Analytics Training Institute
                                         Course Details

Statistical Analysis Software (SAS+):

Duration: 24 Hours + Practice session
Fee Structure: Rs. 8850/‐ (inc. of service tax of 10.3%)

      Introduction to Analytics
      Introduction to SAS, GUI
      Types of Libraries, Creating
      Variable Attributes
               o Name, Type, Format, Informat, Label
      Introduction to Data steps and Proc steps
      DATA Understanding
               o Reading, Importing, Exporting and Copying Data
      Conditional Statements (Where, If, If then Else)
      Appending, Merging and Sorting Datasets
      Proc steps like ‐ Proc Means, Proc Freq, Proc Sort
      Output Delivery System (ODS)
      SAS Functions and Options
      List Input, Delimiters, Reading missing Values, and non standard values
      Do loops
      Generating Data
               o Execution
               o Output Statements
               o Nesting Do loops
               o Do While and Do Until Statement
      Arrays:
               o Dimensions
               o Array elements and Range
               o Proc report
      Introduction to Data base, Relational Data base concepts
      Proc SQL, Data integrity Constraints, Creating table and Inserting Values
      Proc SQL codes to
               o Retrieve & Summarize data
               o Group, Sort & Filter
               o Using Joins
               o Indexes
      Macros:
               o Defining and calling a macro
               o Macro Parameters and Variables
               o Global and Local Variables




                                   Analytics Training Institute
                                    #406, 31st Cross, 8th B Main,
                              4th Block, Jayanagar, Bangalore 560011
                                Phone: 80-4154 0941/99451 26555
                                  Email- info@analyticstraining.in
                                      www.analyticstraining.in
Analytics Training Institute


Excel Programming (Excel +):


Duration: 24 Hours + Practice session
Fee Structure: Rs. 5,530/‐ (inc. of service tax of 10.3%)

      Navigating Through Excel
              o Formatting, sorting, filter, subtotals, grouping and data validation.
      Basic Functions
              o Text, Stat & Math Formulae and Logical
      Advanced Functions
              o Reference ‐ Lookups, Match and Index
              o Using Reference, Logical and Formulae functions in combination
      Pivot Tables and Charts
      Introduction to VBA
              o Recording and running macros
              o Basic concepts of VB
      Data Types, Variables, Procedures & Operators
      Range Selection
      Control Statements
              o If… Then
              o For… Next
              o Do Loops
      Working with Controls
      Command Button, Text Box and Label, Combo Box, User Forms, Scroll Bar and Check Box
      User‐Defined Functions
      Error Handling and Debugging




                                  Analytics Training Institute
                                   #406, 31st Cross, 8th B Main,
                             4th Block, Jayanagar, Bangalore 560011
                               Phone: 80-4154 0941/99451 26555
                                 Email- info@analyticstraining.in
                                     www.analyticstraining.in
Analytics Training Institute


Advanced Analytics (Analytics+):


Prerequisite: SAS Course
Duration: 48Hours + Practice session
Fee Structure: Rs. 13,500/‐ (inc. of service tax of 10.3%)

      Introduction to statistics/ analytics
               o Need for analytics
               o Analytics use in different industries
               o Challenges in adoption of analytics
               o Overview of Course Contents
      Data understanding
               o Data types (Nominal, Ordinal, Interval and Ratio)
      Descriptive statistics
               o Tabular & Graphical Method
               o Summary statistics
      Introduction to some statistical terminologies and inferences
               o Population, Sample and Random variables
               o Point and Interval Estimations
               o Probability
               o Discrete/Continuous Probability Distributions
      Hypothesis Testing
               o Importance of formulating and validating the hypothesis
               o Formulation of hypothesis (Null and alternate)
               o Testing association and differences
               o Statistical significance and test statistic
               o Level of significance
      Z‐Test, T‐Test, Chi‐Square test, ANOVA
      Parametric & Non‐Parametric test
      Correlation & Regression
      Linear Regression
               o Case Study on Multiple Regression
      Logistic Regression
               o Case Study on Logistic Regression
      Cluster Analysis
               o Case Study on Cluster Analysis
      Factor Analysis
               o Case Study on Factor Analysis




