MAHATMA GANDHI INSTITUTE OF TECHNOIOGY
AUTOMATIC RAILWAY GATE CONTROL SYSTEM
DEPARTMENT OF ELECTRONICS AND COMMUNICATION ENGINEERING
GUIDED BY:
MR.K.N.MALLESH SIR
G.MANOJKUMAR(20265A0404)
RAHEEQ REHAN (20265A0405)
AATHUKURI TEJASWI (18265A0401)
Content:
• Abstract
• Project objective.
• Block diagram.
• Working principle.
ABSTRACT
• The main aim of the project is to establish automatic railway gates in place of existing manually
operated railway gates, to reduce maintenance expenditure, human mistakes, and accidents.
• It is a low cost, maintenance free so that the concept is implemented by using an 8051 Micro
controller. Here we established a railway gate moving towards top and bottom directions with the
help of a 2V bi-directional linear DC Motor, controlled by Micro controller according to the
program written in internal flash memory. Two sensors are used in this project to monitor
whether the gate is properly closed or not. Two more sensors are used to detect train movements
i.e. entering and leaving. The intelligent firmware detects the train entry near by the railway gate
with the help of entry sensor, and then the railway gate starts moving towards the downward
direction. The motor stops rotating if any obstructions occurred during this operation. The gate
automatically moves towards upward direction after leaving the train. It can be detected by
leaving sensor. With help of this control system, we can avoid accidents that occur at railway
gates, human mistakes and high maintenance of the control operation. This project was
implemented using 8051 Microcontroller .
Project Objective
• Provide an automatic railway gate at a Level crossing replacing the
gates operated by the gatekeeper for:
• Reduction of time for closing and opening the gate.
• Higher reliability as it is not subjected to manual errors.
• provide safety to the road users by reducing the accidents.
• level crossing:
• The place where track and highway road intersects each other at the
same level is known as "level crossing".
.
Block diagram
IR SENSORS Micro controller Motor Gate
Power supply
WORKING PRINCIPLE
• The arrival of train is detected by the sensor placed on either side of the gate at
about 5km from the level crossing
• Once the arrival is sensed,the sensed signal is sent to the microcontroller.
• Subsequently, buzzer indication and light signals on either side are
• provided to the road users indicating the closure of gates.The departure of the
train is detected by sensors placed at about 1km from the gate.
• The signal about the departure is sent to the microcontroller, which in
• turn operates the motor and opens the gate.
.
Embedded System
• An embedded system is:
• A microcontroller/microprocessor based system
• that is built to control the functions of equipment,
• machinery or plant.
• O Combination of hardware & software for specific
• application. Hardware
• processor, memories, peripherals, power supply etc...
HARDWARE IMPLEMENTATION:
• Micro Controller
• Power supply
• Buzzer and light signals; to warn the road user Two IR (Infrared) sensors
• 12 V Dc Motor
.
.
• .
THANK YOU

More Related Content

Similar to automatic railway gate control system

Automatic gate open and closin ggate
Automatic gate open and closin ggateAutomatic gate open and closin ggate
Automatic gate open and closin ggate
Ecwayt
 
Automatic gate control for opening
Automatic gate control for opening Automatic gate control for opening
Automatic gate control for opening
Ecway Technologies
 
Automatic gate open and closin ggate
Automatic gate open and closin ggateAutomatic gate open and closin ggate
Automatic gate open and closin ggate
Ecwaytechnoz
 
Automatic gate control for opening
Automatic gate control for openingAutomatic gate control for opening
Automatic gate control for opening
Ecway Technologies
 
Automatic gate open and closin ggate
Automatic gate open and closin ggateAutomatic gate open and closin ggate
Automatic gate open and closin ggate
Ecwaytechnoz
 
Automatic gate open and closin ggate
Automatic gate open and closin ggateAutomatic gate open and closin ggate
Automatic gate open and closin ggate
Ecwaytech
 
Automatic gate open and closin ggate
Automatic gate open and closin ggateAutomatic gate open and closin ggate
Automatic gate open and closin ggate
Ecway2004
 
Implementation of automatic railway platform
Implementation of automatic railway platformImplementation of automatic railway platform
Implementation of automatic railway platform
jeevansaral
 
Presentationatchyuth 120413063530-phpapp02
Presentationatchyuth 120413063530-phpapp02Presentationatchyuth 120413063530-phpapp02
Presentationatchyuth 120413063530-phpapp02
Smiley Sowjanya
 

Similar to automatic railway gate control system (20)

Automatic railway gate control
Automatic railway gate controlAutomatic railway gate control
Automatic railway gate control
 
Visualize gate control and track switching (GHanshyam Dusane)
Visualize gate control and track switching (GHanshyam Dusane)Visualize gate control and track switching (GHanshyam Dusane)
Visualize gate control and track switching (GHanshyam Dusane)
 
Automatic gate open and closin ggate
Automatic gate open and closin ggateAutomatic gate open and closin ggate
Automatic gate open and closin ggate
 
Automatic gate control for opening
Automatic gate control for opening Automatic gate control for opening
Automatic gate control for opening
 
Automatic gate open and closin ggate
Automatic gate open and closin ggateAutomatic gate open and closin ggate
Automatic gate open and closin ggate
 
Automatic gate control for opening
Automatic gate control for openingAutomatic gate control for opening
Automatic gate control for opening
 
Automatic gate open and closin ggate
Automatic gate open and closin ggateAutomatic gate open and closin ggate
Automatic gate open and closin ggate
 
Automatic gate open and closin ggate
Automatic gate open and closin ggateAutomatic gate open and closin ggate
Automatic gate open and closin ggate
 
