008.
14. M.B.A. -2010-11 –UD.
Page 14 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
2.5 QUANTITATIVE TECHNIQUES
Subject Description :
To enable the students to learn the techniques of operation Research and resources
Management and their application in business management.
UNIT I
Management & Decision Mathematical Models – Making Types of models (deterministic
and probabilistic) – simple business examples – OR and optimization models – Linear
Programming – formulation – graphical solution –Dual of linear programming problem –
Economic interpretation
UNIT II
Transportation model – Initial Basic Feasible solutions – optimum solution for non –
degeneracy model – Trans-shipment Model – Assignment Model
UNIT III
Network Model – networking – Critical Path Method (CPM) – Time estimates – PERT –
crashing, Resource leveling, Resources planning. Waiting Line Model (Queuing Theory) –
Structure of model – M/M/1 for infinite population.
UNIT IV
Inventory Models – Deterministic Models – EOQ – EOQ with Price Breaks – Probabilistic
Inventory Models - Probabilistic EOQ model
UNIT V
Simulation – types of simulation – Monte Carlo simulation – simulation problems.
Decision Theory – Pay off tables – decision criteria – decision trees.
References :
Operations Research – An Introductions – Hamdy A Tata
Operations Research – Kanti Swarup, Gupta And Man Mohan
Operations Research – Dr. J.K. Sharma Macmillan Indian Ltd.
Quantitative Techniques in Management – ND Vohra.
Operations Research – R. Panneerselvam, 2nd Edition, PHI, 2007
Operations Research, Concepts and cases – Fredrick S Hillier and Herald J Lieberman, 8th
Edition, TMH, 2003
7. Hamdy A Taha, “An Introduction to Operations Research, Prentice Hall, Sixth edition,
2000
8. Ronald L. Rardin, “Optimization in Operations Research”, Pearson Education
9. J. K. Sharma, “ Operations Research: Theory and Applications”, Macmillan , 1997
10. U.K. Srivastava, G.V. Shenoy, S. C. Sharma, “ Quantitative Techniques for Managerial
Decision”, Second Edition, Prentice Hall of India
1.
2.
3.
4.
5.
6.
Questions
: 80% of the questions shall be problems
20% of the questions shall be theory based.
15. M.B.A. -2010-11 –UD.
Page 15 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
2.6 RESEARCH METHODS FOR MANAGEMENT
Subject Description :
Research Methods of Management is emphasizing on the methodology of research and its
application in managerial decision making, explaining hypothesis, meaning and types,
sampling design along with the various parametric and non-parametric test.
Goals:
To familiarize the students with methodology of research and its application in managerial
decision making situations.
Objectives:
On successful completion of the course the students should have:
Understood the scope and significance of research in business decisions.
Studied and understood sampling techniques along with hypothesis testing.
Understood various scaling techniques and measurement scales .
UNIT I
Research - meaning - scope and significance - Types of research - Research Process Characteristics of good research - Scientific method - Problems in research - Identifying
research problem – concepts, constructs and theoretical framework.
UNIT II
Hypothesis:- meaning - sources - Types - formulation Research design - Types - case study features of good design - measurement - meaning - need Errors in measurement - Tests of
sound measurement Techniques of measurement - scaling Techniques - meaning - Types of
scales - scale construction techniques.
UNIT III
Sampling design - meaning - concepts - steps in sampling - criteria for good sample design Types of sample designs - Probability and non-probability samples. Data collection:- Types
of data - sources - Tools for data collection methods of data collection - constructing
questionnaire - Pilot study - case study - Data processing:- coding - editing - and tabulation of
data - Data analysis.
UNIT IV
Test of Significance:- Assumptions about parametric and non-parametric tests. Parametric
Test - T test, F Test and Z test - Non Parametric Test - U Test, Kruskal Wallis, sign test.
Multivariate analysis-factor, cluster, MDS, Discriminant ananlysis. (NO Problems). SPSS
and its applications.
UNIT V
Interpretation - meaning - Techniques of interpretation - Report writing:- Significance Report writing:- Steps in report writing - Layout of report - Types of reports - Oral
presentation - executive summary - mechanics of writing research report - Precautions for
writing report - Norms for using Tables, charts and diagrams - Appendix:- norms for using
Index and Bibliography.
References:
Rao K.V.Research methods for management and commerce – sterling
Uma Sekaran, Research Methods for Business, Wiley India Publications, 4th Edition - 2009.
Zigmund, Business Research Methods
Donald R.Cooper and Pamela S.Schindler - Business Research Methods - Tata McGraw Hill,
2007
5. Naresh K Malhotra – Marketing Research: An Applied Orientation, Pearson Education, 4th
Edition, 2004
6. Wilkinson Bhadarkar - Methodology and Techniques of Social Research - Himalaya.
7. Anderson etal - Assignment and Thesis writing.
Note : 20% of the questions shall be problems
80% of the questions shall be theory based.
1.
2.
3.
4.
16. M.B.A. -2010-11 –UD.
Page 16 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
3.1 BUSINESS ETHICS AND GLOBAL BUSINESS ENVIRONEMNT
UNIT I
Business and society, Business & ethics - Social responsibility - Environmental Pollution and
control. Business and culture - Business and Government - Political system and its influence
on business - Business environment - The concept and significance - constituents of business
environment
UNIT II
Managing Ethics - Frame work of organizational ethic theories and sources, ethics across
cultures, factors influencing business ethics, ethical decision making, ethical values and
stakeholders, ethics and profit, Corporate governance Structure of boards, reforms in boards,
compensation issues, ethical leadership for improved Corporate governance and better
business education.
UNIT III
Introduction - The Globalization of the World Economy – The Changing Nature of Indian
and International Business - The Global Trade and Investment Environment
International trade Theory : Introduction - An Overview of Trade Theory - Mercantilism Absolute Advantage - Comparative Advantage - Heckscher-Ohlin Theory - The New Trade
Theory - National Competitive Advantage - Porter's Diamond.
The Revised Case for Free Trade - Development of the World - Trading System - WTO &
development of World trade - Regional grouping of countries and its impact..
UNIT IV
Foreign Direct Investment: Introduction - Foreign Direct Investment in the World Economy Horizontal Foreign Direct Investment - Vertical Foreign Direct Investment. Benefits and
advantages to host and home countries.The Global Monetary System ,The Foreign Exchange
Market : Introduction - The Functions of the Foreign Exchange Market.
UNIT V
The Strategy and Structure of International Business
The Strategy of International Business : Introduction - Strategy and the Firm - Profiting from
Global Expansion - Pressures for Cost Reductions and Local Responsiveness - Strategic
Choice.
Mode of Entry and Strategic Alliances: Introduction - Entry Modes - Selecting and Entry
Mode
- Strategic Alliances - Making Alliances Work, Exporting, Importing and Counter trade :
Introduction - The Promise and Pitfalls of Exporting - Improving Export Performance Export and Import Financing - Export Assistance – Counter trade.
References :
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
Kitson.A and Campbell.R - The Ethical Organisation, Palgrave, 2001
Davis & Keith William C. Frederik - Business and society
Francis Cherunilam - Business Environment
Pruti S. - Economic & Managerial Environment in India
Shaikh Saleem – Business Environment, Pearson Education, 2006
Hill.C.W., International Business : Competing in the Global market place, Irwin-McGraw
Hill, 1999.
Philip R.Cateora, International Marketing, Irwin McGraw Hill, 9th edn.
Shivaramu, International Business, Macmillan India.
Francis Cherunilam, International Business, Wheeler Publications.
Charles W.L., Hill, International Business, Irwin-McGraw Hill, 1998.
17. M.B.A. -2010-11 –UD.
Page 17 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
3.2 MANAGEMENT INFORMATION SYSTEM
Unit I
Foundations of Information Systems: A framework for business users - Roles of Information
systems - System concepts - Organisation as a system - Components of Information Systems
- IS Activities - Types of IS.
