Response to Request for Proposal 
Submitted by: 
Vmoksha Technologies Pvt. Ltd. 
2799 & 2800, Srinidhi, Sector-1, 27th Main, 
HSR Layout, Bangalore - 560102 
Tel No: +91-80-25053500 / 41376300 
www.vmokshagroup.com
Client logo 
1 
TABLE OF CONTENTS 
1 INTRODUCTION ...............................................................................................................2 
1.1.About Customer ............................................................................................................ 2 
1.2.About us ........................................................................................................................ 2 
1.3.Background ................................................................................................................... 2 
2 SCOPE OF WORK ..............................................................................................................3 
2.1 In Scope ........................................................................................................................ 3 
2.2 Out of Scope.................................................................................................................. 5 
3 PROPOSED SOLUTION ....................................................................................................6 
3.1 Project Objective ........................................................................................................... 6 
3.2 Current Situation ........................................................................................................... 6 
3.3 Vmoksha Solution ......................................................................................................... 7 
3.3.1 Solution Architecture ........................................................................................... 7 
3.3.2 Deployment Architecture..................................................................................... 8 
3.3.3 Hardware Details .................................................................................................. 8 
3.3.4 Software Details .................................................................................................... 9 
4 EXECUTION APPROACH ..............................................................................................10 
4.3 Development Methodology .......................................................................................... 10 
4.4 Staffing ........................................................................................................................ 12 
4.5 Project Management .................................................................................................... 13 
4.5.1 Project Team Organization ............................................................................... 13 
4.5.2 Communication Management ........................................................................... 15 
4.5.3 Issue Management .............................................................................................. 16 
4.5.4 Change Request Management and Escalation................................................. 17 
4.5.5 Quality Management .......................................................................................... 17 
4.5.6 Risk Management ............................................................................................... 18 
4.5.7 Acceptance Management ................................................................................... 18 
4.5.8 Testing Methodology .......................................................................................... 19 
5 PROJECT ESTIMATES AND COMMERCIALS............................................................20 
5.3 Assumptions ............................................................................................................... 20 
5.4 Dependencies .............................................................................................................. 20 
5.5 Lead Time .................................................................................................................... 20 
5.6 Commercials................................................................................................................ 21 
5.7 Project Schedule ......................................................................................................... 21 
5.8 Post Implementation Support ...................................................................................... 21 
5.9 Payment Terms & Conditions ...................................................................................... 21 
6 ANNEXURES ...................................................................................................................22 
Confidential
Client logo 
The Client is a regional body with the regulatory authority to oversee a unified approach to managing the 
commission without regard to political boundaries. Client programs include water quality protection, water 
supply allocation, regulatory review (permitting), water conservation initiatives, watershed planning, drought 
management, Flood control, and recreation. Client has approximately 45 staff conducting business activities 
from a single office located in West Trenton. NJ. Additional information about client can be obtained from 
www.client.net. 
Vmoksha Technologies Inc, is an IT consulting organization with its headquarters in Bangalore, India. Since 
inception in May 2001, Vmoksha has adopted a strategy of rapid organic as well as inorganic 
growth. Vmoksha’s growth has been realized through a strong focus on Offshore IT Outsourcing Services 
and adapting its Flexible Business Model for customers around the globe. The Business strategy has led to 
the acquisitions of a number of large, prestigious customers including 3M Healthcare, Edwards, NTUC 
Fairprice, S1 Corporation, Pickfords, Toyota, Gallo Wineries, CPA, UCB, IBM, Cisco, Wincor Nixdorf, 
Nextance, Unilever-India etc. 
Vmoksha has currently operations in US, Europe and Asia Pacific, with offices in Newport Beach, London 
and Singapore. This has enabled us to provide a high level of customer satisfaction and deliver cost effective 
solutions. 
For more information on Vmoksha technologies please find the annexure A or visit us 
www.vmokshagroup.com 
2 
1 Introduction 
1.1. About Customer 
1.2. About us 
1.3. Background 
Confidential
Client logo 
3 
2 Scope of Work 
2.1 In Scope 
1 Onsite System Study with Client staffs & SME's 
1.1 Study AS-System and the regulatory requirement of the natural gas industry 
2 Arrive Hardware, Software & Network Specifications and Integration 
2.1 Study existing infra and arrive at new infra based on Non Functional Requirements 
2.2 Acquire & Integrate the Hardware’s & Software’s at the time of System T esting 
3 Client Integrated Database 
3.1 MS SQL Server 2005 to 2008 migration 
3.2 Database design to accommodate the concept of related natural gas projects comprising of 
Confidential 
i) withdrawal, ii) well pad and iii) discharge, and the tracking of water between these 
different sites, and associated monitoring 
3.2.1 Client database modifications in terms of structure, queries and reports to handle the new 
data fields being collected 
3.2.2 MS Access User Interface (Front-end) Modifications to reflect the changes made in the back 
end 
3.3 Development of 20 new Queries (workflow & biz rules) 
3.4 Development of 20 new Reports 
3.9 Developing a robust and seamless database and server backup system 
4 Online Client Project Application Forms and Reporting Forms 
4.1 Creating web form specifications 
4.2 Multiple (Approximately 8 applications) web-based project applications (e.g., water 
withdrawal application) 
4.2.1 SQL server database back-end modification 
4.2.2 Secure (password protected) web-based data entry form development 
4.2.3 Data validation and database integrity checks and QA/QC protocols to minimize data entry 
errors 
4.2.4 Coding to populate the database 
4.2.5 Data import feature a.k.a Electronic Data Deliverables (EDD) 
4.2.6 DMS integration i.e. file upload thru web based forms and store it in the DMS
Client logo 
4 
4.3 Multiple (Approximately 5 Reports) web-based reporting (e.g., for submission of a water 
Confidential 
monitoring report by applicant) 
4.3.1 SQL server database back-end modification 
4.3.2 Secure (password protected) web-based data entry form development 
4.3.3 Data validation and database integrity checks and QA/QC protocols to minimize data entry 
errors 
4.3.4 Coding to populate the database 
4.4 Audit trail component to keep track of the modifications post submission by customer staff 
4.5 Electronic Payment Processing 
4.5.1 Integration with ACH 
4.5.2 Payment reconciliation 
4.5.3 Reports to track late or incorrect payments 
5 Database Security (Access control Mechanism) 
5.1 Client staff use 
5.1.1 Implement database security permissions, controlled by SQL server ( i.e. tight role based 
security) 
5.2 External users 
5.2.1 User profile management with individual accounts 
5.2.2 Logon and authentication against database thru SSL 
5.2.3 Data quarantine for review and approval prior upload into IDB 
6 Document Management System 
6.1 Store and manage incoming documents submitted online 
6.2 Store and manage documents prepared by staff in a centralized location 
6.3 3rd Party (MOSS 2010) DMS integration (DMS Acquisition & Implementation) 
6.3.1 Customize and integrate MOSS 2010 into the client’s system (both existing MS access 
forms and new web apps) 
