1. Address:
173 G.T. Road, Panpara. (Near
Naoga),
P.O: Mullickpara,
Serampore. Dist: Hooghly.
West Bengal (INDIA)-712203.
Contact -
+91-9836119800(MOBILE)
ani.mukherjee2015@gmail.com
Aniruddha Mukherjee
Summary:
• Around 9 years of experience in IT industry.
• Understanding of SDLC (Software Development Lifecycle) and STLC (Software Testing Lifecycle).
• Understanding of CMM level work environment.
• Understanding of Testing processes and Concepts.
• Ability to understand the requirements (SRS) and create Test Scenarios and Test Cases.
• Ability to understand Business Requirements (DB related) received from client’s side.
• Ability to draw flow graph notations to confirm the system workflow with the clients/customers.
• Good understanding of various reporting to stakeholders by QA team.
• Good with DB and ability to create SQL queries.
• Good Automation understanding with QTP (in Keyword & Expert view).
• Worked with Selenium Test automation tool to check migrated data in a migration project.
• Know how of Object Oriented Approach.
• Good team player.
• Completed MBA (IT & Systems) from ICFAI University in the year 2009 with First Class.
• Global certification on Software Testing from HP Software University on Manual Testing concepts
(Test-Plans, Test-Scenarios, Phases of testing, Writing effective Test-cases, Etc.), QTP, Quality
Centre and Load Runner.
GENERAL ROLE IN THE PROJECTS
• Reviewing and understanding documents like BRS, SRS, and Test Plans.
• Design, develop and implement comprehensive QA test plans and test cases.
• Executing test cases and creating test logs
• Bug reporting
• Analyze test results, report defects and assist development team with issue resolution during all
phases of development.
• Preparing Functionality documents.
• Preparing user manuals for developed applications.
2. Skills:
Software Testing Skills • Manual Testing,
• Testing Tools:
° QTP (with VB scripting in expert view),
° QC,
° LR &
° PC.
° VSTS [ Performance testing ]
° Selenium (IDE)
° Eclipse
• Well versed with software development life cycle
(SDLC)
Languages C#.net, C++, JAVA, VB.net, HTML, UML (Concepts), VB-scripts.
RDBMS Microsoft SQL Server
Operating Systems Linux6.0, Linux9.1, Windows98, Windows2000, Windows
XP, Windows 7
SharePoint Suite SP 2007, SP 2010, SP 2013
Education
• MBA (IT & Systems) from ICFAI University in the year 2009.
• DIT (Diploma in IT) from NIIT in the year 2004.
• Bachelors in Science (3 Years) With Honours in Botany (Under: Burdwan University) in the year
2002.
Experience:
August 2010 – Present : Netwoven India Pvt. Ltd., Kolkata, India
I am currently is working as Senior Engineer with Netwoven since August 2010. My responsibilites
involve working with clients on testing SharePoint applications. The details are summarized as under:
• Involves understanding business requirements from BRDs,
• preparing test cases (UAT & QA), preparing test data,
• Executing test cases and preparing final test logs with test results.
Project 26 : Juniper Migration Project – Juniper Alias Migration and
Synchronization.
Client : Juniper
Duration : Apr, 2015 – Till Date
Project Summary:
The purpose of this project is to create a seamless synchronization between the Exchange server and
Office 365 Discussion list to store the email threads flowing among the distribution groups as a
2
3. discussion tread in Office 365 and allow the users in the distribution group to access the discussion
threads, search through the mails (stored in the form of a discussion thread in sharepoint online) and
reply back to the discussion thread (which will be sent to the exchange distribution group in the form of
mail).
Roles and Responsibilities :
• QA –Requirement Gathering, Testing, Issue Logging, Data Validation and Product Documentation.
Tools and Technologies : Selenium, Eclipse & Manual Testing.
Project 25 : Juniper Migration Project – JIVE to Office 356 SharePoint
Online 2013 – Document ID Service implementation.
