AUSTRIAN TRADE MISSION
UAE, Oman and Qatar
28 February to 5 March, 2004
Abu Dhabi: Saturday 28 and Sunday 29 February 2004
Dubai: Sunday 29 February and Monday 1 March 2004
Muscat: Tuesday 2 March 2004 (Available at Muscat Grand Hyatt)
Doha: Wednesday 3 and Thursday 4 March 2004
Organization:
Dr. Horst Machu
Regional Director of the Middle East/Africa Desk of the
Austrian Federal Economic Chamber
Dr. Nikolaus Seiwald
The Commercial Counsellor for
UAE, Oman, Qatar & Paksitan
AUSTRIAN EMBASSY/COMMERCIAL SECTION
ABU DHABI, UAE
Tel.: 00971-2-6766633, Fax: 00971-2-6760002
E-Mail: abudhabi@wko.at
Participants in the Austrian Trade Mission
Nr Company Product
01 Franz Achleitner-Fahrzeugbau
und Reifenzentrum Gesellschaft
m.b.H.
Hr. Markus Heiss
A-6300 Wörgl
Innsbruckerstraße 94
Tel.: +43 (0)5332 78 11-319
Fax: +43 (0)5332 75 2 22
E-Mail
markus.heiss@achleitner.com
Website www.achleitner.com
Armoured vehicles, military and special purpose vehicles
Achleitner, founded in 1932 as family business in Tyrol, is highly
recommended among clients all over the world for its armoured
vehicles, military and special purpose vehicles. Quality and
customer orientation are important specifics for the firms
philosophy.
Two products that Achleitner has developed for exclusive needs are
Mantra 4 x 4 and Survivor 4 x 4. Multipurpose applications suit to
customers requirements, both vehicles can be adapted to individual
needs and wishes and are ideal for operations in military and civil
missions. In individual implementations Mantra and Survivor can be
produced due to individual needs.
02 AUSTROCONSULT, Technische und
betriebswirtschaftliche Planung
& Beratung GesmbH
Dr. Hanns Sobotka
Managing Director
Zieglergasse 7
A-1070 Vienna, Austria
Tel: (+43) 1/52730-0
Fax: (+43) 1/52730-36
E-mail:
hanns.sobotka@austroconsult.at
AUSTROCONSULT offers services in the fields of Telecommunications
Intelligent Buildings, Electrical Engineering, Radio/TV
Broadcasting,
Railway Installations, Aviation Systems, Military Electronics,
Security Systems, EDP and Controlling.
Scope of services: Complete project management or controlling of
individual project stages as Project Development (Project
definition, feasibility studies, financing etc). Design
(organization planning, cost estimates, tender documents,
evaluation of offers, etc). Execution Phase (elaboration and
supervision of time schedules, site supervision, preparation and
execution of acceptance tests, auditing, etc) and Operational Phase
(resource management, training, documentation, etc).
03 AVL List GesmbH
Hr. Abbas Kermani
A-8020 Graz
Hans-List-Platz 1
Tel.:+43 (0)316 787-609
Fax +43 (0)316 787-550
E-Mail abbas.kermani@avl.com
Website http://www.avl.com/
Combustion Engines / Measuring Instruments
AVL List GmbH - Power train Development and Engine Test Systems AVL
is the world’s largest privately owned and independent company for
the development of power train systems with internal combustion
engines as well as instrumentation and test systems.
Scope of business Development of Power train Systems: AVL develops
and improves all kinds of power train systems and is a competent
partner to the engine and automotive industry. In addition AVL
develops and markets the simulation methods which are necessary for
the development work.
Engine Instrumentation and Test Systems: The products of this
business area comprise all the instruments and systems required for
engine and vehicle testing. A main focus is on optimally adaptable
emissions test modules.
The network of affiliates and representatives throughout the world
ensures development, service, and support on a local basis.
04 BANK PRIVAT AG
Mr. Pantelis Makrandreou
Hr. Henry Owainati
A-1011 Vienna
Hohenstaufengasse 6
Tel.: +43 (0)1 53 7 40-46159
Fax +43 (0)1 53 7 40-49293
E-Mail
henry.owainati@bankprivat.com
Website
http://www.bankprivat.com
Private Banking Services
05 Hakom -EDV DienstleistungsgmbH
Mr. Gregor Breza-Früchtl
A-1190 Vienna
Hartaeckerstr. 116A
Tel: 0043-664-1432293
Fax: 0043-1-4782960
E-Mail: gregorbf@cso.net
Energy Data Management
Apsys GmbH
Mr. Gregor Breza-Früchtl
A-1190 Vienna
Hartaeckerstr. 116A
Tel: 0043-664-1432293
Fax: 0043-1-4782960
E-Mail: gregorbf@cso.net
Polyurethansystems for floors, walls and ceilings
06 Europe Cooperation Klemenc
Hr. Marjan Klemenc
Mr. Simon Frewat
A-9020 Klagenfurt
Mantschehofgasse 34/32
Telefon +43 (0)463 91 36 47
Fax +43 (0)463 91 36 47
E-Mail office@klemenc-
raumdesign.at
Website www.klemenic-
raumdesign.at
EUROPE COOPERATION Klemenc are specialised in the interior
Decoration of activity rang from planning the interior area to
complete Furnishing.
