Colin is an experienced mining engineer, specializing in mining operation planning, scheduling, design, capital estimating and costing with over ten years’ post graduate experience.
Colin has gained local and international operational and consulting experience in open pit and underground (both mechanized and conventional), doing mineral resource management, production planning, mine designing, operational and capital cost estimates, cost modeling and consulting by use of an extensive OEM database and Cost Engineering models.
Colin has gained experience in sales, marketing and business development by executing tender documents, resource planning & optimization and marketing materials for companies.
Colin is a holder of a Mine Managers Certificate of competency and has worked with major mining houses, namely in South Africa and Australia. Colin has extensive project experience doing engineering, cost estimates, modeling, mineral resource management, design and simulation specializing in mine design software namely Minex, Surpac, Deswik and Talpac.
Colin is in the process of completing his ECSA registration as a Pr.Tech.Eng, and to start working to gaining further experience in mineral resource management in order to be able to assess, create, reserved models and compliant reserve statements. Colin further plans to develop his own equipment costing database to allow for better resource planning, optimization and costing.
Can be headhunted for senior level managerial assignments as NDT Operations / Project Manager NDT & Inspection with an organisation of repute
Preferred Industry: Oil & Gas / NDT, Inspection & Construction Company
An astute professional with over 20 years of experience in NDT Testing & Inspection as well as Project Execution across NDT companies.
Currently associated with Engineering And Research International LLC, Abu Dhabi, UAE as Operations Manager – NDT & Metlab.
Holds important Industry certifications for Inspections like ASNT NDT Level III, CSWIP 3.1.
Holds the merit of imparting Personnel Training in various NDT methods & General/ Radiation Safety.
An effective communicator with excellent relationship management skills and strong analytical, leadership, decision-making, problem solving & organisational abilities.
1. Dr. Aleksandar Jankovic
PERSONAL DETAILS
Address: 5 Arosa St, Jamboree Heights, Brisbane, QLD 4074, Australia.
Telephones: +61 7 3166 7777 (w)
+61 7 32790077 (h) mobile +61 429196676
E-mail: ajankovic@hatch.com.au
Born: 11 June 1962, Paracin, Yugoslavia
(Permanent Resident in Australia since August 1997, Australian Citizen
since 1999).
Marital Status: Married, two children.
Languages: Serbian (original language), English (fluent), Russian (basic), Spanish
(basic),
EDUCATION
1993-1997 Ph.D. Course
University of Queensland, JKMRC, Brisbane, Australia
1989-1991 Master of Technical Science
University in Belgrade, Technical Faculty in Bor, Yugoslavia
1981-1987 Graduated Engineer of Mining- Mineral Processing Major
University in Belgrade, Technical Faculty in Bor, Yugoslavia
PROFESSIONAL SUMMARY
2. Twenty nine years experience in research, consultancy, engineering and operational
environment. Specialist in fine grinding technologies, crushing, grinding and fine
grinding modelling and simulation, with broad experience from major operations all
around the world. Areas of experience include base metals, gold, alumina, iron ore,
coal, phosphate and cement, with emphasis on grinding optimistion, mine to mill
process integration, process and equipment development, ore characterisation testwork,
crushing, grinding and fine grinding process and equipment evaluation and selection.
EXPERIENCE
March 2016 – present… Principal Consultant, Mining & Mineral Processing - Hatch
Responsible for Comminution and fine grinding consulting, design and development.
September 2014 – March 2016…Metso Minerals Process Technology and Innovation – General
Manager Technical Services
Responsible for Process Technology and Innovation R&D and Consulting Services. Projects
include B2 Gold Otjikoto, Vale Salobo, PanAust Inca de Oro and Carmen, G-Resources
Martabe, Newcrest Lihir, CITIC Sino Iron, Eco-Efficient processing R&D........
