SlideShare a Scribd company logo
1 of 12
Achievements and
Results of Pilot Projects,
Results and Scaling-up
Pilot ProjectsPilot Projects
 ICZM Pilot ProjectsICZM Pilot Projects
 Pilot Monitoring ExercisesPilot Monitoring Exercises
 Kamchyia River Basin Management ProjectKamchyia River Basin Management Project
 Vessel Traffic Oil Pollution InformationVessel Traffic Oil Pollution Information
System (VTOPIS)System (VTOPIS)
 Mykolaiv Water & Sewerage ProjectMykolaiv Water & Sewerage Project
 Crimea Regional Water & Sewerage ProjectCrimea Regional Water & Sewerage Project
 Small Grants Programme ProjectsSmall Grants Programme Projects
ICZM Pilot ProjectICZM Pilot Project
AkcakocaAkcakoca
 Testing of land-useTesting of land-use
methodology andmethodology and
development of draftdevelopment of draft
land-use plansland-use plans
 A poster is availableA poster is available
in the poster areain the poster area
 Included inIncluded in
presentation onpresentation on
ICZMICZM
ICZM Pilot Project (SGP)ICZM Pilot Project (SGP)
Coastal zone management Plan forCoastal zone management Plan for
Tarkhankut peninsula in Crimea (Ukraine)Tarkhankut peninsula in Crimea (Ukraine)
 Implemented in partnership with localImplemented in partnership with local
authorities, public and expertsauthorities, public and experts
 Assessment of local conditions andAssessment of local conditions and
opportunities for sustainable developmentopportunities for sustainable development
 Meetings and discussions with land usersMeetings and discussions with land users
and owners, reps of local authoritiesand owners, reps of local authorities
 A draft management plan for theA draft management plan for the
Tiligulskiy Liman Ramsar site has beenTiligulskiy Liman Ramsar site has been
developed and publisheddeveloped and published
Pilot Monitoring ExercisesPilot Monitoring Exercises
Two Pilot Monitoring ExercisesTwo Pilot Monitoring Exercises
1. Identification of the specific biological, chemical1. Identification of the specific biological, chemical
and physical indicators for the Black Seaand physical indicators for the Black Sea
(countries)(countries)
2. Investigation of the regional capacity to2. Investigation of the regional capacity to
undertake monitoring of the selected indicatorsundertake monitoring of the selected indicators
3. Recommendation for training and equipment3. Recommendation for training and equipment
needs in each countryneeds in each country
4. Initiation of training for specific indicators and4. Initiation of training for specific indicators and
QA/QCQA/QC
 A separate presentation has been presentedA separate presentation has been presented
 A poster is available in the exhibition areaA poster is available in the exhibition area
Kamchyia River Basin ManagementKamchyia River Basin Management
Pilot ProjectPilot Project
 Nutrient export from withinNutrient export from within
the Kamchiya River Basinthe Kamchiya River Basin
to the Black Seato the Black Sea
 Nutrient sourceNutrient source
apportionment modellingapportionment modelling
approachapproach
 Approach reflects recentApproach reflects recent
experiences in otherexperiences in other
European river basinsEuropean river basins
 Similar approaches couldSimilar approaches could
be used in other basinsbe used in other basins
Data base
Source oriented approach
Point
Sources
Diffuse
Sources
Natural /
Background
Sources
Industry
Sewered
population
Unsewred
population
Livestock
farming
Land-use
Background N and P
export
Atmospheric
deposition of N
and P
Total Annual Nutrient Loading (TANL)
TANL – ISNL = Retention in inland surface waters/ Unaccounted sources
In-Stream Nutrient Loading (ISNL)
VTOPISVTOPIS
Assessment of the current situationAssessment of the current situation
on management of ship-relatedon management of ship-related
information in Bulgariainformation in Bulgaria
Design a VTOPIS system forDesign a VTOPIS system for
collection, update, exchange andcollection, update, exchange and
management of information, includingmanagement of information, including
generation of required reportsgeneration of required reports
A proposal for multiplication ofA proposal for multiplication of
VTOPIS in the other Black SeaVTOPIS in the other Black Sea
countriescountries
A separate poster is available in theA separate poster is available in the
exhibition areaexhibition area
Mykolaiv Water & SewerageMykolaiv Water & Sewerage
ProjectProject
 Technical Feasibility Studies completedTechnical Feasibility Studies completed
 Public Consultations CompletedPublic Consultations Completed
 Project Approval by City Parliament confirmedProject Approval by City Parliament confirmed
 State Guarantee Procedure startedState Guarantee Procedure started
 National Grant contribution confirmedNational Grant contribution confirmed
 EC Grant confirmed and grant agreement signedEC Grant confirmed and grant agreement signed
with EC/EIBwith EC/EIB
 Construction Works underway (€2.3M)Construction Works underway (€2.3M)
 A separate presentationA separate presentation
 A poster is available in the exhibition areaA poster is available in the exhibition area
Crimea Regional Water &Crimea Regional Water &
Sewerage ProjectSewerage Project
 Key issues identifiedKey issues identified
 Recommendations made how to address theRecommendations made how to address the
issuesissues
 PILOT STIP – LENINSKIY DISTRICTPILOT STIP – LENINSKIY DISTRICT
• A separate poster inA separate poster in
the exhibition areathe exhibition area
Small Grants ProgrammeSmall Grants Programme
ProjectsProjects
 A number of smaller scale projectsA number of smaller scale projects
 Low cost and high effectiveness ofLow cost and high effectiveness of
projects at the local levelprojects at the local level
 Some projects directly contributed to theSome projects directly contributed to the
reduction of pollutionreduction of pollution
 Easy to replicate nationally and in otherEasy to replicate nationally and in other
countriescountries
 A separate presentationA separate presentation
 A poster is available in the exhibition areaA poster is available in the exhibition area
ConclusionsConclusions
 A series of pilot projects have been implementedA series of pilot projects have been implemented
– an important activity of BSERP– an important activity of BSERP
 Different character and objectives of projectsDifferent character and objectives of projects
 Demonstrated solutions to specific issuesDemonstrated solutions to specific issues
 Common features – testing of innovativeCommon features – testing of innovative
approaches, development of replicationapproaches, development of replication
mechanismsmechanisms
 Tangible results in a short-termTangible results in a short-term
 Educational and capacity building componentsEducational and capacity building components
 Involvement of authorities and public at localInvolvement of authorities and public at local
levellevel
Thank youThank you

