SlideShare a Scribd company logo
1 of 2
ECWAY TECHNOLOGIES
IEEE PROJECTS & SOFTWARE DEVELOPMENTS
OUR OFFICES @ CHENNAI / TRICHY / KARUR / ERODE / MADURAI / SALEM / COIMBATORE
BANGALORE / HYDRABAD
CELL: +91 98949 17187, +91 875487 1111 / 2111 / 3111 / 4111 / 5111 / 6111 / 8111
VISIT: www.ecwaytechnologies.com | www.ecwayprojects.com
Mail to: ecwaytechnologies@gmail.com | ecwayembedded@gmail.com

AUTOMATIC GATE CONTROL FOR OPENING
AND CLOSING SYSTEM
ABSTRACT
Aim of this project is to operate and control the unmanned gate in the
proper manner in order to avoid the accidents in the unmanned crossing. The
train accidents due to the absence of human power in the crossing are the
major problems faced by the population. In order to overcome the accidents
due to the above problem
The components to be involved in this project are PIC controller, IR
transmitter and receiver and the control circuit for the railway-crossing gate.
The IR transmitter and a receiver will be placed in the certain distance
[e.g.10km from the left and right] from the level crossing. In the absence of
the train arrival the data will be getting transmitted from the transmitter to
the receiver at that time the gate will be in the opened condition.
During the movement of the train from the left to right through the
track the data from the IR transmitter and the receiver will get stopped at
that time the signal will be given to the controller which controls the gate
controlled circuit. As soon as the control circuit receives the signal it closes
the level crossing gate. At the time when the IR receiver placed in the right
side receives the data from the transmitter placed at the same time the signal
will be given to the controller which controls the gate controlled circuit. As
soon as the controlled circuit signals the gate gets opened.
The same process will be repeated for the train travelling from right to
left. The only change is the gate will open based on the signal from the right
side placed transmitter/receiver and gate will get closed based on the signal
from the left side placed transmitter/receiver

LINE DIAGRAM OF THE SYSTEM

TRAIN
SENSOR-2
CONTROLLER

RELAY
DRIVER
& RELAYS

DC
MOTOR

Gate

TRAIN
SENSOR-1

ADVANTAGES:
 This system determines the accurate position than the manual
method.
 This system reduces the manufacturing lead time.
 This system eliminates the manual work.
 Highly accurate and more efficient.
 Compact and quick response.
Disadvantage
 Maintenance cost is higher
 Electronic system may failure at any time

More Related Content

What's hot

Microcontroller based automatic engine locking system for drunken drivers
Microcontroller based automatic engine locking system for drunken driversMicrocontroller based automatic engine locking system for drunken drivers
Microcontroller based automatic engine locking system for drunken driversVinny Chweety
 
Automatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanismAutomatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanismEcway Technologies
 
Automatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanismAutomatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanismecwayerode
 
Automatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanismAutomatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanismEcway Technologies
 
Wireless Sensor Networking in Railways
Wireless Sensor Networking in RailwaysWireless Sensor Networking in Railways
Wireless Sensor Networking in RailwaysHari Wiz
 
Automation on Traffic Signals
Automation on Traffic SignalsAutomation on Traffic Signals
Automation on Traffic SignalsMphasis
 
1250 alcohol-detection-with-vehicle-controlling
1250 alcohol-detection-with-vehicle-controlling1250 alcohol-detection-with-vehicle-controlling
1250 alcohol-detection-with-vehicle-controllingMikroc Srinivs
 

What's hot (8)

Microcontroller based automatic engine locking system for drunken drivers
Microcontroller based automatic engine locking system for drunken driversMicrocontroller based automatic engine locking system for drunken drivers
Microcontroller based automatic engine locking system for drunken drivers
 
Automatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanismAutomatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanism
 
Automatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanismAutomatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanism
 
Automatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanismAutomatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanism
 
Wireless Sensor Networking in Railways
Wireless Sensor Networking in RailwaysWireless Sensor Networking in Railways
Wireless Sensor Networking in Railways
 
Business Plan
Business PlanBusiness Plan
Business Plan
 
Automation on Traffic Signals
Automation on Traffic SignalsAutomation on Traffic Signals
Automation on Traffic Signals
 
1250 alcohol-detection-with-vehicle-controlling
1250 alcohol-detection-with-vehicle-controlling1250 alcohol-detection-with-vehicle-controlling
1250 alcohol-detection-with-vehicle-controlling
 