Unit II
IS for operations and decision making: Marketing IS, Manufacturing IS, Human Resource IS,
Accounting IS and Financial IS - Transaction Processing Systems- Information Reporting
System - Information for Strategic Advantage.
Unit III
DSS and AI: DSS models and software: The decision making process - Structured, Semi
Structured and Unstructured problems; Overview of AI, Neural Networks, Fuzzy Logic
Systems - Expert Systems.
Unit IV
Managing Information Technology: Managing Information Resources and technologies – IS
architecture and management - Centralised, Decentralised and Distributed - EDI, Supply
chain management & Global Information technology Management.
Unit V
Security and Ethical Challenges: IS controls - facility control and procedural control - Risks
to online operations - Ethics for IS professional - Societal challenges of Information
technology.
TEXT BOOKS
1. James A O'Brien, "Introduction to Information Systems", Tata McGraw Hill, 12th
Edition, 2005.
2. References /Text Books
3. O‟Brien, J.A., and Marakas, G.M. Management Information Systems. (7th edn.),
Tata McGraw Hill: India
4. Oz, E. (2008). Management Information Systems. (2nd edn.), India: Cengage
Learning
5. Laudon, J.P and Laudon, K.C. (2007). Management Information System. (10th
edn.), Pearson Education: India
6. Haag, S., Cummings,M., and Phillips, A. (2008). Management Information Systems.
(6th edn.), Tata McGraw Hill: India
3.3 to 3.6 ELECTIVE COURSES
3.7 PROJECT REPORT & VIVA VOCE
18. M.B.A. -2010-11 –UD.
Page 18 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
4.1 STRATEGIC MANAGEMENT : INDIAN AND GLOBAL CONTEXT
Objectives: Students are expected to integrate their knowledge gained in various functional
areas to make business decisions, from the general manager's point of view in the global and
Indian context.
Teaching and Examination: Students are expected to keep abreast of the contemporary
business practices by reading the business practices by reading the business magazines and
management journals.
Case studies, application project Seminars and group exercises will supplement the class
lectures.
Unit I
Corporate Strategic Planning - Mission - Vision of the firm - Development, maintenance and
the role of leader - Hierarchal levels of planning - Streagic planning process. Strategic
management Practice in India. Competitive advantage of Nations and its implication on
Indian Business.
Unit II
Environment Analysis & Internal Analysis of Firm:
General environment scanning, competitive & environment analysis - to identify
opportunities & threat - Assessing internal environment through functional approach and
value chain - identifying critical success factors - to identify the strength & weakness SWOT audit - core competence - Stockholders' expectations, Scenario-planning - industry
analysis.
Unit III
Strategy Formulation :
Generic strategies - Grand strategies - Strategies of leading Indian companies - The role of
diversification - limits - means and forms. Strategic management for small organisations,
non-profit organisations and large multi product and multiple market organisations.
Unit IV
Tools of Strategy : Planning and evaluation :
Competitive cost dynamics - experience curve - BCG approach - cash flow implication -IABS matrix - A.D.Littles Life-cycle approach to strategic planning - Business portfolio
balancing - Assessment of economic contribution of strategy - Strategic funds programming.
Unit V
Strategy implication & Control :
Various approaches to implementation of strategy - Matching organisation structure with
strategy - 7S model - Strategic control process - Du Pont's control model and other
Quantitative and Qualitative tools - Balanced score card - M.Porter's approach for
Globalisation - Future of Strategic Management.
19. M.B.A. -2010-11 –UD.
Page 19 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
References :
1. Pearce & Robinson, Strategic Management, All Indian Travellors N D.
2. A.C.Hax and NS, Strategic Management: An Integrative Perspective, Majifu, Prentice
Hall.
3. Michael Porter, Competitive strategies.
4. John A Pearce II and Richard B Robinson, “Strategic Management: Formulation,
Implementation and Control”, 9th Edition, TMH, 2007
5. Michael Porter, Competitive Advantage of Nations.
6. Samul C. Certo and J.Paul Peter, Strategic Management, Second Edn. Concepts &
Application, McGraw Hill.
7. Gregory G.Dess and Alex Miller, Strategic Management, McGraw Hill.
8. Gerry Johnson & Kevan scholes, Exploring Corporate Strategy: Text & Cases, Prentice
Hall India.
9. Jauch.L., Rajive Gupta & William.F.Glueck, Business Policy and Strategic Management,
Frank Bros&Co., 2003.
10. Fred R.David, Strategic Management Concepts & Cases, Pearson, 2003.
11. R.Srinivasan, Strategic Management, II edition, Prentice Hall of India, New Delhi.
4.2 to 4.5 ELECTIVE COURSES
20. M.B.A. -2010-11 –UD.
Page 20 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
ELECTIVE PAPERS FOR III SEMESTER
1. INTEGRATED MARKETING COMMUNICATION (IMC)
Unit 1
Role of IMC in marketing process, IMC planning, Participants in IMC process – Clients,
Advertising and Specialised Services agencies. Perspectives on Consumer Behaviour –
Learning and Decision making process. Basics of communication – Source, Message and
channel factors. Objectives and Budgeting for IMC programmes.
Unit 2
Creative process, Planning and Development of Creative strategy, Appeals and Execution
styles, creative tactics, creative brief and approval; Copy writing for Print, Broadcast and
Web media; Design and Production for Print, Broadcast and Web media.
Unit 3
Media Profile – Print, Radio, Television, Film and Video, Internet and Supportive Media –
Audience, Types, Advantages and Limitations, Trends; Media Plan – objectives, strategies,
buying and scheduling, use of computers; Evaluating the effectiveness of advertising.
Unit 4
Direct Markeing and IMC – Objectives, Tools and strategies, Internet and IMC – Web
participants, objectives, developing and maintaining a website; Sales Promotion – Growth,
Types, objectives, integration and effectiveness.
Unit 5
Public Relations – Planning process, tools and effectiveness, Personal selling and IMC –
Scope, Role, and Evaluation, Social, Ethical and Economic effects of advertising and
promotion; Regulation of advertising and promotion.
References:
1. George E. Belch and Michael A. Belch – Advertising and Promotion – IMC
perspective – Tata Mc Graw Hill 2008.
2. Wells, Moriarty and Burnett – Advertising Principles and Practice, Pearson
Education, 2006.
3. Clow and Baack, - Integrated Advertising, Promotion and Marketing
Communications, PHI/Pearson 2007.
4. Shimp – Advertising and Promotion – IMC approach – Cengage Learning, 2007.
5. Jefkins and Yadin – Advertising – Pearson Education, 2003.
6. Kazmi and Batra – Advertising and Sales Promotion – Excel Books, 2007.
7. Chunnawalla – Advertising, Sales and Promotion Management – Himalaya
Publishing, 2007.
8. Advertising & Promotion – IMC Perspective Kruti shate & Plan D‟souza – TMH
2009
9. Principles of Advertising & IMC – Tom Duncan – TMH II Edition, 2007.
21. M.B.A. -2010-11 –UD.
Page 21 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
2. EXPORT MANAGEMENT
AIM : To help students acquire familiarity of the knowledge and process of export and
import trade.
UNIT I : Export - meaning - scope - functions - Role of export in economic development Planning for export - market analysis:- market intelligence and market Research - market
selection and entry strategies for export.
UNIT II : Legal aspects of export trade:- International law: Private Law - Transport
contracts - Payment and credit - settlement of disputes - Indian Laws: EXIM policy - Law
relating to packaging - pricing - Advertising - distribution.
UNIT III : Export financing: methods and sources of export finance - Terms of payment for
export - Letter of credit - Institutional aid for export financing: RBI, EXIM Bank, ECGC commercial banks. Export pricing: Factors influencing export price - Forms of pricing pricing approaches - Transfer pricing - Dumping - International price quotation - Incoterms.