6.3.2 Integration with MS Outlook 
6.3.3 Integration with Exchange Server 
7 Clients Public Web Portal 
7.1 Giving the public the ability to retrieve select data and documents from the client database 
7.2 Signup for automatic notifications on selected projects (e.g., RSS feed).
Client logo 
5 
7.3 Displaying the available spatial and temporal data 
7.4 Querying the available spatial and temporal data graphically within an interactive map using 
Confidential 
ArcGIS server technology 
7.5 FAQs 
8 Standard Operating Procedures (SOPs) 
8.1 Development of technical documentation i.e. Server, Network, Database 
8.2 Development of user manuals for operations and maintenance 
8.3 Development of how-to videos / screen casts for applicants and other external users 
9 End user training 
9.1 Client staff 
9.1.1 System Administrator 
9.1.2 Database Administrator 
9.1.3 End Users 
9.2 External users 
9.2.1 Online how-to videos 
10 Post Implementation support 
2.2 Out of Scope
Client logo 
3.1 Project Objective 
The Client Commission plans to enhance its information technology capabilities in order to improve the 
efficiency of data and document handling and the storage and flow of electro nic information through the 
commission. This initiative is being driven by the need to efficiently process the expected high volume of 
natural gas related projects for client’s regulatory review, but will provide increased efficiency for a number 
of existing paper-based processes. The desired enhancements cover a range of technologies and the client 
is seeking qualified firm(s) or individual(s) (Contractor) to partner with to complete tile detailed design and 
implementation of this important initiative. 
The client processes all project applications and the majority of data reporting in hard copy format. Client staff then 
enters information into a centralized SQL server database via a MS Access front-end. Documents (letters, reports, 
memos, correspondence) related to a particular project are compiled in hard copy in a centralized filing system. The 
individual electronic files comprising the project file are stored on multiple, individual computers and/or on shared file 
servers. 
6 
3 Proposed Solution 
3.2 Current Situation 
Confidential
Client logo 
Based on the high level business understanding and non functional requirements, Vmoksha proposes a robust and 
scalable multi layered, loosely coupled and highly cohesive web based application for the online project & reports 
module and Clients public web portal using Microsoft .Net as the underlying technology. For Document Management 
System (DMS), we agree with Client recommendation to go for MOSS 2010, the reason being, 
 We understood, Client is a Microsoft shop i.e. MS Access, MS SQL 2005, ARC GIS (running in windows), 
7 
3.3 Vmoksha Solution 
3.3.1 Solution Architecture 
windows Active Directory etc. 
 MOSS is a Microsoft product developed in .net technology hence blends well with the proposed solution 
 Meets the required features asked by client i.e. Versioning, security, Outlook integration etc. 
A Logical representation of the solution architecture is as shown in the diagram below – 
Layer Details 
User Interface 
Business 
Data Access 
Confidential
Client logo 
Servers shown in the architecture above may reside on one or more physical [or] virtual machines depending 
upon the hardware sizing, load, desired response, scalability, availability, necessary security, and cost 
factors. 
The following table lists the deployment hardware environment for Web portal, Robust SQL backup & DMS. The 
existing client’s servers will be retained as it is unless a need arise to migrate [or] phase out which will again be finalized 
after the analysis and design phase. This hardware details are just indicative actual will be arrived post requirement 
study (includes functional & non functional) 
8 
3.3.2 Deployment Architecture 
The deployment architecture as conceived by Vmoksha is as shown in the figure below - 
The above architecture is indicative and will be finalized after the analysis/design phase. 
3.3.3 Hardware Details 
Confidential
Client logo 
9 
Sl.No. Category Hardware 
1 Web Server 32 bit Dual (Quad) proc, Xeon E5507, 2.26 GHz , 8 GB RAM 
2 
Confidential 
DB Server (For fault 
tolerance) 
As per existing infrastructure + one additional 
"32 bit Dual (Quad) proc, Xeon E5507, 2.26 GHz , 8 GB RAM" server 
for fault tolerance & robust backup. 
Vmoksha recommends clustered configuration of servers for high availability. 
3.3.4 Software Details 
The following table lists the key software proposed. 
Sl.No. Category Software 
1 OS Windows Server 2008 Standard/Enterprise 
2 Database MS SQL Server 2008 workgroup/ Standard 
3 Web Server IIS 7.0 
4 DMS MOSS 2010 
5 
ACH/Payment 
Gateway 
Service provider and corresponding API/software will be chosen later 
6 GIS ESRi ARC GS/BING/GOOGLE MAPS API 
7 Reporting Tool VS.NET Report Viewer Control 
8 IDE MS VS.NET 2010 
9 AS-IS application MS Office 2010 Pro
Client logo 
Vmoksha will deploy its proven offshore model for execution of this project. The entire development will be executed 
offshore except the requirement study, implementation and knowledge transitioning. Vmoksha proposes to follow 
Waterfall development approach as requirements are fairly stable and known but, methodology and design is amenable 
to absorb any variable requirements. The Pictorial representation of the execution model is as follows: 
10 
4 Execution Approach 
4.3 Development Methodology 
Initiation 
Business 
Requirement 
Analysis Training (KT) 
Onsite 
The activities performed in each phases of the execution and their deliverables are given in the below table 
Confidential 
System 
Design 
Implementation 
System 
Design 
Off-Shore 
SupporSystem t 
Integration 
Testing Post-Implementation 
Development 
Construction Code 
Review 
Unit 
Testing
Client logo 
11 
Phases Activities Deliverables 
Confidential 
Initiation 
- Create a project management structure 
- Define Project Plan and Schedule 
- Identify Risks and Mitigation Plan 
- Review of processes and document templates 
- Define the communication plan and status 
reporting structure 
- Project Plan and Schedule 
- Roles, Responsibilities and Resource Plan 
- Communication Plan 
Business Requirement 
Analysis 
- Understand business objectives 
- Conceptualize user requirements 
- Study functionality and technical architecture 
of the existing MS Access based system 
- Collect and refine the functional requirements 
in detail and consolidate the same. 
