Balanced Scorecard
          LEADERS

         Presents               & Strategy Summit
    16-21 March 2013 • The Address Hotel, Dubai Marina, Dubai, UAE


                                                                                               THE FAMOUS
                                                                                    KAPLAN NORTON
                                                                                            MASTERCLASS


   Packed full of brand NEW features for 2013!
   NEW Strategy Summit – an entire day dedicated to strategy
         formulation, execution, leadership, business excellence		
         and risk management                                               BACK BY POPULAR DEMAND
   NEW   Jeroen de Flander – with fresh NEW thinking on strategy

   NEW
         execution from his upcoming book
         Leaders Live Panel – hear direct from the region’s pioneering
                                                                           Jeroen De Flander
         CEOs on sustainable business success in the Middle East
   NEW   Dedicated programme streams for Balanced Scorecard in the
         private and government administration sectors
   NEW   More audience interaction – brand new discussion sessions to
         brainstorm solutions to your unique challenges
                                                                              With NEW insights from his upcoming book –
   NEW   “How To” Clinics – short, sharp and focused practical		
         training sessions                                                  Strategy Execution Shortcuts – and the best from
   NEW   Leading regional and international Hall of Fame success stories
                                                                                      his successful session in 2012!


   HEAR LEADING EXPERIENCES FROM
     Abunayyan Holding Company ACWA Power International ADWEA Al Ghurair Group Ashghal Dana Gas Department of Economic Development - Dubai
     du Dubai Customs Ducab ENOC First Philec Solar Corporation International Medical Center Jumeirah Group Kiwibank Musanada National Bank
   of Abu Dhabi Qatar Petrochemical Company Seven Sisters Company Tata Chemicals University Health Network and more…


     Pre Event Workshops 		                       16 March 2013             “How To” Clinics 	                         21 March 2013
     A:	 Strategy Execution In Government                                   D:	 Linking Performance To Reward
     B:	 Strategy Formulation For The Strategy Driven Organisation          E:	 Key Performance Indicators
     C:	 Enterprise Risk Management                                         F:	 Aligning Budget With Strategy



     Strategic Partner                    Supporting Sponsor                  Associate Partner                      Media Partners




                         Associate Sponsors                                       Sponsor                             Organised By




To Register contact Sowmya: +971 4 4072730 / F: +971 4 3352718 / Email: sowmya.yellappa@iirme.com
  Tel: +971 4 335 2437
   Tel: +971 4 335 2437 Fax: +971 4 335 2438
                         Fax: +971 4 335 2438 Email: register@iirme.com
                                              Email: register@iirme.com Web: www.iirme.com/bsc 1
                                                                          Web: www.iirme.com/bsc
Agenda At A Glance
                        Sat, 16 March         Sun, 17 March                Mon, 18 March        Tues, 19 March                           Wed, 20 March                                 Thur, 21 March

                                             Strategy Summit                                                                      Balanced Scorecard Forum
                                                                                                                                                                                    Balanced Scorecard
                                                 Featuring
                AM       Pre Event                                                                                                                                                        Forum
                                           Guru Afternoon with                        Kaplan Norton
                         Workshops
                                          Jeroen de Flander, The                       Masterclass                   Private Sector Stream              Government
                          A/B/C                                                                                                                                                       “How To” Clinics
                                           Strategy Execution                                                                                       Administration Stream                D/ E/F
                PM                             Ambassador



   Strategy Summit									
                   NEW for 2013!                                                                                                                                         Sunday, 17 March 2013

        The brand NEW Strategy Summit goes beyond the Balanced Scorecard to take a broader look at the key
     strategy formulation, strategy execution, business excellence and risk management challenges and themes
                           faced by businesses and organisations in the Middle East today.

   08.00	 Opening Remarks From The Chairman
   	      Constantin Salameh, Group CEO, Al Ghurair Group, UAE                                            Strategy Execution Shortcuts
   08.30	 Leaders LIVE Panel: Delivering Sustainable Success In Challenging Times – Key Lessons
          From Middle East Business Leaders
          •	 Do businesses in the Middle East have a higher appetite for risk than their developed
              world counterparts?
                                                                                                          by     Jeroen De Flander
          •	 How are regional companies raising their game in the competitiveness stakes?
          •	 Which geographic and industry sectors represent the most attractive investment and           “Strategy is thinking about a choice and choosing to stick with your thinking”
              expansion prospects for CEOs in today’s business and economic climate?                      “A strategy, even a great one, doesn’t implement itself”
          •	 Which aspects of traditional strategy thinking work best for a region in constant flux?
          •	 What are the biggest barriers to implementing structured strategy execution                  Jeroen de Flander is back with a high energy session combining the best tips from his hugely
              methodologies in the Middle East and what solutions are leaders finding to overcome         popular appearance at Balanced Scorecard Forum 2012 with brand new insights from his next
              them?                                                                                       book, Strategy Execution Shortcuts (planned launch June 2013).
   	      Ahmed Al Arbeed, General Manager, Seven Sisters Company and former CEO, Dana Gas, UAE
   	      Khalid Abunayyan, President and CEO, Abunayyan Holding Company, KSA                            14.00 	 The End Of Strategy Tourism: A 2020 Outlook - A No-Nonsense 2020 Perspective On
   	      Andrew Shaw, Managing Director, Ducab, UAE
                                                                                                                 Strategy And Strategy Execution
   	      Osman Sultan, CEO, du, UAE
                                                                                                         	       In this session, Jeroen takes you on a journey. He shows the future of strategy and strategy
   09.30	 Excellence In Strategy Development And Execution – Critical Success Factors For Growing                execution, how your company could benefit from these insights and what you need to do
          A Successful Business In The Middle East                                                               today to beat your competitors.
   EXCELLENCE
    STRATEGY




          A leader’s insights into the history of strategy and business excellence that underpins                •	 Five things every leader should know about strategy
          more than three decades of sustained growth at Ducab                                                   •	 A 2020 outlook: a peek into the future of strategy and strategy execution
   	      Andrew Shaw, Managing Director, Ducab, UAE                                                             •	 Find out just how the world’s top companies are faring in executing their strategy with
   10.10	 Networking And Refreshment Break                                                                           reference to the world’s leading strategy execution benchmarking data covering over
                                                                                                                     21,000 managers, 1400+ companies, 36 countries and 29 industry sectors
   10.50	 Business War Gaming: Stress Testing Your Strategy
          •	 Good strategy vs bad strategy: the evaluation criteria for winning strategies
                                                                                                         15.30 	 Networking And Refreshment Break
          •	 Playing war games: stress test your strategy against your competition and market
             forces                                                                                      	        Plus Book Signing with Jeroen de Flander
          •	 The feedback loop: constantly honing your strategy towards success                           
   	      Edy Abou Chakra, Partner, ADDIMA Consulting, UK, KSA and Lebanon                               16.00	 4 Hidden Paths To Strategy Execution Success: Practical Tips To Shorten Your Execution
   	      Rami Itani, Manager, ADDIMA Consulting, UK, KSA and Lebanon                                           Journey
   11.30	 Developing An Effective Enterprise Risk Management (ERM) Framework To Manage                   	      In this session, leaders learn strategy execution secrets from the best-in-class. You will
          Strategic And Operational Risk                                                                        discover new insights and receive practical tips to boost strategy execution in your own
          •	 Developing an ERM framework in line with IS0 31000 Risk Management                                 company.
          •	 Repairing the disconnect: understanding that managing risk is integral to achieving
    RISK MANAGEMENT




                                                                                                                •	 Remove strategy graffiti: learn to communicate your strategy into the head, heart and
             strategic goals not a separate exercise                                                                hands of your people without losing the core message
          •	 Developing a comprehensive risk register through open debate and structured                        •	 Re-measure: the value of KPIs is overrated - learn a different approach to	
             workshops with key stakeholders                                                                        measuring success
          •	 Linking risks to your strategic objectives                                                         •	 Raise micro-commitment: learn about the small execution battles and how to win them
          •	 Assessing the impact of risks on your organisation and adopting appropriate risk                   •	 Reduce your complexity footprint: learn why complexity is the silent strategy killer and
             responses                                                                                              what you can do about it
          •	 Setting risk appetite: developing an open and informed approach to managing risk
             Akram Shehata, Acting Head of Corporate Excellence, Qatar Petrochemical Company,             17.30	 Close Of Strategy Summit
             Qatar
   12.10	 ISO 31000 And The COSO ERM Integrated Framework: Your Building Blocks For Enterprise               Jeroen de Flander is a seasoned international strategy execution expert, top executive coach,
          Risk Management                                                                                    seminar leader and highly regarded keynote speaker.
          •	 A strategic initiative driven by the board: linking the risk management process to the          Jeroen has helped more than 21,000 managers in 30 countries master the necessary execution
    RISK MANAGEMENT




             strategy management process                                                                     skills, including the USA, Brazil, Venezuela, Jordan, Malaysia, Spain, Italy, Russia, Estonia, the
          •	 Exploring the role of the risk management committee and leveraging the reach of
                                                                                                             Netherlands, France, the UK, Germany, Egypt, China, Croatia, Korea and Belgium. He has shared
             departmental risk champions
          •	 Developing a comprehensive risk register, key risk indicators (KRIs) and risk responses         the stage with strategy gurus like Michael Porter and Costas Markides.
             through open, structured debate and facilitated workshops                                       His book, Strategy Execution Heroes, reached the Amazon bestseller list in five countries.
          •	 Working with key external stakeholders (from the offtaker to joint venture partners to
             lenders) to understand and manage external risks
   	      Manish Madhok, Director – Group Internal Audit and Risk Management, ACWA Power                     What People Said About
          International, UAE
   	
                                                                                                             Jeroen De Flander At The Balanced
   12.50	 Lunch And Networking Break                                                                         Scorecard Forum 2012:
           “It’s a great event where you get to learn from the                                               “the wow of the event”
           best. It’s not only from an academic point of view                                                “impressive and inspiring”
                       but also full of real life experience which                                           “amazing”
                               makes it very valuable.”                                                      “highly engaging speaker”
                      Mohammed Ebeid, Head of Planning and Logistics, Henkel
To Register contact Sowmya: +971 4 335 2438 / F: +971 4 3352718 / Email: sowmya.yellappa@iirme.com
 2  Tel: +971 4 335 2437 Fax: +971 4 4072730     Email: register@iirme.com  Web: www.iirme.com/bsc
Two Days LIVE and IN PERSON With                                                                                                       THE FAMOUS
  The Iconic Inventors of                                                                                                           Kaplan Norton
  Balanced Scorecard                                                                                                                           Masterclass

  Dr Robert Kaplan, Professor, Harvard Business School                                                                                   Dr David Norton, Director, Palladium Group, and
  and Co-founder of The Balanced Scorecard, USA                                                                                          Co-Founder of The Balanced Scorecard, USA

  Few people have contributed as significantly                                                                  Dr David Norton is one of the most
  to the art, and especially the science, of                                                                    significant figures transforming
  business strategy as Robert Kaplan.                                                                           business today.
                                                                                                                            For full biographies, go to www.iirme.com/bsc

    Masterclass Day One 	                                          Monday, 18 March 2013                 Masterclass Day Two	                                          Tuesday, 19 March 2013