UNIT IV: India's export performance - Problems in export trade- Export promotion - Need Export promotion in India:- Institutional support for export promotion - Export promotion
incentives -EPZ & FTZ, 100% EOU, Export houses, Trading houses - Star Trading houses Project and consultancy export UNIT V: Export Procedure and documentation: Export order execution - Product
preparation - quality control and Pre-shipment inspection - Pachaging - freight forwarders Cargo insurance - customs clearances - Documentation Procedure and clearing Export bills.
Import Procedure:- Import licensing - Replenishment license - Advance import license - Pass
book scheme - Import of capital goods.
References :
1. TAS Balagopal - Export management - Himalaya
2. Varshney & Battacharya - International Marketing Sultanchand & sons
3. Francis chernmilam - International Trade and Export management - Himalaya
4. B.S Rathor - Export Management - Himalaya.
5. S. Shivaramu - Export Marketing - Himalaya
22. M.B.A. -2010-11 –UD.
Page 22 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
3. CONSUMER BEHAVIOUR
UNIT – I
Consumer Behaviour and Marketing Strategy, nature and scope of Consumer
Behaviour.
Market segmentation and Consumer Behaviour.
Learning - nature, conditions relevant to high and low involvement strategies,
characteristics and types of learning, Brand loyalty, Brand equity & leverage.
Perception - Process, interpretation, Perception and marketing strategy. Perceptual process
and buying behaviour.
Perception - Elements, Just notice able difference - its application to Consumer Behaviour,
Perceptual organization and defense, consumer imagery.
UNIT - II
Motivation - Nature, motivational strategies, theories and their relevance, marketing
strategies based on motivational conflict.
Personality - Psycho-analytical neo-Freudian and social approaches to personality
understanding consumer diversity, Brand personality, Self and self image.
UNIT - III
Attitude formation & change - Tricomponent and structural models of attitudes,
sources of
attitude formation, strategies of attitude change, cognitive dissonance,
attribution, self
perception theories, Foot in the door phenomenon.
Groups - types, Celebarities, Family, Socialization of family members, Function of
family,
Family decision-making and consumption - related roles, Family life cycle.
UNIT - IV
Culture- Nature - Characteristics - Measurement, Sub-cultures – Nationality, age,
geographic, Regional and Sex, Subcultural interaction.
Cross culture : International perspective cross cultural consumer analysis,
Multinational
strategies, Cross – cultural psychographic segmentation marketing
mistakes – undertaking
differences.
UNIT - V
Opinion leadership & process, Dynamics, motivation and opinion leadership,
Measurement and corporate strategy of opinion leadership.
Innovation, Characteristics, Types, Profile of consumer innovator, Diffusion of innovation,
Adoption process.
References :
1. Kurder, Consumer Behaviour, PHI/Pearson.
2. Schiffman.L.G. & Kanak.L.L., Consumer Behaviour, PHI/Pearson.
3. Loudon.D, Consumer Behaviour, Concepts & Applications, Albert Biutta, McGraw Hill.
4. Ingel, Roger & Blackwell, Consumer Behaviour.
23. M.B.A. -2010-11 –UD.
Page 23 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
4. RETAIL MANAGEMENT
Unit I
Retailing - An introduction: Definition, Functions, Importance, Types of retailing - Store and
Non Store; Retailing in India - Current Scenario, Retailing from International perspectives;
Consumer buying decision process - influencing factors, Consumer shopping behavior.
Unit II
Retail planning - Purpose, method, structure and monitoring the plan; Retail brand
management- positioning, personality, Types of brand, Brand and life cycle; Merchandise
management - Meaning, Methods, Assortment and Inventory; Purchase negotiation, Supply
channel and relationship, SCM principles, and retail logistics.
Unit III
Retail location decision - Trading area analysis, Types of location Site evaluation; Store
design - layout and space management, Visual merchandising and displays; Retail pricing approaches, influencing factors, Price sensitivity, and mark down policy.
Unit IV
Retail promotion - setting objectives, Role of advertisiting, sales promotion, personal selling
public relations and relationship marketing in retailing; Human resource issues and
considerations; Customer service management.
Unit V
Impact of information technology in retailing - Integrated systems and Networking EDI, Bar
Coding, Customer database management. Electronic retailing - Role of web, on line retailing,
Factors to be considered in having a Web site, limitations of web and future trends;
Consumerism and Ethics in retailing - Social and Green issues; Retail audit.
Reference :
1. Berman and Evens, Retail Management, PHI.
2. David Gilbert, Retail Management, Financial Time/Prentice Hall.
3. Gibson Vedamani, Retail Management, Jaico Books.
4. Levy & Weitz, Retail Management, Tata McGraw Hill.
24. M.B.A. -2010-11 –UD.
Page 24 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
5. PERFORMANCE MANAGEMENT
Unit – 1
Performance Management: Hostility to Traditional Appraisals – Managing Performance;
Performance Management & Human Resource; Performance Management Theatre.
Unit – 2
Planning Manage Performance & Development : Basic Concept – Research Base for
performance planning and Goal-setting; Components of Manage Performance &
Development Plan; Setting Mutual Expectations and Performance criteria.
Unit – 3
Monitoring Manage Performance & Mentoring Manage Development : Introduction –
Research and Theory – Monitoring and Mentoring Behaviours of the Manager.
Unit – 4
Ongoing Performance Monitoring & Review: Supervision – Monitoring and its objectives –
Process of Monitoring – Communication – Problem solving.
Unit – 5
Ongoing Mentoring and Manage Development : Purpose of Manage Development – Process
of Manage Development – Briscoe‟s principles – Training – Delegating – Mentoring –
Engendering Trust – Making a fresh beginning – Role efficacy.
Reference :
1. Prem Chandha “Performance Management”, Macmillan Publications.
25. M.B.A. -2010-11 –UD.
Page 25 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
6. MANAGING INTERPERSONAL EFFECTIVENESS
Course Number
:
Managing Interpersonal Effectiveness. This is a self and Personality development course to
be integrated with exercises and experiential learning.
UNIT I
Self Definition and Perception. Self Schemes, Gaining Self Knowledge, Self Knowledge,
Self awareness, Self effectiveness, Self presentation motives and Strategies, Self monitoring,
Impression Management.
UNIT II
Communication
Communication and language, models of - oral - Qualities and profile of a good speaker,
written - clarity, responsibility, simplicity, style, brevity Interpersonal Communication Barries - ways of over coming - Nonverbal Communication - Paralanguage, Eye Contract,
Facial expression, Kinersics, Body language, Deception, and Detecting deception.
UNIT III
Assertive Training
Nature, importance & relevance to organizational life - Assertion and aggression , Assertive
writing, preparing for assertive business writing - tools, tips, pitfalls, persuation. When to say
Yes/No. Being assertive with oneself - cutting, rewriting, editing and How to enhance
individual assertiveness?
UNIT IV
Transactional Analysis
Introduction, Ego States, exclusion contamination, strokes, Life positions, Types of
Transactions, Time Structures - Withdrawal, Rituals, Pastimes, activities, games - types,
Stamps, Rackets and sweat shirts, scripts. Advantages and disadvantages of TA, TA tips for
performance interviews, Development Planning with subordinates, TA tips for selection.
UNIT V
Counseling
Introduction - other interventions - steps Elements of Counseling - Counseling as a helping
strategy and Significance Predicting People's Problems Journey into life space. Anxiety and
stress Counseling to develop organisations, Check list for Counselors, Training for
Counseling.
References :
1. Venkatapathy.R and Jackson.P.T. Managing Interpersonal Effectiveness, Adhithya
Publishers, 2003.
2. Thomas Harris I'm okay, you're okay.
3. Fishert Uray Getting to Say yes: Negotiating an agreement without giving in AMA,
1993.
4. www. Ta Tutor.