- Analyze and validate implementation approach 
- Wire frames 
- Functional Specifications and Work Flow analysis 
document 
- Redefine Project Plan and Schedule, if required 
System & DB Design 
- Detailed analysis & design and define the core 
system architecture 
- Object and Data modeling 
- Define Coding Standards and Design Guidelines 
- Define Unit Test Procedures 
- Set up the Development Environment 
- Define a Testing Strategy 
- System/Technical Architecture Document 
- Database Design Documents 
- Testing Strategy and System Test Plan 
Development 
- Review Design Document 
- Clarify queries from client 
- Prepare Unit Test Procedure 
- Construction 
- Code Review 
- Unit Testing 
- Source Code
Client logo 
12 
Confidential 
Implementation 
- Staging Environment Setup 
- System Integration 
- Integration and System Testing 
- Load Testing 
- Bug Fixes 
- Support for User Acceptance Test 
- Assist Client project team to setup 
- Production System Environment 
- Post Implementation Support 
- Integration and System Test Cases 
- Test Results 
- Deployment Architecture document 
Knowledge 
Transition 
- Provide Production Support 
- Educate Users and Technical Staff 
- Enhancements and Fine Tuning 
- Hand Holding and Support 
- User Manual 
- Knowledge Repository i.e. FAQs etc. 
- Updated Code 
4.4 Staffing 
The indicative team size in various stages of the project execution is provided below
Client logo 
13 
4.5 Project Management 
4.5.1 Project Team Organization 
Vmoksha proposes a very thin and lean project organization structure as depicted below 
Roles and Responsibilities of each of the role depicted above are listed in the below table 
Role Responsibility 
Client Project Sponsor 
Confidential 
Manage Vendor relationship 
Approval of resources and budget 
Authorize changes in the contract 
Provide final resolution of escalated issues and conflicts on behalf of Client 
Periodic reviews of the project status and reporting to Client management 
Plan and manage Vmoksha’s resources and activities 
Coordination with Vmoksha project team 
Clie 
nt 
Proj 
ect 
Man 
ager
Client logo 
14 
Confidential 
Coordinate reviews & acceptance of deliverables 
Report status updates to client’s business sponsors 
Maintain the overall project plan 
Accept & Approve deliverables 
Client SME 
Resolve queries raised by Vmoksha team at onsite and offshore PM 
Provide existing system understanding to Vmoksha team 
Arrange User Acceptance Testing (UAT) 
Vmoksha Project Sponsor 
Overall responsibility for Vmoksha service commitments 
Authority to approve any engagement defining contract or documents or any changes that 
affect project cost 
Single point of contact for client on any project related issues as escalation 
Periodic reviews of the project status with GDE, PM and Client Provide inputs for management 
status reviews 
Participate in management reviews and teleconferences 
Facilitate preparation and release of all deliverables 
Ensure overall quality of the project and on-time delivery 
Capture and constantly review metrics and productivity figures for the project. 
Vmoksha Global Delivery 
Executive (GDE) 
Provide overall leadership to the project team 
Mobilize project team and other required resources 
Arrange technical and subject matter experts for the team 
Accountable for the scope of the work, including budget, schedule, and quality requirements 
of the deliverables 
Approve all change requests which are having no impact on project cost 
Review the project progress with PM and client 
Vmoksha Onsite 
coordinator 
Coordination day to day project activities with client 
Help offshore team on functional/design knowledge 
Review deliverables 
Arrange to resolve technical queries 
Integration and support user acceptance testing
Client logo 
15 
Confidential 
Project deployment, version rollouts/post implementation support 
Vmoksha Project Manager 
Create the project plan and Statement of Work 
Set up development/test environment 
Understand the architecture and functional overview of the system/identified business functions 
Assign tasks to team and monitors the progress 
Ensure conformance to standards & guidelines 
Coordinate day to day project activities with onsite, client and project team 
Status reporting, reviews of deliverables, manage change and acceptance procedures 
Coordinate with Global Delivery Manager and client PM on progress and issues 
Obtain project completion sign off from Client PM 
Vmoksha Project Team 
Understand functional and technical requirements 
Create Test Plans, carry out coding, testing and peer reviews 
Escalate issues to the Project Manager 
Log the Test results in the Test plans and close defects 
Incorporate change requests 
Create necessary system documentation 
Impart users training 
Vmoksha 
QA/QC Team 
Ensure Process conformance/ adherence for testing, tailored software 
Analyze test results/metrics data and utilize the results for performance/ quality improvement 
in the project 
4.5.2 Communication Management 
Communications management establishes reports and dialogues that ensure constant flow of key project information 
among the project team members, with client’s stakeholders, and with Vmoksha’s Project oversight mechanisms. 
These mechanisms ensure that everyone is informed of project status, and that arising issues can be handled 
promptly 
Team members will prepare weekly status reports for the Vmoksha Project Manager, who will then aggregate the 
reports and provide a weekly status report to the client’s Project Manager/Sponsor and Vmoksha Management.
Client logo 
Similarly, the Vmoksha Project Manager will conduct weekly team status meetings to ensure that we are executing 
against plan and effectively addressing project dynamics. This discussion includes project status, issues, workload, 
and client’s priorities 
The Vmoksha Project Manager will participate in the monthly project review conducted at Vmoksha office. The 
objective of this review is to ensure the project is using the best practices incorporated into Vmoksha’s methodology 
and that client’s satisfaction is maintained 
An issue is defined as any item that adversely affects the execution of the project. Issues may adversely impact the 
project’s cost, timeframe, and quality of the deliverable and/or level of service. 