                                  Analytics Training Institute
                                   #406, 31st Cross, 8th B Main,
                             4th Block, Jayanagar, Bangalore 560011
                               Phone: 80-4154 0941/99451 26555
                                 Email- info@analyticstraining.in
                                     www.analyticstraining.in
Analytics Training Institute


Excel for Financial Modeling (EFM+):


Duration: 24 Hours + Practice Sessions
Fees Structure: Rs. 8000/- (Inclusive of Service Tax of 10.3%)

Module 1

      Excel Basics & Modeling Techniques
      Financial Modeling: Introduction & Concepts
      Simple Interest & Compound Interest model using combo box, Vlook up function & scatter
       diagram
      Various Financial Functions in Excel: DB, DDB, VDB, ISPMT, NPER, SLN, SYD, RATE,
       etc.
      Time Value of Money & Annuity calculation in Excel
      Loan Repayment Model for Fixed & Floating interest rate using Excel
      Cash Flow Techniques in Investment Project Appraisal: IRR, PBP, NPV

Module 2

      Introduction to Financial Markets & Key Economic Concepts
      Introduction to securities and markets
      Equity, futures & options, Dividend Yield
      Portfolio Management using Excel
      Portfolio Rebalancing techniques using Excel
      Stock Market Functioning

Module 3

      Forecasting Balance Sheet, Income Statement, Cash Flow (using Excel)
      Company Valuation: DCF Modeling (using Excel)
      Relative Valuation & Peer Comparison Techniques
      Financial Statement Analysis (in Excel)
      Sector Overview & Revenue Metrics Identification
      Fixed Income Instruments
      Bond Valuation/YTM/YTC
      Introduction to ABS, MBS, RMBS, CLO, FSS, WBS




                                  Analytics Training Institute
                                   #406, 31st Cross, 8th B Main,
                             4th Block, Jayanagar, Bangalore 560011
                               Phone: 80-4154 0941/99451 26555
                                 Email- info@analyticstraining.in
                                     www.analyticstraining.in
Analytics Training Institute


Package Courses:

Package 1: SAS + Advanced Analytics: Rs. 16560/- (inc. of service tax of 10.3%)

Package 2: SAS + Advanced Analytics + Excel Programming: Rs. 20000/- (inc. of service tax of
10.3%)

Package 3: Excel Programming + Excel for Financial Modeling: Rs. 12000/-(inc. of service tax of
10.3%)

Package 4: Excel Programming + Advanced Analytics: Rs. 15000/- (inc. of service tax of 10.3%)

Package 5: SAS + Excel Programming: Rs. 12000/- (inc. of service tax of 10.3%)

Package 6: SAS + Advanced Analytics + Excel Programming + Excel for Financial Modeling:

   Rs. 26560/- (inc. of service tax of 10.3%)




                                   Analytics Training Institute
                                    #406, 31st Cross, 8th B Main,
                              4th Block, Jayanagar, Bangalore 560011
                                Phone: 80-4154 0941/99451 26555
                                  Email- info@analyticstraining.in
                                      www.analyticstraining.in
Analytics Training Institute


Strategic Marketing Analytics:

Duration: 40 Hours + Practice Sessions
Fees Structure: Rs. 15,000/- (Inclusive of Service Tax of 10.3%)


Module 1: Marketing Analytics and Relationship with CRM

      Brief description about marketing and its various elements.
      Description about analytics
      Role of Analytics in Marketing
      How analytics can be beneficial for the Marketing of an organization (Business Examples
       and case study)
      Market Basket Analysis


Module 2: Segmentation and Targeting

      Understanding Segmentation and its importance in creating marketing strategies
      Objectives and subjective segmentation
      Decision tress, CHAID/ CART Analysis, cluster & factor analysis (Business Examples and
       Case studies)
      Cross-sell, up-sell and CHURN model


Module 3: Campaign Effectiveness

      Understanding Marketing Campaigns, and their effectiveness
      Different kind of campaign and their analysis
      Market Mix Modeling
      RoMI, Test and Learn, Creating Propensity Model to understand Campaign Effectiveness
       (Business Example and Case Study)


