SlideShare a Scribd company logo
Asite Platform for Cloud-Based 
Construction Management
Asite Adoddle Overview 
Secure Collaboration in the Cloud. 
Adoddle delivers online information management services to the world's 
most demanding businesses and government organisations to help their 
teams work together more efficiently and effectively. 
Online collaboration allows organisations to share and manage 
information in one secure central location that helps to grow any business 
by applying a Common Data Environment (CDE) methodology.
Asite Adoddle Overview 
Secure Collaboration in the Cloud. 
Asite was launched in June 2001 and was established by renowned 
individuals from key organisations including Sir John Egan whom was the 
Asite Chairman. Sir John Egan wrote the ‘Rethinking Construction’ white 
paper for UK government which paved the way for dramatic improvements in 
the way the Construction Industry operates. 
At present Asite is being used by over 200,000 users across the globe and is 
delivering bottom line gains of up to 2% on construction projects. 
Press below to watch 
a Video
Selected Asite Customers 
Enterprise Framework 5 Year Framework 5 Year Framework 5 Year Framework 5 Year Framework
Europe’s Largest Construction Project 
Crossrail is one of the largest single 
infrastructure investments undertaken in 
the UK with a construction value of £19 
billion. 
Crossrail represents a real commitment 
to the development of new services to 
tackle the lack of capacity and congestion 
on the existing network. 
Building the new railway involves 
constructing eight new stations in central 
London and Docklands and upgrading 
many existing stations. The new railway 
will cover 74 miles of track including 30 
miles of new twin-bore rail tunnel.
Greater London Authority / TfL 
Transport for London and the Greater London 
Authority including the Metropolitan Police, the 
London Development Agency and the London 
Fire and Emergency Planning Authority 
implemented Asite Contract Administration 
Management System. 
Asite's technology provides TfL and the GLA 
with a single integrated data management 
solution for all aspects of the contract 
administration process across their significant 
on-going portfolio of construction and facilities 
management works to manage contract 
change and to provide real-time visibility of 
their actual schedule and cost position against 
budget.
UK Environment Agency adopts Asite 
Platform 
Asite's Adoddle platform enables the 
Environment Agency's internal and external 
project team members to work together more 
effectively by: 
• Storing and controlling all project documents. 
• Helping users through key project processes 
such as business case submission. 
• Automating key contract administration tasks 
such as fee note processing. 
• Replacing the Extranet as an electronic store 
for templates and guidance. 
• Making it easier to share best practice and 
examples. 
• The ability to report across the breadth of the 
service.
New Generation Rolling Stock 
Bombardier Transportation appointed Asite 
for the Queensland Government’s New 
Generation Rolling Stock (NGR) project 
which will see a significant increase to the 
train fleet to meet the growing demand for 
rail services in south-east Queensland, 
Australia. 
Queensland Government signed a $4.4 
billion deal with Bombardier NGR 
Consortium for 75 new six-car trains. The 
project is the largest single investment by 
Queensland in trains and demonstrates 
the government’s commitment to public 
transport in south-east Queensland.
Large infrastructure upgrade program 
Novo Rail is an alliance of Transport for NSW 
to deliver a substantial portfolio of 
infrastructure work across Sydney’s local rail 
network. 
The range of work being safely delivered by 
Novo Rail includes the upgrade and re-energising 
of rail signalling and power 
systems to accommodate the introduction of 
the new Waratah trains. 
The projects generally fall within five 
categories: junctions, traction supply 
upgrades, stabling, overhead wiring and rail 
signalling/].
High-speed link between Hong Kong and 
Mainland China 
Mass Transit Railway (MTR) appointed Asite for 
the rapid transit railway system in Hong Kong. 
The railway network consists of nine urban 
lines, one Airport Express line which connects the 
Airport and downtown, one light rail system with 
12 routes serving the northwest New Territories, 
and one tourist cable car system. In addition, it 
includes MTR feeder bus service and intercity 
passenger transfer. 