 Team members should document issues in their Individual Status Reports 
 However, issues may also be raised during the client’s Status Meeting, Project T eam Meeting or via e-mail 
 Issues are retained for the life of the project 
 Every record in the Issue Log contains a description of the issue, actual or potential impact if not resolved, 
who raised the issue, when the issue was raised, updates, and final resolution 
 Every issue has: 
 A target date for resolution after which the project may be impacted 
 An owner responsible for driving resolution and keeping the Vmoksha Project Manager up to date on 
progress 
4  An extract of the Issue Log is reviewed in the weekly client’s Status Review and weekly T eam Meetings 
16 
Using the weekly status report as the agenda, the Vmoksha Project Manager will conduct weekly status meetings 
with the client’s Project Manager/Sponsor and other appropriate client’s personnel 
4.5.3 Issue Management 
In order to ensure adequate and timely management of project related issues, Vmoksha will implement its issue 
management procedures in this project as described below: 
1  Any team member (Vmoksha or client) may raise an issue to the Vmoksha Project Manager 
2  Issues are recorded into a Project Issue Log 
3  An extract of the Issue Log will be attached to the weekly Project Status Report and reviewed in the 
weekly client’s Status Review meetings as well as in the team meetings 
 The extract includes open issues and issues closed since last status 
5  Issues are closed only when the initiator is comfortable that the resolution addresses his/her problem 
Confidential
Client logo 
Vmoksha recognizes that changes are a normal part of the project life cycle and that managing change is 
critical to the project’s ultimate success. Should any out of scope items be required, Vmoksha or customer 
can invoke a mutually agreed upon Change Management procedure. 
Vmoksha and the client understand that the spirit of change management is to communicate, document and 
control the impact of changes to project scope on level of effort and deadlines 
o The Vmoksha project team will document the change, including a description of the change and the 
o The authorized client resource will approve or reject the change proposed in a timely manner. 
o Vmoksha maintains focus on approved work (per the SOW) until amended through an approved 
There may be instances where an issue needs to be escalated. Vmoksha proposes to follow the proposed 
Project Organization Structure for any escalation 
17 
4.5.4 Change Request Management and Escalation 
A high level overview of the Change Management process is as follows: 
impact on costs, staffing, deliverables, and project schedule 
Vmoksha expects acceptance within 3 business days 
o No work associated with the change request will begin until the change is approved 
Advantages to client include: 
o Able to decide if a change is worth the impact to schedule, cost or level of s ervice 
change request 
4.5.5 Qual i ty Management 
 Internal QA procedures that Vmoksha will in this project are: - 
o Quality Assurance Process 
- Independent audits conducted on regular basis 
- Pre Audit 
- Project Execution Audit 
- Post Audit 
Confidential
Client logo 
 The purpose of Risk management is to minimize the impact on schedule, cost, or level of service 
 Vmoksha approach to Risk Management is guided by its Project Risk Management Procedure 
(PRMP) which is practiced throughout the life of the project to identify risks, predict the probability of 
the risks occurring, quantify the impact should thru occur, and develop a plan for undertaking the 
mitigation actions. 
 The PRMP is updated periodically throughout the project. These risks are reviewed with the Client 
in the periodic Status Review and with Vmoksha Management and also in the Monthly Internal 
Vmoksha Project Reviews 
 Vmoksha has defined deliverables throughout the life of the project. These are the elements that 
move the project towards final completion of the scope as defined in the SOW. Acceptance of a 
deliverable means that client agrees that the deliverable meets the acceptance criteria that are 
defined for that deliverable and that it can be used as input to related future deliverables when 
appropriate 
 Acceptance of deliverables on a timely basis is critical in order to avoid delays to the project. To 
obtain acceptance, Vmoksha provides the deliverable to the appropriate and authorized client 
representative for review, accompanied by a Product/Task Acceptance Form. The Acceptance Form 
includes a description of the deliverable and restates the acceptance criteria defined in the Statement 
of Work for that deliverable. 
18 
- Lessons Learned 
- Corrective action, risk control planning 
o Quality Control 
- Peer reviews 
o Onsite Support 
- Monthly Project Review with Branch Management 
4.5.6 Risk Management 
4.5.7 Acceptance Management 
Confidential
Client logo 
 Vmoksha will schedule and conduct a walk-through for each deliverable to be approved. Acceptance 
of the deliverable will be based upon pre-defined acceptance criteria and provided in writing. If a 
deliverable is rejected, client will document the inaccuracies and/or shortcomings against the 
acceptance criteria, so they can be corrected. Vmoksha expects client to submit acceptance within 
2-3 business days of deliverable submission 
 Vmoksha will define the specific acceptance criteria for each deliverable (including final acceptance 
 Upon completion of the project, submission and acceptance of all project deliverables , the Vmoksha 
Project Manager will submit a Final Project Acceptance Form to the Client Project Manager/Sponsor 
for final acceptance. A Deliverable Acceptance Log will be provided, along with the Final Project 
Acceptance Form, to show that all deliverables have been accepted and approved. 
Vmoksha performs testing at all appropriate stages of the project life cycle and follows the butterfly model for 
validating the software. 
19 
and review time for each deliverable) in the Statement of Work 
4.5.8 Testing Methodology 
Confidential 
 Vmoksha will develop the system test, integration 
and unit test specifications based on the functional 
requirements 
 Client will review and approve the test 
specifications 
 Client will provide the test data. 
 Vmoksha will test the system as per the test 
specifications
Client logo 
The business functions identified in the request for information document provided by Client have been 
considered for preparing estimates. Any change to this list may result in changes to costs and schedules. 
 Any requirements identified during the project that are not covered by this proposal will go through 
 Client will make available entire software code, executables & documentation of the existing system 
 Client must sign off all the deliverables as specified in the mutually agreed project plan. If no feedback 
is received within 1 week of the mutually agreed date, the deliverable will be deemed as accepted. 
 Client Subject Matter Experts and IT team will be made available to Vmoksha project team, for 
seeking clarifications on the business requirements, Operational and technical details on the existing 
systems and system installation 
 Client single point of contact will ensure timely resolution of all queries/issues raised by Vmoksha 
 It is assumed that Client will be able to complete the acceptance testing of new system within a 
period as planned. If due to any reason, this effort goes beyond the stipulated duration, Vmoksha 
would provide the support during on T&M basis 
 Availability of necessary office space, desktop/laptop computers, email and other communication, 
office facilities, Functional & Technical SMEs for Vmoksha executives in Client to execute onsite 
project activity 
5.5 Lead Time 
Two (2) weeks of Lead-time is typically necessary between proposal sign off and commencement of work. 