Module 4: Branding & Customer Perception

      Introduction to Brand Management, Brand Measurement, Brand Positioning, Brand Metrics,
       Brand Asset Valuation, Brand Vitality Assessment, Multi-dimensional Scaling (Business
       Example and Case Study)
      Different kind of methodologies of survey in marketing, data collection, different types of
       scales, data analyzing


Case Studies


                                  Analytics Training Institute
                                   #406, 31st Cross, 8th B Main,
                             4th Block, Jayanagar, Bangalore 560011
                               Phone: 80-4154 0941/99451 26555
                                 Email- info@analyticstraining.in
                                     www.analyticstraining.in
Analytics Training Institute
All topics/methodologies will be covered using case studies in various business scenarios. The
training will be conducted using SPSS/Statistica and R software.

Equity Research and Financial Modeling

Duration: 40 Hours
Fee Structure:
Online-INR 10,500/- (inclusive of Service Tax of 10.3%)
Classroom- INR 17,500/- (inclusive of Service Tax of 10.3%)

I) Selecting a Company
II) Fundamental Analysis
       Macroeconomic Factors
       Industry/Sector Analysis
       Company Business and Strategy Analysis – SWOT, Porters, BCG Matrix
       Market and Competitive Position Analysis Position
III) Financial Analysis
       Income Statement
       Balance Sheet
       Ratio Analysis
IV) Financial Modeling
       Getting Started- Data requirements and best practices for building a robust financial model
       Step by Step Building of a financial model for a company
       Revenue forecasting techniques
       Cost and margin analysis
       Interconnection between all three financial statements (Income Statement, Balance Sheet
        and Cash Flows)
       Forecasting cash flows (depreciation, Capex and free cash flows)
V) Valuation Methodologies
       Time Value of money
       Key Valuation Metrics and Ratios
       Commonly Used Valuation Techniques
       Absolute Valuation Techniques

                                    Analytics Training Institute
                                     #406, 31st Cross, 8th B Main,
                               4th Block, Jayanagar, Bangalore 560011
                                 Phone: 80-4154 0941/99451 26555
                                   Email- info@analyticstraining.in
                                       www.analyticstraining.in
Analytics Training Institute
      Relative Valuation Techniques


Coming Soon…
Excel Analytics:

Prerequisite: Excel Programming
Duration: 24 Hours + Practice session
Fee Structure: Rs. 10,000/‐ (inc. of service tax of 10.3%)

      Introduction to statistics/ analytics
               o Need for analytics
               o Analytics use in different industries
               o Challenges in adoption of analytics
      Data understanding
               o Data types (Nominal, Ordinal, Interval and Ratio)
      Descriptive statistics
               o Tabular & Graphical Method
               o Summary statistics
      Introduction to some statistical terminologies and inferences
               o Population, Sample and Random variables
               o Point and Interval Estimations
               o Probability
               o Discrete/Continuous Probability Distributions
      Hypothesis Testing
               o Importance of formulating and validating the hypothesis
               o Formulation of hypothesis (Null and alternate)
               o Testing association and differences
               o Statistical significance and test statistic
               o Level of significance
      Z‐Test, T‐Test, Chi‐Square test, ANOVA
      Parametric & Non‐Parametric test
      Correlation and Regression

Post Advanced Analytics:

Prerequisite: Advanced Analytics
Duration: 24 Hours + Practice session
Fee Structure: Rs. 10,000/‐(inc. of service tax of 10.3%)

      Time Series Analysis: o ARIMA model, seasonality and trend analysis.
      Market Basket Analysis
              o Association rules
      Market Mix Modeling

                                    Analytics Training Institute
                                     #406, 31st Cross, 8th B Main,
                               4th Block, Jayanagar, Bangalore 560011
                                 Phone: 80-4154 0941/99451 26555
                                   Email- info@analyticstraining.in
                                       www.analyticstraining.in
Analytics Training Institute
    Neural Networks
    Application of Genetic algorithms in Analytics

MS Access:

Duration: 16 Hours + Practice session
Fee Structure: Rs. 5,530/‐ (inc. of service tax of 10.3%)

      Navigating Access and exploring ribbons and tool bar
      Designing a database
               o Fields and primary key
      Relationships
               o One to One, One to Many, Many to Many
      Building a database
               o Database templates, creating and modifying table and building relational tables
      Work With Forms ‐ Creating and designing form and modifying properties
      Sort, Retrieve And Analyze Data
               o Filter, queries to retrieve data, complex queries to modify data
      Work With Reports
      Creating and modifying reports
      Integrate Access With Other Applications
      Importing , creating external links and exporting data
      Manage An Access Database
      Database security and database splitter


SQL:

Duration: 16 Hours + Practice session
Fee Structure: Rs. 5,530/‐ (inc. of service tax of 10.3%)

      Introduction ‐ Database Fundamentals and Normalization
      SQL Overview and Features
      Checking Tables for Consistency
      Using SHOW and DESCRIBE
      Understanding SQL Storage
      Data Definition Language
      SQL Data Types
      The SELECT Statement
      SQL Expressions and Functions
      Updating Tables Using SQL and Joins
      Importing and Exporting Data


                                    Analytics Training Institute
                                     #406, 31st Cross, 8th B Main,
                               4th Block, Jayanagar, Bangalore 560011
                                 Phone: 80-4154 0941/99451 26555
                                   Email- info@analyticstraining.in
                                       www.analyticstraining.in
Analytics Training Institute


R Statistical Software (R+):


Duration: 24 Hours + Practice session
Fee Structure: Rs. 10,000/‐ (inc. of service tax of 10.3%)

      Introduction to Statistics and R
               o Data types (Nominal, Ordinal, Interval and Ratio)
      Descriptive statistics
               o Tabular & Graphical Method
               o Summary statistics
      Population models and Simulation
               o Population, Sample and Random variables
               o Discrete/Continuous Probability Distribution (definitions)
      Theoretical Distributions
               o Binomial Distribution, Poisson Distribution, Normal Distribution
      Correlation and Regression
      Tests of Significance
               o Importance of formulating and validating the hypothesis
               o Formulation of hypothesis (Null and alternate)
               o Binomial test
      Confidence intervals and Microarray
      Analysis of Variance
      Regression
               o Multiple regressions
               o Logistic Regression
      Clustering and Discrimination
      Case studies are given at the end of each class




                                    Analytics Training Institute
                                     #406, 31st Cross, 8th B Main,
                               4th Block, Jayanagar, Bangalore 560011
                                 Phone: 80-4154 0941/99451 26555
                                   Email- info@analyticstraining.in
                                       www.analyticstraining.in