5. Robert L.Gibson and Marianne H.Mitchell, Introduction to Counseling and Guidance,
VI edition, PHI, 2005.
26. M.B.A. -2010-11 –UD.
Page 26 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
7. STAFFING IN ORGANIZATIONS
Unit-I
The Nature of Staffing-staffing models and strategy-staffing ethics-planning-external
influences-human resource planning-staffing planning-legal issues-job analysis rewards-job
requirements job analysis-competency-based job analysis-job rewards-legal issues.
Unit-II
Staffing activities: Recruitment-strategy Development-searching-applicant reactionstransition to selection-legal issues-internal recruitment-recruitment planning-strategy
development-searching-applicant reactions-transition to selection-staffing activities:
selection-measurement-quality of measures-collection of assessment data.
Unit-III
External selection-preliminary issues-initial assessment methods-legal issues-external
selection-substantive assessment methods-discretionary assessment methods-contingent
assessment methods-internal selection-preliminary issues-initial assessment methodssubstantive assessment methods-discretionary assessment methods-staffing activities:
employment-decision making-choice of assessment method-determining assessment scoreshiring standards and cut scores-methods of final choice-decision makers.
Unit-IV
Final match-employment contracts-job offers-job offer process-new employee orientation and
socialization-legal issues.
Unit-V
Staffing system and retention management-staffing system management-administration of
staffing systems-evaluation of staffing systems-retention management-turnover and its
causes-analysts of turnover-retention initiatives: Voluntary, Discharge & Downsizing.
Reference :
27. M.B.A. -2010-11 –UD.
Page 27 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
8. FINANCIAL SERVICES
UNIT I: Overview of Financial services sector – Characteristics of Financial services – role
of financial sector in the Economy – Institutional Framework of Indian financial systemmerchant banking – functions of merchant bankers – pre issue activities and post issue
activities in issue management- SEBI guidelines on merchant bankers
UNIT II: Financial markets: Classification of financial markets – primary and secondary
market – stock exchanges – Capital market instruments- performance of Indian capital market
– money market: instruments and participants
UNIT III: Factoring: concept, mechanism, types of factoring, benefits and functions of
factoring – factoring Vs Forfaiting, Factoring Vs Bills Discounting – Factoring; International
and Indian scenario.
Depositories – mechanism and functions – credit cards and retail financing
UNIT IV: Mutual funds: concept – functions – types of funds – constitution of mutual funds
– SEBI regulation of AMCs – Evaluating mutual fund performance.
Asset securitisation: mechanism, participants and benefits – prospects and problems – Role of
NBFCs in asset financing.
UNIT V: Credit rating: definition – features and advantages – credit rating symbols – credit
rating process – rating methodology – equity grading.
Venture capital: meaning – origin and growth of venture capital – stages of venture capital
financing – venture capital industry in India
REFERENCE:
1. Shanmugham R, Financial Services, Wiley India Pvt. Ltd.,New Delhi, 2010
2. Khan M.Y., “Financial Services”, Tata McGraw Hill Publication Limited, New Delhi,
2009
3. Jeff Madura, “Financial Institutions and Markets”, South Western Cengage Learning,
New Delhi,2009
4. K.Sasidharan and Alex K Mathew, “Financial Services and System”, Tata McGraw Hill
Publication Limited, New Delhi, 2009
5. Bhole L.M and Jitendra Mahakud, “Financial Institutions and Markets: Structure, Growth
and Innovations”, Tata McGraw Hill Publication Limited, New Delhi, 2009
28. M.B.A. -2010-11 –UD.
Page 28 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
9. EQUITY RESEARCH AND PORTFOLIO MANAGEMENT
Unit I: Investment – investment Vs speculation – characterstics of investments – investment
opportunities – investment process – risk and return – measures of return – sources of risk –
measuring risk – risk premium
Unit II: portfolio return and risk – diversification – modern portfolio theory – efficient
portfolios – portfolio selection- capital market theory – capital market line – market portfolio
– CAPM and Security market line – Arbitrage pricing theory – single index model.
Unit III: Fundamental Analysis – factors consider in Economic Analysis – Industrial
Analysis: Industrial classification according to business cycle – Industry life cycle analysis –
key characteristics in an industry analysis – qualitative aspects of industrial analysis –
company analysis fundamentals
Unit IV: Common stock valuation – Dividend discount model – PIE model – relative
valuation ratios.Efficient market theory – Forms of market efficiency – Evidence on market
efficiency – implications of efficient market hypothesis.
Unit V: Technical Analysis Vs Fundamental Analysis – underlying assumption of technical
analysis – advantages – technical trading rules and indicators – momentum indicators – stock
price and volume techniques Portfolio performance evaluation – risk adjusted measures of
performance: style analysis.
REFERENCE:
1. Donald E Fischer and Ronlad J Jorden, “Security Analysis and Portfolio
Management” Prentice Hall India Limited, 6th Edition, New Delhi
2. Charles P Jones, “Investment Analysis and Portfolio Management” Wiley Student
edition, Wiley India Limited, 9th Edition, New Delhi.2008
3. Reily and Brown, “Investment Analysis and Portfolio Management” South
Western Cengage Learning, New Delhi
4. Ranaganatham.M., and Madhumathi.R., “Investment Analysis and Portfolio
Management” Pearson Education India Limited, 2008
29. M.B.A. -2010-11 –UD.
Page 29 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
10. BUSINESS ANALYTICS
Subject Description Students taking this course will appreciate the enormous global
opportunities that currently exist in providing business intelligence services based on data
mining techniques of micro-level data capture, cleansing, validation, storage and analysis.
Unit- 1 Data mining
Data partitioning- Different Methods – Terminology and Notation – Supervised and
Unsupervised learning – Steps in data mining - Training, validation and holdout samplesOpen ended exploration as opposed to a strict view on inference- Oversampling rare eventsDanger of over fitting
Unit – 2 Data Exploration and Dimension ReductionData summeries -pre-processingVisualization-Variable reduction principal components - Curse of dimensionality – Reducing
number of categories in Categorical variables
Unit-3 Classification and Prediction
Judging classification and predictive performance-The concept of lift- Multiple linear
regression -Model selection – Oversampling and Asymmetric costs – Classification using
Triage Strategy – Multiple Linear regression – Equation and Prediction
Unit-4 Classification Methods The Naïve Rules - Naïve Bayes- K-Nearest NeighborsClassification and Prediction- CART- Logistic regression – Advantages and shortcomings of
k-NN algorithms
Unit -5 Classification and Prediction
Recursive partitioning – Avoiding overfitting – CHAID – Regression Trees - Logistic
regression- Cluster Analysis – Measuring Distance between two records – two clusters –
Hierarchical clustering – Non-herarchial clustering – k-means algorithm
Suggested Reading
Data Mining for Business Intelligence: Concepts, Techniques, and Applications in Microsoft
Office Excel with XLMiner (Hardcover), ~ Galit Shmueli, Nitin R. Patel, Peter C. Bruce,
John Wiely & Sons., 2007
References:
1. Competing on Analytics: The New Science of Winning, Thomas H. Davenport,
Jeanne G. Harris, Havard Business School Press, 2007
2. Analytics at Work: Smarter Decisions, Better Results, Thomas H. Davenport
(Author), Jeanne G. Harris, Robert Morison, Havard Business School Publishing
Corporation, 2007
3. Data Mining Techniques: For Marketing, Sales, and Customer Relationship
Management, Michael J. A. Berry, Gordon S. Linoff, John Wiely & Sons, 2004 (2nd
Edition)
30. M.B.A. -2010-11 –UD.
Page 30 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
11. ADVANCED PRODUCTION MANAGEMENT
Course Number
:
Aim
To enable students in learning production management techniques and process at advanced
level.
UNIT – I
Impact of Technology on Production; Economics and Social Issues – Automation –
Operation strategy and competitiveness – economy studies for Investment and replacement in
Production Management.