2009 - 2014 … Metso Minerals Process Technology and Innovation – General Manager of
Technology and Innovation
Responsible for Process Technology and Innovation R&D and consulting on Mine to Mill
process integration, grinding circuit design and optimization. Projects include Rio Tinto Oyu
Tolgoi, Newmont Tanami, Boddington, Glencore CSA Cobar, OneSteel Whayala, Cerro Verde,
Yanacocha, Cerro Corona, Vale Bayovar Peru, Golder Faboliden, Eco-Efficient processing
R&D........
2008- 2009 GRD Minproc – Senior Process Engineer.
La Constancia Cu-Mo-Ag DFS Study, Ban Houayxai gold DFS Study, Phuthep copper project
Accountable to:
-provide designated process engineering teams with appropriate quality and best practice in
process engineering.
-prepare of designated study, project and proposal documents to ensure quality and accuracy of
information.
-ensure delivery of process services to designated study, project and proposal teams on or ahead
of schedule and on or under budget.
2003-2008 Metso Minerals Process Technology (Asia-Pacific) – Manager of Development and
Process Engineering.
Responsible for Metso Minerals Process Technology internal development in fine grinding and
3. external consulting on Mine to Mill process integration, grinding process upgrade and
optimisation for numeros mining operations: Antamina, Andina, Cerro Colorado, Escondida,
Fosfertil, CSN, Oktedi, Freeport, Newmont Batu Hijau, St Ives, Placer Granny Smith, Xstrata Mt
Isa Mines, Newcrest Cadia-Ridgeway, CVRD Salobo and Crajas, Phelps Dodge Cero Verde,
Newmont Mines Congas, Anglogold Ashanti Induapriem, RPM Brasil, BHP Cannington, BHP
Worsley Alumina, BMA Coal, Candelaria, Morrila Mali, Zimplats, …..
2001 -2003 Julius Kruttschnitt Mineral Research Centre – Research Fellow
- Research in Mine to Mill projects: Iron Ore of Canada, Boliden Aitik (Sweden), Kennecott
Utah Copper and Greens Creek, WMC, Cannington. Optimisation of SAG – Ball mill grinding
circuits at Kennecott copper mine.
- Responsible for Tower mill modelling and model validation project
- Consultant with JKTech in fine grinding, grinding optimisation and design: Porgera, MIM,
Worsley Alumina, Alcoa
1999-2001 Julius Kruttschnitt Mineral Research Centre - Senior Research Officer
- Research in Mine to Mill projects: Porgera, Century, Cadia, Alumbrera, Mount Isa, Ernest
Henry, Fimiston.
- Research in Optimisation of SAG – Ball mill grinding circuits: Cannington, Porgera, Kidston,
Elura.
- Responsible for Tower mill modelling and model validation project
- Consultant with JKTech in grinding optimization and fine grinding testwork, scale-up and
simulation.
1998-99 Mount Isa Mines – Project Metallurgist
Responsible for Mine and Concentrator interaction, SAG/ball and rod/ball mill grinding,
regrinding, fine grinding and particle classification related projects in Lead Zinc Concentrator.
Special focus on ISAMILL grinding media optimisation for refractory lead/zinc ore for George
Fisher Project. Work in complex galena – sphalerite flotation circuit. Coordinator for Copper
concentrator SAG – Ball mill circuit optimisation project.
1993-97 Julius Kruttschnitt Mineral Research Centre - Ph.D. Research Scholar
Thesis title “Mathematical Modeling of Stirred Mills”. The objective of the thesis was to
generate a “generic” model able to simulate fine grinding in a range of different stirred mills
design. Significant part of the thesis experimental work was conducted at pilot scale tower and
Sala pin mill located at JKMRC, CMTE and Olympic Dam Operations.
1992-93 Julius Kruttschnitt Mineral Research Centre – AEAP visiting student
4. Conducted evaluation of the grinding performance of the Red Dome grinding circuit using
JKSimMet Mineral Processing Simulator, and evaluation of a industrial size KHD micro screen
performance using various slurry samples.