There are 84 railway stations and 68 light rail 
stops connecting Hong Kong Island, Kowloon and 
many new districts.
Network Rail’s Upgrade Projects 
Network Rail appointed Asite as the solution for the 
GNGE Alliance’s program of works in support of the 
ECML Capacity Relief. 
The Alliance was geared up to deliver a £multi-million 
Rail Upgrade Project and incorporates the introduction 
of new signaling and level crossing technologies onto 
the rail infrastructure. 
This Project brought benefits to both rural passenger 
traffic and freight movements due to increased 
capacity, frequency and line speed. The migration of 
the freight movements will bring further benefit by 
allowing additional passenger traffic to operate on the 
ECML.
New Generation of Nuclear Power Stations 
The EDF Energy project and all of its 
associated developments are known as 
Hinkley Point C. 
Hinkley Point C will be the first in a new 
generation of UK nuclear power stations, 
marking a significant moment in the 
revitalisation of the UK’s nuclear power 
industry.
Power Networks throughout the UK 
UKPN own and maintain electricity cables 
and lines across London, the South East 
and East of England making sure lights 
stay on. 
UKPN maintain and upgrade power 
equipment and move and connect new 
electricity cables.
Project success is dependent on successful communication 
Engineer 
Architect 
Materials Supplier 
Client 
Maintenance 
General Contractor 
Sub Contractor 
I.T. Dept.
Asite manages communication throughout the entire Project lifecycle 
Engineer 
Architect 
Materials Supplier 
Pre-Construction 
Client 
Design 
Maintenance 
Construction 
Close-Out 
General Contractor 
Sub Contractor 
I.T. Dept. 
Facilities Management
How do our clients benefit by using Adoddle? 
Time Saving 
Cost Reduction 
Risk 
Control
Graphical Dashboard 
Dashboard Widgets with drill-down capability 
Federated Search across your project portfolio 
Favorites to get to key information quickly
Design & Construction Drawings 
Online collaboration for Design and Construction drawings 
Manage your contractor and consultant co-ordination 
processes 
Tracking in your Common Data Environment
Submittals 
Fully automated workflow mechanism for submittals 
Link approved submittals to contractor folders 
Online mark-up and collaboration 
Online Stamps within submittals to maintain your existing ways of 
working
Company Directory 
Online and real-time Company Directory to track your supply 
chain 
Capture company information, Cost Codes, Company Contacts
Company Directory (cont’d) 
Centralised management of Cost Codes 
Tag each Company with configurable attributes for classification & 
searching
Project Directory 
Manage your list of approved suppliers for each project 
Assign Cost Codes and Attributes applicable for your project needs 
Capture Supplier-specific Insurance information including 
certificates
Project Portfolio Management 
Real-time dashboard view across all your Capital projects 
Red, Amber, Green signals show visual status for your 
projects
Project Portfolio Management 
Easy drill-down to detailed Activities for each project stage 
Visibility of Portfolio containing projects spread across 
various geographical locations
Project Portfolio Management 
Manage your Portfolio risks across your Capital projects 
Easy tracking of projects with individual milestones
Project Portfolio Management 
Manage your Health & Safety online 
Rate your Suppliers and track improvements
Project Portfolio Management 
Track expenditure against detailed cost plans 
Match your Expenditure Vs Baseline Budget 
Track Funds for your Project needs
Request for Proposal (RFP) 
Robust and secure online RFP process 
Online submission of Invitation to Bid (ITB) to multiple 
Suppliers 
Online submission of Bid Response
Meeting Minutes 
Online capture of Meeting Minutes and actions 
Facilitates capturing re-occurring meeting information with ease 
Tracking all Meeting Actions online
RFIs / NCRs 
Online collaboration using Request for Information 
Automated Workflows and Action tracking 
Online Non Conformance Report (NCR) Tracking 
Easy access to information for Architects and Consultants
Reporting 
Online Reporting capability on click of a button
Adoddle Field 
Manage unlimited 
folders and files 
View over 300 
different 2D file 
formatsView 3D 
Model files 
Online Mark-up 
and save 
Comments 
Snags / RFIs
Mobility - cMOB 
Simplified cMOB user Interface 
Improved graphical display 
Click through on the entire area (Designed for Fat Fingers)
Asite Platform for Cloud-Based Construction Management