Viewers also liked

Formatos 0
Formatos 0Formatos 0
Formatos 0Ivi Uds
 
Ewrt 1 b green sheet winter 2016
Ewrt 1 b green sheet winter 2016Ewrt 1 b green sheet winter 2016
Ewrt 1 b green sheet winter 2016jordanlachance
 
Vacaciones en las Islas Cíes
Vacaciones en las Islas CíesVacaciones en las Islas Cíes
Vacaciones en las Islas CíesPiratas de Nabia
 
Design and fabrication of pneumatic design and fabrication of pneumatic
Design and fabrication of pneumatic design and fabrication of pneumatic  Design and fabrication of pneumatic design and fabrication of pneumatic
Design and fabrication of pneumatic design and fabrication of pneumatic Ecway Technologies
 
10 yr service Award2014MOstate
10 yr service Award2014MOstate10 yr service Award2014MOstate
10 yr service Award2014MOstateErica Payne
 
Craigour park useful information
Craigour park useful informationCraigour park useful information
Craigour park useful informationbrucemurray67
 
Transport av nanokoltuber i mark och grundvatten-fritjof fagerlund
Transport av nanokoltuber i mark  och grundvatten-fritjof fagerlundTransport av nanokoltuber i mark  och grundvatten-fritjof fagerlund
Transport av nanokoltuber i mark och grundvatten-fritjof fagerlundGeological Survey of Sweden
 
Bulletin de nouvelles riet n° 8 – decembre 2015
Bulletin de nouvelles riet n° 8 – decembre 2015Bulletin de nouvelles riet n° 8 – decembre 2015
Bulletin de nouvelles riet n° 8 – decembre 2015RIET_INEW
 
Test de personalidad_madre_teresa
Test de personalidad_madre_teresaTest de personalidad_madre_teresa
Test de personalidad_madre_teresaJavier Hc
 

Viewers also liked (14)

Formatos 0
Formatos 0Formatos 0
Formatos 0
 
Ewrt 1 b green sheet winter 2016
Ewrt 1 b green sheet winter 2016Ewrt 1 b green sheet winter 2016
Ewrt 1 b green sheet winter 2016
 
Portfolio
PortfolioPortfolio
Portfolio
 
éTica
éTicaéTica
éTica
 
Pfos i grundvatten jonas bermin
Pfos i grundvatten jonas berminPfos i grundvatten jonas bermin
Pfos i grundvatten jonas bermin
 
Vacaciones en las Islas Cíes
Vacaciones en las Islas CíesVacaciones en las Islas Cíes
Vacaciones en las Islas Cíes
 
Design and fabrication of pneumatic design and fabrication of pneumatic
Design and fabrication of pneumatic design and fabrication of pneumatic  Design and fabrication of pneumatic design and fabrication of pneumatic
Design and fabrication of pneumatic design and fabrication of pneumatic
 
10 yr service Award2014MOstate
10 yr service Award2014MOstate10 yr service Award2014MOstate
10 yr service Award2014MOstate
 
Diploma Maestria
Diploma MaestriaDiploma Maestria
Diploma Maestria
 
Craigour park useful information
Craigour park useful informationCraigour park useful information
Craigour park useful information
 
Transport av nanokoltuber i mark och grundvatten-fritjof fagerlund
Transport av nanokoltuber i mark  och grundvatten-fritjof fagerlundTransport av nanokoltuber i mark  och grundvatten-fritjof fagerlund
Transport av nanokoltuber i mark och grundvatten-fritjof fagerlund
 
ehrenbeck_resume 2015
ehrenbeck_resume 2015ehrenbeck_resume 2015
ehrenbeck_resume 2015
 
Bulletin de nouvelles riet n° 8 – decembre 2015
Bulletin de nouvelles riet n° 8 – decembre 2015Bulletin de nouvelles riet n° 8 – decembre 2015
Bulletin de nouvelles riet n° 8 – decembre 2015
 
Test de personalidad_madre_teresa
Test de personalidad_madre_teresaTest de personalidad_madre_teresa
Test de personalidad_madre_teresa
 

Similar to Automatic gate control for opening

IRJET-Solar Operated Automatic Railway Gate Control
IRJET-Solar Operated Automatic Railway Gate ControlIRJET-Solar Operated Automatic Railway Gate Control
IRJET-Solar Operated Automatic Railway Gate ControlIRJET Journal
 