20 
5 Project Estimates and Commercials 
5.3 Assumptions 
 The estimation has been done based on RFP (requirement) documents provided by Client: 
the change request management procedure. 
 Client will provide office facilities to Vmoksha Project Team while working at onsite 
within 24 hours 
5.4 Dependencies 
Vmoksha envisages the following dependencies while executing the assignment. Lack of timely input of 
these is likely to adversely affect the project schedules and design decisions. 
Confidential
Client logo 
21 
5.6 Commercials 
5.7 Project Schedule 
A brief schema of the project execution plan is shown below: 
Confidential 
Phases M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 
Business Requirement Analysis 
System Design 
Development 
System Integration Testing 
Implementation (TST & PRD) 
Knowledge Transfer 
5.8 Post Implementation Support 
5.9 Payment Terms & Conditions
Client logo 
22 
6 Annexures 
Annexures will include 
 Brief about the company 
 Case studies 
 References if asked by client 
 Any other related information requested by client 
Confidential

Application development proposal draft

  • 1.
    Response to Requestfor Proposal Submitted by: Vmoksha Technologies Pvt. Ltd. 2799 & 2800, Srinidhi, Sector-1, 27th Main, HSR Layout, Bangalore - 560102 Tel No: +91-80-25053500 / 41376300 www.vmokshagroup.com
  • 2.
    Client logo 1 TABLE OF CONTENTS 1 INTRODUCTION ...............................................................................................................2 1.1.About Customer ............................................................................................................ 2 1.2.About us ........................................................................................................................ 2 1.3.Background ................................................................................................................... 2 2 SCOPE OF WORK ..............................................................................................................3 2.1 In Scope ........................................................................................................................ 3 2.2 Out of Scope.................................................................................................................. 5 3 PROPOSED SOLUTION ....................................................................................................6 3.1 Project Objective ........................................................................................................... 6 3.2 Current Situation ........................................................................................................... 6 3.3 Vmoksha Solution ......................................................................................................... 7 3.3.1 Solution Architecture ........................................................................................... 7 3.3.2 Deployment Architecture..................................................................................... 8 3.3.3 Hardware Details .................................................................................................. 8 3.3.4 Software Details .................................................................................................... 9 4 EXECUTION APPROACH ..............................................................................................10 4.3 Development Methodology .......................................................................................... 10 4.4 Staffing ........................................................................................................................ 12 4.5 Project Management .................................................................................................... 13 4.5.1 Project Team Organization ............................................................................... 13 4.5.2 Communication Management ........................................................................... 15 4.5.3 Issue Management .............................................................................................. 16 4.5.4 Change Request Management and Escalation................................................. 17 4.5.5 Quality Management .......................................................................................... 17 4.5.6 Risk Management ............................................................................................... 18 4.5.7 Acceptance Management ................................................................................... 18 4.5.8 Testing Methodology .......................................................................................... 19 5 PROJECT ESTIMATES AND COMMERCIALS............................................................20 5.3 Assumptions ............................................................................................................... 20 5.4 Dependencies .............................................................................................................. 20 5.5 Lead Time .................................................................................................................... 20 5.6 Commercials................................................................................................................ 21 5.7 Project Schedule ......................................................................................................... 21 5.8 Post Implementation Support ...................................................................................... 21 5.9 Payment Terms & Conditions ...................................................................................... 21 6 ANNEXURES ...................................................................................................................22 Confidential
  • 3.
    Client logo TheClient is a regional body with the regulatory authority to oversee a unified approach to managing the commission without regard to political boundaries. Client programs include water quality protection, water supply allocation, regulatory review (permitting), water conservation initiatives, watershed planning, drought management, Flood control, and recreation. Client has approximately 45 staff conducting business activities from a single office located in West Trenton. NJ. Additional information about client can be obtained from www.client.net. Vmoksha Technologies Inc, is an IT consulting organization with its headquarters in Bangalore, India. Since inception in May 2001, Vmoksha has adopted a strategy of rapid organic as well as inorganic growth. Vmoksha’s growth has been realized through a strong focus on Offshore IT Outsourcing Services and adapting its Flexible Business Model for customers around the globe. The Business strategy has led to the acquisitions of a number of large, prestigious customers including 3M Healthcare, Edwards, NTUC Fairprice, S1 Corporation, Pickfords, Toyota, Gallo Wineries, CPA, UCB, IBM, Cisco, Wincor Nixdorf, Nextance, Unilever-India etc. Vmoksha has currently operations in US, Europe and Asia Pacific, with offices in Newport Beach, London and Singapore. This has enabled us to provide a high level of customer satisfaction and deliver cost effective solutions. For more information on Vmoksha technologies please find the annexure A or visit us www.vmokshagroup.com 2 1 Introduction 1.1. About Customer 1.2. About us 1.3. Background Confidential
  • 4.
    Client logo 3 2 Scope of Work 2.1 In Scope 1 Onsite System Study with Client staffs & SME's 1.1 Study AS-System and the regulatory requirement of the natural gas industry 2 Arrive Hardware, Software & Network Specifications and Integration 2.1 Study existing infra and arrive at new infra based on Non Functional Requirements 2.2 Acquire & Integrate the Hardware’s & Software’s at the time of System T esting 3 Client Integrated Database 3.1 MS SQL Server 2005 to 2008 migration 3.2 Database design to accommodate the concept of related natural gas projects comprising of Confidential i) withdrawal, ii) well pad and iii) discharge, and the tracking of water between these different sites, and associated monitoring 3.2.1 Client database modifications in terms of structure, queries and reports to handle the new data fields being collected 3.2.2 MS Access User Interface (Front-end) Modifications to reflect the changes made in the back end 3.3 Development of 20 new Queries (workflow & biz rules) 3.4 Development of 20 new Reports 3.9 Developing a robust and seamless database and server backup system 4 Online Client Project Application Forms and Reporting Forms 4.1 Creating web form specifications 4.2 Multiple (Approximately 8 applications) web-based project applications (e.g., water withdrawal application) 4.2.1 SQL server database back-end modification 4.2.2 Secure (password protected) web-based data entry form development 4.2.3 Data validation and database integrity checks and QA/QC protocols to minimize data entry errors 4.2.4 Coding to populate the database 4.2.5 Data import feature a.k.a Electronic Data Deliverables (EDD) 4.2.6 DMS integration i.e. file upload thru web based forms and store it in the DMS
  • 5.