Their collaboration with various European manufacturers that meet
the
Highest quality standards enables us to offer quick and individual
Solutions.
07 EVA HandelsgesmbH
Mrs. Jasmin Nezmahen-Castagna
A-8181 St.Ruprecht an der Raab
Wollsdorf 71
Telefon +43 (0)3178 23 27-12
Fax +43 (0)3178 36 10
E-Mail jasmin.nezmahen@obst-
eva.at
Website http://www.obst-eva.at
Apples
EVA is the central export organisation for quality apples from
Styria.
The organisation supplies fresh apples all the year round from the
most up-to-date ULO storage facilities:
Golden Delicious - Royal Gala - Braeburn - Idared - Jonagold –
Elstar - Arlet
EVA's produce is subject to the principles governing integrated
production. Utmost attention is devoted to quality, to the right
time for harvesting, to colour, firmness and sugar content.
EVA can supply in all types of packaging commonly used in Europe
and, from a logistical point of view, can deliver almost anywhere
in Europe.
EVA seeks importers and supermarket chains.
08 EWE Küchen Ges.m.b.H.
Hr. Davide D´Agosto
A-4600 Wels
Dieselstraße 14
Tel: +43 (0)7242 237-327
Fax +43 (0)7242 273-221
E-Mail d.agosto@ewe.at
Website http://www.ewe.at/
Kitchens
EWE is specialized in manufacturing fitted kitchens perfectly
adopted to the needs and demands of the final customer. As the best
known Austrian kitchen manufacturer they are set to be the leaders
concerning design, technical equipment and quality.
They offer 18 different models made of MDF material, high quality
chipboard, solid wood and solid wood veneer plus a variety of
colours and kinds of woods.
Kitchens design for EWE by the world famous architect team (Coop
Himmelblau) is their USP.
High quality kitchens made in Austria is their mission.
09 FINDMYHOME - Gabriel & Hlawa
OEG
Mr. Benedikt Gabriel
Hr. Bernd Hlawa
A-1190 Vienna
Starkfriedgasse 62/ Top 1
Tel.: +43 (0)1 369 27 58
Fax +43 (0)1 369 27 58-50
E-Mail office@findmyhome.at
Website
http://www.findmyhome.at
Production of Websites, Internet movies, promotion films for
projects and properties.
10 iku intelligente Fenstersysteme
AG
Mr. Julius Thurnher
Mrs. Monika Thurner
A-1232 Wien
Slamastraße 25 - 27
Tel.: +43 (0)1 616 56 58-25
Fax +43 (0)1 616 56 58-26
E-Mail info@iku-windows.com
Website http://www.iku-
windows.com
Self Cleaning window- and facade constructions
The intelligent products of iku® windows revolutionize the window &
facade market.
iku® windows, the intelligent window offers extra comfort to the
user, high saving potentials in the running costs and added value
through the possibility of connection to modern building management
systems. The unique self cleaning mechanics by touch of a button is
certainly the highlight iku® windows, the intelligent glass façade
, solves the cleaning problem of glass facades in a simple way.
Again by touch of a button whole glass facades of any height can be
cleaned within minutes - safely and economically. The traditional
cover cap system can be used also in the refurbishment of existing
buildings, the Structural Glazing version is suitable only for new
buildings. iku®windows is protected by international patents. The
products will be sold over licence partners only.
11 MCM MUSIL GmbH
Hr. Michael Musil
A-9587 Riegersdorf
Gladiolenweg 21a
Tel.: +43 (0)4257 21 03
Fax +43 (0)4257 21 0 37
E-Mail michael.musil@gmx.at
Beech Timber
MCM Musil GmbH is based in Riegersdorf in Carinthia, Austria and
has storage facilities in the Trieste Freeport in Italy where the
timber is dried, graded and shipped.
The company, which specialises in beech timber, seeks partners and
importers
12 Mils Electronic
Mr. Wilhelm Harder
Mr. Markus Coll
Tel.: +43 05223 577100
Fax: +43 05223 577101
E-Mail: wh@mils.com
Website: www.mils.com
Mils electronic is a major player in the field of communications
and information security. Their product range includes message
cipher systems, telephone and fax encryption devices and random key
production equipment.
