THE NEXT GREAT UNDERGROUND
MINE IN CANADA
Corporate Presentation
OSISKO GROUP DAYS – SEPTEMBER 2017
WWW.FALCORES.COM | FPC:TSXV
Disclaimer
This presentation contains a review of the Company’s properties in Canada. Viewers are cautioned that the projects are at an early stage of exploration and that estimates and projections
contained herein are based on limited and incomplete data. More work is required before the mineralization on the projects and their economic aspects can be confidentaly modeled.
Therefore, the work results and estimates herein may be considered to be generally indicative only of the nature and quality of the projects. No representation or prediction is intended as to
the results of future work, nor can there be any promise that the estimates herein will be confirmed by future exploration or analysis, or that the projects will otherwise prove to be
economic.
The TSX Venture Exchange has not reviewed and does not accept responsibility for the accuracy or adequacy of this presentation, which has been prepared by management. There can be
no assurance that any of the assumptions in the resource estimates will be supported by a Pre-feasibility or Feasibility Study or that any forward looking event will come to pass. The data is
incomplete and considerable additional work will be required to complete further evaluation, including but not limited to drilling, engineering and socio-economic studies and investment.
Past performance is no guarantee of future performance and all investors are urged to consult their investment professionals before making an investment decision. Investors are further
cautioned that past performance is no guarantee of future performance
Forward-Looking Statements
Certain information included in this presentation constitutes forward-looking statements, including any information as to our projects, plans and future performance. All statements, other
than statements of historical fact, are forward-looking statements. The words “expect”, “believe”, “anticipate”, “will”, “intend”, “estimate”, “forecast”, “budget”, “schedule” and similar
expressions identify forward-looking statements. Forward-looking statements are necessarily based upon a number of factors and assumptions that, while considered reasonable by
management, are inherently subject to significant business, economic and competitive uncertainties and contingencies. Known and unknown factors could cause actual results to differ
materially from those projected in the forward-looking statements.
Such factors include, but are not limited to: changes to current estimates of mineral resources; labour availability; litigation; availability of and increased costs associated with contractors
and exploration equipment; the speculative nature of mineral exploration and development, including the risks of obtaining necessary licenses and permits; contests over title to properties;
uncertainty with the Company’s ability to secure capital to execute its business plans; changes in national and local government legislation in Canada; risk of loss due to sabotage and civil
disturbances; risks arising from holding derivative instruments; and business opportunities that may be pursued by the Company. Many of these uncertainties and contingencies can affect
our actual results and could cause actual results to differ materially from those expressed or implied in any forward-looking statements made by, or on behalf of, us. Readers are cautioned
that forward-looking statements are not guarantees of future performance.
The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as
required by applicable law.
Cautionary Note to U.S Investors Concerning Measured, Indicated and Inferred Resources
This presentation uses the terms “measured,” “indicated” and “inferred resources. We advise investors that while those terms are recognized and required by Canadian regulations, the
United States Securities and Exchange commission does not recognize them. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or other
economic studies. United States investors are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be converted into mineral reserves. United
States investors are also cautioned not to assume that all or any part of an inferred mineral resource exists, or is economically or legally mineable.
CAUTIONARY STATEMENT
TSXV: FPC | WWW.FALCORES.COM | 3
TSXV:FPC
C$217M
MARKET CAP
~C$46.2M
CASH & CASH EQUIVALENTS
7.1 Moz AuEq M&I
TOTAL RESOURCES
1.7 Moz AuEq Inferred
TOTAL RESOURCES
236,000 GOLD OZ
ESTIMATED AVERAGE GOLD
ANNUAL PRODUCTION
US$427 PER GOLD OZ
ALL-IN SUSTAINING COST
US$680M
DEVELOPMENT CAPITAL EXPENDITURE
>12 YEARS
INITIAL MINE LIFE
TSXV: FPC | WWW.FALCORES.COM | 4
EXPERIENCED SENIOR LEADERSHIP TEAM|DRIVER OF VALUE
 Luc Lessard, President & CEO, Director
 Vincent Metcalfe, CFO
 Claude Léveillée, VP Community Relations & HR
 Anthony Glavac, VP – Controller
 Helene Cartier, VP – Environment
 Francois Vezina, VP – Mining
 Christian Laroche, VP – Processing
 John-Paul McGrath – Project Manager
 Claude Bernier, Exploration Manager
 Sylvain Doire, Environment
 Claude Pilote, Senior Geologist
 Daniel Mathieu – Mechanical Designer
EXECUTIVE MANAGEMENT BOARD OF DIRECTORS
 Sean Roosen, Chair
 Mario Caron, Lead Director
 Bryan Coates
 Paola Farnesi
 Claude Ferron
 Paul Henri-Girard
 Chantal Sorel
Denotes former member of Canadian Malartic team
TSXV: FPC | WWW.FALCORES.COM | 5
CAPITAL SUMMARY & SHAREHOLDER REGISTRY
SHAREHOLDER REGISTRY
Osisko Gold Royalties 13.3%
Tocqueville 9.0%
Investissement Quebec 5.2%
Oppenheimer Funds 2.0%
Old Mutual 1.6%
RBIM 1.1%
CIBC Asset Management 1.0%
Caisse de Depot du Quebec 1.0%
Shares Outstanding (basic) 179,644,768
Stock Options 9,151,736
Warrants 28,281,717
Shares Outstanding (fully diluted) 205,934,721
Share Price C$1.21
Market Capitalization C$217.4
Cash Position ~C$42.6 M
CAPITAL STRUCTURE (AS OF SEPT 8, 2017)
Source: Factset, Bloomberg, public filings and Company estimates
TSXV: FPC | WWW.FALCORES.COM | 6
HORNE 5 PROJECT| LOCATION
 Located in Rouyn-Noranda, Québec, Canada
 Access to better & experienced miners due
to better work-life balance & conditions
 Eliminates the need for a camp
 Experienced labour pool
 The region of Abitibi produces some of the
most experienced miners in the world
 Experienced suppliers
 Access to tier 1 mining equipment suppliers
& mining contractors in the world
 ~80% of required suppliers & contractors
located within 1 hour from project
 Québec Government
 Strong supporter of the mining industry
 Clear permitting process & BAPE process for
operations over 2,000 tpd
 Great infrastructure
 Rail & highway access
 Affordable and reliable power source
HORNE 5
MONTREAL
TSXV: FPC | WWW.FALCORES.COM | 7
HORNE 5 PROJECT| MINERALIZATION
 The Horne Mine orebodies (Upper H, Lower H and
Horne 5 deposit)
 Dip subvertically within rhyolitic flows,
breccias, and tuffs that are bounded by the
Andesite and the Horne Creek faults.
 Least-altered rhyolites have low K2O
contents and other geochemical features
that place them within the FII tholeiitic
series (Lesher et al., 1986)
 Graded volcaniclastic beds, metal zoning in
the orebodies, and locations of chloritized-
mineralized rhyolites indicate that the
volcanic sequence youngs to the north.
 The volcanics in the fault wedge are variably
silicified and sericitized, and local zones in
the orebody sidewalls and footwall are
chloritized
 The Horne Block lies between the Horne Creek
Fault and the Andesite Fault
TSXV: FPC | WWW.FALCORES.COM | 8
HIGH GRADE ZONES
HORNE 5 PROJECT| LONG & CROSS SECTIONS OF THE DEPOSIT
MINERAL ENVELOPS
MEASURED & INDICATED + INFERRED (at C$55 NSR cut-off)
Resource
Class
Tonnes Au Equivalent
g/t
Au
g/t
Ag
g/t
Cu
%
Zn
%
Contained Au
EQ (mm oz)
Contained Au
(mm oz)
Contained Ag
(oz)
Contained Cu
(mm lbs)
Contained Zn
(mm lbs)
Measured 9.4 2.45 1.58 16.33 0.18 0.81 736 475 4,914 37.7 167.4
Indicated 81.7 2.41 1.56 14.19 0.18 0.86 6,336 4,088 37,295 315.8 1,552.7
Total M&I 91.1 2.41 1.56 14.41 0.18 0.86 7,072 4,564 42,209 353.5 1,720.1
Inferred 22.3 2.39 1.47 22.98 0.20 0.68 1,710 1,053 16,463 99.2 336.1
TSXV: FPC | WWW.FALCORES.COM | 9
HORNE 5 PROJECT| THE NEW PROJECT – THE NEW VISION
 A state-of-the-art UNDERGROUND MINING project
 Mining method
 Transverse long-hole stoping
 Phase 1 – Stope size 40m X 25m X 20m
(~69,000 t per stope, 83 stopes per year)
 Production drilling in ore at 6.5 inches
 Primary – secondary stope mining sequencing
 Stope paste backfill to ensure stability
 3% dilution
 95% ore recovery
 2016 PEA
 236,000 ounces of avg. annual gold production
 US$427 per ounce all-in cash cost
 Development capital investments of US$680 million
 Quemont Shaft
 Use of existing 1,200 metre shaft
 525 full-time jobs during operation : >12 years
 800 jobs during 18-24 construction period
16 M
AuEq Oz
Produced
7.1 M
AuEq Oz
M&I
1.7 M
AuEq Oz
Inferred
4.0 M AuEq Oz
Produced
HORNE 5
PROJECT
FEASIBILITY
TSXV: FPC | WWW.FALCORES.COM | 10
HORNE 5 PROJECT| MINING APPROACH FOR FEASIBILITY >12 YEARS OF LIFE
1,200 METRE
EXISTING
QUEMONT
SHAFT
TSXV: FPC | WWW.FALCORES.COM | 11
Project Potash Corp
Ukraine KJRK
Phase 1
Ukraine KJRK
Phase 2
Horne 5
Phase 1
Horne 5
Phase 2
Depth (m) 1,200 1,340 1,800 1,200 1,800
Speed (m/s) 18-20 19 19 18 18
Operating Hours 19-20 22 22 19 19
Skip capacity (t) 40-65 50 50 43 39.4
Productivity
(tpd)
25,000-30,000 22,050 17,640 23,200 16,550
HORNE 5 PROJECT| HOISTING COMPARABLES
43T SKIP – Similar to Horne 5 Sizing
TSXV: FPC | WWW.FALCORES.COM | 12
HORNE 5 PROJECT| HIGH LEVEL OF AUTOMATION
 STATE-OF-THE-ART OPERATION
 Surface control underground operations:
 Hoist – production and services
 Teleoperation of loaders
 Monitoring and management of ventilation
requirements and paste backfill distribution
 Water pumping monitoring
 Staff & equipment location monitoring
 HIGH CAPACITY PRODUCTION MINING EQUIPMENT
 Scoop tram: 21 metric tonnes
 Haulage truck: 63 metric tonnes
 Conveyor system from deposit to Quemont shaft