   07.15	 Registration And Morning Coffee                                                               07.30	 Morning Coffee
   08.00	 Opening Remarks From The Chairman                                                             08.00	 Opening Remarks From The Chairman
   	      Jose Maria Ortis, Vice President, Palladium, EMEA                                             	      David Jalili, Managing Partner, Ibitkar Management Services (IMS), UAE
   08.15	 The Strategy Execution System: From A to Z                                                    08.10	 Aligning Human Capital To The Strategy (Part 2)
          •	 The six stage strategy execution cycle: overview                                                  •	 Linking employee competencies and personal development plans to the strategy
          •	 Stage 1: develop the strategy                                                                     •	 Identify your strategic job families
          •	 The strategy cycle: incremental and major change                                                  •	 Employee incentive programmes that drive performance
          •	 Key components in a strategy                                                               	      Dr David Norton
   	      Dr David Norton
                                                                                                        09.15	 Linking Strategy To Operations
   09.45	 Strategy Maps, Balanced Scorecards And KPIs                                                          •	 Linking your process and quality improvement programmes to your strategy
          •	 Strategy maps in the private sector                                                               •	 Deriving operational dashboards to drive continuous improvement in strategic
          •	 Selecting KPIs linked to your differentiating value proposition                                      processes
          •	 Strategy maps for the public sector                                                               •	 Data integrity
          •	 Government ministries and state-owned-enterprises                                                    ŠŠ Metric owners
          •	 Whole of government strategy maps                                                                    ŠŠ Scandal in Atlanta Public School System’s BSC
          •	 Strategic themes: the new organising framework for your strategy map and strategy                    ŠŠ Role for internal audit
             execution system                                                                                     ŠŠ When to invest in an automated software system
          •	 Step-by-step roadmap for your initial BSC project: key milestones                          	      Dr Robert Kaplan
   	      Dr Robert Kaplan
                                                                                                        10.30	 Networking And Refreshment Break
   11.00	 Networking And Refreshment Break
   11.30	 Setting Stretch Targets: Selecting And Funding Strategic Initiatives                          11.00	 Introducing Risk Management Into Your Strategy Execution System
          •	 The tangible benefits from successful implementation of the BSC: lessons from the Hall            •	 Risk is a multi-dimensional word
             of Fame companies                                                                                    ŠŠ Preventable risks
          •	 Targets for breakthrough performance in shareholder value, customer satisfaction,                    ŠŠ Strategy risks
             citizen performance, quality improvements and employee alignment                                     ŠŠ External risks
          •	 Selecting initiatives for achieving breakthrough performance in your strategic themes             •	 Belief systems, internal controls and internal audit to eliminate preventable risks
          •	 Funding initiatives with StratEx                                                                  •	 Overcoming individual and organisational biases to stimulate interactive discussions
          •	 Setting the StratEx budget: role for theme teams                                                     about the risks in your strategy
   	      Dr David Norton                                                                                      •	 How leading companies implement customised, risk management systems
                                                                                                                  ŠŠ Using your strategy map to identify and mitigate the principal risks in your strategy
   12.45	 Lunch And Networking Break                                                                              ŠŠ Funding your risk mitigation program
                                                                                                               •	 Identifying the unknown-unknown risks your organisation faces
   14.00	 Aligning Organisational Units For Corporate Synergies                                                   ŠŠ Scenario planning
          •	 Aligning related business units to the corporate strategy                                            ŠŠ War gaming
          •	 Corporate strategy and scorecards for conglomerates
                                                                                                        	      Dr Robert Kaplan
          •	 Aligning support units, HR and IT, to business unit value creation
          •	 How aligned is your organisation? Developing an alignment score                            12.30	 Lunch And Networking Break
          •	 Crossing organisational boundaries: using strategy maps and scorecards to align with
             suppliers and customers                                                                    13.45	 Completing The Loop: Monitoring, Adapting, And Sustaining Your Strategy Execution
          •	 Aligning NGOs and the public sector to co-create shared value strategies                          System
   	      Dr Robert Kaplan                                                                                     •	 Conducting effective operational and strategy review meetings
                                                                                                               •	 Testing and adapting your strategy to changing competitive, regulatory and economic
   15.30	 Networking And Refreshment Break                                                                        conditions
   16.00	 Aligning Human Capital To The Strategy (Part 1)                                                      •	 Sustaining your strategy execution system: the Office of Strategy Management
          •	 Communication: “Seven Times Seven Different Ways”                                          	      Dr David Norton
          •	 Developing a communications strategy                                                       15.00	 Leadership: The Necessary And (Now) Sufficient Condition For Strategy Execution
          •	 Establishing a clear line of sight: aligning employees’ personal objectives to strategic          •	 Leadership: establish the vision, communicate the vision and strategy, motivate
             priorities                                                                                           employees to join in the strategic journey
   	      Dr David Norton                                                                                      •	 The strategic change agenda that explains the need for change
   17.00	 Kaplan-Norton Clinic                                                                                 •	 Lessons from John Kotter and Michael Beer on overcoming organisational resistance to
          •	 Extended Q&A session                                                                                 change and achieving buy-in up, down, and across the organisation
          •	 Discussion of practical implementation details and issues                                  	      Dr Robert Kaplan
   	      Dr Robert Kaplan
                                                                                                        16.00	 Networking And Refreshment Break
   	      Dr David Norton
                                                                                                        16.30	 Kaplan-Norton Clinic
   17.45	 Close Of Masterclass Day One
                                                                                                               •	 Extended Q&A session
                                                                                                               •	 Discussion of practical implementation details and issues
        “Most energising course I have attended in the                                                  	      Dr Robert Kaplan
                      last 10-15 years”                                                                 	      Dr David Norton
     Asad Zain, Head of Planning, Olayan Financing Company                                              17.15	 Close Of Masterclass

To Register contact Sowmya:+971 4 4 4072730 / F: +971register@iirme.com sowmya.yellappa@iirme.com
   Tel: +971 4 335 2437 Fax: +971 335 2438     Email: 4 3352718 / Email: Web: www.iirme.com/bsc 3
Balanced Scorecard Forum
      Day One		                                                                                                                                                       Wednesday, 20 March 2013

    08.00	 Registration And Morning Coffee                                                                            •	 Identifying the best software solution for your organisation: in-house, external
                                                                                                                         development or off-the-shelf?
    08.15	 Opening Remarks From The Chairman
                                                                                                                      •	 Cascading the strategy into front line operational and individual performance measures
    	      Edy Abou Chakra, Partner, ADDIMA Consulting, UK, KSA and Lebanon
                                                                                                                         using value drivers: how your strategy management system can support this process
    08.30	 Bridging The Gap Between Business Planning And Human Resources For Full Alignment Of                	      Karola Lepasaar, Executive Director Strategy and Planning, Department of Economic
           Individual Performance With The Organisation’s Strategy                                                    Development – Dubai, UAE
 Hall of   •	 Employee empowerment for a successful cascade: creating an open dialogue to develop
 Fame         scorecards, KPIs and targets                                                                      10.30     Networking And Refreshment Break
 Award
 Winner •	 Developing individual scorecards that are meaningful to the employee while reflecting                11.00	 International Keynote: Combining The Balanced Scorecard Strategy Management System
  2012        strategic objectives                                                                                     With Sustainability Thinking
           •	 Linking performance to reward: a key enabler for strategy execution success                     Hall of •	 Coordinating cross-functional “theme teams” to ensure total focus on core critical
    	      Ramakrishna Kovvidi, Senior Vice President Organisation Development, Du, UAE                       Fame        success factors
                                                                                                              Award •	 Leveraging the discipline of the Balanced Scorecard to better manage change initiatives
     09.10	 A Four Year Roadmap To Successful Strategy Execution At ENOC                                      Winner
            •	 Understanding the critical role of the leadership in driving the BSC change programme          2009 •	 Achieving corporate social responsibility through the application of the strategy
                                                                                                                          management system
            •	 A structured approach to driving awareness and employee engagement across the
                                                                                                               	       Murray Wu, General Manager Corporate Social Responsibility, Kiwibank, New Zealand
               whole organisation
            •	 Creating a culture of challenge to deliver improved performance outcomes across the             11.40	 Protecting The Life Of A Shared Vision: How To Create A Mission Guardian In Every
               four perspectives                                                                                               Employee
    	       Salah Galadari, Director Group Business Planning and Performance Management, Emirates                              •	 Starting with the leader: leadership essentials for a shared vision
            National Oil Company (ENOC), UAE                                                                                   •	 Creating a culture: creating mission advocates that will lead change
                                                                                                                               •	 Developing individual scorecards that are meaningful to the employee while reflecting
    09.50	 Leveraging IT Systems To Boost Strategic Alignment, Communications, Execution And
                                                                                                                                  strategic objectives
           Reporting
                                                                                                                               Dr Walid Fitaihi, CEO, International Medical Center, KSA
           •	 The case for automating strategy management processes and a performance database
              in your organisation                                                                             12.30	 Lunch And Networking Break



    Streamed Sessions 									
                       NEW for 2013!
       Streamed sessions for the private (profit focused) and government sector will give each attendee more access to high
       value, relevant, industry leading case studies than ever before. Learn from your direct peers and apply the key tools and
                      solutions that helped them execute their strategies successfully in your own organisation!

    Private Sector/ “For Profit” Stream                                                                      OR       Government Administration Stream
    13.30	 Opening Remarks From The Chairman                                                                   13.30	 Opening Remarks From The Chairman
    	      Edy Abou Chakra, Partner, ADDIMA Consulting, UK, KSA and Lebanon                                    	      Alan Fell, Managing Director, Alan Fell Consultancy, UK
    13.40	 Bringing Strategy To Life Through Successful Execution Of Big Strategic Projects And Small          13.40	 Driving Value Creation and Total Alignment Through Communication, Education and
           Strategic Initiatives                                                                                      Engagement at ADWEA
           •	 A flexible approach to the Balanced Scorecard that evolves as the business grows and                    •	 Articulating a corporate strategy for the whole water and electricity sector in Abu Dhabi
               diversifies                                                                                            •	 Aligning the ADWEA group to drive business results with the Balanced Scorecard
           •	 Using the PMO to deliver strategic projects that move the needle on the Balanced Scorecard              •	 Successfully communicating strategy throughout the entire ADWEA Group
           •	 Empowering business units to determine the continuous improvement initiatives that will                 •	 Linking strategy to operations with value chain analysis: reengineering business processes to
               impact the Group’s four key KPIs                                                                          ensure all activities support ADWEA’s strategic priorities
           •	 Sharpening strategy execution by focusing on the big things and simplifying the scorecard               •	 Bigger than Balanced Scorecard: exploring how ASTRO (ADWEA Strategic Transformation) is
    	      Nitin Thariyan, Director of Projects, Group Strategy Department, Jumeirah Group, UAE                          using its strategy execution model to propel its own transformation
    14.20 	 Starting Out On The Journey To Drive Value Creation With A Fit-For-Purpose Balanced                	      Dr Mohamed Guidoum, Corporate Strategy and Performance Lead, Abu Dhabi Water and
            Scorecard In A Diversified Conglomerate                                                                   Electricity Authority (ADWEA), UAE
            •	 A balancing act: developing a sensible and coherent approach to strategy execution at both      14.20	 A Journey Of Culture Change And Key Performance Indicators (KPIs) At Dubai Customs: Driving
               the holding group and operating company level                                                          Tangible Performance Improvements With The Right KPIs
                                                                                                                                                                 ­
            •	 Readiness assessment: outlining the key dimensions for assessing how ready your business               •	 Linking the Dubai Customs BSC with the vision of ­the Executive Council of Dubai: a top down
               is for the Balanced Scorecard                                                                             and bottom up approach to total government alignment
            •	 Getting away from “consultant speak”: talking to your teams in a language that resonates               •	 Creating a strategy focused organisation with effective use of KPIs
               with them for max imum engagement                                                                      •	 Th­e rocky road to a mature approach to KPIs: from first steps to complexity and back again
            •	 Getting off the ground with performance measurement in a data scarce environment                       •	 Driving performance benefits through employee buy-in, a common language and data
            •	 Identifying and understanding the crucial cause and effect relationships for your business:               verification
               how robust is your scorecard?                                                                   	      Ahmed Abdul Salam Kazim, Director of Strategy and Corporate Excellence, Dubai Customs, UAE
    	       Sohail Gondal, Head of Strategic Planning, Al Ghurair Group, UAE
                                                                                                               15.00	 Networking And Refreshment Break
    15.00	 Networking And Refreshment Break
                                                                                                               15.30	 Ashghal’s Strategy, Change And Transformation To Deliver Qatar’s Ambitious Goals
    15.30	 Empowering, Engaging And Developing Your Employees As A Catalyst For Strategy Execution                    •	 Exploring the role of the Office of Strategy Management (OSM)
           Success                                                                                                    •	 Integrating a project management office (PMO) within the OSM to achieve real business
           •	 Making the strategic planning process less painful by enhancing the capability of middle                   transformation
              management                                                                                              •	 Integrated strategy and risk management
           •	 An inclusive, workshop-based approach to creating the scorecard and defining strategic                  •	 Aligning partners to the strategy and the budget to strategic objectives
              objectives across all four perspectives                                                                 •	 Ensuring focus and commitment to the strategic agenda in the face of operational pressures
           •	 Building a critical mass of change agents to embed the Balanced Scorecard approach across               •	 Strategy reviews at Ashghal: a new approach to reviews, cycles, lead up, reporting formats
              a large organisation                                                                                       and mechanisms and meeting dynamics
           •	 “Learning and growth” as the foundation for successful strategy execution: key strategies        	      Mark Ranford, Advisor and Acting Head, Corporate Planning Section, Qatar Public Works
              for defining and building the critical human resource competencies to deliver business goals            Authority – Ashghal, Qatar
    	      Santosh Simhan, Former Manager Strategy and Business Development, Tata Chemicals, India
                                                                                                               16.10	 Roundtable Discussions Interactive Session
    16.10	 Roundtable Discussions Interactive Session                                                          	      A perfect opportunity to identify practical ways to address your top challenges.
           A perfect opportunity to identify practical ways to address your top challenges.                    	Moderators:
           Moderators:                                                                                         	               Managing Director                           UK
    	      Edy Abou Chakra, Partner, ADDIMA Consulting, UK, KSA, Lebanon                                                            Advisor and Acting Head, Corporate Planning Section Qatar Public Works
    	      Nitin Thariyan, Director of Projects, Group Strategy Department, Jumeirah Group, UAE                       Authority –          Qatar
    17.00	 Closing Remarks From The Chairman                                                                                     Managing Partner,                                       UAE
                                                                                                               17.00	 Closing Remarks From The Chairman
    17.10	 Close Of Forum Day One
                                                                                                               17.10	 Close Of Forum Day One

