This document provides an overview of Agnico Eagle Mines Limited's presentation at the 22nd Annual Canada Mining Event hosted by Bank of America Merrill Lynch in September 2016. It contains forward-looking statements about Agnico Eagle's production guidance, costs, projects and growth plans. It also notes the risks associated with forward-looking statements and provides details on Agnico Eagle's non-GAAP financial measures and production guidance methodology. Finally, it highlights Agnico Eagle's strategy of value creation through consistent performance, production growth, high-quality reserves, exploration success and financial strength.
Agnico Eagle reported its first quarter 2016 results on April 29, 2016. The document provides forward-looking statements regarding Agnico Eagle's expectations for production, costs, capital expenditures, and other estimates. It notes that actual results may differ materially from expectations due to risks and uncertainties in the business. The document also explains non-GAAP measures used to evaluate performance such as total cash costs per ounce and all-in sustaining costs per ounce.
Agnico Eagle held a Denver Gold Forum in September 2016 to provide information to investors. The document included forward-looking statements about production guidance, costs, and other estimates. It noted the risks that actual results may differ from expectations due to uncertainties in metal prices, costs, and other factors. It also summarized the company's strategy of production growth from its existing assets, high-quality gold reserves with above-average grades, and exploration adding new resources.
This document provides an overview of Agnico Eagle Mines Limited's annual and special meeting on April 29, 2016. It includes forward-looking statements about production guidance, costs, and projects. It notes the risks associated with forward-looking statements and provides non-GAAP financial measures to assess performance. The company has a strong track record of exceeding production guidance and lowering costs. It is positioned for growth through optimizing existing operations, exploration success adding reserves, and a pipeline of development projects expected to increase production by 30-40% by 2020.
The document provides an overview of Agnico Eagle's corporate update presentation from January 2018. It includes forward-looking statements and notes regarding non-GAAP measures. The summary highlights Agnico Eagle's growing production base, high quality long life assets, strategy of value creation, track record of meeting guidance, mineral reserves and resources, successful M&A and exploration adding value, and project pipeline expected to drive further production growth to 2 million ounces by 2020.
This document provides an overview of Agnico Eagle's European Gold Forum presentation in Zurich in April 2016. It includes forward-looking statements about production guidance and costs. It also notes that total cash costs, all-in sustaining costs, and minesite costs per tonne are non-GAAP measures and provides definitions for these terms. Finally, it directs readers to Agnico Eagle's regulatory filings for further information.
The Nunavut Experience Mining and Exploring North of 60Agnico Eagle Mines
The document discusses permitting for mining and exploration projects in Nunavut, Canada. It notes that [1] Inuit organizations own subsurface and surface rights to portions of the land in Nunavut. [2] Key Inuit organizations that must be engaged with for agreements include Nunavut Tungavik Incorporated and regional Inuit organizations. [3] Permitting for exploration projects in Nunavut involves engaging with both Inuit organizations and various federal and territorial government bodies.
Agnico Eagle reported strong results for the second quarter of 2016, including:
- Gold production of 408,932 ounces at total cash costs of $592 per ounce
- Increased 2016 production guidance to 1.58-1.6 million ounces at lower costs
- Repaid $210 million credit facility balance and $20 million loan, reducing net debt to $742 million
- Declared a 25% increased quarterly dividend to $0.10 per share
Agnico Eagle plans to acquire Cayden Resources, an exploration company with properties in Mexico, for approximately C$205 million. The key asset being acquired is the El Barqueño property in Jalisco State, which has shown potential for multiple gold deposits along an 8km strike length based on drilling to date. Agnico Eagle expects to begin a C$10-15 million exploration program at El Barqueño in 2015 with the goal of outlining a maiden resource. The acquisition is expected to enhance Agnico Eagle's growth in Mexico and provide an opportunity to establish a new operating base.
Agnico Eagle reported its first quarter 2016 results on April 29, 2016. The document provides forward-looking statements regarding Agnico Eagle's expectations for production, costs, capital expenditures, and other estimates. It notes that actual results may differ materially from expectations due to risks and uncertainties in the business. The document also explains non-GAAP measures used to evaluate performance such as total cash costs per ounce and all-in sustaining costs per ounce.
Agnico Eagle held a Denver Gold Forum in September 2016 to provide information to investors. The document included forward-looking statements about production guidance, costs, and other estimates. It noted the risks that actual results may differ from expectations due to uncertainties in metal prices, costs, and other factors. It also summarized the company's strategy of production growth from its existing assets, high-quality gold reserves with above-average grades, and exploration adding new resources.
This document provides an overview of Agnico Eagle Mines Limited's annual and special meeting on April 29, 2016. It includes forward-looking statements about production guidance, costs, and projects. It notes the risks associated with forward-looking statements and provides non-GAAP financial measures to assess performance. The company has a strong track record of exceeding production guidance and lowering costs. It is positioned for growth through optimizing existing operations, exploration success adding reserves, and a pipeline of development projects expected to increase production by 30-40% by 2020.
The document provides an overview of Agnico Eagle's corporate update presentation from January 2018. It includes forward-looking statements and notes regarding non-GAAP measures. The summary highlights Agnico Eagle's growing production base, high quality long life assets, strategy of value creation, track record of meeting guidance, mineral reserves and resources, successful M&A and exploration adding value, and project pipeline expected to drive further production growth to 2 million ounces by 2020.
This document provides an overview of Agnico Eagle's European Gold Forum presentation in Zurich in April 2016. It includes forward-looking statements about production guidance and costs. It also notes that total cash costs, all-in sustaining costs, and minesite costs per tonne are non-GAAP measures and provides definitions for these terms. Finally, it directs readers to Agnico Eagle's regulatory filings for further information.
The Nunavut Experience Mining and Exploring North of 60Agnico Eagle Mines
The document discusses permitting for mining and exploration projects in Nunavut, Canada. It notes that [1] Inuit organizations own subsurface and surface rights to portions of the land in Nunavut. [2] Key Inuit organizations that must be engaged with for agreements include Nunavut Tungavik Incorporated and regional Inuit organizations. [3] Permitting for exploration projects in Nunavut involves engaging with both Inuit organizations and various federal and territorial government bodies.
Agnico Eagle reported strong results for the second quarter of 2016, including:
- Gold production of 408,932 ounces at total cash costs of $592 per ounce
- Increased 2016 production guidance to 1.58-1.6 million ounces at lower costs
- Repaid $210 million credit facility balance and $20 million loan, reducing net debt to $742 million
- Declared a 25% increased quarterly dividend to $0.10 per share
Agnico Eagle plans to acquire Cayden Resources, an exploration company with properties in Mexico, for approximately C$205 million. The key asset being acquired is the El Barqueño property in Jalisco State, which has shown potential for multiple gold deposits along an 8km strike length based on drilling to date. Agnico Eagle expects to begin a C$10-15 million exploration program at El Barqueño in 2015 with the goal of outlining a maiden resource. The acquisition is expected to enhance Agnico Eagle's growth in Mexico and provide an opportunity to establish a new operating base.
Agnico Eagle reported its fourth quarter and full year 2017 results. Some highlights include:
- Production guidance for 2018 of 1.75-1.8 million ounces of gold at total cash costs between $650-700 per ounce and AISC of $950-1000 per ounce.
- Continued progress on construction at the Meliadine and Amaruq projects in Nunavut, with production expected to begin in 2019.
- Exploration success at several mines, with potential to extend mine lives and add new resources.
Macquarie 2015 Global Metals, Mining % Materials Conference, New YorkAgnico Eagle Mines
This document provides an overview of Agnico Eagle's presentation at the Macquarie 2015 Global Metals, Mining & Materials Conference on June 10-11, 2015. It discusses Agnico Eagle's assets in Nunavut, Finland, Mexico, and the Abitibi Region, which are focused in four low-risk mining jurisdictions. Production is forecast to be approximately 1.6 million ounces in 2015 at a cash cost of $618 per ounce. The presentation also highlights Agnico Eagle's reserve quality, production and cost profile, opportunities to enhance future production, 2014 reserve highlights, and exploration/development pipeline.
Raymond James 38th Annual Institutional Investors ConferenceAgnico Eagle Mines
The document provides forward-looking statements and notes regarding Agnico Eagle's presentation at the Raymond James 38th Annual Institutional Investors Conference in March 2017. It discusses Agnico Eagle's solid production base, high quality long life assets, and proven value creating strategy. It also summarizes Agnico Eagle's 2016 operating and financial highlights, 2016 exploration and reserve highlights, and track record of meeting production guidance. Finally, it notes Agnico Eagle mined below its average reserve grade in 2016 and successfully replaced reserves and resources with grades remaining unchanged.
The document provides an overview of Scotiabank's BBQ on August 18, 2015. It includes forward-looking statements about Agnico Eagle's expected future production, costs, projects, and studies. Highlights from the first half of 2015 include strong operating performance with 807,888 ounces of gold produced at total cash costs of $595 per ounce. Production guidance for 2015 is maintained at 1.6 million ounces with reduced costs. The Goldex Deep 1 project was approved to add 7 years of mine life. Drilling is expanding resources at Amaruq and the Vault extension could reduce the potential production gap with Amaruq.