ATI All Courses

  • 1.
    Analytics Training Institute Course Details Statistical Analysis Software (SAS+): Duration: 24 Hours + Practice session Fee Structure: Rs. 8850/‐ (inc. of service tax of 10.3%)  Introduction to Analytics  Introduction to SAS, GUI  Types of Libraries, Creating  Variable Attributes o Name, Type, Format, Informat, Label  Introduction to Data steps and Proc steps  DATA Understanding o Reading, Importing, Exporting and Copying Data  Conditional Statements (Where, If, If then Else)  Appending, Merging and Sorting Datasets  Proc steps like ‐ Proc Means, Proc Freq, Proc Sort  Output Delivery System (ODS)  SAS Functions and Options  List Input, Delimiters, Reading missing Values, and non standard values  Do loops  Generating Data o Execution o Output Statements o Nesting Do loops o Do While and Do Until Statement  Arrays: o Dimensions o Array elements and Range o Proc report  Introduction to Data base, Relational Data base concepts  Proc SQL, Data integrity Constraints, Creating table and Inserting Values  Proc SQL codes to o Retrieve & Summarize data o Group, Sort & Filter o Using Joins o Indexes  Macros: o Defining and calling a macro o Macro Parameters and Variables o Global and Local Variables Analytics Training Institute #406, 31st Cross, 8th B Main, 4th Block, Jayanagar, Bangalore 560011 Phone: 80-4154 0941/99451 26555 Email- info@analyticstraining.in www.analyticstraining.in
  • 2.
    Analytics Training Institute ExcelProgramming (Excel +): Duration: 24 Hours + Practice session Fee Structure: Rs. 5,530/‐ (inc. of service tax of 10.3%)  Navigating Through Excel o Formatting, sorting, filter, subtotals, grouping and data validation.  Basic Functions o Text, Stat & Math Formulae and Logical  Advanced Functions o Reference ‐ Lookups, Match and Index o Using Reference, Logical and Formulae functions in combination  Pivot Tables and Charts  Introduction to VBA o Recording and running macros o Basic concepts of VB  Data Types, Variables, Procedures & Operators  Range Selection  Control Statements o If… Then o For… Next o Do Loops  Working with Controls  Command Button, Text Box and Label, Combo Box, User Forms, Scroll Bar and Check Box  User‐Defined Functions  Error Handling and Debugging Analytics Training Institute #406, 31st Cross, 8th B Main, 4th Block, Jayanagar, Bangalore 560011 Phone: 80-4154 0941/99451 26555 Email- info@analyticstraining.in www.analyticstraining.in
  • 3.
    Analytics Training Institute AdvancedAnalytics (Analytics+): Prerequisite: SAS Course Duration: 48Hours + Practice session Fee Structure: Rs. 13,500/‐ (inc. of service tax of 10.3%)  Introduction to statistics/ analytics o Need for analytics o Analytics use in different industries o Challenges in adoption of analytics o Overview of Course Contents  Data understanding o Data types (Nominal, Ordinal, Interval and Ratio)  Descriptive statistics o Tabular & Graphical Method o Summary statistics  Introduction to some statistical terminologies and inferences o Population, Sample and Random variables o Point and Interval Estimations o Probability o Discrete/Continuous Probability Distributions  Hypothesis Testing o Importance of formulating and validating the hypothesis o Formulation of hypothesis (Null and alternate) o Testing association and differences o Statistical significance and test statistic o Level of significance  Z‐Test, T‐Test, Chi‐Square test, ANOVA  Parametric & Non‐Parametric test  Correlation & Regression  Linear Regression o Case Study on Multiple Regression  Logistic Regression o Case Study on Logistic Regression  Cluster Analysis o Case Study on Cluster Analysis  Factor Analysis o Case Study on Factor Analysis Analytics Training Institute #406, 31st Cross, 8th B Main, 4th Block, Jayanagar, Bangalore 560011 Phone: 80-4154 0941/99451 26555 Email- info@analyticstraining.in www.analyticstraining.in
  • 4.