Automatic gate open and closin ggate
Automatic gate open and closin ggateAutomatic gate open and closin ggate
Automatic gate open and closin ggate
 
Un manned railway gate
Un manned railway gateUn manned railway gate
Un manned railway gate
 
Nabil slide fyp1 new
Nabil slide fyp1 newNabil slide fyp1 new
Nabil slide fyp1 new
 
AUTOMATIC RAILWAY GATE DETECTION SYSTEM PPT
AUTOMATIC RAILWAY GATE DETECTION SYSTEM PPTAUTOMATIC RAILWAY GATE DETECTION SYSTEM PPT
AUTOMATIC RAILWAY GATE DETECTION SYSTEM PPT
 
Automatic gate open and closin ggate
Automatic gate open and closin ggateAutomatic gate open and closin ggate
Automatic gate open and closin ggate
 
Smart railway crossing embedded with automated platform bridge
Smart railway crossing embedded with automated platform bridgeSmart railway crossing embedded with automated platform bridge
Smart railway crossing embedded with automated platform bridge
 
RAGU PPT
RAGU PPTRAGU PPT
RAGU PPT
 
Arts final project(MOBILE BRIDGE PLATFORM)
Arts final project(MOBILE BRIDGE PLATFORM)Arts final project(MOBILE BRIDGE PLATFORM)
Arts final project(MOBILE BRIDGE PLATFORM)
 
Implementation of automatic railway platform
Implementation of automatic railway platformImplementation of automatic railway platform
Implementation of automatic railway platform
 
Automatic Crack Detecting system for Railway security
Automatic Crack Detecting system for Railway securityAutomatic Crack Detecting system for Railway security
Automatic Crack Detecting system for Railway security
 
PLC 5.docx
PLC 5.docxPLC 5.docx
PLC 5.docx
 
Presentationatchyuth 120413063530-phpapp02
Presentationatchyuth 120413063530-phpapp02Presentationatchyuth 120413063530-phpapp02
Presentationatchyuth 120413063530-phpapp02
 

Recently uploaded

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Recently uploaded (20)

DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Navigating Identity and Access Management in the Modern Enterprise
Navigating Identity and Access Management in the Modern EnterpriseNavigating Identity and Access Management in the Modern Enterprise
Navigating Identity and Access Management in the Modern Enterprise
 
AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by Anitaraj
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Stronger Together: Developing an Organizational Strategy for Accessible Desig...
Stronger Together: Developing an Organizational Strategy for Accessible Desig...Stronger Together: Developing an Organizational Strategy for Accessible Desig...
Stronger Together: Developing an Organizational Strategy for Accessible Desig...
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Choreo: Empowering the Future of Enterprise Software Engineering
Choreo: Empowering the Future of Enterprise Software EngineeringChoreo: Empowering the Future of Enterprise Software Engineering
Choreo: Empowering the Future of Enterprise Software Engineering
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
 

automatic railway gate control system

  • 1. MAHATMA GANDHI INSTITUTE OF TECHNOIOGY AUTOMATIC RAILWAY GATE CONTROL SYSTEM DEPARTMENT OF ELECTRONICS AND COMMUNICATION ENGINEERING GUIDED BY: MR.K.N.MALLESH SIR G.MANOJKUMAR(20265A0404) RAHEEQ REHAN (20265A0405) AATHUKURI TEJASWI (18265A0401)
  • 2. Content: • Abstract • Project objective. • Block diagram. • Working principle.
  • 3. ABSTRACT • The main aim of the project is to establish automatic railway gates in place of existing manually operated railway gates, to reduce maintenance expenditure, human mistakes, and accidents. • It is a low cost, maintenance free so that the concept is implemented by using an 8051 Micro controller. Here we established a railway gate moving towards top and bottom directions with the help of a 2V bi-directional linear DC Motor, controlled by Micro controller according to the program written in internal flash memory. Two sensors are used in this project to monitor whether the gate is properly closed or not. Two more sensors are used to detect train movements i.e. entering and leaving. The intelligent firmware detects the train entry near by the railway gate with the help of entry sensor, and then the railway gate starts moving towards the downward direction. The motor stops rotating if any obstructions occurred during this operation. The gate automatically moves towards upward direction after leaving the train. It can be detected by leaving sensor. With help of this control system, we can avoid accidents that occur at railway gates, human mistakes and high maintenance of the control operation. This project was implemented using 8051 Microcontroller .
  • 4. Project Objective • Provide an automatic railway gate at a Level crossing replacing the gates operated by the gatekeeper for: • Reduction of time for closing and opening the gate. • Higher reliability as it is not subjected to manual errors. • provide safety to the road users by reducing the accidents. • level crossing: • The place where track and highway road intersects each other at the same level is known as "level crossing".
  • 5. .
  • 6. Block diagram IR SENSORS Micro controller Motor Gate Power supply
  • 7. WORKING PRINCIPLE • The arrival of train is detected by the sensor placed on either side of the gate at about 5km from the level crossing • Once the arrival is sensed,the sensed signal is sent to the microcontroller. • Subsequently, buzzer indication and light signals on either side are • provided to the road users indicating the closure of gates.The departure of the train is detected by sensors placed at about 1km from the gate. • The signal about the departure is sent to the microcontroller, which in • turn operates the motor and opens the gate.
  • 8. .
  • 9. Embedded System • An embedded system is: • A microcontroller/microprocessor based system • that is built to control the functions of equipment, • machinery or plant. • O Combination of hardware & software for specific • application. Hardware • processor, memories, peripherals, power supply etc...
  • 10. HARDWARE IMPLEMENTATION: • Micro Controller • Power supply • Buzzer and light signals; to warn the road user Two IR (Infrared) sensors • 12 V Dc Motor
  • 11. .