AD AC NO. 2 of 2009
GOVERNMENT OF INDIA 12th
May 2009
CIVIL AVIATION DEPARTMENT
O/O DIRECTOR GENERAL OF CIVIL AVIATION
AERODROME
ADVISORY CIRCULAR
SUBJECT : PREPARATION OF ACTION PLAN FOR ADDRESSING NON-
COMPLIANCE AND INSPECTION OBSERVATIONS.
A. INTRODUCTION
During the aerodrome inspections, various observations are pointed out in the
inspection reports which are relating to the non-compliance of requirements contained in
the various CARs. These observations/ non-compliances are required to be rectified by the
aerodrome operators in a time-bound manner.
It has been observed in the past that the aerodrome operators while submitting the
action taken report had been reflecting PDC against the observations which cannot be
rectified by them immediately and require some time and resources from within/ outside the
organization. It has been further observed that these PDCs are indicated by the aerodrome
operators without giving any firm commitment and with due consultation with the concerned
department involved in the process within the organization. As a result no firm action plan
is drawn at any stage and the aerodrome operators keep on revising the PDC.
In addition while applying for an exemption, the aerodrome operators are required
to submit an ‘Action Plan’ for rectification of non-compliance as indicated in para 2.6 of the
exemption form among other requirements. It has been further observed that aerodrome
operators had been submitting the action as completed to this office which has been found
non-complied during the subsequent surveillance inspections by this office. Such actions
are not only submission of false information but also defeat the very purpose of ensuring
the standards and safety requirement.
B. PREPRATION AND SUBMISSION OF ACTION PLAN :
An action plan required to be submitted to this office by the aerodrome operator in
case of non-compliance/ observations on the aerodrome facilities has been devised and is
enclosed at Appendix-I. Henceforth, action plan for rectification of observations as well as
for rectification of non-compliances as required in para 2.6 of the exemption form would be
acceptable in this prescribed format only.
The action plan may be divided into the parts, if more than one department within
the organisation is responsible for completion of the action plan. The action plan for each
department should be signed by the official concerned who will also indicate the date of
completion on his part of the action. This form has been devised on the principal of safety
PREPRATION OF ACTION PLAN FOR ADDRESSING AD AC –2/2009
NON-COMPLIANCE & INSP OBSNS
Issue -I/ Rev 0
May. 2009
2
management system. The risk management in the SMS also requires that prior to
submission of action plan; the person proposing the action, acts as a nodal point, holds
meetings with the concerned department within the organisation divide the action for each
department and fill up details of each action in the Action column.
The action Plan may be further divided into parts (Action Plan 1, Action Plan 2 etc.)
as indicated in the form if the non-compliance plan for project requires completion of the
job in more than one phase (like same non-compliance for two different runways). The
individuals from concerned department then determine the date of the completion of action
and fill up the same in the prescribed column.
Thereafter, the assurance portion is to be signed by all individuals from concerned
department with signature of the proposing official and countersigned by the Aerodrome in-
charge who is ultimately responsible for the completion of the job.
The action plan prepared with the above exercise and in consultation with the
concerned departments is considered achievable and is expected to be completed in time.
Therefore, no extension in the action plan would be accepted, except in case of exigencies
beyond control. Such cases would be considered only once if submitted with proper
justification and supporting evidences and fresh action plan in the above format. In such
cases
C. SUBMISSION OF COMPLETION REPORT:
Similar process is also required to be followed on completion of each job and to be
communicated to the Nodal official by the concerned responsible officials from the involved
departments. The Nodal officer and Aerodrome In-charge may thereafter assess the quality
and adequacy of the job done. On completion of all actions, the Nodal officer and
Aerodrome In-charge shall verify that the job has been done as per the guarantee provided
and complies with the requirements and submit the same in the form prescribed for the
purpose at Annex -II. Cases will be closed on receipt of such compliances from the
aerodrome operators.
Sd/-
(J.S.Rawat)
Deputy Director General
for Director General of Civil Aviation
PREPRATION OF ACTION PLAN FOR ADDRESSING AD AC –2/2009
NON-COMPLIANCE & INSP OBSNS
Issue -I/ Rev 0
May. 2009
3
Annex-I
Name of aerodrome operator
Project Plan to address Non-Compliance /Observation
Ref No :
Non-Compliance/ observation: (Reference to CAR etc.)
Non-Compliance/ observation description: (Describe)
Proposed way to resolve non-compliance: (Describe - proposed way to
resolve non-compliance should cover Design or Scope of works to be undertaken and
implementation strategy etc.)
1. Action Plan 1 (Description)
Action Responsibility of Target date of
Completion
(Describe) Name, designation Dept. I
(Describe) Name, designation Dept. II
… ..
… ..
2. Action Plan 2 (Description)
Action Responsibility of Target date of
Completion
(Describe) Name, designation Dept. I
(Describe) Name, designation Dept. II
…
…
Guarantee:
We hereby guarantee that the foregoing action plan is achievable and that the work shall be
completed within the timeframe specified.
Name Designation Signature Date
i. Dept.I
ii. Dept.II
---
Proposing /Nodal officer
Aerodrome incharge
PREPRATION OF ACTION PLAN FOR ADDRESSING AD AC –2/2009
NON-COMPLIANCE & INSP OBSNS
Issue -I/ Rev 0
May. 2009
4
Annex-II
Name of aerodrome operator
Completion Report of Project Plan to address Non-Compliance/Observation
Ref No:
Non-Compliance/ observation: (Reference to CAR etc.)
Non-Compliance/ observation described: (Describe)
Action completed to resolve non-compliance: (Describe)
1. Action Plan 1 (Description)
Action Completed by Target date of
Completion/ actual
completion date
(Describe)
(Describe)
…
Proposing /Nodal officer
Aerodrome incharge
2. Action Plan 2 (Description)
Action Completed by Target date of
Completion/ actual
completion date
(Describe) Name, designation Dept. I
(Describe) Name, designation Dept II
… ….
Proposing /Nodal officer
Aerodrome incharge
Certification :
We hereby certify that the job has been completed as per the guarantee provided in respect of
above non-compliance/observation and the aerodrome is now compliant with the provision of
aforesaid non-compliance/ observation.
Name Designation Signature Date
i. Dept.I
ii. Dept.II
…
Proposing /Nodal officer
Aerodrome incharge
PREPRATION OF ACTION PLAN FOR ADDRESSING AD AC –2/2009
NON-COMPLIANCE & INSP OBSNS
Issue -I/ Rev 0
May. 2009
5

