Summer Degree 40°very hot
We were focusing on production of self-loading concrete mixer 5
years ago, and learn users request and workers demand. Our boss and
engineers often went to project jobsites and learn the units working
situation.
The follow unit of ADDFORCE LT3500 was produced in Jan.2016,
PO01, it has been worked with 1700 hours until April, 2017
The unit boss is a contractor in Uzbekistan ,its famous old city as
follow
The following picture showing time is August,2016. It is the hottest
time at local above 44 degree. Most workers no wearing shoes to work
The ADDFORCE LT3500 working with 10-12hours each day at that
hot summer. It is the best time to test Machine performance- Cooling is
the biggest test, if the performance is not good, work less than 30
minutes hydraulic oil temperature up to more than 90 degrees, must
stop cooling.
We fully learn the demand of temperature and condition, and our
units hydraulic system experienced long-term running and good quality.
before our units , their worker made concrete in jobsite

ADDFORCE self-loading concrete mixer 3.5cbm story

  • 1.
    Summer Degree 40°veryhot We were focusing on production of self-loading concrete mixer 5 years ago, and learn users request and workers demand. Our boss and engineers often went to project jobsites and learn the units working situation. The follow unit of ADDFORCE LT3500 was produced in Jan.2016, PO01, it has been worked with 1700 hours until April, 2017
  • 3.
    The unit bossis a contractor in Uzbekistan ,its famous old city as follow
  • 4.
    The following pictureshowing time is August,2016. It is the hottest time at local above 44 degree. Most workers no wearing shoes to work The ADDFORCE LT3500 working with 10-12hours each day at that hot summer. It is the best time to test Machine performance- Cooling is the biggest test, if the performance is not good, work less than 30 minutes hydraulic oil temperature up to more than 90 degrees, must stop cooling. We fully learn the demand of temperature and condition, and our units hydraulic system experienced long-term running and good quality.
  • 11.
    before our units, their worker made concrete in jobsite