The LaRonde mine achieved record quarterly gold production of 105,345 ounces due to higher tonnage and grades from mining areas. Production guidance for 2017 was increased to over 1.68 million ounces of gold and unit costs were reduced based on strong year-to-date operational performance across Agnico Eagle's mines. Exploration continues at LaRonde to evaluate mining below current levels and infill drilling is ongoing to define higher grade mineralization in the western portions of the deposit.
This document provides a corporate update for Agnico Eagle. It discusses Agnico Eagle's increased gold production guidance for 2014 and 2015, driven by strong operational performance at Meadowbank, Kittila, and Mexican operations. Production is forecast to increase 14% to 1.6 million ounces in 2015 while total cash costs are expected to decline 6% from 2014 levels. The document also addresses Agnico Eagle's financial position and flexibility.
The document provides an update on Agnico Eagle Mines for August 2016. It includes forward-looking statements and notes of caution regarding the use of non-GAAP measures in financial presentations. The update discusses Agnico Eagle's consistent strategy of production growth, high quality gold reserves with above peer average grades, strong balance sheet, and exploration as a value driver. It also provides highlights on recent operational and financial results and production guidance into 2019 and beyond.
- Agnico Eagle reported second quarter 2018 results with total payable gold production of 404,961 ounces and total cash costs per ounce of $656.
- Production guidance for 2018 was increased to 1.58 million ounces of gold from 1.53 million ounces previously.
- The Amaruq project received permit approval and preliminary construction work began, while the Meliadine project remains on schedule for first production in Q2 2019.
- LaRonde Zone 5 declared commercial production as of June 1, 2018 and the mine life at Lapa was extended until the fourth quarter of 2018.
- Agnico Eagle reported strong Q3 2014 operating performance with gold production of 349,273 oz and total cash costs of $716/oz.
- Production for 2014 is expected to exceed guidance and reach approximately 1.4 Moz, while 2015 guidance is increased to approximately 1.6 Moz due to higher forecasts at Meadowbank, Kittila, and Mexican operations.
- Upgrades at LaRonde, lower costs at Goldex, and optimization at Canadian Malartic position the Abitibi operations for increased performance going forward.
Agnico Eagle reported record annual gold production in 2014 of 1.429 million ounces at total cash costs of $637 per ounce. For the fourth quarter of 2014, gold production was 387,538 ounces at total cash costs of $662 per ounce. Agnico Eagle expects gold production to increase to approximately 1.6 million ounces in 2015 at total cash costs of $610 to $630 per ounce, and all-in sustaining costs of $880 to $900 per ounce. Agnico Eagle also provided three-year production guidance for 2015 to 2017, with expected average annual gold production of approximately 1.6 million ounces.
The document provides forward-looking statements and notes of caution for Agnico Eagle's presentation at a metals and mining conference. It notes that forward-looking production estimates involve risks and uncertainties beyond Agnico Eagle's control. It also explains that the presentation discloses non-GAAP financial measures like total cash costs per ounce of gold produced, and provides reconciliations to IFRS measures. Finally, it states that the gold production guidance is based on mineral reserves but includes contingencies and price assumptions different than those used for reserves.
The document provides an update on Agnico Eagle, a gold mining company. It discusses forward-looking production guidance estimates for 2015, including expected ore grades, metal production, costs per ounce, and estimated timing of technical reports. It notes Agnico Eagle expects around 14% production growth in 2015 and all-in sustaining costs in 2015 are expected to decline by 6% from 2014 levels. The document also contains standard cautionary notes about forward-looking statements and the use of non-GAAP measures in evaluations performance.
This document provides an overview of a site tour that was conducted at El Barqueño on September 23, 2015. It begins with standard forward-looking statements and disclaimers about projections. It then provides notes to investors about the use of non-GAAP financial measures in evaluations, production guidance assumptions, mineral resource categories, and scientific and technical data standards. Key points covered include projected total cash costs, all-in sustaining costs, mineral reserve estimates used, and qualifications of individuals who approved the scientific and technical content.
The document provides an overview of Agnico Eagle's Kittila mine site visit in November 2016. Some key points:
- Kittila is Agnico Eagle's largest gold mine in Europe and has estimated reserves to continue operations through 2035.
- Underground development and mining rates are being optimized to fully access the Rimpi and newly discovered Sisar zones.
- Drilling in Q3 2016 yielded the widest intercept to date in the Sisar Central Zone of 6.6 g/t gold over 12.7 metres.
- The processing plant uses pressure oxidation in an autoclave to treat the refractory gold ore, followed by milling, flotation, leaching and electrowin
The document provides an overview of Agnico Eagle's Amaruq investor tour on August 20, 2015. It begins with forward-looking statements and notes of caution for investors. It then provides an agenda that will discuss Nunavut, the Meadowbank operations including the Vault extension, details on Amaruq, and information on Meliadine. Exploration and development highlights are provided, noting increased resources at Amaruq and optimization studies continuing at Meliadine.
This document is an introduction and forward-looking statement from Agnico Eagle for their presentation at the Bank of America Merrill Lynch 21st Annual Canada Mining Conference in September 2015. It outlines key assumptions and risk factors for forward-looking production guidance, cost estimates, and timelines. It also provides notes to investors on the use of non-GAAP financial measures and production guidance included in the presentation.
Agnico Eagle provided a corporate update for January 2015 including the following key points:
- 2015 gold production is expected to increase 14% to approximately 1.6 million ounces compared to 2014, driven by higher production at Meadowbank, Kittila, and Mexican operations. Total cash costs per ounce are expected to decline 6% from 2014.
- The company has manageable expansion capital requirements with projects like the Kittila plant expansion and Pinos shaft completion expected to increase production capacity.
- Agnico Eagle has financial flexibility with a net debt of $1.2 billion and $700 million in undrawn credit lines to fund future growth.
Raymond james-39th-annual-institutional-investors-conferenceAgnico Eagle Mines
- The document provides forward-looking statements regarding Agnico Eagle's operations, projects, production estimates, costs, and cash flows.
- It notes key assumptions underlying these statements and risks that could cause actual results to differ materially.
- Non-GAAP financial measures including total cash costs, all-in sustaining costs, and minesite costs are discussed and reconciled to IFRS measures.
Scotia building a high quality manageable gold business in challenging timesAgnico Eagle Mines
Agnico Eagle Mines is preparing to begin commercial production at its La India gold mine in Mexico in Q1 2014, ahead of schedule and on budget. La India is expected to produce approximately 90,000 ounces of gold per year at total cash costs of $500 per ounce. The project was commissioned just 22 months after Agnico Eagle acquired it in 2011 for $157.6 million. La India adds a new source of low-cost gold production in Mexico for Agnico Eagle.
This document provides forward-looking statements and notes to investors regarding Agnico Eagle's presentation at the Jefferies 11th Annual Industrials Conference in August 2015. It cautions readers that forward-looking statements are subject to risks and uncertainties. It also notes that the presentation discloses non-GAAP financial measures such as total cash costs per ounce and minesite costs per tonne, and provides reconciliations to IFRS measures. Finally, it states that the gold production guidance is based on mineral reserves but includes contingencies and price assumptions different from reserve estimates.
Bank of America Merrill Lynch 2016 Global Metals, Mining & Steel ConferenceAgnico Eagle Mines
This document is from Agnico Eagle's presentation at the 2016 Bank of America Merrill Lynch Global Metals, Mining & Steel Conference in May 2016. It includes forward-looking statements regarding Agnico Eagle's estimated production metrics, costs, and project timelines that are based on certain assumptions that may prove to be incorrect. It also notes that certain non-GAAP financial measures are used such as total cash costs per ounce and all-in sustaining costs per ounce, and provides definitions for these terms. The presentation contains cautionary language regarding the risks and uncertainties inherent in forward-looking information.
- Agnico Eagle exceeded gold production guidance for the fourth consecutive year, producing 1.671 million ounces of gold in 2015 at total cash costs of $567 per ounce.
- Stable production of approximately 1.53 million ounces per year is expected from 2016-2018, with 2016 guidance of 1.525-1.565 million ounces at total cash costs of $590-630 per ounce.
- Gold reserve grades increased at key mines in 2015 and significant increases in measured, indicated, and inferred gold resources were reported, while gold reserves declined only slightly.
Agnico Eagle reported its fourth quarter and full year 2017 results. Some highlights include:
- Production guidance for 2018 of 1.75-1.8 million ounces of gold at total cash costs between $650-700 per ounce and AISC of $950-1000 per ounce.
- Continued progress on construction at the Meliadine and Amaruq projects in Nunavut, with production expected to begin in 2019.
- Exploration success at several mines, with potential to extend mine lives and add new resources.
Macquarie 2015 Global Metals, Mining % Materials Conference, New YorkAgnico Eagle Mines
This document provides an overview of Agnico Eagle's presentation at the Macquarie 2015 Global Metals, Mining & Materials Conference on June 10-11, 2015. It discusses Agnico Eagle's assets in Nunavut, Finland, Mexico, and the Abitibi Region, which are focused in four low-risk mining jurisdictions. Production is forecast to be approximately 1.6 million ounces in 2015 at a cash cost of $618 per ounce. The presentation also highlights Agnico Eagle's reserve quality, production and cost profile, opportunities to enhance future production, 2014 reserve highlights, and exploration/development pipeline.
