SlideShare a Scribd company logo
Dr. Aleksandar Jankovic
PERSONAL DETAILS
Address: 5 Arosa St, Jamboree Heights, Brisbane, QLD 4074, Australia.
Telephones: +61 7 3166 7777 (w)
+61 7 32790077 (h) mobile +61 429196676
E-mail: ajankovic@hatch.com.au
Born: 11 June 1962, Paracin, Yugoslavia
(Permanent Resident in Australia since August 1997, Australian Citizen
since 1999).
Marital Status: Married, two children.
Languages: Serbian (original language), English (fluent), Russian (basic), Spanish
(basic),
EDUCATION
1993-1997 Ph.D. Course
University of Queensland, JKMRC, Brisbane, Australia
1989-1991 Master of Technical Science
University in Belgrade, Technical Faculty in Bor, Yugoslavia
1981-1987 Graduated Engineer of Mining- Mineral Processing Major
University in Belgrade, Technical Faculty in Bor, Yugoslavia
PROFESSIONAL SUMMARY
Twenty nine years experience in research, consultancy, engineering and operational
environment. Specialist in fine grinding technologies, crushing, grinding and fine
grinding modelling and simulation, with broad experience from major operations all
around the world. Areas of experience include base metals, gold, alumina, iron ore,
coal, phosphate and cement, with emphasis on grinding optimistion, mine to mill
process integration, process and equipment development, ore characterisation testwork,
crushing, grinding and fine grinding process and equipment evaluation and selection.
EXPERIENCE
March 2016 – present… Principal Consultant, Mining & Mineral Processing - Hatch
Responsible for Comminution and fine grinding consulting, design and development.
September 2014 – March 2016…Metso Minerals Process Technology and Innovation – General
Manager Technical Services
Responsible for Process Technology and Innovation R&D and Consulting Services. Projects
include B2 Gold Otjikoto, Vale Salobo, PanAust Inca de Oro and Carmen, G-Resources
Martabe, Newcrest Lihir, CITIC Sino Iron, Eco-Efficient processing R&D........
2009 - 2014 … Metso Minerals Process Technology and Innovation – General Manager of
Technology and Innovation
Responsible for Process Technology and Innovation R&D and consulting on Mine to Mill
process integration, grinding circuit design and optimization. Projects include Rio Tinto Oyu
Tolgoi, Newmont Tanami, Boddington, Glencore CSA Cobar, OneSteel Whayala, Cerro Verde,
Yanacocha, Cerro Corona, Vale Bayovar Peru, Golder Faboliden, Eco-Efficient processing
R&D........
2008- 2009 GRD Minproc – Senior Process Engineer.
La Constancia Cu-Mo-Ag DFS Study, Ban Houayxai gold DFS Study, Phuthep copper project
Accountable to:
-provide designated process engineering teams with appropriate quality and best practice in
process engineering.
-prepare of designated study, project and proposal documents to ensure quality and accuracy of
information.
-ensure delivery of process services to designated study, project and proposal teams on or ahead
of schedule and on or under budget.
2003-2008 Metso Minerals Process Technology (Asia-Pacific) – Manager of Development and
Process Engineering.
Responsible for Metso Minerals Process Technology internal development in fine grinding and
external consulting on Mine to Mill process integration, grinding process upgrade and
optimisation for numeros mining operations: Antamina, Andina, Cerro Colorado, Escondida,
Fosfertil, CSN, Oktedi, Freeport, Newmont Batu Hijau, St Ives, Placer Granny Smith, Xstrata Mt
Isa Mines, Newcrest Cadia-Ridgeway, CVRD Salobo and Crajas, Phelps Dodge Cero Verde,
Newmont Mines Congas, Anglogold Ashanti Induapriem, RPM Brasil, BHP Cannington, BHP
Worsley Alumina, BMA Coal, Candelaria, Morrila Mali, Zimplats, …..
2001 -2003 Julius Kruttschnitt Mineral Research Centre – Research Fellow
- Research in Mine to Mill projects: Iron Ore of Canada, Boliden Aitik (Sweden), Kennecott
Utah Copper and Greens Creek, WMC, Cannington. Optimisation of SAG – Ball mill grinding
circuits at Kennecott copper mine.
- Responsible for Tower mill modelling and model validation project
- Consultant with JKTech in fine grinding, grinding optimisation and design: Porgera, MIM,
Worsley Alumina, Alcoa
1999-2001 Julius Kruttschnitt Mineral Research Centre - Senior Research Officer
- Research in Mine to Mill projects: Porgera, Century, Cadia, Alumbrera, Mount Isa, Ernest
Henry, Fimiston.
- Research in Optimisation of SAG – Ball mill grinding circuits: Cannington, Porgera, Kidston,
Elura.
- Responsible for Tower mill modelling and model validation project
- Consultant with JKTech in grinding optimization and fine grinding testwork, scale-up and
simulation.
1998-99 Mount Isa Mines – Project Metallurgist
Responsible for Mine and Concentrator interaction, SAG/ball and rod/ball mill grinding,
regrinding, fine grinding and particle classification related projects in Lead Zinc Concentrator.
Special focus on ISAMILL grinding media optimisation for refractory lead/zinc ore for George
Fisher Project. Work in complex galena – sphalerite flotation circuit. Coordinator for Copper
concentrator SAG – Ball mill circuit optimisation project.
1993-97 Julius Kruttschnitt Mineral Research Centre - Ph.D. Research Scholar
Thesis title “Mathematical Modeling of Stirred Mills”. The objective of the thesis was to
generate a “generic” model able to simulate fine grinding in a range of different stirred mills
design. Significant part of the thesis experimental work was conducted at pilot scale tower and
Sala pin mill located at JKMRC, CMTE and Olympic Dam Operations.
1992-93 Julius Kruttschnitt Mineral Research Centre – AEAP visiting student
Conducted evaluation of the grinding performance of the Red Dome grinding circuit using
JKSimMet Mineral Processing Simulator, and evaluation of a industrial size KHD micro screen
performance using various slurry samples.
1987 – 92 Tutor, University in Belgrade, Technical Faculty in Bor, Yugoslavia
Full time tutor at Technical Faculty in Bor covering tutorials for year 3 and 4 and 5 undergraduate
students at Mineral Processing Department. The job description included laboratory tutorials,
tutorials in data analysis, material balances, equipment selection and plant design, project work and
supervision of the undergraduate students.
Project work was carried out in RTB Bor (Mining-Metallurgical Basin), large copper and gold
producer located in the east Serbia. Company used to operate four copper mines with
approximately 15 Mt per year ore throughput. I was involved in several projects with RTB Bor
such as:
-Development of the Jaw Crusher with Two Mowing Jaws; 1988-1989
-Improvement of the Grinding and Classification Processes at RTB Bor Mineral Processing
Plants; 1987-1989.
-Development of the On Line Laser Particle Sizer for Measurement in Plant Conditions; 1989
PUBLICATIONS
Diaz, R., Mamani, H., Valery, W., Jankovic, A., Valle, R., Duffy K. A., 2015. Diagnosis Of Process Health, Its
Treatment And Improvement To Maximise Plant Throughput At Goldfields Cerro Corona. SAG2015, Vancouver,
Canada, 20-24 September
Duffy, K., Valery, W., Jankovic, A., Holtham, P., 2015. Integrating Bulk Ore Sorting into a Mining Operation to
Maximise Profitability, In Proceedings of Metallurgical Plant Design and Operating Strategies, Perth, Australia, 7-8
September.
Jankovic, A., Baguley, P., Valery Jnr., W., Holtham, P., 2015. Effect of Mineral Density for Milling Magnetite Ores,
Proceedings of Iron Ore 2015 Conference, Perth, Australia, 13-15 July, pp 159-164