Ever since their founding, the cryptographic functions in their
products have relied on the strongest possible encryption
algorithms and the unbreakable One Time Key encryption method.
As an independent and privately held Austrian company, they are in
a unique position to provide their customers world wide with this
highest standard of security. Additionally, they can use decades of
experience that they have gathered to find the best solution for
each customer’s security demand.
13 Nowicky Pharma
Dr. Wassil Nowicky
A-1040 Vienna
Margaretenstraße 7
Telefon +43 (0)1 586 12 23-11
Fax +43 (0)1 586 89 94
E-Mail nowicky@ukrin.com
Website www.ukrin.com
Anticancer drug - UKRAIN anticancer drug is a derivative of alkaloids from
the plant greater celandine and is used in the cancer therapy. It destroys
cancer cells through apoptosis without attacking healthy cells. Thereof
results the excellent tolerance. Has no significant side effects.
Activates a whole series of highly effective immune system mechanisms and
inhibits the formation of new blood vessels through which the tumour is
provided with nutrients. Developer & Manufacturer of UKRAIN anticancer
drug is Mr. Wassil Nowicky
14 Österreichische Staatsdruckerei
Austrian State Printing House
OeSD
Mrs. Claudia Hager
A-1239 Vienna
Tenschertstraße 7
Telefon +43 (0)1 20 6 66-308
Fax +43 (0)1 20 6 66-100
E-Mail hager@staatsdruckerei.at
Website www.staatsdruckerei.at
High Security Printing House for documents, identity cards, stamps,
high-end print products and personalisation systems with 200 years
experience and company seat in Vienna. Certified as “High Security
Printer”.
OeSD produces fraud-protected documents, such as passports (with
chip), driving licenses, identity cards incorporating overt and
covert high-tech security features. Our services include data
capture and data enhancement, as well as personalisation software
and hardware and consulting for the document issuance system.
Their stamps, especially intaglio and photogravure combination
printed, have won a number of international awards. Innovative
finishing techniques make them a piece of art.
15 Oilindustries Equipment GmbH
Hr. Iradj Radjabi-Rahat
Mr. Mehri Ajir
Dr. Amir Reza Radjabi-Rahat
A-1190 Vienna
Schreiberweg 3
Telefon +43 (0)1 368 43 88-44
Fax +43 (0)1 368 43 88-99
E-Mail radjabi@damavand.info
Website www.damavand.info
Industrial Filters and Sifters specially for the Oil-industry
16 Orion Leuchten-Fabrik Molecz &
Sohn Gesellschaft m.b.H.
Hr. Florian Molecz
Mr. Leopold Molecz
A-1232 Wien
Oberlaaerstraße 284
Telefon +43 (0)1 616 80 91
Fax +43 (0)1 616 71 40
E-Mail export@orion.co.at
Website http://www.orion.co.at
Lighting
The ORION-Lighting-Company with it's head office in Vienna,
distribution centres and showrooms all over Austria, Budapest and
Prague, and 350 employees has been working since 1948 in production
and sale of lighting fixtures in all different styles.
Several designers and a production-team are working together and
complementing each other to develop series and special productions
of all measurements which especially is important for the equipment
of hotels, restaurants, embassies, churches etc.
The product range - about 12.000 different articles - contains
economy-priced spots as well as exclusively designed crystal
chandeliers and enables a perfect made-to-measure offer for each
customer. Orion is looking for a partner who is interested in
working exclusively with the company in the field of crystal
chandeliers and lighting fixtures for pretentious clients.
17 Pewag Austria GmbH
Hr. Karl Heinz Fuchsbichler
A-8010 Graz
Theodor-Körner-Straße 59
Tel.: +43 (0)316 60 70-224
Fax +43 (0)316 60 70-198
E-Mail fkh@pewag.com
Website www.pewag.com
Industrial Chains
18 Pörner Ingenieur-GesmbH
Mr. Herbert Smejkal
A-1050 Vienna
Hamburgerstraße 9
Tel.: +43 (0)1 58 99 00
Fax +43 (0)1 589 90 99
E-Mail vienna@poerner.at
Website www.poerner.at
Bitumen Technology
With 25 years of experience and a team of 150 experts at its
command Pörner are a flexible engineering office for the
construction of processing plants for industry. Pörner realise
turnkey projects worldwide up to an investment level of Euro 30m.