To Register contact Sowmya: +971 4 335 2438 / F: +971 4 3352718 / Email: sowmya.yellappa@iirme.com
 4  Tel: +971 4 335 2437 Fax: +971 4 4072730     Email: register@iirme.com  Web: www.iirme.com/bsc
Day Two		                                                                                                                                                          Thursday, 21 March 2013

    08.00	 Morning Coffee                                                                                              •	 Moving beyond performance measurement outputs to a real focus on tangible business
                                                                                                                          outcomes and alignment to strategic direction;
    08.15	 Opening Remarks From The Chairman                                                                           •	 Developing multi-level targets to build culture of performance to keep the business moving
    	      Alan Fell, Managing Director, Alan Fell Consultancy, UK                                                        forward: baseline, stretch and outperform
     08.30	 Achieving Strategic Alignment To Maximise Performance Synergies With A Combination                         •	 A continued push for excellence: challenges, next steps and ambitions
            Of Balanced Scorecard And Business Excellence Models                                                	      Ramana Kumar, Senior Manager Business Planning and Strategy, National Bank of Abu Dhabi,
           •	 Implementing a disciplined seven step Strategy Management Process (SMP) to achieve                       UAE
               total strategic alignment                                                                        10.45	 Networking And Refreshment Break
           •	 Simplifying goals and measures to get the Balanced Scorecard and other multiple
Hall of
Fame           projects off the ground in the early years                                                       11.15	 Best Practices Of Performance Management And Strategy Execution Software
Award      •	 Leverage strategic themes and objectives to beat big cost challenges and achieve                         Implementation With Corporater
Winner         profitable growth                                                                                       •	 Implementing software to execute strategy in line with the Execution Premium Process™
 2010      •	 Combining the Balanced Scorecard, Lean Six Sigma and Statistical Process Control                            (XPP)
               programmes to create a flexible organisation and fast track process improvements                        •	 How to use Corporater to prepare executives for strategy review meetings: the power of
           •	 Embedding a target setting culture and linking personal scorecards to compensation to                       strategy workflow to boost the performance culture
               achieve an execution premium                                                                            •	 Exploring how organisations behave before and after the implementation of software for
     	      Dr Dan C. Lachica, President, First Philec Solar Corporation, Philippines                                     automating strategy execution process
                                                                                                                	      Pedro Pereira, Vice President, Corporater Middle East, UAE
    09.15	 Building A Balanced Scorecard And A Straight Talking Culture In A Public Healthcare
           Provider                                                                                             11.45	 Growing Up With The Balanced Scorecard: The Journey From Musanada’s Inception Through To
           •	 Adapting the traditional Balanced Scorecard perspectives to reflect the functioning of a                 Strategic Repositioning And Beyond
              publicly funded healthcare system                                                                        •	 Communicating and validating company setup strategy across multiple stakeholders using
           •	 Assessing the impact of the Balanced Scorecard in aligning organisational units around                      the Balanced Scorecard
              shared goals                                                                                             •	 Revisiting strategic direction and creating alignment to new direction using the Balanced
           •	 Identifying key lessons learned and evolving the scorecard in subsequent iterations                         Scorecard
           •	 Keeping the Balanced Scorecard alive in the organisation after the initial momentum has                  •	 Effectively managing strategic initiatives whilst maintaining linkage to strategic objectives
              subsided                                                                                                    and targets
    	      Adil Khalfan, Regional Director, University Health Network International Programme,                         •	 Measuring and evaluating company and individual performance across a cascaded
           Kuwait                                                                                                         Balanced Scorecard framework
                                                                                                                       •	 Tailoring performance reporting to management needs: assessing and delivering the
    10.00	 Starting With The End In Mind: Examining A Bank’s Journey To Be The World’s Best Arab                          different reporting needs of both senior executives and front line staff
           Bank: Delivering Excellence With The BSC                                                             	      Mark Limpkin, Senior Strategy Manager, Abu Dhabi General Services Company (Musanada),
           •	 Creating clarity of direction and embedding it from the top of the organisation to all the               UAE	
              key strategic roles;
                                                                                                                12.30	 Lunch And Networking Break

    “How To” Clinics
                     The clinics will run simultaneously from 13.30 to 17.00 with an appropriate break for prayer and refreshments.
                                     For full clinic details and clinic leader biographies, please visit www.iirme.com/bsc
    Clinic D         Linking Performance To Reward                OR Clinic E
                                                                     	
                                                                                            From Key Performance And Risk 	 OR Clinic F Aligning Budget With Strategy
                                                                                            Indicators To Predictive Analytics
    Drive the right behaviours and business outcomes for your              Make better informed business decisions for better performance Clear your biggest obstacle to strategy execution success by
    organisation by successfully linking compensation with                 outcomes                                                       aligning your budget with your strategy!
    performance!
                                                                           Clinic Overview                                                        Clinic Overview
    Clinic overview                                                        Data based decision making is at the core of better management         An organisation’s budget is supposed to be the tool that turns
    “Linking performance with reward” is a subject that typically          practices today. Tools such as Key Performance Indicators (KPIs)       strategy into action. Unfortunately, up to 60% of organisations
    generates a range of strongly held (and often opposing) views.         and Key Risk Indicators (KRIs) assist with the provision of critical   do not link corporate strategy to the budget. This clinic
    Too many schemes that aim to align Balanced Scorecards with            business data for decision making. This workshop will explore          addresses the importance of aligning the budgeting process
    compensation fail to achieve the desired behavioral response.          the relationship between metrics, KPIs and KRIs and how they           with focus on timing, strategic initiative budgeting, strat-ex and
    This clinic is in two distinct halves.                                 can be deployed in practice.                                           responsibilities. The clinic will provide the tools to link corporate
    The first part deals with the desirability, or otherwise, of linking                                                                          strategy to the budget and provides reasons why it is important
    performance and compensation. Participants will be encouraged          Benefits Of Attending                                                  to link these two variables. Presentations will be augmented
    to explore the range of views and experiences and consider what         •	 Understand the difference between metrics, KPIs and KRIs           with interactive discussions to ensure learning and group work to
    approach will best work within the corporate culture of their           •	 Learn techniques for their selection and configuration             embed and practise some of the techniques.
    organisation.                                                           •	 Review predictive analytics best practice
    The second part of the clinic makes the assumption that we do           •	 Analyse typical mistakes in deploying metrics, KPIs and            Benefits Of Attending
    want to align performance and compensation. So how best can                KRIs                                                               This clinic will raise your knowledge in:
    this be achieved? There is a myriad of potential solutions and                                                                                 •	 The benefits of aligning the budget with the strategy
                                                                           Key Topics And Tools                                                    •	 Tools for aligning strategies and budgets
    the aim of the clinic is to review the key decision points that         •	 Understanding metrics, Key Performance Indicators and
    organisations need to consider and decide upon.                                                                                                •	 How strategic initiatives and projects are handled within an
                                                                               Key Risk Indicators                                                      aligned budget
    Benefits Of Attending                                                   •	 An overview of predictive analytics                                 •	 Alignment effectiveness with respect to corporate
    You will gain a thorough understanding of the benefits and              •	 Metrics activation: documentation and data gathering                     performance
    pitfalls of linking performance and compensation. You will learn        •	 Reporting and communicating results
    how to develop an effective performance based compensation              •	 Value generation: decision making and improvement                  Key Topics
    framework that meets the needs of your organisation and                 •	 Enablers for working with KPIs, KRIs and analytics                 The clinic will cover the following aspects:
    promotes the desired behaviours and business outcomes.                                                                                         •	 Background and timing of the budget and strategy reviews
                                                                           Who Should Attend?                                                      •	 Strategic initiatives
    Key Topics                                                             Everyone interested in the correct deployment and usage of KPIs         •	 Tools, methodologies and steps for alignment
     •	 Linking performance with reward – does it work?                    and KRIs, from analysts to CEOs. The exercises and examples             •	 Roles and responsibilities
     •	 The seven key decision points                                      analysed will be relevant to members of strategy and other              •	 Benefits of alignment
                                                                           operational teams alike.                                                •	
    Who should attend?
    The clinic is aimed at:                                              Your Expert Clinic Leader                                                Who Should Attend?
     •	 All those directly involved in the implementation and                                                                                      •	 Board and executive /non executive directors involved in
         effective management application of Balanced Scorecards 	               Aurel Brudan, Founder and CEO, The KPI Institute, 	                  organisation strategy
         at all levels within an organisation – in particular those from 	Australia                                                                •	 CEOs, leaders and senior managers
         the “Strategy Office” or equivalent functions.                                                                                            •	 Functional managers and Heads
     •	 HR professionals who are focused upon achieving the most                                                                                   •	 Practitioners in strategy, corporate and business planning,
         effective alignment of compensation and performance for
         their organisation.                                                                                                                          excellence, finance, sales, operations and HR

    Your Expert Clinic Leader                                                                                                                     Your Expert Clinic Leader
                                                                                                                                                  	         David Jalili, Managing Partner, Ibtikar Management 	
    	 Alan Fell, Managing Director, Alan Fell Consultancy, 	                                                                                      	         Services (IMS), UAE
    	UK


   Tel: +971 4 335 2437                            Fax: +971 4 335 2438                               Email: register@iirme.com                                  Web: www.iirme.com/bsc                                   5
Expert Led Pre Event Workshops		                                                                                                                                    Saturday, 16 March 2013

                            Registration will be at 08.00. The workshops will run simultaneously from 08.30 – 14.30 after which time lunch will be served.
                                              For full workshop details and workshop leader biographies, please visit www.iirme.com/bsc