Raymond James 38th Annual Institutional Investors ConferenceAgnico Eagle Mines
The document provides forward-looking statements and notes regarding Agnico Eagle's presentation at the Raymond James 38th Annual Institutional Investors Conference in March 2017. It discusses Agnico Eagle's solid production base, high quality long life assets, and proven value creating strategy. It also summarizes Agnico Eagle's 2016 operating and financial highlights, 2016 exploration and reserve highlights, and track record of meeting production guidance. Finally, it notes Agnico Eagle mined below its average reserve grade in 2016 and successfully replaced reserves and resources with grades remaining unchanged.
The document provides an overview of Scotiabank's BBQ on August 18, 2015. It includes forward-looking statements about Agnico Eagle's expected future production, costs, projects, and studies. Highlights from the first half of 2015 include strong operating performance with 807,888 ounces of gold produced at total cash costs of $595 per ounce. Production guidance for 2015 is maintained at 1.6 million ounces with reduced costs. The Goldex Deep 1 project was approved to add 7 years of mine life. Drilling is expanding resources at Amaruq and the Vault extension could reduce the potential production gap with Amaruq.
The LaRonde mine achieved record quarterly gold production of 105,345 ounces due to higher tonnage and grades from mining areas. Production guidance for 2017 was increased to over 1.68 million ounces of gold and unit costs were reduced based on strong year-to-date operational performance across Agnico Eagle's mines. Exploration continues at LaRonde to evaluate mining below current levels and infill drilling is ongoing to define higher grade mineralization in the western portions of the deposit.
This document provides a corporate update for Agnico Eagle. It discusses Agnico Eagle's increased gold production guidance for 2014 and 2015, driven by strong operational performance at Meadowbank, Kittila, and Mexican operations. Production is forecast to increase 14% to 1.6 million ounces in 2015 while total cash costs are expected to decline 6% from 2014 levels. The document also addresses Agnico Eagle's financial position and flexibility.
The document provides an update on Agnico Eagle Mines for August 2016. It includes forward-looking statements and notes of caution regarding the use of non-GAAP measures in financial presentations. The update discusses Agnico Eagle's consistent strategy of production growth, high quality gold reserves with above peer average grades, strong balance sheet, and exploration as a value driver. It also provides highlights on recent operational and financial results and production guidance into 2019 and beyond.
- Agnico Eagle reported second quarter 2018 results with total payable gold production of 404,961 ounces and total cash costs per ounce of $656.
- Production guidance for 2018 was increased to 1.58 million ounces of gold from 1.53 million ounces previously.
- The Amaruq project received permit approval and preliminary construction work began, while the Meliadine project remains on schedule for first production in Q2 2019.
- LaRonde Zone 5 declared commercial production as of June 1, 2018 and the mine life at Lapa was extended until the fourth quarter of 2018.
- Agnico Eagle reported strong Q3 2014 operating performance with gold production of 349,273 oz and total cash costs of $716/oz.
- Production for 2014 is expected to exceed guidance and reach approximately 1.4 Moz, while 2015 guidance is increased to approximately 1.6 Moz due to higher forecasts at Meadowbank, Kittila, and Mexican operations.
- Upgrades at LaRonde, lower costs at Goldex, and optimization at Canadian Malartic position the Abitibi operations for increased performance going forward.
Agnico Eagle reported record annual gold production in 2014 of 1.429 million ounces at total cash costs of $637 per ounce. For the fourth quarter of 2014, gold production was 387,538 ounces at total cash costs of $662 per ounce. Agnico Eagle expects gold production to increase to approximately 1.6 million ounces in 2015 at total cash costs of $610 to $630 per ounce, and all-in sustaining costs of $880 to $900 per ounce. Agnico Eagle also provided three-year production guidance for 2015 to 2017, with expected average annual gold production of approximately 1.6 million ounces.
The document provides forward-looking statements and notes of caution for Agnico Eagle's presentation at a metals and mining conference. It notes that forward-looking production estimates involve risks and uncertainties beyond Agnico Eagle's control. It also explains that the presentation discloses non-GAAP financial measures like total cash costs per ounce of gold produced, and provides reconciliations to IFRS measures. Finally, it states that the gold production guidance is based on mineral reserves but includes contingencies and price assumptions different than those used for reserves.
The document provides an update on Agnico Eagle, a gold mining company. It discusses forward-looking production guidance estimates for 2015, including expected ore grades, metal production, costs per ounce, and estimated timing of technical reports. It notes Agnico Eagle expects around 14% production growth in 2015 and all-in sustaining costs in 2015 are expected to decline by 6% from 2014 levels. The document also contains standard cautionary notes about forward-looking statements and the use of non-GAAP measures in evaluations performance.
This document provides an overview of a site tour that was conducted at El Barqueño on September 23, 2015. It begins with standard forward-looking statements and disclaimers about projections. It then provides notes to investors about the use of non-GAAP financial measures in evaluations, production guidance assumptions, mineral resource categories, and scientific and technical data standards. Key points covered include projected total cash costs, all-in sustaining costs, mineral reserve estimates used, and qualifications of individuals who approved the scientific and technical content.
The document provides an overview of Agnico Eagle's Kittila mine site visit in November 2016. Some key points:
- Kittila is Agnico Eagle's largest gold mine in Europe and has estimated reserves to continue operations through 2035.
- Underground development and mining rates are being optimized to fully access the Rimpi and newly discovered Sisar zones.
- Drilling in Q3 2016 yielded the widest intercept to date in the Sisar Central Zone of 6.6 g/t gold over 12.7 metres.
- The processing plant uses pressure oxidation in an autoclave to treat the refractory gold ore, followed by milling, flotation, leaching and electrowin
The document provides an overview of Agnico Eagle's Amaruq investor tour on August 20, 2015. It begins with forward-looking statements and notes of caution for investors. It then provides an agenda that will discuss Nunavut, the Meadowbank operations including the Vault extension, details on Amaruq, and information on Meliadine. Exploration and development highlights are provided, noting increased resources at Amaruq and optimization studies continuing at Meliadine.
This document is an introduction and forward-looking statement from Agnico Eagle for their presentation at the Bank of America Merrill Lynch 21st Annual Canada Mining Conference in September 2015. It outlines key assumptions and risk factors for forward-looking production guidance, cost estimates, and timelines. It also provides notes to investors on the use of non-GAAP financial measures and production guidance included in the presentation.
Agnico Eagle provided a corporate update for January 2015 including the following key points:
- 2015 gold production is expected to increase 14% to approximately 1.6 million ounces compared to 2014, driven by higher production at Meadowbank, Kittila, and Mexican operations. Total cash costs per ounce are expected to decline 6% from 2014.
- The company has manageable expansion capital requirements with projects like the Kittila plant expansion and Pinos shaft completion expected to increase production capacity.
- Agnico Eagle has financial flexibility with a net debt of $1.2 billion and $700 million in undrawn credit lines to fund future growth.
Raymond james-39th-annual-institutional-investors-conferenceAgnico Eagle Mines
- The document provides forward-looking statements regarding Agnico Eagle's operations, projects, production estimates, costs, and cash flows.
- It notes key assumptions underlying these statements and risks that could cause actual results to differ materially.
- Non-GAAP financial measures including total cash costs, all-in sustaining costs, and minesite costs are discussed and reconciled to IFRS measures.
Scotia building a high quality manageable gold business in challenging timesAgnico Eagle Mines
Agnico Eagle Mines is preparing to begin commercial production at its La India gold mine in Mexico in Q1 2014, ahead of schedule and on budget. La India is expected to produce approximately 90,000 ounces of gold per year at total cash costs of $500 per ounce. The project was commissioned just 22 months after Agnico Eagle acquired it in 2011 for $157.6 million. La India adds a new source of low-cost gold production in Mexico for Agnico Eagle.
This document provides forward-looking statements and notes to investors regarding Agnico Eagle's presentation at the Jefferies 11th Annual Industrials Conference in August 2015. It cautions readers that forward-looking statements are subject to risks and uncertainties. It also notes that the presentation discloses non-GAAP financial measures such as total cash costs per ounce and minesite costs per tonne, and provides reconciliations to IFRS measures. Finally, it states that the gold production guidance is based on mineral reserves but includes contingencies and price assumptions different from reserve estimates.
Bank of America Merrill Lynch 2016 Global Metals, Mining & Steel ConferenceAgnico Eagle Mines
This document is from Agnico Eagle's presentation at the 2016 Bank of America Merrill Lynch Global Metals, Mining & Steel Conference in May 2016. It includes forward-looking statements regarding Agnico Eagle's estimated production metrics, costs, and project timelines that are based on certain assumptions that may prove to be incorrect. It also notes that certain non-GAAP financial measures are used such as total cash costs per ounce and all-in sustaining costs per ounce, and provides definitions for these terms. The presentation contains cautionary language regarding the risks and uncertainties inherent in forward-looking information.
- Agnico Eagle exceeded gold production guidance for the fourth consecutive year, producing 1.671 million ounces of gold in 2015 at total cash costs of $567 per ounce.
- Stable production of approximately 1.53 million ounces per year is expected from 2016-2018, with 2016 guidance of 1.525-1.565 million ounces at total cash costs of $590-630 per ounce.
- Gold reserve grades increased at key mines in 2015 and significant increases in measured, indicated, and inferred gold resources were reported, while gold reserves declined only slightly.
- Agnico Eagle reported strong fourth quarter and full year 2015 results, exceeding annual gold production guidance for the fourth consecutive year.