In the bitumen technology field Pörner are a world leader with
their Biturox® process for the production of quality bitumen. The
current trend is towards bitumen qualities of high penetration
index for the construction of road surfaces of extra-long life. By
the Biturex® process mixes of raw materials from refineries like
short residue, vacuum gas oils, asphaltenes, extract from lube oil
production, etc. can be turned into "Multigrade" bitumen by
precisely controlled air oxidation. From what would normally be
considered unsuitable crude oils the Biturex® process produces
standard bitumen.
Process know-how, the relevant application technology and
experience in the right choice of equipment are the three good
reasons why Pörner can build Biturex® bitumen production plants at
economy prices in the shortest possible times.
19 Precht Eduard
Hr. Eduard Precht
A-1011 Vienna
Landskrongasse 5/8
Telefon +43 (0)1 535 98 29
Fax +43 (0)1 535 98 29
E-Mail precht@utanet.at
Property investments.
Real Estate investments and management in central Europe.
They offer safe investments direct in commercial property including
professional property management under Austrian control.
20 Seele GmbH & Co. KG
Mr. Arnulf Christa
Gutenbergstraße 19
86368 Gersthofen
Telefon ++49 821 / 24 94 - 333
Telefax ++49 821 / 24 94 - 300
eMail: lwoltmann@seele-
online.com
Internet: www.seele-online.com
Seele is a supplier for premium class construction with steel and glass.
SEELE stands for modern architecture using modern materials. It stands for aesthetics and
innovation. For glass facades, glass roofs, and glass-steel constructions.
Some of our recent projects are e.g. the Greater London Authority Headquarters, the
Seattle Central Library or the Airport Cologne/Bonn as well as the skylights at Terminal 2
Airport Munich.
21 SPHINX FILMS INT.
Mr. Ahmed Radwan
Mr. Rainer Schober
A-1120 Vienna
Rotenmühlgasse 11
Tel.: +43 (0)1 524 33 91
Fax +43 (0)1 524 33 93
E-Mail office@sphinx-films.com
Website www.sphinx-films.com
Sphinx Film Int. is a film and television production company with an
extensive network of partners world-wide. The company seeks and offers
opportunities to cooperate on international productions in the area of
feature films, television programming and commercials, including
financing/co-financing.
22 Starlinger & Co G.b.H.
Hr. Günter Wais
A-1060 Vienna
Sonnenuhrgasse 4
Tel.: +43 (0)1 59 9 55-220
Fax +43 (0)1 59 9 55-25
E-Mail sales.wg@starlinger.com
Website www.starlinger.com
Machines for Production of Woven Plastic Sacks; Plastic Recycling
Lines
Starlinger are the world's leading producer of high-quality
machines for woven plastic sack production (coated or uncoated
standard sacks, Leno sacks, valve sacks, AD*STAR block bottom valve
sacks and FIBC [Big Bags]).
Sacks produced on Starlinger machines are used for the safe and
low-cost packaging of various bulk goods e.g. cement, seed, grain,
flour, sugar, citrus fruits, fertilizer and animal feed.
Starlinger's range of products also includes plastics recycling
machines (e.g. for PET bottles or fibres/filaments) and extrusion
machines for special filaments (e.g. for artificial grass or carpet
backing materials).
Satisfied customers in over 130 countries testify to the
outstanding quality of the company's products.
23 Vesely Alfred Timber-Export
Hr. Alfred Vesely
A-1060 Vienna
Stiegengasse 5/5
Tel.: +43 (0)1 586 48 00 12
Fax +43 (0)1 586 49 00
E-Mail a.vesely@vesely.at
Website www.vesely.at
Sawn timber – It is one of the leading Austrian suppliers of sawn timber
(like whitewood and timber) to the Middle East and to North and East
Africa. The timber is mainly for use in the building industry and is of
high quality.
After sawing, the timber is transported by rail or road to Koper in
Slovenia where the loading base is situated. It is stored under roofed
cover pending shipment and all consignments are marked with the firm’s
logo. They are inspected by a broker from the Vienna Commodity Exchange
and each purchaser receives a certificate stating that the goods will be
shipped in accordance with the conditions of the sales agreement.
24 Vexcel Imaging GmbH
Hr. Engelberg Breg
A-8010 Graz
Münzgrabenstraße 11
Tel.: +43 (0)316 84 90 66-22
Fax +43 (0)316 849 06 69
E-Mail engbreg@vexcel.co.at
Website www.vexcel.co.at
VEXCEL Ultrasan 5000 – It is one of the leading companies in developing
and producing high precision mapping scanner. The Ultrascan 5000 has been
sold all over the world in a high number.