More Related Content

What's hot

Project Management Project Assignment - Project Schedule & Resource Allocatio...
Project Management Project Assignment - Project Schedule & Resource Allocatio...Project Management Project Assignment - Project Schedule & Resource Allocatio...
Project Management Project Assignment - Project Schedule & Resource Allocatio...
Shuchi Joshi
 
Proje yönetimi eğitimi
Proje yönetimi eğitimiProje yönetimi eğitimi
Proje yönetimi eğitimi
Oktay Altındiş
 
CREATING CITIES, SHAPING INDIVIDUALS Urban Land Use Planning
CREATING CITIES, SHAPING INDIVIDUALS Urban Land Use PlanningCREATING CITIES, SHAPING INDIVIDUALS Urban Land Use Planning
CREATING CITIES, SHAPING INDIVIDUALS Urban Land Use Planning
Marion Micah Tinio
 
it-Prepare-an-Actionable-Roadmap-for-Your-PMO-Phases-1-3-V2.pptx
it-Prepare-an-Actionable-Roadmap-for-Your-PMO-Phases-1-3-V2.pptxit-Prepare-an-Actionable-Roadmap-for-Your-PMO-Phases-1-3-V2.pptx
it-Prepare-an-Actionable-Roadmap-for-Your-PMO-Phases-1-3-V2.pptx
ssuserf016f4
 
Project Management PPT
Project Management PPTProject Management PPT
Project Management PPTbletindia
 
The role of the project manager based on pmbok6 by mm rahman stm skill that m...
The role of the project manager based on pmbok6 by mm rahman stm skill that m...The role of the project manager based on pmbok6 by mm rahman stm skill that m...
The role of the project manager based on pmbok6 by mm rahman stm skill that m...
STM-Skill That Matters
 
PROJECT CHARTER
PROJECT CHARTERPROJECT CHARTER
PROJECT CHARTER
Muneeb HaXan
 
Project communications management (PMBOK 5th Edition)
Project communications management (PMBOK 5th Edition)Project communications management (PMBOK 5th Edition)
Project communications management (PMBOK 5th Edition)
pankajsh10
 
WP3 Quality Management Plan
WP3 Quality Management PlanWP3 Quality Management Plan
WP3 Quality Management Plan
WelDest Project (Erasmus LLP)
 
PUTRAJAYA SITE ANALSYS - TEAM CY
PUTRAJAYA SITE ANALSYS - TEAM CYPUTRAJAYA SITE ANALSYS - TEAM CY
PUTRAJAYA SITE ANALSYS - TEAM CY
Preston Liew
 
Prezentācija par projektu vadību
Prezentācija par projektu vadībuPrezentācija par projektu vadību
Prezentācija par projektu vadību
Centre for Public Policy PROVIDUS
 

What's hot (12)

Project Management Project Assignment - Project Schedule & Resource Allocatio...
Project Management Project Assignment - Project Schedule & Resource Allocatio...Project Management Project Assignment - Project Schedule & Resource Allocatio...
Project Management Project Assignment - Project Schedule & Resource Allocatio...
 
Proje yönetimi eğitimi
Proje yönetimi eğitimiProje yönetimi eğitimi
Proje yönetimi eğitimi
 
CREATING CITIES, SHAPING INDIVIDUALS Urban Land Use Planning
CREATING CITIES, SHAPING INDIVIDUALS Urban Land Use PlanningCREATING CITIES, SHAPING INDIVIDUALS Urban Land Use Planning
CREATING CITIES, SHAPING INDIVIDUALS Urban Land Use Planning
 
Project management
Project managementProject management
Project management
 
it-Prepare-an-Actionable-Roadmap-for-Your-PMO-Phases-1-3-V2.pptx
it-Prepare-an-Actionable-Roadmap-for-Your-PMO-Phases-1-3-V2.pptxit-Prepare-an-Actionable-Roadmap-for-Your-PMO-Phases-1-3-V2.pptx
it-Prepare-an-Actionable-Roadmap-for-Your-PMO-Phases-1-3-V2.pptx
 
Project Management PPT
Project Management PPTProject Management PPT
Project Management PPT
 
The role of the project manager based on pmbok6 by mm rahman stm skill that m...
The role of the project manager based on pmbok6 by mm rahman stm skill that m...The role of the project manager based on pmbok6 by mm rahman stm skill that m...
The role of the project manager based on pmbok6 by mm rahman stm skill that m...
 