- For 2016, the company expects gold production of 1.525-1.565 million ounces at total cash costs of $590-630 per ounce, with continued stable production and costs through 2018.
- Significant increases in gold resources were reported at the Amaruq, El Barqueño, and Sisar Zone projects, which could support future production growth beyond 2019.
Raymond James Institutional Investors Conference OrlandoAgnico Eagle Mines
The document provides forward-looking statements and notes regarding non-GAAP financial measures for Agnico Eagle Mines Limited. It summarizes Agnico Eagle's fourth quarter and full year 2015 operating results, including record annual gold production of 1.671 million ounces at total cash costs of $567 per ounce. It also outlines Agnico Eagle's strategic plan for 2016 and beyond, focusing on optimizing existing mines and projects, delivering on expectations, building a project pipeline, and developing people. The company aims to improve its cost structure, increase reserve quality, and maximize free cash flow per share.
- Agnico Eagle provides a corporate update for September 2016, outlining key points such as production growth targets, high quality gold reserves, ongoing exploration success, and a strong balance sheet.
- The company has a goal of producing over 2 million ounces of gold annually by 2020 through exploiting its existing asset base, which contains high average grade reserves over double the industry average.
- Exploration continues to deliver value by expanding reserves and resources at mines such as Kittila, Meadowbank, Meliadine, Pinos Altos, and La India.
- The document is a presentation from Agnico Eagle Mines Limited given at a Scotia BBQ on August 18, 2016.
- It discusses Agnico Eagle's forward-looking statements and production guidance, provides an overview of the company's strong financial position and long history of dividend payments, and outlines its growth strategy through projects in its development pipeline.
- Agnico Eagle has successfully grown production and reserves through acquisitions and exploration over the past decade and expects its project pipeline to drive a new phase of 30-40% production growth by 2020.
Agnico Eagle reported its fourth quarter and full year 2016 results. Key highlights included:
1) Continued strong operating performance in 2016 with gold production exceeding guidance and lower than expected costs.
2) The Amaruq satellite deposit at Meadowbank and the Meliadine project were approved for development with both expected to start up in Q3 2019.
3) A four-year production guidance was issued with gold production expected to increase from current levels to 2 million ounces by 2020 and unit costs expected to decline over that period.
This document provides forward-looking statements and notes to investors regarding Agnico Eagle's corporate update presentation at the Scotiabank Mining Conference in December 2017. It outlines key assumptions and risk factors for Agnico Eagle's projections, including commodity prices, production estimates, costs estimates, currency fluctuations, and permitting/development timelines. It also notes that certain terms used in the presentation, such as total cash costs per ounce and all-in sustaining costs per ounce, are non-GAAP measures and provides reconciliations to IFRS measures.
BMO Capital Markets 26th Global Metals & Mining ConferenceAgnico Eagle Mines
- The document discusses Agnico Eagle's forward-looking statements and provides context for non-GAAP financial measures used. It notes key assumptions and risks that could impact projections.
- Agnico Eagle exceeded 2016 production guidance of 1.6 million ounces at total cash costs of $600 per ounce. Production was 1.66 million ounces at total cash costs of $573 per ounce.
- New four-year guidance forecasts production growth to over 2 million ounces in 2020 as the Amaruq and Meliadine projects come online. Costs are expected to decline as production increases.
Operations continue to deliver strong performance in the second quarter of 2017, with total gold production of 427,743 ounces and total cash costs per ounce of $556. Infill and exploration drilling at multiple properties, including LaRonde and Amaruq, yielded positive results that are expected to result in mineral resource additions and conversions. The Meliadine project is progressing on schedule and budget, with underground development ahead of plan and engineering 80% complete at the end of June 2017.
The document discusses Agnico Eagle's third quarter 2016 results. It provides forward-looking statements regarding production guidance, projects, and costs. It notes the risks and assumptions underlying the forward-looking statements. It also discusses non-GAAP measures used to evaluate performance such as total cash costs per ounce and all-in sustaining costs per ounce.
- Agnico Eagle provides a corporate update for November 2016, outlining its consistent strategy and solid execution that drives superior per share returns.
- Production is expected to grow to approximately 2.0 million ounces of gold in 2020 from its existing asset base.
- Agnico Eagle has high quality gold reserves with an average grade more than double that of North American peers that will support production growth.
- Exploration continues to be a key value driver, with several prospects delivering results.
The document provides forward-looking statements and production guidance for Agnico Eagle at the BMO Capital Markets 24th Global Metals and Mining Conference in February 2015. It notes key assumptions used in projections, such as metal prices and exchange rates, and risks that could impact projections. It also provides context on non-GAAP terms used, such as total cash costs per ounce and minesite costs per tonne, and reconciles them to GAAP financial reporting. Finally, it states that the gold production guidance is based on mineral reserves but includes contingencies, and does not reconcile exactly to reserve models due to factors like metal price and exchange rate assumptions.
- Agnico Eagle reported its third quarter 2015 results on October 29, 2015.
- The document discusses forward-looking statements regarding production guidance, costs, and expansion projects and contains risks and assumptions.
- It also notes that certain measures used are non-GAAP measures and provides reconciliations to IFRS, and that production guidance is based on reserves but includes contingencies and different price assumptions than reserves.
The Barsele Gold Project is located in northern Sweden near existing infrastructure. Agnico Eagle has a 55% interest in the project. Previous exploration identified gold mineralization at the Central, Avan, and Skiråsen zones. In 2015-2016, Agnico Eagle conducted drilling programs to expand and define these zones, with the goal of releasing an initial inferred resource estimate by the end of 2016. Drilling to date has shown potential to extend mineralization to depth at the Avan zone.
Similar to Bank of America Merrill Lynch 2016 Global Metals, Mining Event (15)
Bank of America Merrill Lynch 2016 Global Metals, Mining Event
1. BANK OF AMERICA MERRILL LYNCH
22ND ANNUAL CANADA MINING EVENT
SEPTEMBER 2016
2. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 2
Forward Looking Statements
The information in this presentation has been prepared by Agnico Eagle Mines Limited (“Agnico Eagle” or the “Company”) as at September 6, 2016. Certain
statements contained in this document constitute “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of
1995 and “forward-looking information” under the provisions of Canadian provincial securities laws and are referred to herein as “forward-looking statements”.
When used in this document, the words “anticipate”, “estimate”, “expect”, “forecast”, “planned”, “will”, “could”, “potential” and similar expressions are intended to
identify forward-looking statements. Such statements include without limitation: the Company's forward-looking production guidance, including estimated ore
grades, project timelines, drilling results, metal production, life of mine estimates, production, total cash costs per ounce, minesite costs per tonne; all-in sustaining
costs per ounce and cash flows; the estimated timing and conclusions of technical reports and other studies; the methods by which ore will be extracted or
processed; statements concerning expansion projects, recovery rates, mill throughput, optimization and projected exploration expenditures, including costs and
other estimates upon which such projections are based; estimates of depreciation expense, general and administrative expense and tax rates; the impact of
maintenance shutdowns; statements regarding timing and amounts of capital expenditures and other assumptions; estimates of future mineral reserves, mineral
resources, mineral production, optimization efforts and sales; estimates of mine life; estimates of future mining costs, total cash costs per ounce, minesite costs per
tonne, all-in sustaining costs per ounce and other expenses; estimates of future capital expenditures and other cash needs, and expectations as to the funding
thereof; statements and information as to the projected development of certain ore deposits, including estimates of exploration, development and production and
other capital costs, and estimates of the timing of such exploration, development and production or decisions with respect to such exploration, development and
production; estimates of mineral reserves and mineral resources, and statements and information regarding anticipated future exploration; the anticipated timing of
events with respect to the Company’s mine sites and statements and information regarding the sufficiency of the Company’s cash resources and other statements
and information regarding anticipated trends with respect to the Company's operations, exploration and the funding thereof. Such statements and information reflect
the Company’s views as at the date of this document and are subject to certain risks, uncertainties and assumptions, and undue reliance should not be placed on
such statements and information. Forward-looking statements are necessarily based upon a number of factors and assumptions that, while considered reasonable
by Agnico Eagle as of the date of such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. The
material factors and assumptions used in the preparation of the forward-looking statements contained herein, which may prove to be incorrect, include, but are not
limited to, the assumptions set forth herein and in management's discussion and analysis (“MD&A”) and the Company's Annual Information Form (“AIF”) for the year
ended December 31, 2015 filed with Canadian securities regulators and that are included in its Annual Report on Form 40-F for the year ended December 31, 2015
(“Form 40-F”) filed with the U.S. Securities and Exchange Commission (the “SEC”) as well as: that there are no significant disruptions affecting operations; that
production, permitting and expansion at each of Agnico Eagle's properties proceeds on a basis consistent with current expectations and plans; that the relevant
metals prices, exchange rates and prices for key mining and construction supplies will be consistent with Agnico Eagle's expectations; that Agnico Eagle's current
estimates of mineral reserves, mineral resources, mineral grades and metal recovery are accurate; that there are no material delays in the timing for completion of
ongoing growth projects; that the Company's current plans to optimize production are successful; and that there are no material variations in the current tax and
regulatory environment. Many factors, known and unknown could cause the actual results to be materially different from those expressed or implied by such
forward-looking statements and information. Such risks include, but are not limited to: the volatility of prices of gold and other metals; uncertainty of mineral
reserves, mineral resources, mineral grades and mineral recovery estimates; uncertainty of future production, project development, capital expenditures, and other
costs; currency fluctuations; financing of additional capital requirements; cost of exploration and development programs; mining risks; community protests; risks
associated with foreign operations; governmental and environmental regulation; the volatility of the Company’s stock price; and risks associated with the Company’s
currency, fuel and by-product metal derivative strategies. For a more detailed discussion of such risks and other factors that may affect the Company’s ability to
achieve the expectations set forth in the forward-looking statements contained in this document, see the AIF and MD&A filed on SEDAR at www.sedar.com and
included in the Form 40-F filed on EDGAR at www.sec.gov, as well as the Company’s other filings with the Canadian securities regulators and the SEC. Other than
as required by law, the Company does not intend, and does not assume any obligation, to update these forward-looking statements and information. For a detailed
breakdown of the Company’s mineral reserve and mineral resource position see the Company’s press release dated February 10, 2016.
3. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 3
Notes to Investors
Note Regarding the Use of Non-GAAP Financial Measures
This presentation discloses certain measures, including ‘‘total cash costs per ounce’’, ‘‘minesite costs per tonne’’ and “all-in sustaining costs per ounce” that are
not recognized measures under IFRS. This data may not be comparable to data presented by other gold producers. For a reconciliation of these measures to
the most directly comparable financial information presented in the consolidated financial statements prepared in accordance with IFRS and for an explanation of
how management uses these measures, see “Non-GAAP Financial Performance Measures” in the MD&A filed on SEDAR at www.sedar.com and included in the
Form 6-K filed on EDGAR at www.sec.gov, as well as the Company’s other filings with the Canadian securities regulators and the SEC. Total cash costs per
ounce of gold produced is presented on both a by-product basis (deducting by-product metal revenues from production costs) and co-product basis (before by-
product metal revenues). Total cash costs per ounce of gold produced on a by-product basis is calculated by adjusting production costs as recorded in the
consolidated statements of income (loss) for by-product revenues, unsold concentrate inventory production costs, smelting, refining and marketing charges and
other adjustments, and then dividing by the number of ounces of gold produced. Total cash costs per ounce of gold produced on a co-product basis is calculated
in the same manner as total cash costs per ounce of gold produced on a by-product basis except that no adjustment is made for by-product metal revenues.
Accordingly, the calculation of total cash costs per ounce of gold produced on a co-product basis does not reflect a reduction in production costs or smelting,
refining and marketing charges associated with the production and sale of by-product metals. Total cash costs per ounce of gold produced is intended to provide
information about the cash generating capabilities of the Company’s mining operations. Management also uses these measures to monitor the performance of
the Company’s mining operations. As market prices for gold are quoted on a per ounce basis, using the total cash costs per ounce of gold produced on a by-
product basis measure allows management to assess a mine’s cash generating capabilities at various gold prices. All-in sustaining costs per ounce is used to
show the full cost of gold production from current operations. The Company calculates all-in sustaining costs per ounce of gold produced on a by-product basis
as the aggregate of total cash costs per ounce on a by-product basis, sustaining capital expenditures (including capitalized exploration), general and
administrative expenses (including stock options) and reclamation expenses divided by the amount of gold produced. The all-in sustaining costs per ounce of
gold produced on a co-product basis is calculated in the same manner as the all-in sustaining costs per ounce of gold produced on a by-product basis except that
the total cash costs per ounce on a co-product basis is used, meaning no adjustment is made for by-product metal revenues. The Company's methodology for
calculating all-in sustaining costs per ounce may differ from to the methodology used by other producers that disclose all-in sustaining costs per ounce. The
Company may change the methodology it uses to calculate all-in sustaining costs per ounce in the future, including in response to the adoption of formal industry
guidance regarding this measure by the World Gold Council. Management is aware that these per ounce measures of performance can be affected by
fluctuations in exchange rates and, in the case of total cash costs per ounce of gold produced on a by-product basis, by-product metal prices. Management
compensates for these inherent limitations by using these measures in conjunction with minesite costs per tonne (discussed below) as well as other data
prepared in accordance with IFRS. Management also performs sensitivity analyses in order to quantify the effects of fluctuating exchange rates and metal prices.
This presentation also contains information as to estimated future total cash costs per ounce, all-in sustaining costs per ounce and minesite costs per tonne. The
estimates are based upon the total cash costs per ounce, all-in sustaining costs per ounce and minesite costs per tonne that the Company expects to incur to
mine gold at its mines and projects and, consistent with the reconciliation of these actual costs referred to above, do not include production costs attributable to
accretion expense and other asset retirement costs, which will vary over time as each project is developed and mined. It is therefore not practicable to reconcile
these forward-looking non-GAAP financial measures to the most comparable IFRS measure.
Note Regarding Production Guidance
The gold production guidance is based on the Company’s mineral reserves but includes contingencies and assumes metal prices and foreign exchange rates that
are different from those used in the mineral reserve estimates. These factors and others mean that the gold production guidance presented in this presentation
does not reconcile exactly with the production models used to support these mineral reserves.
4. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 4
Consistent Strategy and Solid Execution Drives Superior per Share
Returns
Production Growth – Existing Asset Base has Potential to Produce 30% -
40% more Gold by 2020
High Quality Gold Reserves – Average Gold Grade more than Double the
North American Peers
Exploration Delivering on Several Fronts - Remains a Key Value Driver
Strong Balance Sheet with Enhanced Financial Flexibility
Q2 2016 Dividend Increased by 25% - 34 Years of Consecutive
Dividends
Agnico Eagle – A High Quality Gold Mining Business
5. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 5
9%
6%
2% 1%
0% -4% -5% -6% -7%
6%
0%
-2%
-4% -4%
-7%
-10%
-13%
-11%
-15%
-10%
-5%
0%
5%
10%
Agnico Eagle Eldorado Goldcorp Yamana Industry
Average
Newmont Barrick IAMGOLD Kinross
Compound Annual Growth Rate (2005 – 2015)
NAVPS Share PriceSource: Scotia Global Banking and Markets, Bloomberg
Long Term Focus on per Share Value Creation
Agnico Eagle Strategy Delivers Superior NAV Growth per Share
6. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 6
Successful M&A and Exploration Strategy
Significant Value Added, Key Deposits Still Open and Positioned to Deliver More Value
Detailed information on mineral reserves and mineral resources can be found in the February 10, 2016 press release
Kittila
2005 2015
Mined through 2015 (koz) Proven & Probable (koz) Measured & Indicated (koz) Inferred (koz) Cost per Oz ($)
$54
$19
Purchase Discovery
2,800 koz
8,863 koz
+217%
Meadowbank
(Including Amaruq)
2007 2015
$173
$28
Purchase Discovery
3,830 koz
7,693 koz
+101%
Meliadine
2010 2015
$121
$27
Purchase Discovery
5,020 koz
10,276 koz
+105%
Pinos Altos
2006 2015
$43 $46
Purchase Discovery
2,100 koz
4,133 koz
+97%
La India
2011 2015
$186
$16
Purchase Discovery
1,266 koz
3,095 koz
+144%
7. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 7
1,025
1,060
1,400
1,650
1,590*
1,044
1,099
1,429
1,671
$660
$690
$663
$600
$600*
$640
$672
$637
$567
$500
$550
$600
$650
$700
$750
$800
900
1,000
1,100
1,200
1,300
1,400
1,500
1,600
1,700
2012 2013 2014 2015 2016
TotalCashCostsperOunce
GoldOunces(inThousands)
Production Guidance Production Actual Cost Guidance Cost Actual
Solid Track Record of Meeting Expectations
Guidance Exceeded for Fourth Consecutive Year
*Approximate mid-point of estimated 2016 production and cash costs guidance
8. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 8
Operating Results
Continued Strong Operational Performance
Q2 2016 Total Operating Margin – $282.2MQ2 2016 Revenue by Metal
LaRonde, 20%
Canadian
Malartic, 18%
Pinos Altos, 17%Meadowbank,
12%
La India, 9%
Goldex, 8%
Kittila, 8%
Lapa, 5%
Creston
Mascota, 3%
*Total cash costs are presented on a by-product basis, that is net of by-product revenue
Gold
95%
Silver
4%
Base Metals
1%
Q2 2016 H1 2016
All amounts are in US$ Production
(Gold oz)
Total Cash Cost*
($/oz)
Operating Margin
($000’s)
Production
(Gold oz)
Total Cash Cost*
($/oz)
Northern Business
LaRonde 75,159 $543 $54,985 150,496 $536
Lapa 21,914 $658 $14,437 43,623 $663
Goldex 31,452 $513 $22,896 63,792 $509
Canadian Malartic (50%) 72,502 $621 $50,133 146,115 $589
Kittila 46,209 $756 $22,079 94,336 $741
Meadowbank 72,402 $789 $34,733 144,713 $789
319,638 $652 $199,263 643,075 $641
Southern Business
Pinos Altos 49,458 $348 $48,392 97,575 $346
Creston Mascota 12,398 $469 $9,719 23,949 $465
La India 27,438 $381 $24,818 55,669 $371
89,294 $375 $82,929 177,193 $370
Total 408,932 $592 $282,192 820,268 $582
9. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 9
High Quality Gold Reserves
Higher Grade Mineral Reserves Drive Production Growth
19.1 Mozs of gold (251 million tonnes of ore grading 2.37 g/t gold) calculated using gold price of $1,100
Mineral Reserve sensitivity: A $100 per ounce move in the gold price (all other assumptions unchanged)