UNIT – II
Design of the systems and procedures: Product Decision and Process Selection – Design of
facilities.
UNIT – III
Design of Production, planning and control system – design on scheduling system – design of
inventory system – design of maintenance system.
UNIT – IV
Productivity Techniques – Application of quantitative models for production planning and
control – process charts, network analysis.
UNIT – V
Human aspects of production management – Methods of improving business process reengineering – synchronous manufacturing – production planning and financial planning.
REFERENCES:
1. Chase and O‟ Aqulano – Production and Operations Management
2. J.D. Radford and D.B. Richardson Oriver W. Wight – The Management of Production
and Inventory Management in Computer area
3. Powell Niland – Production Planning, Scheduling and Inventory control
4. Floyd C. Mann and L. Richard – Automation and the worker Heffman
5. S.C. Agarwal – Maintenance Management
6. E. Leno J. Miller – Modern Maintenance Management Jerome W. Blood (ed)
31. M.B.A. -2010-11 –UD.
Page 31 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
12. INTEGRATED MATERIALS MANAGEMENT
AIM
The Course is aimed at acquainting the student with various objectives and functions of
Materials Management. This course also lays emphasis on decision making process.
UNIT – I
INTRODUCTION AND BASIC CONCEPTS
Concept and significance of Integrated Materials Management
Materials codification and computerization
UNIT – II
MATERIALS PLANNING AND CONTROL
Inventory Planning and Control
Models – Theory and Practice ABC, VED and other classifications EOQ – Reorder point –
Lead Time Analysis – Safety – Stocks – Q System – P System – S System.
Materials Requirement Planning (MRP)
Materials Problems in Indian Conditions and Inventory Audit and Inventory Audit and
Information Systems.
UNIT – III
PURCHASING
Purchasing Fundamentals – Make or Buy – Source Selection – Vendor Rating – Value
Analysis.
Purchase Negotiations – Purchase Timing – Purchase Contracts – Purchase Insurance
Purchasing Capital Goods, Seasonal Goods, Imported Goods
Deferred Payment Schemes – Lending Institutions – Leasing Trends.
Governmental buying – D.G.S.&D – Evaluation of Purchase Performance.
UNIT – IV
WAREHOUSING AND STORES
Location and Layout of Warehouses and stores – Different typical models.
Stores Procedures and Records for Receipt, Inspection, Issue, Reorder checking – Kardex
Sores Accounting.
UNIT – V
MISCELLANEOUS TOPICS
Practical problems in Management of Dead Stocks, Surplus stocks and scraps – Evaluation of
Stores Performance.
Materials Handling and Transportation Management
Case Studies
REFERENCES:
1. P. Gopalakrishnan, Purchasing and Materials Management, Tata McGraw Hill
Publishing Company Ltd.
2. A.K. Datta – Integrated Materials Management A Functional Approach – Prentice
Hall of India P. Ltd.
3. M.S. Sandilya and P. Gopalakrishnan – Inventory Management: Text and Cases –
Macmillan Indian Ltd.
4. M.D. Patel, A. Chunawalla and D.R. Patel – Integrated Materials Management
(Concepts & Cases) – Himalaya Publishing House.
32. M.B.A. -2010-11 –UD.
Page 32 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
13. INTERNATIONAL TOURISM MANAGEMENT
Objective: To familiarise the students with the concepts and practices of International
Tourism
Unit I
Globalisation & tourism sector Globalisation & the business world, the tourism industry,
challenges, Factors affecting Global & regional tourist movements, Demand and origin
factors, destination & resource factors. Contemporary trends in international tourist
movements.
Unit II
The emergence of international hotels & tourisms .Historical aspects, development of chains,
development abroad, airline connection .-Political aspects of the international travel, tourism
-Barriers to travel, tourism investment & business, regulations, international organisations
dealing with barriers viz : WTO, IMF, IHA, need for government support of tourism, national
tourism organizations, political stability, travel
advisories, political risk, crisis management
Unit III
International hotels -Balancing global & local perspectives -Operating in a multinational
environment ---International rules & regulations -a brief study
Human resources & cultural diversity -Understanding cultural diversity, cultural perceptions,
business protocol, cultural considerations in negotiations
Unit IV
International tourism sales & marketing -Market research, developing an international
marketing strategy, understanding various travel distribution systems viz GDS, product
positioning
Unit V
Global competition & the future -Long -term tourism growth trends, tourism growth in major
regions, transportation developments, technology & automation, Development issues, tourism
& the environment.
References:
1. International Tourism by H.L.Bhattia
2. Contemporary tourism: an international approach-Chris Cooper&C.Michael Hail
3. International cases in Tourism Management-Susan Horner&John Susan Brooke
4. The International Marketing of Travel and Tourism: A Strategic approach by Francois
Vellas & Lionel Becherel
5. Human Resource Management for Tourism ,Hospitality and Leisure Industries: An
International Perspective by Tom Baum
33. M.B.A. -2010-11 –UD.
Page 33 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
14. CROSS CULTURAL MANAGEMENT
UNIT 1
Introduction A multi-layered subject area Non - cultural explanations The centrality of
ethics
Changing nature of the world Defining culture Levels of analysis Dealing with the ecological
fallacy
Culture change convergence and divergence Interpreting culture profiles Changing natures of
National culture Organisational culture National and organisational culture – similarities Non
- cultural explanations
Understanding models of culture - A twenty – first – century view Contributions of Geert
Hofstede The Chinese Value Survey Criticisms of Hofstede‟s work Issues in cross –
cultural studies: Evaluation of various models Cultural differences in communication style
Unit
II
Conceptualising culture – the way forward Approaches existing and new methods to study
culture Emerging theoretical approaches of culture Convergence, divergence, globalization
and cross – cultural management Localizing cross – cultural issues
cross – cultural social relations in the workplace
Culture and organisation structure various models of organizational structure Contingent
factors
Culture and the contingency approach Impact of culture on structure
Contemporary and emerging structures Culture and structure – a complex area
Unit III
Intercultural communication The need for awareness Stereotyping in communication
Barriers to intercultural communication Mixed messages and non – verbal communication
Enhancing intercultural communication Cross – cultural theory and communication Chinese
culture Levels of communication
Leadership and cross cultural issues – Approaches to leadership Project GLOBE Evaluation
of Project GLOBE The institutional level Emerging twenty – first century approaches to
leadership
Unit IV
Motivation and cross cultural issues exchange Are the needs universal contextual or local
Self – actualization and cross cultural perspectives. content approach Job characteristics
Needs and job characteristics models Orientations to work across cultures Other „process‟
models of motivation
Globalised motivational strategies
Intercultural competencies, training and ethics Overcoming culture shock Intercultural
competencies cultural awareness Cross – cultural training – other considerations The
effectiveness of cross – cultural training The ethical dimension Ethics and the cross –
cultural manager Gender issues and ethics Dealing with ethical dilemmas Non – negotiable
moral issues
34. M.B.A. -2010-11 –UD.
Page 34 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
Unit V
Culture and human resource management International HRM in context Culture and human
resource management Culture and the functional areas of HRM home country host country
third country employment and the issues based on culture The effect of culture
Comparing cultures Cultural values Cross – cultural management in „new‟ forms of
organization
Diversity and synergy – the future of cross – cultural management Non – managerial
approaches
Universalism or relativism? Continuous change Strategies to manage work force across
culture and the implications
REFERENCES
1. Ray French Cross cultural Management in work organizations Universities press
(India) Private Limited 2008. (Recommended text)
2. Denny, S. (2003) „Culture and its influence on management: a critique and an
empirical test‟, in M. Tayeb (ed.) International Management: Theories and practices.