Client : Juniper
Duration : Feb, 2015 – Till Date
Project Summary:
Implementation of Document ID Service on the documents (to identify the documents uniquely and refer
to the documents within a specified site collection by using DOC ID enabled URLs) migrated in the site
collections hosted as Office 365.
Roles and Responsibilities :
• QA –Requirement Gathering, Testing, Issue Logging, Data Validation and Product Documentation,
following up with Microsoft Support and playing the role of Point of contact to fix the Microsoft bug in
the feature – Document ID Service.
Tools and Technologies : Selenium, Eclipse & Manual Testing.
Project 24 : Juniper Migration Project – JIVE to Office 356 SharePoint
Online 2013 – Personal Site Migration
Client : Juniper
Duration : Dec, 2014 – Jan, 2015
Project Summary:
JIVE to Office 365 Migration project for the JIVE Personal Sites – Functionality testing & Documentation
and Data population & fixing.
Roles and Responsibilities :
• QA –Requirement Gathering, Testing, Issue Logging, Data Validation and Product Documentation.
Tools and Technologies : Selenium, Eclipse & Manual Testing.
Project 23 : Juniper Migration Project – JIVE to Office 356 SharePoint
Online 2013
Client : Juniper
Duration : Mar, 2014 – Nov, 2014
Project Summary:
JIVE to Office 365 Migration project – Functionality testing & Documentation
3
4. Roles and Responsibilities :
• QA –Requirement Gathering, Testing, Issue Logging, Data Validation and Product Documentation.
Tools and Technologies : Selenium, Eclipse & Manual Testing.
Project 22 : Juniper Migration Project – Sharepoint 2007 to Office 365
SharePoint Online 2013
Client : Juniper
Duration : Dec, 2013 – Feb, 2014
Project Summary:
SP2007 to Office 365 Migration project – Functionality testing & Documentation
Roles and Responsibilities :
• QA –Requirement Gathering, Testing, Issue Logging, Data Validation and Product Documentation.
Tools and Technologies : Manual Testing & Metavis Migration Tool
Project 21 : SMARTCP4–Document management workflows in SP 2010
Client : SMART
Duration : July, 2013 – Dec, 2013
Project Summary:
SMART Document Workflow management in SP2010 – Functionality testing
Roles and Responsibilities :
• QA –Requirement Gathering, Testing, Issue Logging, Data Validation and Product Documentation.
Tools and Technologies : Manual Testing
Project 20 : Informatica [ FAST ESP to FAST SP4 in SP 2010 –
migration]
Client : Informatica
Duration : Feb, 2013 – July, 2013
Project Summary:
FAST search and SP2010 integration – Functionality testing
Roles and Responsibilities :
• QA –Requirement Gathering, Testing, Issue Logging, Data Validation and Product Documentation.
Tools and Technologies : Manual Testing
Project 19 : SP 2013 Functionaliy Manual
Client : Netwoven Internal
Duration : Apr, 2013 – July, 2013
4
5. Project Summary:
Documentation & Generic Functionality Testing of SP2013
Roles and Responsibilities :
• QA –Requirement Gathering, Testing, Issue Logging, Data Validation and Product Documentation.
Tools and Technologies : Manual Testing
Project 18 : Stanford Management Company [ Performance testing on
HA environment using VSTS ]
Client : SMC
Duration : Apr, 2013 – July, 2013
Project Summary:
SMC HA environment – Performance and load Testing
Roles and Responsibilities :
• QA –Requirement Gathering, Testing, Issue Logging, Data Validation and Product Documentation.
Tools and Technologies : VSTS – Performance testing
Project 17 : Abaxis
Client : Abaxis
Duration : Mar, 2013 – July, 2013
Project Summary:
Developed a new portal – Functionality Testing
Roles and Responsibilities :
• QA –Requirement Gathering, Testing, Issue Logging, Data Validation and Product Documentation.
Tools and Technologies : Manual Testing
Project 16 : AMAT : Customer Portal
Client : Applied Materials
Duration : Feb, 2013 – Dec, 2013
Project Summary:
AMAT Extranet Portal Search function – Functionality Testing
Roles and Responsibilities :
• QA –Requirement Gathering, Testing, Issue Logging, Data Validation and Product Documentation.
