B636 Phase 1
Project Storyboard
B636 Aerial View Prior to Retrofit
Aerial view of 633 and 636 after 636 expansion June 2016
Breaking
Ground
Grading
and
Civil Work
Columns
go up
Structural Laydown Area
Structure Taking Form
Building Structure
and Shell
Parking Lot/Civil Work
The Roof
Interior
Demolition
and
Trenching
for Drain
Piping
Construction
Trailers
Building Shell
Exterior
Siding
Complete
Ductwork
and
High Piping
Installation
Starts
Interior Concrete is Poured
Tech Core Ductwork and Pipe Rack Installation Begins
Interior
Framing
and
Utility
Piping
Civil Work
for Switchgear 2
Pipe Rack Rigging
Mezzanine
and
First Floor
Interior
Views
Catwalk and Pipe Module Installation
Interior
Progress
Buffer Prep Module
Being Brought Inside
Interior
Progress
Views
Admin Area Under Construction
Admin Areas
Under
Construction
Completed
Admin Areas
IT Server Rooms & UPS Room
Air Handlers in
Mezzanine Installed
QC Lab Progress
QC Lab Casework Completed
Validation Lab
Production Equipment
being Set in Place
CIP Skids
Modules 3 & 4 being Put Together
Seed Reactors
and
Cell Culture
Hall Utility Panels
Interstitial
Space
Roof Exhaust
Fans and
Ductwork
Architectural Finishes
for Material Air Locks
and Clean Corridor
Bio-Waste Collection Tank
Construction
CUB Expansion Shell, WFI Still
Set in Place, Trenching for Drains
CUB Interior Progress
CUB Utility
Equipment
Installation
CUB WFI
and Pure Steam Generators
CUB Second Floor WFI Storage Tanks
Electrical
Glycol Tank
Process Glycol Tank
and Chiller
Installation - Tank
with and without
Insulation
Aerial View Expanded Building 636
Finished
Systems
compressd Air Carbon Filter
CIP Skids
Finished
Systems
Rocker Reactors Seed Reactors
Production Reactors
Finished
Systems
Technical Core
Column PackingChromatography Controller Skids
Confidentiality Notice
This file is private and may contain confidential and proprietary information. If you have received this file in error, please notify us and remove
it from your systme and note that you must not copy, distribute or take any action in reliance on it. Any unauthorized use or disclosure of the
contents of this file is not permitted and may be unlawful. AstraZeneca PLC, 2 Kingdom Street, London, W2 6BD, UK, T: +44(0)20 7604 8000,
F: +44 (0)20 7604 8151, www.astrazeneca.com

More Related Content

Similar to B636 Project storyboard

Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)
Nekumi Kida
 
Btech report
Btech reportBtech report
Btech report
Chong Chin Pin
 
Building Technology : Industrialize Building Technology
Building Technology : Industrialize Building TechnologyBuilding Technology : Industrialize Building Technology
Building Technology : Industrialize Building Technology
Quinn Liew
 
Bc open pre fabricated construction system
Bc open pre fabricated construction systemBc open pre fabricated construction system
Bc open pre fabricated construction system
Anuj Singhal
 
Portfolio aya abbas2
Portfolio  aya abbas2Portfolio  aya abbas2
Portfolio aya abbas2
aya abbas
 
Murch School SIT Meeting Presentation (March 14, 2016)
Murch School SIT Meeting Presentation (March 14, 2016)Murch School SIT Meeting Presentation (March 14, 2016)
Murch School SIT Meeting Presentation (March 14, 2016)
DC Department of General Services
 
Victoria Building Analyze-Report
Victoria Building Analyze-ReportVictoria Building Analyze-Report
Victoria Building Analyze-Report
Ghazal Fateh
 
Phase 7D Meeting 1 (4/10/14)
Phase 7D Meeting 1 (4/10/14)Phase 7D Meeting 1 (4/10/14)
Phase 7D Meeting 1 (4/10/14)
MKThink Strategy
 
Dockside Green Case-study, Victoria, British Columbia, Canada LEED
Dockside Green Case-study, Victoria, British Columbia, Canada LEEDDockside Green Case-study, Victoria, British Columbia, Canada LEED
Dockside Green Case-study, Victoria, British Columbia, Canada LEED
yagnik moradiya
 
ANACOSTIA GATEWAY report
ANACOSTIA GATEWAY reportANACOSTIA GATEWAY report
ANACOSTIA GATEWAY report
Ngo Quan
 

Similar to B636 Project storyboard (10)

Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)
 
Btech report
Btech reportBtech report
Btech report
 
Building Technology : Industrialize Building Technology
Building Technology : Industrialize Building TechnologyBuilding Technology : Industrialize Building Technology
Building Technology : Industrialize Building Technology
 
Bc open pre fabricated construction system
Bc open pre fabricated construction systemBc open pre fabricated construction system
Bc open pre fabricated construction system
 
Portfolio aya abbas2
Portfolio  aya abbas2Portfolio  aya abbas2
Portfolio aya abbas2
 
Murch School SIT Meeting Presentation (March 14, 2016)
Murch School SIT Meeting Presentation (March 14, 2016)Murch School SIT Meeting Presentation (March 14, 2016)
Murch School SIT Meeting Presentation (March 14, 2016)
 
Victoria Building Analyze-Report
Victoria Building Analyze-ReportVictoria Building Analyze-Report
Victoria Building Analyze-Report
 
Phase 7D Meeting 1 (4/10/14)
Phase 7D Meeting 1 (4/10/14)Phase 7D Meeting 1 (4/10/14)
Phase 7D Meeting 1 (4/10/14)
 
Dockside Green Case-study, Victoria, British Columbia, Canada LEED
Dockside Green Case-study, Victoria, British Columbia, Canada LEEDDockside Green Case-study, Victoria, British Columbia, Canada LEED
Dockside Green Case-study, Victoria, British Columbia, Canada LEED
 
ANACOSTIA GATEWAY report
ANACOSTIA GATEWAY reportANACOSTIA GATEWAY report
ANACOSTIA GATEWAY report
 

B636 Project storyboard