    Analytics Training Institute Excelfor Financial Modeling (EFM+): Duration: 24 Hours + Practice Sessions Fees Structure: Rs. 8000/- (Inclusive of Service Tax of 10.3%) Module 1  Excel Basics & Modeling Techniques  Financial Modeling: Introduction & Concepts  Simple Interest & Compound Interest model using combo box, Vlook up function & scatter diagram  Various Financial Functions in Excel: DB, DDB, VDB, ISPMT, NPER, SLN, SYD, RATE, etc.  Time Value of Money & Annuity calculation in Excel  Loan Repayment Model for Fixed & Floating interest rate using Excel  Cash Flow Techniques in Investment Project Appraisal: IRR, PBP, NPV Module 2  Introduction to Financial Markets & Key Economic Concepts  Introduction to securities and markets  Equity, futures & options, Dividend Yield  Portfolio Management using Excel  Portfolio Rebalancing techniques using Excel  Stock Market Functioning Module 3  Forecasting Balance Sheet, Income Statement, Cash Flow (using Excel)  Company Valuation: DCF Modeling (using Excel)  Relative Valuation & Peer Comparison Techniques  Financial Statement Analysis (in Excel)  Sector Overview & Revenue Metrics Identification  Fixed Income Instruments  Bond Valuation/YTM/YTC  Introduction to ABS, MBS, RMBS, CLO, FSS, WBS Analytics Training Institute #406, 31st Cross, 8th B Main, 4th Block, Jayanagar, Bangalore 560011 Phone: 80-4154 0941/99451 26555 Email- info@analyticstraining.in www.analyticstraining.in
  • 5.
    Analytics Training Institute PackageCourses: Package 1: SAS + Advanced Analytics: Rs. 16560/- (inc. of service tax of 10.3%) Package 2: SAS + Advanced Analytics + Excel Programming: Rs. 20000/- (inc. of service tax of 10.3%) Package 3: Excel Programming + Excel for Financial Modeling: Rs. 12000/-(inc. of service tax of 10.3%) Package 4: Excel Programming + Advanced Analytics: Rs. 15000/- (inc. of service tax of 10.3%) Package 5: SAS + Excel Programming: Rs. 12000/- (inc. of service tax of 10.3%) Package 6: SAS + Advanced Analytics + Excel Programming + Excel for Financial Modeling: Rs. 26560/- (inc. of service tax of 10.3%) Analytics Training Institute #406, 31st Cross, 8th B Main, 4th Block, Jayanagar, Bangalore 560011 Phone: 80-4154 0941/99451 26555 Email- info@analyticstraining.in www.analyticstraining.in
  • 6.
    Analytics Training Institute StrategicMarketing Analytics: Duration: 40 Hours + Practice Sessions Fees Structure: Rs. 15,000/- (Inclusive of Service Tax of 10.3%) Module 1: Marketing Analytics and Relationship with CRM  Brief description about marketing and its various elements.  Description about analytics  Role of Analytics in Marketing  How analytics can be beneficial for the Marketing of an organization (Business Examples and case study)  Market Basket Analysis Module 2: Segmentation and Targeting  Understanding Segmentation and its importance in creating marketing strategies  Objectives and subjective segmentation  Decision tress, CHAID/ CART Analysis, cluster & factor analysis (Business Examples and Case studies)  Cross-sell, up-sell and CHURN model Module 3: Campaign Effectiveness  Understanding Marketing Campaigns, and their effectiveness  Different kind of campaign and their analysis  Market Mix Modeling  RoMI, Test and Learn, Creating Propensity Model to understand Campaign Effectiveness (Business Example and Case Study) Module 4: Branding & Customer Perception  Introduction to Brand Management, Brand Measurement, Brand Positioning, Brand Metrics, Brand Asset Valuation, Brand Vitality Assessment, Multi-dimensional Scaling (Business Example and Case Study)  Different kind of methodologies of survey in marketing, data collection, different types of scales, data analyzing Case Studies Analytics Training Institute #406, 31st Cross, 8th B Main, 4th Block, Jayanagar, Bangalore 560011 Phone: 80-4154 0941/99451 26555 Email- info@analyticstraining.in www.analyticstraining.in
  • 7.
    Analytics Training Institute Alltopics/methodologies will be covered using case studies in various business scenarios. The training will be conducted using SPSS/Statistica and R software. Equity Research and Financial Modeling Duration: 40 Hours Fee Structure: Online-INR 10,500/- (inclusive of Service Tax of 10.3%) Classroom- INR 17,500/- (inclusive of Service Tax of 10.3%) I) Selecting a Company II) Fundamental Analysis  Macroeconomic Factors  Industry/Sector Analysis  Company Business and Strategy Analysis – SWOT, Porters, BCG Matrix  Market and Competitive Position Analysis Position III) Financial Analysis  Income Statement  Balance Sheet  Ratio Analysis IV) Financial Modeling  Getting Started- Data requirements and best practices for building a robust financial model  Step by Step Building of a financial model for a company  Revenue forecasting techniques  Cost and margin analysis  Interconnection between all three financial statements (Income Statement, Balance Sheet and Cash Flows)  Forecasting cash flows (depreciation, Capex and free cash flows) V) Valuation Methodologies  Time Value of money  Key Valuation Metrics and Ratios  Commonly Used Valuation Techniques  Absolute Valuation Techniques Analytics Training Institute #406, 31st Cross, 8th B Main, 4th Block, Jayanagar, Bangalore 560011 Phone: 80-4154 0941/99451 26555 Email- info@analyticstraining.in www.analyticstraining.in