Harlow: FT/Prentice Hall
3. Dowling, P.J. and Welth, D.E. (2004) International Human Resource Management.
Managing people in a multinational context. London: Thomson
4. Gooderham, P.N. and Nordhaug, O. (2003) International Management: Crossboundary challenges. Oxford: Blackwell
5. Guirdham, M. (2005) Communicating Across Cultures at Work, 2nd edition.
Basingstoke: Palgrave Macmillan
6. Holden, N. J. (2002) Cross-Cultural Management: A knowledge management
perspective. Harlow: FT/Prentice Hall
7. Schneider, S. C. and Barsoux, J.-L. (1997) Managing Across Cultures, 2nd edition.
Harlow: FT/Prentice Hall
8. Warner, M. and Joynt, P. (eds) (2002) Managing Across Cultures: Issues and
perspectives, 2nd edition. London: Thomson
35. M.B.A. -2010-11 –UD.
Page 35 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
15. TRAINING AND DEVELOPMENT - ENHANCING COMMUNICATION
AND LEADERSHIP SKILLS
Unit-I
Introducing to training: Understanding training-understanding “soft” skills-Communication,
Management and Leadership-Training Process-how adults learn-general laws of learningandragogy versus pedagogy-learning styles-domains of learning-how to conduct a needs
assessment-how to assess needs without a comprehensive needs assessment process-analyze a
training task-prepare a task analysis.
Unit-II
Developing objectives and designing curriculum-How to write training objectives-design
curriculum-teach a skill-How to make every lesson successful-internal sources of training
material-external sources of training material-processing external materials-sample training
content outlines-lecturing-conducting experiential activities-facilitating group discussionsselecting the best training methods.
Unit-III
Using Technology and Presentational Aids in training-Purposes for using presentational
Aids-Strategies for Using Presentational Aids-Types of Presentational Aids-ComputerGenerated Visual Presentations-Internet as a Presentational Aid-Purpose of training planspreparing to write a training plan-training plan formats-practical training planning tips-testing
the training plan.
Unit-IV
Delivering the Training Session-Planning Your Delivery-Establishing Verbal Immediacy &
Nonverbal Immediacy-Strategies for Evaluating and improving your delivery-Anticipating
problem trainees-understanding conflict management styles-using conflict management
skills-reducing conflict.
Unit-V
Assessing Learning Outcomes: Importance of Assessment-measuring Learning OutcomesAssessment Desgins-Inetrpreting Assessment Information-Trends in Training and
Development-Career Opportunities in Training and Development-Writing and Presenting
Proposals.
Reference
1. Riordan “Technical Report Writing today” Biztantra Publication 2008.
36. M.B.A. -2010-11 –UD.
Page 36 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
ELECTIVE PAPERS FOR IV SEMESTER
1. SERVICES MARKETING
Unit 1
Service – Meaning, Nature and Types; Growth and importance of service economy, Behaviour of service customers, Segmentation, Targeting and Positioning Strategies; Service
marketing plan – Service Mission and other components, Globalisation of services.
Unit 2
Service product design and offer, Service differentiation, Demand and supply management,
Service Pricing, Service Distribution channels and delivery, External marketing
communication.
Unit 3
Service scape, Service Process, Service quality and its measurement, Service failures and
recovery, Service guarantee, Complaint management, People in services, Internal marketing
and employee empowerment, Technology and its impact on services, Ethics in services.
Unit 4
Marketing of Hotel, Travel and Tourism, Leisure and entertainment, and Transport –
Passenger and Cargo, Telecommunication services.
Unit 5
Marketing of Banking, Insurance, I.T, enabled services, Consultancy, Healthcare, Education,
Charity and Social Marketing.
References:
1. Services Marketing – Christopher Lovelock – Pearson Education – 2003.
2. Services Marketing Indian Edition – Zeithmal, etal – Mc Graw Hill 2008.
3. Marketing of Services – Indian Edition – Hoffman and Bateson – Cengage Learning
2006.
4. Services Marketing – Helen Woodruff – Macmilan.
5. Essence of Services Marketing – Adrian Payne – Prentice Hall.
6. Services Marketing – Ram Mohan Rao – Pearson Education – 2007.
7. Services Marketing – Rajendra Nargundkar – Tata Mc Graw Hill – 2006.
8. Services Marketing – Govind Apte – Oxford University Press – 2004.
9. Services Marketing – S. M. Jha – Himalaya Publishing – 2000.
10. Services Marketing – Ravi shankar – Excel Books – 2004.
11. Services Marketing – Bhattacharjee – Jaico Books – 2006.
12. Services Marketing – Harsh Verma – Pearson Education – 2008.
37. M.B.A. -2010-11 –UD.
Page 37 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
2. BRAND MANAGEMENT
UNIT – I
Concept of a brand – Evolution, perspectives, anatomy, types of brand names, brand name
associations, Brands Vs Products, Advantages of Brands to consumers & firms. Brand
elements: Components & choosing brand elements, Branding challenges & opportunities.
UNIT – II
Brand positioning – Basic concepts – alternatives – risks – Brands & consumers –Strategies
for positioning the brand for competitive advantage – Points of parity – Points of difference Buying decision perspectives on consumer behaviour, Building a strong brand – Method &
implications.
UNIT – III
Brand Image, image dimensions, brand associations & image, Brand identity – perspectives,
levels, and prisms. Managing Brand image – stages – functional, symbolic & experiential
brands. Brand Equity – Sources of Equity. Brand Equity models, Brand audits. Brand
Loyalty & cult brands.
UNIT – IV
Leveraging Brands – Brand extensions, extendibility, merits & demerits, Line extensions,
line trap – Co-branding & Licensing Brands. Reinforcing and Revitalisation of Brands –
need, methods, Brand Architecture – product, line, range, umbrella & source endorsed
brands. Brand Portfolio Management.
UNIT – V
Brand valuation – Methods of valuation, implications for buying & selling brands.
Applications – Branding industrial products, services and Retailers – Building Brands online.
Indianisation of Foreign brands & taking Indian brands global – issues & challenges.
Reference:
1.
2.
3.
4.
5.
6.
7.
Kevin Lane Keller, Strategic Brand Management, PHI/Pearson, New Delhi.
Kapferer, Strategic Brand Management, Kogan Page, New Delhi.
Harsh Varma, Brand Management, Excell Books, New Delhi.
Majumdar, Product Management in India, PHI.
Sengupta, Brand Positioning, Tata McGraw Hill.
Rameshkumar, Managing Indian Brands, Vikas.
Chandrasekar, Product Management, Himalaya.
38. M.B.A. -2010-11 –UD.
Page 38 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
3. DISTRIBUTION MANAGEMENT
UNIT I : EMERGENCE AND COMPONENTS OF MARKETING CHANNELS
Types, Functions, Relationship, Retailing – Structure, operations and strategies, wholesaling
– structure, operations and strategies, Physical Distribution – Structure and strategy.
UNIT II : CHANNEL MANAGEMENT
Channel Planning, Designing Channel Systems – Organising patterns – Channels Policies,
Channel Communication and information systems, Assessing marketing channel
performance, Distribution cost analysis.
UNIT III : CHANNEL MANAGEMENT IN OTHER CONTEXTS
Channel Management by wholesalers and Retailers – Retail formats – Franchise-designing
and management Telemarketing, e-marketing, e-tailing, Integrated distribution management
UNIT IV : RETAIL MANAGEMENT
Identifying and Understanding consumers - Choosing a store Location – Trading area
analysis and site selection, Buying and handling merchandise, pricing and financial
management – Establishing and maintaining a retail image. Customer service
UNIT V : PHYSICAL DISTRIBUTION MANAGEMENT
Importance of Physical distribution, Logistics System analysis and design, Organization and
control, Role and Importance of warehousing, Warehouse Type, Size, number, location,
prerequistion for Warehousing, Warehousing in India, Inventory Control – Cost and issues –
Risk Management.
References :
1. Marketing Channels – Louis.w. Stern & Abel I. Elansary – Prentice Hall India.
2. Retail Management – A Strategic Approach – Berry Berman & Joel.r. Evans –
Macmillan, New York.