Breath alcholic tester
Breath alcholic testerBreath alcholic tester
Breath alcholic testerEcwaytechnoz
 
Breath alcholic tester
Breath alcholic testerBreath alcholic tester
Breath alcholic testerEcwaytechnoz
 
Breath alcholic tester
Breath alcholic testerBreath alcholic tester
Breath alcholic testerEcway2004
 
Road accident avoiding system by drunker sensing technique
Road accident avoiding system by drunker sensing techniqueRoad accident avoiding system by drunker sensing technique
Road accident avoiding system by drunker sensing techniqueEcway Technologies
 
Breath alcholic tester
Breath alcholic testerBreath alcholic tester
Breath alcholic testerEcwaytech
 
Breath alcholic tester
Breath alcholic testerBreath alcholic tester
Breath alcholic testerEcwayt
 
automatic railway gate control system
automatic railway gate control system automatic railway gate control system
automatic railway gate control system GManojkumar11
 
Visualize gate control and track switching (GHanshyam Dusane)
Visualize gate control and track switching (GHanshyam Dusane)Visualize gate control and track switching (GHanshyam Dusane)
Visualize gate control and track switching (GHanshyam Dusane)Ghanshyam Dusane
 
AUTOMATIC RAILWAY GATE CONTROL SYSTEM
AUTOMATIC RAILWAY GATE CONTROL SYSTEMAUTOMATIC RAILWAY GATE CONTROL SYSTEM
AUTOMATIC RAILWAY GATE CONTROL SYSTEMJOLLUSUDARSHANREDDY
 
Automatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanismAutomatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanismEcwaytechnoz
 
Automatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanismAutomatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanismEcway2004
 
Et0011 automatic pneumatic bumper adjust mechanism
Et0011   automatic pneumatic bumper adjust mechanismEt0011   automatic pneumatic bumper adjust mechanism
Et0011 automatic pneumatic bumper adjust mechanismEcway Technologies
 
Automatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanismAutomatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanismEcwaytech
 
Et0011 automatic pneumatic bumper adjust mechanism
Et0011   automatic pneumatic bumper adjust mechanismEt0011   automatic pneumatic bumper adjust mechanism
Et0011 automatic pneumatic bumper adjust mechanismEcwaytech
 
Automatic pneumatic clutch and braking system
Automatic pneumatic clutch and braking systemAutomatic pneumatic clutch and braking system
Automatic pneumatic clutch and braking systemEcwaytechnoz
 
Automatic pneumatic clutch and braking system
Automatic pneumatic clutch and braking systemAutomatic pneumatic clutch and braking system
Automatic pneumatic clutch and braking systemEcway Technologies
 
Automatic pneumatic clutch and braking system
Automatic pneumatic clutch and braking systemAutomatic pneumatic clutch and braking system
Automatic pneumatic clutch and braking systemEcwaytech
 
FINAL REPORT_B.tech
FINAL REPORT_B.techFINAL REPORT_B.tech
FINAL REPORT_B.techafzal usmani
 
IRJET- Automatic Footbridge Platform System on Railway Platform
IRJET- Automatic Footbridge Platform System on Railway PlatformIRJET- Automatic Footbridge Platform System on Railway Platform
IRJET- Automatic Footbridge Platform System on Railway PlatformIRJET Journal
 

Similar to Automatic gate control for opening (20)

IRJET-Solar Operated Automatic Railway Gate Control
IRJET-Solar Operated Automatic Railway Gate ControlIRJET-Solar Operated Automatic Railway Gate Control
IRJET-Solar Operated Automatic Railway Gate Control
 
Breath alcholic tester
Breath alcholic testerBreath alcholic tester
Breath alcholic tester
 
Breath alcholic tester
Breath alcholic testerBreath alcholic tester
Breath alcholic tester
 
Breath alcholic tester
Breath alcholic testerBreath alcholic tester
Breath alcholic tester
 
Road accident avoiding system by drunker sensing technique
Road accident avoiding system by drunker sensing techniqueRoad accident avoiding system by drunker sensing technique
Road accident avoiding system by drunker sensing technique
 
Breath alcholic tester
Breath alcholic testerBreath alcholic tester
Breath alcholic tester
 
Breath alcholic tester
Breath alcholic testerBreath alcholic tester
Breath alcholic tester
 
automatic railway gate control system
automatic railway gate control system automatic railway gate control system
automatic railway gate control system
 