Jankovic, A., Suthers, S., Wills, T., Valery Jnr., W., 2015. Evaluation of dry grinding using HPGR in closed circuit
with an air classifier, Minerals Engineering Journal Vol 71, pp 133-138
Jankovic, A., Valery, W., Sonmez, B., Oliviera, R., 2014. Effect of circulating load and classification efficiency on
HPGR and ball mill capacity, Proceedings of XXVII IMPC, 20-24 October, Santiago – Chile. Chapter 9, pp. 1-14
Maclean, A., Wirfiyata, F., Khomaeni, G., Jankovic, A., Pasin, G., Valery, W., 2014. The Ball mill Polymet liner
evaluation at PT Newmont Nusa Tenggara - Batu Hijau mine. In Proceedings of 12 AusIMM Mill Operators
Conference. Townsville, Australia 1-3 September
Jankovic, A., Valery, W., Sonmez, B., Oliviera, R., Dündar, H., 2013. A pilot scale comparison of various HPGR
operating configurations. In Proceedings of 10th
International Mineral Processing Conference Procemin 2013.
Santiago, Chile 15-18 October
Runge, K.; Tabosa, E.; Jankovic, A., 2013. Particle Size Distribution Effects that should be considered when
performing Flotation Geometallurgical Testing. In: Proceedings of the Second AusIMM International
Geometallurgy Conference, Brisbane, Australia, 30 September - 2 October, AusIMM, 2013 Publication series
10/2013, pp 335-344
Jankovic. A, and Valery, W, 2013. Energy Efficient Ball Mill Circuit – Equipment Sizing Considerations. In
Proceedings of Metallurgical Plant Design and Operating Strategies (MetPlant 2013), Perth, Australia 15 - 17 July
Sonmez, B., Eduardo, N., Corsini, J., Jankovic, A., Valery, W., Benzer, H., Dündar, H., 2013 Modelling And
Simulation Studies At An Aggregate Plant. In Proceedings of XV Balkan Mineral Processing Congress, Sozopol,
Bulgaria June 12-16.
Jankovic, A., Valery, W., Sonmez, B., 2013. The Benefits of High Classification Efficiency in Closed Ball Mill
Circuits. In Proceedings of XV Balkan Mineral Processing Congress. Sozopol, Bulgaria 12-16 June
Jankovic, A., Valery, W., Lee, D., Peres, J., Jeston, S., 2013 Validation Of A Closed Circuit Ball Mill Model.
Journal of Mining and Metallurgy, 49 A (1) (2013) 37 - 43, Republic of Serbia
Isokangas, E. Valery, W. Jankovic, A. Sonmez, B. 2012 Using process integration and optimisation to provide
integrated process solutions for mining operations, from mine to mill. XXVI International Mineral Processing
Congress, New Delhi, India
Jankovic. A, and Valery, W, 2012. The Impact Of Classification On The Energy Efficiency Of Grinding Circuits –
The Hidden Opportunity. In Proceedings of 11 AusIMM Mill Operators Conference. Hobart, Tasmania 29-31
October
Jankovic. A, and Valery, W, 2013. Closed Circuit Ball Mill – Basics Revisited. Minerals Engineering vol 43–44
pp. 148–153. presented at MEI Comminution 2012 Conference Cape Town 17-20 April
Rybinski, E., Ghersi, J., Davila, F., Linares, J., Valery, W., Jankovic, A., Valle, R., Dikmen, S. (2011) Optimisation
and Continuous Improvement of Antamina Comminution Circuit, SAG2011, Vancouver, Canada, 25-28 September
Hart, S., Rees, T., Valery, W., Jankovic, A. (2011) Process Integration And Optimisation Of The Boddington HPGR
Circuit, SAG2011, Vancouver, Canada, 25-28 September
Sonmez, B., Valery, W., Jankovic, A., 2011. New Methodology to Improve Productivity of Mining Operations,
Balkan Congress, Turkey
Jankovic, A., Valery, W., (2010) Reducing Grinding Energy and Cost - Magnetite Iron Ore Design Case Study,
Proceedings of the XIIth International Minerals Processing Symposium. Cappadocia Nevsehir, Turkey, 6-8 October
Jankovic, A., Dundar, H., Mehta, R., (2010) Relationships between the Comminution Energy and Product Size for a
Magnetite Ore. Journal of South African Insistute of Mining and Metallurgy. Vol 110, March, pp. 141-146
Gomes, MP., Tavarez Jnr, L., Nunes, E., Colacioppo, J., Jankovic, A., Valery, W., 2010. Optimization of the SAG
Mill Circuit at Kinross Paracatu, Brazil, Comminution 10
McNab, B., Jankovic, A., David, D., Payne, P. 2009. Processing of Magnetite Iron Ores – Comparing Grinding
Options. Proceedings of Iron Ore 2009 Conference, Perth, Australia, 27-29 July, pp. 277-288.
Markovic, Z.S., Jankovic, A., Tomanec. R.,2008. Effect of particle size and liberation on flotation of A low grade
porphyry copper ore. Journal of Mining and Metallurgy, 44 A (1) (2008) pp. 24 – 30. Bor, Republic of Serbia
Dance, A., Valery, W., Jankovic, A., La Rosa, D., Esen S. (2007) Maintaining the Benefit – How to Ensure Mine to
Mill Continues to Work for You. Proceedings of Ninth Mill Operators Conference, Fremantle, Australia, 19-21
March, pp. 215-223.
Esen, S., La Rosa, D., Dance, A., Valery, W., Jankovic, A. (2007) Integration and Optimisationof Blasting and
Comminution Processess. Proceedings of EXPLO Conference, Wollongong, Australia, 3-4 September, pp. 95-103.
Jankovic, A., Valery, W., Maloney, K., Markovic Z. S. (2006) Improving Overall Concentrator Performance with
Stirred Milling. Proceedings of XXIII International Minerals Processing Congress, Istanbul, Turkey, 3-8 September,
Vol 2, pp. 1949-1954.
Esen, S., Benzer, H., Jankovic, A., Cook, P. (2006) Pregrinding Technology. World Cement, November, pp. 103-
110.
Dance, A., Valery Jnr., W., Jankovic, A., La Rosa, D., Esen, S. (2006) Higher Productivity Through Cooperative
Effort: A Method Of Revealing And Correcting Hidden Operating Inefficiencies. SAG2006 – HPGR,
Geometallurgy, Testing. International Conference on Autogenous and Semiautogenous Grinding Technology,
Volume 4, 375 – 390, Vancouver, Canada.
Jankovic, A., W., Valery Jnr., Clarke, G. (2006) Design And Implementation Of An AVC Grinding Circuit at BHP
Billiton Cannington. SAG2006 – Circuit Design. International Conference on Autogenous and Semiautogenous
Grinding Technology, Volume 2, 290 – 300, Vancouver, Canada.
Tondo L.A., Valery Jnr. W., Peroni, R., La Rosa, D., Silva, A., Jankovic, A., Colacioppo, J. (2006) Kinross’ Rio
Paracatu Mineração (RPM) Mining And Milling Optimisation Of The Existing And New SAG Mill Circuit.
SAG2006 – Circuit Design. International Conference on Autogenous and Semiautogenous Grinding Technology,
Volume 2, 301 – 313, Vancouver, Canada.
Renner D., La Rosa, D., DeKlerk W., Valery W., Simpson, P., Bonney S.N., A., Jankovic, A. (2006) Anglogold
Ashanti Induapriem Mining and Milling Process Integration and Optimisation. SAG2006 – Circuit Design.
International Conference on Autogenous and Semiautogenous Grinding Technology, Volume 1, 249 – 256,
Vancouver, Canada.
Burger, B., McCaffery K., McGaffin I., Jankovic, A., Valery, W., and La Rosa, D., (2006) Batu Hijau Model for
Throughput Forecast, Mining and Milling Optimisation, and Expansion Studies. Advances in Comminution,edited
by S. Komar Kawatra, SME publication. March, pp. 461-479
Benzer, H. Jankovic, A. and Ergun, L. (2006) Cement Clinker Grinding Practice and Technology, Advances in
Comminution,edited by S. Komar Kawatra, SME publication. March, pp. 169-179
Jankovic, A., Sinclair., S. (2006) The shape of product size distribution in stirred mills, Minerals Engineering
Journal, Vol.19 pp 1528-1536, presented at Comminution 2006 Conference In Perth March 14-17
Jankovic, A. (2005) Optimisation of Ball Size Distribution in Industrial Wet Ball Mills, In Proceedings of 37th
International Conference on Mining and Metallurgy, Bor Lake, Serbia and Montenegro. 3-6 October 2005.
Jankovic, A. (2005) A review of regrinding and fine grinding technology - the facts and myths, presented at the 6th