 Ability to operate between working shifts
(20h/day vs 14h/day for a conventional mine)
TSXV: FPC | WWW.FALCORES.COM | 13
Cash Cost Summary (PEA)
Mining $324
Processing $340
Tailings and Water $70
G&A $47
Smelting and Refining $107
Royalties $35
By-Product Credit ($608)
Sustaining $98
Closure $13
Total AISC US$427
Pre-Production Cost $233
All-In Costs US$660
HORNE 5 PROJECT| LOW ALL-IN SUSTAINING COST, A TOP QUARTILE ASSET
Source: Wood Mackenzie Ltd. And BMO Capital Markets
* All-in Sustaining Costs are presented as defined by the World Gold Council ("WGC") less Corporate G&A
$0
$500
$1,000
$1,500
$2,000
$2,500
2016 Gold Mine, Composite, Total Cash + Sustaining Capex Cost
Grouped By Mine and Ranked By Total Cash plus Sustaining Capex
TotalCash+SustainingCapex(US$/oz)
0 500 1000 1500 2000
Paid Gold (t)
Horne 5 Project AISC of US$402/oz
2016 Gold AISC Cost Curve 0
US$427/oz
TSXV: FPC | WWW.FALCORES.COM | 14
HORNE 5 PROJECT| PROPOSED FLOWSHEET (PEA)
 Semi-Autogenous-Ball milling-Crushing
 15,000 tpd facility
 92% of mill availability
 Flotation & thickening section divided in
three circuits dedicated to recovering
copper, zinc and pyrite concentrates
 Pyrite concentrate will require a finer grind
to achieve improved gold recovery by
cyanide leaching/CIP
 Paste Backfill Capacity
 60% paste backfill plant availability
 Cyanide destruction circuit
 Process Products
 16% Copper concentrate (+/- 130 tpd)
 52% Zinc concentrate (+/- 200 tpd)
 Ag-Au ingot
 Stockpile live capacity is 12 hours. (8,000 t)
TSXV: FPC | WWW.FALCORES.COM | 15
HORNE 5 PROJECT| DEVELOPMENT CAPITAL EXPENDITURES US$680M
$186
$265
$16
$74
$14
$82
$45
Mining
Processing Plant
Electrical and Communication
Site Infrastructure
Tailings and Water Management
Indirects
Contingency
TOTAL
PRE-PRODUCTION
CAPITAL COSTS
US$680M
Note: Amounts may vary due to rounding.
*FROM PEA
TSXV: FPC | WWW.FALCORES.COM | 16
HORNE 5 PROJECT| FEASIBILITY ADVANCING – SURFACE
TSXV: FPC | WWW.FALCORES.COM | 17
Goldex D Zone
(Agnico Eagle)
Young-Davidson
(Alamos)
LaRonde 2
(Agnico Eagle)
Horne 5 PEA
(Falco)
Horne 5 CURRENT
(Falco)
Resource Grade
(g/t AuEq)
1.69 2.69 5.1 2.9 2.4
Mining Method Long hole Transverse long hole
Long. Retreat /
Tr. Open Stoping
Transverse long hole
Transverse long
hole
Depth (m) 670 - 1,200 750 - 1,500 2,000-3,000 600 - 2,300 600 – 1,800
Stope Size 22 x 30 x 50 12-40 x 20 x 30 5-25 x 15 x 30 38 x 15 x 15 P1: 40 x 20 x25
Mining Rate 6,800 tpd 8,000 tpd 7,200 tpd 15,000 tpd 16,000 tpd
Specific Gravity 2.8 2.69 3.3 3.45 3.45
Mining Dilution 15% 10% 10%-20% < 4% < 4%
Operating Cost/NSR C$35-37/t * C$53.50/t * C$95/t C$47.50/T* n/a
Annual Production
(koz)
113,300 * 200,000 * 230,000 * 236,000* n/a
IRR ** 15.0% IRR 10.3% IRR 13.3% IRR 16.0% IRR n/a
* Projected life-of-mine (LOM) and 2017-2019 average for Goldex
** Last available public filings
Source: Company website, technical reports and filings from SEDAR
HORNE 5 PROJECT| HIGH MARGIN PROJECT
TSXV: FPC | WWW.FALCORES.COM | 18
$13
$128
$89
$71
$3
$76 $68
$53 $51
$39 $36 $29 $25 $23
$11 $10 $8
TMAC
Pretium
GoldRoad
Kaminak
Dalradian
Sabina
Lundin
Continental
Victoria
BeloSun
MidasGold
FirstMining
Falco
CharaatGold
TaungGold
Newcastle
Exeter
(1)
(1)
EV / RESOURCES (US$/OZ AU EQ.)
$164
$1,506
$734
$404
$133
$496 $485 $458 $433 $365 $296 $239 $228 $204 $169 $139 $83
Pretium
TMAC
Lundin
Continental
GoldRoad
Sabina
Kaminak
Dalradian
FirstMining
BeloSun
Victoria
MidasGold
TaungGold
Falco
Newcastle
Exeter
CharaatGold
(1)
(1)
MARKET CAP. (US$ MM)
IN PRODUCTION OR ACQUIRED
1. Acquisition Multiple
Source: Company websites, filings from SEDAR and Factset
COMPARABLES – PRE-PRODUCTION > 5 M OZS & CAPEX BELOW $1BN
TSXV: FPC | WWW.FALCORES.COM | 19
ALL-IN SUSTAINING CASH COST (US$/OZ AU)
$427 $446
$524
$750 $752
$492
$583 $605 $616 $620 $623 $634 $674 $690
$779
$855 $860
Falco
Pretium
Continental
Kaminak
TaungGold
CharaatGold
MidasGold
Sabina
Lundin
Victoria
Dalradian
GoldRoad
TMAC
Exeter
BeloSun
Newcastle
FirstMining
17
20
18 18
11
20
18 17 17
14 13 13 12 12 11 11 10
TMAC
TaungGold
Exeter
Pretium
CharaatGold
Falco
BeloSun
Newcastle
Continental
GoldRoad
Lundin
MidasGold
Sabina
Kaminak
FirstMining
Dalradian
Victoria
LIFE OF MINE (YEARS)
1. Payback period not disclosed.
Source: Company websites, filings from SEDAR and Factset
M&I
ONLY
COMPARABLES – PRE-PRODUCTION > 5 M OZS & CAPEX BELOW $1BN
IN PRODUCTION OR ACQUIRED
TSXV: FPC | WWW.FALCORES.COM | 20
ACTIVITIES START COMPLETION
PEA COMPLETED
Feasibility Study Q2 2016 Q3 2017
Environmental Impact assessment Q2 2016 Q4 2017
Dewatering (Phase 1) Q1 2018 Q3 2019
Detailed engineering Q4 2017 Q4 2018
Head frame and hoist construction (Exploration Phase) Q4 2017 Q3 2018
Public audiences – “BAPE” Q4 2017 Q1 2019
Permits for project construction Q2 2019
Processing plant construction Spring 2019
First mineralized ore in mine Q1 2021
Full mine ramp up (Phase 1) H1 2021
End of process plant construction / plant commissioning H1 2021
Process plant ramp up H2 2021
HORNE 5 PROJECT| PROJECT SCHEDULE
TSXV: FPC | WWW.FALCORES.COM | 21
RIMO
Lac
Laynes
Routhier
NORALEX
Dufresnor
Baie
D’Alembert
Four Corners -
Beauchastel Gold
Viau -
Lac Hervé
Horne 5 Project
Flavrian
FALCO RESOURCES| REGIONAL EXPLORATION – 40,000 METRE PROGRAM
TSXV: FPC | WWW.FALCORES.COM | 22
HORNE 5 PROJECT| DEEP EXPLORATION POTENTIAL (VS. LA RONDE VMS)
3,000 M
HG_F zone (Inferred) not included in Feasibility holds:
2.8 m tonnes at 3.38 Au g/t
VS. current PEA diluted grade of 1.63 Au g/t
1,000 M
2,000 M
Horne 5 Project La Ronde Complex (Agnico Eagle)
TSXV: FPC | WWW.FALCORES.COM | 23
FALCO RESOURCES| CLOSING THOUGHTS
OBSERVATION: WHAT IS LEFT IN THE ABITIBI 10 YEARS FROM NOW?
 Dearth of sizable gold projects in the Abitibi 10 years from now
HORNE 5 PROJECT:
 Long-life Project & Low AISC: >12 years of life with upside & < $427/ Au Oz AISC
 State-of-the-art project: A true mine of the future
 Strong Exploration Upside
 Ideal location: Infrastructure & Strong Labour Pool + Strong Government Support
 Strong & Experienced Team to Advance the Project
TSXV: FPC | WWW.FALCORES.COM | 24
Head Office
Falco Resources Ltd.
1100, avenue des
Canadiens-de-Montréal
Bureau 300
Montréal, QC H3B 2S2
Tél. : +1.514.905.3162
Toll Free : +1.888.915.2009
Courriel : info@falcores.com
Investor Inquiries
Vincent Metcalfe, CFO
Tel: +1.514.905.3162
Email: vmetcalfe@falcores.com
CONTACT US
TSXV: FPC | WWW.FALCORES.COM | 25
APPENDIX
TSXV: FPC | WWW.FALCORES.COM | 26
Appendix A - HORNE 5 PROJECT LOCATED NORTH OF THE CITY OF ROUYN-NORANDA
HORNE 5 PROJECT LOCATED IN AN INDUSTRIAL PARK
City of
Rouyn-Noranda
Smelter
Horne Mine
Quemont Shaft
Falco
Surface Rights
Industrial Park
Rail
Highway
TSXV: FPC | WWW.FALCORES.COM | 27
Appendix – @ C$55NSR
Note: Commodity Price Assumptions in US$ - $1,300/oz Au, $18.50/oz AG, $2.15/lb CU, $1.00/lb ZN
Resource
Class
Cut-off
(NSR C$)
Tonnes Au Equivalent
g/t
Au
g/t
Ag
g/t
Cu
%
Zn
%
Contained Au
EQ
(oz)
Contained Au
(oz)
Contained Ag
(oz)
Contained Cu
(lbs)
Contained Zn
(lbs)
> 40 112,837,300 2.19 1.40 13.51 0.16 0.77 7,933,432 5,092,093 49,006,097 404,004,013 1,918,532,372
> 45 105,660,800 2.26 1.45 13.80 0.17 0.80 7,675,704 4,934,128 46,895,548 388,219,896 1,861,812,513
> 50 98,431,300 2.34 1.50 14.10 0.17 0.83 7,389,520 4,758,936 44,630,965 371,415,421 1,795,554,378
> 55 91,096,800 2.41 1.56 14.41 0.18 0.86 7,072,273 4,563,793 42,209,208 353,502,913 1,720,132,089
> 60 83,674,500 2.50 1.62 14.74 0.18 0.89 6,724,071 4,348,340 39,658,845 334,697,744 1,635,170,900
> 65 76,164,000 2.59 1.68 15.10 0.19 0.92 6,343,817 4,114,360 36,964,321 314,464,092 1,538,362,827
> 70 68,857,000 2.69 1.75 15.44 0.19 0.94 5,946,460 3,872,056 34,187,862 293,539,891 1,433,144,432
> 75 61,768,900 2.79 1.82 15.78 0.20 0.97 5,534,345 3,622,782 31,338,658 272,412,325 1,319,587,642
> 80 55,205,800 2.89 1.90 16.07 0.21 0.99 5,128,157 3,379,201 28,514,569 252,090,038 1,204,136,268
> 85 48,979,500 3.00 1.99 16.32 0.22 1.01 4,719,916 3,133,727 25,694,362 232,283,780 1,087,297,243
> 90 43,127,300 3.11 2.08 16.53 0.22 1.02 4,314,767 2,889,443 22,920,820 212,895,273 971,164,640
> 95 37,708,700 3.23 2.19 16.76 0.23 1.03 3,920,117 2,649,110 20,318,763 194,147,093 859,000,393
> 100 32,847,800 3.36 2.29 16.93 0.24 1.04 3,547,992 2,423,233 17,878,830 176,525,171 751,901,217
Resource
Class
Cut-off
(NSR C$)
Tonnes Au Equivalent
g/t
Au
g/t
Ag
g/t
Cu
%
Zn
%
Contained Au
EQ
(oz)
Contained Au
(oz)
Contained Ag
(oz)
Contained Cu
(lbs)
Contained Zn
(lbs)
> 40 29,982,700 2.09 1.27 20.20 0.18 0.62 2,018,308 1,225,760 19,474,995 121,579,421 408,634,980
> 45 27,554,500 2.18 1.33 21.03 0.19 0.64 1,930,445 1,176,117 18,634,351 114,786,950 389,104,374
> 50 24,940,000 2.28 1.39 21.98 0.20 0.66 1,826,125 1,116,815 17,622,512 107,406,534 365,167,423
> 55 22,283,200 2.39 1.47 22.98 0.20 0.68 1,709,902 1,053,061 16,463,471 99,171,805 336,101,668
> 60 20,058,400 2.49 1.54 23.94 0.21 0.70 1,604,361 995,491 15,437,436 91,439,498 309,347,419
> 65 17,472,900 2.62 1.64 25.21 0.21 0.72 1,472,114 922,946 14,159,498 80,661,116 278,551,219
> 70 15,293,600 2.75 1.74 26.48 0.21 0.74 1,352,929 856,634 13,019,250 71,823,610 249,906,179
> 75 13,406,500 2.88 1.84 27.70 0.22 0.75 1,242,755 794,507 11,940,661 64,601,999 222,924,808
> 80 11,528,900 3.04 1.96 29.10 0.23 0.77 1,126,483 727,514 10,784,724 57,409,881 195,709,438
> 85 9,821,100 3.21 2.11 30.25 0.23 0.78 1,014,192 664,774 9,552,769 50,654,094 168,612,199
> 90 8,222,900 3.41 2.29 30.98 0.25 0.77 902,741 604,603 8,189,164 44,700,861 139,977,418
> 95 6,927,000 3.63 2.48 31.57 0.26 0.76 807,727 552,850 7,030,524 39,678,474 115,974,677
> 100 5,912,700 3.84 2.68 32.15 0.27 0.74 729,660 509,966 6,112,206 35,554,367 96,081,089
Inferred
Measured
+
Indicated
TSXV: FPC | WWW.FALCORES.COM | 28
Appendix - RESOURCE COMPARISON – APRIL 2014 MINERAL RESOURCE TO CURRENT
Resource Category Measured Indicated Inferred
Mineral Resource
Estimate
Cut-off
(NSR C$)
Tonnes Au (g/t) Ag (g/t) Cu (%) Zn (%) Tonnes Au (g/t) Ag (g/t) Cu (%) Zn (%) Tonnes Au (g/t) Ag (g/t) Cu (%) Zn (%)
