Bearing ratio capacity of
compacted soils
Standard Test Method for CBR
(California Bearing Ratio) of
Laboratory-Compacted Soils1
DEFINITION
CALIFORNIA BEARING RATIO IS
THE RATIO OF FORCE PER UNIT
AREA REQUIRED TO PENETRATE
IN TO A SOIL MASS WITH A
CIRCULAR PLUNGER OF 50MM
DIAMETER AT THE RATE OF
1.25MM / MIN.
Summary of Test Method
1.For tests performed on materials compacted to
one water content, three specimens are
prepared.The specimens are compacted using
three different compactive efforts to obtain unit
weights both above and below the desired unit
weight. After allowing specimens to take on
water by soaking, or other specified treatment
such as curing, each specimen is subjected to
penetration by a cylindrical rod. Results of
stress (load) versus penetration depth are
plotted to determine the CBR for each
specimen.The CBR at the specified density is
determined from a graph of CBR versus dry unit
weight.
2. For tests in which the result is to be
determined for a water content range, a
series of specimens at each of three
compactive efforts are prepared over the
range of water content of interest. The
compactive efforts are chosen to produce
unit weights above and below the desired
unit weight. After allowing the specimens to
take on water by soaking, or other specified
treatment such as curing, each specimen is
penetrated. Results are plotted to obtain the
CBR for each specimen. A plot of CBR
versus unit weight for each water content is
made to determine the minimum CBR for the
water content range of interest.
Significance and Use
This test method is used to evaluate the
potential strength of subgrade , subbase ,
and base course material, including recycled
materials for use in road and airfield
pavements. The CBR value obtained in this
test forms an integral part of several flexible
pavement design methods.
PROCEDURE
There are two types of methods in compacting
soil specimen in the CBR moulds i. Static
Compaction method. ii. Dynamic Compaction
method.
The material used in the above two methods
shall pass 19mm sieve for fine grained soils
and 37.50mm sieve for coarse materials up to
37.50mm.
Replace the material retained on 19mm sieve by
an equal amount of material passing 19mm
sieve and retained on 4.75mm sieve
Replace the material retained on 37.50mm sieve
by an equal amount of material passing
37.50mm sieve and retained on 4.75mm sieve.
APPARTUS
CBR LOADING MACHINE
SURCHARGE
Slotted weight
Rammer
MIXING TOOLS
Static Compaction
1 In this method calculate the mass of wet soil
at required moisture content to give a desired
density when compacted in a standard test
mould as given below Volume of mould =
2250cc. Weight of dry soil (W) = 2250 x
MDD.
m Weight of wet soil =1+ m/100xW
Weight of water = Weight of wet soil - Weight
of dry soil.
m = Optimum moisture content obtained from
the laboratory compaction test.
2.Take oven dried soil sample of calculated
weight and thoroughly mix with water (OMC)
as obtained from the above equation.
3.Record the empty weight of the mould with
base plate, with extension collar removed
(m1).
4.Place the correct mass of the wet soil in to
the mould in five layers.
5.Gently compact each layer with the spacer
disc.
6.Place a filter paper on top of the soil followed
by a 5cms displacer disc.
7.Compact the mould by pressing it in between
the platens of the compression testing
machine until the top of the spacer disc
comes flush with the top of the mould.
8.Held the load for about 30 seconds and then
release.
Dynamic Compaction
1.Take representative sample of soil weighing
approximately 6kg and mix thoroughly at
OMC.
2.Record the empty weight of the mould with
base plate, with extension collar removed
(m1).
3.Replace the extension collar of the mould.
4.Insert a spacer disc over the base plate and
place a coarse filter paper on the top of the
spacer disc.
5.Place the mould on a solid base such as a
concrete floor or plinth and compact the wet
soil in to the mould in five layers of
approximately equal mass each layer being
given 56 blows with 4.90kg hammer equally
distributed and dropped from a height of 450
mm above the soil.
6.The amount of soil used shall be sufficient to
fill the mould, leaving not more than about
6mm to be struck off when the extension
collar is removed.
7.Remove the extension collar and carefully
level the compacted soil to the top of the
mould by means of a straight edge.
8.Remove the spacer disc by inverting the
mould and weigh the mould with compacted
soil (m2).
9.Place a filter paper between the base plate
and the inverted mould.
10.Replace the extension collar of the mould.
Test for Swelling
This test is optional and may be omitted if not
necessary.
Determine the initial height of specimen (h) in
mm.
Mount the expansion-measuring device along
with the tripod on the edge of the mould and
record the initial dial gauge reading (ds).
Keep this set up as such undisturbed for 96
hours noting down the readings every day
against the time of reading.
Maintain a constant water level through out the
period of soaking.
Note the final reading of the dial gauge at the
end of soaking period (dh).
Calculations for Swelling
Expansion ratio=df - ds/h x 100
ds = Initial dial gauge reading in mm
df = final dial gauge reading in mm
h = initial height of specimen in mm
Penetration Test
After 96 hours of soaking take out the
specimen from the water and remove the
extension collar, perforated disc, surcharge
weights and filter paper.
Bearing ratio capacity of compacted soil