Annual I.I.R. Crushing and Grinding Conference, Perth, Australia. 22-25 March 2005.
Onederra, I., Esen, S., and Jankovic, A., (2004) Estimation of fines generated by blasting – applications for the
mining and quarrying industries Mining Technology (Trans. Inst. Min. Metall. A) December 2004 Vol. 113 A9
Jankovic, A., Valery Jnr., W. (2004) Design and Operation of Vertimill® for Secondary Grinding, In Proceedings of
36th International Conference on Mining and Metallurgy, Bor Lake, Serbia and Montenegro. 29 September- 2
October 2004.
Jankovic, A., Cervellin, A. (2004) Coarse Grinding with Laboratory Pin Stirred Mill, In Proceedings of the 36th
International Conference on Mining and Metallurgy, Bor Lake, Serbia and Montenegro. 29 September- 2 October
2004.
Jankovic, A., Valery Jnr., W. and Davis, E. (2004) Cement Grinding Optimisation, presented at Comminution 2004
Conference and published at the Minerals Engineering Journal, Vol.17 No.11-12, 2004
Valery Jnr. W. and Jankovic, A. (2004) Multi-Stage Crushing versus SAG Mill and HPGR, presented at the 5th
Annual I.I.R. Crushing and Grinding Conference, Townsville, Australia. 29-30 March 2004.
Valery Jnr., W., La Rosa, D., Jankovic, A. (2004) Mining and Milling Process Integration and Optimisation,
presented at the SME 2004 Conference, Denver, CO. 23-25 February 2004.
Jankovic, A., 2003. Variables Affecting the Fine Grinding of Minerals Using Stirred Mills, Minerals Engeneering
vol 16, pp 337-345,. paper presented at MEI Conference 02, Perth – Australia.
Valery, W., Jankovic, A., 2002. The Future of Comminution, Proceedings of 34th
International Octobar
Conference on Mining and Metalurgy .October, pp 287-298
Jankovic, A., Markovic, Z., 2002. Pebble Milling Option for Reduced Throughput, Proceedings of 34th
International Octobar Conference on Mining and Metalurgy .October, pp 287-298
Jankovic, A., 2001. Media Stress Intensity Analysis for Vertical Stirred Mills, Minerals Engeneering, vol 14.
Special issue from MEI Conference Comminution 01, Brisbane - Australia, ., pp 1177-1186
Lam, M., Jankovic, A., Valery, W., Kanchibotla, S., 2001. Maximising the Grinding Circuit Throughput at Porgera
Gold Mine Through Blast Fragmentation, Third International Conference On Autogenous And Semiautogenous
Grinding Technology; September 30-October 3, Vancouver, B. C., Canada, pp 271-288.
Grundstrom, C., Kanchibotla, S., Jankovic, A., Thortnton, D., 2001. Blast Fragmentation for Maximising the
Grinding Circuit Throughput at Porgera Gold Mine, Proceedings of the 27 th Annual Conference on Explosives and
Blasting Technique, pp 250-258.
Jankovic, A., and S, Morrell., 2000. Scale-Up Of Tower Mill Performance Using Modelling And Simulation,
Proceedings of XXI IMPC, Rome – Italy. pp A3 1-8
Jankovic, A., 2000. Fine Grinding In Australian Minerals Industry, Journal of Mining and Metallurgy-Collection of
Papers, Section A: Mining, vol 36. No 5-6. Bor, Yugoslavia. pp 51-61.
Jankovic, A., 1999. Mathematical Modelling of Stirred Mills, Phd Thesis – University of Queensland, JKMRC,
Brisbane, Australia.
Jankovic, A., Young, M., Hinds, D., 1999. Tower fine Milling Experience at Mount Isa Mines. In: N. Jackson, G.
Dunlop, and P. Cameron (Editors), Mineral Processing & Hydrometallurgy Plant Design, Australian Mineral
Foundation, ISBN No: 0-908039-70-0, pp 243-250
Jankovic, A., 1998. Tower Mill Grinding Efficiency, Journal of Mining and Metallurgy-Collection of Papers,
Section A: Mining, vol 34. No 3-4. Bor, Yugoslavia. ., pp 164-173
Jankovic, A. and S, Morrell., 1998. A Study of Fine Particles Breakage Characterization. Proceedings of 4th
Conference on Environment and Mineral Processing, VSB-Tu Ostrava, Czech Republic., pp 9-15
Jankovic, A., 1997. Power Modelling of Stirred Mills, Proceedings of the Second UBC-MCGILL BI- Annual
International Symposium on Fundamentals of Mineral Processing and the Environment, Sudbury, Ontario, August,
pp 463-470
Jankovic, A. Trumic, G., Trumic, M., Markovic, Z., 1997. Extension and Facilitation of the Bond Grindability Test;
Proceedings of 7 th Balkan Conference on Mineral Processing, Vatra Dornei, Romania. May
Jankovic, A., 1997. Vertical Pin Stirred Mills Power Modelling, New Trends in Mineral Processing II, Proceedings,
VSB - Technicka Univerzita Ostrava, Jun
Jankovic, A., Morrell, S., 1996. Evaluation of the Performance of the KHD Micro-Screen, poster presentation at
Minerals Engineering Conference; Brisbane, Australia, August
Jankovic, A., 1995. Stirred Mills Modeling - Literature Review, Zbornik Radova Glasnika Rudarstva I Metalurgije,
(Journal of Mining and Metallurgical Engineering Collection of Papers) vol 32 No3,
Jankovic, A., 1995. Comparison of a laboratory tower and tumbling ball mill, Zbornik Radova Glasnika Rudarstva I
Metalurgije, (Journal of Mining and Metallurgical Engineering Collection of Papers) vol 31 No2.
Magdalinovic. N., Budic. I., Markovic. Z.S., Jankovic, A., 1995. The Energy for Copper Ore Crushing; Proceedings
of 6 th Balkan Conference on Mineral Processing, Ohrid, Republic of Macedonia. September 18-21.
Jankovic, A., 1993. Observations on the Bond Grindability Test and Proposals for Its Improvement; The Second
JKMRC Postgraduate Conference, Brisbane, Australia. September
Jankovic, A., 1992. Mathematical Model of the Grinding Kinetics in the Bond Rod Mill; Zbornik Radova Glasnika
Rudarstva I Metalurgije (Journal of Mining and Metallurgy-Collection of Papers), vol 6. No 2. Bor. Yugoslavia.
Jankovic, A., 1992. Mathematical Model of Grinding Kinetics in the Bond Ball Mill; Zbornik Radova Glasnika
Rudarstva I Metalurgije (Journal of Mining and Metallurgy-Collection of Papers), vol 5. No 4. Bor, Yugoslavia.
Jankovic, A., 1991. Methods for Size Distribution Determination in Mineral Processing; Tehnica, Journal of
Yugoslav Engineers and Technicians Association vol 3-4.
Jankovic, A., 1991. Hydrocyclone Optimization by use of the Experiment Design Method; XIII Yugoslav Mineral
Processing Simposium-Colection of Papers, Gornji Milanovac, Yugoslavia.
Jankovic, A., 1991. Mill Optimization's by use of the Experimental Design Method; II Symposium on Mathematical
Method and Computer Application in Geology Mining and Metallurgy-Collection of Papers; Belgrade, Yugoslavia.
Jankovic, A., 1990. Laser Particle Size in Mineral Processing; Conference on Technologies Advancement and
Rationalization in Geology Mining and Metallurgy, Collection of Mineral Processing Papers, Belgrade, Yugoslavia.
Jankovic, A., Magdalinovic. N., 1990. Multihidrocyclone - New Unit for Classification; Conference on
Technologies Advancement and Rationalization in Geology Mining and Metallurgy, Collection of Mineral
Processing Papers, Belgrade, Yugoslavia.
Magdalinovic. N., Budic. I., Markovic. Z.S., Jankovic, A., 1990. Mathematical Model for Determination of a
Optimal Crusher Product size; AufbereitungTechnic, 31.(1990) No5.
Magdalinovic. N., Budic. I., Markovic. Z.S., Jankovic, A., 1989. Optimal Crusher Product Size Determination in
RTB Bor Mineral Processing Plants; Octobers Consultations- Collection of Papers, Bor, Yugoslavia.
Jankovic, A., 1988. Contribution to the Theory of Screening Kinetics; Zbornik Radova Glasnika Rudarstva I
Metalurgije (Journal of Mining and Metallurgical Engineering Collection of Papers) vol 24 No2.
Jankovic, A., 1987. Shorten Procedure for Bond Work Index Determination; Octobers Consultations-Collection of
Papers, Bor, Yugoslavia.