More Related Content

What's hot

Training fidic moustafa ismail 2017 _ lec 4
Training fidic moustafa ismail  2017 _  lec 4Training fidic moustafa ismail  2017 _  lec 4
Training fidic moustafa ismail 2017 _ lec 4Moustafa Ismail Abu Dief
 
Flex Maint Plan C 40 A
Flex Maint Plan C 40 AFlex Maint Plan C 40 A
Flex Maint Plan C 40 Akingstonmj
 
Ss 07 training fidic moustafa ismail 2018__ lec 7B
Ss 07 training fidic moustafa ismail  2018__ lec 7BSs 07 training fidic moustafa ismail  2018__ lec 7B
Ss 07 training fidic moustafa ismail 2018__ lec 7BMoustafa Ismail Abu Dief
 
Executive Transport Detatchment Sigonella
Executive Transport Detatchment SigonellaExecutive Transport Detatchment Sigonella
Executive Transport Detatchment Sigonellakingstonmj
 
Aged aircraft maintenance.
Aged aircraft maintenance.Aged aircraft maintenance.
Aged aircraft maintenance.S P Singh
 
Air Logistics Training Center
Air Logistics Training CenterAir Logistics Training Center
Air Logistics Training Centerkingstonmj
 
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias TanFIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias TanAdrias TAN
 
Time management in fidic red book 2017(prmg080 project)
Time management in fidic red book 2017(prmg080 project)Time management in fidic red book 2017(prmg080 project)
Time management in fidic red book 2017(prmg080 project)mohamed Ismail
 
06 5759-tec ops-sect 3 (3.01-3.10)- repairs, maint & insp
06 5759-tec ops-sect 3 (3.01-3.10)- repairs, maint & insp06 5759-tec ops-sect 3 (3.01-3.10)- repairs, maint & insp
06 5759-tec ops-sect 3 (3.01-3.10)- repairs, maint & inspharish chandra CHOPRA
 
