Submitted
(50%)
Approved with
Comments
(75%)
Approved
(100%)
Total
1 SFO/003/2015/GD/WBA/1001 Quality Plan 0.250 0.125 - 0.125 0.250 Approved
2 SFO/003/2015/GD/WBA/1002 HSE Plan 0.250 0.125 - 0.125 0.250 Approved
3 SFO/003/2015/GD/WBA/1003 Electrical MAS List 0.250 0.125 - 0.125 0.250 Approved
4 SFO/003/2015/GD/WBA/1004 Civil MAS List 0.250 0.125 - 0.125 0.250 Approved
5 SFO/003/2015/GD/WBA/1005 Consultancy Approval 0.250 0.125 - 0.125 0.250 Approved
6 SFO/003/2015/GD/WBA/1006 Project Execution Plan & Progress Weightage 0.250 0.125 - 0.125 0.250 Approved
7 SFO/003/2015/GD/WBA/1007 Project Organogram 0.250 0.125 - 0.125 0.250 Approved
8 SFO/003/2015/GD/WBA/1008 Civil Sub contractor 0.250 0.125 - 0.125 0.250 Approved
9 SFO/003/2015/GD/WBA/1009 Project Sign Board 0.250 0.125 - 0.125 0.250 Approved
10 SFO/003/2015/GD/WBA/1010 Document Control Schedule 0.250 0.125 - 0.125 0.250 Approved
2.500 1.250 0.000 1.250 2.500
Tender No : 03 / 2015
Upgrading of Wadi Bani Auf Primary Substation from 1 x 6 MVA to 1 x 20 MVA ( 33 / 11 kV) at Rustaq in South Batinah Governorate
TOTAL
Status
GENERAL DOCUMENTS
PlannedDescriptionDrawing NumberSI. No.
Actual
Submitted
(50%)
Approved with
Comments
(75%)
Approved
(100%)
Total
Tender No : 03 / 2015
Upgrading of Wadi Bani Auf Primary Substation from 1 x 6 MVA to 1 x 20 MVA ( 33 / 11 kV) at Rustaq in South Batinah Governorate
StatusPlannedDescriptionDrawing NumberSI. No.
Actual
1 03/2015/WBA/C/1001 Site Plan 0.200 0.100 - 0.100 0.200 Approved
2 03/2015/WBA/C/1002 Cable Cellar Plan 0.200 0.100 - 0.100 0.200 Approved
3 03/2015/WBA/C/1003 Ground Floor Plan 0.200 0.100 - 0.100 0.200 Approved
4 03/2015/WBA/C/1004 Roof Plan & Sections 0.200 0.100 - 0.100 0.200 Approved
5 03/2015/WBA/C/1005 Elevations 0.200 0.100 - 0.100 0.200 Approved
6 03/2015/WBA/C/1006 Door & Window Schedule 0.200 0.100 - 0.100 0.200 Approved
7 03/2015/WBA/C/1007 General Architectural 0.200 0.100 - 0.100 0.200 Approved
8 03/2015/WBA/C/1008 Site Grading Plan & Details 0.200 0.100 - 0.100 0.200 Approved
9 03/2015/WBA/C/1009 Water Supply Layout 0.200 0.100 - 0.100 0.200 Approved
10 03/2015/WBA/C/1010 Drainage Layout 0.200 0.100 - 0.100 0.200 Approved
11 03/2015/WBA/C/1011 Contour Plan 0.200 0.100 - 0.100 0.200 Approved
12 03/2015/WBA/C/1012 Site Plan 0.130 0.065 - 0.065 0.130 Approved
13 03/2015/WBA/C/1013 Cable Cellar Plan 0.130 0.065 - 0.065 0.130 Approved
14 03/2015/WBA/C/1014 Ground Floor Plan 0.130 0.065 - 0.065 0.130 Approved
15 03/2015/WBA/C/1015 Roof Plan & Sections 0.120 0.060 - 0.060 0.120 Approved
16 03/2015/WBA/C/1016 Elevations 0.100 0.050 - 0.050 0.100 Approved
17 03/2015/WBA/C/1017 Column Layout 0.130 0.065 - 0.065 0.130 Approved
18 03/2015/WBA/C/1018 Foundation Layout 0.130 0.065 - 0.065 0.130 Approved
19 03/2015/WBA/C/1019 Plinth Beam Layout 0.130 0.065 - 0.065 0.130 Approved
20 03/2015/WBA/C/1020 Ground Floor Slab Layout 0.130 0.065 - 0.065 0.130 Approved
21 03/2015/WBA/C/1021 Roofl Slab & Beam 0.130 0.065 - 0.065 0.130 Approved
22 03/2015/WBA/C/1022 Ladder & Handrail details 0.130 0.065 - 0.065 0.130 Approved
23 03/2015/WBA/C/1023 Gate & Compound wall details 0.130 0.065 - 0.065 0.130 Approved
24 03/2015/WBA/C/1024 GA for 20 MVA Transformer Foundation 0.130 0.065 - 0.065 0.130 Approved
25 03/2015/WBA/C/1025 RC Details of 20 MVA Transformer 0.130 0.065 - 0.065 0.130 Approved
26 03/2015/WBA/C/1026 Capacitor bank & Aux. Transformer Foundation 0.130 0.065 - 0.065 0.130 Approved
27 03/2015/WBA/C/1027 Cable Trench details 0.250 0.125 - 0.125 0.250 Approved
CIVIL DRAWINGS
Submitted
(50%)
Approved with
Comments
(75%)
Approved
(100%)
Total
Tender No : 03 / 2015
Upgrading of Wadi Bani Auf Primary Substation from 1 x 6 MVA to 1 x 20 MVA ( 33 / 11 kV) at Rustaq in South Batinah Governorate
StatusPlannedDescriptionDrawing NumberSI. No.