1987 – 92 Tutor, University in Belgrade, Technical Faculty in Bor, Yugoslavia
Full time tutor at Technical Faculty in Bor covering tutorials for year 3 and 4 and 5 undergraduate
students at Mineral Processing Department. The job description included laboratory tutorials,
tutorials in data analysis, material balances, equipment selection and plant design, project work and
supervision of the undergraduate students.
Project work was carried out in RTB Bor (Mining-Metallurgical Basin), large copper and gold
producer located in the east Serbia. Company used to operate four copper mines with
approximately 15 Mt per year ore throughput. I was involved in several projects with RTB Bor
such as:
-Development of the Jaw Crusher with Two Mowing Jaws; 1988-1989
-Improvement of the Grinding and Classification Processes at RTB Bor Mineral Processing
Plants; 1987-1989.
-Development of the On Line Laser Particle Sizer for Measurement in Plant Conditions; 1989
PUBLICATIONS
Diaz, R., Mamani, H., Valery, W., Jankovic, A., Valle, R., Duffy K. A., 2015. Diagnosis Of Process Health, Its
Treatment And Improvement To Maximise Plant Throughput At Goldfields Cerro Corona. SAG2015, Vancouver,
Canada, 20-24 September
Duffy, K., Valery, W., Jankovic, A., Holtham, P., 2015. Integrating Bulk Ore Sorting into a Mining Operation to
Maximise Profitability, In Proceedings of Metallurgical Plant Design and Operating Strategies, Perth, Australia, 7-8
September.
Jankovic, A., Baguley, P., Valery Jnr., W., Holtham, P., 2015. Effect of Mineral Density for Milling Magnetite Ores,
Proceedings of Iron Ore 2015 Conference, Perth, Australia, 13-15 July, pp 159-164
Jankovic, A., Suthers, S., Wills, T., Valery Jnr., W., 2015. Evaluation of dry grinding using HPGR in closed circuit
with an air classifier, Minerals Engineering Journal Vol 71, pp 133-138
Jankovic, A., Valery, W., Sonmez, B., Oliviera, R., 2014. Effect of circulating load and classification efficiency on
HPGR and ball mill capacity, Proceedings of XXVII IMPC, 20-24 October, Santiago – Chile. Chapter 9, pp. 1-14
5. Maclean, A., Wirfiyata, F., Khomaeni, G., Jankovic, A., Pasin, G., Valery, W., 2014. The Ball mill Polymet liner
evaluation at PT Newmont Nusa Tenggara - Batu Hijau mine. In Proceedings of 12 AusIMM Mill Operators
Conference. Townsville, Australia 1-3 September
Jankovic, A., Valery, W., Sonmez, B., Oliviera, R., Dündar, H., 2013. A pilot scale comparison of various HPGR
operating configurations. In Proceedings of 10th
International Mineral Processing Conference Procemin 2013.
Santiago, Chile 15-18 October
Runge, K.; Tabosa, E.; Jankovic, A., 2013. Particle Size Distribution Effects that should be considered when
performing Flotation Geometallurgical Testing. In: Proceedings of the Second AusIMM International
Geometallurgy Conference, Brisbane, Australia, 30 September - 2 October, AusIMM, 2013 Publication series
10/2013, pp 335-344
Jankovic. A, and Valery, W, 2013. Energy Efficient Ball Mill Circuit – Equipment Sizing Considerations. In
Proceedings of Metallurgical Plant Design and Operating Strategies (MetPlant 2013), Perth, Australia 15 - 17 July
Sonmez, B., Eduardo, N., Corsini, J., Jankovic, A., Valery, W., Benzer, H., Dündar, H., 2013 Modelling And
Simulation Studies At An Aggregate Plant. In Proceedings of XV Balkan Mineral Processing Congress, Sozopol,
Bulgaria June 12-16.