2016 update (Sept. 26) > 55 9,361,800 1.58 16.33 0.18 0.81 81,735,100 1.56 14.19 0.18 0.86 22,283,200 1.47 22.98 0.20 0.68
2016 (Jan. 8) > 65 -- -- -- -- -- 58,346,300 1.82 15.60 0.20 1.00 12,678,700 2.10 26.26 0.22 0.57
Maiden 2014 (Feb. 17) > 80 -- -- -- -- -- -- -- -- -- -- 25,319,200 2.64 -- 0.23 0.70
Update ∆ Measured ∆ Indicated ∆ Inferred
Mineral Resource Estimate Tonnes Au (g/t) Ag (g/t) Cu (%) Zn (%) Tonnes Au (g/t) Ag (g/t) Cu (%) Zn (%) Tonnes Au (g/t) Ag (g/t) Cu (%) Zn (%)
2016 update vs. Jan. 2016 100% 100% 100% 100% 100% 40% -14% -9% -10% -14% 76% -30% -12% -9% 19%
2016 update vs. Maiden 2014 -- -- -- -- -- 100% 100% 100% 100% 100% -12% -44% 100% -13% -3%
Resources have increased 310% from 2014 and 47% from earlier in 2016
TSXV: FPC | WWW.FALCORES.COM | 29
Appendix – Historical Drill Density of Horne 5 Deposit
600m
HORNEQUEMONT  Exceptional Drill
Density
 4,384 underground
drill holes at 15 m
spacing (305,788m)
drilled by Noranda
 Very high confidence
in historical drilling
 Great upside at
Depth – limited
drilling vs. upper area
TSXV: FPC | WWW.FALCORES.COM | 30
Appendix – Horne 5 Deposit & 2015 Confirmation Drilling Program
HORNEQUEMONT
TSXV: FPC | WWW.FALCORES.COM | 31
Appendix – Current Mineral Envelops
TSXV: FPC | WWW.FALCORES.COM | 32
• NPV of $1.131 billion at a 5% discount rate and an IRR of 20.0% before taxes and mining duties
• NPV of $667 million at a 5% discount rate and an IRR of 16.0% after taxes and mining duties
• Peak-year production of 274 kozs and average LOM annual production of 236 kozs of gold
• Net payable gold recovery of 86.8%
• 3,051,000 gold ounces production at an average diluted grade of 2.60 g/t Au LOM
• 2,903,000 ounces of payable gold LOM
• 807 million pounds of payable zinc LOM
• 194 million pounds of payable copper LOM
• 23.8 million ounces of payable silver LOM
• All-in sustaining costs* of US$427 PER PAYABLE GOLD OUNCE
• All-in cost (CAPEX plus OPEX) is estimated at US$660 per payable gold ounce
• Initial CAPEX of C$905 million (including a $60 million contingency) or US$680 million
• Payback Period of 3.8 years pre-tax and 4.1 years post-tax
• Gross Revenue of $6.8 billion and Operating Cash-flow of $2.6 billion
• Start of production in 2020
• Full production in 2021
• Initial mine life of 12 years
*All-in Sustaining Costs are presented as defined by the World Gold Council ("WGC") less Corporate G&A
Note: Commodity Price Assumptions in US$ - $1,250/oz Au, $17.00/oz AG, $2.85/lb CU, $1.00/lb ZN
Appendix – Horne 5 Project Key Highlights
TSXV: FPC | WWW.FALCORES.COM | 33
PROCESSING | SAG & Ball Mill with Cyclone Cluster
TSXV: FPC | WWW.FALCORES.COM | 34
PROCESSING | Overall Flotation Tank
TSXV: FPC | WWW.FALCORES.COM | 35
PROCESSING | Regrind Mill
TSXV: FPC | WWW.FALCORES.COM | 36
PROCESSING | Carbon in Pulp
TSXV: FPC | WWW.FALCORES.COM | 37
NORALEX –Young Buck Longitudinal - looking NE
Open
TSXV: FPC | WWW.FALCORES.COM | 38
FLAVRIAN – Duprat Syenite
Similar Magnetic signature to Upper Beaver ?
 Similar context as Queenston’s Upper
Beaver syenite;
 1.2 km in diameter, 1 existing drill hole;
 Two anomalous gold values on the contacts
of the syenite;
 Largely unexplored
TSXV: FPC | WWW.FALCORES.COM | 39
CENTRAL CAMP – West Ansil – 1.7 KM of Ansil
Inmont
New Insco
Bouchard-Hebert
Horne
Ansil
Gallen
Aldermac
Corbet
Millenbach
0 5 km
Montbray
Norbec
Delbridge
Amulet A-CWaite
DEPOSIT Mt %Cu %Zn Opt Au
Horne (H-G-E) 54.0 2.20 0.18
Quemont 15.0 1.22 1.90 0.12
Bouchard-Hebert lens 1100 10.2 0.72 5.39 0.04
Amulet Lower A 5.2 5.10 5.20 0.04
Norbec 4.3 2.77 4.70 0.02
Millenbach 3.5 3.50 4.50 0.03
Gallen 3.3 0.07 4.77 0.02
Corbet 2.7 2.90 2.00 0.03
East Waite 1.7 4.10 3.25 0.05
Ansil 1.4 7.18 0.80 0.06
Old Waite 1.2 4.70 2.98 0.03
New Insco (Not mined) 1.2 2.11 0.03
Delbridge 0.4 0.55 8.60 0.07
TSXV: FPC | WWW.FALCORES.COM | 40
CENTRAL CAMP – West Ansil Massive Sulphide Zones
Category (NI 43-101) Tons (MT) Cu % Zn % Au g/t Ag g/t
Indicated Resource: 0.53 3.4 0.4 1.4 9.2
Inferred Resource: 0.60 3.3 0.2 0.3 5.9
AN-05-04 – 3.57% Cu over 52.7 m
TSXV: FPC | WWW.FALCORES.COM | 41
Appendix – Mineral Resource Estimates & Modeling Notes
1. The effective date of the resource estimate is September 26, 2016. The Independent and Qualified Persons for the Mineral Resource Estimate as required by National Instrument 43-101
are Carl Pelletier, P. Geo., B.Sc. and Guilhem Servelle, P.Geo., M.Sc., both employees of InnovExplo Inc.
2. Mineral Resources are not Mineral Reserves and have not demonstrated economic viability.
3. While the results are presented undiluted and in situ, the reported mineral resources are considered by the Qualified Persons to have reasonable prospects for economic extraction.
4. These estimates include six (6) low grade gold-bearing mineralized zones.
5. The principal low-grade gold-bearing mineralized zone includes six (6) high-grade gold-bearing zones, one (1) high-grade copper-bearing zone, one (1) high grade zinc-bearing zone, three (3)
high-grade silver-bearing zones. Note that these high-grade zones may overlap each other.
6. Resources were compiled at NSR cut-offs of C$40, C$45, C$50, C$55, C$60, C$65, C$70, C$75, C$80, C$85, C$90, C$95, and C$100 per tonne for sensitivity purposes.
7. The official base case resource is reported at a C$55 per tonne NSR cut-off.
8. The appropriate NSR cut-off will vary depending on prevailing economic and operational parameters to be determined.
9. NSR estimates are based on the following assumptions: exchange rate of $C1.30/$US, metal prices of (all $US): gold $1,300/oz, silver $18.50, copper $2.15/lb, zinc $1.00/lb (Long term
analyst consensus price forecast study). Net recoveries of 86.8% for gold, 74.9% for silver, 67.3% for zinc and 74.0% for copper. Smelting cost (including transportation) C$6.52 per tonne (based
on the Cost Mine service as well as on non-public smelter contract obtained from one of the proposed destinations and on talks with transport providers).
10. Gold equivalent calculations assume these same metal prices.
11. Inferred resources are separate from Indicated Resources
12. The quantity and grade of reported Inferred Resources in this estimate are uncertain in nature and there has not been sufficient work to define these Inferred Resources as Indicated or
Measured Resources. It is uncertain if further work will result in upgrading them to an Indicated or Measured mineral resource category.
13. The resource was estimated using Geovia GEMS 6.7. The estimate is based on 5,977 diamond drill holes (478,281m) of which 4,138 crosscut mineralized zones for a total of 177,996m of core
within these zones. For silver the estimate also uses the results of an exhaustive metallurgical test comprising 2,112 diamond drill holes assayed for silver over a total length of 75,540 meters. A
minimum true thickness of 7.0 m was applied, using the grade of the adjacent material when assayed, or a value of zero when not assayed. Only the silver interpolation in the Inferred resources
does not use the material when not assayed.
14. The estimate database contains also 14,799 channel samples for a total of 23,791m from drifts historically sampled. Channel sample data was only used for distance to composite criterion for
resource classification purposes.
15. 91% of density values were estimated using historical drill hole iron assays data and Falco density data for an average of 3.41 g/cm3. Interpolation method use 3 pass ID2 for the ENV_A and HG_A
to HG_F zones. 8% of density values were fixed at 2.88 g/cm3 for ENV_B to ENV_E zones due to the scarcity of the data. 2.88 g/cm3 representing the median of the available data. 1% of density
values were fixed at 2.67 g/cm3 for ENV_F zone due to the scarcity of the date and to adequately characterise this quartz-rich zone.
16. Compositing was done on drill hole sections falling within the mineralized zones (composite = 3.0 metres). Tails shorter than 0.75 m were not created.
17. Resources were evaluated from drill holes using an ID2 interpolation method in a block model (block size = 5 x 5 x 5 m).
18. High grade capping was done on raw assay data and established on a per zone basis for gold (Au g/t): (HG_A: 35; HG_B: 35; HG_C: 25; HG_D: 35; HG_E: 25; HG_F: 35; ENV_A: 35; ENV_B: 25;
ENV_C: 25; ENV_D: 20; ENV_E: 35; ENV_F: 25) and for silver (Ag g/t): SG_HG:100; HG_D: 165; HG_F: 165; ENV_A_SG_Low: 110; ENV_B: 100; ENV_C: 100; ENV_D: 100. Capping grade selection is
supported by statistical analysis. No capping was applied to the Cu and Zn data based on statistical analysis.
19. The Mineral Resources presented herein are categorized as Measured, Indicated and Inferred. The Inferred category is only defined within the areas where blocks were interpolated during pass
1 or pass 2 in areas where continuity is sufficient to avoid isolated blocks. The Indicated category is only defined by blocks interpolated in areas where the maximum distance to the closest drill
hole composite is less than 25m for blocks interpolated in passes 1 and 2. The Measured category is only defined by blocks classified as indicated and in sufficient proximity to sampled drifts (<
15m). The average distance to the nearest composite is 6.97 meters for the Measured resources, 10.01 meters for the Indicated resources and 40.10 meters for the Inferred resources.
20. Tonnage estimates were rounded to the nearest hundred tonnes. Any discrepancies in the totals are due to rounding effects. Rounding practice follows the recommendations set out in Form 43-
101F1.
21. CIM definitions and guidelines were followed in estimating mineral resources.
22. InnovExplo is not aware of any known environmental, permitting, legal, title-related, taxation, socio-political, marketing or other relevant issue that could materially affect the mineral resource
estimate.
23. Metal contained in ounces (troy) = metric tonnes x grade / 31.10348. Calculations used metric units (metres, tonnes and g/t). Metal contents are presented in ounces and pounds .
RESOURCE ESTIMATE NOTES