    Client logo 4 4.3 Multiple (Approximately 5 Reports) web-based reporting (e.g., for submission of a water Confidential monitoring report by applicant) 4.3.1 SQL server database back-end modification 4.3.2 Secure (password protected) web-based data entry form development 4.3.3 Data validation and database integrity checks and QA/QC protocols to minimize data entry errors 4.3.4 Coding to populate the database 4.4 Audit trail component to keep track of the modifications post submission by customer staff 4.5 Electronic Payment Processing 4.5.1 Integration with ACH 4.5.2 Payment reconciliation 4.5.3 Reports to track late or incorrect payments 5 Database Security (Access control Mechanism) 5.1 Client staff use 5.1.1 Implement database security permissions, controlled by SQL server ( i.e. tight role based security) 5.2 External users 5.2.1 User profile management with individual accounts 5.2.2 Logon and authentication against database thru SSL 5.2.3 Data quarantine for review and approval prior upload into IDB 6 Document Management System 6.1 Store and manage incoming documents submitted online 6.2 Store and manage documents prepared by staff in a centralized location 6.3 3rd Party (MOSS 2010) DMS integration (DMS Acquisition & Implementation) 6.3.1 Customize and integrate MOSS 2010 into the client’s system (both existing MS access forms and new web apps) 6.3.2 Integration with MS Outlook 6.3.3 Integration with Exchange Server 7 Clients Public Web Portal 7.1 Giving the public the ability to retrieve select data and documents from the client database 7.2 Signup for automatic notifications on selected projects (e.g., RSS feed).
  • 6.
    Client logo 5 7.3 Displaying the available spatial and temporal data 7.4 Querying the available spatial and temporal data graphically within an interactive map using Confidential ArcGIS server technology 7.5 FAQs 8 Standard Operating Procedures (SOPs) 8.1 Development of technical documentation i.e. Server, Network, Database 8.2 Development of user manuals for operations and maintenance 8.3 Development of how-to videos / screen casts for applicants and other external users 9 End user training 9.1 Client staff 9.1.1 System Administrator 9.1.2 Database Administrator 9.1.3 End Users 9.2 External users 9.2.1 Online how-to videos 10 Post Implementation support 2.2 Out of Scope
  • 7.
    Client logo 3.1Project Objective The Client Commission plans to enhance its information technology capabilities in order to improve the efficiency of data and document handling and the storage and flow of electro nic information through the commission. This initiative is being driven by the need to efficiently process the expected high volume of natural gas related projects for client’s regulatory review, but will provide increased efficiency for a number of existing paper-based processes. The desired enhancements cover a range of technologies and the client is seeking qualified firm(s) or individual(s) (Contractor) to partner with to complete tile detailed design and implementation of this important initiative. The client processes all project applications and the majority of data reporting in hard copy format. Client staff then enters information into a centralized SQL server database via a MS Access front-end. Documents (letters, reports, memos, correspondence) related to a particular project are compiled in hard copy in a centralized filing system. The individual electronic files comprising the project file are stored on multiple, individual computers and/or on shared file servers. 6 3 Proposed Solution 3.2 Current Situation Confidential
  • 8.
    Client logo Basedon the high level business understanding and non functional requirements, Vmoksha proposes a robust and scalable multi layered, loosely coupled and highly cohesive web based application for the online project & reports module and Clients public web portal using Microsoft .Net as the underlying technology. For Document Management System (DMS), we agree with Client recommendation to go for MOSS 2010, the reason being,  We understood, Client is a Microsoft shop i.e. MS Access, MS SQL 2005, ARC GIS (running in windows), 7 3.3 Vmoksha Solution 3.3.1 Solution Architecture windows Active Directory etc.  MOSS is a Microsoft product developed in .net technology hence blends well with the proposed solution  Meets the required features asked by client i.e. Versioning, security, Outlook integration etc. A Logical representation of the solution architecture is as shown in the diagram below – Layer Details User Interface Business Data Access Confidential
  • 9.
    Client logo Serversshown in the architecture above may reside on one or more physical [or] virtual machines depending upon the hardware sizing, load, desired response, scalability, availability, necessary security, and cost factors. The following table lists the deployment hardware environment for Web portal, Robust SQL backup & DMS. The existing client’s servers will be retained as it is unless a need arise to migrate [or] phase out which will again be finalized after the analysis and design phase. This hardware details are just indicative actual will be arrived post requirement study (includes functional & non functional) 8 3.3.2 Deployment Architecture The deployment architecture as conceived by Vmoksha is as shown in the figure below - The above architecture is indicative and will be finalized after the analysis/design phase. 3.3.3 Hardware Details Confidential
  • 10.
    Client logo 9 Sl.No. Category Hardware 1 Web Server 32 bit Dual (Quad) proc, Xeon E5507, 2.26 GHz , 8 GB RAM 2 Confidential DB Server (For fault tolerance) As per existing infrastructure + one additional "32 bit Dual (Quad) proc, Xeon E5507, 2.26 GHz , 8 GB RAM" server for fault tolerance & robust backup. Vmoksha recommends clustered configuration of servers for high availability. 3.3.4 Software Details The following table lists the key software proposed. Sl.No. Category Software 1 OS Windows Server 2008 Standard/Enterprise 2 Database MS SQL Server 2008 workgroup/ Standard 3 Web Server IIS 7.0 4 DMS MOSS 2010 5 ACH/Payment Gateway Service provider and corresponding API/software will be chosen later 6 GIS ESRi ARC GS/BING/GOOGLE MAPS API 7 Reporting Tool VS.NET Report Viewer Control 8 IDE MS VS.NET 2010 9 AS-IS application MS Office 2010 Pro
  • 11.
    Client logo Vmokshawill deploy its proven offshore model for execution of this project. The entire development will be executed offshore except the requirement study, implementation and knowledge transitioning. Vmoksha proposes to follow Waterfall development approach as requirements are fairly stable and known but, methodology and design is amenable to absorb any variable requirements. The Pictorial representation of the execution model is as follows: 10 4 Execution Approach 4.3 Development Methodology Initiation Business Requirement Analysis Training (KT) Onsite The activities performed in each phases of the execution and their deliverables are given in the below table Confidential System Design Implementation System Design Off-Shore SupporSystem t Integration Testing Post-Implementation Development Construction Code Review Unit Testing
  • 12.