PROJECT CHARTER
PROJECT CHARTERPROJECT CHARTER
PROJECT CHARTER
 
Project communications management (PMBOK 5th Edition)
Project communications management (PMBOK 5th Edition)Project communications management (PMBOK 5th Edition)
Project communications management (PMBOK 5th Edition)
 
WP3 Quality Management Plan
WP3 Quality Management PlanWP3 Quality Management Plan
WP3 Quality Management Plan
 
PUTRAJAYA SITE ANALSYS - TEAM CY
PUTRAJAYA SITE ANALSYS - TEAM CYPUTRAJAYA SITE ANALSYS - TEAM CY
PUTRAJAYA SITE ANALSYS - TEAM CY
 
Prezentācija par projektu vadību
Prezentācija par projektu vadībuPrezentācija par projektu vadību
Prezentācija par projektu vadību
 

Viewers also liked

Share
ShareShare
Asite BIM Breakfast seminar
Asite BIM Breakfast seminar Asite BIM Breakfast seminar
Asite BIM Breakfast seminar
Lisa Murphy
 
Asite cSIM - collaborative supplier information modelling
Asite cSIM - collaborative supplier information modellingAsite cSIM - collaborative supplier information modelling
Asite cSIM - collaborative supplier information modellingTracey Saunders
 
My Business in the Cloud Presentation Ian Saunders Asite 09/09/2014
My Business in the Cloud Presentation Ian Saunders Asite 09/09/2014My Business in the Cloud Presentation Ian Saunders Asite 09/09/2014
My Business in the Cloud Presentation Ian Saunders Asite 09/09/2014
Tracey Saunders
 
2015 02 - uk-c bim-breakfast-seminar-nd-iss1 (1)
2015 02 - uk-c bim-breakfast-seminar-nd-iss1 (1)2015 02 - uk-c bim-breakfast-seminar-nd-iss1 (1)
2015 02 - uk-c bim-breakfast-seminar-nd-iss1 (1)
Tracey Saunders
 
Collaborative BIM - Asite Breakfast Seminar 2013-10-16
Collaborative BIM - Asite Breakfast Seminar 2013-10-16Collaborative BIM - Asite Breakfast Seminar 2013-10-16
Collaborative BIM - Asite Breakfast Seminar 2013-10-16
Asite Solutions Ltd.
 

Viewers also liked (6)

Share
ShareShare
Share
 
Asite BIM Breakfast seminar
Asite BIM Breakfast seminar Asite BIM Breakfast seminar
Asite BIM Breakfast seminar
 
Asite cSIM - collaborative supplier information modelling
Asite cSIM - collaborative supplier information modellingAsite cSIM - collaborative supplier information modelling
Asite cSIM - collaborative supplier information modelling
 
My Business in the Cloud Presentation Ian Saunders Asite 09/09/2014
My Business in the Cloud Presentation Ian Saunders Asite 09/09/2014My Business in the Cloud Presentation Ian Saunders Asite 09/09/2014
My Business in the Cloud Presentation Ian Saunders Asite 09/09/2014
 
2015 02 - uk-c bim-breakfast-seminar-nd-iss1 (1)
2015 02 - uk-c bim-breakfast-seminar-nd-iss1 (1)2015 02 - uk-c bim-breakfast-seminar-nd-iss1 (1)
2015 02 - uk-c bim-breakfast-seminar-nd-iss1 (1)
 
Collaborative BIM - Asite Breakfast Seminar 2013-10-16
Collaborative BIM - Asite Breakfast Seminar 2013-10-16Collaborative BIM - Asite Breakfast Seminar 2013-10-16
Collaborative BIM - Asite Breakfast Seminar 2013-10-16
 

Similar to Asite Platform for Cloud-Based Construction Management

AESIN MWC2016 Presentations AESIN, Visteon, Plextek
AESIN MWC2016 Presentations AESIN, Visteon, PlextekAESIN MWC2016 Presentations AESIN, Visteon, Plextek
AESIN MWC2016 Presentations AESIN, Visteon, Plextek
Sophie Ericson
 
Smart Cities: Technologies for Efficient and Sustainable Cities
Smart Cities: Technologies for Efficient and Sustainable CitiesSmart Cities: Technologies for Efficient and Sustainable Cities
Smart Cities: Technologies for Efficient and Sustainable Cities
Community Protection Forum
 
A Simple Journey Enabled by Connected Corridors
A Simple Journey Enabled by Connected CorridorsA Simple Journey Enabled by Connected Corridors
A Simple Journey Enabled by Connected Corridors
Sophie Ericson
 