  • 8.
    Analytics Training Institute  Relative Valuation Techniques Coming Soon… Excel Analytics: Prerequisite: Excel Programming Duration: 24 Hours + Practice session Fee Structure: Rs. 10,000/‐ (inc. of service tax of 10.3%)  Introduction to statistics/ analytics o Need for analytics o Analytics use in different industries o Challenges in adoption of analytics  Data understanding o Data types (Nominal, Ordinal, Interval and Ratio)  Descriptive statistics o Tabular & Graphical Method o Summary statistics  Introduction to some statistical terminologies and inferences o Population, Sample and Random variables o Point and Interval Estimations o Probability o Discrete/Continuous Probability Distributions  Hypothesis Testing o Importance of formulating and validating the hypothesis o Formulation of hypothesis (Null and alternate) o Testing association and differences o Statistical significance and test statistic o Level of significance  Z‐Test, T‐Test, Chi‐Square test, ANOVA  Parametric & Non‐Parametric test  Correlation and Regression Post Advanced Analytics: Prerequisite: Advanced Analytics Duration: 24 Hours + Practice session Fee Structure: Rs. 10,000/‐(inc. of service tax of 10.3%)  Time Series Analysis: o ARIMA model, seasonality and trend analysis.  Market Basket Analysis o Association rules  Market Mix Modeling Analytics Training Institute #406, 31st Cross, 8th B Main, 4th Block, Jayanagar, Bangalore 560011 Phone: 80-4154 0941/99451 26555 Email- info@analyticstraining.in www.analyticstraining.in
  • 9.
    Analytics Training Institute  Neural Networks  Application of Genetic algorithms in Analytics MS Access: Duration: 16 Hours + Practice session Fee Structure: Rs. 5,530/‐ (inc. of service tax of 10.3%)  Navigating Access and exploring ribbons and tool bar  Designing a database o Fields and primary key  Relationships o One to One, One to Many, Many to Many  Building a database o Database templates, creating and modifying table and building relational tables  Work With Forms ‐ Creating and designing form and modifying properties  Sort, Retrieve And Analyze Data o Filter, queries to retrieve data, complex queries to modify data  Work With Reports  Creating and modifying reports  Integrate Access With Other Applications  Importing , creating external links and exporting data  Manage An Access Database  Database security and database splitter SQL: Duration: 16 Hours + Practice session Fee Structure: Rs. 5,530/‐ (inc. of service tax of 10.3%)  Introduction ‐ Database Fundamentals and Normalization  SQL Overview and Features  Checking Tables for Consistency  Using SHOW and DESCRIBE  Understanding SQL Storage  Data Definition Language  SQL Data Types  The SELECT Statement  SQL Expressions and Functions  Updating Tables Using SQL and Joins  Importing and Exporting Data Analytics Training Institute #406, 31st Cross, 8th B Main, 4th Block, Jayanagar, Bangalore 560011 Phone: 80-4154 0941/99451 26555 Email- info@analyticstraining.in www.analyticstraining.in
  • 10.
    Analytics Training Institute RStatistical Software (R+): Duration: 24 Hours + Practice session Fee Structure: Rs. 10,000/‐ (inc. of service tax of 10.3%)  Introduction to Statistics and R o Data types (Nominal, Ordinal, Interval and Ratio)  Descriptive statistics o Tabular & Graphical Method o Summary statistics  Population models and Simulation o Population, Sample and Random variables o Discrete/Continuous Probability Distribution (definitions)  Theoretical Distributions o Binomial Distribution, Poisson Distribution, Normal Distribution  Correlation and Regression  Tests of Significance o Importance of formulating and validating the hypothesis o Formulation of hypothesis (Null and alternate) o Binomial test  Confidence intervals and Microarray  Analysis of Variance  Regression o Multiple regressions o Logistic Regression  Clustering and Discrimination  Case studies are given at the end of each class Analytics Training Institute #406, 31st Cross, 8th B Main, 4th Block, Jayanagar, Bangalore 560011 Phone: 80-4154 0941/99451 26555 Email- info@analyticstraining.in www.analyticstraining.in