Training fidic moustafa ismail 2018 _ lec 8
Training fidic moustafa ismail  2018 _ lec 8Training fidic moustafa ismail  2018 _ lec 8
Training fidic moustafa ismail 2018 _ lec 8Moustafa Ismail Abu Dief
 
Ss 5 training fidic Dr. Moustafa Ismail 2017 _ lec 5
Ss 5 training fidic Dr. Moustafa Ismail  2017 _ lec 5Ss 5 training fidic Dr. Moustafa Ismail  2017 _ lec 5
Ss 5 training fidic Dr. Moustafa Ismail 2017 _ lec 5Moustafa Ismail Abu Dief
 
resume Jennifer Hall 01-2017a
resume Jennifer Hall 01-2017aresume Jennifer Hall 01-2017a
resume Jennifer Hall 01-2017aJennifer Hall
 
Procedures on Acceptance, Inspection and Recording of Deliveries
Procedures on Acceptance, Inspection and Recording of DeliveriesProcedures on Acceptance, Inspection and Recording of Deliveries
Procedures on Acceptance, Inspection and Recording of DeliveriesRex Galos
 
Managing Educational Resources
Managing Educational ResourcesManaging Educational Resources
Managing Educational Resourceslerise
 
Fidic comparison red yellow - silver book
Fidic comparison red   yellow - silver bookFidic comparison red   yellow - silver book
Fidic comparison red yellow - silver bookHani Saad
 
Bo Q Preamble Td2 3 Jan 20
Bo Q Preamble Td2 3  Jan 20Bo Q Preamble Td2 3  Jan 20
Bo Q Preamble Td2 3 Jan 20guest5980d0
 

What's hot (20)

Training fidic moustafa ismail 2017 _ lec 4
Training fidic moustafa ismail  2017 _  lec 4Training fidic moustafa ismail  2017 _  lec 4
Training fidic moustafa ismail 2017 _ lec 4
 
C Welman - C
C Welman - CC Welman - C
C Welman - C
 
Flex Maint Plan C 40 A
Flex Maint Plan C 40 AFlex Maint Plan C 40 A
Flex Maint Plan C 40 A
 
Ss 07 training fidic moustafa ismail 2018__ lec 7B
Ss 07 training fidic moustafa ismail  2018__ lec 7BSs 07 training fidic moustafa ismail  2018__ lec 7B
Ss 07 training fidic moustafa ismail 2018__ lec 7B
 
Executive Transport Detatchment Sigonella
Executive Transport Detatchment SigonellaExecutive Transport Detatchment Sigonella
Executive Transport Detatchment Sigonella
 
Aged aircraft maintenance.
Aged aircraft maintenance.Aged aircraft maintenance.
Aged aircraft maintenance.
 
Air Logistics Training Center
Air Logistics Training CenterAir Logistics Training Center
Air Logistics Training Center
 
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias TanFIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
 
Time management in fidic red book 2017(prmg080 project)
Time management in fidic red book 2017(prmg080 project)Time management in fidic red book 2017(prmg080 project)
Time management in fidic red book 2017(prmg080 project)
 
06 5759-tec ops-sect 3 (3.01-3.10)- repairs, maint & insp
06 5759-tec ops-sect 3 (3.01-3.10)- repairs, maint & insp06 5759-tec ops-sect 3 (3.01-3.10)- repairs, maint & insp
06 5759-tec ops-sect 3 (3.01-3.10)- repairs, maint & insp
 
Training fidic moustafa ismail 2018 _ lec 8
Training fidic moustafa ismail  2018 _ lec 8Training fidic moustafa ismail  2018 _ lec 8
Training fidic moustafa ismail 2018 _ lec 8
 
VMET_Document
VMET_DocumentVMET_Document
VMET_Document
 
Ss 5 training fidic Dr. Moustafa Ismail 2017 _ lec 5
Ss 5 training fidic Dr. Moustafa Ismail  2017 _ lec 5Ss 5 training fidic Dr. Moustafa Ismail  2017 _ lec 5
Ss 5 training fidic Dr. Moustafa Ismail 2017 _ lec 5
 
Procedures
ProceduresProcedures
Procedures
 
Cl presentation
Cl presentationCl presentation
Cl presentation
 
resume Jennifer Hall 01-2017a
resume Jennifer Hall 01-2017aresume Jennifer Hall 01-2017a
resume Jennifer Hall 01-2017a
 