H2020 Briefing Webinar on the 2020 Transport Calls - Collated Pitches
H2020 Briefing Webinar on the 2020 Transport Calls - Collated PitchesH2020 Briefing Webinar on the 2020 Transport Calls - Collated Pitches
H2020 Briefing Webinar on the 2020 Transport Calls - Collated Pitches
KTN
 
Smart Cities Week Australia 2019 - Case Study: Idaho National Laboratory
Smart Cities Week Australia 2019 - Case Study: Idaho National LaboratorySmart Cities Week Australia 2019 - Case Study: Idaho National Laboratory
Smart Cities Week Australia 2019 - Case Study: Idaho National Laboratory
Patrick Spedding
 
Why Ontario Government chose Equinix Cloud Exchange Connect
Why Ontario Government chose Equinix Cloud Exchange ConnectWhy Ontario Government chose Equinix Cloud Exchange Connect
Why Ontario Government chose Equinix Cloud Exchange Connect
Morgan Davidson
 
Example is the concept of smart city, being developed by cisco – andrey zuzin
Example is the concept of smart city, being developed by cisco – andrey zuzinExample is the concept of smart city, being developed by cisco – andrey zuzin
Example is the concept of smart city, being developed by cisco – andrey zuzinAlbert Yefimov
 
Project COLA - Project Flyer EN Web
Project COLA - Project Flyer EN WebProject COLA - Project Flyer EN Web
Project COLA - Project Flyer EN Web
Project COLA
 
Davra IOT Solution - Connected Roadways
Davra IOT Solution - Connected RoadwaysDavra IOT Solution - Connected Roadways
Davra IOT Solution - Connected Roadways
davranetworks
 
M3 - An overview of High Speed 2
M3 - An overview of High Speed 2M3 - An overview of High Speed 2
M3 - An overview of High Speed 2
Project Controls Expo
 
Stuart Revelle, 5GIC - INCA Full Fibre & 5G Seminar 12/7/17
Stuart Revelle, 5GIC - INCA Full Fibre & 5G Seminar 12/7/17Stuart Revelle, 5GIC - INCA Full Fibre & 5G Seminar 12/7/17
Stuart Revelle, 5GIC - INCA Full Fibre & 5G Seminar 12/7/17
Independent Networks Co-operative Association
 
NEC-newsletter-71
NEC-newsletter-71NEC-newsletter-71
NEC-newsletter-71sam hyde
 
Five ways to drive process adoption
Five ways to drive process adoptionFive ways to drive process adoption
Five ways to drive process adoption
Aconex
 
Infrastructure Innovations in the Rail Industry #COMIT2017
Infrastructure Innovations in the Rail Industry #COMIT2017Infrastructure Innovations in the Rail Industry #COMIT2017
Infrastructure Innovations in the Rail Industry #COMIT2017
Comit Projects Ltd
 
Cut Carbon Symposium - DTE Exhibition
Cut Carbon Symposium - DTE ExhibitionCut Carbon Symposium - DTE Exhibition
Cut Carbon Symposium - DTE Exhibition
DecarboN8
 
CD Sept 2015 (Tarmac) - Asset Tagging at Thames Tideway
CD Sept 2015 (Tarmac) - Asset Tagging at Thames TidewayCD Sept 2015 (Tarmac) - Asset Tagging at Thames Tideway
CD Sept 2015 (Tarmac) - Asset Tagging at Thames Tideway
Comit Projects Ltd
 
OSGi and Next Generation Trains - Jens Haeger, Deutsche Bahn
OSGi and Next Generation Trains - Jens Haeger, Deutsche BahnOSGi and Next Generation Trains - Jens Haeger, Deutsche Bahn
OSGi and Next Generation Trains - Jens Haeger, Deutsche Bahn
mfrancis
 

Similar to Asite Platform for Cloud-Based Construction Management (20)

AESIN MWC2016 Presentations AESIN, Visteon, Plextek
AESIN MWC2016 Presentations AESIN, Visteon, PlextekAESIN MWC2016 Presentations AESIN, Visteon, Plextek
AESIN MWC2016 Presentations AESIN, Visteon, Plextek
 
Smart Cities: Technologies for Efficient and Sustainable Cities
Smart Cities: Technologies for Efficient and Sustainable CitiesSmart Cities: Technologies for Efficient and Sustainable Cities
Smart Cities: Technologies for Efficient and Sustainable Cities
 