More Related Content

What's hot

Statement of Qualification
Statement of QualificationStatement of Qualification
Statement of Qualification
Ashok Medhi
 
AHBeosumbarPrTechEngCV2013Vol2
AHBeosumbarPrTechEngCV2013Vol2AHBeosumbarPrTechEngCV2013Vol2
AHBeosumbarPrTechEngCV2013Vol2Ashwin Beosumbar
 
djn Resume 2015_August
djn Resume 2015_Augustdjn Resume 2015_August
djn Resume 2015_AugustDavid Neitsch
 
Brian Charles Hoskins
Brian Charles HoskinsBrian Charles Hoskins
Brian Charles HoskinsBrian Hoskins
 
Civil Engineer Hassan Shafeeq CV
Civil Engineer Hassan Shafeeq CVCivil Engineer Hassan Shafeeq CV
Civil Engineer Hassan Shafeeq CV
Hassan Shafeeq Mohammed
 
Eric Peterson Acuity 2011 CV
Eric Peterson Acuity 2011 CVEric Peterson Acuity 2011 CV
Eric Peterson Acuity 2011 CVelmpeterson
 
Oremet Corporate Profile June 2016
Oremet Corporate Profile June 2016Oremet Corporate Profile June 2016
Oremet Corporate Profile June 2016Elias Nacario
 
Resume-Rahul Ragit
Resume-Rahul RagitResume-Rahul Ragit
Resume-Rahul RagitRahul Ragit
 
Patrick B Wiseman work experience
Patrick B Wiseman work experiencePatrick B Wiseman work experience
Patrick B Wiseman work experiencePat Wiseman
 
DAHL JEFFREY - CV - Resume 20161026
DAHL JEFFREY - CV - Resume 20161026DAHL JEFFREY - CV - Resume 20161026
DAHL JEFFREY - CV - Resume 20161026Jeff Dahl
 

What's hot (19)

Paul R 2015
Paul R 2015Paul R 2015
Paul R 2015
 
Statement of Qualification
Statement of QualificationStatement of Qualification
Statement of Qualification
 
AHBeosumbarPrTechEngCV2013Vol2
AHBeosumbarPrTechEngCV2013Vol2AHBeosumbarPrTechEngCV2013Vol2
AHBeosumbarPrTechEngCV2013Vol2
 
djn Resume 2015_August
djn Resume 2015_Augustdjn Resume 2015_August
djn Resume 2015_August
 
Brian Charles Hoskins
Brian Charles HoskinsBrian Charles Hoskins
Brian Charles Hoskins
 
CV of Purushotham (1)
CV of Purushotham (1)CV of Purushotham (1)
CV of Purushotham (1)
 
Civil Engineer Hassan Shafeeq CV
Civil Engineer Hassan Shafeeq CVCivil Engineer Hassan Shafeeq CV
Civil Engineer Hassan Shafeeq CV
 
Eric Peterson Acuity 2011 CV
Eric Peterson Acuity 2011 CVEric Peterson Acuity 2011 CV
Eric Peterson Acuity 2011 CV
 
Scott Bullock CV 25112016
Scott Bullock CV 25112016Scott Bullock CV 25112016
Scott Bullock CV 25112016
 
Resume August 2015
Resume August 2015Resume August 2015
Resume August 2015
 
Oremet Corporate Profile June 2016
Oremet Corporate Profile June 2016Oremet Corporate Profile June 2016
Oremet Corporate Profile June 2016
 
jameston magallano
jameston magallanojameston magallano
jameston magallano
 
S_S_Kushwah_CV_-_Copy
S_S_Kushwah_CV_-_CopyS_S_Kushwah_CV_-_Copy
S_S_Kushwah_CV_-_Copy
 
Resume-Rahul Ragit
Resume-Rahul RagitResume-Rahul Ragit
Resume-Rahul Ragit
 
7nteng
7nteng7nteng
7nteng
 
Resume201503230249
Resume201503230249Resume201503230249
Resume201503230249
 
Patrick B Wiseman work experience
Patrick B Wiseman work experiencePatrick B Wiseman work experience
Patrick B Wiseman work experience
 
res-16
res-16res-16
res-16
 
DAHL JEFFREY - CV - Resume 20161026
DAHL JEFFREY - CV - Resume 20161026DAHL JEFFREY - CV - Resume 20161026
DAHL JEFFREY - CV - Resume 20161026
 

Similar to Aleksandar Jankovic CV 16

Sten Johansson CV1 -2016
Sten Johansson CV1 -2016Sten Johansson CV1 -2016
Sten Johansson CV1 -2016Sten Johansson
 