More Related Content

Similar to Achievements and results of pilot projects, results and scaling-up

Akvaplan-niva International project examples
Akvaplan-niva International project examplesAkvaplan-niva International project examples
Akvaplan-niva International project examplesPatrick White
 
ASCLME project management indicators
ASCLME project management indicatorsASCLME project management indicators
ASCLME project management indicatorsIwl Pcu
 
ASCLME project management indicators
ASCLME project management indicatorsASCLME project management indicators
ASCLME project management indicatorsIwl Pcu
 
Experience with the Design of Logical Frameworks and the Evaluation of Delive...
Experience with the Design of Logical Frameworks and the Evaluation of Delive...Experience with the Design of Logical Frameworks and the Evaluation of Delive...
Experience with the Design of Logical Frameworks and the Evaluation of Delive...Iwl Pcu
 
BSERP small grants programmes
BSERP small grants programmesBSERP small grants programmes
BSERP small grants programmesIwl Pcu
 
IW:LEARN Services for LMEs
IW:LEARN Services for LMEsIW:LEARN Services for LMEs
IW:LEARN Services for LMEsIwl Pcu
 
IW:LEARN Services for LMEs
IW:LEARN Services for LMEsIW:LEARN Services for LMEs
IW:LEARN Services for LMEsIwl Pcu
 
Knowledge Transfer - Insights from European Marine and Maritime Research
Knowledge Transfer - Insights from European Marine and Maritime ResearchKnowledge Transfer - Insights from European Marine and Maritime Research
Knowledge Transfer - Insights from European Marine and Maritime ResearchMEOPAR
 
Transboundary Diagnostic Anaylsis: The Mediterreanean Region
Transboundary Diagnostic Anaylsis: The Mediterreanean RegionTransboundary Diagnostic Anaylsis: The Mediterreanean Region
Transboundary Diagnostic Anaylsis: The Mediterreanean RegionIwl Pcu
 