results in approximately a 5.4% change in mineral reserves
Measured and indicated mineral resources - 15.0 Mozs of gold (309 million tonnes of ore grading 1.52
g/t gold)
Inferred mineral resources -16.5 Mozs of gold (230 million tonnes of ore grading 2.24 g/t gold)
Mineral reserves grade more than double the average grade of North American peer companies
*For a detailed breakdown of Agnico Eagle’s mineral reserve and mineral resource position see the Company’s press release dated February 10, 2016
Source: Company reportsSource: Company reports, Barclays Research
2.37
1.40 1.32 1.22
1.08 1.06 1.06
0.70 0.63
0
1
2
3
AEM
IAG
ABX
EGO
AVERAGE
NEM
GG
KGC
AUY
Mineral Reserve Grade (g/t)
-22%
-11% -9%
0%
21%
29%
32%
35%
44%
-30%
-20%
-10%
0%
10%
20%
30%
40%
50%
AEM IAG NGD KGC AUY GG NEM ABX EGO
5-Year Difference Between Production and
Mineral Reserve Grade
10. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 10
2016E 2017E 2018E 2019 and Beyond
Payable Gold Production Profile
* Approximate mid-point of estimated 2016 production guidance
1,590,000* 1,555,000
1,500,000
M e l i a d i n e
A m a r u q
E l B a r q u e n o
L a R o n d e I I I
K i t t i l a
G o l d e x D e e p 2
Project Pipeline Expected to Drive Next Phase of Production Growth
30% to 40% Growth in Gold Production Possible by 2020
11. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 11
Upper Beaver*
Strong Exploration/Development Pipeline Supports Future Growth
Hammond Reef*
El Barqueño
Meliadine
Amaruq
Pinos Altos Satellites
La India Expansion Potential
LaRonde III
Odyssey* Rimpi and New Sisar Zones at
Kittila
Bousquet Zone 5
Advanced Exploration Approaching Development
Mine Site –
Expansion/Extension
*50% AEM Ownership
**55% AEM Ownership
Blue – Northern Business
Gold – Southern Business
Barsele**
Akasaba West
Goldex Deep 1 and 2
Long Term
Near Term
12. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 12
$474M
$1,200M
Cash and cash equivalents Undrawn credit facilities
Financial Position
The Company has Reduced Net Debt for Seven Consecutive Quarters
Strong Available Liquidity - $1.7B*
Long-term Debt Maturities
*As at June 30, 2016, excluding accordion
$742 million of net debt as of June 30,
2016
Manageable debt repayment schedule
225 million shares fully diluted after 59
years of operating history
On June 30, 2016, the Company
issued on a private placement basis
an aggregate of $350 million of
guaranteed senior unsecured notes
due 2023, 2026 and 2028 with a
weighted average maturity of 9.43
years and weighted average yield of
4.77%
C$20
US$115
US$360
US$225
US$100US$100
US$50
US$200
US$50
$0
$50
$100
$150
$200
$250
$300
$350
$400
2017 2020 2022 2023 2024 2025 2026 2028
CAD USD
13. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 13
Net Debt/EBITDA 2016 Estimates
Well Positioned Compared to the Peer Group
Source: Bank of America Merrill Lynch – July 25, 2016
0.17
0.89
1.04 1.06
1.23
1.29
1.53
1.67
2.21
IAMGOLD Agnico Eagle
Mines
Newmont
Mining
Kinross Gold Industry
Average
Eldorado Gold Barrick Gold Goldcorp Yamana Gold
14. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 14
$-
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
$700,000
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
InThousandsof$US
Cumulative
Dividends of:
~$685M
Long History of Dividend Payments to Shareholders
34 Years of Consecutive Annual Dividends
15. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 15
AEM US Equity XAU IndexGold Spot
AEM US Equity
CAGR
15.87%
Gold Spot CAGR
8.91%
XAU Index CAGR
2.51%
Superior Share Performance Since 1998
Agnico Eagle has Consistently Outperformed Gold and Gold Equities
Source: Bloomberg – September 2, 2016
10%
100%
1000%
10000%
17. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 17
Agnico Eagle in Nunavut
Large and Expanding Land Position Totalling 438,335 Ha Covering 3 Major Geological Belts
Major Assets:
■ Meadowbank
2007 Acquired Cumberland Resources Ltd.
Production since 2010
■ Amaruq
2013 Exploration Discovery
Satellite Deposit – Approaching Development
■ Meliadine
2010 Acquired Comaplex Mineral Corp.
Approaching Development
Detailed information on mineral reserves and mineral resources can be found in the February 10, 2016 press release
18. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 18
Amaruq Project
Completion of Phase 1 Drill Program Leads to Improved Understanding of Whale Tail Ore Shoot
19. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 19
Amaruq Project
Scope of V Zone Expanded; Deposit Could Potentially Provide a Second Source of Open Pit Ore
AMQ16-833
15.5 g/t Au / 5.4 m
AMQ16-720
6.6 g/t Au / 12.9 m
Incl. 17.2 g/t Au / 3.6 m
AMQ16-706
15.5 g/t Au / 9.4 m
Incl. 25.0 g/t Au / 5.6 m
AMQ16-694
12.7 g/t Au / 10.6 m
Incl. 15.2 g/t Au / 4.7 m
AMQ16-748
10.6 g/t Au / 7.0 m
Incl. 25.0 g/t Au / 5.6 m
AMQ16-683
15.1 g/t Au / 6.1 m
AMQ16-833
4.3 g/t Au / 12.7 m
AMQ16-720
7.2 g/t Au / 7.3 m
20. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 20
Combined Open Pit and Underground Potential
Amaruq Resources - December 31, 2015
AMQ15-475
8.1 g/t Au / 5.9 m
AMQ15-536
11.8 g/t Au / 4.8 m
Incl. 16.7 g/t Au / 2.9 m
AMQ15-507
5.4 g/t Au / 12.4 m
Incl. 8.1 g/t Au / 3.1 m
AMQ15-511
5.8 g/t Au / 10.7 m
Incl. 9.9 g/t Au / 4.5 m
Mineral Reserve & Mineral
Resource Data
(as at December 31, 2015)
COG
(g/t)
Tonnes
(000’s)
Au grade
(g/t)
Au
(000’s oz)
Open Pit 2.4 10,365 5.48 1.825
Underground 4.5 6,515 6.96 1,457
Total Inferred Resource 16,880 6.05 3,283
Detailed information on mineral reserves and mineral resources can be found in the February 10, 2016 press release
21. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 21
Amaruq Regional Exploration
Multiple Gold Occurrences Identified Along the Belt
22. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 22
Meliadine Development Project
Current Focus on Optimization of the Resource Base and Potential Production Scenarios
Proven and probable gold reserves: 3.4 million ounces
Indicated gold resources: 3.31 million ounces
Inferred gold resources: 3.55 million ounces
For additional details on Meliadine mineral reserves and mineral resources see Presentation Appendix and AEM February 10, 2016 press release
23. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 23
Meliadine Regional Exploration Potential
Numerous Gold Occurrences Remain to be Drilled Over 80km Geological Belt
24. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 24
LaRonde Extension and Bousquet Zone 5
Potential to Provide Future Production Optionality
Increased production forecasts through 2018 reflect grades closer to that of the reserves
Work is ongoing to assess the potential to extend mineral reserves and mine between 311 and 371 levels (a depth of
3.1 to 3.7km)
An internal technical study to evaluate the potential to initially mine the Bousquet Zone 5 from a depth of 90 to 330
metres via an underground ramp is expected to be completed by the end of 2016.
25. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 25
Goldex Deep 1
Mine Life Extended from 2018 to 2024
Deep 1 mining area includes lower part of
the Dx zone and top of the D zone
Estimated annual production >100,000
ounces at an average total cash cost of
~$620 per ounce
Advancement of Deep 1 has potential to
unlock other value creating opportunities:
Potential to increase mill throughput
Potential for additional mineral resource
conversion in Deep 1
Potential for mining at Deep 2 (below Level
120)
Potential to develop the Akasaba West
deposit
26. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 26
Odyssey Prospect
Drilling Outlines Significant Areas of Mineralization in the North and South Zones
27. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 27
Kittila
Drilling Extends Sisar Zone to the North and South
ROD16-700D
4.7 g/t Au / 6.9 m
and 4.4 g/t Au / 3.3 m
and 7.4 g/t Au / 9.6 m
incl. 11.2 g/t Au / 5.1 m
RIE16-607
4.1 g/t Au / 5.4 m
RIE16-601
7.6 g/t Au / 6.8 m
RIE16-603
3.0 g/t Au / 7.7 m
RIE16-604
4.3 g/t Au / 4.5 m
RIE16-600
4.8 g/t Au / 3.6 mROD16-700C
6.3 g/t Au / 6.9 m
ROD16-700E
7.0 g/t Au / 6.9 m
ROD16-700B
6.4 g/t Au / 6.5 m
incl. 9.7 g/t Au / 3.1 m
RIE16-606
4.1 g/t Au / 6.1 mInferred resources at
Sisar are estimated at
651,000 ounces of gold
(3.4 million tonnes at
5.91 g/t gold)
28. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 28
Madrono Prospect
Initial Drilling Yields Positive Results – Good Potential for Additional Mineralization Close to Existing
Mines
MAD16-004
1.3 g/t Au / 5.1 m
and 1.6 g/t Au / 2.1 m
MAD16-005
4.1 g/t Au / 6.2 m
Incl. 7.7 g/t Au / 2.7 m
MAD16-003
2.3 g/t Au / 4.4 m
and 2.4 g/t Au / 8.5 m
and 2.3 g/t Au / 2.1 m
Madrono is within the Pinos Altos property
area, approximately 0.5 km east of the
Creston Mascota pit
At least three gold-silver veins: Madrono,
Santa Martha and El Salto have been
identified . Previous mining in this area
included small-scale bonanza production
from underground on three levels in the
1930s
A $1.25 million phase one exploration
program began at the end of May and will
include 5,500 metres of drilling to test the
extent of mineralized structures found by
surface exploration
Three rigs are currently working at Madrono;
12 holes (2,978 metres) were completed to
the end of June.