Samuel Edmonds - Resume
Samuel Edmonds - ResumeSamuel Edmonds - Resume
Samuel Edmonds - ResumeSam Edmonds
 
Michael Groarke Resume
Michael Groarke Resume Michael Groarke Resume
Michael Groarke Resume
Michael Groarke
 
CV Dr. Prithwiraj Sahu Environment Specialist
CV Dr. Prithwiraj Sahu  Environment SpecialistCV Dr. Prithwiraj Sahu  Environment Specialist
CV Dr. Prithwiraj Sahu Environment SpecialistPrithwiraj Sahu
 
20150728_CV_Sunit Patel
20150728_CV_Sunit Patel20150728_CV_Sunit Patel
20150728_CV_Sunit PatelSunit Patel
 
CV Colin Little_June2016
CV Colin Little_June2016CV Colin Little_June2016
CV Colin Little_June2016
Colin Little
 
CV_WeifnegLi_2016
CV_WeifnegLi_2016CV_WeifnegLi_2016
CV_WeifnegLi_2016Weifeng Li
 
ProResume-CV_7.0
ProResume-CV_7.0ProResume-CV_7.0
ProResume-CV_7.0Mark Travis
 
Resume of manoj Geologist
Resume of manoj GeologistResume of manoj Geologist
Resume of manoj GeologistManoj Sharma
 
CV Jill Cooper
CV Jill CooperCV Jill Cooper
CV Jill Cooper
Jill Cooper
 
CV Anisimov Geologist Funct 2015
CV Anisimov Geologist Funct 2015CV Anisimov Geologist Funct 2015
CV Anisimov Geologist Funct 2015Ilya Anisimov
 
Steve king solid geology ltd capability statement april 2018 email
Steve king solid geology ltd capability statement april 2018 emailSteve king solid geology ltd capability statement april 2018 email
Steve king solid geology ltd capability statement april 2018 email
Steve King
 
Resume - Jayesh Vanza
Resume - Jayesh Vanza Resume - Jayesh Vanza
Resume - Jayesh Vanza
jayesh127
 

Similar to Aleksandar Jankovic CV 16 (20)

Manivannan resume (3)
Manivannan resume (3)Manivannan resume (3)
Manivannan resume (3)
 
Sten Johansson CV1 -2016
Sten Johansson CV1 -2016Sten Johansson CV1 -2016
Sten Johansson CV1 -2016
 
Samuel Edmonds - Resume
Samuel Edmonds - ResumeSamuel Edmonds - Resume
Samuel Edmonds - Resume
 
Michael Groarke Resume
Michael Groarke Resume Michael Groarke Resume
Michael Groarke Resume
 
CV Dr. Prithwiraj Sahu Environment Specialist
CV Dr. Prithwiraj Sahu  Environment SpecialistCV Dr. Prithwiraj Sahu  Environment Specialist
CV Dr. Prithwiraj Sahu Environment Specialist
 
20150728_CV_Sunit Patel
20150728_CV_Sunit Patel20150728_CV_Sunit Patel
20150728_CV_Sunit Patel
 
CV Colin Little_June2016
CV Colin Little_June2016CV Colin Little_June2016
CV Colin Little_June2016
 
CV_WeifnegLi_2016
CV_WeifnegLi_2016CV_WeifnegLi_2016
CV_WeifnegLi_2016
 
Pekka_Bergström_2016
Pekka_Bergström_2016Pekka_Bergström_2016
Pekka_Bergström_2016
 
ProResume-CV_7.0
ProResume-CV_7.0ProResume-CV_7.0
ProResume-CV_7.0
 
Resume of manoj Geologist
Resume of manoj GeologistResume of manoj Geologist
Resume of manoj Geologist
 
CV Jill Cooper
CV Jill CooperCV Jill Cooper
CV Jill Cooper
 
Akash CV 12_16
Akash CV 12_16Akash CV 12_16
Akash CV 12_16
 
AmanCV
AmanCVAmanCV
AmanCV
 
CV Anisimov Geologist Funct 2015
CV Anisimov Geologist Funct 2015CV Anisimov Geologist Funct 2015
CV Anisimov Geologist Funct 2015
 
KMac_CV_November 2016
KMac_CV_November 2016KMac_CV_November 2016
KMac_CV_November 2016
 
Current Resume
Current ResumeCurrent Resume
Current Resume
 
Steve king solid geology ltd capability statement april 2018 email
Steve king solid geology ltd capability statement april 2018 emailSteve king solid geology ltd capability statement april 2018 email
Steve king solid geology ltd capability statement april 2018 email
 
AndrewRussellResume
AndrewRussellResumeAndrewRussellResume
AndrewRussellResume
 
Resume - Jayesh Vanza
Resume - Jayesh Vanza Resume - Jayesh Vanza
Resume - Jayesh Vanza
 