Assessing a Regional Legal Framework for the Establishment of a Benguela Curr...
Assessing a Regional Legal Framework for the Establishment of a Benguela Curr...Assessing a Regional Legal Framework for the Establishment of a Benguela Curr...
Assessing a Regional Legal Framework for the Establishment of a Benguela Curr...Iwl Pcu
 
Assessing a Regional Legal Framework for the Establishment of a Benguela Curr...
Assessing a Regional Legal Framework for the Establishment of a Benguela Curr...Assessing a Regional Legal Framework for the Establishment of a Benguela Curr...
Assessing a Regional Legal Framework for the Establishment of a Benguela Curr...Iwl Pcu
 
IGCC/GCLME Achievements, Best Practices and Challenges
IGCC/GCLME Achievements, Best Practices and ChallengesIGCC/GCLME Achievements, Best Practices and Challenges
IGCC/GCLME Achievements, Best Practices and ChallengesIwl Pcu
 
C4.04: Design of a GEO Coastal Ocean Pilot Project for the Caribbean Region -...
C4.04: Design of a GEO Coastal Ocean Pilot Project for the Caribbean Region -...C4.04: Design of a GEO Coastal Ocean Pilot Project for the Caribbean Region -...
C4.04: Design of a GEO Coastal Ocean Pilot Project for the Caribbean Region -...Blue Planet Symposium
 
Results of the monitoring activities for the last 15 years -increase of insti...
Results of the monitoring activities for the last 15 years -increase of insti...Results of the monitoring activities for the last 15 years -increase of insti...
Results of the monitoring activities for the last 15 years -increase of insti...Iwl Pcu
 
Progress in the Implementation of the LVEMP 1 and the Preparation of the LVEMP 2
Progress in the Implementation of the LVEMP 1 and the Preparation of the LVEMP 2Progress in the Implementation of the LVEMP 1 and the Preparation of the LVEMP 2
Progress in the Implementation of the LVEMP 1 and the Preparation of the LVEMP 2Iwl Pcu
 
Joint Monitoring and Assessment in transboundary basins: obligations and expe...
Joint Monitoring and Assessment in transboundary basins: obligations and expe...Joint Monitoring and Assessment in transboundary basins: obligations and expe...
Joint Monitoring and Assessment in transboundary basins: obligations and expe...Iwl Pcu
 
Joint Monitoring and Assessment in transboundary basins: obligations and expe...
Joint Monitoring and Assessment in transboundary basins: obligations and expe...Joint Monitoring and Assessment in transboundary basins: obligations and expe...
Joint Monitoring and Assessment in transboundary basins: obligations and expe...Iwl Pcu
 
(XIMB) Sustainability - Shipping Industry
(XIMB) Sustainability - Shipping Industry(XIMB) Sustainability - Shipping Industry
(XIMB) Sustainability - Shipping IndustrySustainabilityXIMB
 

Similar to Achievements and results of pilot projects, results and scaling-up (20)

Akvaplan-niva International project examples
Akvaplan-niva International project examplesAkvaplan-niva International project examples
Akvaplan-niva International project examples
 
ASCLME project management indicators
ASCLME project management indicatorsASCLME project management indicators
ASCLME project management indicators
 
ASCLME project management indicators
ASCLME project management indicatorsASCLME project management indicators
ASCLME project management indicators
 
Experience with the Design of Logical Frameworks and the Evaluation of Delive...
Experience with the Design of Logical Frameworks and the Evaluation of Delive...Experience with the Design of Logical Frameworks and the Evaluation of Delive...
Experience with the Design of Logical Frameworks and the Evaluation of Delive...
 
