Ahmad AlFahom, PMP CIVIL Engineer
Mobile No.: +962 799599612
Phone No.: +962 796783954
E-mail: ahmad.alfahom@yahoo.com
Permanent address: Alaqsa street- Amman, Jordan
Date of birth: 28th
may, 1986
Nationality: Jordanian
Marital status: Married
CAREER OBJECTIVE:
Looking to join with a stable company to give me a chance to learn more and
to enhance my professional experience in the field of civil engineering, in which I may
work to my highest potential and make a significant contribution for company's
success.
ACADEMIC QUALIFICATIONS:
2003-up to 2004 General Secondary Certificate
Omar bin-Alkattab School
2004-up to 15 June 2008 University of Jordan; Amman, Jordan
B.Sc. Degree in civil Engineering
GPA: 3.3 / 4 (Very good)
Ahmad.M.Alfahom
PROFESSIONAL EXPERIENCE:
United nations (UNRWA) June 2013 - Now
• Projects: Rehabilitation of Talbieh Camp
• Position: Technical Site Engineer

 MK Associates October 2011 – May 2013
Joint venture with Universal Acarsan for medical caring
and construction- Turkey
• Job Location: Turkey office.
• Projects: Implementation of 11 hospitals In Iraq
• Position: Technical Civil Engineer In project management
department (Responsible for Skeleton work, aluminum facades
work and internal finishing work).
Duties:
• Coordinates project development from initiation to closure.
• Develops and maintains a detailed project schedule which includes
administrative tasks and all project components.
• Supports and participates in the related project meetings, including agendas,
minutes and supporting materials.
• Organizes and archives all project documents. Creates database for tracking
and creating detailed reports.
• Coordinates and runs meetings. Collaborates with all those departments
involved in the project. Prepares and makes presentations.
• Preparing expense reports and handling all department requisitions and
invoices for payment.
• Preparing related method statement, shop drawings, material approval
submissions and all correspondence to the client.
• Following up all site issues, and finding solutions before and after any problem.
Ahmad.M.Alfahom
 Masader Contracting Co.: October 2009 – August 2011
PROJECTS:
1. DISI-MUDAWARRA TO AMMAN WATER CONVEYANCE PROJECT
(From Madaba bridge pump station - MBPS to Abu Alanda - 15 Km);
• Position: Site Civil Engineer.
• Client: Disi Water Company (DIWACO).
• Main Contractor: GAMA Contracting Company.
2. ABDALI DISTRICT HEATING AND COOLING SCHEME, JD01-
DISTRIBUTION PIPE NETWORK (12 Km of Pipeline)
• Position: Site Civil Engineer.
• Client: Jordan District Energy (JDE).
DUTIES:
• Preparing Daily Progress Report & Participating in Monthly Report.
• Making of Submittals and Shop Drawings which are proposing during the
construction.
• Follow up Testing Material Delivered to site (Backfill materials, Sand, Base
course and Sub base).
• Supervision of Compaction Test, Core Test, Slump Test, Cube Test.
• Maintaining of designed quality of work according to specifications.
Ahmad.M.Alfahom
• Choosing the best solution for site problem, obstruction and making the
required contacts responsible parties.
• Supervision of Earth works (Excavation & Backfilling).
• Supervision of Service repairing and reinstatement to original condition
(Drainage Lines, Storm Lines, Firefighting, Domestic Water, Irrigation, Fiber
optic conduits, Electrical cables, Sidewalks, curbstone, and Gullies).
• Following up inspection request and closing noncompliance report (NCR).
 Tahan Bushnaq Consultant: 1st
Nov. 2008 – 1st
Oct. 2009
Site Engineer in Abdali project (Three buildings 10 floors each
with a car elevators and ramps).
DUTIES:
• Following the work as per schedule and approval plan.
• Checking all finishing works and concrete repairs work (Epoxy works, Grouting,
Plasticizers and Joint Fillers).
• Making site inspection for work to be submitted by the contractor after
completion of each activity.
• Ensure that standard and acceptable safety precaution is taken throughout
the site.
PROFESSIONAL COURSES:
PMP: Ocean training office
 Design of Buildings resistance to Seismic responds
Ahmad.M.Alfahom
 Concrete structures design course
 Primavera: Engineers Training Center (ETC) (30 Hours).
 AutoCAD: University of Jordan (30 Hours).
ENGINEERING COMPUTER SKILLS:
ETABS.
SAFE.
STAAD.
PROKON.
AutoCAD.
COMPUTER SKILLS:
MS-Office; Word, Excel, Outlook, PowerPoint.
Internet (Browsing & Research).
OTHER SKILLS:
Fast Learning.
Team Work Ethics.
Self-Motivated.
Work under Pressure.
Time Management Skills.
Driving License.
MEMBERSHIPS:
Member in the Jordan Engineers Association (JEA) at the Civil Engineering
Division; Sep. 2008.
PMI institute for project management professional PMP number 1801808
LANGUAGES:
Arabic – mother tongue
Ahmad.M.Alfahom
English – good written and spoken
REFERENCES:
 Available upon request
Ahmad.M.Alfahom
English – good written and spoken
REFERENCES:
 Available upon request
Ahmad.M.Alfahom