More Related Content

What's hot

2015 Investor Presentation - Vancouver
2015 Investor Presentation - Vancouver2015 Investor Presentation - Vancouver
2015 Investor Presentation - Vancouver
FalcoCorporate
 
TRU Precious Metals Investor Presentation - May 2021
TRU Precious Metals Investor Presentation - May 2021TRU Precious Metals Investor Presentation - May 2021
TRU Precious Metals Investor Presentation - May 2021
MomentumPR
 
12.6 2016 investor presentation
12.6 2016 investor presentation12.6 2016 investor presentation
12.6 2016 investor presentation
FalcoCorporate
 
Harfang Exploration - Corporate Presentation, July 2020
Harfang Exploration - Corporate Presentation, July 2020Harfang Exploration - Corporate Presentation, July 2020
Harfang Exploration - Corporate Presentation, July 2020
HarfangEx
 
Canamex Corporate Presentation
Canamex Corporate PresentationCanamex Corporate Presentation
Canamex Corporate Presentation
MomentumPR
 
Investor Presentation February 2015
Investor Presentation February 2015Investor Presentation February 2015
Investor Presentation February 2015
Sagegold
 
Rover metals-january-2022-update
Rover metals-january-2022-updateRover metals-january-2022-update
Rover metals-january-2022-update
MomentumPR
 
Cascada updated corporate presentation september 2021
Cascada updated corporate presentation september 2021Cascada updated corporate presentation september 2021
Cascada updated corporate presentation september 2021
ZhalaRahim
 
Sage Gold Inc. Corporate Presentation
Sage Gold Inc. Corporate PresentationSage Gold Inc. Corporate Presentation
Sage Gold Inc. Corporate Presentation
MomentumPR
 
NOVAGOLD 2016 First Quarter Financials & Project Update
NOVAGOLD 2016 First Quarter Financials & Project UpdateNOVAGOLD 2016 First Quarter Financials & Project Update
NOVAGOLD 2016 First Quarter Financials & Project Update
NOVAGOLD
 
August Investor presentation
August Investor presentationAugust Investor presentation
August Investor presentation
FalcoCorporate
 
Presentation
PresentationPresentation
Presentation
Adnet Communications
 
Mao marketing-presentation-june2013
Mao marketing-presentation-june2013Mao marketing-presentation-june2013
Mao marketing-presentation-june2013Company Spotlight
 
Novo Resources Corp. Investor Presentation
Novo Resources Corp. Investor PresentationNovo Resources Corp. Investor Presentation
Novo Resources Corp. Investor Presentation
Loadedimage
 
OZ - Corporate Presentation - January 2021
OZ - Corporate Presentation - January 2021OZ - Corporate Presentation - January 2021
OZ - Corporate Presentation - January 2021
AnnaSokolova11
 
Precious metals summit 2019, beaver creek
Precious metals summit 2019, beaver creekPrecious metals summit 2019, beaver creek
Precious metals summit 2019, beaver creek
Probe Gold
 
Cascada updated corporate presentation july 2021
Cascada updated corporate presentation july 2021Cascada updated corporate presentation july 2021
Cascada updated corporate presentation july 2021
ZhalaRahim
 
Peterdavies 140303205825-phpapp01
Peterdavies 140303205825-phpapp01Peterdavies 140303205825-phpapp01
Peterdavies 140303205825-phpapp01ImageRes
 
Lion One Metals Presentation Jan 2022
Lion One Metals Presentation Jan 2022Lion One Metals Presentation Jan 2022
Lion One Metals Presentation Jan 2022
Joe Gray
 

What's hot (20)

2015 Investor Presentation - Vancouver
2015 Investor Presentation - Vancouver2015 Investor Presentation - Vancouver
2015 Investor Presentation - Vancouver
 
TRU Precious Metals Investor Presentation - May 2021
TRU Precious Metals Investor Presentation - May 2021TRU Precious Metals Investor Presentation - May 2021
TRU Precious Metals Investor Presentation - May 2021
 
12.6 2016 investor presentation
12.6 2016 investor presentation12.6 2016 investor presentation
12.6 2016 investor presentation
 
Harfang Exploration - Corporate Presentation, July 2020
Harfang Exploration - Corporate Presentation, July 2020Harfang Exploration - Corporate Presentation, July 2020
Harfang Exploration - Corporate Presentation, July 2020
 
Canamex Corporate Presentation
Canamex Corporate PresentationCanamex Corporate Presentation
Canamex Corporate Presentation
 
Investor Presentation February 2015
Investor Presentation February 2015Investor Presentation February 2015
Investor Presentation February 2015
 
Rover metals-january-2022-update
Rover metals-january-2022-updateRover metals-january-2022-update
Rover metals-january-2022-update
 
Cascada updated corporate presentation september 2021
Cascada updated corporate presentation september 2021Cascada updated corporate presentation september 2021
Cascada updated corporate presentation september 2021
 
Sage Gold Inc. Corporate Presentation
Sage Gold Inc. Corporate PresentationSage Gold Inc. Corporate Presentation
Sage Gold Inc. Corporate Presentation
 
NOVAGOLD 2016 First Quarter Financials & Project Update
NOVAGOLD 2016 First Quarter Financials & Project UpdateNOVAGOLD 2016 First Quarter Financials & Project Update
NOVAGOLD 2016 First Quarter Financials & Project Update
 
August Investor presentation
August Investor presentationAugust Investor presentation
August Investor presentation
 
Presentation
PresentationPresentation
Presentation
 
Mao marketing-presentation-june2013
Mao marketing-presentation-june2013Mao marketing-presentation-june2013
Mao marketing-presentation-june2013
 
Novo Resources Corp. Investor Presentation
Novo Resources Corp. Investor PresentationNovo Resources Corp. Investor Presentation
Novo Resources Corp. Investor Presentation
 
OZ - Corporate Presentation - January 2021
OZ - Corporate Presentation - January 2021OZ - Corporate Presentation - January 2021
OZ - Corporate Presentation - January 2021
 
Precious metals summit 2019, beaver creek
Precious metals summit 2019, beaver creekPrecious metals summit 2019, beaver creek
Precious metals summit 2019, beaver creek
 
Cascada updated corporate presentation july 2021
Cascada updated corporate presentation july 2021Cascada updated corporate presentation july 2021
Cascada updated corporate presentation july 2021
 
Peterdavies 140303205825-phpapp01
Peterdavies 140303205825-phpapp01Peterdavies 140303205825-phpapp01
Peterdavies 140303205825-phpapp01
 
Maudore mar13presentation
Maudore mar13presentationMaudore mar13presentation
Maudore mar13presentation
 
Lion One Metals Presentation Jan 2022
Lion One Metals Presentation Jan 2022Lion One Metals Presentation Jan 2022
Lion One Metals Presentation Jan 2022
 

Similar to 30.3 falco presentation osisko days - sept 2017 125dpi

Falco Resources - March 2016 investor presentation
Falco Resources - March 2016 investor presentationFalco Resources - March 2016 investor presentation
Falco Resources - March 2016 investor presentation
Vincent Metcalfe
 
February 2016 Corporate Presentation
February 2016 Corporate PresentationFebruary 2016 Corporate Presentation
February 2016 Corporate Presentation
FalcoCorporate
 
17.7 falco presentation bmo
17.7 falco presentation   bmo17.7 falco presentation   bmo
17.7 falco presentation bmo
FalcoCorporate
 
March 2015 Corporate Presentation
March 2015 Corporate Presentation March 2015 Corporate Presentation
March 2015 Corporate Presentation
FalcoCorporate
 
March 2015 investor presentation
March 2015 investor presentationMarch 2015 investor presentation
March 2015 investor presentation
FalcoCorporate
 
March 2015 investor presentation revised cover
March 2015 investor presentation revised coverMarch 2015 investor presentation revised cover
March 2015 investor presentation revised cover
FalcoCorporate
 
March 2015-investor-presentation
March 2015-investor-presentationMarch 2015-investor-presentation
March 2015-investor-presentation
FalcoCorporate
 
March 2015 investor presentation revised cover
March 2015 investor presentation revised coverMarch 2015 investor presentation revised cover
March 2015 investor presentation revised cover
FalcoCorporate
 
March 2015 investor presentation revised cover
March 2015 investor presentation revised coverMarch 2015 investor presentation revised cover
March 2015 investor presentation revised cover
FalcoCorporate
 
March 2015 Corporate Presentation
March 2015 Corporate Presentation March 2015 Corporate Presentation
March 2015 Corporate Presentation
FalcoCorporate
 
2015 investor-presentation-vancouver-april v001-s68iw2
2015 investor-presentation-vancouver-april v001-s68iw22015 investor-presentation-vancouver-april v001-s68iw2
2015 investor-presentation-vancouver-april v001-s68iw2
FalcoCorporate
 