Seminar Series_final
Seminar Series_finalSeminar Series_final
Seminar Series_final
 
BSERP small grants programmes
BSERP small grants programmesBSERP small grants programmes
BSERP small grants programmes
 
IW:LEARN Services for LMEs
IW:LEARN Services for LMEsIW:LEARN Services for LMEs
IW:LEARN Services for LMEs
 
IW:LEARN Services for LMEs
IW:LEARN Services for LMEsIW:LEARN Services for LMEs
IW:LEARN Services for LMEs
 
Aczmp athens, greece
Aczmp   athens, greeceAczmp   athens, greece
Aczmp athens, greece
 
Knowledge Transfer - Insights from European Marine and Maritime Research
Knowledge Transfer - Insights from European Marine and Maritime ResearchKnowledge Transfer - Insights from European Marine and Maritime Research
Knowledge Transfer - Insights from European Marine and Maritime Research
 
Transboundary Diagnostic Anaylsis: The Mediterreanean Region
Transboundary Diagnostic Anaylsis: The Mediterreanean RegionTransboundary Diagnostic Anaylsis: The Mediterreanean Region
Transboundary Diagnostic Anaylsis: The Mediterreanean Region
 
Assessing a Regional Legal Framework for the Establishment of a Benguela Curr...
Assessing a Regional Legal Framework for the Establishment of a Benguela Curr...Assessing a Regional Legal Framework for the Establishment of a Benguela Curr...
Assessing a Regional Legal Framework for the Establishment of a Benguela Curr...
 
Assessing a Regional Legal Framework for the Establishment of a Benguela Curr...
Assessing a Regional Legal Framework for the Establishment of a Benguela Curr...Assessing a Regional Legal Framework for the Establishment of a Benguela Curr...
Assessing a Regional Legal Framework for the Establishment of a Benguela Curr...
 
IGCC/GCLME Achievements, Best Practices and Challenges
IGCC/GCLME Achievements, Best Practices and ChallengesIGCC/GCLME Achievements, Best Practices and Challenges
IGCC/GCLME Achievements, Best Practices and Challenges
 
C4.04: Design of a GEO Coastal Ocean Pilot Project for the Caribbean Region -...
C4.04: Design of a GEO Coastal Ocean Pilot Project for the Caribbean Region -...C4.04: Design of a GEO Coastal Ocean Pilot Project for the Caribbean Region -...
C4.04: Design of a GEO Coastal Ocean Pilot Project for the Caribbean Region -...
 
Results of the monitoring activities for the last 15 years -increase of insti...
Results of the monitoring activities for the last 15 years -increase of insti...Results of the monitoring activities for the last 15 years -increase of insti...
Results of the monitoring activities for the last 15 years -increase of insti...
 
Progress in the Implementation of the LVEMP 1 and the Preparation of the LVEMP 2
Progress in the Implementation of the LVEMP 1 and the Preparation of the LVEMP 2Progress in the Implementation of the LVEMP 1 and the Preparation of the LVEMP 2
Progress in the Implementation of the LVEMP 1 and the Preparation of the LVEMP 2
 
Joint Monitoring and Assessment in transboundary basins: obligations and expe...
Joint Monitoring and Assessment in transboundary basins: obligations and expe...Joint Monitoring and Assessment in transboundary basins: obligations and expe...
Joint Monitoring and Assessment in transboundary basins: obligations and expe...
 
Joint Monitoring and Assessment in transboundary basins: obligations and expe...
Joint Monitoring and Assessment in transboundary basins: obligations and expe...Joint Monitoring and Assessment in transboundary basins: obligations and expe...
Joint Monitoring and Assessment in transboundary basins: obligations and expe...
 
(XIMB) Sustainability - Shipping Industry
(XIMB) Sustainability - Shipping Industry(XIMB) Sustainability - Shipping Industry
(XIMB) Sustainability - Shipping Industry
 

More from Iwl Pcu

Flood and Drought Management Tools (IWC8)
Flood and Drought Management Tools (IWC8)Flood and Drought Management Tools (IWC8)
Flood and Drought Management Tools (IWC8)Iwl Pcu
 
Caribbean Wastewater - Innovative Solutions (IWC8)
Caribbean Wastewater - Innovative Solutions (IWC8)Caribbean Wastewater - Innovative Solutions (IWC8)
Caribbean Wastewater - Innovative Solutions (IWC8)Iwl Pcu
 
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...Iwl Pcu
 
Understanding the audience (IWC8)
Understanding the audience (IWC8)Understanding the audience (IWC8)
Understanding the audience (IWC8)Iwl Pcu
 