Actual
28 03/2015/WBA/C/1028 Capacitor bank shed 0.130 0.065 - 0.065 0.130 Approved
29 03/2015/WBA/C/1029 20 MVA Transformer Shed 0.130 0.065 - 0.065 0.130 Approved
30 03/2015/WBA/C/1030 Holding Tank details 0.130 0.065 - 0.065 0.130 Approved
31 03/2015/WBA/C/1031 General Structural Details 0.250 0.125 - 0.125 0.250 Approved
5.000 2.500 0.000 2.500 5.000
1 03/2015/WBA/E/1001 Key SLD 0.100 0.050 0.025 - 0.075 Approved with Comments
2 03/2015/WBA/E/1002 33kV SLD 0.100 0.050 0.025 - 0.075 Approved with Comments
3 03/2015/WBA/E/1003 11kV SLD 0.100 0.050 0.025 - 0.075 Approved with Comments
4 03/2015/WBA/E/1004 415V SLD 0.150 0.075 - 0.075 0.150 Approved
5 03/2015/WBA/E/1005 110V SLD 0.150 0.075 - 0.075 0.150 Approved
6 03/2015/WBA/E/1006 33KV BLD SH.1-5 0.150 0.075 0.038 - 0.113 Approved with Comments
7 03/2015/WBA/E/1007 11KV BLD SH.1-16 0.150 0.075 0.038 - 0.113 Approved with Comments
8 03/2015/WBA/E/1008 Overall Layout 0.150 0.075 0.038 - 0.113 Approved with Comments
9 03/2015/WBA/E/1009 Control Building 0.150 0.075 0.038 - 0.113 Approved with Comments
10 03/2015/WBA/E/1010 Overall grounding 0.150 0.075 - 0.075 0.150 Approved
11 03/2015/WBA/E/1011 Equp.Earthing 0.150 0.075 - 0.075 0.150 Approved
12 03/2015/WBA/E/1012 Cable Trench Layout_Sh.1 to 3 0.150 0.075 0.038 - 0.113 Approved with Comments
13 03/2015/WBA/E/1013 Lightning protection_Sh.1 to 2 0.150 0.075 0.038 - 0.113 Approved with Comments
14 03/2015/WBA/E/1014 Lighting - Sh.1 to 5 0.150 0.075 0.038 - 0.113 Approved with Comments
15 03/2015/WBA/E/1015 STD Earthing_Sh.1 to 2 0.150 0.075 - 0.075 0.150 Approved
2.100 1.050 0.338 0.375 1.763
TOTAL
ELECTRICAL DRAWINGS
TOTAL
Submitted
(50%)
Approved with
Comments
(75%)
Approved
(100%)
Total
Tender No : 03 / 2015
Upgrading of Wadi Bani Auf Primary Substation from 1 x 6 MVA to 1 x 20 MVA ( 33 / 11 kV) at Rustaq in South Batinah Governorate
StatusPlannedDescriptionDrawing NumberSI. No.