Aleksandar Jankovic CV 16

  • 1. Dr. Aleksandar Jankovic PERSONAL DETAILS Address: 5 Arosa St, Jamboree Heights, Brisbane, QLD 4074, Australia. Telephones: +61 7 3166 7777 (w) +61 7 32790077 (h) mobile +61 429196676 E-mail: ajankovic@hatch.com.au Born: 11 June 1962, Paracin, Yugoslavia (Permanent Resident in Australia since August 1997, Australian Citizen since 1999). Marital Status: Married, two children. Languages: Serbian (original language), English (fluent), Russian (basic), Spanish (basic), EDUCATION 1993-1997 Ph.D. Course University of Queensland, JKMRC, Brisbane, Australia 1989-1991 Master of Technical Science University in Belgrade, Technical Faculty in Bor, Yugoslavia 1981-1987 Graduated Engineer of Mining- Mineral Processing Major University in Belgrade, Technical Faculty in Bor, Yugoslavia PROFESSIONAL SUMMARY
  • 2. Twenty nine years experience in research, consultancy, engineering and operational environment. Specialist in fine grinding technologies, crushing, grinding and fine grinding modelling and simulation, with broad experience from major operations all around the world. Areas of experience include base metals, gold, alumina, iron ore, coal, phosphate and cement, with emphasis on grinding optimistion, mine to mill process integration, process and equipment development, ore characterisation testwork, crushing, grinding and fine grinding process and equipment evaluation and selection. EXPERIENCE March 2016 – present… Principal Consultant, Mining & Mineral Processing - Hatch Responsible for Comminution and fine grinding consulting, design and development. September 2014 – March 2016…Metso Minerals Process Technology and Innovation – General Manager Technical Services Responsible for Process Technology and Innovation R&D and Consulting Services. Projects include B2 Gold Otjikoto, Vale Salobo, PanAust Inca de Oro and Carmen, G-Resources Martabe, Newcrest Lihir, CITIC Sino Iron, Eco-Efficient processing R&D........ 2009 - 2014 … Metso Minerals Process Technology and Innovation – General Manager of Technology and Innovation Responsible for Process Technology and Innovation R&D and consulting on Mine to Mill process integration, grinding circuit design and optimization. Projects include Rio Tinto Oyu Tolgoi, Newmont Tanami, Boddington, Glencore CSA Cobar, OneSteel Whayala, Cerro Verde, Yanacocha, Cerro Corona, Vale Bayovar Peru, Golder Faboliden, Eco-Efficient processing R&D........ 2008- 2009 GRD Minproc – Senior Process Engineer. La Constancia Cu-Mo-Ag DFS Study, Ban Houayxai gold DFS Study, Phuthep copper project Accountable to: -provide designated process engineering teams with appropriate quality and best practice in process engineering. -prepare of designated study, project and proposal documents to ensure quality and accuracy of information. -ensure delivery of process services to designated study, project and proposal teams on or ahead of schedule and on or under budget. 2003-2008 Metso Minerals Process Technology (Asia-Pacific) – Manager of Development and Process Engineering. Responsible for Metso Minerals Process Technology internal development in fine grinding and
  • 3. external consulting on Mine to Mill process integration, grinding process upgrade and optimisation for numeros mining operations: Antamina, Andina, Cerro Colorado, Escondida, Fosfertil, CSN, Oktedi, Freeport, Newmont Batu Hijau, St Ives, Placer Granny Smith, Xstrata Mt Isa Mines, Newcrest Cadia-Ridgeway, CVRD Salobo and Crajas, Phelps Dodge Cero Verde, Newmont Mines Congas, Anglogold Ashanti Induapriem, RPM Brasil, BHP Cannington, BHP Worsley Alumina, BMA Coal, Candelaria, Morrila Mali, Zimplats, ….. 2001 -2003 Julius Kruttschnitt Mineral Research Centre – Research Fellow - Research in Mine to Mill projects: Iron Ore of Canada, Boliden Aitik (Sweden), Kennecott Utah Copper and Greens Creek, WMC, Cannington. Optimisation of SAG – Ball mill grinding circuits at Kennecott copper mine. - Responsible for Tower mill modelling and model validation project - Consultant with JKTech in fine grinding, grinding optimisation and design: Porgera, MIM, Worsley Alumina, Alcoa 1999-2001 Julius Kruttschnitt Mineral Research Centre - Senior Research Officer - Research in Mine to Mill projects: Porgera, Century, Cadia, Alumbrera, Mount Isa, Ernest Henry, Fimiston. - Research in Optimisation of SAG – Ball mill grinding circuits: Cannington, Porgera, Kidston, Elura. - Responsible for Tower mill modelling and model validation project - Consultant with JKTech in grinding optimization and fine grinding testwork, scale-up and simulation. 1998-99 Mount Isa Mines – Project Metallurgist Responsible for Mine and Concentrator interaction, SAG/ball and rod/ball mill grinding, regrinding, fine grinding and particle classification related projects in Lead Zinc Concentrator. Special focus on ISAMILL grinding media optimisation for refractory lead/zinc ore for George Fisher Project. Work in complex galena – sphalerite flotation circuit. Coordinator for Copper concentrator SAG – Ball mill circuit optimisation project. 1993-97 Julius Kruttschnitt Mineral Research Centre - Ph.D. Research Scholar Thesis title “Mathematical Modeling of Stirred Mills”. The objective of the thesis was to generate a “generic” model able to simulate fine grinding in a range of different stirred mills design. Significant part of the thesis experimental work was conducted at pilot scale tower and Sala pin mill located at JKMRC, CMTE and Olympic Dam Operations. 1992-93 Julius Kruttschnitt Mineral Research Centre – AEAP visiting student
  • 4. Conducted evaluation of the grinding performance of the Red Dome grinding circuit using JKSimMet Mineral Processing Simulator, and evaluation of a industrial size KHD micro screen performance using various slurry samples. 1987 – 92 Tutor, University in Belgrade, Technical Faculty in Bor, Yugoslavia Full time tutor at Technical Faculty in Bor covering tutorials for year 3 and 4 and 5 undergraduate students at Mineral Processing Department. The job description included laboratory tutorials, tutorials in data analysis, material balances, equipment selection and plant design, project work and supervision of the undergraduate students. Project work was carried out in RTB Bor (Mining-Metallurgical Basin), large copper and gold producer located in the east Serbia. Company used to operate four copper mines with approximately 15 Mt per year ore throughput. I was involved in several projects with RTB Bor such as: -Development of the Jaw Crusher with Two Mowing Jaws; 1988-1989 -Improvement of the Grinding and Classification Processes at RTB Bor Mineral Processing Plants; 1987-1989. -Development of the On Line Laser Particle Sizer for Measurement in Plant Conditions; 1989 PUBLICATIONS Diaz, R., Mamani, H., Valery, W., Jankovic, A., Valle, R., Duffy K. A., 2015. Diagnosis Of Process Health, Its Treatment And Improvement To Maximise Plant Throughput At Goldfields Cerro Corona. SAG2015, Vancouver, Canada, 20-24 September Duffy, K., Valery, W., Jankovic, A., Holtham, P., 2015. Integrating Bulk Ore Sorting into a Mining Operation to Maximise Profitability, In Proceedings of Metallurgical Plant Design and Operating Strategies, Perth, Australia, 7-8 September. Jankovic, A., Baguley, P., Valery Jnr., W., Holtham, P., 2015. Effect of Mineral Density for Milling Magnetite Ores, Proceedings of Iron Ore 2015 Conference, Perth, Australia, 13-15 July, pp 159-164 Jankovic, A., Suthers, S., Wills, T., Valery Jnr., W., 2015. Evaluation of dry grinding using HPGR in closed circuit with an air classifier, Minerals Engineering Journal Vol 71, pp 133-138 Jankovic, A., Valery, W., Sonmez, B., Oliviera, R., 2014. Effect of circulating load and classification efficiency on HPGR and ball mill capacity, Proceedings of XXVII IMPC, 20-24 October, Santiago – Chile. Chapter 9, pp. 1-14