5
6. Tools and Technologies : Manual Testing
Project 15 : AMAT:Applied Service Knowledge Search Portal (1.0 - 1.5)
Client : Applied Materials
Duration : Aug, 2012 – Feb, 2013
Project Summary:
AMAT Search functionality within SP 2010 Portal – Functionality Testing
Roles and Responsibilities :
• QA –Requirement Gathering, Testing, Issue Logging, Data Validation and Product Documentation.
Tools and Technologies : Manual Testing
Project 14 : VMware Mobile Request Application
Client : VMware
Duration : July, 2012 – Aug, 2012
Project Summary:
VMware Support Project – Functionality Testing
Roles and Responsibilities :
• QA –Requirement Gathering, Testing, Issue Logging, Data Validation and Product Documentation.
Tools and Technologies : Manual Testing
Project 13 : Socialcast
Client : VMware
Duration : June, 2012 – July, 2012
Project Summary:
VMware Socialcast integration – Functionality Testing
Roles and Responsibilities :
• QA –Requirement Gathering, Testing, Issue Logging, Data Validation and Product Documentation.
Tools and Technologies : Manual Testing
Project 12 : Varian - VOS Engineering Portal
Client : Varian
Duration : May, 2012 – Aug, 2012
Project Summary:
Varian Engineering Portal workflow and automated site creation – Functionality Testing
Roles and Responsibilities :
6
7. • QA –Requirement Gathering, Testing, Issue Logging, Data Validation and Product Documentation.
Tools and Technologies : Manual Testing
Project 11 : VMware GnC
Client : Feb, 2012 – May, 2012
Duration :
Project Summary:
VMware GnC Workflow management – Functionality Testing
Roles and Responsibilities :
• QA –Requirement Gathering, Testing, Issue Logging, Data Validation and Product Documentation.
Tools and Technologies : Manual Testing
Project 10 : Coil Strap Cut Length Calculator (StrongTie)
Client : Simpson
Duration : Jan, 2012 – Jan, 2012
Project Summary:
Functionality Testing of automated calculation SW.
Roles and Responsibilities :
• QA –Requirement Gathering, Testing, Issue Logging, Data Validation and Product Documentation.
Tools and Technologies : Manual Testing
Project 9 : Ellipsis (Search & Export)
Client : Ellipsis
Duration : Oct, 2011 – Dec, 2011
Project Summary:
Search & Data Export – Functionality Testing
Roles and Responsibilities :
• QA –Requirement Gathering, Testing, Issue Logging, Data Validation and Product Documentation.
Tools and Technologies : Manual Testing
Project 8 : SOX Sales
Client : VMware
Duration : Sep, 2011 – Oct, 2011
Project Summary:
7
8. VMware Support Project – Functionality Testing
Roles and Responsibilities :
• QA –Requirement Gathering, Testing, Issue Logging, Data Validation and Product Documentation.
Tools and Technologies : Manual Testing
Project 7 : Lit Hold Tracking Site
Client : VMware
Duration : July, 2011 – Aug, 2011
Project Summary:
VMware Support Project – Functionality Testing
Roles and Responsibilities :
• QA –Requirement Gathering, Testing, Issue Logging, Data Validation and Product Documentation.
Tools and Technologies : Manual Testing
Project 6 : Legal Knowledge Management Portal
Client : VMware
Duration : May, 2011 – June, 2011
Project Summary:
VMware Support Project – Functionality Testing
Roles and Responsibilities :
• QA –Requirement Gathering, Testing, Issue Logging, Data Validation and Product Documentation.
Tools and Technologies : Manual Testing
Project 5 : MS Dynamics
Client : Microsoft
Duration : Mar, 2011 – May, 2011
Project Summary:
Microsoft Dynamics functionality testing
Roles and Responsibilities :
• QA –Requirement Gathering, Testing, Issue Logging, Data Validation and Product Documentation.