Actual
1 SFO/003/2015/CAL/WBA/1001 33KV CT (Protection & Metering) Sizing & PT sizing calculation 0.250 0.125 0.063 - 0.188 Approved with Comments
2 SFO/003/2015/CAL/WBA/1002 11KV CT (Protection & Metering) Sizing & PT sizing calculation 0.250 0.125 - 0.125 0.250 Approved
3 SFO/003/2015/CAL/WBA/1003 Grounding Conductor Sizing Calculation 0.250 0.125 - 0.125 0.250 Approved
4 SFO/003/2015/CAL/WBA/1004 Grounding Step & Touch Potential Calculation 0.250 0.125 - 0.125 0.250 Approved
5 SFO/003/2015/CAL/WBA/1005 Sizing of 110V Battery Load Cycle calculation 0.250 - - - -
6 SFO/003/2015/CAL/WBA/1006 SCADA I/O List 0.250 0.125 - 0.125 0.250 Approved
7 SFO/003/2015/CAL/WBA/1007 Power Cable Schedule 0.250 - - - -
8 SFO/003/2015/CAL/WBA/1008 Control Cable Schedule 0.250 - - - -
9 SFO/003/2015/CAL/WBA/1009 Control cable Interconnection chart 0.250 - - - -
10 SFO/003/2015/CAL/WBA/1010 Lighting Calculation for Indoor & Outdoor 0.200 0.100 - 0.100 0.200 Approved
11 SFO/003/2015/CAL/WBA/1011 Relay Setting Calculations 0.250 - - - -
12 SFO/003/2015/CAL/WBA/1012 Exhaust Fan Air Flow Calculation 0.100 - - - -
13 SFO/003/2015/CAL/WBA/1013 Power Cable Calculation 0.100 - - - -
2.900 0.725 0.063 0.600 1.388TOTAL
ELECTRICAL CALCULATIONS
1
2
3
4
Planned
2.500
Tender No : 03 / 2015
Upgrading of Wadi Bani Auf Primary Substation from 1 x 6 MVA to 1 x 20 MVA ( 33 / 11 kV) at Rustaq in South Batinah Governorate
DOCUMENT CONTROL SCHEDULE - SUMMARY
SI. No. Description Actual Remarks
General Documents
Civil Drawings 5.0005.000
2.500
1.763
1.388
Electrical Drawings
Electrical Calculation
GRAND TOTAL 12.500 10.650
2.100
2.900
Submitted
(50%)
Approved with
Comments
(75%)
Approved
(100%)
Total
1 03/2015/WBA/MAS/1001 33kV AIS 1.100 0.550 - 0.550 1.100 Approved
2 03/2015/WBA/MAS/1002 33kV CONTROL AND RELAY PANEL 1.050 0.525 - 0.525 1.050 Approved
3 03/2015/WBA/MAS/1003 33kV PROTECTION RELAYS 0.350 0.175 - 0.175 0.350 Approved
4 03/2015/WBA/MAS/1004 11kV AIS 1.500 0.750 - 0.750 1.500 Approved
5 03/2015/WBA/MAS/1005 11kV PROTECTION RELAYS 0.350 0.175 - 0.175 0.350 Approved
6 03/2015/WBA/MAS/1006 500kVA TRANSFORMER 0.300 0.150 - 0.150 0.300 Approved
7 03/2015/WBA/MAS/1007 LVAC 0.300 0.150 - 0.150 0.300 Approved
8 03/2015/WBA/MAS/1008 RTU 0.300 0.150 - 0.150 0.300 Approved
9 03/2015/WBA/MAS/1009 GPRS 0.300 0.150 - 0.150 0.300 Approved
10 03/2015/WBA/MAS/1010 GPS 0.300 0.150 - 0.150 0.300 Approved
11 03/2015/WBA/MAS/1011 33kV & 11kV SCADA MARSHALLING PANEL 0.300 0.150 - 0.150 0.300 Approved
12 03/2015/WBA/MAS/1012 DISTRIBUTION BOARD 0.300 0.150 - 0.150 0.300 Approved
13 03/2015/WBA/MAS/1013 STATION COMMUNICATION SWITCH 0.300 0.150 - 0.150 0.300 Approved
14 03/2015/WBA/MAS/1014 LV POWER & CONTROL CABLE 0.200 0.100 - 0.100 0.200 Approved
15 03/2015/WBA/MAS/1015 LIGHTING 0.200 0.100 - 0.100 0.200 Approved
16 03/2015/WBA/MAS/1016 EARTHING & LIGHTNING 0.200 0.100 - 0.100 0.200 Approved
17 03/2015/WBA/MAS/1017 FIRE ALARM SYSTEM 0.200 0.100 - 0.100 0.200 Approved
18 03/2015/WBA/MAS/1018 CABLE TRAYS 0.200 0.100 - 0.100 0.200 Approved
19 03/2015/WBA/MAS/1019 EXHAUST FAN 0.100 0.050 - 0.050 0.100 Approved
20 03/2015/WBA/MAS/1020 SWITCH SOCKET ACCESSORIES 0.100 0.050 - 0.050 0.100 Approved
21 03/2015/WBA/MAS/1021 GI CONDUIT AND FITTINGS 0.100 0.050 - 0.050 0.100 Approved