3. Physical Distribution MGT – Logistical Approach – K.K Khanna – Himmalaya.
4. Contemporary Logistics – James C Johnson & Donald F. Wood – Himalaya.
5. Strategic Marketing Channel MGT – Donald Bowersox, & Bixby Cooper – MC Graw
Hill International.
6. Retail Marketing Management – David Gilbert – Pearson Education/Prentice Hall.
39. M.B.A. -2010-11 –UD.
Page 39 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
4.Rural Marketing
Unit - I
Concept & scope, Nature & taxonomy of rural market. Rural vs. Urban marketing, Rural
market Environment.
Unit - II
Rural Consumer Behaviour Challenges, models of consumer behaviour, Decision process,
Buying behaviour pattern, diffusion of innovation, brand loyalty.
Unit - III
Marketing Information System – Rural marketing intelligence system, Marketing Research –
rural way Rural Research Business.
Unit - IV
Rural marketing strategies – Product strategy, pricing strategy, promotion & distribution
strategies.
Unit - V
Rural market segmentation – Degrees of segmentation, Bases of segmentation, Rural Retail
& IT models. Public – Private Partnership –
Recommended Books:
Rural marketing – C.S.G. Krishnamacharyulu & Lalitha Ramachandran: Pearson Education.
Rural marketing – T.P. Gopalaswamy: Vileas Publishing.
Rural marketing – U.C. Mathar: Excel books.
40. M.B.A. -2010-11 –UD.
Page 40 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
5. ORGANISATIONAL DEVELOPMENT
AIM : To enable the students on the principles and practices of developing organizations.
The specific areas covered are:
UNIT I
Introduction to Organisation Development:- Concepts, Nature and Scope of O.D. : Historical
Perspective of O.D. - : Underlying Assumptions & Values
Theory and Practice on change and changing - The Nature of Planned Change - The Nature
of Client Systems : Group Dynamics, Intergroup - Dynamics and Organisations as Systems.
UNIT II
Operational Components of O.D - Diagnostic, Action and Process - Maintenance
components.
UNIT III
O.D.Interventions: - Team Interventions - Inter-group Interventions - Personal, Interpersonal
and group process interventions - Comprehensive interventions - Structural Interventions.
UNIT IV
Implementation and assessment of O.D - Implementation conditions for failure and success in
O.D. - efforts. - Assessment of O.D. and change in organisational performance - The impact of
O.D.
UNIT V
Some key considerations and Issues in O.D - Issues in consultant - Client relationship Mechanistic & Organic systems and contingency approach - The future of O.D. - Some
Indian experience in O.D
References :
1. Wendell L.French & Cecil H. Bell,Jr.Organization Development, PHI Fourth edition.
2. French, Bell and Zawacki - Organization Development Theory, Practice and
Research Universal Book Stall, Third Edition.
3. Rosabeth Moss Kanter: The change Masters, Simson & Schaster.
41. M.B.A. -2010-11 –UD.
Page 41 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
6. LABOUR WELFARE AND INDUSTRIAL RELATIONS
Course Number :
AIM : To familiarise the students with the knowledge of industrial relations and their impact
on managing human resource.
UNIT I : Industrial Relations - Concepts and systems - IR at National and International
levels - Infrastructure that guide and direct Industrial relations - Trends in India.
Trade unionism - Theory, Policy - their influence on HRM - objectives and functions structure - Types - Indian Trade Union movement - Their strength and weaknesses.
UNIT II : Labour Relations :- Industrial relations - industrial disputes - causes - handling
and settling disputes - employee grievances - steps in grievance handling - causes for poor
industrial relations - remedies.
UNIT III : Collective Bargaining :- Concept - function and importance - Principles and
forms of collective bargaining - Procedure - conditions for effective collective bargaining worker's Participation in management:- Role and methods of worker's participation.
UNIT IV : Working Conditions: Factories Act 1948 - The Workman's Compensation Act,
1923 - The Employee's State Insurance Act, 1948 - The Employee's Provident Funds and
Miscellaneous Provisions
Act, 1952.
UNIT V : The Payment of Wages Act,1936 - The Minimum wages Act, 1948 - The
Industrial Disputes Act 1947 - The Industrial Employment (Standing Orders) Act,1946 - The
Trade Union Act, 1926 and latest legislations.
References :
1.
2.
3.
4.
5.
6.
Personnel Management & Industrial Relation -P.C.Tripathi
Dynamics of Personnel Management - C.B.Mamoria
Human Resource Management - N.G.Nair & Latha Nair Sultan Chand & Sons.
Essentials of Human Resource Management and Industrial Relations – P.SubbaraoHimalaya.
N.D. Kapoor - Mercandile Law - Sultanchand & Sons
R.Venkatapathy & Assissi Menachery - Industrial Relations & Labour Legislation
- Aditya Publishers.
42. M.B.A. -2010-11 –UD.
Page 42 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
7. EMPLOYEE TRAINING & DEVELOPMENT
Unit-I
Introduction to Employee Training and Development: Forces affecting the workplace
training-Designing Effective Training- Forces Influencing working and learning-snapshot of
training practices-Strategic Training-Evolution of Training role-organizational characteristics
that influence training-training needs in different strategies- organization the training
department-marketing the training function-outsourcing training.
Unit-II
Needs Assessment: Methods used in needs assessment-process-competency models-scope of
needs assessment-Training Evaluation-reasons for evaluating training-overview of the
evaluation process-determining whether outcomes are good-evaluation practices-evaluation
designs-determining return on investment-measuring human capital and training.
Unit-III
Traditional Training Methods : Hands-on-methods-group building methods-choosing a
training method-E-learning and use of technology in training-Technology‟s influence on
training and learning-Technology and multimedia-computer-based training-developing
effective online learning-blended learning-mobile technologies and training methodsintelligent tutoring systems-distance learning-technologies for training support-technologies
for training administration-learning management system-systems for training delivery,
support and administration.
Unit-IV
Employee Development-Approaches to employee development-the development planning
process-company strategies for providing development-special issues in training and
employee development-partnership with local community provides job opportunities-training
issues resulting from external environment-training issues related to internal needs of the
company.
Unit-V
Special challenges in career management-socialization and orientation-dual-career pathsplateauing-skills obsolescence-coping with career breaks-balancing work and life-company
policies to accommodate work and nonwork-coping with job loss-dealing with older workersthe future of training and development-increased use of new technologies for training
delivery-increased emphasis on speed in design-focus in content, and use of multiple delivery
methods-increased emphasis on capturing and sharing-intellectual capital-increased use of
true performance support-increased emphasis on performance analysis and learning for
business enhancement-key issues in implementing change.
References :
43. M.B.A. -2010-11 –UD.
Page 43 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
8. INTERNATIONAL FINANCIAL MANAGEMENT
Subject Description:
IFM describes the international financial environment, foreign exchange and derivatives
market, managing foreign exchange risk, foreign Investment analysis and the ways to
managing multi national working capital management.
Objectives:
On successful completion of the course the students must be able to
1. Understand International Financial Environment
2. Understand the operations of foreign exchange derivatives market
3. Manage the foreign exchange risk
4. Analyse the foreign investment proposals
5. Manage the working capital of MNCs .
UNIT – I IFM Environment :
MNC and Multinational Financial Management – The determination of Exchange rates- the
international monetary system- parity conditions in international finance and currency
forecasting – The balance of payments and international economic linkage.
UNIT – II Derivative Management and Foreign exchange Risk Management:
The foreign exchange market – currency futures and options market- swaps interest rate
futures. Managing Transaction and translation exposure- Measuring and managing economic
exposure.
UNIT – III Financing MNCs:
International financing and capital markets-Euromarkets, – the cost of capital and foreign
investments.