Jankovic, A., Valery, W., Sonmez, B., 2013. The Benefits of High Classification Efficiency in Closed Ball Mill
Circuits. In Proceedings of XV Balkan Mineral Processing Congress. Sozopol, Bulgaria 12-16 June
Jankovic, A., Valery, W., Lee, D., Peres, J., Jeston, S., 2013 Validation Of A Closed Circuit Ball Mill Model.
Journal of Mining and Metallurgy, 49 A (1) (2013) 37 - 43, Republic of Serbia
Isokangas, E. Valery, W. Jankovic, A. Sonmez, B. 2012 Using process integration and optimisation to provide
integrated process solutions for mining operations, from mine to mill. XXVI International Mineral Processing
Congress, New Delhi, India
Jankovic. A, and Valery, W, 2012. The Impact Of Classification On The Energy Efficiency Of Grinding Circuits –
The Hidden Opportunity. In Proceedings of 11 AusIMM Mill Operators Conference. Hobart, Tasmania 29-31
October
Jankovic. A, and Valery, W, 2013. Closed Circuit Ball Mill – Basics Revisited. Minerals Engineering vol 43–44
pp. 148–153. presented at MEI Comminution 2012 Conference Cape Town 17-20 April
Rybinski, E., Ghersi, J., Davila, F., Linares, J., Valery, W., Jankovic, A., Valle, R., Dikmen, S. (2011) Optimisation
and Continuous Improvement of Antamina Comminution Circuit, SAG2011, Vancouver, Canada, 25-28 September
6. Hart, S., Rees, T., Valery, W., Jankovic, A. (2011) Process Integration And Optimisation Of The Boddington HPGR
Circuit, SAG2011, Vancouver, Canada, 25-28 September
Sonmez, B., Valery, W., Jankovic, A., 2011. New Methodology to Improve Productivity of Mining Operations,
Balkan Congress, Turkey
Jankovic, A., Valery, W., (2010) Reducing Grinding Energy and Cost - Magnetite Iron Ore Design Case Study,
Proceedings of the XIIth International Minerals Processing Symposium. Cappadocia Nevsehir, Turkey, 6-8 October
Jankovic, A., Dundar, H., Mehta, R., (2010) Relationships between the Comminution Energy and Product Size for a
Magnetite Ore. Journal of South African Insistute of Mining and Metallurgy. Vol 110, March, pp. 141-146
Gomes, MP., Tavarez Jnr, L., Nunes, E., Colacioppo, J., Jankovic, A., Valery, W., 2010. Optimization of the SAG
Mill Circuit at Kinross Paracatu, Brazil, Comminution 10
McNab, B., Jankovic, A., David, D., Payne, P. 2009. Processing of Magnetite Iron Ores – Comparing Grinding
Options. Proceedings of Iron Ore 2009 Conference, Perth, Australia, 27-29 July, pp. 277-288.
Markovic, Z.S., Jankovic, A., Tomanec. R.,2008. Effect of particle size and liberation on flotation of A low grade
porphyry copper ore. Journal of Mining and Metallurgy, 44 A (1) (2008) pp. 24 – 30. Bor, Republic of Serbia
Dance, A., Valery, W., Jankovic, A., La Rosa, D., Esen S. (2007) Maintaining the Benefit – How to Ensure Mine to
Mill Continues to Work for You. Proceedings of Ninth Mill Operators Conference, Fremantle, Australia, 19-21
March, pp. 215-223.
Esen, S., La Rosa, D., Dance, A., Valery, W., Jankovic, A. (2007) Integration and Optimisationof Blasting and
Comminution Processess. Proceedings of EXPLO Conference, Wollongong, Australia, 3-4 September, pp. 95-103.
Jankovic, A., Valery, W., Maloney, K., Markovic Z. S. (2006) Improving Overall Concentrator Performance with
Stirred Milling. Proceedings of XXIII International Minerals Processing Congress, Istanbul, Turkey, 3-8 September,
Vol 2, pp. 1949-1954.