Effective slide designing
Effective slide designingEffective slide designing
Effective slide designingIwl Pcu
 
How to communicate science effectively (IWC8 Presentation)
How to communicate science effectively (IWC8 Presentation)How to communicate science effectively (IWC8 Presentation)
How to communicate science effectively (IWC8 Presentation)Iwl Pcu
 
Presentation vs Publication
Presentation vs PublicationPresentation vs Publication
Presentation vs PublicationIwl Pcu
 
Introduction to Nutrient Roundtable (IWC8)
Introduction to Nutrient Roundtable (IWC8)Introduction to Nutrient Roundtable (IWC8)
Introduction to Nutrient Roundtable (IWC8)Iwl Pcu
 
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 1
TDA/SAP Methodology Training Course Module 2 Section 1TDA/SAP Methodology Training Course Module 2 Section 1
TDA/SAP Methodology Training Course Module 2 Section 1Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 9
TDA/SAP Methodology Training Course Module 2 Section 9TDA/SAP Methodology Training Course Module 2 Section 9
TDA/SAP Methodology Training Course Module 2 Section 9Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 7
TDA/SAP Methodology Training Course Module 2 Section 7TDA/SAP Methodology Training Course Module 2 Section 7
TDA/SAP Methodology Training Course Module 2 Section 7Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 6
TDA/SAP Methodology Training Course Module 2 Section 6TDA/SAP Methodology Training Course Module 2 Section 6
TDA/SAP Methodology Training Course Module 2 Section 6Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 

More from Iwl Pcu (20)

Flood and Drought Management Tools (IWC8)
Flood and Drought Management Tools (IWC8)Flood and Drought Management Tools (IWC8)
Flood and Drought Management Tools (IWC8)
 
Caribbean Wastewater - Innovative Solutions (IWC8)
Caribbean Wastewater - Innovative Solutions (IWC8)Caribbean Wastewater - Innovative Solutions (IWC8)
Caribbean Wastewater - Innovative Solutions (IWC8)
 
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
 
Understanding the audience (IWC8)
Understanding the audience (IWC8)Understanding the audience (IWC8)
Understanding the audience (IWC8)
 
Effective slide designing
Effective slide designingEffective slide designing
Effective slide designing
 
How to communicate science effectively (IWC8 Presentation)
How to communicate science effectively (IWC8 Presentation)How to communicate science effectively (IWC8 Presentation)
How to communicate science effectively (IWC8 Presentation)
 
Presentation vs Publication
Presentation vs PublicationPresentation vs Publication
Presentation vs Publication
 
Introduction to Nutrient Roundtable (IWC8)
Introduction to Nutrient Roundtable (IWC8)Introduction to Nutrient Roundtable (IWC8)
Introduction to Nutrient Roundtable (IWC8)
 
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
 
TDA/SAP Methodology Training Course Module 2 Section 1
TDA/SAP Methodology Training Course Module 2 Section 1TDA/SAP Methodology Training Course Module 2 Section 1
TDA/SAP Methodology Training Course Module 2 Section 1
 
TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10
 
TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10
 
TDA/SAP Methodology Training Course Module 2 Section 9
TDA/SAP Methodology Training Course Module 2 Section 9TDA/SAP Methodology Training Course Module 2 Section 9
TDA/SAP Methodology Training Course Module 2 Section 9
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 
TDA/SAP Methodology Training Course Module 2 Section 7
TDA/SAP Methodology Training Course Module 2 Section 7TDA/SAP Methodology Training Course Module 2 Section 7
TDA/SAP Methodology Training Course Module 2 Section 7
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 
TDA/SAP Methodology Training Course Module 2 Section 6
TDA/SAP Methodology Training Course Module 2 Section 6TDA/SAP Methodology Training Course Module 2 Section 6
TDA/SAP Methodology Training Course Module 2 Section 6
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 

