SlideShare a Scribd company logo
1 of 2
Aju Vignesh
Email: vignesh2696@gmail.com Tel: +91-91583674 27
Profile
Around 3 years of comprehensive professional experience with Tetra pak .India .Ltd. Led different minor, major
Beverage, Dairy and chocolate projects and ensured successful delivery. Managed interfaces with various
stakeholders while pursuing excellence in project within time and schedule.
Team player, Key negotiator and Problem solving helped me secure many of our projects with clients.
Leadership skill has helped me lead our multi-functional team to greater level of achievement for the company.
Work Experiences
Tetra pak. India limited Sep 2013 to Present
Designation: Site Engineer Base –Bangalore India
Responsibilities and Experiences with Major Clients :
A. Coca-Cola India pvt.ltd(Bidadi,Bangalore)
 Installed Tanks,Modules,DVP’s, Della Tofolla
 Guiding the fabrication team for piping work
 Piping work done as per P&ID by understanding the process
 Company facilitated for this project as it was completed in time as per schedule.


B. Hutsun Dairy Plant (Thrunellvelli)
Complete responsibility for this project including:
 Discussing & Finalizing the scope of work 
 Utility piping’s 
 Preparation the Piping Layout 
 Procurement of the materials for the job 
 Guiding the Site team for Installing the system 
 Erection of tanks,Modules,Silo 150 KL


C. AMR Dairy plant (Amreli,Gujrat)
Responsible for project Management that Includes:
 Discussing & Finalizing the scope of work 
 Guiding the utility section(Boiler, refrigeration)
 Preparation the Piping Layout 
 Selection of equipment’s for this job 
 Procurement of the materials for the job 
 Guiding the Site Team for Installing the system 
 First time we erected chiminy(36 mtr).


D. Coca cola India pvt ltd ( Nemam ,Chennai)
 Planning of the whole project
 Discussing & finalizing the Scope of work 
 Installed spiraflo and pasteuriser for blending section
 Procurement of the materials for the job 
 Preparing the GA Drawings for Tanks& flow plates 
 Selection for equipment’s for this job 
 Guiding the Site team for Installing the system 
 Learning how to Commissioning the System 

E. Milk mantra Dairy site (konark,Orrisa)
 Installed tanks,silo, Pasteuriser, Homogenizer, Separator
 P & I D & piping layout preparation
 Guiding the site team for Installing the system
 Procurement of material for job
F. Other Projects ( Cadbury, Visakha dairy, Dabur(Nepal), PepsiCo )
 Cadbury India project(SMP&FCMP powder unit)
 Visakh Dairy (Blending section, installation, piping, commissioning),
 Dabur Nepal(Lemonez project)
 PepsiCo ,Punjab(Almix unit upgrade project)

Achievement
 Academic project Fountain type aerator that project is one of the best project in that year
 Visakha dairy customer appreciate one of the best project which completed in time. 
.
Qualifications
  B.Tech (Mechanical Engineering) from Udaya Anna University 2013
 
Technical Skills
 MS-Office (Word/Excel/PowerPoint/) 
 Auto Cad Drafting (Auto Cad 2013) 
Personal Details
Nationality : Indian
Age : 24 years
Languages : English / Malayalam/Tamil / Hindi
Gender : Male
Passport No. : N9599879
References : SURESH.B (8095042000)

More Related Content

What's hot (20)

sunil1CV
sunil1CVsunil1CV
sunil1CV
 
Motiur Rahman_Mechanical_Prjct_Engg_resume,_Resume
Motiur Rahman_Mechanical_Prjct_Engg_resume,_ResumeMotiur Rahman_Mechanical_Prjct_Engg_resume,_Resume
Motiur Rahman_Mechanical_Prjct_Engg_resume,_Resume
 
Mkj 14 jan-2015
Mkj 14 jan-2015Mkj 14 jan-2015
Mkj 14 jan-2015
 
Muhammad mohsin updated resume
Muhammad mohsin updated resumeMuhammad mohsin updated resume
Muhammad mohsin updated resume
 
Resume_chemical-2
Resume_chemical-2Resume_chemical-2
Resume_chemical-2
 
bhushan resume
bhushan resumebhushan resume
bhushan resume
 
Puneet_Singh
Puneet_SinghPuneet_Singh
Puneet_Singh
 
Zahid CV
Zahid CVZahid CV
Zahid CV
 
Binay Kumar Sharma
Binay Kumar SharmaBinay Kumar Sharma
Binay Kumar Sharma
 
Resume amar navgan
Resume  amar navganResume  amar navgan
Resume amar navgan
 
SANJAY SINGH RESUME - Copy
SANJAY SINGH RESUME - CopySANJAY SINGH RESUME - Copy
SANJAY SINGH RESUME - Copy
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
C V vishal Dhanjode
C V vishal DhanjodeC V vishal Dhanjode
C V vishal Dhanjode
 
kunnal updated resume(1)
kunnal updated resume(1)kunnal updated resume(1)
kunnal updated resume(1)
 
Jurnet Peta Kerja Gelombang 4 2014
Jurnet Peta Kerja Gelombang 4 2014Jurnet Peta Kerja Gelombang 4 2014
Jurnet Peta Kerja Gelombang 4 2014
 