Tools and Technologies : Manual Testing
8
9. Project 4 : IT Service Notification
Client : VMware
Duration : Jan, 2011 – Feb, 2011
Project Summary:
VMware Support Project – Functionality Testing
Roles and Responsibilities :
• QA –Requirement Gathering, Testing, Issue Logging, Data Validation and Product Documentation.
Tools and Technologies : Manual Testing
Project 3 : Legal Clause Library
Client : VMware
Duration : Dec, 2010 – Jan, 2011
Project Summary:
VMware Support Project – Functionality Testing
Roles and Responsibilities :
• QA –Requirement Gathering, Testing, Issue Logging, Data Validation and Product Documentation.
Tools and Technologies : Manual Testing
Project 2 : Online Gate Pass
Client : VMware
Duration : Sep, 2010 – Dec, 2010
Project Summary:
VMware Support Project – Functionality Testing
Roles and Responsibilities :
• QA
Tools and Technologies : Manual Testing
Project 1 : Sales Staff Mapping
Client : VMware.
Duration : Aug, 2010 – Sep, 2010
Project Summary:
VMware Support Project – Functionality Testing
Roles and Responsibilities :
• QA –Requirement Gathering, Testing, Issue Logging, Data Validation and Product Documentation.
9
10. Tools and Technologies : Manual Testing
January 2010 to August 2010 : Software Engineer (Testing), Stryker Global
Technology Centre, Gurgaon, India
Aniruddha has worked as SW Engineer (Testing) on verification & validation of computer aided surgery
systems, involving requirement analysis, preparing & executing test cases (partly using QTP 9.2 for
testing low risk and iterative functionalities) and logging defects (using JIRA bug tracking tool).
Project Details:
Spine Map – OR Simulation software converting MR, PET, X-Ray images and rendering 3-D images
(Simulation) of Human Spine after corrections are done as per medical technologies.
Ortho Map - OR Simulation software converting MR, PET, X-Ray images and rendering 3-D images
(Simulation) of the affected part of Human skeleton after corrections are done as per medical
technologies.
Tools and Technologies: JIRA
August 2007 to January 2008 : Industry Trainer (Part Time), Technable Solutions Pvt Ltd
Industry Trainer: Did the job of a part time faculty, conducting training classes & screening exams and
imparting training to the selected candidates, helping them cracking interviews.
November 2005 to May 2006 : Management Trainee (Systems Division),
Trimurti Industries Ltd.
Worked on the requirement analysis, application development & testing
• Was engaged in a job, which requires dealing with calculation of Production cost and preparing
Production Reports of the different units of the Organization.
• Also helped in developing an application for a Rubber Production unit and prepared test cases
(using expert view in QTP 9.0 & Mercury - QC) for the same, after gathering business
requirements from different units of the organization.
June 2004 to October 2005 : Senior Associate, Xsinter Software Solution
Pvt. Ltd.
Project 1 : Medical Billing Project
Worked on this project for around 6 months which included:
• Gathering the following business requirements from the clients
• Payment posting.
• Charge entry.
• Demographic entry of patients.
• Solving the Clients’ (Medical Insurances) Problems (Through Video Conference).
Project 2 : IPA Manager Project (Phase1)
Dealt with this project for around 6 months (parallel to my first project), which included working for the
“INDEPENDENT PHYSICIAN ASSOCIATIONS” (IPA) & maintaining the DB using SQL Queries along
with creating test scenarios from the business requirements.
10
11. Project 3 : IPA Manager Project (Phase 2)
• Going through the requirement specification, understanding the domain concepts and test
specifications.
• Interacting with the Project lead to gain a good understanding of the business and technical
aspects and assisting him in developing an effective and efficient Testing Approach.
• Test plan Preparation.
• Test case Design and Execution (Manual and also using QTP 8.2).
• Test case Execution: Involved in Smoke testing, Functional testing and regression testing.
• Participating in peer reviews of testing deliverables.
• Defect Reporting and participation in Defect review meetings.
11