Procedures on Acceptance, Inspection and Recording of Deliveries
Procedures on Acceptance, Inspection and Recording of DeliveriesProcedures on Acceptance, Inspection and Recording of Deliveries
Procedures on Acceptance, Inspection and Recording of Deliveries
 
Managing Educational Resources
Managing Educational ResourcesManaging Educational Resources
Managing Educational Resources
 
Fidic comparison red yellow - silver book
Fidic comparison red   yellow - silver bookFidic comparison red   yellow - silver book
Fidic comparison red yellow - silver book
 
Bo Q Preamble Td2 3 Jan 20
Bo Q Preamble Td2 3  Jan 20Bo Q Preamble Td2 3  Jan 20
Bo Q Preamble Td2 3 Jan 20
 

Viewers also liked

Marketing 420.pptx part 2
Marketing 420.pptx part 2Marketing 420.pptx part 2
Marketing 420.pptx part 2kierasafirah
 
Materi Bupati Kaur Hermen Malik, Kedaulatan Pangan, Makasar
Materi Bupati Kaur Hermen Malik, Kedaulatan Pangan, MakasarMateri Bupati Kaur Hermen Malik, Kedaulatan Pangan, Makasar
Materi Bupati Kaur Hermen Malik, Kedaulatan Pangan, MakasarDian Utama
 
Quist legacy gen 1 del 2
Quist legacy gen 1 del 2Quist legacy gen 1 del 2
Quist legacy gen 1 del 2Hikke
 
P2 kpt bedahdesa_sosialisasi_bedahdesa_mercure
P2 kpt bedahdesa_sosialisasi_bedahdesa_mercureP2 kpt bedahdesa_sosialisasi_bedahdesa_mercure
P2 kpt bedahdesa_sosialisasi_bedahdesa_mercureDian Utama
 
Quist-Legacy Gen 1 kap 1
Quist-Legacy Gen 1 kap 1Quist-Legacy Gen 1 kap 1
Quist-Legacy Gen 1 kap 1Hikke
 
Product & service decisions
Product & service decisionsProduct & service decisions
Product & service decisionskierasafirah
 
Corema península ibérica
Corema península ibéricaCorema península ibérica
Corema península ibéricaPrego Alberto
 
Paparan pdt bedah desa kemenhub
Paparan pdt bedah desa kemenhubPaparan pdt bedah desa kemenhub
Paparan pdt bedah desa kemenhubDian Utama
 
PL/CUDA - Fusion of HPC Grade Power with In-Database Analytics
PL/CUDA - Fusion of HPC Grade Power with In-Database AnalyticsPL/CUDA - Fusion of HPC Grade Power with In-Database Analytics
PL/CUDA - Fusion of HPC Grade Power with In-Database AnalyticsKohei KaiGai
 

Viewers also liked (17)

promo_artsbrebeuf
promo_artsbrebeufpromo_artsbrebeuf
promo_artsbrebeuf
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Marketing 420.pptx part 2
Marketing 420.pptx part 2Marketing 420.pptx part 2
Marketing 420.pptx part 2
 
Materi Bupati Kaur Hermen Malik, Kedaulatan Pangan, Makasar
Materi Bupati Kaur Hermen Malik, Kedaulatan Pangan, MakasarMateri Bupati Kaur Hermen Malik, Kedaulatan Pangan, Makasar
Materi Bupati Kaur Hermen Malik, Kedaulatan Pangan, Makasar
 
Quist legacy gen 1 del 2
Quist legacy gen 1 del 2Quist legacy gen 1 del 2
Quist legacy gen 1 del 2
 
P2 kpt bedahdesa_sosialisasi_bedahdesa_mercure
P2 kpt bedahdesa_sosialisasi_bedahdesa_mercureP2 kpt bedahdesa_sosialisasi_bedahdesa_mercure
P2 kpt bedahdesa_sosialisasi_bedahdesa_mercure
 
Quist-Legacy Gen 1 kap 1
Quist-Legacy Gen 1 kap 1Quist-Legacy Gen 1 kap 1
Quist-Legacy Gen 1 kap 1
 
Diapositivas amalia y lorena
Diapositivas amalia y lorenaDiapositivas amalia y lorena
Diapositivas amalia y lorena
 