  • 5. Maclean, A., Wirfiyata, F., Khomaeni, G., Jankovic, A., Pasin, G., Valery, W., 2014. The Ball mill Polymet liner evaluation at PT Newmont Nusa Tenggara - Batu Hijau mine. In Proceedings of 12 AusIMM Mill Operators Conference. Townsville, Australia 1-3 September Jankovic, A., Valery, W., Sonmez, B., Oliviera, R., Dündar, H., 2013. A pilot scale comparison of various HPGR operating configurations. In Proceedings of 10th International Mineral Processing Conference Procemin 2013. Santiago, Chile 15-18 October Runge, K.; Tabosa, E.; Jankovic, A., 2013. Particle Size Distribution Effects that should be considered when performing Flotation Geometallurgical Testing. In: Proceedings of the Second AusIMM International Geometallurgy Conference, Brisbane, Australia, 30 September - 2 October, AusIMM, 2013 Publication series 10/2013, pp 335-344 Jankovic. A, and Valery, W, 2013. Energy Efficient Ball Mill Circuit – Equipment Sizing Considerations. In Proceedings of Metallurgical Plant Design and Operating Strategies (MetPlant 2013), Perth, Australia 15 - 17 July Sonmez, B., Eduardo, N., Corsini, J., Jankovic, A., Valery, W., Benzer, H., Dündar, H., 2013 Modelling And Simulation Studies At An Aggregate Plant. In Proceedings of XV Balkan Mineral Processing Congress, Sozopol, Bulgaria June 12-16. Jankovic, A., Valery, W., Sonmez, B., 2013. The Benefits of High Classification Efficiency in Closed Ball Mill Circuits. In Proceedings of XV Balkan Mineral Processing Congress. Sozopol, Bulgaria 12-16 June Jankovic, A., Valery, W., Lee, D., Peres, J., Jeston, S., 2013 Validation Of A Closed Circuit Ball Mill Model. Journal of Mining and Metallurgy, 49 A (1) (2013) 37 - 43, Republic of Serbia Isokangas, E. Valery, W. Jankovic, A. Sonmez, B. 2012 Using process integration and optimisation to provide integrated process solutions for mining operations, from mine to mill. XXVI International Mineral Processing Congress, New Delhi, India Jankovic. A, and Valery, W, 2012. The Impact Of Classification On The Energy Efficiency Of Grinding Circuits – The Hidden Opportunity. In Proceedings of 11 AusIMM Mill Operators Conference. Hobart, Tasmania 29-31 October Jankovic. A, and Valery, W, 2013. Closed Circuit Ball Mill – Basics Revisited. Minerals Engineering vol 43–44 pp. 148–153. presented at MEI Comminution 2012 Conference Cape Town 17-20 April Rybinski, E., Ghersi, J., Davila, F., Linares, J., Valery, W., Jankovic, A., Valle, R., Dikmen, S. (2011) Optimisation and Continuous Improvement of Antamina Comminution Circuit, SAG2011, Vancouver, Canada, 25-28 September
  • 6. Hart, S., Rees, T., Valery, W., Jankovic, A. (2011) Process Integration And Optimisation Of The Boddington HPGR Circuit, SAG2011, Vancouver, Canada, 25-28 September Sonmez, B., Valery, W., Jankovic, A., 2011. New Methodology to Improve Productivity of Mining Operations, Balkan Congress, Turkey Jankovic, A., Valery, W., (2010) Reducing Grinding Energy and Cost - Magnetite Iron Ore Design Case Study, Proceedings of the XIIth International Minerals Processing Symposium. Cappadocia Nevsehir, Turkey, 6-8 October Jankovic, A., Dundar, H., Mehta, R., (2010) Relationships between the Comminution Energy and Product Size for a Magnetite Ore. Journal of South African Insistute of Mining and Metallurgy. Vol 110, March, pp. 141-146 Gomes, MP., Tavarez Jnr, L., Nunes, E., Colacioppo, J., Jankovic, A., Valery, W., 2010. Optimization of the SAG Mill Circuit at Kinross Paracatu, Brazil, Comminution 10 McNab, B., Jankovic, A., David, D., Payne, P. 2009. Processing of Magnetite Iron Ores – Comparing Grinding Options. Proceedings of Iron Ore 2009 Conference, Perth, Australia, 27-29 July, pp. 277-288. Markovic, Z.S., Jankovic, A., Tomanec. R.,2008. Effect of particle size and liberation on flotation of A low grade porphyry copper ore. Journal of Mining and Metallurgy, 44 A (1) (2008) pp. 24 – 30. Bor, Republic of Serbia Dance, A., Valery, W., Jankovic, A., La Rosa, D., Esen S. (2007) Maintaining the Benefit – How to Ensure Mine to Mill Continues to Work for You. Proceedings of Ninth Mill Operators Conference, Fremantle, Australia, 19-21 March, pp. 215-223. Esen, S., La Rosa, D., Dance, A., Valery, W., Jankovic, A. (2007) Integration and Optimisationof Blasting and Comminution Processess. Proceedings of EXPLO Conference, Wollongong, Australia, 3-4 September, pp. 95-103. Jankovic, A., Valery, W., Maloney, K., Markovic Z. S. (2006) Improving Overall Concentrator Performance with Stirred Milling. Proceedings of XXIII International Minerals Processing Congress, Istanbul, Turkey, 3-8 September, Vol 2, pp. 1949-1954. Esen, S., Benzer, H., Jankovic, A., Cook, P. (2006) Pregrinding Technology. World Cement, November, pp. 103- 110. Dance, A., Valery Jnr., W., Jankovic, A., La Rosa, D., Esen, S. (2006) Higher Productivity Through Cooperative Effort: A Method Of Revealing And Correcting Hidden Operating Inefficiencies. SAG2006 – HPGR, Geometallurgy, Testing. International Conference on Autogenous and Semiautogenous Grinding Technology, Volume 4, 375 – 390, Vancouver, Canada. Jankovic, A., W., Valery Jnr., Clarke, G. (2006) Design And Implementation Of An AVC Grinding Circuit at BHP Billiton Cannington. SAG2006 – Circuit Design. International Conference on Autogenous and Semiautogenous Grinding Technology, Volume 2, 290 – 300, Vancouver, Canada. Tondo L.A., Valery Jnr. W., Peroni, R., La Rosa, D., Silva, A., Jankovic, A., Colacioppo, J. (2006) Kinross’ Rio Paracatu Mineração (RPM) Mining And Milling Optimisation Of The Existing And New SAG Mill Circuit.
  • 7. SAG2006 – Circuit Design. International Conference on Autogenous and Semiautogenous Grinding Technology, Volume 2, 301 – 313, Vancouver, Canada. Renner D., La Rosa, D., DeKlerk W., Valery W., Simpson, P., Bonney S.N., A., Jankovic, A. (2006) Anglogold Ashanti Induapriem Mining and Milling Process Integration and Optimisation. SAG2006 – Circuit Design. International Conference on Autogenous and Semiautogenous Grinding Technology, Volume 1, 249 – 256, Vancouver, Canada. Burger, B., McCaffery K., McGaffin I., Jankovic, A., Valery, W., and La Rosa, D., (2006) Batu Hijau Model for Throughput Forecast, Mining and Milling Optimisation, and Expansion Studies. Advances in Comminution,edited by S. Komar Kawatra, SME publication. March, pp. 461-479 Benzer, H. Jankovic, A. and Ergun, L. (2006) Cement Clinker Grinding Practice and Technology, Advances in Comminution,edited by S. Komar Kawatra, SME publication. March, pp. 169-179 Jankovic, A., Sinclair., S. (2006) The shape of product size distribution in stirred mills, Minerals Engineering Journal, Vol.19 pp 1528-1536, presented at Comminution 2006 Conference In Perth March 14-17 Jankovic, A. (2005) Optimisation of Ball Size Distribution in Industrial Wet Ball Mills, In Proceedings of 37th International Conference on Mining and Metallurgy, Bor Lake, Serbia and Montenegro. 3-6 October 2005. Jankovic, A. (2005) A review of regrinding and fine grinding technology - the facts and myths, presented at the 6th Annual I.I.R. Crushing and Grinding Conference, Perth, Australia. 