20.1 falco presentation may 2017
20.1 falco presentation   may 201720.1 falco presentation   may 2017
20.1 falco presentation may 2017
FalcoCorporate
 
12.3 2016 investor presentation
12.3 2016 investor presentation12.3 2016 investor presentation
12.3 2016 investor presentation
FalcoCorporate
 
21.1 falco presentation august 2017 100dpi
21.1 falco presentation   august 2017 100dpi21.1 falco presentation   august 2017 100dpi
21.1 falco presentation august 2017 100dpi
FalcoCorporate
 
2015 investor presentation june
2015 investor presentation   june2015 investor presentation   june
2015 investor presentation june
FalcoCorporate
 
September 2015 Corporate Presentation
September 2015 Corporate PresentationSeptember 2015 Corporate Presentation
September 2015 Corporate Presentation
FalcoCorporate
 
Falco jan2018
Falco jan2018Falco jan2018
Falco jan2018
FalcoCorporate
 
2018 Falco Presentation
2018 Falco Presentation2018 Falco Presentation
2018 Falco Presentation
Vincent Metcalfe
 
AuRico Metals August 2016 Investor Presentation
AuRico Metals August 2016 Investor PresentationAuRico Metals August 2016 Investor Presentation
AuRico Metals August 2016 Investor Presentation
AuricoCorporate
 
2022.09.06 Quarterly Update Probe final.pdf
2022.09.06 Quarterly Update Probe final.pdf2022.09.06 Quarterly Update Probe final.pdf
2022.09.06 Quarterly Update Probe final.pdf
seemasindwani
 

Similar to 30.3 falco presentation osisko days - sept 2017 125dpi (20)

Falco Resources - March 2016 investor presentation
Falco Resources - March 2016 investor presentationFalco Resources - March 2016 investor presentation
Falco Resources - March 2016 investor presentation
 
February 2016 Corporate Presentation
February 2016 Corporate PresentationFebruary 2016 Corporate Presentation
February 2016 Corporate Presentation
 
17.7 falco presentation bmo
17.7 falco presentation   bmo17.7 falco presentation   bmo
17.7 falco presentation bmo
 
March 2015 Corporate Presentation
March 2015 Corporate Presentation March 2015 Corporate Presentation
March 2015 Corporate Presentation
 
March 2015 investor presentation
March 2015 investor presentationMarch 2015 investor presentation
March 2015 investor presentation
 
March 2015 investor presentation revised cover
March 2015 investor presentation revised coverMarch 2015 investor presentation revised cover
March 2015 investor presentation revised cover
 
March 2015-investor-presentation
March 2015-investor-presentationMarch 2015-investor-presentation
March 2015-investor-presentation
 
March 2015 investor presentation revised cover
March 2015 investor presentation revised coverMarch 2015 investor presentation revised cover
March 2015 investor presentation revised cover
 
March 2015 investor presentation revised cover
March 2015 investor presentation revised coverMarch 2015 investor presentation revised cover
March 2015 investor presentation revised cover
 
March 2015 Corporate Presentation
March 2015 Corporate Presentation March 2015 Corporate Presentation
March 2015 Corporate Presentation
 
2015 investor-presentation-vancouver-april v001-s68iw2
2015 investor-presentation-vancouver-april v001-s68iw22015 investor-presentation-vancouver-april v001-s68iw2
2015 investor-presentation-vancouver-april v001-s68iw2
 
20.1 falco presentation may 2017
20.1 falco presentation   may 201720.1 falco presentation   may 2017
20.1 falco presentation may 2017
 
12.3 2016 investor presentation
12.3 2016 investor presentation12.3 2016 investor presentation
12.3 2016 investor presentation
 
21.1 falco presentation august 2017 100dpi
21.1 falco presentation   august 2017 100dpi21.1 falco presentation   august 2017 100dpi
21.1 falco presentation august 2017 100dpi
 
2015 investor presentation june
2015 investor presentation   june2015 investor presentation   june
2015 investor presentation june
 
September 2015 Corporate Presentation
September 2015 Corporate PresentationSeptember 2015 Corporate Presentation
September 2015 Corporate Presentation
 
Falco jan2018
Falco jan2018Falco jan2018
Falco jan2018
 
2018 Falco Presentation
2018 Falco Presentation2018 Falco Presentation
2018 Falco Presentation
 
AuRico Metals August 2016 Investor Presentation
AuRico Metals August 2016 Investor PresentationAuRico Metals August 2016 Investor Presentation
AuRico Metals August 2016 Investor Presentation
 
2022.09.06 Quarterly Update Probe final.pdf
2022.09.06 Quarterly Update Probe final.pdf2022.09.06 Quarterly Update Probe final.pdf
2022.09.06 Quarterly Update Probe final.pdf
 

More from FalcoCorporate

50.1 falco presentation feasibility - final - v2
50.1 falco presentation   feasibility - final - v250.1 falco presentation   feasibility - final - v2
50.1 falco presentation feasibility - final - v2
FalcoCorporate
 
50.1 falco presentation feasibility - final(1)
50.1 falco presentation   feasibility - final(1)50.1 falco presentation   feasibility - final(1)
50.1 falco presentation feasibility - final(1)
FalcoCorporate
 
10.3 2016 investor presentation pea
10.3 2016 investor presentation   pea10.3 2016 investor presentation   pea
10.3 2016 investor presentation pea
FalcoCorporate
 
9.2 2016 investor presentation
9.2 2016 investor presentation9.2 2016 investor presentation
9.2 2016 investor presentation
FalcoCorporate
 
9.1 2016 investor presentation
9.1 2016 investor presentation9.1 2016 investor presentation
9.1 2016 investor presentation
FalcoCorporate
 
Septembre 2015 Présentation
Septembre 2015 PrésentationSeptembre 2015 Présentation
Septembre 2015 Présentation
FalcoCorporate
 
2015 presentation-investisseurs-juin
2015 presentation-investisseurs-juin2015 presentation-investisseurs-juin
2015 presentation-investisseurs-juin
FalcoCorporate
 
March 2015 investor presentation fr
March 2015 investor presentation frMarch 2015 investor presentation fr
March 2015 investor presentation fr
FalcoCorporate
 
March 2015 investor presentation fr
March 2015 investor presentation frMarch 2015 investor presentation fr
March 2015 investor presentation fr
FalcoCorporate
 
March 2015 investor presentation fr
March 2015 investor presentation frMarch 2015 investor presentation fr
March 2015 investor presentation fr
FalcoCorporate
 

More from FalcoCorporate (10)

50.1 falco presentation feasibility - final - v2
50.1 falco presentation   feasibility - final - v250.1 falco presentation   feasibility - final - v2
50.1 falco presentation feasibility - final - v2
 
50.1 falco presentation feasibility - final(1)
50.1 falco presentation   feasibility - final(1)50.1 falco presentation   feasibility - final(1)
50.1 falco presentation feasibility - final(1)
 
10.3 2016 investor presentation pea
10.3 2016 investor presentation   pea10.3 2016 investor presentation   pea
10.3 2016 investor presentation pea
 
9.2 2016 investor presentation
9.2 2016 investor presentation9.2 2016 investor presentation
9.2 2016 investor presentation
 
9.1 2016 investor presentation
9.1 2016 investor presentation9.1 2016 investor presentation
9.1 2016 investor presentation
 
Septembre 2015 Présentation
Septembre 2015 PrésentationSeptembre 2015 Présentation
Septembre 2015 Présentation
 
2015 presentation-investisseurs-juin
2015 presentation-investisseurs-juin2015 presentation-investisseurs-juin
2015 presentation-investisseurs-juin
 
March 2015 investor presentation fr
March 2015 investor presentation frMarch 2015 investor presentation fr
March 2015 investor presentation fr
 
March 2015 investor presentation fr
March 2015 investor presentation frMarch 2015 investor presentation fr
March 2015 investor presentation fr
 
March 2015 investor presentation fr
March 2015 investor presentation frMarch 2015 investor presentation fr
March 2015 investor presentation fr
 

Recently uploaded

Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
CollectiveMining1
 
Snam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial PresentationSnam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial Presentation
Valentina Ottini
 
2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf
Sysco_Investors
 
Corporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdfCorporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdf
Probe Gold
 
cyberagent_For New Investors_EN_240424.pdf
cyberagent_For New Investors_EN_240424.pdfcyberagent_For New Investors_EN_240424.pdf
cyberagent_For New Investors_EN_240424.pdf
CyberAgent, Inc.
 
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
ybout
 
Investor Day 2024 Presentation Sysco 2024
Investor Day 2024 Presentation Sysco 2024Investor Day 2024 Presentation Sysco 2024
Investor Day 2024 Presentation Sysco 2024
Sysco_Investors
 
Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24
Philip Rabenok
 

Recently uploaded (8)

Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
Snam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial PresentationSnam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial Presentation
 
2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf
 
Corporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdfCorporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdf
 
cyberagent_For New Investors_EN_240424.pdf
cyberagent_For New Investors_EN_240424.pdfcyberagent_For New Investors_EN_240424.pdf
cyberagent_For New Investors_EN_240424.pdf
 
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
 
Investor Day 2024 Presentation Sysco 2024
Investor Day 2024 Presentation Sysco 2024Investor Day 2024 Presentation Sysco 2024
Investor Day 2024 Presentation Sysco 2024
 
Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24
 

30.3 falco presentation osisko days - sept 2017 125dpi

  • 1. THE NEXT GREAT UNDERGROUND MINE IN CANADA Corporate Presentation OSISKO GROUP DAYS – SEPTEMBER 2017 WWW.FALCORES.COM | FPC:TSXV
  • 2. Disclaimer This presentation contains a review of the Company’s properties in Canada. Viewers are cautioned that the projects are at an early stage of exploration and that estimates and projections contained herein are based on limited and incomplete data. More work is required before the mineralization on the projects and their economic aspects can be confidentaly modeled. Therefore, the work results and estimates herein may be considered to be generally indicative only of the nature and quality of the projects. No representation or prediction is intended as to the results of future work, nor can there be any promise that the estimates herein will be confirmed by future exploration or analysis, or that the projects will otherwise prove to be economic. The TSX Venture Exchange has not reviewed and does not accept responsibility for the accuracy or adequacy of this presentation, which has been prepared by management. There can be no assurance that any of the assumptions in the resource estimates will be supported by a Pre-feasibility or Feasibility Study or that any forward looking event will come to pass. The data is incomplete and considerable additional work will be required to complete further evaluation, including but not limited to drilling, engineering and socio-economic studies and investment. Past performance is no guarantee of future performance and all investors are urged to consult their investment professionals before making an investment decision. Investors are further cautioned that past performance is no guarantee of future performance Forward-Looking Statements Certain information included in this presentation constitutes forward-looking statements, including any information as to our projects, plans and future performance. All statements, other than statements of historical fact, are forward-looking statements. The words “expect”, “believe”, “anticipate”, “will”, “intend”, “estimate”, “forecast”, “budget”, “schedule” and similar expressions identify forward-looking statements. Forward-looking statements are necessarily based upon a number of factors and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties and contingencies. Known and unknown factors could cause actual results to differ materially from those projected in the forward-looking statements. Such factors include, but are not limited to: changes to current estimates of mineral resources; labour availability; litigation; availability of and increased costs associated with contractors and exploration equipment; the speculative nature of mineral exploration and development, including the risks of obtaining necessary licenses and permits; contests over title to properties; uncertainty with the Company’s ability to secure capital to execute its business plans; changes in national and local government legislation in Canada; risk of loss due to sabotage and civil disturbances; risks arising from holding derivative instruments; and business opportunities that may be pursued by the Company. Many of these uncertainties and contingencies can affect our actual results and could cause actual results to differ materially from those expressed or implied in any forward-looking statements made by, or on behalf of, us. Readers are cautioned that forward-looking statements are not guarantees of future performance. The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by applicable law. Cautionary Note to U.S Investors Concerning Measured, Indicated and Inferred Resources This presentation uses the terms “measured,” “indicated” and “inferred resources. We advise investors that while those terms are recognized and required by Canadian regulations, the United States Securities and Exchange commission does not recognize them. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or other economic studies. United States investors are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be converted into mineral reserves. United States investors are also cautioned not to assume that all or any part of an inferred mineral resource exists, or is economically or legally mineable. CAUTIONARY STATEMENT
  • 3. TSXV: FPC | WWW.FALCORES.COM | 3 TSXV:FPC C$217M MARKET CAP ~C$46.2M CASH & CASH EQUIVALENTS 7.1 Moz AuEq M&I TOTAL RESOURCES 1.7 Moz AuEq Inferred TOTAL RESOURCES 236,000 GOLD OZ ESTIMATED AVERAGE GOLD ANNUAL PRODUCTION US$427 PER GOLD OZ ALL-IN SUSTAINING COST US$680M DEVELOPMENT CAPITAL EXPENDITURE >12 YEARS INITIAL MINE LIFE
  • 4. TSXV: FPC | WWW.FALCORES.COM | 4 EXPERIENCED SENIOR LEADERSHIP TEAM|DRIVER OF VALUE  Luc Lessard, President & CEO, Director  Vincent Metcalfe, CFO  Claude Léveillée, VP Community Relations & HR  Anthony Glavac, VP – Controller  Helene Cartier, VP – Environment  Francois Vezina, VP – Mining  Christian Laroche, VP – Processing  John-Paul McGrath – Project Manager  Claude Bernier, Exploration Manager  Sylvain Doire, Environment  Claude Pilote, Senior Geologist  Daniel Mathieu – Mechanical Designer EXECUTIVE MANAGEMENT BOARD OF DIRECTORS  Sean Roosen, Chair  Mario Caron, Lead Director  Bryan Coates  Paola Farnesi  Claude Ferron  Paul Henri-Girard  Chantal Sorel Denotes former member of Canadian Malartic team
  • 5. TSXV: FPC | WWW.FALCORES.COM | 5 CAPITAL SUMMARY & SHAREHOLDER REGISTRY SHAREHOLDER REGISTRY Osisko Gold Royalties 13.3% Tocqueville 9.0% Investissement Quebec 5.2% Oppenheimer Funds 2.0% Old Mutual 1.6% RBIM 1.1% CIBC Asset Management 1.0% Caisse de Depot du Quebec 1.0% Shares Outstanding (basic) 179,644,768 Stock Options 9,151,736 Warrants 28,281,717 Shares Outstanding (fully diluted) 205,934,721 Share Price C$1.21 Market Capitalization C$217.4 Cash Position ~C$42.6 M CAPITAL STRUCTURE (AS OF SEPT 8, 2017) Source: Factset, Bloomberg, public filings and Company estimates
  • 6. TSXV: FPC | WWW.FALCORES.COM | 6 HORNE 5 PROJECT| LOCATION  Located in Rouyn-Noranda, Québec, Canada  Access to better & experienced miners due to better work-life balance & conditions  Eliminates the need for a camp  Experienced labour pool  The region of Abitibi produces some of the most experienced miners in the world  Experienced suppliers  Access to tier 1 mining equipment suppliers & mining contractors in the world  ~80% of required suppliers & contractors located within 1 hour from project  Québec Government  Strong supporter of the mining industry  Clear permitting process & BAPE process for operations over 2,000 tpd  Great infrastructure  Rail & highway access  Affordable and reliable power source HORNE 5 MONTREAL
  • 7. TSXV: FPC | WWW.FALCORES.COM | 7 HORNE 5 PROJECT| MINERALIZATION  The Horne Mine orebodies (Upper H, Lower H and Horne 5 deposit)  Dip subvertically within rhyolitic flows, breccias, and tuffs that are bounded by the Andesite and the Horne Creek faults.  Least-altered rhyolites have low K2O contents and other geochemical features that place them within the FII tholeiitic series (Lesher et al., 1986)  Graded volcaniclastic beds, metal zoning in the orebodies, and locations of chloritized- mineralized rhyolites indicate that the volcanic sequence youngs to the north.  The volcanics in the fault wedge are variably silicified and sericitized, and local zones in the orebody sidewalls and footwall are chloritized  The Horne Block lies between the Horne Creek Fault and the Andesite Fault
  • 8. TSXV: FPC | WWW.FALCORES.COM | 8 HIGH GRADE ZONES HORNE 5 PROJECT| LONG & CROSS SECTIONS OF THE DEPOSIT MINERAL ENVELOPS MEASURED & INDICATED + INFERRED (at C$55 NSR cut-off) Resource Class Tonnes Au Equivalent g/t Au g/t Ag g/t Cu % Zn % Contained Au EQ (mm oz) Contained Au (mm oz) Contained Ag (oz) Contained Cu (mm lbs) Contained Zn (mm lbs) Measured 9.4 2.45 1.58 16.33 0.18 0.81 736 475 4,914 37.7 167.4 Indicated 81.7 2.41 1.56 14.19 0.18 0.86 6,336 4,088 37,295 315.8 1,552.7 Total M&I 91.1 2.41 1.56 14.41 0.18 0.86 7,072 4,564 42,209 353.5 1,720.1 Inferred 22.3 2.39 1.47 22.98 0.20 0.68 1,710 1,053 16,463 99.2 336.1
  • 9. TSXV: FPC | WWW.FALCORES.COM | 9 HORNE 5 PROJECT| THE NEW PROJECT – THE NEW VISION  A state-of-the-art UNDERGROUND MINING project  Mining method  Transverse long-hole stoping  Phase 1 – Stope size 40m X 25m X 20m (~69,000 t per stope, 83 stopes per year)  Production drilling in ore at 6.5 inches  Primary – secondary stope mining sequencing  Stope paste backfill to ensure stability  3% dilution  95% ore recovery  2016 PEA  236,000 ounces of avg. annual gold production  US$427 per ounce all-in cash cost  Development capital investments of US$680 million  Quemont Shaft  Use of existing 1,200 metre shaft  525 full-time jobs during operation : >12 years  800 jobs during 18-24 construction period 16 M AuEq Oz Produced 7.1 M AuEq Oz M&I 1.7 M AuEq Oz Inferred 4.0 M AuEq Oz Produced HORNE 5 PROJECT FEASIBILITY
  • 10. TSXV: FPC | WWW.FALCORES.COM | 10 HORNE 5 PROJECT| MINING APPROACH FOR FEASIBILITY >12 YEARS OF LIFE 1,200 METRE EXISTING QUEMONT SHAFT
  • 11. TSXV: FPC | WWW.FALCORES.COM | 11 Project Potash Corp Ukraine KJRK Phase 1 Ukraine KJRK Phase 2 Horne 5 Phase 1 Horne 5 Phase 2 Depth (m) 1,200 1,340 1,800 1,200 1,800 Speed (m/s) 18-20 19 19 18 18 Operating Hours 19-20 22 22 19 19 Skip capacity (t) 40-65 50 50 43 39.4 Productivity (tpd) 25,000-30,000 22,050 17,640 23,200 16,550 HORNE 5 PROJECT| HOISTING COMPARABLES 43T SKIP – Similar to Horne 5 Sizing
  • 12. TSXV: FPC | WWW.FALCORES.COM | 12 HORNE 5 PROJECT| HIGH LEVEL OF AUTOMATION  STATE-OF-THE-ART OPERATION  Surface control underground operations:  Hoist – production and services  Teleoperation of loaders  Monitoring and management of ventilation requirements and paste backfill distribution  Water pumping monitoring  Staff & equipment location monitoring  HIGH CAPACITY PRODUCTION MINING EQUIPMENT  Scoop tram: 21 metric tonnes  Haulage truck: 63 metric tonnes  Conveyor system from deposit to Quemont shaft  Ability to operate between working shifts (20h/day vs 14h/day for a conventional mine)