A Simple Journey Enabled by Connected Corridors
A Simple Journey Enabled by Connected CorridorsA Simple Journey Enabled by Connected Corridors
A Simple Journey Enabled by Connected Corridors
 
H2020 Briefing Webinar on the 2020 Transport Calls - Collated Pitches
H2020 Briefing Webinar on the 2020 Transport Calls - Collated PitchesH2020 Briefing Webinar on the 2020 Transport Calls - Collated Pitches
H2020 Briefing Webinar on the 2020 Transport Calls - Collated Pitches
 
Smart Cities Week Australia 2019 - Case Study: Idaho National Laboratory
Smart Cities Week Australia 2019 - Case Study: Idaho National LaboratorySmart Cities Week Australia 2019 - Case Study: Idaho National Laboratory
Smart Cities Week Australia 2019 - Case Study: Idaho National Laboratory
 
Why Ontario Government chose Equinix Cloud Exchange Connect
Why Ontario Government chose Equinix Cloud Exchange ConnectWhy Ontario Government chose Equinix Cloud Exchange Connect
Why Ontario Government chose Equinix Cloud Exchange Connect
 
Example is the concept of smart city, being developed by cisco – andrey zuzin
Example is the concept of smart city, being developed by cisco – andrey zuzinExample is the concept of smart city, being developed by cisco – andrey zuzin
Example is the concept of smart city, being developed by cisco – andrey zuzin
 
Project COLA - Project Flyer EN Web
Project COLA - Project Flyer EN WebProject COLA - Project Flyer EN Web
Project COLA - Project Flyer EN Web
 
Davra IOT Solution - Connected Roadways
Davra IOT Solution - Connected RoadwaysDavra IOT Solution - Connected Roadways
Davra IOT Solution - Connected Roadways
 
M3 - An overview of High Speed 2
M3 - An overview of High Speed 2M3 - An overview of High Speed 2
M3 - An overview of High Speed 2
 
Stuart Revelle, 5GIC - INCA Full Fibre & 5G Seminar 12/7/17
Stuart Revelle, 5GIC - INCA Full Fibre & 5G Seminar 12/7/17Stuart Revelle, 5GIC - INCA Full Fibre & 5G Seminar 12/7/17
Stuart Revelle, 5GIC - INCA Full Fibre & 5G Seminar 12/7/17
 
NEC-newsletter-71
NEC-newsletter-71NEC-newsletter-71
NEC-newsletter-71
 
Five ways to drive process adoption
Five ways to drive process adoptionFive ways to drive process adoption
Five ways to drive process adoption
 
Infrastructure Innovations in the Rail Industry #COMIT2017
Infrastructure Innovations in the Rail Industry #COMIT2017Infrastructure Innovations in the Rail Industry #COMIT2017
Infrastructure Innovations in the Rail Industry #COMIT2017
 
Ahmed El-sheikha C Vjune
Ahmed El-sheikha C VjuneAhmed El-sheikha C Vjune
Ahmed El-sheikha C Vjune
 
PCPMar2015
PCPMar2015PCPMar2015
PCPMar2015
 
Cut Carbon Symposium - DTE Exhibition
Cut Carbon Symposium - DTE ExhibitionCut Carbon Symposium - DTE Exhibition
Cut Carbon Symposium - DTE Exhibition
 
CD Sept 2015 (Tarmac) - Asset Tagging at Thames Tideway
CD Sept 2015 (Tarmac) - Asset Tagging at Thames TidewayCD Sept 2015 (Tarmac) - Asset Tagging at Thames Tideway
CD Sept 2015 (Tarmac) - Asset Tagging at Thames Tideway
 
ADSS Overview
ADSS OverviewADSS Overview
ADSS Overview
 
OSGi and Next Generation Trains - Jens Haeger, Deutsche Bahn
OSGi and Next Generation Trains - Jens Haeger, Deutsche BahnOSGi and Next Generation Trains - Jens Haeger, Deutsche Bahn
OSGi and Next Generation Trains - Jens Haeger, Deutsche Bahn
 

Recently uploaded

DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
Kari Kakkonen
 
Welocme to ViralQR, your best QR code generator.
Welocme to ViralQR, your best QR code generator.Welocme to ViralQR, your best QR code generator.
Welocme to ViralQR, your best QR code generator.
ViralQR
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance
 