UNIT – IV Foreign Investment Analysis:
International portfolio investment-corporate strategy and Foreign Direct investment- Capital
budgeting for MNCs
UNIT – V Multinational Working Capital Management.
Financing foreign trade - Current Asset management and short term financing – managing
multinational financial system-Foreign Exchange Management Act.
References :
1. Alan C. Shapiro multinational Financial Management 8th edition. Wiley India New
Delhi 2008.
2. Eun / Resnick International Financial Management Tata Mc Graw hill – New Delhi
2008.
3. Levi .D Maurice International Finance Mc Graw Hill New Delhi 2008.
4. P.K. Jain and others. International Financial Management Mac Millan co. New Delhi
2008.
44. M.B.A. -2010-11 –UD.
Page 44 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
9. INSURANCE MANAGEMENT
Subject Description: Provides an overall view of the risk, risk management process. It
further elaborates on property and liability risk management, Life, Health and income
exposures. It explains the state of affairs of insurance industry in India.
Goals : To help the student to understand the risk and its management process through
insurance and other methods.
Objectives:
On successful completion of the course the student should be able to
1. Calculate the risk and manages it
2. Understand the Property and Liability Risk Management techniques
3. Understand the risk management techniques of Life, Health and Income
exposures.
4. Understand the functioning of Insurance Industry in India.
Unit – I
Risk – Risk identification evaluation, Property and liability Loss exposures, Life, Health, and
Loss of Income exposures and non insurance risk management techniques. Selecting and
Implementing Risk management techniques.
Unit – II
Property and liability risk Management- Risk Management of commercial property, Business
liability and risk management insurance - Workers‟ compensation and alternative risk
managing.
Unit - III
Risk Management of Auto owners - Insurance Claims – the need for insurance-personal
automobile policy-personal automobile rating- premium and death rates-cost containmentadvances in driver and auto safety. Risk management of home owners policy coverage-perils
covered by the policy-flood Insurance-personal articles floater-personal risk management
Unit – IV
Loss of life –types of life insurance- tax incentives for life insurance- Life insurance contract
provisions. Loss of Health- Health insurance providers- mechanics of cost sharing- health
expense insurance- disability income insurance - heath insurance policy provisions - health
care reforms. Annuities- structures of annuities- annuity characteristics- annuity taxation.
Employees benefits- health and retirement benefits.
Unit – V
Life and General insurance industry in India – IRDA Act- Investment norms – Protection of
policy holders Interest.
Reference:
1. Jave S. Trieschimam, Sandra G. Gustarson, Robert E Houyt, Risk Management
and Insurance Thomson Sowlla Western Singapore 2003.
2. Scoh E Herrington Risk Management and Insurance Mc Graw Hill New Delhi 2003.
3. Dorfman Mark S Introduction to Risk Management and Insurance 8th Edition.
Prentice Hill India New Delhi 2007.
4. Harold D Stephen and W Jean Kwon Risk Management and Insurance Blackwell
Publicing co., New York 2007.
5. Misra M.N. and Misra S.R Insurance Principles and Practice S .Chand and Co.
New Delhi 2007.
6. Gupta P.K. Insurance and Risk Management Himalayan. Publishing House New
Delhi 2008.
45. M.B.A. -2010-11 –UD.
Page 45 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
10. COST MANAGEMENT
UNIT I:
Introduction to cost management and basic cost management concepts. A Systems
framework; factors affecting cost management; cost assignment: Direct tracing and
allocation - Functional -based and Activity -based cost management systems.
UNIT II:
Cost Behaviour-Basics- Resources. Activities and Cost Behaviour- Methods for
separating mixed costs into Fixed and Variable components- Reliability of Cost Formula
Cost Estimation using Multiple Regression- The Learning Curve and Non-linear cost
Behaviour.
UNIT III:
Activity Based Costing- Functional based product costing- ABC costing systemProduct and service costing - Job order system - Characteristics of the production
process - single and multiple overhead rates- An overview of cost allocation-Allocating one
department's costs to another department.
UNIT IV:
Decentralisation and Responsibility Accounting Performance
Investment Centers - Transfer pricing - Setting transfer prices.
Evaluation-
UNIT V:
Strategic Cost Management Basic Concepts - Value Chain Analysis- Life Cycle Cost
Management - JIT and its effect on cost management system.- Activity Based Management The Balanced Scorecard- strategic based control.
Books for Reference:
1. Cost Management - Guan. I lansen and Mower. (South Western Cengage
Learning)
2. Cost Management: A Strategic Emphasis - Blocher, Chen, Cokins and Lin. (Tata
Me Graw Hill)
3. Advanced Management Accounting - Atkinson and Robert Haplan. (Prentice Hall
of India)
4. Cost Management - .lawahar Lai (Tata Me Graw Hi l l )
5. Introduction to Management Accounting - Hongren, Sundem and Stratton. (PHI)
46. M.B.A. -2010-11 –UD.
Page 46 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
11. SOFTWARE PROJECT MANAGEMENT
Unit I
Introduction to Software Projects : Introduction- software projects - software projects versus
other types of projects - Projects Management - Requirements specification - An overview of
project planning - Project evaluation: Strategic and technical assessment - Risk evaluation Project Analysis and Technical planning - Software Estimation.
Unit II
Activity planning : Objectives- Project schedules and activities-Different planning models Sequencing and Scheduling projects - Network planning model - shortening project duration Identifying critical activities - Risk Management: Nature of risk-Management risk-Evaluation
risk
Unit III
Resource Allocation : Nature of resources-Resource requirements-Creating Critical path and
counting the cost- Monitoring and control: Responsibility-assessing progress-setting cheek
points- taking snap shots- collecting data - visualizing progress - Cost monitoring - Priority
monitoring - Managing people and organizing teams.
Unit IV
Software Configuration Management : Basic Functions - Responsibilities - Standards Configuration management - Prototyping - Models of Prototyping - Planning for small
projects: Introduction - Some problem with student projects - Content of project plan.
Unit V
Software maintenance and configuration Management : Maintenance characteristics Management tasks - Maintenance side effects - Maintenance issues - Configuration
Management - Source code metrics - Case study - PRINCE project management.
TEXT BOOKS
1. Mike Cotterell, Bob Hughes, "Software project management", Inclination/Thomas
Computer press, 1995.
2. Darrel Ince, H.Sharp and M.Woodman, "Introduction to software project management
and Quality Assurance", Tata McGraw Hill, 1995.
47. M.B.A. -2010-11 –UD.
Page 47 of 54
Annexure No. 72-A
SCAA - Dt.28.05.2010
12. e-MARKETING
Unit I
e-Marketing challenges and opportunities; e-business models; Customers in the 21st Century;
Market Segmentation; Consumer Navigation behaviour.
Unit II
e-Marketing Plan; Environmental Scan; market opportunity analysis; design marketing-mix;
database marketing.
Unit III
e-Marketing information system; Marketing knowledge; marketing data collection
[intelligence];
internet based research approaches; marketing databases and data ware
houses; data analysis.
Unit IV
Product adoption and Product life cycle; Customer value online : Branding, Labeling, Online
benefits; new Product strategies; new product trends; Pricing; intermediaries; distribution
channels; direct selling.
Unit V
Integrated marketing Communication; Communication strategies; net as a medium; building
customer relationship; CRM.
Reference :
1. Judy straus, Raymond frost, e-marketing, Pearson Education, New Delhi.
2. Internet marketing - Rafi Mohammed; Robert J.Fisher, Bernard.J Jacowiski, Aileen
M.Cahill - Tata McGraw Hill, New Delhi.
3. Ravi Kalakota, Andrew B.Whinston - Electronic Commerce, Pearson Education.
4. Schneider & Perry, Electronic Commerce, Thomson learning.
5. Strauss & Frost, E-Marketing, Prentice Hall.
6. Albert Napier et.al., Creating and Willing E-Business, Vikas Publications.