    Client logo 11 Phases Activities Deliverables Confidential Initiation - Create a project management structure - Define Project Plan and Schedule - Identify Risks and Mitigation Plan - Review of processes and document templates - Define the communication plan and status reporting structure - Project Plan and Schedule - Roles, Responsibilities and Resource Plan - Communication Plan Business Requirement Analysis - Understand business objectives - Conceptualize user requirements - Study functionality and technical architecture of the existing MS Access based system - Collect and refine the functional requirements in detail and consolidate the same. - Analyze and validate implementation approach - Wire frames - Functional Specifications and Work Flow analysis document - Redefine Project Plan and Schedule, if required System & DB Design - Detailed analysis & design and define the core system architecture - Object and Data modeling - Define Coding Standards and Design Guidelines - Define Unit Test Procedures - Set up the Development Environment - Define a Testing Strategy - System/Technical Architecture Document - Database Design Documents - Testing Strategy and System Test Plan Development - Review Design Document - Clarify queries from client - Prepare Unit Test Procedure - Construction - Code Review - Unit Testing - Source Code
  • 13.
    Client logo 12 Confidential Implementation - Staging Environment Setup - System Integration - Integration and System Testing - Load Testing - Bug Fixes - Support for User Acceptance Test - Assist Client project team to setup - Production System Environment - Post Implementation Support - Integration and System Test Cases - Test Results - Deployment Architecture document Knowledge Transition - Provide Production Support - Educate Users and Technical Staff - Enhancements and Fine Tuning - Hand Holding and Support - User Manual - Knowledge Repository i.e. FAQs etc. - Updated Code 4.4 Staffing The indicative team size in various stages of the project execution is provided below
  • 14.
    Client logo 13 4.5 Project Management 4.5.1 Project Team Organization Vmoksha proposes a very thin and lean project organization structure as depicted below Roles and Responsibilities of each of the role depicted above are listed in the below table Role Responsibility Client Project Sponsor Confidential Manage Vendor relationship Approval of resources and budget Authorize changes in the contract Provide final resolution of escalated issues and conflicts on behalf of Client Periodic reviews of the project status and reporting to Client management Plan and manage Vmoksha’s resources and activities Coordination with Vmoksha project team Clie nt Proj ect Man ager
  • 15.
    Client logo 14 Confidential Coordinate reviews & acceptance of deliverables Report status updates to client’s business sponsors Maintain the overall project plan Accept & Approve deliverables Client SME Resolve queries raised by Vmoksha team at onsite and offshore PM Provide existing system understanding to Vmoksha team Arrange User Acceptance Testing (UAT) Vmoksha Project Sponsor Overall responsibility for Vmoksha service commitments Authority to approve any engagement defining contract or documents or any changes that affect project cost Single point of contact for client on any project related issues as escalation Periodic reviews of the project status with GDE, PM and Client Provide inputs for management status reviews Participate in management reviews and teleconferences Facilitate preparation and release of all deliverables Ensure overall quality of the project and on-time delivery Capture and constantly review metrics and productivity figures for the project. Vmoksha Global Delivery Executive (GDE) Provide overall leadership to the project team Mobilize project team and other required resources Arrange technical and subject matter experts for the team Accountable for the scope of the work, including budget, schedule, and quality requirements of the deliverables Approve all change requests which are having no impact on project cost Review the project progress with PM and client Vmoksha Onsite coordinator Coordination day to day project activities with client Help offshore team on functional/design knowledge Review deliverables Arrange to resolve technical queries Integration and support user acceptance testing
  • 16.
    Client logo 15 Confidential Project deployment, version rollouts/post implementation support Vmoksha Project Manager Create the project plan and Statement of Work Set up development/test environment Understand the architecture and functional overview of the system/identified business functions Assign tasks to team and monitors the progress Ensure conformance to standards & guidelines Coordinate day to day project activities with onsite, client and project team Status reporting, reviews of deliverables, manage change and acceptance procedures Coordinate with Global Delivery Manager and client PM on progress and issues Obtain project completion sign off from Client PM Vmoksha Project Team Understand functional and technical requirements Create Test Plans, carry out coding, testing and peer reviews Escalate issues to the Project Manager Log the Test results in the Test plans and close defects Incorporate change requests Create necessary system documentation Impart users training Vmoksha QA/QC Team Ensure Process conformance/ adherence for testing, tailored software Analyze test results/metrics data and utilize the results for performance/ quality improvement in the project 4.5.2 Communication Management Communications management establishes reports and dialogues that ensure constant flow of key project information among the project team members, with client’s stakeholders, and with Vmoksha’s Project oversight mechanisms. These mechanisms ensure that everyone is informed of project status, and that arising issues can be handled promptly Team members will prepare weekly status reports for the Vmoksha Project Manager, who will then aggregate the reports and provide a weekly status report to the client’s Project Manager/Sponsor and Vmoksha Management.
  • 17.
    Client logo Similarly,the Vmoksha Project Manager will conduct weekly team status meetings to ensure that we are executing against plan and effectively addressing project dynamics. This discussion includes project status, issues, workload, and client’s priorities The Vmoksha Project Manager will participate in the monthly project review conducted at Vmoksha office. The objective of this review is to ensure the project is using the best practices incorporated into Vmoksha’s methodology and that client’s satisfaction is maintained An issue is defined as any item that adversely affects the execution of the project. Issues may adversely impact the project’s cost, timeframe, and quality of the deliverable and/or level of service.  Team members should document issues in their Individual Status Reports  However, issues may also be raised during the client’s Status Meeting, Project T eam Meeting or via e-mail  Issues are retained for the life of the project  Every record in the Issue Log contains a description of the issue, actual or potential impact if not resolved, who raised the issue, when the issue was raised, updates, and final resolution  Every issue has:  A target date for resolution after which the project may be impacted  An owner responsible for driving resolution and keeping the Vmoksha Project Manager up to date on progress 4  An extract of the Issue Log is reviewed in the weekly client’s Status Review and weekly T eam Meetings 16 Using the weekly status report as the agenda, the Vmoksha Project Manager will conduct weekly status meetings with the client’s Project Manager/Sponsor and other appropriate client’s personnel 4.5.3 Issue Management In order to ensure adequate and timely management of project related issues, Vmoksha will implement its issue management procedures in this project as described below: 1  Any team member (Vmoksha or client) may raise an issue to the Vmoksha Project Manager 2  Issues are recorded into a Project Issue Log 3  An extract of the Issue Log will be attached to the weekly Project Status Report and reviewed in the weekly client’s Status Review meetings as well as in the team meetings  The extract includes open issues and issues closed since last status 5  Issues are closed only when the initiator is comfortable that the resolution addresses his/her problem Confidential
  • 18.