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdfObservability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Paige Cruz
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
Prayukth K V
 
Quantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIsQuantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIs
Vlad Stirbu
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
Laura Byrne
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
Product School
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
KatiaHIMEUR1
 
PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
ControlCase
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
James Anderson
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
DianaGray10
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Albert Hoitingh
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
Alan Dix
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
Thijs Feryn
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
Jemma Hussein Allen
 
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
UiPathCommunity
 
By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024
Pierluigi Pugliese
 
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Thierry Lestable
 
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdfSAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
Peter Spielvogel
 

Recently uploaded (20)

DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
 
Welocme to ViralQR, your best QR code generator.
Welocme to ViralQR, your best QR code generator.Welocme to ViralQR, your best QR code generator.
Welocme to ViralQR, your best QR code generator.
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
 
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdfObservability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
 
Quantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIsQuantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIs
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
 
PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
 
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
 
By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024
 
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
 
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdfSAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
 

Asite Platform for Cloud-Based Construction Management

  • 1. Asite Platform for Cloud-Based Construction Management
  • 2.
  • 3. Asite Adoddle Overview Secure Collaboration in the Cloud. Adoddle delivers online information management services to the world's most demanding businesses and government organisations to help their teams work together more efficiently and effectively. Online collaboration allows organisations to share and manage information in one secure central location that helps to grow any business by applying a Common Data Environment (CDE) methodology.
  • 4. Asite Adoddle Overview Secure Collaboration in the Cloud. Asite was launched in June 2001 and was established by renowned individuals from key organisations including Sir John Egan whom was the Asite Chairman. Sir John Egan wrote the ‘Rethinking Construction’ white paper for UK government which paved the way for dramatic improvements in the way the Construction Industry operates. At present Asite is being used by over 200,000 users across the globe and is delivering bottom line gains of up to 2% on construction projects. Press below to watch a Video
  • 5. Selected Asite Customers Enterprise Framework 5 Year Framework 5 Year Framework 5 Year Framework 5 Year Framework
  • 6. Europe’s Largest Construction Project Crossrail is one of the largest single infrastructure investments undertaken in the UK with a construction value of £19 billion. Crossrail represents a real commitment to the development of new services to tackle the lack of capacity and congestion on the existing network. Building the new railway involves constructing eight new stations in central London and Docklands and upgrading many existing stations. The new railway will cover 74 miles of track including 30 miles of new twin-bore rail tunnel.
  • 7. Greater London Authority / TfL Transport for London and the Greater London Authority including the Metropolitan Police, the London Development Agency and the London Fire and Emergency Planning Authority implemented Asite Contract Administration Management System. Asite's technology provides TfL and the GLA with a single integrated data management solution for all aspects of the contract administration process across their significant on-going portfolio of construction and facilities management works to manage contract change and to provide real-time visibility of their actual schedule and cost position against budget.
  • 8. UK Environment Agency adopts Asite Platform Asite's Adoddle platform enables the Environment Agency's internal and external project team members to work together more effectively by: • Storing and controlling all project documents. • Helping users through key project processes such as business case submission. • Automating key contract administration tasks such as fee note processing. • Replacing the Extranet as an electronic store for templates and guidance. • Making it easier to share best practice and examples. • The ability to report across the breadth of the service.
  • 9. New Generation Rolling Stock Bombardier Transportation appointed Asite for the Queensland Government’s New Generation Rolling Stock (NGR) project which will see a significant increase to the train fleet to meet the growing demand for rail services in south-east Queensland, Australia. Queensland Government signed a $4.4 billion deal with Bombardier NGR Consortium for 75 new six-car trains. The project is the largest single investment by Queensland in trains and demonstrates the government’s commitment to public transport in south-east Queensland.