MATERIAL APPROVAL
Tender No : 03 / 2015
Upgrading of Wadi Bani Auf Primary Substation from 1 x 6 MVA to 1 x 20 MVA ( 33 / 11 kV) at Rustaq in South Batinah Governorate
SI. No. Drawing Number Description Planned
Actual
Status
Submitted
(50%)
Approved with
Comments
(75%)
Approved
(100%)
Total
Tender No : 03 / 2015
Upgrading of Wadi Bani Auf Primary Substation from 1 x 6 MVA to 1 x 20 MVA ( 33 / 11 kV) at Rustaq in South Batinah Governorate
SI. No. Drawing Number Description Planned
Actual
Status
22 03/2015/WBA/MAS/1022 PVC DUCT 0.100 0.050 - 0.050 0.100 Approved
23 03/2015/WBA/MAS/1023 POWER QUALITY METER 0.150 0.075 - 0.075 0.150 Approved
8.300 4.150 - 4.150 8.300
1 03/2015/WBA/VD/1001 33kV AIS 1.500 0.750 - 0.750 1.500 Approved
2 03/2015/WBA/VD/1002 33kV CONTROL & RELAY PANEL 1.500 0.750 - 0.750 1.500 Approved
3 03/2015/WBA/VD/1003 11kV AIS 2.500 1.250 - 1.250 2.500 Approved
4 03/2015/WBA/VD/1004 500kVA TRANSFORMER 0.350 0.175 - 0.175 0.350 Approved
5 03/2015/WBA/VD/1005 LVAC 0.350 0.175 - 0.175 0.350 Approved
6 03/2015/WBA/VD/1006 RTU SCADA SYSTEM 0.500 0.250 - 0.250 0.500 Approved
7 03/2015/WBA/VD/1007 33kV & 11kV SCADA MARSHALLING PANEL 0.250 0.125 - 0.125 0.250 Approved
8 03/2015/WBA/VD/1008 DISTRIBUTION BOARD 0.250 - - - -
7.200 3.475 - 3.475 6.950
TOTAL
VENDOR DRAWINGS
TOTAL
SI. No. Description Planned Actual Status
1 33kV AIS 1.500 1.500
2 11kV SWITCHGEAR 2.600 2.600
3 500kVA AUXILIARY TRANSFORMER 0.350 0.350
4 33kV CONTROL AND RELAY PANEL 0.750 0.750
5 LV POWER & CONTROL CABLES 0.350 0.350
6 EARTHING & LIGHTNING SYSTEM 0.350 0.350
7 LVAC 0.350 0.350
8 DISTRIBUTION BOARD 0.200
9 RTU SCADA SYSTEM 0.350 0.350
10 33kV & 11kV SCADA MARSHALLING PANEL 0.200 0.200
7.000 6.800
Tender No : 03 / 2015
Upgrading of Wadi Bani Auf Primary Substation from 1 x 6 MVA to 1 x 20 MVA ( 33 / 11 kV) at Rustaq in South Batinah Governorate
TOTAL
MANFACTURING CLEARANCE
SI. No. Description Planned Actual Status
Tender No : 03 / 2015
Upgrading of Wadi Bani Auf Primary Substation from 1 x 6 MVA to 1 x 20 MVA ( 33 / 11 kV) at Rustaq in South Batinah Governorate
1 33 kV AIS 0.300 0.300
2 11 kV SWITCHGEAR 0.800
3 33 kV CONTROL AND RELAY PANEL 0.300 0.300
4 RTU SCADA SYSTEM 0.300 0.300
1.700 0.900
FACTORY ACCEPTANCE TEST
TOTAL
SI. No. Description Planned Actual Status
Tender No : 03 / 2015
Upgrading of Wadi Bani Auf Primary Substation from 1 x 6 MVA to 1 x 20 MVA ( 33 / 11 kV) at Rustaq in South Batinah Governorate
1 33 kV AIS 1.500 1.500
2 11 kV SWITCHGEAR 2.000
3 500 kVA AUXILIARY TRANSFORMER 0.300 0.300
4 33 kV CONTROL AND RELAY PANEL 0.350 0.350
5 LV POWER & CONTROL CABLES 0.350 0.175
6 EARTHING & LIGHTNING SYSTEM 0.350
7 LVAC 0.200 0.100
8 DISTRIBUTION BOARD 0.200
9 RTU SCADA SYSTEM 0.350 0.350
10 33kV & 11kV SCADA MARSHALLING PANEL 0.200 0.200
5.800 2.975TOTAL
DELIVERY
SI. No. Description Planned Actual Status
Tender No : 03 / 2015
Upgrading of Wadi Bani Auf Primary Substation from 1 x 6 MVA to 1 x 20 MVA ( 33 / 11 kV) at Rustaq in South Batinah Governorate
1 MATERIAL APPROVAL 8.300 8.300
2 VENDOR DRAWING 7.200 6.950
3 MANUFACTURING CLEARANCE 7.000 6.800
4 FACTORY ACCEPTANCE TEST 1.700 0.900
5 DELIVERY 5.800 2.975
30.000 25.925TOTAL
SUMMARY

Annexures

  • 2.