Ahmad Alfahom CV

  • 1.
    Ahmad AlFahom, PMPCIVIL Engineer Mobile No.: +962 799599612 Phone No.: +962 796783954 E-mail: ahmad.alfahom@yahoo.com Permanent address: Alaqsa street- Amman, Jordan Date of birth: 28th may, 1986 Nationality: Jordanian Marital status: Married CAREER OBJECTIVE: Looking to join with a stable company to give me a chance to learn more and to enhance my professional experience in the field of civil engineering, in which I may work to my highest potential and make a significant contribution for company's success. ACADEMIC QUALIFICATIONS: 2003-up to 2004 General Secondary Certificate Omar bin-Alkattab School 2004-up to 15 June 2008 University of Jordan; Amman, Jordan B.Sc. Degree in civil Engineering GPA: 3.3 / 4 (Very good) Ahmad.M.Alfahom
  • 2.
    PROFESSIONAL EXPERIENCE: United nations(UNRWA) June 2013 - Now • Projects: Rehabilitation of Talbieh Camp • Position: Technical Site Engineer   MK Associates October 2011 – May 2013 Joint venture with Universal Acarsan for medical caring and construction- Turkey • Job Location: Turkey office. • Projects: Implementation of 11 hospitals In Iraq • Position: Technical Civil Engineer In project management department (Responsible for Skeleton work, aluminum facades work and internal finishing work). Duties: • Coordinates project development from initiation to closure. • Develops and maintains a detailed project schedule which includes administrative tasks and all project components. • Supports and participates in the related project meetings, including agendas, minutes and supporting materials. • Organizes and archives all project documents. Creates database for tracking and creating detailed reports. • Coordinates and runs meetings. Collaborates with all those departments involved in the project. Prepares and makes presentations. • Preparing expense reports and handling all department requisitions and invoices for payment. • Preparing related method statement, shop drawings, material approval submissions and all correspondence to the client. • Following up all site issues, and finding solutions before and after any problem. Ahmad.M.Alfahom
  • 3.
     Masader ContractingCo.: October 2009 – August 2011 PROJECTS: 1. DISI-MUDAWARRA TO AMMAN WATER CONVEYANCE PROJECT (From Madaba bridge pump station - MBPS to Abu Alanda - 15 Km); • Position: Site Civil Engineer. • Client: Disi Water Company (DIWACO). • Main Contractor: GAMA Contracting Company. 2. ABDALI DISTRICT HEATING AND COOLING SCHEME, JD01- DISTRIBUTION PIPE NETWORK (12 Km of Pipeline) • Position: Site Civil Engineer. • Client: Jordan District Energy (JDE). DUTIES: • Preparing Daily Progress Report & Participating in Monthly Report. • Making of Submittals and Shop Drawings which are proposing during the construction. • Follow up Testing Material Delivered to site (Backfill materials, Sand, Base course and Sub base). • Supervision of Compaction Test, Core Test, Slump Test, Cube Test. • Maintaining of designed quality of work according to specifications. Ahmad.M.Alfahom
  • 4.
    • Choosing thebest solution for site problem, obstruction and making the required contacts responsible parties. • Supervision of Earth works (Excavation & Backfilling). • Supervision of Service repairing and reinstatement to original condition (Drainage Lines, Storm Lines, Firefighting, Domestic Water, Irrigation, Fiber optic conduits, Electrical cables, Sidewalks, curbstone, and Gullies). • Following up inspection request and closing noncompliance report (NCR).  Tahan Bushnaq Consultant: 1st Nov. 2008 – 1st Oct. 2009 Site Engineer in Abdali project (Three buildings 10 floors each with a car elevators and ramps). DUTIES: • Following the work as per schedule and approval plan. • Checking all finishing works and concrete repairs work (Epoxy works, Grouting, Plasticizers and Joint Fillers). • Making site inspection for work to be submitted by the contractor after completion of each activity. • Ensure that standard and acceptable safety precaution is taken throughout the site. PROFESSIONAL COURSES: PMP: Ocean training office  Design of Buildings resistance to Seismic responds Ahmad.M.Alfahom
  • 5.
     Concrete structuresdesign course  Primavera: Engineers Training Center (ETC) (30 Hours).  AutoCAD: University of Jordan (30 Hours). ENGINEERING COMPUTER SKILLS: ETABS. SAFE. STAAD. PROKON. AutoCAD. COMPUTER SKILLS: MS-Office; Word, Excel, Outlook, PowerPoint. Internet (Browsing & Research). OTHER SKILLS: Fast Learning. Team Work Ethics. Self-Motivated. Work under Pressure. Time Management Skills. Driving License. MEMBERSHIPS: Member in the Jordan Engineers Association (JEA) at the Civil Engineering Division; Sep. 2008. PMI institute for project management professional PMP number 1801808 LANGUAGES: Arabic – mother tongue Ahmad.M.Alfahom