    Workshop A:                                                                                                Key Topics
                                                                                                                •	 Understanding the key challenges in strategy execution in government across the GCC
                                                                                                                •	 Learn the latest practices in public sector alignment with national aspirations
                                                                                                                   ŠŠ Examples of successful organisations leveraging alignment with country vision and
    Strategy Execution In Government                                                                                  aspirations
                                                                                                                   ŠŠ Key elements of the alignment with the country vision and aspirations (goals, projects,
    Maximise your organisation’s contribution to the national vision                                                  budget and other resources management)
                                                                                                                   ŠŠ Leadership involvement in government organisations, how to identify and overcome
    Workshop Overview                                                                                                 barriers for leadership to drive the process
    The success of any public organisation in the GCC is typically conditioned by its capability to                ŠŠ Employee engagement in government organisations: cascading, communication,
    align with national aspirations and to execute the strategy in a public environment, where                        recognition. What are the best practices in the region to ensure people’s commitment
    leadership constraints, people engagement and stakeholder management play a key role                              to execution?
    in achieving breakthrough results. Some governments as a whole and government entities                         ŠŠ Stakeholder engagement as a key element to ensure execution of the strategy when
    individually have been successfully developing approaches to better execute the strategy, by                      aligning an organisation with the national vision
    customising the standard approach to a challenging environment and characteristics of the                      ŠŠ Work session using the presented tools and techniques in strategy execution
    public sector in the GCC. This body of knowledge is now grouped in a “whole of government”                  •	 Discussion of the implementation of relevant tools and techniques and the differences
    methodological approach ready to implement across public entities in the region.                               between the private and public sectors
    The half-day workshop provides the concepts and tools for developing an organisation’s                      •	 Key success factors in the development of a sustainable  process for strategy execution
    strategy execution model in alignment with the country vision and aspirations. The focus will be               management
    on using the latest best practices in aligned strategy execution by public entities from across
    the GCC.                                                                                                   Who Should Attend?
                                                                                                                •	 Leaders and senior managers
    Benefits Of Attending                                                                                       •	 Functional managers and heads
     •	 Aligning with articulated and agreed national aspirations                                               •	 Practitioners in strategy, business planning, excellence, finance, operations and human
     •	 Proven tools and methodologies for developing successfully aligned strategies                              resources
     •	 Techniques for a more effective discussion with national authorities, stakeholders and
        partners                                                                                               Your Expert Workshop Leader
     •	 Use of tools to prioritise resource requirements and limitations (manpower, budget etc.)
     •	 Roadmap for successful strategy execution                                                                              Aldo Labaki, Consulting Manager,
                                                                                                                               Palladium Middle East, UAE



                                                                                                          OR
    Workshop B:                                                                                                Key Topics
                                                                                                                •	
                                                                                                                •	
                                                                                                                     Strategy elements
                                                                                                                     Analysis of your competition
                                                                                                                     Types of strategies
    Strategy Formulation For The
                                                                                                                •	
                                                                                                                •	   Testing your strategy

    Strategy Driven Organisation                                                                               Who Should Attend?
                                                                                                               Business leaders and senior management who are looking to transform their organisation from
    Become a strategy driven organisation to outperform the market                                             firefighting mode to a strategy driven mode.
    and achieve sustainable business success                                                                   Your Expert Workshop Leader
    Workshop Overview
    In this workshop, you will learn what it takes to formulate a winning business strategy that builds                        Edy Abou Chakra, BSMP, CISA, CEC, Partner,
    on an organisation’s competitive advantages.                                                                               ADDIMA, UK, KSA, Lebanon

    Benefits Of Attending
     •	   What makes a good strategy and why you need it
     •	   What strategy is, what the different types of strategies are and where to use them
     •	   How to turn your company into a strategy driven organisation
     •	   How to continually refine your strategy using the Balanced Scorecard

                                                                                                          OR
    Workshop C:                                                                                                Key Topics And Tools
                                                                                                                •	 What is ERM and why is it important for your organisation?
                                                                                                                •	 Establishing and embedding a risk management framework and risk aware culture
                                                                                                                •	 The risk roles and responsibilities of the board, the risk management function, senior
    Enterprise Risk Management                                                                                     management and internal audit
                                                                                                                •	 Understanding the concept of risk and risk categories
    Keep your business on track by mitigating key risks with a                                                  •	 Identifying and prioritising the key strategic and operational risks facing your organisation
                                                                                                                •	 Using a heat map to evaluate the probability and impact of risks for your business
    comprehensive risk management process                                                                       •	 Developing and using a risk register and key risk indicators
    Workshop Overview                                                                                           •	 Establishing ownership and accountability for key risks
    In the dynamic Middle East business environment, risk is a fact of life. Businesses and                     •	 Understanding and evaluating risk management and mitigation options
    organisations are now more than ever aware that “things can go wrong” and risk events                       •	 Designing effective controls to manage key business risks
    can impact the profitability, reputation and sustainability of your business. Enterprise risk
    management (ERM) is an important discipline for identifying, evaluating and managing risk
                                                                                                               Who Should Attend?
                                                                                                                •	   Senior management
    in a holistic, joined-up way across your whole organisation. This workshop will give you the                •	   Strategy, planning and performance management functions
    tools you need to establish an effective risk management framework for your organisation.                   •	   Risk managers and directors
    In adopting ERM, you will better mitigate the key risks which might otherwise impact your                   •	   Internal auditors
    business’s ability to achieve its strategic goals and sustain a successful business.
                                                                                                               Your Expert Workshop Leader
    Benefits Of Attending
     •	   Establish a well organised and focused risk management process                                                       Susan Daniel, Chief Risk and Compliance Officer,
     •	   Identify and prioritise the key risks facing your organisation                                                       State General Reserve Fund, Oman
     •	   Assess how effectively risks are being managed in your organisations
     •	   Design and adopt appropriate controls to mitigate the impact of potential risks


6     Tel: +971 4 335 2437                           Fax: +971 4 335 2438                                 Email: register@iirme.com                          Web: www.iirme.com/bsc
Sponsorship Opportunities
With more coverage of broader strategy, strategy execution, business excellence and risk management topics,
the Balanced Scorecard & Strategy Summit offers more opportunities to showcase your expertise to Middle
East’s businesses and government organisations.                                                                                                    Contact
Align your brand with Dr Robert Kaplan and Dr David Norton, the iconic inventors of the Balanced Scorecard,                                        Charlie Bark-Jones
and position your company as a leader of Balanced Scorecard programmes and business strategy in the region.                                        for details on tailored
                                                                                                                                                   sponsorship packages to
Help the region’s companies and organisations develop and execute strategies that lead to sustainable                                              meet your needs on
business success. Whether your expertise is in strategy formulation, business excellence, risk management,                                         +971 (0)4 407 2608 or
company performance management or quality, the Balanced Scorecard & Strategy Summit gives you the best                                             sponsorship@iirme.com
opportunity of the year to make crucial new business leads and achieve your own commercial growth targets.




Sponsors & Partners
 Strategic Partner                                                                                  Associate Sponsors
                                  Palladium Group is the global leader                                                              IYCON is a leading Technology Solutions &
                                  in helping organisations execute their                                                            Services Company with a focus on providing
                                  strategies by making better decisions.                                                            High Quality Business and Technology
                                  Our expertise in strategy, risk, corporate                                                        Solutions to organisations across EMEA,
 performance management and business intelligence helps clients achieve                                                             the Asian Subcontinent, North America &
 an execution premium. Our services include consulting, conferences,                                Oceania. IYCON helps companies discover and maintain their competitive
 communities, training and technology. Palladium’s Balanced Scorecard Hall                          advantage, as well as empowering them with the ability to master change.
 of Fame for Executing Strategy™ recognises more than 120 organisations                             (Sustaining Your Adaptive Advantage™). IYCON’s offerings include QPR Suite
 worldwide that have achieved outstanding execution premiums.                                       2012. IYCON is the Strategic VAR for QPR Software as well as a QPR Global
                                                                                                    Implementation Partner for QPR.
 Please visit www.thepalladiumgroup.com for more information.
                                                                                                    QPR Suite 2012 is composed of out-of-the box software for process, risk and
                                                                                                    performance management. It is applicable to all industries and to the needs
 Supporting Sponsor                                                                                 of the private as well as the public sector. QPR software is used by 1,500
                                ADDIMA Consulting is a specialized consulting                       customers around the world in both the private and public sector.
                                firm based in London with solid presence in                                                                 smartKPIs.com is an online platform
                                the Middle East through its offices in Riyadh,                                                              for performance management
                                Dubai and Beirut. ADDIMA is well positioned                                                                 knowledge integration. At its core is
 to provide a proven turnkey Balanced Scorecard (BSC) development &                                                                         an online catalogue of over 6,100 KPI
 implementation because of :                                                                        examples from 14 functional departments and 24 industries. The Premium
  •	 Our experienced & certified BSC practitioners and strategy experts                             section contains 1,500 KPIs preselected as the most relevant for practice
  •	 Our solid expertise in various industries in the Middle East, our deep understanding of the    and thoroughly documented in 30 fields. The website also contains pre-
     local culture, and the command of the Arabic business language in addition to the English      populated Strategy Maps, KPI Dashboards and Scorecards, examples of
     and French                                                                                     KPIs used at individual level, interviews with practitioners, consultants
  •	 Our exclusive partnership in the Middle East with Paul Niven, a noted speaker and writer       and academics and references 1000 reports illustrating the use of KPIs
     on the subject of the Balanced Scorecard, and hands-on practitioner                            and organisational objectives in practice. Operated from Melbourne by eab
                                                                                                    group, www.smartKPIs.com is complemented by three other websites
                                                                                                    dedicated to performance architecture: www.purposefulIdentity.com, www.
 Associate Partner                                                                                  integratingPerformance.com and www.BalancedScorecardReview.com.
                                  Corporater is a specialised vendor for
                                  Balanced Scorecard and Performance                                Sponsor
                                  Management software solutions that                                                For over a decade, Ibtikar has provided innovative support
                                  are flexible, ready-to-run, and that can                                          and solutions to organizations to meet their business goals,
 be easily managed and configured by business users. Founded in the year                                            from organizational performance to talent management, and
 2000, Corporater has over 1000 customers from all key domains with an                                              from quality to winning excellence awards throughout the
 international presence in over 29 countries through its offices and strategic                      Gulf region. We believe in a simple premise: success, continuity and increased
 partnerships. Corporater recently established its operations in Dubai to                           economic value is only achieved through providing implementable, practical
 support and grow key partnerships in UAE.                                                          solutions and full knowledge transfer. Our team of experienced consultants
 Corporater EPM Suite is a Palladium Kaplan-Norton Balanced Scorecard                               possess specific strengths in implementing management systems covering
 Certified Software.                                                                                Business Excellence, Strategy, Corporate Performance Management and
 Please visit www.corporater.com for more information. www.corporater.com                           Human Resources Consultancy.
 for more information.

Tel: +971 4 335 2437                        Fax: +971 4 335 2438                             Email: register@iirme.com                 Web: www.iirme.com/bsc                        7
Balanced Scorecard
         LEADERS

       Presents                          & Strategy Summit
16-21 March 2013 • The Address Hotel, Dubai Marina, Dubai, UAE

For Group Discounts: Conference SalesManager :
Sowmya Yellappa REGISTER
 FIVE WAYS TO
                971-4-3352437                                         IIR Holdings Ltd., P.O Box 21743
       +971 4 4072730 Dubai, UAE
Call : 971-4-3352438
Fax : +971 4 3352718
                          www.iirme.com/bsc
Email: sowmya.yellappa@iirme.com
       register@iirme.com


Please                 the days you wish to attend:

    16 March 2013                         17 March 2013                       18 March 2013                       19 March 2013                       20 March 2013                       21 March 2012
                                                                                                                                                                            Forum
       Workshop
                                               Summit                                             Masterclass                                                             (two days)
        (one day)
                                              (one day)                                           (two days)                                                           Including Clinics                                                                                                 AZ3014
       Select one:
                                                                                                                                                                   D         or E            or F
         A         B          C                                                                                                                                                                                                          GROUP DISCOUNTS
                                                                                                                                                                                                                                            AVAILABLE
                                               Book by                                                 Book from                                                              Book after
        Days
                                           3 January 2013                                     4 January – 7 February 2013                                                  8 February 2013                                               CALL – 971 -4-3352483
                                                                                                                                                                                                                                       E-MAIL+971 4 4072730
                                                                                                                                                                                                                                       Call: – a.watts@iirme.com
      6 Days                                    US$ 5,280                                                       US$ 5,680                                                       US$ 5,880
                                                                                                                                                                                                                             Conference fees include documentation, luncheon and
      5 Days                                    US$ 4,995                                                       US$ 5,395                                                       US$ 5,595                                    refreshments. Delegates who attend all sessions will receive
                                                                                                                                                                                                                             a Certificate of Attendance.