Engr.rizwanch@gmail.com(cv)
Engr.rizwanch@gmail.com(cv)Engr.rizwanch@gmail.com(cv)
Engr.rizwanch@gmail.com(cv)
 
amit
amitamit
amit
 
Mahesh Patil
Mahesh PatilMahesh Patil
Mahesh Patil
 
djm
djmdjm
djm
 

Similar to Aju_Resume (1) (20)

Gopinath._P_Latest_by_MAR_2015
Gopinath._P_Latest_by_MAR_2015Gopinath._P_Latest_by_MAR_2015
Gopinath._P_Latest_by_MAR_2015
 
Resume 25_01_17
Resume 25_01_17Resume 25_01_17
Resume 25_01_17
 
B more vitae
B more vitaeB more vitae
B more vitae
 
Mid Level Production Engineer with 4 yrs Experience
Mid Level Production Engineer with 4 yrs ExperienceMid Level Production Engineer with 4 yrs Experience
Mid Level Production Engineer with 4 yrs Experience
 
Madhusudan.V_2016.01.03
Madhusudan.V_2016.01.03Madhusudan.V_2016.01.03
Madhusudan.V_2016.01.03
 
Pankaj 25 yrs
Pankaj 25 yrsPankaj 25 yrs
Pankaj 25 yrs
 
Resume
ResumeResume
Resume
 
Nuwan's CV PDF
Nuwan's CV PDFNuwan's CV PDF
Nuwan's CV PDF
 
Vkdt sspipe-software-intro
Vkdt sspipe-software-introVkdt sspipe-software-intro
Vkdt sspipe-software-intro
 
Murtuza resume
Murtuza resumeMurtuza resume
Murtuza resume
 
Resume
ResumeResume
Resume
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 
C V (21-07-2016)
C V (21-07-2016)C V (21-07-2016)
C V (21-07-2016)
 
CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23
 
SOURAV LAHA
SOURAV LAHASOURAV LAHA
SOURAV LAHA
 
CV_Umang Mansuriya
CV_Umang MansuriyaCV_Umang Mansuriya
CV_Umang Mansuriya
 
CV_Umang Mansuriya
CV_Umang Mansuriya CV_Umang Mansuriya
CV_Umang Mansuriya
 
resume 66
resume 66resume 66
resume 66
 
Vipul CV
Vipul CVVipul CV
Vipul CV
 
Pardeep kumar
Pardeep kumarPardeep kumar
Pardeep kumar
 

Aju_Resume (1)

  • 1. Aju Vignesh Email: vignesh2696@gmail.com Tel: +91-91583674 27 Profile Around 3 years of comprehensive professional experience with Tetra pak .India .Ltd. Led different minor, major Beverage, Dairy and chocolate projects and ensured successful delivery. Managed interfaces with various stakeholders while pursuing excellence in project within time and schedule. Team player, Key negotiator and Problem solving helped me secure many of our projects with clients. Leadership skill has helped me lead our multi-functional team to greater level of achievement for the company. Work Experiences Tetra pak. India limited Sep 2013 to Present Designation: Site Engineer Base –Bangalore India Responsibilities and Experiences with Major Clients : A. Coca-Cola India pvt.ltd(Bidadi,Bangalore)  Installed Tanks,Modules,DVP’s, Della Tofolla  Guiding the fabrication team for piping work  Piping work done as per P&ID by understanding the process  Company facilitated for this project as it was completed in time as per schedule.   B. Hutsun Dairy Plant (Thrunellvelli) Complete responsibility for this project including:  Discussing & Finalizing the scope of work   Utility piping’s   Preparation the Piping Layout   Procurement of the materials for the job   Guiding the Site team for Installing the system   Erection of tanks,Modules,Silo 150 KL   C. AMR Dairy plant (Amreli,Gujrat) Responsible for project Management that Includes:  Discussing & Finalizing the scope of work   Guiding the utility section(Boiler, refrigeration)  Preparation the Piping Layout   Selection of equipment’s for this job   Procurement of the materials for the job   Guiding the Site Team for Installing the system   First time we erected chiminy(36 mtr).   D. Coca cola India pvt ltd ( Nemam ,Chennai)  Planning of the whole project
  • 2.  Discussing & finalizing the Scope of work   Installed spiraflo and pasteuriser for blending section  Procurement of the materials for the job   Preparing the GA Drawings for Tanks& flow plates   Selection for equipment’s for this job   Guiding the Site team for Installing the system   Learning how to Commissioning the System   E. Milk mantra Dairy site (konark,Orrisa)  Installed tanks,silo, Pasteuriser, Homogenizer, Separator  P & I D & piping layout preparation  Guiding the site team for Installing the system  Procurement of material for job F. Other Projects ( Cadbury, Visakha dairy, Dabur(Nepal), PepsiCo )  Cadbury India project(SMP&FCMP powder unit)  Visakh Dairy (Blending section, installation, piping, commissioning),  Dabur Nepal(Lemonez project)  PepsiCo ,Punjab(Almix unit upgrade project)  Achievement  Academic project Fountain type aerator that project is one of the best project in that year  Visakha dairy customer appreciate one of the best project which completed in time.  . Qualifications   B.Tech (Mechanical Engineering) from Udaya Anna University 2013   Technical Skills  MS-Office (Word/Excel/PowerPoint/)   Auto Cad Drafting (Auto Cad 2013)  Personal Details Nationality : Indian Age : 24 years Languages : English / Malayalam/Tamil / Hindi Gender : Male Passport No. : N9599879 References : SURESH.B (8095042000)