  • 13. TSXV: FPC | WWW.FALCORES.COM | 13 Cash Cost Summary (PEA) Mining $324 Processing $340 Tailings and Water $70 G&A $47 Smelting and Refining $107 Royalties $35 By-Product Credit ($608) Sustaining $98 Closure $13 Total AISC US$427 Pre-Production Cost $233 All-In Costs US$660 HORNE 5 PROJECT| LOW ALL-IN SUSTAINING COST, A TOP QUARTILE ASSET Source: Wood Mackenzie Ltd. And BMO Capital Markets * All-in Sustaining Costs are presented as defined by the World Gold Council ("WGC") less Corporate G&A $0 $500 $1,000 $1,500 $2,000 $2,500 2016 Gold Mine, Composite, Total Cash + Sustaining Capex Cost Grouped By Mine and Ranked By Total Cash plus Sustaining Capex TotalCash+SustainingCapex(US$/oz) 0 500 1000 1500 2000 Paid Gold (t) Horne 5 Project AISC of US$402/oz 2016 Gold AISC Cost Curve 0 US$427/oz
  • 14. TSXV: FPC | WWW.FALCORES.COM | 14 HORNE 5 PROJECT| PROPOSED FLOWSHEET (PEA)  Semi-Autogenous-Ball milling-Crushing  15,000 tpd facility  92% of mill availability  Flotation & thickening section divided in three circuits dedicated to recovering copper, zinc and pyrite concentrates  Pyrite concentrate will require a finer grind to achieve improved gold recovery by cyanide leaching/CIP  Paste Backfill Capacity  60% paste backfill plant availability  Cyanide destruction circuit  Process Products  16% Copper concentrate (+/- 130 tpd)  52% Zinc concentrate (+/- 200 tpd)  Ag-Au ingot  Stockpile live capacity is 12 hours. (8,000 t)
  • 15. TSXV: FPC | WWW.FALCORES.COM | 15 HORNE 5 PROJECT| DEVELOPMENT CAPITAL EXPENDITURES US$680M $186 $265 $16 $74 $14 $82 $45 Mining Processing Plant Electrical and Communication Site Infrastructure Tailings and Water Management Indirects Contingency TOTAL PRE-PRODUCTION CAPITAL COSTS US$680M Note: Amounts may vary due to rounding. *FROM PEA
  • 16. TSXV: FPC | WWW.FALCORES.COM | 16 HORNE 5 PROJECT| FEASIBILITY ADVANCING – SURFACE
  • 17. TSXV: FPC | WWW.FALCORES.COM | 17 Goldex D Zone (Agnico Eagle) Young-Davidson (Alamos) LaRonde 2 (Agnico Eagle) Horne 5 PEA (Falco) Horne 5 CURRENT (Falco) Resource Grade (g/t AuEq) 1.69 2.69 5.1 2.9 2.4 Mining Method Long hole Transverse long hole Long. Retreat / Tr. Open Stoping Transverse long hole Transverse long hole Depth (m) 670 - 1,200 750 - 1,500 2,000-3,000 600 - 2,300 600 – 1,800 Stope Size 22 x 30 x 50 12-40 x 20 x 30 5-25 x 15 x 30 38 x 15 x 15 P1: 40 x 20 x25 Mining Rate 6,800 tpd 8,000 tpd 7,200 tpd 15,000 tpd 16,000 tpd Specific Gravity 2.8 2.69 3.3 3.45 3.45 Mining Dilution 15% 10% 10%-20% < 4% < 4% Operating Cost/NSR C$35-37/t * C$53.50/t * C$95/t C$47.50/T* n/a Annual Production (koz) 113,300 * 200,000 * 230,000 * 236,000* n/a IRR ** 15.0% IRR 10.3% IRR 13.3% IRR 16.0% IRR n/a * Projected life-of-mine (LOM) and 2017-2019 average for Goldex ** Last available public filings Source: Company website, technical reports and filings from SEDAR HORNE 5 PROJECT| HIGH MARGIN PROJECT
  • 18. TSXV: FPC | WWW.FALCORES.COM | 18 $13 $128 $89 $71 $3 $76 $68 $53 $51 $39 $36 $29 $25 $23 $11 $10 $8 TMAC Pretium GoldRoad Kaminak Dalradian Sabina Lundin Continental Victoria BeloSun MidasGold FirstMining Falco CharaatGold TaungGold Newcastle Exeter (1) (1) EV / RESOURCES (US$/OZ AU EQ.) $164 $1,506 $734 $404 $133 $496 $485 $458 $433 $365 $296 $239 $228 $204 $169 $139 $83 Pretium TMAC Lundin Continental GoldRoad Sabina Kaminak Dalradian FirstMining BeloSun Victoria MidasGold TaungGold Falco Newcastle Exeter CharaatGold (1) (1) MARKET CAP. (US$ MM) IN PRODUCTION OR ACQUIRED 1. Acquisition Multiple Source: Company websites, filings from SEDAR and Factset COMPARABLES – PRE-PRODUCTION > 5 M OZS & CAPEX BELOW $1BN
  • 19. TSXV: FPC | WWW.FALCORES.COM | 19 ALL-IN SUSTAINING CASH COST (US$/OZ AU) $427 $446 $524 $750 $752 $492 $583 $605 $616 $620 $623 $634 $674 $690 $779 $855 $860 Falco Pretium Continental Kaminak TaungGold CharaatGold MidasGold Sabina Lundin Victoria Dalradian GoldRoad TMAC Exeter BeloSun Newcastle FirstMining 17 20 18 18 11 20 18 17 17 14 13 13 12 12 11 11 10 TMAC TaungGold Exeter Pretium CharaatGold Falco BeloSun Newcastle Continental GoldRoad Lundin MidasGold Sabina Kaminak FirstMining Dalradian Victoria LIFE OF MINE (YEARS) 1. Payback period not disclosed. Source: Company websites, filings from SEDAR and Factset M&I ONLY COMPARABLES – PRE-PRODUCTION > 5 M OZS & CAPEX BELOW $1BN IN PRODUCTION OR ACQUIRED
  • 20. TSXV: FPC | WWW.FALCORES.COM | 20 ACTIVITIES START COMPLETION PEA COMPLETED Feasibility Study Q2 2016 Q3 2017 Environmental Impact assessment Q2 2016 Q4 2017 Dewatering (Phase 1) Q1 2018 Q3 2019 Detailed engineering Q4 2017 Q4 2018 Head frame and hoist construction (Exploration Phase) Q4 2017 Q3 2018 Public audiences – “BAPE” Q4 2017 Q1 2019 Permits for project construction Q2 2019 Processing plant construction Spring 2019 First mineralized ore in mine Q1 2021 Full mine ramp up (Phase 1) H1 2021 End of process plant construction / plant commissioning H1 2021 Process plant ramp up H2 2021 HORNE 5 PROJECT| PROJECT SCHEDULE
  • 21. TSXV: FPC | WWW.FALCORES.COM | 21 RIMO Lac Laynes Routhier NORALEX Dufresnor Baie D’Alembert Four Corners - Beauchastel Gold Viau - Lac Hervé Horne 5 Project Flavrian FALCO RESOURCES| REGIONAL EXPLORATION – 40,000 METRE PROGRAM
  • 22. TSXV: FPC | WWW.FALCORES.COM | 22 HORNE 5 PROJECT| DEEP EXPLORATION POTENTIAL (VS. LA RONDE VMS) 3,000 M HG_F zone (Inferred) not included in Feasibility holds: 2.8 m tonnes at 3.38 Au g/t VS. current PEA diluted grade of 1.63 Au g/t 1,000 M 2,000 M Horne 5 Project La Ronde Complex (Agnico Eagle)
  • 23. TSXV: FPC | WWW.FALCORES.COM | 23 FALCO RESOURCES| CLOSING THOUGHTS OBSERVATION: WHAT IS LEFT IN THE ABITIBI 10 YEARS FROM NOW?  Dearth of sizable gold projects in the Abitibi 10 years from now HORNE 5 PROJECT:  Long-life Project & Low AISC: >12 years of life with upside & < $427/ Au Oz AISC  State-of-the-art project: A true mine of the future  Strong Exploration Upside  Ideal location: Infrastructure & Strong Labour Pool + Strong Government Support  Strong & Experienced Team to Advance the Project
  • 24. TSXV: FPC | WWW.FALCORES.COM | 24 Head Office Falco Resources Ltd. 1100, avenue des Canadiens-de-Montréal Bureau 300 Montréal, QC H3B 2S2 Tél. : +1.514.905.3162 Toll Free : +1.888.915.2009 Courriel : info@falcores.com Investor Inquiries Vincent Metcalfe, CFO Tel: +1.514.905.3162 Email: vmetcalfe@falcores.com CONTACT US
  • 25. TSXV: FPC | WWW.FALCORES.COM | 25 APPENDIX
  • 26. TSXV: FPC | WWW.FALCORES.COM | 26 Appendix A - HORNE 5 PROJECT LOCATED NORTH OF THE CITY OF ROUYN-NORANDA HORNE 5 PROJECT LOCATED IN AN INDUSTRIAL PARK City of Rouyn-Noranda Smelter Horne Mine Quemont Shaft Falco Surface Rights Industrial Park Rail Highway
  • 27. TSXV: FPC | WWW.FALCORES.COM | 27 Appendix – @ C$55NSR Note: Commodity Price Assumptions in US$ - $1,300/oz Au, $18.50/oz AG, $2.15/lb CU, $1.00/lb ZN Resource Class Cut-off (NSR C$) Tonnes Au Equivalent g/t Au g/t Ag g/t Cu % Zn % Contained Au EQ (oz) Contained Au (oz) Contained Ag (oz) Contained Cu (lbs) Contained Zn (lbs) > 40 112,837,300 2.19 1.40 13.51 0.16 0.77 7,933,432 5,092,093 49,006,097 404,004,013 1,918,532,372 > 45 105,660,800 2.26 1.45 13.80 0.17 0.80 7,675,704 4,934,128 46,895,548 388,219,896 1,861,812,513 > 50 98,431,300 2.34 1.50 14.10 0.17 0.83 7,389,520 4,758,936 44,630,965 371,415,421 1,795,554,378 > 55 91,096,800 2.41 1.56 14.41 0.18 0.86 7,072,273 4,563,793 42,209,208 353,502,913 1,720,132,089 > 60 83,674,500 2.50 1.62 14.74 0.18 0.89 6,724,071 4,348,340 39,658,845 334,697,744 1,635,170,900 > 65 76,164,000 2.59 1.68 15.10 0.19 0.92 6,343,817 4,114,360 36,964,321 314,464,092 1,538,362,827 > 70 68,857,000 2.69 1.75 15.44 0.19 0.94 5,946,460 3,872,056 34,187,862 293,539,891 1,433,144,432 > 75 61,768,900 2.79 1.82 15.78 0.20 0.97 5,534,345 3,622,782 31,338,658 272,412,325 1,319,587,642 > 80 55,205,800 2.89 1.90 16.07 0.21 0.99 5,128,157 3,379,201 28,514,569 252,090,038 1,204,136,268 > 85 48,979,500 3.00 1.99 16.32 0.22 1.01 4,719,916 3,133,727 25,694,362 232,283,780 1,087,297,243 > 90 43,127,300 3.11 2.08 16.53 0.22 1.02 4,314,767 2,889,443 22,920,820 212,895,273 971,164,640 > 95 37,708,700 3.23 2.19 16.76 0.23 1.03 3,920,117 2,649,110 20,318,763 194,147,093 859,000,393 > 100 32,847,800 3.36 2.29 16.93 0.24 1.04 3,547,992 2,423,233 17,878,830 176,525,171 751,901,217 Resource Class Cut-off (NSR C$) Tonnes Au Equivalent g/t Au g/t Ag g/t Cu % Zn % Contained Au EQ (oz) Contained Au (oz) Contained Ag (oz) Contained Cu (lbs) Contained Zn (lbs) > 40 29,982,700 2.09 1.27 20.20 0.18 0.62 2,018,308 1,225,760 19,474,995 121,579,421 408,634,980 > 45 27,554,500 2.18 1.33 21.03 0.19 0.64 1,930,445 1,176,117 18,634,351 114,786,950 389,104,374 > 50 24,940,000 2.28 1.39 21.98 0.20 0.66 1,826,125 1,116,815 17,622,512 107,406,534 365,167,423 > 55 22,283,200 2.39 1.47 22.98 0.20 0.68 1,709,902 1,053,061 16,463,471 99,171,805 336,101,668 > 60 20,058,400 2.49 1.54 23.94 0.21 0.70 1,604,361 995,491 15,437,436 91,439,498 309,347,419 > 65 17,472,900 2.62 1.64 25.21 0.21 0.72 1,472,114 922,946 14,159,498 80,661,116 278,551,219 > 70 15,293,600 2.75 1.74 26.48 0.21 0.74 1,352,929 856,634 13,019,250 71,823,610 249,906,179 > 75 13,406,500 2.88 1.84 27.70 0.22 0.75 1,242,755 794,507 11,940,661 64,601,999 222,924,808 > 80 11,528,900 3.04 1.96 29.10 0.23 0.77 1,126,483 727,514 10,784,724 57,409,881 195,709,438 > 85 9,821,100 3.21 2.11 30.25 0.23 0.78 1,014,192 664,774 9,552,769 50,654,094 168,612,199 > 90 8,222,900 3.41 2.29 30.98 0.25 0.77 902,741 604,603 8,189,164 44,700,861 139,977,418 > 95 6,927,000 3.63 2.48 31.57 0.26 0.76 807,727 552,850 7,030,524 39,678,474 115,974,677 > 100 5,912,700 3.84 2.68 32.15 0.27 0.74 729,660 509,966 6,112,206 35,554,367 96,081,089 Inferred Measured + Indicated