The Ultrascan 5000 is a low cost high precision scanner with the
best price-performance-ratio as all other mapping scanners. The low
price makes high precision technology available for small and
medium companies. With its full automatic Rollfilmunit the US5000
is made for stand alone production. AFR SW allows users to convert
analogue film archives into digital files for a variety of film
formats and oversized images including 9x18 inches and 5x92 inches.
With US5000 scanner companies can do their own scanning and do not
have to rely any more on outside service

atm-5

  • 1.
    AUSTRIAN TRADE MISSION UAE,Oman and Qatar 28 February to 5 March, 2004 Abu Dhabi: Saturday 28 and Sunday 29 February 2004 Dubai: Sunday 29 February and Monday 1 March 2004 Muscat: Tuesday 2 March 2004 (Available at Muscat Grand Hyatt) Doha: Wednesday 3 and Thursday 4 March 2004 Organization: Dr. Horst Machu Regional Director of the Middle East/Africa Desk of the Austrian Federal Economic Chamber Dr. Nikolaus Seiwald The Commercial Counsellor for UAE, Oman, Qatar & Paksitan AUSTRIAN EMBASSY/COMMERCIAL SECTION ABU DHABI, UAE Tel.: 00971-2-6766633, Fax: 00971-2-6760002 E-Mail: abudhabi@wko.at
  • 2.
    Participants in theAustrian Trade Mission Nr Company Product 01 Franz Achleitner-Fahrzeugbau und Reifenzentrum Gesellschaft m.b.H. Hr. Markus Heiss A-6300 Wörgl Innsbruckerstraße 94 Tel.: +43 (0)5332 78 11-319 Fax: +43 (0)5332 75 2 22 E-Mail markus.heiss@achleitner.com Website www.achleitner.com Armoured vehicles, military and special purpose vehicles Achleitner, founded in 1932 as family business in Tyrol, is highly recommended among clients all over the world for its armoured vehicles, military and special purpose vehicles. Quality and customer orientation are important specifics for the firms philosophy. Two products that Achleitner has developed for exclusive needs are Mantra 4 x 4 and Survivor 4 x 4. Multipurpose applications suit to customers requirements, both vehicles can be adapted to individual needs and wishes and are ideal for operations in military and civil missions. In individual implementations Mantra and Survivor can be produced due to individual needs. 02 AUSTROCONSULT, Technische und betriebswirtschaftliche Planung & Beratung GesmbH Dr. Hanns Sobotka Managing Director Zieglergasse 7 A-1070 Vienna, Austria Tel: (+43) 1/52730-0 Fax: (+43) 1/52730-36 E-mail: hanns.sobotka@austroconsult.at AUSTROCONSULT offers services in the fields of Telecommunications Intelligent Buildings, Electrical Engineering, Radio/TV Broadcasting, Railway Installations, Aviation Systems, Military Electronics, Security Systems, EDP and Controlling. Scope of services: Complete project management or controlling of individual project stages as Project Development (Project definition, feasibility studies, financing etc). Design (organization planning, cost estimates, tender documents, evaluation of offers, etc). Execution Phase (elaboration and supervision of time schedules, site supervision, preparation and execution of acceptance tests, auditing, etc) and Operational Phase (resource management, training, documentation, etc).
  • 3.
    03 AVL ListGesmbH Hr. Abbas Kermani A-8020 Graz Hans-List-Platz 1 Tel.:+43 (0)316 787-609 Fax +43 (0)316 787-550 E-Mail abbas.kermani@avl.com Website http://www.avl.com/ Combustion Engines / Measuring Instruments AVL List GmbH - Power train Development and Engine Test Systems AVL is the world’s largest privately owned and independent company for the development of power train systems with internal combustion engines as well as instrumentation and test systems. Scope of business Development of Power train Systems: AVL develops and improves all kinds of power train systems and is a competent partner to the engine and automotive industry. In addition AVL develops and markets the simulation methods which are necessary for the development work. Engine Instrumentation and Test Systems: The products of this business area comprise all the instruments and systems required for engine and vehicle testing. A main focus is on optimally adaptable emissions test modules. The network of affiliates and representatives throughout the world ensures development, service, and support on a local basis. 04 BANK PRIVAT AG Mr. Pantelis Makrandreou Hr. Henry Owainati A-1011 Vienna Hohenstaufengasse 6 Tel.: +43 (0)1 53 7 40-46159 Fax +43 (0)1 53 7 40-49293 E-Mail henry.owainati@bankprivat.com Website http://www.bankprivat.com Private Banking Services 05 Hakom -EDV DienstleistungsgmbH Mr. Gregor Breza-Früchtl A-1190 Vienna Hartaeckerstr. 116A Tel: 0043-664-1432293 Fax: 0043-1-4782960 E-Mail: gregorbf@cso.net Energy Data Management
  • 4.