More Related Content

What's hot

Aggregate impact and crushing test
Aggregate impact and crushing testAggregate impact and crushing test
Aggregate impact and crushing testsudeepmahapatro
 
methods of sub-surface exploration, methods of boring, number, location and d...
methods of sub-surface exploration, methods of boring, number, location and d...methods of sub-surface exploration, methods of boring, number, location and d...
methods of sub-surface exploration, methods of boring, number, location and d...Prajakta Lade
 
Bearing capacity theory is code ,vesic ,hansen, meyerhof, skemptons( usefulse...
Bearing capacity theory is code ,vesic ,hansen, meyerhof, skemptons( usefulse...Bearing capacity theory is code ,vesic ,hansen, meyerhof, skemptons( usefulse...
Bearing capacity theory is code ,vesic ,hansen, meyerhof, skemptons( usefulse...Make Mannan
 
DEEP FOUNDATION
DEEP FOUNDATIONDEEP FOUNDATION
DEEP FOUNDATIONaframawal
 
Construction equipment
Construction equipmentConstruction equipment
Construction equipmentTareq Shreehah
 
Aggregate properties
Aggregate propertiesAggregate properties
Aggregate propertiesdoni089
 
Bearing capacity of shallow foundations by abhishek sharma
Bearing capacity of shallow foundations by abhishek sharma Bearing capacity of shallow foundations by abhishek sharma
Bearing capacity of shallow foundations by abhishek sharma ABHISHEK SHARMA
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSKHUSHBU SHAH
 
Braced cut in deep excavation
Braced cut in deep excavationBraced cut in deep excavation
Braced cut in deep excavationYogesh Pandey
 

What's hot (20)

Bearing capacity of soil final
Bearing capacity of soil  final Bearing capacity of soil  final
Bearing capacity of soil final
 
Aggregate impact and crushing test
Aggregate impact and crushing testAggregate impact and crushing test
Aggregate impact and crushing test
 
methods of sub-surface exploration, methods of boring, number, location and d...
methods of sub-surface exploration, methods of boring, number, location and d...methods of sub-surface exploration, methods of boring, number, location and d...
methods of sub-surface exploration, methods of boring, number, location and d...
 
Subsurface exploration
Subsurface exploration  Subsurface exploration
Subsurface exploration
 
Bearing capacity theory is code ,vesic ,hansen, meyerhof, skemptons( usefulse...
Bearing capacity theory is code ,vesic ,hansen, meyerhof, skemptons( usefulse...Bearing capacity theory is code ,vesic ,hansen, meyerhof, skemptons( usefulse...
Bearing capacity theory is code ,vesic ,hansen, meyerhof, skemptons( usefulse...
 
Plate load test
Plate load testPlate load test
Plate load test
 
Methods of boring ppt
Methods of boring  pptMethods of boring  ppt
Methods of boring ppt
 
Dewatering by well point system
Dewatering by well point systemDewatering by well point system
Dewatering by well point system
 
DEEP FOUNDATION
DEEP FOUNDATIONDEEP FOUNDATION
DEEP FOUNDATION
 
Construction equipment
Construction equipmentConstruction equipment
Construction equipment
 
Aggregate properties
Aggregate propertiesAggregate properties
Aggregate properties
 
CBR TEST
CBR TESTCBR TEST
CBR TEST
 
PAVEMENT DESIGN
PAVEMENT DESIGNPAVEMENT DESIGN
PAVEMENT DESIGN
 
Aggregate crushing strength test
Aggregate crushing strength testAggregate crushing strength test
Aggregate crushing strength test
 
Pavement
PavementPavement
Pavement
 
Bearing capacity of shallow foundations by abhishek sharma
Bearing capacity of shallow foundations by abhishek sharma Bearing capacity of shallow foundations by abhishek sharma
Bearing capacity of shallow foundations by abhishek sharma
 
Pavement
PavementPavement
Pavement
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONS
 
Building components
Building componentsBuilding components
Building components
 
Braced cut in deep excavation
Braced cut in deep excavationBraced cut in deep excavation
Braced cut in deep excavation
 