  • 28. TSXV: FPC | WWW.FALCORES.COM | 28 Appendix - RESOURCE COMPARISON – APRIL 2014 MINERAL RESOURCE TO CURRENT Resource Category Measured Indicated Inferred Mineral Resource Estimate Cut-off (NSR C$) Tonnes Au (g/t) Ag (g/t) Cu (%) Zn (%) Tonnes Au (g/t) Ag (g/t) Cu (%) Zn (%) Tonnes Au (g/t) Ag (g/t) Cu (%) Zn (%) 2016 update (Sept. 26) > 55 9,361,800 1.58 16.33 0.18 0.81 81,735,100 1.56 14.19 0.18 0.86 22,283,200 1.47 22.98 0.20 0.68 2016 (Jan. 8) > 65 -- -- -- -- -- 58,346,300 1.82 15.60 0.20 1.00 12,678,700 2.10 26.26 0.22 0.57 Maiden 2014 (Feb. 17) > 80 -- -- -- -- -- -- -- -- -- -- 25,319,200 2.64 -- 0.23 0.70 Update ∆ Measured ∆ Indicated ∆ Inferred Mineral Resource Estimate Tonnes Au (g/t) Ag (g/t) Cu (%) Zn (%) Tonnes Au (g/t) Ag (g/t) Cu (%) Zn (%) Tonnes Au (g/t) Ag (g/t) Cu (%) Zn (%) 2016 update vs. Jan. 2016 100% 100% 100% 100% 100% 40% -14% -9% -10% -14% 76% -30% -12% -9% 19% 2016 update vs. Maiden 2014 -- -- -- -- -- 100% 100% 100% 100% 100% -12% -44% 100% -13% -3% Resources have increased 310% from 2014 and 47% from earlier in 2016
  • 29. TSXV: FPC | WWW.FALCORES.COM | 29 Appendix – Historical Drill Density of Horne 5 Deposit 600m HORNEQUEMONT  Exceptional Drill Density  4,384 underground drill holes at 15 m spacing (305,788m) drilled by Noranda  Very high confidence in historical drilling  Great upside at Depth – limited drilling vs. upper area
  • 30. TSXV: FPC | WWW.FALCORES.COM | 30 Appendix – Horne 5 Deposit & 2015 Confirmation Drilling Program HORNEQUEMONT
  • 31. TSXV: FPC | WWW.FALCORES.COM | 31 Appendix – Current Mineral Envelops
  • 32. TSXV: FPC | WWW.FALCORES.COM | 32 • NPV of $1.131 billion at a 5% discount rate and an IRR of 20.0% before taxes and mining duties • NPV of $667 million at a 5% discount rate and an IRR of 16.0% after taxes and mining duties • Peak-year production of 274 kozs and average LOM annual production of 236 kozs of gold • Net payable gold recovery of 86.8% • 3,051,000 gold ounces production at an average diluted grade of 2.60 g/t Au LOM • 2,903,000 ounces of payable gold LOM • 807 million pounds of payable zinc LOM • 194 million pounds of payable copper LOM • 23.8 million ounces of payable silver LOM • All-in sustaining costs* of US$427 PER PAYABLE GOLD OUNCE • All-in cost (CAPEX plus OPEX) is estimated at US$660 per payable gold ounce • Initial CAPEX of C$905 million (including a $60 million contingency) or US$680 million • Payback Period of 3.8 years pre-tax and 4.1 years post-tax • Gross Revenue of $6.8 billion and Operating Cash-flow of $2.6 billion • Start of production in 2020 • Full production in 2021 • Initial mine life of 12 years *All-in Sustaining Costs are presented as defined by the World Gold Council ("WGC") less Corporate G&A Note: Commodity Price Assumptions in US$ - $1,250/oz Au, $17.00/oz AG, $2.85/lb CU, $1.00/lb ZN Appendix – Horne 5 Project Key Highlights
  • 33. TSXV: FPC | WWW.FALCORES.COM | 33 PROCESSING | SAG & Ball Mill with Cyclone Cluster
  • 34. TSXV: FPC | WWW.FALCORES.COM | 34 PROCESSING | Overall Flotation Tank
  • 35. TSXV: FPC | WWW.FALCORES.COM | 35 PROCESSING | Regrind Mill
  • 36. TSXV: FPC | WWW.FALCORES.COM | 36 PROCESSING | Carbon in Pulp
  • 37. TSXV: FPC | WWW.FALCORES.COM | 37 NORALEX –Young Buck Longitudinal - looking NE Open
  • 38. TSXV: FPC | WWW.FALCORES.COM | 38 FLAVRIAN – Duprat Syenite Similar Magnetic signature to Upper Beaver ?  Similar context as Queenston’s Upper Beaver syenite;  1.2 km in diameter, 1 existing drill hole;  Two anomalous gold values on the contacts of the syenite;  Largely unexplored
  • 39. TSXV: FPC | WWW.FALCORES.COM | 39 CENTRAL CAMP – West Ansil – 1.7 KM of Ansil Inmont New Insco Bouchard-Hebert Horne Ansil Gallen Aldermac Corbet Millenbach 0 5 km Montbray Norbec Delbridge Amulet A-CWaite DEPOSIT Mt %Cu %Zn Opt Au Horne (H-G-E) 54.0 2.20 0.18 Quemont 15.0 1.22 1.90 0.12 Bouchard-Hebert lens 1100 10.2 0.72 5.39 0.04 Amulet Lower A 5.2 5.10 5.20 0.04 Norbec 4.3 2.77 4.70 0.02 Millenbach 3.5 3.50 4.50 0.03 Gallen 3.3 0.07 4.77 0.02 Corbet 2.7 2.90 2.00 0.03 East Waite 1.7 4.10 3.25 0.05 Ansil 1.4 7.18 0.80 0.06 Old Waite 1.2 4.70 2.98 0.03 New Insco (Not mined) 1.2 2.11 0.03 Delbridge 0.4 0.55 8.60 0.07
  • 40. TSXV: FPC | WWW.FALCORES.COM | 40 CENTRAL CAMP – West Ansil Massive Sulphide Zones Category (NI 43-101) Tons (MT) Cu % Zn % Au g/t Ag g/t Indicated Resource: 0.53 3.4 0.4 1.4 9.2 Inferred Resource: 0.60 3.3 0.2 0.3 5.9 AN-05-04 – 3.57% Cu over 52.7 m
  • 41. TSXV: FPC | WWW.FALCORES.COM | 41 Appendix – Mineral Resource Estimates & Modeling Notes 1. The effective date of the resource estimate is September 26, 2016. The Independent and Qualified Persons for the Mineral Resource Estimate as required by National Instrument 43-101 are Carl Pelletier, P. Geo., B.Sc. and Guilhem Servelle, P.Geo., M.Sc., both employees of InnovExplo Inc. 2. Mineral Resources are not Mineral Reserves and have not demonstrated economic viability. 3. While the results are presented undiluted and in situ, the reported mineral resources are considered by the Qualified Persons to have reasonable prospects for economic extraction. 4. These estimates include six (6) low grade gold-bearing mineralized zones. 5. The principal low-grade gold-bearing mineralized zone includes six (6) high-grade gold-bearing zones, one (1) high-grade copper-bearing zone, one (1) high grade zinc-bearing zone, three (3) high-grade silver-bearing zones. Note that these high-grade zones may overlap each other. 6. Resources were compiled at NSR cut-offs of C$40, C$45, C$50, C$55, C$60, C$65, C$70, C$75, C$80, C$85, C$90, C$95, and C$100 per tonne for sensitivity purposes. 7. The official base case resource is reported at a C$55 per tonne NSR cut-off. 8. The appropriate NSR cut-off will vary depending on prevailing economic and operational parameters to be determined. 9. NSR estimates are based on the following assumptions: exchange rate of $C1.30/$US, metal prices of (all $US): gold $1,300/oz, silver $18.50, copper $2.15/lb, zinc $1.00/lb (Long term analyst consensus price forecast study). Net recoveries of 86.8% for gold, 74.9% for silver, 67.3% for zinc and 74.0% for copper. Smelting cost (including transportation) C$6.52 per tonne (based on the Cost Mine service as well as on non-public smelter contract obtained from one of the proposed destinations and on talks with transport providers). 10. Gold equivalent calculations assume these same metal prices. 11. Inferred resources are separate from Indicated Resources 12. The quantity and grade of reported Inferred Resources in this estimate are uncertain in nature and there has not been sufficient work to define these Inferred Resources as Indicated or Measured Resources. It is uncertain if further work will result in upgrading them to an Indicated or Measured mineral resource category. 13. The resource was estimated using Geovia GEMS 6.7. The estimate is based on 5,977 diamond drill holes (478,281m) of which 4,138 crosscut mineralized zones for a total of 177,996m of core within these zones. For silver the estimate also uses the results of an exhaustive metallurgical test comprising 2,112 diamond drill holes assayed for silver over a total length of 75,540 meters. A minimum true thickness of 7.0 m was applied, using the grade of the adjacent material when assayed, or a value of zero when not assayed. Only the silver interpolation in the Inferred resources does not use the material when not assayed. 14. The estimate database contains also 14,799 channel samples for a total of 23,791m from drifts historically sampled. Channel sample data was only used for distance to composite criterion for resource classification purposes. 15. 91% of density values were estimated using historical drill hole iron assays data and Falco density data for an average of 3.41 g/cm3. Interpolation method use 3 pass ID2 for the ENV_A and HG_A to HG_F zones. 8% of density values were fixed at 2.88 g/cm3 for ENV_B to ENV_E zones due to the scarcity of the data. 2.88 g/cm3 representing the median of the available data. 1% of density values were fixed at 2.67 g/cm3 for ENV_F zone due to the scarcity of the date and to adequately characterise this quartz-rich zone. 16. Compositing was done on drill hole sections falling within the mineralized zones (composite = 3.0 metres). Tails shorter than 0.75 m were not created. 17. Resources were evaluated from drill holes using an ID2 interpolation method in a block model (block size = 5 x 5 x 5 m). 18. High grade capping was done on raw assay data and established on a per zone basis for gold (Au g/t): (HG_A: 35; HG_B: 35; HG_C: 25; HG_D: 35; HG_E: 25; HG_F: 35; ENV_A: 35; ENV_B: 25; ENV_C: 25; ENV_D: 20; ENV_E: 35; ENV_F: 25) and for silver (Ag g/t): SG_HG:100; HG_D: 165; HG_F: 165; ENV_A_SG_Low: 110; ENV_B: 100; ENV_C: 100; ENV_D: 100. Capping grade selection is supported by statistical analysis. No capping was applied to the Cu and Zn data based on statistical analysis. 19. The Mineral Resources presented herein are categorized as Measured, Indicated and Inferred. The Inferred category is only defined within the areas where blocks were interpolated during pass 1 or pass 2 in areas where continuity is sufficient to avoid isolated blocks. The Indicated category is only defined by blocks interpolated in areas where the maximum distance to the closest drill hole composite is less than 25m for blocks interpolated in passes 1 and 2. The Measured category is only defined by blocks classified as indicated and in sufficient proximity to sampled drifts (< 15m). The average distance to the nearest composite is 6.97 meters for the Measured resources, 10.01 meters for the Indicated resources and 40.10 meters for the Inferred resources. 20. Tonnage estimates were rounded to the nearest hundred tonnes. Any discrepancies in the totals are due to rounding effects. Rounding practice follows the recommendations set out in Form 43- 101F1. 21. CIM definitions and guidelines were followed in estimating mineral resources. 22. InnovExplo is not aware of any known environmental, permitting, legal, title-related, taxation, socio-political, marketing or other relevant issue that could materially affect the mineral resource estimate. 23. Metal contained in ounces (troy) = metric tonnes x grade / 31.10348. Calculations used metric units (metres, tonnes and g/t). Metal contents are presented in ounces and pounds . RESOURCE ESTIMATE NOTES