    Apsys GmbH Mr. GregorBreza-Früchtl A-1190 Vienna Hartaeckerstr. 116A Tel: 0043-664-1432293 Fax: 0043-1-4782960 E-Mail: gregorbf@cso.net Polyurethansystems for floors, walls and ceilings 06 Europe Cooperation Klemenc Hr. Marjan Klemenc Mr. Simon Frewat A-9020 Klagenfurt Mantschehofgasse 34/32 Telefon +43 (0)463 91 36 47 Fax +43 (0)463 91 36 47 E-Mail office@klemenc- raumdesign.at Website www.klemenic- raumdesign.at EUROPE COOPERATION Klemenc are specialised in the interior Decoration of activity rang from planning the interior area to complete Furnishing. Their collaboration with various European manufacturers that meet the Highest quality standards enables us to offer quick and individual Solutions. 07 EVA HandelsgesmbH Mrs. Jasmin Nezmahen-Castagna A-8181 St.Ruprecht an der Raab Wollsdorf 71 Telefon +43 (0)3178 23 27-12 Fax +43 (0)3178 36 10 E-Mail jasmin.nezmahen@obst- eva.at Website http://www.obst-eva.at Apples EVA is the central export organisation for quality apples from Styria. The organisation supplies fresh apples all the year round from the most up-to-date ULO storage facilities: Golden Delicious - Royal Gala - Braeburn - Idared - Jonagold – Elstar - Arlet EVA's produce is subject to the principles governing integrated production. Utmost attention is devoted to quality, to the right time for harvesting, to colour, firmness and sugar content. EVA can supply in all types of packaging commonly used in Europe and, from a logistical point of view, can deliver almost anywhere in Europe. EVA seeks importers and supermarket chains.
  • 5.
    08 EWE KüchenGes.m.b.H. Hr. Davide D´Agosto A-4600 Wels Dieselstraße 14 Tel: +43 (0)7242 237-327 Fax +43 (0)7242 273-221 E-Mail d.agosto@ewe.at Website http://www.ewe.at/ Kitchens EWE is specialized in manufacturing fitted kitchens perfectly adopted to the needs and demands of the final customer. As the best known Austrian kitchen manufacturer they are set to be the leaders concerning design, technical equipment and quality. They offer 18 different models made of MDF material, high quality chipboard, solid wood and solid wood veneer plus a variety of colours and kinds of woods. Kitchens design for EWE by the world famous architect team (Coop Himmelblau) is their USP. High quality kitchens made in Austria is their mission. 09 FINDMYHOME - Gabriel & Hlawa OEG Mr. Benedikt Gabriel Hr. Bernd Hlawa A-1190 Vienna Starkfriedgasse 62/ Top 1 Tel.: +43 (0)1 369 27 58 Fax +43 (0)1 369 27 58-50 E-Mail office@findmyhome.at Website http://www.findmyhome.at Production of Websites, Internet movies, promotion films for projects and properties. 10 iku intelligente Fenstersysteme AG Mr. Julius Thurnher Mrs. Monika Thurner A-1232 Wien Slamastraße 25 - 27 Tel.: +43 (0)1 616 56 58-25 Fax +43 (0)1 616 56 58-26 E-Mail info@iku-windows.com Website http://www.iku- windows.com Self Cleaning window- and facade constructions The intelligent products of iku® windows revolutionize the window & facade market. iku® windows, the intelligent window offers extra comfort to the user, high saving potentials in the running costs and added value through the possibility of connection to modern building management systems. The unique self cleaning mechanics by touch of a button is certainly the highlight iku® windows, the intelligent glass façade , solves the cleaning problem of glass facades in a simple way. Again by touch of a button whole glass facades of any height can be cleaned within minutes - safely and economically. The traditional cover cap system can be used also in the refurbishment of existing buildings, the Structural Glazing version is suitable only for new buildings. iku®windows is protected by international patents. The products will be sold over licence partners only.
  • 6.