Similar to Bearing ratio capacity of compacted soil

California bearingratio test
California bearingratio testCalifornia bearingratio test
California bearingratio testAsok999
 
Construction of High Speed Highway and Test track
Construction of High Speed Highway and Test trackConstruction of High Speed Highway and Test track
Construction of High Speed Highway and Test trackNikhil Kumar
 
Subgrade soil test, by Micotol
Subgrade soil test, by MicotolSubgrade soil test, by Micotol
Subgrade soil test, by MicotolMicotol
 
Ex 8 standard proctor test
Ex 8 standard proctor testEx 8 standard proctor test
Ex 8 standard proctor testbhimaji40
 
Cbr aashto t193 plus proctor t180
Cbr aashto t193 plus proctor t180Cbr aashto t193 plus proctor t180
Cbr aashto t193 plus proctor t180Ayaz khan
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)inventionjournals
 
Proctor Compaction Test: A Basic Guide
Proctor Compaction Test: A Basic GuideProctor Compaction Test: A Basic Guide
Proctor Compaction Test: A Basic GuideCatie Ewen
 
Proctor compaction test
Proctor compaction testProctor compaction test
Proctor compaction testFaizan Tanoli
 
Highway Engineering Common Laboratory Tests.pdf
Highway Engineering Common Laboratory Tests.pdfHighway Engineering Common Laboratory Tests.pdf
Highway Engineering Common Laboratory Tests.pdfTesfayeWondimu
 
DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOIL
DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOILDETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOIL
DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOILJaptyesh Singh
 
Ex 12 direct shear test
Ex 12 direct shear testEx 12 direct shear test
Ex 12 direct shear testbhimaji40
 
Chapter Seven soil mechanics-I.pdf
Chapter Seven soil mechanics-I.pdfChapter Seven soil mechanics-I.pdf
Chapter Seven soil mechanics-I.pdfdumesagudissa
 
Soil Test and Surveys
Soil Test and SurveysSoil Test and Surveys
Soil Test and SurveysJerome Jaime
 

Similar to Bearing ratio capacity of compacted soil (20)

Cbr test
Cbr testCbr test
Cbr test
 
Cbr test
Cbr testCbr test
Cbr test
 
California bearingratio test
California bearingratio testCalifornia bearingratio test
California bearingratio test
 
Construction of High Speed Highway and Test track
Construction of High Speed Highway and Test trackConstruction of High Speed Highway and Test track
Construction of High Speed Highway and Test track
 
Subgrade soil test, by Micotol
Subgrade soil test, by MicotolSubgrade soil test, by Micotol
Subgrade soil test, by Micotol
 
Ex 8 standard proctor test
Ex 8 standard proctor testEx 8 standard proctor test
Ex 8 standard proctor test
 
Cbr aashto t193 plus proctor t180
Cbr aashto t193 plus proctor t180Cbr aashto t193 plus proctor t180
Cbr aashto t193 plus proctor t180
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)
 
Proctor Compaction Test: A Basic Guide
Proctor Compaction Test: A Basic GuideProctor Compaction Test: A Basic Guide
Proctor Compaction Test: A Basic Guide
 
Proctor compaction test
Proctor compaction testProctor compaction test
Proctor compaction test
 
Highway Engineering Common Laboratory Tests.pdf
Highway Engineering Common Laboratory Tests.pdfHighway Engineering Common Laboratory Tests.pdf
Highway Engineering Common Laboratory Tests.pdf
 
upe T99180
upe T99180upe T99180
upe T99180
 
DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOIL
DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOILDETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOIL
DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOIL
 
Ex 12 direct shear test
Ex 12 direct shear testEx 12 direct shear test
Ex 12 direct shear test
 
Chapter Seven soil mechanics-I.pdf
Chapter Seven soil mechanics-I.pdfChapter Seven soil mechanics-I.pdf
Chapter Seven soil mechanics-I.pdf
 
Soil Compaction
Soil Compaction Soil Compaction
Soil Compaction
 
Index properties
Index propertiesIndex properties
Index properties
 
Soil Test and Surveys
Soil Test and SurveysSoil Test and Surveys
Soil Test and Surveys
 
Compaction
CompactionCompaction
Compaction
 
Chapter 21
Chapter 21Chapter 21
Chapter 21
 

Recently uploaded

Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptxrouholahahmadi9876
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxpritamlangde
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...jabtakhaidam7
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 

Recently uploaded (20)

Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 

Bearing ratio capacity of compacted soil

  • 1. Bearing ratio capacity of compacted soils Standard Test Method for CBR (California Bearing Ratio) of Laboratory-Compacted Soils1
  • 2. DEFINITION CALIFORNIA BEARING RATIO IS THE RATIO OF FORCE PER UNIT AREA REQUIRED TO PENETRATE IN TO A SOIL MASS WITH A CIRCULAR PLUNGER OF 50MM DIAMETER AT THE RATE OF 1.25MM / MIN.
  • 3. Summary of Test Method 1.For tests performed on materials compacted to one water content, three specimens are prepared.The specimens are compacted using three different compactive efforts to obtain unit weights both above and below the desired unit weight. After allowing specimens to take on water by soaking, or other specified treatment such as curing, each specimen is subjected to penetration by a cylindrical rod. Results of stress (load) versus penetration depth are plotted to determine the CBR for each specimen.The CBR at the specified density is determined from a graph of CBR versus dry unit weight.
  • 4. 2. For tests in which the result is to be determined for a water content range, a series of specimens at each of three compactive efforts are prepared over the range of water content of interest. The compactive efforts are chosen to produce unit weights above and below the desired unit weight. After allowing the specimens to take on water by soaking, or other specified treatment such as curing, each specimen is penetrated. Results are plotted to obtain the CBR for each specimen. A plot of CBR versus unit weight for each water content is made to determine the minimum CBR for the water content range of interest.
  • 5. Significance and Use This test method is used to evaluate the potential strength of subgrade , subbase , and base course material, including recycled materials for use in road and airfield pavements. The CBR value obtained in this test forms an integral part of several flexible pavement design methods.
  • 6. PROCEDURE There are two types of methods in compacting soil specimen in the CBR moulds i. Static Compaction method. ii. Dynamic Compaction method. The material used in the above two methods shall pass 19mm sieve for fine grained soils and 37.50mm sieve for coarse materials up to 37.50mm. Replace the material retained on 19mm sieve by an equal amount of material passing 19mm sieve and retained on 4.75mm sieve Replace the material retained on 37.50mm sieve by an equal amount of material passing 37.50mm sieve and retained on 4.75mm sieve.
  • 12. Static Compaction 1 In this method calculate the mass of wet soil at required moisture content to give a desired density when compacted in a standard test mould as given below Volume of mould = 2250cc. Weight of dry soil (W) = 2250 x MDD. m Weight of wet soil =1+ m/100xW Weight of water = Weight of wet soil - Weight of dry soil. m = Optimum moisture content obtained from the laboratory compaction test.
  • 13. 2.Take oven dried soil sample of calculated weight and thoroughly mix with water (OMC) as obtained from the above equation. 3.Record the empty weight of the mould with base plate, with extension collar removed (m1). 4.Place the correct mass of the wet soil in to the mould in five layers. 5.Gently compact each layer with the spacer disc. 6.Place a filter paper on top of the soil followed by a 5cms displacer disc.
  • 14. 7.Compact the mould by pressing it in between the platens of the compression testing machine until the top of the spacer disc comes flush with the top of the mould. 8.Held the load for about 30 seconds and then release. Dynamic Compaction 1.Take representative sample of soil weighing approximately 6kg and mix thoroughly at OMC. 2.Record the empty weight of the mould with base plate, with extension collar removed (m1).
  • 15. 3.Replace the extension collar of the mould. 4.Insert a spacer disc over the base plate and place a coarse filter paper on the top of the spacer disc. 5.Place the mould on a solid base such as a concrete floor or plinth and compact the wet soil in to the mould in five layers of approximately equal mass each layer being given 56 blows with 4.90kg hammer equally distributed and dropped from a height of 450 mm above the soil.
  • 16. 6.The amount of soil used shall be sufficient to fill the mould, leaving not more than about 6mm to be struck off when the extension collar is removed. 7.Remove the extension collar and carefully level the compacted soil to the top of the mould by means of a straight edge. 8.Remove the spacer disc by inverting the mould and weigh the mould with compacted soil (m2). 9.Place a filter paper between the base plate and the inverted mould. 10.Replace the extension collar of the mould.
  • 17. Test for Swelling This test is optional and may be omitted if not necessary. Determine the initial height of specimen (h) in mm. Mount the expansion-measuring device along with the tripod on the edge of the mould and record the initial dial gauge reading (ds). Keep this set up as such undisturbed for 96 hours noting down the readings every day against the time of reading.
  • 18. Maintain a constant water level through out the period of soaking. Note the final reading of the dial gauge at the end of soaking period (dh). Calculations for Swelling Expansion ratio=df - ds/h x 100 ds = Initial dial gauge reading in mm df = final dial gauge reading in mm h = initial height of specimen in mm
  • 19. Penetration Test After 96 hours of soaking take out the specimen from the water and remove the extension collar, perforated disc, surcharge weights and filter paper.