    Submitted (50%) Approved with Comments (75%) Approved (100%) Total 1 SFO/003/2015/GD/WBA/1001Quality Plan 0.250 0.125 - 0.125 0.250 Approved 2 SFO/003/2015/GD/WBA/1002 HSE Plan 0.250 0.125 - 0.125 0.250 Approved 3 SFO/003/2015/GD/WBA/1003 Electrical MAS List 0.250 0.125 - 0.125 0.250 Approved 4 SFO/003/2015/GD/WBA/1004 Civil MAS List 0.250 0.125 - 0.125 0.250 Approved 5 SFO/003/2015/GD/WBA/1005 Consultancy Approval 0.250 0.125 - 0.125 0.250 Approved 6 SFO/003/2015/GD/WBA/1006 Project Execution Plan & Progress Weightage 0.250 0.125 - 0.125 0.250 Approved 7 SFO/003/2015/GD/WBA/1007 Project Organogram 0.250 0.125 - 0.125 0.250 Approved 8 SFO/003/2015/GD/WBA/1008 Civil Sub contractor 0.250 0.125 - 0.125 0.250 Approved 9 SFO/003/2015/GD/WBA/1009 Project Sign Board 0.250 0.125 - 0.125 0.250 Approved 10 SFO/003/2015/GD/WBA/1010 Document Control Schedule 0.250 0.125 - 0.125 0.250 Approved 2.500 1.250 0.000 1.250 2.500 Tender No : 03 / 2015 Upgrading of Wadi Bani Auf Primary Substation from 1 x 6 MVA to 1 x 20 MVA ( 33 / 11 kV) at Rustaq in South Batinah Governorate TOTAL Status GENERAL DOCUMENTS PlannedDescriptionDrawing NumberSI. No. Actual
  • 3.
    Submitted (50%) Approved with Comments (75%) Approved (100%) Total Tender No: 03 / 2015 Upgrading of Wadi Bani Auf Primary Substation from 1 x 6 MVA to 1 x 20 MVA ( 33 / 11 kV) at Rustaq in South Batinah Governorate StatusPlannedDescriptionDrawing NumberSI. No. Actual 1 03/2015/WBA/C/1001 Site Plan 0.200 0.100 - 0.100 0.200 Approved 2 03/2015/WBA/C/1002 Cable Cellar Plan 0.200 0.100 - 0.100 0.200 Approved 3 03/2015/WBA/C/1003 Ground Floor Plan 0.200 0.100 - 0.100 0.200 Approved 4 03/2015/WBA/C/1004 Roof Plan & Sections 0.200 0.100 - 0.100 0.200 Approved 5 03/2015/WBA/C/1005 Elevations 0.200 0.100 - 0.100 0.200 Approved 6 03/2015/WBA/C/1006 Door & Window Schedule 0.200 0.100 - 0.100 0.200 Approved 7 03/2015/WBA/C/1007 General Architectural 0.200 0.100 - 0.100 0.200 Approved 8 03/2015/WBA/C/1008 Site Grading Plan & Details 0.200 0.100 - 0.100 0.200 Approved 9 03/2015/WBA/C/1009 Water Supply Layout 0.200 0.100 - 0.100 0.200 Approved 10 03/2015/WBA/C/1010 Drainage Layout 0.200 0.100 - 0.100 0.200 Approved 11 03/2015/WBA/C/1011 Contour Plan 0.200 0.100 - 0.100 0.200 Approved 12 03/2015/WBA/C/1012 Site Plan 0.130 0.065 - 0.065 0.130 Approved 13 03/2015/WBA/C/1013 Cable Cellar Plan 0.130 0.065 - 0.065 0.130 Approved 14 03/2015/WBA/C/1014 Ground Floor Plan 0.130 0.065 - 0.065 0.130 Approved 15 03/2015/WBA/C/1015 Roof Plan & Sections 0.120 0.060 - 0.060 0.120 Approved 16 03/2015/WBA/C/1016 Elevations 0.100 0.050 - 0.050 0.100 Approved 17 03/2015/WBA/C/1017 Column Layout 0.130 0.065 - 0.065 0.130 Approved 18 03/2015/WBA/C/1018 Foundation Layout 0.130 0.065 - 0.065 0.130 Approved 19 03/2015/WBA/C/1019 Plinth Beam Layout 0.130 0.065 - 0.065 0.130 Approved 20 03/2015/WBA/C/1020 Ground Floor Slab Layout 0.130 0.065 - 0.065 0.130 Approved 21 03/2015/WBA/C/1021 Roofl Slab & Beam 0.130 0.065 - 0.065 0.130 Approved 22 03/2015/WBA/C/1022 Ladder & Handrail details 0.130 0.065 - 0.065 0.130 Approved 23 03/2015/WBA/C/1023 Gate & Compound wall details 0.130 0.065 - 0.065 0.130 Approved 24 03/2015/WBA/C/1024 GA for 20 MVA Transformer Foundation 0.130 0.065 - 0.065 0.130 Approved 25 03/2015/WBA/C/1025 RC Details of 20 MVA Transformer 0.130 0.065 - 0.065 0.130 Approved 26 03/2015/WBA/C/1026 Capacitor bank & Aux. Transformer Foundation 0.130 0.065 - 0.065 0.130 Approved 27 03/2015/WBA/C/1027 Cable Trench details 0.250 0.125 - 0.125 0.250 Approved CIVIL DRAWINGS
  • 4.