Hole MAD16-005 returned up to 4.1 g/t gold
and 64.5 g/t silver (both grades uncapped)
over 6.2 metres estimated true width at 45
metres depth
29. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 29
EL
COCHI
INDIA
ESTE
LA INDIA
EL
REALITO
MAIN ZONE
Key target area to be drill tested include El Realito, El Cochi and La India Este
An initial drill program is planned at the Kilometre 15 area which is located east and contiguous with the El
Realito property
La India Exploration Potential
Several Near-Mine Targets to be Evaluated in 2016
30. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 30
Drilling outlines New 700-Metre Long Olmeca Structure and Extends Existing Deposits
2016 exploration focus
on mineral resource
development,
conversion and
regional exploration
Drilling is currently
moving beyond the
deposits that host the
mineral resources
Significant high-grade
intercepts are reported
at the new Olmeca
prospect, which has
been traced over 700
metres of strike length
Results from Olmeca
include up to 4.5 g/t
gold (capped) and 4.7
g/t silver (uncapped)
over 11.0 metres
estimated true width
El Barqueno Project
El Barqueno contains an initial total inferred mineral resource of 0.61 Mozs of gold
and 3.7 Mozs of silver (19.7 million tonnes grading 0.96 g/t gold and 5.78 g/t silver)
See AEM February 10, 2016 press release and appendix for detailed breakdown of mineral reserves and mineral resources
32. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 32
PRODUCTION Q2 YTD 2016 PRODUCTION HIGHLIGHTS
LaRonde 150,496 ozs
at total cash costs of $536/oz
Strong operational performance resulted in higher production driven by
higher grades and recoveries in the processing facility
Exploration and studies are continuing to assess the potential to extend
the mineral reserves and carry out mining activities between the 311 and
371 levels
During Q2 2016, dewatering of the Bousquet Zone 5 old pit was completed
along with rehabilitation of the ramp portal and 92 metres of underground
development. A certificate of authorization was issued by the Quebec
government to permit collection of a bulk sample
An internal technical study is expected to be completed by the end 2016.
Following the completion of technical studies and permitting, Bousquet
Zone 5 could potentially be in production in the second half of 2018
Canadian
Malartic GP (50%) 146,115 ozs
at total cash costs of $589/oz
In Q2 2016, the Canadian Malartic mill (on a 100% basis) processed an
average of 55,481 tpd. The record daily throughput in Q2 2016 was
primarily due to higher crusher availability, better crushing performance
from the secondary crusher and better plant availability
Permitting activities for the Canadian Malartic pit extension and deviation
of Highway 117 are continuing. As part of the Quebec environmental
impact evaluation process, public hearings on the Canadian Malartic pit
extension project took place on June 14 to 16 and July 12 and 13, 2016 in
Malartic, Quebec
Drilling continued on the Odyssey North and South Zones. Recent drilling
has yielded significant intercepts such as 2.63 grams per tonne (“g/t”) gold
(capped) over 33.5 metres estimated true width at 1,138 metres depth in
drill hole ODY16-5039, showing similarities to the Goldex mine deposit
Goldex 63,792 ozs
at total cash costs of $509/oz
Higher throughput in Q2 2016 period was due to better underground
hoisting performance and acceleration of the mining sequence
Development of the Deep 1 Zone remains on time and on budget for
startup in Q1 2018. In Q2 2016 the excavation of the second leg of the
Rail-Veyor (conveyor system) ramp was completed and the initial
components of the Rail-Veyor are now being installed
Permitting of the Akasaba project is progressing at both the provincial and
federal levels
Lapa 43,623 ozs
at total cash costs of $663/oz
Production was expected to show a gradual decline moving into Q4 2016.
The Company is now evaluating a number of opportunities that could see
production potentially extend through year end, and exceed previous
guidance
Abitibi Region
Solid and Growing Production Base in Quebec
33. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 33
EXPLORATION AND DEVELOPMENT HIGHLIGHTS
Meliadine
2016 capital budget of $96 million. 2016 capital program is to ensure that the project remains on track for a
potential 2020 production start-up
On May 19, 2016, the Company received the Type A Water Licence, which is the final permit needed to
commence construction activities
Internal studies are continuing to evaluate the potential to extract additional gold from the Tiriganiaq and
Wesmeg/Normeg deposits, which could potentially extend the mine life, increase annual production and improve
project economics and the after-tax internal rate of return. These studies are expected to be completed by the end
of 2016
Amaruq
Construction of the Amaruq Exploration Access Road commenced in Q1 2016. At the end of Q2 2016,
approximately 13.3 km of road had been completed. Construction is expected to resume this August with a focus
on bridge installation. Completion of the 62 km long road is expected by the end of 2017
On June 30, 2016 the Company submitted an application and environmental impact statement for the Whale Tail
satellite pit with both the NIRB and Nunavut Water Board. This application is currently undergoing screening by
the NIRB which initiates the permitting process, a process that is expected to take place over a period of
approximately two years
Drilling at Amaruq discovered an additional vein structure in the V Zone and further infills the Whale Tail deposit.
The V Zones are being evaluated as a potential second source of open pit ore at Amaruq
Nunavut
Arctic Platform Continues to Build Critical Mass
PRODUCTION Q2 YTD 2016 PRODUCTION HIGHLIGHTS
Meadowbank 144,713 ozs
at total cash costs of $789/oz
Studies are underway to investigate opportunities to extend production at
Meadowbank through year-end 2018. Potential opportunities include the
development of the Phaser pit, located to the southwest of the Vault pit,
and an additional pushback to access additional ore in the E3 pit at the
Portage deposit
*For additional details on the updated Amaruq mineral resource see Presentation Appendix and AEM February 10, 2016 press release
34. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 34
EXPLORATION AND DEVELOPMENT HIGHLIGHTS
Rimpi
Development
Previous drilling on the Rimpi Zone has outlined a significant zone of mineralization with potentially wider widths
and better grades than those currently being mined at Kittilä
Main underground ramp at Kittilä is being extended to reach the Rimpi Zone at depth and facilitate further
exploration. In addition, a surface ramp is being driven into the Rimpi Zone for production purposes and to provide
a second egress for the Suuri ramp system
New Parallel
Sisar Zone
Recent drilling continues to extend the Sisar Zone upward and to the north and south. Drill hole ROD16-700D
intersected 7.4 g/t gold (uncapped) over 9.6 metres estimated true width at 1,161 metres depth
Underground development to access the upper portion of the Sisar Zone continued during Q2 2016. The Sisar
zone is located approximately 150 to 200 metres from existing underground infrastructure
Barsele Project
Sweden
Agnico Eagle holds a 55% interest in the project with an option to go to 70%. The property contains intrusive-
hosted gold mineralization (similar to Goldex) and gold-rich volcanogenic massive sulphide mineralization (similar
to LaRonde). A $4.3 million exploration program consisting of 12,000 metres of drilling is planned for 2016 to
further evaluate the intrusive hosted mineralization
Finland and Sweden
Reviewing Opportunities to Increase Kittila Production, New Sisar Zone Provides Additional