Untuk poster
Untuk posterUntuk poster
Untuk poster
 
Aviones
AvionesAviones
Aviones
 
Bmthn1
Bmthn1Bmthn1
Bmthn1
 
Product & service decisions
Product & service decisionsProduct & service decisions
Product & service decisions
 
Corema península ibérica
Corema península ibéricaCorema península ibérica
Corema península ibérica
 
Paparan pdt bedah desa kemenhub
Paparan pdt bedah desa kemenhubPaparan pdt bedah desa kemenhub
Paparan pdt bedah desa kemenhub
 
MWP
MWPMWP
MWP
 
OPM
OPMOPM
OPM
 
PL/CUDA - Fusion of HPC Grade Power with In-Database Analytics
PL/CUDA - Fusion of HPC Grade Power with In-Database AnalyticsPL/CUDA - Fusion of HPC Grade Power with In-Database Analytics
PL/CUDA - Fusion of HPC Grade Power with In-Database Analytics
 

Similar to Ad2 2009

Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...
Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...
Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...Project Controls Expo
 
FAC-COR Level IIIndividual Assignment – Day 5 – COR Work PlanMo.docx
FAC-COR Level IIIndividual Assignment – Day 5 – COR Work PlanMo.docxFAC-COR Level IIIndividual Assignment – Day 5 – COR Work PlanMo.docx
FAC-COR Level IIIndividual Assignment – Day 5 – COR Work PlanMo.docxssuser454af01
 
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16Arvind Solanki
 
Tpqma r5 to upload in slide share
Tpqma r5 to upload in slide shareTpqma r5 to upload in slide share
Tpqma r5 to upload in slide shareRajiva Gupta
 
Importance of Taking Over Certificate (TOC)
Importance of Taking Over Certificate (TOC)Importance of Taking Over Certificate (TOC)
Importance of Taking Over Certificate (TOC)Sadeeq Ullah Khan
 
Techno Engineering & Associates
Techno Engineering & AssociatesTechno Engineering & Associates
Techno Engineering & AssociatesCerasela Angelescu
 
257883989-Claim-in-Red-Book-FIdic-Presentation-ver03.pptx
257883989-Claim-in-Red-Book-FIdic-Presentation-ver03.pptx257883989-Claim-in-Red-Book-FIdic-Presentation-ver03.pptx
257883989-Claim-in-Red-Book-FIdic-Presentation-ver03.pptxssuser6d14e4
 
Guidelines for the monitoring officers
Guidelines for the monitoring officersGuidelines for the monitoring officers
Guidelines for the monitoring officershayat alishah
 
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1Antonio Coladarce
 
NCSIP ERs 140521
NCSIP ERs 140521NCSIP ERs 140521
NCSIP ERs 140521Assen Antov
 
Neda contractor performance evaluation system
Neda contractor performance evaluation system Neda contractor performance evaluation system
Neda contractor performance evaluation system Mabelle Gaytano
 
Work Project 1-latest
Work Project 1-latestWork Project 1-latest
Work Project 1-latestRanjit David
 
Abs 1975 single point moorings
Abs 1975 single point mooringsAbs 1975 single point moorings
Abs 1975 single point mooringsIgnacio Santana
 
Construction Futures Wales - NEC Workshop - Importance of Program Control & M...
Construction Futures Wales - NEC Workshop - Importance of Program Control & M...Construction Futures Wales - NEC Workshop - Importance of Program Control & M...
Construction Futures Wales - NEC Workshop - Importance of Program Control & M...Rae Davies
 

Similar to Ad2 2009 (20)

Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...
Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...
Project Controls Expo, 18th Nov 2014 - "NEC3 Contracts – Managing Risk and Ch...
 