    Submitted (50%) Approved with Comments (75%) Approved (100%) Total Tender No: 03 / 2015 Upgrading of Wadi Bani Auf Primary Substation from 1 x 6 MVA to 1 x 20 MVA ( 33 / 11 kV) at Rustaq in South Batinah Governorate StatusPlannedDescriptionDrawing NumberSI. No. Actual 28 03/2015/WBA/C/1028 Capacitor bank shed 0.130 0.065 - 0.065 0.130 Approved 29 03/2015/WBA/C/1029 20 MVA Transformer Shed 0.130 0.065 - 0.065 0.130 Approved 30 03/2015/WBA/C/1030 Holding Tank details 0.130 0.065 - 0.065 0.130 Approved 31 03/2015/WBA/C/1031 General Structural Details 0.250 0.125 - 0.125 0.250 Approved 5.000 2.500 0.000 2.500 5.000 1 03/2015/WBA/E/1001 Key SLD 0.100 0.050 0.025 - 0.075 Approved with Comments 2 03/2015/WBA/E/1002 33kV SLD 0.100 0.050 0.025 - 0.075 Approved with Comments 3 03/2015/WBA/E/1003 11kV SLD 0.100 0.050 0.025 - 0.075 Approved with Comments 4 03/2015/WBA/E/1004 415V SLD 0.150 0.075 - 0.075 0.150 Approved 5 03/2015/WBA/E/1005 110V SLD 0.150 0.075 - 0.075 0.150 Approved 6 03/2015/WBA/E/1006 33KV BLD SH.1-5 0.150 0.075 0.038 - 0.113 Approved with Comments 7 03/2015/WBA/E/1007 11KV BLD SH.1-16 0.150 0.075 0.038 - 0.113 Approved with Comments 8 03/2015/WBA/E/1008 Overall Layout 0.150 0.075 0.038 - 0.113 Approved with Comments 9 03/2015/WBA/E/1009 Control Building 0.150 0.075 0.038 - 0.113 Approved with Comments 10 03/2015/WBA/E/1010 Overall grounding 0.150 0.075 - 0.075 0.150 Approved 11 03/2015/WBA/E/1011 Equp.Earthing 0.150 0.075 - 0.075 0.150 Approved 12 03/2015/WBA/E/1012 Cable Trench Layout_Sh.1 to 3 0.150 0.075 0.038 - 0.113 Approved with Comments 13 03/2015/WBA/E/1013 Lightning protection_Sh.1 to 2 0.150 0.075 0.038 - 0.113 Approved with Comments 14 03/2015/WBA/E/1014 Lighting - Sh.1 to 5 0.150 0.075 0.038 - 0.113 Approved with Comments 15 03/2015/WBA/E/1015 STD Earthing_Sh.1 to 2 0.150 0.075 - 0.075 0.150 Approved 2.100 1.050 0.338 0.375 1.763 TOTAL ELECTRICAL DRAWINGS TOTAL
  • 5.
    Submitted (50%) Approved with Comments (75%) Approved (100%) Total Tender No: 03 / 2015 Upgrading of Wadi Bani Auf Primary Substation from 1 x 6 MVA to 1 x 20 MVA ( 33 / 11 kV) at Rustaq in South Batinah Governorate StatusPlannedDescriptionDrawing NumberSI. No. Actual 1 SFO/003/2015/CAL/WBA/1001 33KV CT (Protection & Metering) Sizing & PT sizing calculation 0.250 0.125 0.063 - 0.188 Approved with Comments 2 SFO/003/2015/CAL/WBA/1002 11KV CT (Protection & Metering) Sizing & PT sizing calculation 0.250 0.125 - 0.125 0.250 Approved 3 SFO/003/2015/CAL/WBA/1003 Grounding Conductor Sizing Calculation 0.250 0.125 - 0.125 0.250 Approved 4 SFO/003/2015/CAL/WBA/1004 Grounding Step & Touch Potential Calculation 0.250 0.125 - 0.125 0.250 Approved 5 SFO/003/2015/CAL/WBA/1005 Sizing of 110V Battery Load Cycle calculation 0.250 - - - - 6 SFO/003/2015/CAL/WBA/1006 SCADA I/O List 0.250 0.125 - 0.125 0.250 Approved 7 SFO/003/2015/CAL/WBA/1007 Power Cable Schedule 0.250 - - - - 8 SFO/003/2015/CAL/WBA/1008 Control Cable Schedule 0.250 - - - - 9 SFO/003/2015/CAL/WBA/1009 Control cable Interconnection chart 0.250 - - - - 10 SFO/003/2015/CAL/WBA/1010 Lighting Calculation for Indoor & Outdoor 0.200 0.100 - 0.100 0.200 Approved 11 SFO/003/2015/CAL/WBA/1011 Relay Setting Calculations 0.250 - - - - 12 SFO/003/2015/CAL/WBA/1012 Exhaust Fan Air Flow Calculation 0.100 - - - - 13 SFO/003/2015/CAL/WBA/1013 Power Cable Calculation 0.100 - - - - 2.900 0.725 0.063 0.600 1.388TOTAL ELECTRICAL CALCULATIONS
  • 6.