      4 Days                                    US$ 4,285                                                       US$ 4,685                                                       US$ 4,885                                    All registrations are subject to our terms and conditions which
                                                                                                                                                                                                                             are available at www.iirme.com/terms. Please read them as
                                                                                                                                                                                                                             they include important information. By submitting your
                                                                                                                                                                                                                             registration you agree to be bound by the terms and conditions
      3 Days                                    US$ 3,595                                                       US$ 3,995                                                        US$ 4,195                                   in full.


                                                                                                                                                                                                                                                       Payments
      2 Days                                    US$ 2,595                                                       US$ 2,795                                                       US$ 2,990
                                                                                                                                                                                                                             A confirmation letter and invoice will be sent upon receipt of your
                                                                                                                                                                                                                             registration. Please note that full payment must be received prior
                                                                                                                                                                                                                             to the event. Only those delegates whose fees have been paid
        1 Day                                   US$ 1,295                                                       US$ 1,395                                                        US$ 1,495                                   in full will be admitted to the event. You can pay by company
                                                                                                                                                                                                                             cheques or bankers draft in Dirhams or US$. Please note that all
                                                                                                                                                                                                                             US$ cheques and drafts should be drawn on a New York bank and
                                                                                                                                                                                                                             an extra amount of US$ 6 per payment should be added
    Fees include documentation, luncheon and refreshments. Delegates who attend all sessions will receive a Certificate of Attendance.                                                                                       to cover bank clearing charges. In any event payment must be
                                                                                                                                                                                                                             received not later than 48 hours before the Event. Entry to the
                                                                                                                                                                                                                             Event may be refused if payment in full is not received.
DELEGATE DETAILS                                                                                                                                                                                                             Credit card payment
                                                                                                                                                                                                                                I
                                                                                                                                                                                                                                f you would like to pay by credit card, please tick here and a
                                                                                                                                                                                                                                member of our team will contact you to take the details
 Name: ..............................................................................................................................................................................................................

 Job Title: ......................................................................................................... Email: .....................................................................................
                                                                                                                                                                                                                                                     Cancellation
 Tel: ..................................................... Fax: .................................................... Mobile: ................................................................................               If you are unable to attend, a substitute delegate will be welcome
                                                                                                                                                                                                                             in your place. Registrations cancelled more than 7 days before
COMPANY DETAILS                                                                                                                                                                                                              the Event are subject to a $200 administration charge. Registration
                                                                                                                                                                                                                             fees for registrations cancelled 7 days or less before the Event
Company: ............................................................................................................................................................................................................        must be paid in full. Substitutions are welcome at any time.

Address: ................................................................................................................................................................................................................              Avoid Visa Delays - Book Now
Postcode: ................................................................................. Country: ...........................................................................................................             Delegates requiring visas should contact the hotel they wish to
                                                                                                                                                                                                                             stay at directly, as soon as possible. Visas for non-GCC nationals
Tel: .............................................................................................. Fax: .................................................................................................................
                                                                                                                                                                                                                             may take several weeks to process.
. 	 of employees on your site:
No.
                                                                                                                                                                                                                             All registrations are subject to acceptance by IIR which will be
1000+     500-999     250-499                                 50-249              0-49                              YES, I would like to receive information about future events
                                                                                                                                                                                                                             confirmed to you in writing.
                                                                                                                     services via e-mail .................................................................
Nature of your company's business: ..........................................
                                                                                                                                                                                                                             Due to unforeseen circumstances, the programme may change and IIR
                                                                                                                                                                                                                             reserves the right to alter the venue and/or speakers or topics.
To assist us with future correspondence, please supply the following details:
                                                                                                                                                                                                                                                       Event Venue:
Name of the Department Head: .....................................................................................................................................................................
                                                                                                                                                                                                                              The Address Hotel, Dubai Marina, Dubai, UAE
Department: ........................................................... Mobile: .......................................... Email: .......................................................................                     Tel: +971 4 436 7777
                                                                                                                                                                                                                              Accommodation Details
                                                                                                                                                                                                                              We highly recommend you secure your room reservation at the
Training Manager: .............................................................................................................................................................................................
                                                                                                                                                                                                                              earliest to avoid last minute inconvenience. You can contact the
                                                                                                                                                                                                                              IIR Hospitality Desk for assistance on:
Department: ........................................................... Mobile: .......................................... Email: ......................................................................
                                                                                                                                                                                                                              Tel: +971-4-4072693	        Fax: +971-4-4072517
                                                                                                                                                                                                                              Email: hospitality@iirme.com
Booking Contact: ................................................................................................................................................................................................

                                                                                                                                                                                                                              IK/VH      BU303    BALANCED SCORECARD
                                                                                                                                                                                                                                                                                                    J




Department: ........................................................... Mobile: .......................................... Email: ........................................................................
                                                                                                                                                                                                                                                                                                   O




                                                                                                                                                                                                                                                                        © Copyright I.I.R. HOLDINGS B.V.