Optionality
PRODUCTION Q2 YTD 2016 PRODUCTION HIGHLIGHTS
Kittila 94,336 ozs
at total cash costs of $741/oz
The Kittila mine and mill has shown potential to operate in excess of
4,000 tpd and efforts are ongoing to assess the optimal throughput rate
Studies are also underway to optimize underground mining rates and fully
integrate the upper and lower Rimpi zones and the newly discovered
Sisar Zone in a new Kittila mine plan
35. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 35
PRODUCTION Q2 YTD 2016 PRODUCTION HIGHLIGHTS
Pinos Altos 97,575 ozs
at total cash costs of $346/oz
The Pinos Altos shaft project was completed and commissioned for
hoisting in mid-June. Adjustments to ore-waste hoisting parameters and
settings progressed through the second half of June
Ramp up to the design capacity will continue in Q3 2016. The shaft
completion will allow better matching of the mill capacity with the future
mining capacity at Pinos Altos once the open pit mining operation begins
to wind down as planned over the next several years
Creston
Mascota
23,949 ozs
at total cash costs of $465/oz
Infill drilling continued in Q2 2016 with several high grade intercepts
encountered suggesting potential for modest extension to the mine life
During Q2 2016, initial drilling was carried out on the Madrono property,
which is located just 0.5 km from the Creston Mascota pit
Hole MAD16-005 returned up to 4.1 g/t gold and 64.5 g/t silver (both
grades uncapped) over 6.2 metres estimated true width at 45 metres
depth, confirming the potential to outline additional high-grade satellite
zones close to the existing mines
Permits were obtained in June 2016 to allow for the construction of an
additional 75 exploration drill pads on the Madrono property. Further
drilling is planned for Madrono through the balance of 2016
La India 55,669 ozs
at total cash costs of $371/oz
Construction of the haul road to the Main Zone was completed during Q2
2016. Mining activities began in May 2016
During Q2 2016, a number of areas on the La India property were drill
tested including the infill drilling at the Main Zone and exploration drilling
at India East and El Cochi
In late June 2016, the environmental permit for exploration at the El
Realito area was obtained (permission for 40 drill pads), and drilling will
be carried out later this year
Mexico
Continued Low Operating Costs and Record Silver Production in Q2 2016
EXPLORATION AND DEVELOPMENT HIGHLIGHTS
El Barqueño
2016 Exploration focus on mineral resource development, conversion and regional exploration.
Drilling is currently moving beyond the deposits that host the mineral resources
Significant high-grade intercepts are reported at the new Olmeca prospect, which has been traced over 700
metres of strike length
Results from Olmeca include up to 4.5 g/t gold (capped) and 4.7 g/t silver (uncapped) over 11.0 metres estimated
true width
Other regional targets to be tested in 2016 include: Peña Blanca, Zapote-Mixteca, San Diego, Olmeca, Huichol,
Tarasca
37. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 37
P/NAV Valuation
Historical NAV and Future Production Growth Supports a Higher Multiple
2.17 x
1.89 x 1.88 x
1.77 x
1.44 x 1.42 x
1.32 x
1.27 x
1.17 x
1.07 x
0.91 x
0.73 x
Randgold Barrick Agnico Eagle Newmont Goldcorp Average Yamana Kinross Alamos IAMGOLD Eldorado Centerra
Source: Street Estimates, Bloomberg, July 2016
42. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 42
Notes to Investors Regarding
The Use of Mineral Resources
Cautionary Note to Investors Concerning Estimates of Measured and Indicated Mineral Resources
This document uses the terms “measured mineral resources” and “indicated mineral resources”. Investors are advised that while those terms are recognized and required by Canadian
regulations, the SEC does not recognize them. Investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into
mineral reserves.
Cautionary Note to Investors Concerning Estimates of Inferred Mineral Resources
This document also uses the term “inferred mineral resources”. Investors are advised that while this term is recognized and required by Canadian regulations, the SEC does not
recognize it. “Inferred mineral resources” have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be
assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form
the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that part or all of an inferred mineral resource exists, or is
economically or legally mineable.
Scientific and Technical Data
Cautionary Note To U.S. Investors - The SEC permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically
and legally extract or produce. Agnico Eagle reports mineral resource and mineral reserve estimates in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum
Best Practice Guidelines for Exploration and for Estimation of Mineral Resources and Mineral Reserves in accordance with the Canadian securities regulatory authorities' (the "CSA")
National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"). These standards are similar to those used by the SEC’s Industry Guide No. 7, as interpreted by
Staff at the SEC ("Guide 7"). However, the definitions in NI 43-101 differ in certain respects from those under Guide 7. Accordingly, mineral reserve information contained herein may
not be comparable to similar information disclosed by U.S. companies. Under the requirements of the SEC, mineralization may not be classified as a "mineral reserve" unless the
determination has been made that the mineralization could be economically and legally produced or extracted at the time the mineral reserve determination is made. A "final" or
"bankable" feasibility study is required to meet the requirements to designate mineral reserves under Industry Guide 7. Agnico Eagle uses certain terms in this presentation, such as
"measured", "indicated", and "inferred", and "resources" that the SEC guidelines strictly prohibit U.S. registered companies from including in their filings with the SEC.
In prior periods, mineral reserves for all properties were typically estimated using historic three-year average metals prices and foreign exchange rates in accordance with the SEC
guidelines. These guidelines require the use of prices that reflect current economic conditions at the time of mineral reserve determination, which the Staff of the SEC has interpreted
to mean historic three-year average prices. Given the current lower commodity price environment, Agnico Eagle has decided to use price assumptions that are below the three-year
averages. The assumptions used for the mineral reserve estimates at all mines and advanced projects as of December 31, 2015 (other than the Canadian Malartic mine), reported by
the Company on February 10, 2016, are $1,100 per ounce gold, $16.00 per ounce silver, $0.90 per pound zinc, $2.50 per pound copper, and US$/C$, Euro/US$ and US$/MXP
exchange rates for all mines and projects other than the Lapa, Meadowbank and Creston Mascota mines and Santo Niño open pit at Pinos Altos of 1.16, 1.20 and 14.00, respectively.
Due to shorter mine life, the assumptions used for the mineral reserve estimates at the short-life mines (the Lapa, Meadowbank and Creston Mascota mines and Santo Niño open pit)
as of December 31, 2015, reported by the Company on February 10, 2016, include the same metal price assumptions, and US$/C$ and US$/MXP exchange rates of 1.30 and 16.00,
respectively. The assumptions used for the mineral reserves estimate at the Canadian Malartic mine as of December 31, 2015, reported by the Company on February 10, 2016, are
$1,150 per ounce gold, a cut-off grade between 0.30 g/t and 0.33 g/t gold (depending on the deposit) and a US$/C$ exchange rate of 1.24.
NI 43-101 requires mining companies to disclose mineral reserves and mineral resources using the subcategories of "proven mineral reserves”, "probable mineral reserves”, "measured
mineral resources”, "indicated mineral resources” and "inferred mineral resources”. Mineral resources that are not mineral reserves do not have demonstrated economic viability.
43. AGNICO EAGLE | BAML 22ND ANNUAL CANADA MINING EVENT| 43
Notes to Investors Regarding
The Use of Mineral Resources
A mineral reserve is the economically mineable part of a measured and/or indicated mineral resource. It includes diluting materials and allowances for losses, which may occur when
the material is mined or extracted and is defined by studies at pre-feasibility or feasibility level as appropriate that include application of modifying factors. Such studies demonstrate
that, at the time of reporting, extraction could reasonably be justified.
Modifying factors are considerations used to convert mineral resources to mineral reserves. These include, but are not restricted to, mining, processing, metallurgical, infrastructure,
economic, marketing, legal, environmental, social and governmental factors.
A proven mineral reserve is the economically mineable part of a measured mineral resource. A proven mineral reserve implies a high degree of confidence in the modifying factors. A
probable mineral reserve is the economically mineable part of an indicated and, in some circumstances, a measured mineral resource. The confidence in the modifying factors
applying to a probable mineral reserve is lower than that applying to a proven mineral reserve.
A mineral resource is a concentration or occurrence of solid material of economic interest in or on the Earth's crust in such form, grade or quality and quantity that there are reasonable
prospects for eventual economic extraction. The location, quantity, grade or quality, continuity and other geological characteristics of a mineral resource are known, estimated or
interpreted from specific geological evidence and knowledge, including sampling.
A measured mineral resource is that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics are estimated with confidence
sufficient to allow the application of modifying factors to support detailed mine planning and final evaluation of the economic viability of the deposit. Geological evidence is derived from
detailed and reliable exploration, sampling and testing and is sufficient to confirm geological and grade or quality continuity between points of observation. An indicated mineral
resource is that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics are estimated with sufficient confidence to allow the
application of modifying factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Geological evidence is derived from adequately
detailed and reliable exploration, sampling and testing and is sufficient to assume geological and grade or quality continuity between points of observation. An inferred mineral
resource is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Geological evidence is
sufficient to imply but not verify geological and grade or quality continuity.
Investors are cautioned not to assume that part or all of an inferred mineral resource exists, or is economically or legally mineable.
A feasibility study is a comprehensive technical and economic study of the selected development option for a mineral project that includes appropriately detailed assessments of
applicable modifying factors together with any other relevant operational factors and detailed financial analysis that are necessary to demonstrate, at the time of reporting, that
extraction is reasonably justified (economically mineable). The results of the study may reasonably serve as the basis for a final decision by a proponent or financial institution to
proceed with, or finance, the development of the project. The confidence level of the study will be higher than that of a Pre-Feasibility Study.
The effective date for all of the Company's mineral resource and mineral reserve estimates in this presentation is December 31, 2015. Additional information about each of the mineral
projects that is required by NI 43-101, sections 3.2 and 3.3 and paragraphs 3.4 (a), (c) and (d) can be found in the Technical Reports filed by Agnico Eagle, which may be found at
www.sedar.com. Other important operating information can be found in the Company's AIF and Form 40-F.
The scientific and technical information relating to Agnico Eagle’s mineral reserves and mineral resources contained herein (other than the Canadian Malartic mine) has been approved
by Daniel Doucet, Eng., Senior Corporate Director, Reserve Development; and relating to mineral reserves and mineral resources at the Canadian Malartic mine contained herein has
been approved by Donald Gervais, P.Geo., Director of Technical Services at Canadian Malartic Corporation. Each of them is a "Qualified Person" for the purposes of NI 43-101.