    1 2 3 4 Planned 2.500 Tender No :03 / 2015 Upgrading of Wadi Bani Auf Primary Substation from 1 x 6 MVA to 1 x 20 MVA ( 33 / 11 kV) at Rustaq in South Batinah Governorate DOCUMENT CONTROL SCHEDULE - SUMMARY SI. No. Description Actual Remarks General Documents Civil Drawings 5.0005.000 2.500 1.763 1.388 Electrical Drawings Electrical Calculation GRAND TOTAL 12.500 10.650 2.100 2.900
  • 8.
    Submitted (50%) Approved with Comments (75%) Approved (100%) Total 1 03/2015/WBA/MAS/100133kV AIS 1.100 0.550 - 0.550 1.100 Approved 2 03/2015/WBA/MAS/1002 33kV CONTROL AND RELAY PANEL 1.050 0.525 - 0.525 1.050 Approved 3 03/2015/WBA/MAS/1003 33kV PROTECTION RELAYS 0.350 0.175 - 0.175 0.350 Approved 4 03/2015/WBA/MAS/1004 11kV AIS 1.500 0.750 - 0.750 1.500 Approved 5 03/2015/WBA/MAS/1005 11kV PROTECTION RELAYS 0.350 0.175 - 0.175 0.350 Approved 6 03/2015/WBA/MAS/1006 500kVA TRANSFORMER 0.300 0.150 - 0.150 0.300 Approved 7 03/2015/WBA/MAS/1007 LVAC 0.300 0.150 - 0.150 0.300 Approved 8 03/2015/WBA/MAS/1008 RTU 0.300 0.150 - 0.150 0.300 Approved 9 03/2015/WBA/MAS/1009 GPRS 0.300 0.150 - 0.150 0.300 Approved 10 03/2015/WBA/MAS/1010 GPS 0.300 0.150 - 0.150 0.300 Approved 11 03/2015/WBA/MAS/1011 33kV & 11kV SCADA MARSHALLING PANEL 0.300 0.150 - 0.150 0.300 Approved 12 03/2015/WBA/MAS/1012 DISTRIBUTION BOARD 0.300 0.150 - 0.150 0.300 Approved 13 03/2015/WBA/MAS/1013 STATION COMMUNICATION SWITCH 0.300 0.150 - 0.150 0.300 Approved 14 03/2015/WBA/MAS/1014 LV POWER & CONTROL CABLE 0.200 0.100 - 0.100 0.200 Approved 15 03/2015/WBA/MAS/1015 LIGHTING 0.200 0.100 - 0.100 0.200 Approved 16 03/2015/WBA/MAS/1016 EARTHING & LIGHTNING 0.200 0.100 - 0.100 0.200 Approved 17 03/2015/WBA/MAS/1017 FIRE ALARM SYSTEM 0.200 0.100 - 0.100 0.200 Approved 18 03/2015/WBA/MAS/1018 CABLE TRAYS 0.200 0.100 - 0.100 0.200 Approved 19 03/2015/WBA/MAS/1019 EXHAUST FAN 0.100 0.050 - 0.050 0.100 Approved 20 03/2015/WBA/MAS/1020 SWITCH SOCKET ACCESSORIES 0.100 0.050 - 0.050 0.100 Approved 21 03/2015/WBA/MAS/1021 GI CONDUIT AND FITTINGS 0.100 0.050 - 0.050 0.100 Approved MATERIAL APPROVAL Tender No : 03 / 2015 Upgrading of Wadi Bani Auf Primary Substation from 1 x 6 MVA to 1 x 20 MVA ( 33 / 11 kV) at Rustaq in South Batinah Governorate SI. No. Drawing Number Description Planned Actual Status
  • 9.