Balanced Scorecard & Strategy Summit 2013 Dubai

  • 1.
    Balanced Scorecard LEADERS Presents & Strategy Summit 16-21 March 2013 • The Address Hotel, Dubai Marina, Dubai, UAE THE FAMOUS KAPLAN NORTON MASTERCLASS Packed full of brand NEW features for 2013! NEW Strategy Summit – an entire day dedicated to strategy formulation, execution, leadership, business excellence and risk management BACK BY POPULAR DEMAND NEW Jeroen de Flander – with fresh NEW thinking on strategy NEW execution from his upcoming book Leaders Live Panel – hear direct from the region’s pioneering Jeroen De Flander CEOs on sustainable business success in the Middle East NEW Dedicated programme streams for Balanced Scorecard in the private and government administration sectors NEW More audience interaction – brand new discussion sessions to brainstorm solutions to your unique challenges With NEW insights from his upcoming book – NEW “How To” Clinics – short, sharp and focused practical training sessions Strategy Execution Shortcuts – and the best from NEW Leading regional and international Hall of Fame success stories his successful session in 2012! HEAR LEADING EXPERIENCES FROM Abunayyan Holding Company ACWA Power International ADWEA Al Ghurair Group Ashghal Dana Gas Department of Economic Development - Dubai du Dubai Customs Ducab ENOC First Philec Solar Corporation International Medical Center Jumeirah Group Kiwibank Musanada National Bank of Abu Dhabi Qatar Petrochemical Company Seven Sisters Company Tata Chemicals University Health Network and more… Pre Event Workshops 16 March 2013 “How To” Clinics 21 March 2013 A: Strategy Execution In Government D: Linking Performance To Reward B: Strategy Formulation For The Strategy Driven Organisation E: Key Performance Indicators C: Enterprise Risk Management F: Aligning Budget With Strategy Strategic Partner Supporting Sponsor Associate Partner Media Partners Associate Sponsors Sponsor Organised By To Register contact Sowmya: +971 4 4072730 / F: +971 4 3352718 / Email: sowmya.yellappa@iirme.com Tel: +971 4 335 2437 Tel: +971 4 335 2437 Fax: +971 4 335 2438 Fax: +971 4 335 2438 Email: register@iirme.com Email: register@iirme.com Web: www.iirme.com/bsc 1 Web: www.iirme.com/bsc
  • 2.
    Agenda At AGlance Sat, 16 March Sun, 17 March Mon, 18 March Tues, 19 March Wed, 20 March Thur, 21 March Strategy Summit Balanced Scorecard Forum Balanced Scorecard Featuring AM Pre Event Forum Guru Afternoon with Kaplan Norton Workshops Jeroen de Flander, The Masterclass Private Sector Stream Government A/B/C “How To” Clinics Strategy Execution Administration Stream D/ E/F PM Ambassador Strategy Summit NEW for 2013! Sunday, 17 March 2013 The brand NEW Strategy Summit goes beyond the Balanced Scorecard to take a broader look at the key strategy formulation, strategy execution, business excellence and risk management challenges and themes faced by businesses and organisations in the Middle East today. 08.00 Opening Remarks From The Chairman Constantin Salameh, Group CEO, Al Ghurair Group, UAE Strategy Execution Shortcuts 08.30 Leaders LIVE Panel: Delivering Sustainable Success In Challenging Times – Key Lessons From Middle East Business Leaders • Do businesses in the Middle East have a higher appetite for risk than their developed world counterparts? by Jeroen De Flander • How are regional companies raising their game in the competitiveness stakes? • Which geographic and industry sectors represent the most attractive investment and “Strategy is thinking about a choice and choosing to stick with your thinking” expansion prospects for CEOs in today’s business and economic climate? “A strategy, even a great one, doesn’t implement itself” • Which aspects of traditional strategy thinking work best for a region in constant flux? • What are the biggest barriers to implementing structured strategy execution Jeroen de Flander is back with a high energy session combining the best tips from his hugely methodologies in the Middle East and what solutions are leaders finding to overcome popular appearance at Balanced Scorecard Forum 2012 with brand new insights from his next them? book, Strategy Execution Shortcuts (planned launch June 2013). Ahmed Al Arbeed, General Manager, Seven Sisters Company and former CEO, Dana Gas, UAE Khalid Abunayyan, President and CEO, Abunayyan Holding Company, KSA 14.00 The End Of Strategy Tourism: A 2020 Outlook - A No-Nonsense 2020 Perspective On Andrew Shaw, Managing Director, Ducab, UAE Strategy And Strategy Execution Osman Sultan, CEO, du, UAE In this session, Jeroen takes you on a journey. He shows the future of strategy and strategy 09.30 Excellence In Strategy Development And Execution – Critical Success Factors For Growing execution, how your company could benefit from these insights and what you need to do A Successful Business In The Middle East today to beat your competitors. EXCELLENCE STRATEGY A leader’s insights into the history of strategy and business excellence that underpins • Five things every leader should know about strategy more than three decades of sustained growth at Ducab • A 2020 outlook: a peek into the future of strategy and strategy execution Andrew Shaw, Managing Director, Ducab, UAE • Find out just how the world’s top companies are faring in executing their strategy with 10.10 Networking And Refreshment Break reference to the world’s leading strategy execution benchmarking data covering over 21,000 managers, 1400+ companies, 36 countries and 29 industry sectors 10.50 Business War Gaming: Stress Testing Your Strategy • Good strategy vs bad strategy: the evaluation criteria for winning strategies 15.30 Networking And Refreshment Break • Playing war games: stress test your strategy against your competition and market forces Plus Book Signing with Jeroen de Flander • The feedback loop: constantly honing your strategy towards success   Edy Abou Chakra, Partner, ADDIMA Consulting, UK, KSA and Lebanon 16.00 4 Hidden Paths To Strategy Execution Success: Practical Tips To Shorten Your Execution Rami Itani, Manager, ADDIMA Consulting, UK, KSA and Lebanon Journey 11.30 Developing An Effective Enterprise Risk Management (ERM) Framework To Manage In this session, leaders learn strategy execution secrets from the best-in-class. You will Strategic And Operational Risk discover new insights and receive practical tips to boost strategy execution in your own • Developing an ERM framework in line with IS0 31000 Risk Management company. • Repairing the disconnect: understanding that managing risk is integral to achieving RISK MANAGEMENT • Remove strategy graffiti: learn to communicate your strategy into the head, heart and strategic goals not a separate exercise hands of your people without losing the core message • Developing a comprehensive risk register through open debate and structured • Re-measure: the value of KPIs is overrated - learn a different approach to workshops with key stakeholders measuring success • Linking risks to your strategic objectives • Raise micro-commitment: learn about the small execution battles and how to win them • Assessing the impact of risks on your organisation and adopting appropriate risk • Reduce your complexity footprint: learn why complexity is the silent strategy killer and responses what you can do about it • Setting risk appetite: developing an open and informed approach to managing risk Akram Shehata, Acting Head of Corporate Excellence, Qatar Petrochemical Company,  17.30 Close Of Strategy Summit Qatar 12.10 ISO 31000 And The COSO ERM Integrated Framework: Your Building Blocks For Enterprise Jeroen de Flander is a seasoned international strategy execution expert, top executive coach, Risk Management seminar leader and highly regarded keynote speaker. • A strategic initiative driven by the board: linking the risk management process to the Jeroen has helped more than 21,000 managers in 30 countries master the necessary execution RISK MANAGEMENT strategy management process skills, including the USA, Brazil, Venezuela, Jordan, Malaysia, Spain, Italy, Russia, Estonia, the • Exploring the role of the risk management committee and leveraging the reach of Netherlands, France, the UK, Germany, Egypt, China, Croatia, Korea and Belgium. He has shared departmental risk champions • Developing a comprehensive risk register, key risk indicators (KRIs) and risk responses the stage with strategy gurus like Michael Porter and Costas Markides. through open, structured debate and facilitated workshops His book, Strategy Execution Heroes, reached the Amazon bestseller list in five countries. • Working with key external stakeholders (from the offtaker to joint venture partners to lenders) to understand and manage external risks Manish Madhok, Director – Group Internal Audit and Risk Management, ACWA Power What People Said About International, UAE Jeroen De Flander At The Balanced 12.50 Lunch And Networking Break Scorecard Forum 2012: “It’s a great event where you get to learn from the “the wow of the event” best. It’s not only from an academic point of view “impressive and inspiring” but also full of real life experience which “amazing” makes it very valuable.” “highly engaging speaker” Mohammed Ebeid, Head of Planning and Logistics, Henkel To Register contact Sowmya: +971 4 335 2438 / F: +971 4 3352718 / Email: sowmya.yellappa@iirme.com 2 Tel: +971 4 335 2437 Fax: +971 4 4072730 Email: register@iirme.com Web: www.iirme.com/bsc
  • 3.
    Two Days LIVEand IN PERSON With THE FAMOUS The Iconic Inventors of Kaplan Norton Balanced Scorecard Masterclass Dr Robert Kaplan, Professor, Harvard Business School Dr David Norton, Director, Palladium Group, and and Co-founder of The Balanced Scorecard, USA Co-Founder of The Balanced Scorecard, USA Few people have contributed as significantly Dr David Norton is one of the most to the art, and especially the science, of significant figures transforming business strategy as Robert Kaplan. business today. For full biographies, go to www.iirme.com/bsc Masterclass Day One Monday, 18 March 2013 Masterclass Day Two Tuesday, 19 March 2013 07.15 Registration And Morning Coffee 07.30 Morning Coffee 08.00 Opening Remarks From The Chairman 08.00 Opening Remarks From The Chairman Jose Maria Ortis, Vice President, Palladium, EMEA David Jalili, Managing Partner, Ibitkar Management Services (IMS), UAE 08.15 The Strategy Execution System: From A to Z 08.10 Aligning Human Capital To The Strategy (Part 2) • The six stage strategy execution cycle: overview • Linking employee competencies and personal development plans to the strategy • Stage 1: develop the strategy • Identify your strategic job families • The strategy cycle: incremental and major change • Employee incentive programmes that drive performance • Key components in a strategy Dr David Norton Dr David Norton 09.15 Linking Strategy To Operations 09.45 Strategy Maps, Balanced Scorecards And KPIs • Linking your process and quality improvement programmes to your strategy • Strategy maps in the private sector • Deriving operational dashboards to drive continuous improvement in strategic • Selecting KPIs linked to your differentiating value proposition processes • Strategy maps for the public sector • Data integrity • Government ministries and state-owned-enterprises ŠŠ Metric owners • Whole of government strategy maps ŠŠ Scandal in Atlanta Public School System’s BSC • Strategic themes: the new organising framework for your strategy map and strategy ŠŠ Role for internal audit execution system ŠŠ When to invest in an automated software system • Step-by-step roadmap for your initial BSC project: key milestones Dr Robert Kaplan Dr Robert Kaplan 10.30 Networking And Refreshment Break 11.00 Networking And Refreshment Break 11.30 Setting Stretch Targets: Selecting And Funding Strategic Initiatives 11.00 Introducing Risk Management Into Your Strategy Execution System • The tangible benefits from successful implementation of the BSC: lessons from the Hall • Risk is a multi-dimensional word of Fame companies ŠŠ Preventable risks • Targets for breakthrough performance in shareholder value, customer satisfaction, ŠŠ Strategy risks citizen performance, quality improvements and employee alignment ŠŠ External risks • Selecting initiatives for achieving breakthrough performance in your strategic themes • Belief systems, internal controls and internal audit to eliminate preventable risks • Funding initiatives with StratEx • Overcoming individual and organisational biases to stimulate interactive discussions • Setting the StratEx budget: role for theme teams about the risks in your strategy Dr David Norton • How leading companies implement customised, risk management systems ŠŠ Using your strategy map to identify and mitigate the principal risks in your strategy 12.45 Lunch And Networking Break ŠŠ Funding your risk mitigation program • Identifying the unknown-unknown risks your organisation faces 14.00 Aligning Organisational Units For Corporate Synergies ŠŠ Scenario planning • Aligning related business units to the corporate strategy ŠŠ War gaming • Corporate strategy and scorecards for conglomerates Dr Robert Kaplan • Aligning support units, HR and IT, to business unit value creation • How aligned is your organisation? Developing an alignment score 12.30 Lunch And Networking Break • Crossing organisational boundaries: using strategy maps and scorecards to align with suppliers and customers 13.45 Completing The Loop: Monitoring, Adapting, And Sustaining Your Strategy Execution • Aligning NGOs and the public sector to co-create shared value strategies System Dr Robert Kaplan • Conducting effective operational and strategy review meetings • Testing and adapting your strategy to changing competitive, regulatory and economic 15.30 Networking And Refreshment Break conditions 16.00 Aligning Human Capital To The Strategy (Part 1) • Sustaining your strategy execution system: the Office of Strategy Management • Communication: “Seven Times Seven Different Ways” Dr David Norton • Developing a communications strategy 15.00 Leadership: The Necessary And (Now) Sufficient Condition For Strategy Execution • Establishing a clear line of sight: aligning employees’ personal objectives to strategic • Leadership: establish the vision, communicate the vision and strategy, motivate priorities employees to join in the strategic journey Dr David Norton • The strategic change agenda that explains the need for change 17.00 Kaplan-Norton Clinic • Lessons from John Kotter and Michael Beer on overcoming organisational resistance to • Extended Q&A session change and achieving buy-in up, down, and across the organisation • Discussion of practical implementation details and issues Dr Robert Kaplan Dr Robert Kaplan 16.00 Networking And Refreshment Break Dr David Norton 16.30 Kaplan-Norton Clinic 17.45 Close Of Masterclass Day One • Extended Q&A session • Discussion of practical implementation details and issues “Most energising course I have attended in the Dr Robert Kaplan last 10-15 years” Dr David Norton Asad Zain, Head of Planning, Olayan Financing Company 17.15 Close Of Masterclass To Register contact Sowmya:+971 4 4 4072730 / F: +971register@iirme.com sowmya.yellappa@iirme.com Tel: +971 4 335 2437 Fax: +971 335 2438 Email: 4 3352718 / Email: Web: www.iirme.com/bsc 3
  • 4.