FAC-COR Level IIIndividual Assignment – Day 5 – COR Work PlanMo.docx
FAC-COR Level IIIndividual Assignment – Day 5 – COR Work PlanMo.docxFAC-COR Level IIIndividual Assignment – Day 5 – COR Work PlanMo.docx
FAC-COR Level IIIndividual Assignment – Day 5 – COR Work PlanMo.docx
 
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
 
Tpqma r5 to upload in slide share
Tpqma r5 to upload in slide shareTpqma r5 to upload in slide share
Tpqma r5 to upload in slide share
 
Newsletter august
Newsletter augustNewsletter august
Newsletter august
 
Circular-No-02-2021.pdf
Circular-No-02-2021.pdfCircular-No-02-2021.pdf
Circular-No-02-2021.pdf
 
FIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshopFIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshop
 
Importance of Taking Over Certificate (TOC)
Importance of Taking Over Certificate (TOC)Importance of Taking Over Certificate (TOC)
Importance of Taking Over Certificate (TOC)
 
Techno Engineering & Associates
Techno Engineering & AssociatesTechno Engineering & Associates
Techno Engineering & Associates
 
257883989-Claim-in-Red-Book-FIdic-Presentation-ver03.pptx
257883989-Claim-in-Red-Book-FIdic-Presentation-ver03.pptx257883989-Claim-in-Red-Book-FIdic-Presentation-ver03.pptx
257883989-Claim-in-Red-Book-FIdic-Presentation-ver03.pptx
 
Guidelines for the monitoring officers
Guidelines for the monitoring officersGuidelines for the monitoring officers
Guidelines for the monitoring officers
 
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
 
Producción inspeccionada de aeronaves
Producción inspeccionada de aeronavesProducción inspeccionada de aeronaves
Producción inspeccionada de aeronaves
 
HSE Temporary works management plan
HSE Temporary works management planHSE Temporary works management plan
HSE Temporary works management plan
 
HSE plan and Bridging document
HSE plan and Bridging documentHSE plan and Bridging document
HSE plan and Bridging document
 
NCSIP ERs 140521
NCSIP ERs 140521NCSIP ERs 140521
NCSIP ERs 140521
 
Neda contractor performance evaluation system
Neda contractor performance evaluation system Neda contractor performance evaluation system
Neda contractor performance evaluation system
 
Work Project 1-latest
Work Project 1-latestWork Project 1-latest
Work Project 1-latest
 
Abs 1975 single point moorings
Abs 1975 single point mooringsAbs 1975 single point moorings
Abs 1975 single point moorings
 
Construction Futures Wales - NEC Workshop - Importance of Program Control & M...
Construction Futures Wales - NEC Workshop - Importance of Program Control & M...Construction Futures Wales - NEC Workshop - Importance of Program Control & M...
Construction Futures Wales - NEC Workshop - Importance of Program Control & M...
 