Esen, S., Benzer, H., Jankovic, A., Cook, P. (2006) Pregrinding Technology. World Cement, November, pp. 103-
110.
Dance, A., Valery Jnr., W., Jankovic, A., La Rosa, D., Esen, S. (2006) Higher Productivity Through Cooperative
Effort: A Method Of Revealing And Correcting Hidden Operating Inefficiencies. SAG2006 – HPGR,
Geometallurgy, Testing. International Conference on Autogenous and Semiautogenous Grinding Technology,
Volume 4, 375 – 390, Vancouver, Canada.
Jankovic, A., W., Valery Jnr., Clarke, G. (2006) Design And Implementation Of An AVC Grinding Circuit at BHP
Billiton Cannington. SAG2006 – Circuit Design. International Conference on Autogenous and Semiautogenous
Grinding Technology, Volume 2, 290 – 300, Vancouver, Canada.
Tondo L.A., Valery Jnr. W., Peroni, R., La Rosa, D., Silva, A., Jankovic, A., Colacioppo, J. (2006) Kinross’ Rio
Paracatu Mineração (RPM) Mining And Milling Optimisation Of The Existing And New SAG Mill Circuit.
7. SAG2006 – Circuit Design. International Conference on Autogenous and Semiautogenous Grinding Technology,
Volume 2, 301 – 313, Vancouver, Canada.
Renner D., La Rosa, D., DeKlerk W., Valery W., Simpson, P., Bonney S.N., A., Jankovic, A. (2006) Anglogold
Ashanti Induapriem Mining and Milling Process Integration and Optimisation. SAG2006 – Circuit Design.
International Conference on Autogenous and Semiautogenous Grinding Technology, Volume 1, 249 – 256,
Vancouver, Canada.
Burger, B., McCaffery K., McGaffin I., Jankovic, A., Valery, W., and La Rosa, D., (2006) Batu Hijau Model for
Throughput Forecast, Mining and Milling Optimisation, and Expansion Studies. Advances in Comminution,edited
by S. Komar Kawatra, SME publication. March, pp. 461-479
Benzer, H. Jankovic, A. and Ergun, L. (2006) Cement Clinker Grinding Practice and Technology, Advances in
Comminution,edited by S. Komar Kawatra, SME publication. March, pp. 169-179
Jankovic, A., Sinclair., S. (2006) The shape of product size distribution in stirred mills, Minerals Engineering
Journal, Vol.19 pp 1528-1536, presented at Comminution 2006 Conference In Perth March 14-17
Jankovic, A. (2005) Optimisation of Ball Size Distribution in Industrial Wet Ball Mills, In Proceedings of 37th
International Conference on Mining and Metallurgy, Bor Lake, Serbia and Montenegro. 3-6 October 2005.
Jankovic, A. (2005) A review of regrinding and fine grinding technology - the facts and myths, presented at the 6th
Annual I.I.R. Crushing and Grinding Conference, Perth, Australia. 22-25 March 2005.
Onederra, I., Esen, S., and Jankovic, A., (2004) Estimation of fines generated by blasting – applications for the
mining and quarrying industries Mining Technology (Trans. Inst. Min. Metall. A) December 2004 Vol. 113 A9
Jankovic, A., Valery Jnr., W. (2004) Design and Operation of Vertimill® for Secondary Grinding, In Proceedings of
36th International Conference on Mining and Metallurgy, Bor Lake, Serbia and Montenegro. 29 September- 2
October 2004.
Jankovic, A., Cervellin, A. (2004) Coarse Grinding with Laboratory Pin Stirred Mill, In Proceedings of the 36th
International Conference on Mining and Metallurgy, Bor Lake, Serbia and Montenegro. 29 September- 2 October
2004.