    Balanced Scorecard Forum Day One Wednesday, 20 March 2013 08.00 Registration And Morning Coffee • Identifying the best software solution for your organisation: in-house, external development or off-the-shelf? 08.15 Opening Remarks From The Chairman • Cascading the strategy into front line operational and individual performance measures Edy Abou Chakra, Partner, ADDIMA Consulting, UK, KSA and Lebanon using value drivers: how your strategy management system can support this process 08.30 Bridging The Gap Between Business Planning And Human Resources For Full Alignment Of Karola Lepasaar, Executive Director Strategy and Planning, Department of Economic Individual Performance With The Organisation’s Strategy Development – Dubai, UAE Hall of • Employee empowerment for a successful cascade: creating an open dialogue to develop Fame scorecards, KPIs and targets  10.30     Networking And Refreshment Break Award Winner • Developing individual scorecards that are meaningful to the employee while reflecting  11.00 International Keynote: Combining The Balanced Scorecard Strategy Management System 2012 strategic objectives With Sustainability Thinking • Linking performance to reward: a key enabler for strategy execution success Hall of • Coordinating cross-functional “theme teams” to ensure total focus on core critical Ramakrishna Kovvidi, Senior Vice President Organisation Development, Du, UAE Fame success factors Award • Leveraging the discipline of the Balanced Scorecard to better manage change initiatives  09.10 A Four Year Roadmap To Successful Strategy Execution At ENOC Winner • Understanding the critical role of the leadership in driving the BSC change programme 2009 • Achieving corporate social responsibility through the application of the strategy management system • A structured approach to driving awareness and employee engagement across the Murray Wu, General Manager Corporate Social Responsibility, Kiwibank, New Zealand whole organisation • Creating a culture of challenge to deliver improved performance outcomes across the 11.40 Protecting The Life Of A Shared Vision: How To Create A Mission Guardian In Every four perspectives Employee Salah Galadari, Director Group Business Planning and Performance Management, Emirates • Starting with the leader: leadership essentials for a shared vision National Oil Company (ENOC), UAE • Creating a culture: creating mission advocates that will lead change • Developing individual scorecards that are meaningful to the employee while reflecting 09.50 Leveraging IT Systems To Boost Strategic Alignment, Communications, Execution And strategic objectives Reporting                 Dr Walid Fitaihi, CEO, International Medical Center, KSA • The case for automating strategy management processes and a performance database in your organisation 12.30 Lunch And Networking Break Streamed Sessions NEW for 2013! Streamed sessions for the private (profit focused) and government sector will give each attendee more access to high value, relevant, industry leading case studies than ever before. Learn from your direct peers and apply the key tools and solutions that helped them execute their strategies successfully in your own organisation! Private Sector/ “For Profit” Stream OR Government Administration Stream 13.30 Opening Remarks From The Chairman 13.30 Opening Remarks From The Chairman Edy Abou Chakra, Partner, ADDIMA Consulting, UK, KSA and Lebanon Alan Fell, Managing Director, Alan Fell Consultancy, UK 13.40 Bringing Strategy To Life Through Successful Execution Of Big Strategic Projects And Small 13.40 Driving Value Creation and Total Alignment Through Communication, Education and Strategic Initiatives Engagement at ADWEA • A flexible approach to the Balanced Scorecard that evolves as the business grows and • Articulating a corporate strategy for the whole water and electricity sector in Abu Dhabi diversifies • Aligning the ADWEA group to drive business results with the Balanced Scorecard • Using the PMO to deliver strategic projects that move the needle on the Balanced Scorecard • Successfully communicating strategy throughout the entire ADWEA Group • Empowering business units to determine the continuous improvement initiatives that will • Linking strategy to operations with value chain analysis: reengineering business processes to impact the Group’s four key KPIs ensure all activities support ADWEA’s strategic priorities • Sharpening strategy execution by focusing on the big things and simplifying the scorecard • Bigger than Balanced Scorecard: exploring how ASTRO (ADWEA Strategic Transformation) is Nitin Thariyan, Director of Projects, Group Strategy Department, Jumeirah Group, UAE using its strategy execution model to propel its own transformation 14.20 Starting Out On The Journey To Drive Value Creation With A Fit-For-Purpose Balanced Dr Mohamed Guidoum, Corporate Strategy and Performance Lead, Abu Dhabi Water and Scorecard In A Diversified Conglomerate Electricity Authority (ADWEA), UAE • A balancing act: developing a sensible and coherent approach to strategy execution at both 14.20 A Journey Of Culture Change And Key Performance Indicators (KPIs) At Dubai Customs: Driving the holding group and operating company level Tangible Performance Improvements With The Right KPIs ­ • Readiness assessment: outlining the key dimensions for assessing how ready your business • Linking the Dubai Customs BSC with the vision of ­the Executive Council of Dubai: a top down is for the Balanced Scorecard and bottom up approach to total government alignment • Getting away from “consultant speak”: talking to your teams in a language that resonates • Creating a strategy focused organisation with effective use of KPIs with them for max imum engagement • Th­e rocky road to a mature approach to KPIs: from first steps to complexity and back again • Getting off the ground with performance measurement in a data scarce environment • Driving performance benefits through employee buy-in, a common language and data • Identifying and understanding the crucial cause and effect relationships for your business: verification how robust is your scorecard? Ahmed Abdul Salam Kazim, Director of Strategy and Corporate Excellence, Dubai Customs, UAE Sohail Gondal, Head of Strategic Planning, Al Ghurair Group, UAE 15.00 Networking And Refreshment Break 15.00 Networking And Refreshment Break 15.30 Ashghal’s Strategy, Change And Transformation To Deliver Qatar’s Ambitious Goals 15.30 Empowering, Engaging And Developing Your Employees As A Catalyst For Strategy Execution • Exploring the role of the Office of Strategy Management (OSM) Success • Integrating a project management office (PMO) within the OSM to achieve real business • Making the strategic planning process less painful by enhancing the capability of middle transformation management • Integrated strategy and risk management • An inclusive, workshop-based approach to creating the scorecard and defining strategic • Aligning partners to the strategy and the budget to strategic objectives objectives across all four perspectives • Ensuring focus and commitment to the strategic agenda in the face of operational pressures • Building a critical mass of change agents to embed the Balanced Scorecard approach across • Strategy reviews at Ashghal: a new approach to reviews, cycles, lead up, reporting formats a large organisation and mechanisms and meeting dynamics • “Learning and growth” as the foundation for successful strategy execution: key strategies Mark Ranford, Advisor and Acting Head, Corporate Planning Section, Qatar Public Works for defining and building the critical human resource competencies to deliver business goals Authority – Ashghal, Qatar Santosh Simhan, Former Manager Strategy and Business Development, Tata Chemicals, India 16.10 Roundtable Discussions Interactive Session 16.10 Roundtable Discussions Interactive Session A perfect opportunity to identify practical ways to address your top challenges. A perfect opportunity to identify practical ways to address your top challenges. Moderators: Moderators: Managing Director UK Edy Abou Chakra, Partner, ADDIMA Consulting, UK, KSA, Lebanon Advisor and Acting Head, Corporate Planning Section Qatar Public Works Nitin Thariyan, Director of Projects, Group Strategy Department, Jumeirah Group, UAE Authority – Qatar 17.00 Closing Remarks From The Chairman Managing Partner, UAE 17.00 Closing Remarks From The Chairman 17.10 Close Of Forum Day One 17.10 Close Of Forum Day One To Register contact Sowmya: +971 4 335 2438 / F: +971 4 3352718 / Email: sowmya.yellappa@iirme.com 4 Tel: +971 4 335 2437 Fax: +971 4 4072730 Email: register@iirme.com Web: www.iirme.com/bsc
  • 5.
    Day Two Thursday, 21 March 2013 08.00 Morning Coffee • Moving beyond performance measurement outputs to a real focus on tangible business outcomes and alignment to strategic direction; 08.15 Opening Remarks From The Chairman • Developing multi-level targets to build culture of performance to keep the business moving Alan Fell, Managing Director, Alan Fell Consultancy, UK forward: baseline, stretch and outperform 08.30 Achieving Strategic Alignment To Maximise Performance Synergies With A Combination • A continued push for excellence: challenges, next steps and ambitions Of Balanced Scorecard And Business Excellence Models Ramana Kumar, Senior Manager Business Planning and Strategy, National Bank of Abu Dhabi, • Implementing a disciplined seven step Strategy Management Process (SMP) to achieve UAE total strategic alignment 10.45 Networking And Refreshment Break • Simplifying goals and measures to get the Balanced Scorecard and other multiple Hall of Fame projects off the ground in the early years 11.15 Best Practices Of Performance Management And Strategy Execution Software Award • Leverage strategic themes and objectives to beat big cost challenges and achieve Implementation With Corporater Winner profitable growth • Implementing software to execute strategy in line with the Execution Premium Process™ 2010 • Combining the Balanced Scorecard, Lean Six Sigma and Statistical Process Control (XPP) programmes to create a flexible organisation and fast track process improvements • How to use Corporater to prepare executives for strategy review meetings: the power of • Embedding a target setting culture and linking personal scorecards to compensation to strategy workflow to boost the performance culture achieve an execution premium • Exploring how organisations behave before and after the implementation of software for Dr Dan C. Lachica, President, First Philec Solar Corporation, Philippines automating strategy execution process Pedro Pereira, Vice President, Corporater Middle East, UAE 09.15 Building A Balanced Scorecard And A Straight Talking Culture In A Public Healthcare Provider 11.45 Growing Up With The Balanced Scorecard: The Journey From Musanada’s Inception Through To • Adapting the traditional Balanced Scorecard perspectives to reflect the functioning of a Strategic Repositioning And Beyond publicly funded healthcare system • Communicating and validating company setup strategy across multiple stakeholders using • Assessing the impact of the Balanced Scorecard in aligning organisational units around the Balanced Scorecard shared goals • Revisiting strategic direction and creating alignment to new direction using the Balanced • Identifying key lessons learned and evolving the scorecard in subsequent iterations Scorecard • Keeping the Balanced Scorecard alive in the organisation after the initial momentum has • Effectively managing strategic initiatives whilst maintaining linkage to strategic objectives subsided and targets Adil Khalfan, Regional Director, University Health Network International Programme, • Measuring and evaluating company and individual performance across a cascaded Kuwait Balanced Scorecard framework • Tailoring performance reporting to management needs: assessing and delivering the 10.00 Starting With The End In Mind: Examining A Bank’s Journey To Be The World’s Best Arab different reporting needs of both senior executives and front line staff Bank: Delivering Excellence With The BSC Mark Limpkin, Senior Strategy Manager, Abu Dhabi General Services Company (Musanada), • Creating clarity of direction and embedding it from the top of the organisation to all the UAE key strategic roles; 12.30 Lunch And Networking Break “How To” Clinics The clinics will run simultaneously from 13.30 to 17.00 with an appropriate break for prayer and refreshments. For full clinic details and clinic leader biographies, please visit www.iirme.com/bsc Clinic D Linking Performance To Reward OR Clinic E From Key Performance And Risk OR Clinic F Aligning Budget With Strategy Indicators To Predictive Analytics Drive the right behaviours and business outcomes for your Make better informed business decisions for better performance Clear your biggest obstacle to strategy execution success by organisation by successfully linking compensation with outcomes aligning your budget with your strategy! performance! Clinic Overview Clinic Overview Clinic overview Data based decision making is at the core of better management An organisation’s budget is supposed to be the tool that turns “Linking performance with reward” is a subject that typically practices today. Tools such as Key Performance Indicators (KPIs) strategy into action. Unfortunately, up to 60% of organisations generates a range of strongly held (and often opposing) views. and Key Risk Indicators (KRIs) assist with the provision of critical do not link corporate strategy to the budget. This clinic Too many schemes that aim to align Balanced Scorecards with business data for decision making. This workshop will explore addresses the importance of aligning the budgeting process compensation fail to achieve the desired behavioral response. the relationship between metrics, KPIs and KRIs and how they with focus on timing, strategic initiative budgeting, strat-ex and This clinic is in two distinct halves. can be deployed in practice. responsibilities. The clinic will provide the tools to link corporate The first part deals with the desirability, or otherwise, of linking strategy to the budget and provides reasons why it is important performance and compensation. Participants will be encouraged Benefits Of Attending to link these two variables. Presentations will be augmented to explore the range of views and experiences and consider what • Understand the difference between metrics, KPIs and KRIs with interactive discussions to ensure learning and group work to approach will best work within the corporate culture of their • Learn techniques for their selection and configuration embed and practise some of the techniques. organisation. • Review predictive analytics best practice The second part of the clinic makes the assumption that we do • Analyse typical mistakes in deploying metrics, KPIs and Benefits Of Attending want to align performance and compensation. So how best can KRIs This clinic will raise your knowledge in: this be achieved? There is a myriad of potential solutions and • The benefits of aligning the budget with the strategy Key Topics And Tools • Tools for aligning strategies and budgets the aim of the clinic is to review the key decision points that • Understanding metrics, Key Performance Indicators and organisations need to consider and decide upon. • How strategic initiatives and projects are handled within an Key Risk Indicators aligned budget Benefits Of Attending • An overview of predictive analytics • Alignment effectiveness with respect to corporate You will gain a thorough understanding of the benefits and • Metrics activation: documentation and data gathering performance pitfalls of linking performance and compensation. You will learn • Reporting and communicating results how to develop an effective performance based compensation • Value generation: decision making and improvement Key Topics framework that meets the needs of your organisation and • Enablers for working with KPIs, KRIs and analytics The clinic will cover the following aspects: promotes the desired behaviours and business outcomes. • Background and timing of the budget and strategy reviews Who Should Attend? • Strategic initiatives Key Topics Everyone interested in the correct deployment and usage of KPIs • Tools, methodologies and steps for alignment • Linking performance with reward – does it work? and KRIs, from analysts to CEOs. The exercises and examples • Roles and responsibilities • The seven key decision points analysed will be relevant to members of strategy and other • Benefits of alignment operational teams alike. • Who should attend? The clinic is aimed at: Your Expert Clinic Leader Who Should Attend? • All those directly involved in the implementation and • Board and executive /non executive directors involved in effective management application of Balanced Scorecards Aurel Brudan, Founder and CEO, The KPI Institute, organisation strategy at all levels within an organisation – in particular those from Australia • CEOs, leaders and senior managers the “Strategy Office” or equivalent functions. • Functional managers and Heads • HR professionals who are focused upon achieving the most • Practitioners in strategy, corporate and business planning, effective alignment of compensation and performance for their organisation. excellence, finance, sales, operations and HR Your Expert Clinic Leader Your Expert Clinic Leader David Jalili, Managing Partner, Ibtikar Management Alan Fell, Managing Director, Alan Fell Consultancy, Services (IMS), UAE UK Tel: +971 4 335 2437 Fax: +971 4 335 2438 Email: register@iirme.com Web: www.iirme.com/bsc 5
  • 6.