    11 MCM MUSILGmbH Hr. Michael Musil A-9587 Riegersdorf Gladiolenweg 21a Tel.: +43 (0)4257 21 03 Fax +43 (0)4257 21 0 37 E-Mail michael.musil@gmx.at Beech Timber MCM Musil GmbH is based in Riegersdorf in Carinthia, Austria and has storage facilities in the Trieste Freeport in Italy where the timber is dried, graded and shipped. The company, which specialises in beech timber, seeks partners and importers 12 Mils Electronic Mr. Wilhelm Harder Mr. Markus Coll Tel.: +43 05223 577100 Fax: +43 05223 577101 E-Mail: wh@mils.com Website: www.mils.com Mils electronic is a major player in the field of communications and information security. Their product range includes message cipher systems, telephone and fax encryption devices and random key production equipment. Ever since their founding, the cryptographic functions in their products have relied on the strongest possible encryption algorithms and the unbreakable One Time Key encryption method. As an independent and privately held Austrian company, they are in a unique position to provide their customers world wide with this highest standard of security. Additionally, they can use decades of experience that they have gathered to find the best solution for each customer’s security demand. 13 Nowicky Pharma Dr. Wassil Nowicky A-1040 Vienna Margaretenstraße 7 Telefon +43 (0)1 586 12 23-11 Fax +43 (0)1 586 89 94 E-Mail nowicky@ukrin.com Website www.ukrin.com Anticancer drug - UKRAIN anticancer drug is a derivative of alkaloids from the plant greater celandine and is used in the cancer therapy. It destroys cancer cells through apoptosis without attacking healthy cells. Thereof results the excellent tolerance. Has no significant side effects. Activates a whole series of highly effective immune system mechanisms and inhibits the formation of new blood vessels through which the tumour is provided with nutrients. Developer & Manufacturer of UKRAIN anticancer drug is Mr. Wassil Nowicky
  • 7.
    14 Österreichische Staatsdruckerei AustrianState Printing House OeSD Mrs. Claudia Hager A-1239 Vienna Tenschertstraße 7 Telefon +43 (0)1 20 6 66-308 Fax +43 (0)1 20 6 66-100 E-Mail hager@staatsdruckerei.at Website www.staatsdruckerei.at High Security Printing House for documents, identity cards, stamps, high-end print products and personalisation systems with 200 years experience and company seat in Vienna. Certified as “High Security Printer”. OeSD produces fraud-protected documents, such as passports (with chip), driving licenses, identity cards incorporating overt and covert high-tech security features. Our services include data capture and data enhancement, as well as personalisation software and hardware and consulting for the document issuance system. Their stamps, especially intaglio and photogravure combination printed, have won a number of international awards. Innovative finishing techniques make them a piece of art. 15 Oilindustries Equipment GmbH Hr. Iradj Radjabi-Rahat Mr. Mehri Ajir Dr. Amir Reza Radjabi-Rahat A-1190 Vienna Schreiberweg 3 Telefon +43 (0)1 368 43 88-44 Fax +43 (0)1 368 43 88-99 E-Mail radjabi@damavand.info Website www.damavand.info Industrial Filters and Sifters specially for the Oil-industry 16 Orion Leuchten-Fabrik Molecz & Sohn Gesellschaft m.b.H. Hr. Florian Molecz Mr. Leopold Molecz A-1232 Wien Oberlaaerstraße 284 Telefon +43 (0)1 616 80 91 Fax +43 (0)1 616 71 40 E-Mail export@orion.co.at Website http://www.orion.co.at Lighting The ORION-Lighting-Company with it's head office in Vienna, distribution centres and showrooms all over Austria, Budapest and Prague, and 350 employees has been working since 1948 in production and sale of lighting fixtures in all different styles. Several designers and a production-team are working together and complementing each other to develop series and special productions of all measurements which especially is important for the equipment of hotels, restaurants, embassies, churches etc. The product range - about 12.000 different articles - contains economy-priced spots as well as exclusively designed crystal chandeliers and enables a perfect made-to-measure offer for each customer. Orion is looking for a partner who is interested in working exclusively with the company in the field of crystal chandeliers and lighting fixtures for pretentious clients.
  • 8.
    17 Pewag AustriaGmbH Hr. Karl Heinz Fuchsbichler A-8010 Graz Theodor-Körner-Straße 59 Tel.: +43 (0)316 60 70-224 Fax +43 (0)316 60 70-198 E-Mail fkh@pewag.com Website www.pewag.com Industrial Chains 18 Pörner Ingenieur-GesmbH Mr. Herbert Smejkal A-1050 Vienna Hamburgerstraße 9 Tel.: +43 (0)1 58 99 00 Fax +43 (0)1 589 90 99 E-Mail vienna@poerner.at Website www.poerner.at Bitumen Technology With 25 years of experience and a team of 150 experts at its command Pörner are a flexible engineering office for the construction of processing plants for industry. Pörner realise turnkey projects worldwide up to an investment level of Euro 30m. In the bitumen technology field Pörner are a world leader with their Biturox® process for the production of quality bitumen. The current trend is towards bitumen qualities of high penetration index for the construction of road surfaces of extra-long life. By the Biturex® process mixes of raw materials from refineries like short residue, vacuum gas oils, asphaltenes, extract from lube oil production, etc. can be turned into "Multigrade" bitumen by precisely controlled air oxidation. From what would normally be considered unsuitable crude oils the Biturex® process produces standard bitumen. Process know-how, the relevant application technology and experience in the right choice of equipment are the three good reasons why Pörner can build Biturex® bitumen production plants at economy prices in the shortest possible times. 19 Precht Eduard Hr. Eduard Precht A-1011 Vienna Landskrongasse 5/8 Telefon +43 (0)1 535 98 29 Fax +43 (0)1 535 98 29 E-Mail precht@utanet.at Property investments. Real Estate investments and management in central Europe. They offer safe investments direct in commercial property including professional property management under Austrian control.