Ad2 2009

  • 1. AD AC NO. 2 of 2009 GOVERNMENT OF INDIA 12th May 2009 CIVIL AVIATION DEPARTMENT O/O DIRECTOR GENERAL OF CIVIL AVIATION AERODROME ADVISORY CIRCULAR SUBJECT : PREPARATION OF ACTION PLAN FOR ADDRESSING NON- COMPLIANCE AND INSPECTION OBSERVATIONS. A. INTRODUCTION During the aerodrome inspections, various observations are pointed out in the inspection reports which are relating to the non-compliance of requirements contained in the various CARs. These observations/ non-compliances are required to be rectified by the aerodrome operators in a time-bound manner. It has been observed in the past that the aerodrome operators while submitting the action taken report had been reflecting PDC against the observations which cannot be rectified by them immediately and require some time and resources from within/ outside the organization. It has been further observed that these PDCs are indicated by the aerodrome operators without giving any firm commitment and with due consultation with the concerned department involved in the process within the organization. As a result no firm action plan is drawn at any stage and the aerodrome operators keep on revising the PDC. In addition while applying for an exemption, the aerodrome operators are required to submit an ‘Action Plan’ for rectification of non-compliance as indicated in para 2.6 of the exemption form among other requirements. It has been further observed that aerodrome operators had been submitting the action as completed to this office which has been found non-complied during the subsequent surveillance inspections by this office. Such actions are not only submission of false information but also defeat the very purpose of ensuring the standards and safety requirement. B. PREPRATION AND SUBMISSION OF ACTION PLAN : An action plan required to be submitted to this office by the aerodrome operator in case of non-compliance/ observations on the aerodrome facilities has been devised and is enclosed at Appendix-I. Henceforth, action plan for rectification of observations as well as for rectification of non-compliances as required in para 2.6 of the exemption form would be acceptable in this prescribed format only. The action plan may be divided into the parts, if more than one department within the organisation is responsible for completion of the action plan. The action plan for each department should be signed by the official concerned who will also indicate the date of completion on his part of the action. This form has been devised on the principal of safety
  • 2. PREPRATION OF ACTION PLAN FOR ADDRESSING AD AC –2/2009 NON-COMPLIANCE & INSP OBSNS Issue -I/ Rev 0 May. 2009 2 management system. The risk management in the SMS also requires that prior to submission of action plan; the person proposing the action, acts as a nodal point, holds meetings with the concerned department within the organisation divide the action for each department and fill up details of each action in the Action column. The action Plan may be further divided into parts (Action Plan 1, Action Plan 2 etc.) as indicated in the form if the non-compliance plan for project requires completion of the job in more than one phase (like same non-compliance for two different runways). The individuals from concerned department then determine the date of the completion of action and fill up the same in the prescribed column. Thereafter, the assurance portion is to be signed by all individuals from concerned department with signature of the proposing official and countersigned by the Aerodrome in- charge who is ultimately responsible for the completion of the job. The action plan prepared with the above exercise and in consultation with the concerned departments is considered achievable and is expected to be completed in time. Therefore, no extension in the action plan would be accepted, except in case of exigencies beyond control. Such cases would be considered only once if submitted with proper justification and supporting evidences and fresh action plan in the above format. In such cases C. SUBMISSION OF COMPLETION REPORT: Similar process is also required to be followed on completion of each job and to be communicated to the Nodal official by the concerned responsible officials from the involved departments. The Nodal officer and Aerodrome In-charge may thereafter assess the quality and adequacy of the job done. On completion of all actions, the Nodal officer and Aerodrome In-charge shall verify that the job has been done as per the guarantee provided and complies with the requirements and submit the same in the form prescribed for the purpose at Annex -II. Cases will be closed on receipt of such compliances from the aerodrome operators. Sd/- (J.S.Rawat) Deputy Director General for Director General of Civil Aviation
  • 3. PREPRATION OF ACTION PLAN FOR ADDRESSING AD AC –2/2009 NON-COMPLIANCE & INSP OBSNS Issue -I/ Rev 0 May. 2009 3 Annex-I Name of aerodrome operator Project Plan to address Non-Compliance /Observation Ref No : Non-Compliance/ observation: (Reference to CAR etc.) Non-Compliance/ observation description: (Describe) Proposed way to resolve non-compliance: (Describe - proposed way to resolve non-compliance should cover Design or Scope of works to be undertaken and implementation strategy etc.) 1. Action Plan 1 (Description) Action Responsibility of Target date of Completion (Describe) Name, designation Dept. I (Describe) Name, designation Dept. II … .. … .. 2. Action Plan 2 (Description) Action Responsibility of Target date of Completion (Describe) Name, designation Dept. I (Describe) Name, designation Dept. II … … Guarantee: We hereby guarantee that the foregoing action plan is achievable and that the work shall be completed within the timeframe specified. Name Designation Signature Date i. Dept.I ii. Dept.II --- Proposing /Nodal officer Aerodrome incharge
  • 4. PREPRATION OF ACTION PLAN FOR ADDRESSING AD AC –2/2009 NON-COMPLIANCE & INSP OBSNS Issue -I/ Rev 0 May. 2009 4 Annex-II Name of aerodrome operator Completion Report of Project Plan to address Non-Compliance/Observation Ref No: Non-Compliance/ observation: (Reference to CAR etc.) Non-Compliance/ observation described: (Describe) Action completed to resolve non-compliance: (Describe) 1. Action Plan 1 (Description) Action Completed by Target date of Completion/ actual completion date (Describe) (Describe) … Proposing /Nodal officer Aerodrome incharge 2. Action Plan 2 (Description) Action Completed by Target date of Completion/ actual completion date (Describe) Name, designation Dept. I (Describe) Name, designation Dept II … …. Proposing /Nodal officer Aerodrome incharge Certification : We hereby certify that the job has been completed as per the guarantee provided in respect of above non-compliance/observation and the aerodrome is now compliant with the provision of aforesaid non-compliance/ observation. Name Designation Signature Date i. Dept.I ii. Dept.II … Proposing /Nodal officer Aerodrome incharge
  • 5. PREPRATION OF ACTION PLAN FOR ADDRESSING AD AC –2/2009 NON-COMPLIANCE & INSP OBSNS Issue -I/ Rev 0 May. 2009 5