    Expert Led PreEvent Workshops Saturday, 16 March 2013 Registration will be at 08.00. The workshops will run simultaneously from 08.30 – 14.30 after which time lunch will be served. For full workshop details and workshop leader biographies, please visit www.iirme.com/bsc Workshop A: Key Topics • Understanding the key challenges in strategy execution in government across the GCC • Learn the latest practices in public sector alignment with national aspirations ŠŠ Examples of successful organisations leveraging alignment with country vision and Strategy Execution In Government aspirations ŠŠ Key elements of the alignment with the country vision and aspirations (goals, projects, Maximise your organisation’s contribution to the national vision budget and other resources management) ŠŠ Leadership involvement in government organisations, how to identify and overcome Workshop Overview barriers for leadership to drive the process The success of any public organisation in the GCC is typically conditioned by its capability to ŠŠ Employee engagement in government organisations: cascading, communication, align with national aspirations and to execute the strategy in a public environment, where recognition. What are the best practices in the region to ensure people’s commitment leadership constraints, people engagement and stakeholder management play a key role to execution? in achieving breakthrough results. Some governments as a whole and government entities ŠŠ Stakeholder engagement as a key element to ensure execution of the strategy when individually have been successfully developing approaches to better execute the strategy, by aligning an organisation with the national vision customising the standard approach to a challenging environment and characteristics of the ŠŠ Work session using the presented tools and techniques in strategy execution public sector in the GCC. This body of knowledge is now grouped in a “whole of government” • Discussion of the implementation of relevant tools and techniques and the differences methodological approach ready to implement across public entities in the region. between the private and public sectors The half-day workshop provides the concepts and tools for developing an organisation’s • Key success factors in the development of a sustainable  process for strategy execution strategy execution model in alignment with the country vision and aspirations. The focus will be management on using the latest best practices in aligned strategy execution by public entities from across the GCC. Who Should Attend? • Leaders and senior managers Benefits Of Attending • Functional managers and heads • Aligning with articulated and agreed national aspirations • Practitioners in strategy, business planning, excellence, finance, operations and human • Proven tools and methodologies for developing successfully aligned strategies resources • Techniques for a more effective discussion with national authorities, stakeholders and partners Your Expert Workshop Leader • Use of tools to prioritise resource requirements and limitations (manpower, budget etc.) • Roadmap for successful strategy execution Aldo Labaki, Consulting Manager, Palladium Middle East, UAE OR Workshop B: Key Topics • • Strategy elements Analysis of your competition Types of strategies Strategy Formulation For The • • Testing your strategy Strategy Driven Organisation Who Should Attend? Business leaders and senior management who are looking to transform their organisation from Become a strategy driven organisation to outperform the market firefighting mode to a strategy driven mode. and achieve sustainable business success Your Expert Workshop Leader Workshop Overview In this workshop, you will learn what it takes to formulate a winning business strategy that builds Edy Abou Chakra, BSMP, CISA, CEC, Partner, on an organisation’s competitive advantages. ADDIMA, UK, KSA, Lebanon Benefits Of Attending • What makes a good strategy and why you need it • What strategy is, what the different types of strategies are and where to use them • How to turn your company into a strategy driven organisation • How to continually refine your strategy using the Balanced Scorecard OR Workshop C: Key Topics And Tools • What is ERM and why is it important for your organisation? • Establishing and embedding a risk management framework and risk aware culture • The risk roles and responsibilities of the board, the risk management function, senior Enterprise Risk Management management and internal audit • Understanding the concept of risk and risk categories Keep your business on track by mitigating key risks with a • Identifying and prioritising the key strategic and operational risks facing your organisation • Using a heat map to evaluate the probability and impact of risks for your business comprehensive risk management process • Developing and using a risk register and key risk indicators Workshop Overview • Establishing ownership and accountability for key risks In the dynamic Middle East business environment, risk is a fact of life. Businesses and • Understanding and evaluating risk management and mitigation options organisations are now more than ever aware that “things can go wrong” and risk events • Designing effective controls to manage key business risks can impact the profitability, reputation and sustainability of your business. Enterprise risk management (ERM) is an important discipline for identifying, evaluating and managing risk Who Should Attend? • Senior management in a holistic, joined-up way across your whole organisation. This workshop will give you the • Strategy, planning and performance management functions tools you need to establish an effective risk management framework for your organisation. • Risk managers and directors In adopting ERM, you will better mitigate the key risks which might otherwise impact your • Internal auditors business’s ability to achieve its strategic goals and sustain a successful business. Your Expert Workshop Leader Benefits Of Attending • Establish a well organised and focused risk management process Susan Daniel, Chief Risk and Compliance Officer, • Identify and prioritise the key risks facing your organisation State General Reserve Fund, Oman • Assess how effectively risks are being managed in your organisations • Design and adopt appropriate controls to mitigate the impact of potential risks 6 Tel: +971 4 335 2437 Fax: +971 4 335 2438 Email: register@iirme.com Web: www.iirme.com/bsc
  • 7.
    Sponsorship Opportunities With morecoverage of broader strategy, strategy execution, business excellence and risk management topics, the Balanced Scorecard & Strategy Summit offers more opportunities to showcase your expertise to Middle East’s businesses and government organisations. Contact Align your brand with Dr Robert Kaplan and Dr David Norton, the iconic inventors of the Balanced Scorecard, Charlie Bark-Jones and position your company as a leader of Balanced Scorecard programmes and business strategy in the region. for details on tailored sponsorship packages to Help the region’s companies and organisations develop and execute strategies that lead to sustainable meet your needs on business success. Whether your expertise is in strategy formulation, business excellence, risk management, +971 (0)4 407 2608 or company performance management or quality, the Balanced Scorecard & Strategy Summit gives you the best sponsorship@iirme.com opportunity of the year to make crucial new business leads and achieve your own commercial growth targets. Sponsors & Partners Strategic Partner Associate Sponsors Palladium Group is the global leader IYCON is a leading Technology Solutions & in helping organisations execute their Services Company with a focus on providing strategies by making better decisions. High Quality Business and Technology Our expertise in strategy, risk, corporate Solutions to organisations across EMEA, performance management and business intelligence helps clients achieve the Asian Subcontinent, North America & an execution premium. Our services include consulting, conferences, Oceania. IYCON helps companies discover and maintain their competitive communities, training and technology. Palladium’s Balanced Scorecard Hall advantage, as well as empowering them with the ability to master change. of Fame for Executing Strategy™ recognises more than 120 organisations (Sustaining Your Adaptive Advantage™). IYCON’s offerings include QPR Suite worldwide that have achieved outstanding execution premiums. 2012. IYCON is the Strategic VAR for QPR Software as well as a QPR Global Implementation Partner for QPR. Please visit www.thepalladiumgroup.com for more information. QPR Suite 2012 is composed of out-of-the box software for process, risk and performance management. It is applicable to all industries and to the needs Supporting Sponsor of the private as well as the public sector. QPR software is used by 1,500 ADDIMA Consulting is a specialized consulting customers around the world in both the private and public sector. firm based in London with solid presence in smartKPIs.com is an online platform the Middle East through its offices in Riyadh, for performance management Dubai and Beirut. ADDIMA is well positioned knowledge integration. At its core is to provide a proven turnkey Balanced Scorecard (BSC) development & an online catalogue of over 6,100 KPI implementation because of : examples from 14 functional departments and 24 industries. The Premium • Our experienced & certified BSC practitioners and strategy experts section contains 1,500 KPIs preselected as the most relevant for practice • Our solid expertise in various industries in the Middle East, our deep understanding of the and thoroughly documented in 30 fields. The website also contains pre- local culture, and the command of the Arabic business language in addition to the English populated Strategy Maps, KPI Dashboards and Scorecards, examples of and French KPIs used at individual level, interviews with practitioners, consultants • Our exclusive partnership in the Middle East with Paul Niven, a noted speaker and writer and academics and references 1000 reports illustrating the use of KPIs on the subject of the Balanced Scorecard, and hands-on practitioner and organisational objectives in practice. Operated from Melbourne by eab group, www.smartKPIs.com is complemented by three other websites dedicated to performance architecture: www.purposefulIdentity.com, www. Associate Partner integratingPerformance.com and www.BalancedScorecardReview.com. Corporater is a specialised vendor for Balanced Scorecard and Performance Sponsor Management software solutions that For over a decade, Ibtikar has provided innovative support are flexible, ready-to-run, and that can and solutions to organizations to meet their business goals, be easily managed and configured by business users. Founded in the year from organizational performance to talent management, and 2000, Corporater has over 1000 customers from all key domains with an from quality to winning excellence awards throughout the international presence in over 29 countries through its offices and strategic Gulf region. We believe in a simple premise: success, continuity and increased partnerships. Corporater recently established its operations in Dubai to economic value is only achieved through providing implementable, practical support and grow key partnerships in UAE. solutions and full knowledge transfer. Our team of experienced consultants Corporater EPM Suite is a Palladium Kaplan-Norton Balanced Scorecard possess specific strengths in implementing management systems covering Certified Software. Business Excellence, Strategy, Corporate Performance Management and Please visit www.corporater.com for more information. www.corporater.com Human Resources Consultancy. for more information. Tel: +971 4 335 2437 Fax: +971 4 335 2438 Email: register@iirme.com Web: www.iirme.com/bsc 7
  • 8.
    Balanced Scorecard LEADERS Presents & Strategy Summit 16-21 March 2013 • The Address Hotel, Dubai Marina, Dubai, UAE For Group Discounts: Conference SalesManager : Sowmya Yellappa REGISTER FIVE WAYS TO 971-4-3352437 IIR Holdings Ltd., P.O Box 21743 +971 4 4072730 Dubai, UAE Call : 971-4-3352438 Fax : +971 4 3352718 www.iirme.com/bsc Email: sowmya.yellappa@iirme.com register@iirme.com Please the days you wish to attend: 16 March 2013 17 March 2013 18 March 2013 19 March 2013 20 March 2013 21 March 2012 Forum Workshop Summit Masterclass (two days) (one day) (one day) (two days) Including Clinics AZ3014 Select one: D or E or F A B C GROUP DISCOUNTS AVAILABLE Book by Book from Book after Days 3 January 2013 4 January – 7 February 2013 8 February 2013 CALL – 971 -4-3352483 E-MAIL+971 4 4072730 Call: – a.watts@iirme.com 6 Days US$ 5,280 US$ 5,680 US$ 5,880 Conference fees include documentation, luncheon and 5 Days US$ 4,995 US$ 5,395 US$ 5,595 refreshments. Delegates who attend all sessions will receive a Certificate of Attendance. 4 Days US$ 4,285 US$ 4,685 US$ 4,885 All registrations are subject to our terms and conditions which are available at www.iirme.com/terms. Please read them as they include important information. By submitting your registration you agree to be bound by the terms and conditions 3 Days US$ 3,595 US$ 3,995 US$ 4,195 in full. Payments 2 Days US$ 2,595 US$ 2,795 US$ 2,990 A confirmation letter and invoice will be sent upon receipt of your registration. Please note that full payment must be received prior to the event. Only those delegates whose fees have been paid 1 Day US$ 1,295 US$ 1,395 US$ 1,495 in full will be admitted to the event. You can pay by company cheques or bankers draft in Dirhams or US$. Please note that all US$ cheques and drafts should be drawn on a New York bank and an extra amount of US$ 6 per payment should be added Fees include documentation, luncheon and refreshments. Delegates who attend all sessions will receive a Certificate of Attendance. to cover bank clearing charges. In any event payment must be received not later than 48 hours before the Event. Entry to the Event may be refused if payment in full is not received. DELEGATE DETAILS Credit card payment I f you would like to pay by credit card, please tick here and a member of our team will contact you to take the details Name: .............................................................................................................................................................................................................. Job Title: ......................................................................................................... Email: ..................................................................................... Cancellation Tel: ..................................................... Fax: .................................................... Mobile: ................................................................................ If you are unable to attend, a substitute delegate will be welcome in your place. Registrations cancelled more than 7 days before COMPANY DETAILS the Event are subject to a $200 administration charge. Registration fees for registrations cancelled 7 days or less before the Event Company: ............................................................................................................................................................................................................ must be paid in full. Substitutions are welcome at any time. Address: ................................................................................................................................................................................................................ Avoid Visa Delays - Book Now Postcode: ................................................................................. Country: ........................................................................................................... Delegates requiring visas should contact the hotel they wish to stay at directly, as soon as possible. Visas for non-GCC nationals Tel: .............................................................................................. Fax: ................................................................................................................. may take several weeks to process. . of employees on your site: No. All registrations are subject to acceptance by IIR which will be 1000+ 500-999 250-499 50-249 0-49 YES, I would like to receive information about future events confirmed to you in writing. services via e-mail ................................................................. Nature of your company's business: .......................................... Due to unforeseen circumstances, the programme may change and IIR reserves the right to alter the venue and/or speakers or topics. To assist us with future correspondence, please supply the following details: Event Venue: Name of the Department Head: ..................................................................................................................................................................... The Address Hotel, Dubai Marina, Dubai, UAE Department: ........................................................... Mobile: .......................................... Email: ....................................................................... Tel: +971 4 436 7777 Accommodation Details We highly recommend you secure your room reservation at the Training Manager: ............................................................................................................................................................................................. earliest to avoid last minute inconvenience. You can contact the IIR Hospitality Desk for assistance on: Department: ........................................................... Mobile: .......................................... Email: ...................................................................... Tel: +971-4-4072693 Fax: +971-4-4072517 Email: hospitality@iirme.com Booking Contact: ................................................................................................................................................................................................ IK/VH BU303 BALANCED SCORECARD J Department: ........................................................... Mobile: .......................................... Email: ........................................................................ O © Copyright I.I.R. HOLDINGS B.V.