  • 10. Large infrastructure upgrade program Novo Rail is an alliance of Transport for NSW to deliver a substantial portfolio of infrastructure work across Sydney’s local rail network. The range of work being safely delivered by Novo Rail includes the upgrade and re-energising of rail signalling and power systems to accommodate the introduction of the new Waratah trains. The projects generally fall within five categories: junctions, traction supply upgrades, stabling, overhead wiring and rail signalling/].
  • 11. High-speed link between Hong Kong and Mainland China Mass Transit Railway (MTR) appointed Asite for the rapid transit railway system in Hong Kong. The railway network consists of nine urban lines, one Airport Express line which connects the Airport and downtown, one light rail system with 12 routes serving the northwest New Territories, and one tourist cable car system. In addition, it includes MTR feeder bus service and intercity passenger transfer. There are 84 railway stations and 68 light rail stops connecting Hong Kong Island, Kowloon and many new districts.
  • 12. Network Rail’s Upgrade Projects Network Rail appointed Asite as the solution for the GNGE Alliance’s program of works in support of the ECML Capacity Relief. The Alliance was geared up to deliver a £multi-million Rail Upgrade Project and incorporates the introduction of new signaling and level crossing technologies onto the rail infrastructure. This Project brought benefits to both rural passenger traffic and freight movements due to increased capacity, frequency and line speed. The migration of the freight movements will bring further benefit by allowing additional passenger traffic to operate on the ECML.
  • 13. New Generation of Nuclear Power Stations The EDF Energy project and all of its associated developments are known as Hinkley Point C. Hinkley Point C will be the first in a new generation of UK nuclear power stations, marking a significant moment in the revitalisation of the UK’s nuclear power industry.
  • 14. Power Networks throughout the UK UKPN own and maintain electricity cables and lines across London, the South East and East of England making sure lights stay on. UKPN maintain and upgrade power equipment and move and connect new electricity cables.
  • 15. Project success is dependent on successful communication Engineer Architect Materials Supplier Client Maintenance General Contractor Sub Contractor I.T. Dept.
  • 16. Asite manages communication throughout the entire Project lifecycle Engineer Architect Materials Supplier Pre-Construction Client Design Maintenance Construction Close-Out General Contractor Sub Contractor I.T. Dept. Facilities Management
  • 17. How do our clients benefit by using Adoddle? Time Saving Cost Reduction Risk Control
  • 18.
  • 19. Graphical Dashboard Dashboard Widgets with drill-down capability Federated Search across your project portfolio Favorites to get to key information quickly
  • 20. Design & Construction Drawings Online collaboration for Design and Construction drawings Manage your contractor and consultant co-ordination processes Tracking in your Common Data Environment
  • 21. Submittals Fully automated workflow mechanism for submittals Link approved submittals to contractor folders Online mark-up and collaboration Online Stamps within submittals to maintain your existing ways of working
  • 22. Company Directory Online and real-time Company Directory to track your supply chain Capture company information, Cost Codes, Company Contacts
  • 23. Company Directory (cont’d) Centralised management of Cost Codes Tag each Company with configurable attributes for classification & searching
  • 24. Project Directory Manage your list of approved suppliers for each project Assign Cost Codes and Attributes applicable for your project needs Capture Supplier-specific Insurance information including certificates
  • 25. Project Portfolio Management Real-time dashboard view across all your Capital projects Red, Amber, Green signals show visual status for your projects
  • 26. Project Portfolio Management Easy drill-down to detailed Activities for each project stage Visibility of Portfolio containing projects spread across various geographical locations
  • 27. Project Portfolio Management Manage your Portfolio risks across your Capital projects Easy tracking of projects with individual milestones
  • 28. Project Portfolio Management Manage your Health & Safety online Rate your Suppliers and track improvements
  • 29. Project Portfolio Management Track expenditure against detailed cost plans Match your Expenditure Vs Baseline Budget Track Funds for your Project needs
  • 30. Request for Proposal (RFP) Robust and secure online RFP process Online submission of Invitation to Bid (ITB) to multiple Suppliers Online submission of Bid Response
  • 31. Meeting Minutes Online capture of Meeting Minutes and actions Facilitates capturing re-occurring meeting information with ease Tracking all Meeting Actions online
  • 32. RFIs / NCRs Online collaboration using Request for Information Automated Workflows and Action tracking Online Non Conformance Report (NCR) Tracking Easy access to information for Architects and Consultants
  • 33. Reporting Online Reporting capability on click of a button
  • 34. Adoddle Field Manage unlimited folders and files View over 300 different 2D file formatsView 3D Model files Online Mark-up and save Comments Snags / RFIs
  • 35. Mobility - cMOB Simplified cMOB user Interface Improved graphical display Click through on the entire area (Designed for Fat Fingers)