Visualize gate control and track switching (GHanshyam Dusane)
Visualize gate control and track switching (GHanshyam Dusane)Visualize gate control and track switching (GHanshyam Dusane)
Visualize gate control and track switching (GHanshyam Dusane)
 
AUTOMATIC RAILWAY GATE CONTROL SYSTEM
AUTOMATIC RAILWAY GATE CONTROL SYSTEMAUTOMATIC RAILWAY GATE CONTROL SYSTEM
AUTOMATIC RAILWAY GATE CONTROL SYSTEM
 
Automatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanismAutomatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanism
 
Automatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanismAutomatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanism
 
Et0011 automatic pneumatic bumper adjust mechanism
Et0011   automatic pneumatic bumper adjust mechanismEt0011   automatic pneumatic bumper adjust mechanism
Et0011 automatic pneumatic bumper adjust mechanism
 
Automatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanismAutomatic pneumatic bumper adjust mechanism
Automatic pneumatic bumper adjust mechanism
 
Et0011 automatic pneumatic bumper adjust mechanism
Et0011   automatic pneumatic bumper adjust mechanismEt0011   automatic pneumatic bumper adjust mechanism
Et0011 automatic pneumatic bumper adjust mechanism
 
Automatic pneumatic clutch and braking system
Automatic pneumatic clutch and braking systemAutomatic pneumatic clutch and braking system
Automatic pneumatic clutch and braking system
 
Automatic pneumatic clutch and braking system
Automatic pneumatic clutch and braking systemAutomatic pneumatic clutch and braking system
Automatic pneumatic clutch and braking system
 
Automatic pneumatic clutch and braking system
Automatic pneumatic clutch and braking systemAutomatic pneumatic clutch and braking system
Automatic pneumatic clutch and braking system
 
FINAL REPORT_B.tech
FINAL REPORT_B.techFINAL REPORT_B.tech
FINAL REPORT_B.tech
 
IRJET- Automatic Footbridge Platform System on Railway Platform
IRJET- Automatic Footbridge Platform System on Railway PlatformIRJET- Automatic Footbridge Platform System on Railway Platform
IRJET- Automatic Footbridge Platform System on Railway Platform
 

Automatic gate control for opening

  • 1. ECWAY TECHNOLOGIES IEEE PROJECTS & SOFTWARE DEVELOPMENTS OUR OFFICES @ CHENNAI / TRICHY / KARUR / ERODE / MADURAI / SALEM / COIMBATORE BANGALORE / HYDRABAD CELL: +91 98949 17187, +91 875487 1111 / 2111 / 3111 / 4111 / 5111 / 6111 / 8111 VISIT: www.ecwaytechnologies.com | www.ecwayprojects.com Mail to: ecwaytechnologies@gmail.com | ecwayembedded@gmail.com AUTOMATIC GATE CONTROL FOR OPENING AND CLOSING SYSTEM ABSTRACT Aim of this project is to operate and control the unmanned gate in the proper manner in order to avoid the accidents in the unmanned crossing. The train accidents due to the absence of human power in the crossing are the major problems faced by the population. In order to overcome the accidents due to the above problem The components to be involved in this project are PIC controller, IR transmitter and receiver and the control circuit for the railway-crossing gate. The IR transmitter and a receiver will be placed in the certain distance [e.g.10km from the left and right] from the level crossing. In the absence of the train arrival the data will be getting transmitted from the transmitter to the receiver at that time the gate will be in the opened condition. During the movement of the train from the left to right through the track the data from the IR transmitter and the receiver will get stopped at that time the signal will be given to the controller which controls the gate controlled circuit. As soon as the control circuit receives the signal it closes the level crossing gate. At the time when the IR receiver placed in the right side receives the data from the transmitter placed at the same time the signal will be given to the controller which controls the gate controlled circuit. As soon as the controlled circuit signals the gate gets opened.
  • 2. The same process will be repeated for the train travelling from right to left. The only change is the gate will open based on the signal from the right side placed transmitter/receiver and gate will get closed based on the signal from the left side placed transmitter/receiver LINE DIAGRAM OF THE SYSTEM TRAIN SENSOR-2 CONTROLLER RELAY DRIVER & RELAYS DC MOTOR Gate TRAIN SENSOR-1 ADVANTAGES:  This system determines the accurate position than the manual method.  This system reduces the manufacturing lead time.  This system eliminates the manual work.  Highly accurate and more efficient.  Compact and quick response. Disadvantage  Maintenance cost is higher  Electronic system may failure at any time