    Submitted (50%) Approved with Comments (75%) Approved (100%) Total Tender No: 03 / 2015 Upgrading of Wadi Bani Auf Primary Substation from 1 x 6 MVA to 1 x 20 MVA ( 33 / 11 kV) at Rustaq in South Batinah Governorate SI. No. Drawing Number Description Planned Actual Status 22 03/2015/WBA/MAS/1022 PVC DUCT 0.100 0.050 - 0.050 0.100 Approved 23 03/2015/WBA/MAS/1023 POWER QUALITY METER 0.150 0.075 - 0.075 0.150 Approved 8.300 4.150 - 4.150 8.300 1 03/2015/WBA/VD/1001 33kV AIS 1.500 0.750 - 0.750 1.500 Approved 2 03/2015/WBA/VD/1002 33kV CONTROL & RELAY PANEL 1.500 0.750 - 0.750 1.500 Approved 3 03/2015/WBA/VD/1003 11kV AIS 2.500 1.250 - 1.250 2.500 Approved 4 03/2015/WBA/VD/1004 500kVA TRANSFORMER 0.350 0.175 - 0.175 0.350 Approved 5 03/2015/WBA/VD/1005 LVAC 0.350 0.175 - 0.175 0.350 Approved 6 03/2015/WBA/VD/1006 RTU SCADA SYSTEM 0.500 0.250 - 0.250 0.500 Approved 7 03/2015/WBA/VD/1007 33kV & 11kV SCADA MARSHALLING PANEL 0.250 0.125 - 0.125 0.250 Approved 8 03/2015/WBA/VD/1008 DISTRIBUTION BOARD 0.250 - - - - 7.200 3.475 - 3.475 6.950 TOTAL VENDOR DRAWINGS TOTAL
  • 10.
    SI. No. DescriptionPlanned Actual Status 1 33kV AIS 1.500 1.500 2 11kV SWITCHGEAR 2.600 2.600 3 500kVA AUXILIARY TRANSFORMER 0.350 0.350 4 33kV CONTROL AND RELAY PANEL 0.750 0.750 5 LV POWER & CONTROL CABLES 0.350 0.350 6 EARTHING & LIGHTNING SYSTEM 0.350 0.350 7 LVAC 0.350 0.350 8 DISTRIBUTION BOARD 0.200 9 RTU SCADA SYSTEM 0.350 0.350 10 33kV & 11kV SCADA MARSHALLING PANEL 0.200 0.200 7.000 6.800 Tender No : 03 / 2015 Upgrading of Wadi Bani Auf Primary Substation from 1 x 6 MVA to 1 x 20 MVA ( 33 / 11 kV) at Rustaq in South Batinah Governorate TOTAL MANFACTURING CLEARANCE
  • 11.
    SI. No. DescriptionPlanned Actual Status Tender No : 03 / 2015 Upgrading of Wadi Bani Auf Primary Substation from 1 x 6 MVA to 1 x 20 MVA ( 33 / 11 kV) at Rustaq in South Batinah Governorate 1 33 kV AIS 0.300 0.300 2 11 kV SWITCHGEAR 0.800 3 33 kV CONTROL AND RELAY PANEL 0.300 0.300 4 RTU SCADA SYSTEM 0.300 0.300 1.700 0.900 FACTORY ACCEPTANCE TEST TOTAL
  • 12.
    SI. No. DescriptionPlanned Actual Status Tender No : 03 / 2015 Upgrading of Wadi Bani Auf Primary Substation from 1 x 6 MVA to 1 x 20 MVA ( 33 / 11 kV) at Rustaq in South Batinah Governorate 1 33 kV AIS 1.500 1.500 2 11 kV SWITCHGEAR 2.000 3 500 kVA AUXILIARY TRANSFORMER 0.300 0.300 4 33 kV CONTROL AND RELAY PANEL 0.350 0.350 5 LV POWER & CONTROL CABLES 0.350 0.175 6 EARTHING & LIGHTNING SYSTEM 0.350 7 LVAC 0.200 0.100 8 DISTRIBUTION BOARD 0.200 9 RTU SCADA SYSTEM 0.350 0.350 10 33kV & 11kV SCADA MARSHALLING PANEL 0.200 0.200 5.800 2.975TOTAL DELIVERY
  • 13.
    SI. No. DescriptionPlanned Actual Status Tender No : 03 / 2015 Upgrading of Wadi Bani Auf Primary Substation from 1 x 6 MVA to 1 x 20 MVA ( 33 / 11 kV) at Rustaq in South Batinah Governorate 1 MATERIAL APPROVAL 8.300 8.300 2 VENDOR DRAWING 7.200 6.950 3 MANUFACTURING CLEARANCE 7.000 6.800 4 FACTORY ACCEPTANCE TEST 1.700 0.900 5 DELIVERY 5.800 2.975 30.000 25.925TOTAL SUMMARY