  • 9.
    20 Seele GmbH& Co. KG Mr. Arnulf Christa Gutenbergstraße 19 86368 Gersthofen Telefon ++49 821 / 24 94 - 333 Telefax ++49 821 / 24 94 - 300 eMail: lwoltmann@seele- online.com Internet: www.seele-online.com Seele is a supplier for premium class construction with steel and glass. SEELE stands for modern architecture using modern materials. It stands for aesthetics and innovation. For glass facades, glass roofs, and glass-steel constructions. Some of our recent projects are e.g. the Greater London Authority Headquarters, the Seattle Central Library or the Airport Cologne/Bonn as well as the skylights at Terminal 2 Airport Munich. 21 SPHINX FILMS INT. Mr. Ahmed Radwan Mr. Rainer Schober A-1120 Vienna Rotenmühlgasse 11 Tel.: +43 (0)1 524 33 91 Fax +43 (0)1 524 33 93 E-Mail office@sphinx-films.com Website www.sphinx-films.com Sphinx Film Int. is a film and television production company with an extensive network of partners world-wide. The company seeks and offers opportunities to cooperate on international productions in the area of feature films, television programming and commercials, including financing/co-financing. 22 Starlinger & Co G.b.H. Hr. Günter Wais A-1060 Vienna Sonnenuhrgasse 4 Tel.: +43 (0)1 59 9 55-220 Fax +43 (0)1 59 9 55-25 E-Mail sales.wg@starlinger.com Website www.starlinger.com Machines for Production of Woven Plastic Sacks; Plastic Recycling Lines Starlinger are the world's leading producer of high-quality machines for woven plastic sack production (coated or uncoated standard sacks, Leno sacks, valve sacks, AD*STAR block bottom valve sacks and FIBC [Big Bags]). Sacks produced on Starlinger machines are used for the safe and low-cost packaging of various bulk goods e.g. cement, seed, grain, flour, sugar, citrus fruits, fertilizer and animal feed. Starlinger's range of products also includes plastics recycling machines (e.g. for PET bottles or fibres/filaments) and extrusion machines for special filaments (e.g. for artificial grass or carpet backing materials). Satisfied customers in over 130 countries testify to the outstanding quality of the company's products.
  • 10.
    23 Vesely AlfredTimber-Export Hr. Alfred Vesely A-1060 Vienna Stiegengasse 5/5 Tel.: +43 (0)1 586 48 00 12 Fax +43 (0)1 586 49 00 E-Mail a.vesely@vesely.at Website www.vesely.at Sawn timber – It is one of the leading Austrian suppliers of sawn timber (like whitewood and timber) to the Middle East and to North and East Africa. The timber is mainly for use in the building industry and is of high quality. After sawing, the timber is transported by rail or road to Koper in Slovenia where the loading base is situated. It is stored under roofed cover pending shipment and all consignments are marked with the firm’s logo. They are inspected by a broker from the Vienna Commodity Exchange and each purchaser receives a certificate stating that the goods will be shipped in accordance with the conditions of the sales agreement. 24 Vexcel Imaging GmbH Hr. Engelberg Breg A-8010 Graz Münzgrabenstraße 11 Tel.: +43 (0)316 84 90 66-22 Fax +43 (0)316 849 06 69 E-Mail engbreg@vexcel.co.at Website www.vexcel.co.at VEXCEL Ultrasan 5000 – It is one of the leading companies in developing and producing high precision mapping scanner. The Ultrascan 5000 has been sold all over the world in a high number. The Ultrascan 5000 is a low cost high precision scanner with the best price-performance-ratio as all other mapping scanners. The low price makes high precision technology available for small and medium companies. With its full automatic Rollfilmunit the US5000 is made for stand alone production. AFR SW allows users to convert analogue film archives into digital files for a variety of film formats and oversized images including 9x18 inches and 5x92 inches. With US5000 scanner companies can do their own scanning and do not have to rely any more on outside service