    Client logo Vmoksharecognizes that changes are a normal part of the project life cycle and that managing change is critical to the project’s ultimate success. Should any out of scope items be required, Vmoksha or customer can invoke a mutually agreed upon Change Management procedure. Vmoksha and the client understand that the spirit of change management is to communicate, document and control the impact of changes to project scope on level of effort and deadlines o The Vmoksha project team will document the change, including a description of the change and the o The authorized client resource will approve or reject the change proposed in a timely manner. o Vmoksha maintains focus on approved work (per the SOW) until amended through an approved There may be instances where an issue needs to be escalated. Vmoksha proposes to follow the proposed Project Organization Structure for any escalation 17 4.5.4 Change Request Management and Escalation A high level overview of the Change Management process is as follows: impact on costs, staffing, deliverables, and project schedule Vmoksha expects acceptance within 3 business days o No work associated with the change request will begin until the change is approved Advantages to client include: o Able to decide if a change is worth the impact to schedule, cost or level of s ervice change request 4.5.5 Qual i ty Management  Internal QA procedures that Vmoksha will in this project are: - o Quality Assurance Process - Independent audits conducted on regular basis - Pre Audit - Project Execution Audit - Post Audit Confidential
  • 19.
    Client logo The purpose of Risk management is to minimize the impact on schedule, cost, or level of service  Vmoksha approach to Risk Management is guided by its Project Risk Management Procedure (PRMP) which is practiced throughout the life of the project to identify risks, predict the probability of the risks occurring, quantify the impact should thru occur, and develop a plan for undertaking the mitigation actions.  The PRMP is updated periodically throughout the project. These risks are reviewed with the Client in the periodic Status Review and with Vmoksha Management and also in the Monthly Internal Vmoksha Project Reviews  Vmoksha has defined deliverables throughout the life of the project. These are the elements that move the project towards final completion of the scope as defined in the SOW. Acceptance of a deliverable means that client agrees that the deliverable meets the acceptance criteria that are defined for that deliverable and that it can be used as input to related future deliverables when appropriate  Acceptance of deliverables on a timely basis is critical in order to avoid delays to the project. To obtain acceptance, Vmoksha provides the deliverable to the appropriate and authorized client representative for review, accompanied by a Product/Task Acceptance Form. The Acceptance Form includes a description of the deliverable and restates the acceptance criteria defined in the Statement of Work for that deliverable. 18 - Lessons Learned - Corrective action, risk control planning o Quality Control - Peer reviews o Onsite Support - Monthly Project Review with Branch Management 4.5.6 Risk Management 4.5.7 Acceptance Management Confidential
  • 20.
    Client logo Vmoksha will schedule and conduct a walk-through for each deliverable to be approved. Acceptance of the deliverable will be based upon pre-defined acceptance criteria and provided in writing. If a deliverable is rejected, client will document the inaccuracies and/or shortcomings against the acceptance criteria, so they can be corrected. Vmoksha expects client to submit acceptance within 2-3 business days of deliverable submission  Vmoksha will define the specific acceptance criteria for each deliverable (including final acceptance  Upon completion of the project, submission and acceptance of all project deliverables , the Vmoksha Project Manager will submit a Final Project Acceptance Form to the Client Project Manager/Sponsor for final acceptance. A Deliverable Acceptance Log will be provided, along with the Final Project Acceptance Form, to show that all deliverables have been accepted and approved. Vmoksha performs testing at all appropriate stages of the project life cycle and follows the butterfly model for validating the software. 19 and review time for each deliverable) in the Statement of Work 4.5.8 Testing Methodology Confidential  Vmoksha will develop the system test, integration and unit test specifications based on the functional requirements  Client will review and approve the test specifications  Client will provide the test data.  Vmoksha will test the system as per the test specifications
  • 21.
    Client logo Thebusiness functions identified in the request for information document provided by Client have been considered for preparing estimates. Any change to this list may result in changes to costs and schedules.  Any requirements identified during the project that are not covered by this proposal will go through  Client will make available entire software code, executables & documentation of the existing system  Client must sign off all the deliverables as specified in the mutually agreed project plan. If no feedback is received within 1 week of the mutually agreed date, the deliverable will be deemed as accepted.  Client Subject Matter Experts and IT team will be made available to Vmoksha project team, for seeking clarifications on the business requirements, Operational and technical details on the existing systems and system installation  Client single point of contact will ensure timely resolution of all queries/issues raised by Vmoksha  It is assumed that Client will be able to complete the acceptance testing of new system within a period as planned. If due to any reason, this effort goes beyond the stipulated duration, Vmoksha would provide the support during on T&M basis  Availability of necessary office space, desktop/laptop computers, email and other communication, office facilities, Functional & Technical SMEs for Vmoksha executives in Client to execute onsite project activity 5.5 Lead Time Two (2) weeks of Lead-time is typically necessary between proposal sign off and commencement of work. 20 5 Project Estimates and Commercials 5.3 Assumptions  The estimation has been done based on RFP (requirement) documents provided by Client: the change request management procedure.  Client will provide office facilities to Vmoksha Project Team while working at onsite within 24 hours 5.4 Dependencies Vmoksha envisages the following dependencies while executing the assignment. Lack of timely input of these is likely to adversely affect the project schedules and design decisions. Confidential
  • 22.
    Client logo 21 5.6 Commercials 5.7 Project Schedule A brief schema of the project execution plan is shown below: Confidential Phases M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 Business Requirement Analysis System Design Development System Integration Testing Implementation (TST & PRD) Knowledge Transfer 5.8 Post Implementation Support 5.9 Payment Terms & Conditions
  • 23.
    Client logo 22 6 Annexures Annexures will include  Brief about the company  Case studies  References if asked by client  Any other related information requested by client Confidential