Jankovic, A., Valery Jnr., W. and Davis, E. (2004) Cement Grinding Optimisation, presented at Comminution 2004
Conference and published at the Minerals Engineering Journal, Vol.17 No.11-12, 2004
Valery Jnr. W. and Jankovic, A. (2004) Multi-Stage Crushing versus SAG Mill and HPGR, presented at the 5th
Annual I.I.R. Crushing and Grinding Conference, Townsville, Australia. 29-30 March 2004.
Valery Jnr., W., La Rosa, D., Jankovic, A. (2004) Mining and Milling Process Integration and Optimisation,
presented at the SME 2004 Conference, Denver, CO. 23-25 February 2004.
Jankovic, A., 2003. Variables Affecting the Fine Grinding of Minerals Using Stirred Mills, Minerals Engeneering
vol 16, pp 337-345,. paper presented at MEI Conference 02, Perth – Australia.
8. Valery, W., Jankovic, A., 2002. The Future of Comminution, Proceedings of 34th
International Octobar
Conference on Mining and Metalurgy .October, pp 287-298
Jankovic, A., Markovic, Z., 2002. Pebble Milling Option for Reduced Throughput, Proceedings of 34th
International Octobar Conference on Mining and Metalurgy .October, pp 287-298
Jankovic, A., 2001. Media Stress Intensity Analysis for Vertical Stirred Mills, Minerals Engeneering, vol 14.
Special issue from MEI Conference Comminution 01, Brisbane - Australia, ., pp 1177-1186
Lam, M., Jankovic, A., Valery, W., Kanchibotla, S., 2001. Maximising the Grinding Circuit Throughput at Porgera
Gold Mine Through Blast Fragmentation, Third International Conference On Autogenous And Semiautogenous
Grinding Technology; September 30-October 3, Vancouver, B. C., Canada, pp 271-288.
Grundstrom, C., Kanchibotla, S., Jankovic, A., Thortnton, D., 2001. Blast Fragmentation for Maximising the
Grinding Circuit Throughput at Porgera Gold Mine, Proceedings of the 27 th Annual Conference on Explosives and
Blasting Technique, pp 250-258.
Jankovic, A., and S, Morrell., 2000. Scale-Up Of Tower Mill Performance Using Modelling And Simulation,
Proceedings of XXI IMPC, Rome – Italy. pp A3 1-8
Jankovic, A., 2000. Fine Grinding In Australian Minerals Industry, Journal of Mining and Metallurgy-Collection of
Papers, Section A: Mining, vol 36. No 5-6. Bor, Yugoslavia. pp 51-61.
Jankovic, A., 1999. Mathematical Modelling of Stirred Mills, Phd Thesis – University of Queensland, JKMRC,
Brisbane, Australia.
Jankovic, A., Young, M., Hinds, D., 1999. Tower fine Milling Experience at Mount Isa Mines. In: N. Jackson, G.
Dunlop, and P. Cameron (Editors), Mineral Processing & Hydrometallurgy Plant Design, Australian Mineral
Foundation, ISBN No: 0-908039-70-0, pp 243-250
Jankovic, A., 1998. Tower Mill Grinding Efficiency, Journal of Mining and Metallurgy-Collection of Papers,
Section A: Mining, vol 34. No 3-4. Bor, Yugoslavia. ., pp 164-173
Jankovic, A. and S, Morrell., 1998. A Study of Fine Particles Breakage Characterization. Proceedings of 4th
Conference on Environment and Mineral Processing, VSB-Tu Ostrava, Czech Republic., pp 9-15
Jankovic, A., 1997. Power Modelling of Stirred Mills, Proceedings of the Second UBC-MCGILL BI- Annual
International Symposium on Fundamentals of Mineral Processing and the Environment, Sudbury, Ontario, August,
pp 463-470
Jankovic, A. Trumic, G., Trumic, M., Markovic, Z., 1997. Extension and Facilitation of the Bond Grindability Test;
Proceedings of 7 th Balkan Conference on Mineral Processing, Vatra Dornei, Romania. May
Jankovic, A., 1997. Vertical Pin Stirred Mills Power Modelling, New Trends in Mineral Processing II, Proceedings,
VSB - Technicka Univerzita Ostrava, Jun
9. Jankovic, A., Morrell, S., 1996. Evaluation of the Performance of the KHD Micro-Screen, poster presentation at
Minerals Engineering Conference; Brisbane, Australia, August
Jankovic, A., 1995. Stirred Mills Modeling - Literature Review, Zbornik Radova Glasnika Rudarstva I Metalurgije,
(Journal of Mining and Metallurgical Engineering Collection of Papers) vol 32 No3,
Jankovic, A., 1995. Comparison of a laboratory tower and tumbling ball mill, Zbornik Radova Glasnika Rudarstva I
Metalurgije, (Journal of Mining and Metallurgical Engineering Collection of Papers) vol 31 No2.