22-25 March 2005. Onederra, I., Esen, S., and Jankovic, A., (2004) Estimation of fines generated by blasting – applications for the mining and quarrying industries Mining Technology (Trans. Inst. Min. Metall. A) December 2004 Vol. 113 A9 Jankovic, A., Valery Jnr., W. (2004) Design and Operation of Vertimill® for Secondary Grinding, In Proceedings of 36th International Conference on Mining and Metallurgy, Bor Lake, Serbia and Montenegro. 29 September- 2 October 2004. Jankovic, A., Cervellin, A. (2004) Coarse Grinding with Laboratory Pin Stirred Mill, In Proceedings of the 36th International Conference on Mining and Metallurgy, Bor Lake, Serbia and Montenegro. 29 September- 2 October 2004. Jankovic, A., Valery Jnr., W. and Davis, E. (2004) Cement Grinding Optimisation, presented at Comminution 2004 Conference and published at the Minerals Engineering Journal, Vol.17 No.11-12, 2004 Valery Jnr. W. and Jankovic, A. (2004) Multi-Stage Crushing versus SAG Mill and HPGR, presented at the 5th Annual I.I.R. Crushing and Grinding Conference, Townsville, Australia. 29-30 March 2004. Valery Jnr., W., La Rosa, D., Jankovic, A. (2004) Mining and Milling Process Integration and Optimisation, presented at the SME 2004 Conference, Denver, CO. 23-25 February 2004. Jankovic, A., 2003. Variables Affecting the Fine Grinding of Minerals Using Stirred Mills, Minerals Engeneering vol 16, pp 337-345,. paper presented at MEI Conference 02, Perth – Australia.
  • 8. Valery, W., Jankovic, A., 2002. The Future of Comminution, Proceedings of 34th International Octobar Conference on Mining and Metalurgy .October, pp 287-298 Jankovic, A., Markovic, Z., 2002. Pebble Milling Option for Reduced Throughput, Proceedings of 34th International Octobar Conference on Mining and Metalurgy .October, pp 287-298 Jankovic, A., 2001. Media Stress Intensity Analysis for Vertical Stirred Mills, Minerals Engeneering, vol 14. Special issue from MEI Conference Comminution 01, Brisbane - Australia, ., pp 1177-1186 Lam, M., Jankovic, A., Valery, W., Kanchibotla, S., 2001. Maximising the Grinding Circuit Throughput at Porgera Gold Mine Through Blast Fragmentation, Third International Conference On Autogenous And Semiautogenous Grinding Technology; September 30-October 3, Vancouver, B. C., Canada, pp 271-288. Grundstrom, C., Kanchibotla, S., Jankovic, A., Thortnton, D., 2001. Blast Fragmentation for Maximising the Grinding Circuit Throughput at Porgera Gold Mine, Proceedings of the 27 th Annual Conference on Explosives and Blasting Technique, pp 250-258. Jankovic, A., and S, Morrell., 2000. Scale-Up Of Tower Mill Performance Using Modelling And Simulation, Proceedings of XXI IMPC, Rome – Italy. pp A3 1-8 Jankovic, A., 2000. Fine Grinding In Australian Minerals Industry, Journal of Mining and Metallurgy-Collection of Papers, Section A: Mining, vol 36. No 5-6. Bor, Yugoslavia. pp 51-61. Jankovic, A., 1999. Mathematical Modelling of Stirred Mills, Phd Thesis – University of Queensland, JKMRC, Brisbane, Australia. Jankovic, A., Young, M., Hinds, D., 1999. Tower fine Milling Experience at Mount Isa Mines. In: N. Jackson, G. Dunlop, and P. Cameron (Editors), Mineral Processing & Hydrometallurgy Plant Design, Australian Mineral Foundation, ISBN No: 0-908039-70-0, pp 243-250 Jankovic, A., 1998. Tower Mill Grinding Efficiency, Journal of Mining and Metallurgy-Collection of Papers, Section A: Mining, vol 34. No 3-4. Bor, Yugoslavia. ., pp 164-173 Jankovic, A. and S, Morrell., 1998. A Study of Fine Particles Breakage Characterization. Proceedings of 4th Conference on Environment and Mineral Processing, VSB-Tu Ostrava, Czech Republic., pp 9-15 Jankovic, A., 1997. Power Modelling of Stirred Mills, Proceedings of the Second UBC-MCGILL BI- Annual International Symposium on Fundamentals of Mineral Processing and the Environment, Sudbury, Ontario, August, pp 463-470 Jankovic, A. Trumic, G., Trumic, M., Markovic, Z., 1997. Extension and Facilitation of the Bond Grindability Test; Proceedings of 7 th Balkan Conference on Mineral Processing, Vatra Dornei, Romania. May Jankovic, A., 1997. Vertical Pin Stirred Mills Power Modelling, New Trends in Mineral Processing II, Proceedings, VSB - Technicka Univerzita Ostrava, Jun
  • 9. Jankovic, A., Morrell, S., 1996. Evaluation of the Performance of the KHD Micro-Screen, poster presentation at Minerals Engineering Conference; Brisbane, Australia, August Jankovic, A., 1995. Stirred Mills Modeling - Literature Review, Zbornik Radova Glasnika Rudarstva I Metalurgije, (Journal of Mining and Metallurgical Engineering Collection of Papers) vol 32 No3, Jankovic, A., 1995. Comparison of a laboratory tower and tumbling ball mill, Zbornik Radova Glasnika Rudarstva I Metalurgije, (Journal of Mining and Metallurgical Engineering Collection of Papers) vol 31 No2. Magdalinovic. N., Budic. I., Markovic. Z.S., Jankovic, A., 1995. The Energy for Copper Ore Crushing; Proceedings of 6 th Balkan Conference on Mineral Processing, Ohrid, Republic of Macedonia. September 18-21. Jankovic, A., 1993. Observations on the Bond Grindability Test and Proposals for Its Improvement; The Second JKMRC Postgraduate Conference, Brisbane, Australia. September Jankovic, A., 1992. Mathematical Model of the Grinding Kinetics in the Bond Rod Mill; Zbornik Radova Glasnika Rudarstva I Metalurgije (Journal of Mining and Metallurgy-Collection of Papers), vol 6. No 2. Bor. Yugoslavia. Jankovic, A., 1992. Mathematical Model of Grinding Kinetics in the Bond Ball Mill; Zbornik Radova Glasnika Rudarstva I Metalurgije (Journal of Mining and Metallurgy-Collection of Papers), vol 5. No 4. Bor, Yugoslavia. Jankovic, A., 1991. Methods for Size Distribution Determination in Mineral Processing; Tehnica, Journal of Yugoslav Engineers and Technicians Association vol 3-4. Jankovic, A., 1991. Hydrocyclone Optimization by use of the Experiment Design Method; XIII Yugoslav Mineral Processing Simposium-Colection of Papers, Gornji Milanovac, Yugoslavia. Jankovic, A., 1991. Mill Optimization's by use of the Experimental Design Method; II Symposium on Mathematical Method and Computer Application in Geology Mining and Metallurgy-Collection of Papers; Belgrade, Yugoslavia. Jankovic, A., 1990. Laser Particle Size in Mineral Processing; Conference on Technologies Advancement and Rationalization in Geology Mining and Metallurgy, Collection of Mineral Processing Papers, Belgrade, Yugoslavia. Jankovic, A., Magdalinovic. N., 1990. Multihidrocyclone - New Unit for Classification; Conference on Technologies Advancement and Rationalization in Geology Mining and Metallurgy, Collection of Mineral Processing Papers, Belgrade, Yugoslavia. Magdalinovic. N., Budic. I., Markovic. Z.S., Jankovic, A., 1990. Mathematical Model for Determination of a Optimal Crusher Product size; AufbereitungTechnic, 31.(1990) No5. Magdalinovic. N., Budic. I., Markovic. Z.S., Jankovic, A., 1989. Optimal Crusher Product Size Determination in RTB Bor Mineral Processing Plants; Octobers Consultations- Collection of Papers, Bor, Yugoslavia. Jankovic, A., 1988. Contribution to the Theory of Screening Kinetics; Zbornik Radova Glasnika Rudarstva I Metalurgije (Journal of Mining and Metallurgical Engineering Collection of Papers) vol 24 No2.
  • 10. Jankovic, A., 1987. Shorten Procedure for Bond Work Index Determination; Octobers Consultations-Collection of Papers, Bor, Yugoslavia.