Magdalinovic. N., Budic. I., Markovic. Z.S., Jankovic, A., 1995. The Energy for Copper Ore Crushing; Proceedings
of 6 th Balkan Conference on Mineral Processing, Ohrid, Republic of Macedonia. September 18-21.
Jankovic, A., 1993. Observations on the Bond Grindability Test and Proposals for Its Improvement; The Second
JKMRC Postgraduate Conference, Brisbane, Australia. September
Jankovic, A., 1992. Mathematical Model of the Grinding Kinetics in the Bond Rod Mill; Zbornik Radova Glasnika
Rudarstva I Metalurgije (Journal of Mining and Metallurgy-Collection of Papers), vol 6. No 2. Bor. Yugoslavia.
Jankovic, A., 1992. Mathematical Model of Grinding Kinetics in the Bond Ball Mill; Zbornik Radova Glasnika
Rudarstva I Metalurgije (Journal of Mining and Metallurgy-Collection of Papers), vol 5. No 4. Bor, Yugoslavia.
Jankovic, A., 1991. Methods for Size Distribution Determination in Mineral Processing; Tehnica, Journal of
Yugoslav Engineers and Technicians Association vol 3-4.
Jankovic, A., 1991. Hydrocyclone Optimization by use of the Experiment Design Method; XIII Yugoslav Mineral
Processing Simposium-Colection of Papers, Gornji Milanovac, Yugoslavia.
Jankovic, A., 1991. Mill Optimization's by use of the Experimental Design Method; II Symposium on Mathematical
Method and Computer Application in Geology Mining and Metallurgy-Collection of Papers; Belgrade, Yugoslavia.
Jankovic, A., 1990. Laser Particle Size in Mineral Processing; Conference on Technologies Advancement and
Rationalization in Geology Mining and Metallurgy, Collection of Mineral Processing Papers, Belgrade, Yugoslavia.
Jankovic, A., Magdalinovic. N., 1990. Multihidrocyclone - New Unit for Classification; Conference on
Technologies Advancement and Rationalization in Geology Mining and Metallurgy, Collection of Mineral
Processing Papers, Belgrade, Yugoslavia.
Magdalinovic. N., Budic. I., Markovic. Z.S., Jankovic, A., 1990. Mathematical Model for Determination of a
Optimal Crusher Product size; AufbereitungTechnic, 31.(1990) No5.
Magdalinovic. N., Budic. I., Markovic. Z.S., Jankovic, A., 1989. Optimal Crusher Product Size Determination in
RTB Bor Mineral Processing Plants; Octobers Consultations- Collection of Papers, Bor, Yugoslavia.
Jankovic, A., 1988. Contribution to the Theory of Screening Kinetics; Zbornik Radova Glasnika Rudarstva I
Metalurgije (Journal of Mining and Metallurgical Engineering Collection of Papers) vol 24 No2.
10. Jankovic, A., 1987. Shorten Procedure for Bond Work Index Determination; Octobers Consultations-Collection of
Papers, Bor, Yugoslavia.