Achievements and results of pilot projects, results and scaling-up

  • 1. Achievements and Results of Pilot Projects, Results and Scaling-up
  • 2. Pilot ProjectsPilot Projects  ICZM Pilot ProjectsICZM Pilot Projects  Pilot Monitoring ExercisesPilot Monitoring Exercises  Kamchyia River Basin Management ProjectKamchyia River Basin Management Project  Vessel Traffic Oil Pollution InformationVessel Traffic Oil Pollution Information System (VTOPIS)System (VTOPIS)  Mykolaiv Water & Sewerage ProjectMykolaiv Water & Sewerage Project  Crimea Regional Water & Sewerage ProjectCrimea Regional Water & Sewerage Project  Small Grants Programme ProjectsSmall Grants Programme Projects
  • 3. ICZM Pilot ProjectICZM Pilot Project AkcakocaAkcakoca  Testing of land-useTesting of land-use methodology andmethodology and development of draftdevelopment of draft land-use plansland-use plans  A poster is availableA poster is available in the poster areain the poster area  Included inIncluded in presentation onpresentation on ICZMICZM
  • 4. ICZM Pilot Project (SGP)ICZM Pilot Project (SGP) Coastal zone management Plan forCoastal zone management Plan for Tarkhankut peninsula in Crimea (Ukraine)Tarkhankut peninsula in Crimea (Ukraine)  Implemented in partnership with localImplemented in partnership with local authorities, public and expertsauthorities, public and experts  Assessment of local conditions andAssessment of local conditions and opportunities for sustainable developmentopportunities for sustainable development  Meetings and discussions with land usersMeetings and discussions with land users and owners, reps of local authoritiesand owners, reps of local authorities  A draft management plan for theA draft management plan for the Tiligulskiy Liman Ramsar site has beenTiligulskiy Liman Ramsar site has been developed and publisheddeveloped and published
  • 5. Pilot Monitoring ExercisesPilot Monitoring Exercises Two Pilot Monitoring ExercisesTwo Pilot Monitoring Exercises 1. Identification of the specific biological, chemical1. Identification of the specific biological, chemical and physical indicators for the Black Seaand physical indicators for the Black Sea (countries)(countries) 2. Investigation of the regional capacity to2. Investigation of the regional capacity to undertake monitoring of the selected indicatorsundertake monitoring of the selected indicators 3. Recommendation for training and equipment3. Recommendation for training and equipment needs in each countryneeds in each country 4. Initiation of training for specific indicators and4. Initiation of training for specific indicators and QA/QCQA/QC  A separate presentation has been presentedA separate presentation has been presented  A poster is available in the exhibition areaA poster is available in the exhibition area
  • 6. Kamchyia River Basin ManagementKamchyia River Basin Management Pilot ProjectPilot Project  Nutrient export from withinNutrient export from within the Kamchiya River Basinthe Kamchiya River Basin to the Black Seato the Black Sea  Nutrient sourceNutrient source apportionment modellingapportionment modelling approachapproach  Approach reflects recentApproach reflects recent experiences in otherexperiences in other European river basinsEuropean river basins  Similar approaches couldSimilar approaches could be used in other basinsbe used in other basins Data base Source oriented approach Point Sources Diffuse Sources Natural / Background Sources Industry Sewered population Unsewred population Livestock farming Land-use Background N and P export Atmospheric deposition of N and P Total Annual Nutrient Loading (TANL) TANL – ISNL = Retention in inland surface waters/ Unaccounted sources In-Stream Nutrient Loading (ISNL)
  • 7. VTOPISVTOPIS Assessment of the current situationAssessment of the current situation on management of ship-relatedon management of ship-related information in Bulgariainformation in Bulgaria Design a VTOPIS system forDesign a VTOPIS system for collection, update, exchange andcollection, update, exchange and management of information, includingmanagement of information, including generation of required reportsgeneration of required reports A proposal for multiplication ofA proposal for multiplication of VTOPIS in the other Black SeaVTOPIS in the other Black Sea countriescountries A separate poster is available in theA separate poster is available in the exhibition areaexhibition area
  • 8. Mykolaiv Water & SewerageMykolaiv Water & Sewerage ProjectProject  Technical Feasibility Studies completedTechnical Feasibility Studies completed  Public Consultations CompletedPublic Consultations Completed  Project Approval by City Parliament confirmedProject Approval by City Parliament confirmed  State Guarantee Procedure startedState Guarantee Procedure started  National Grant contribution confirmedNational Grant contribution confirmed  EC Grant confirmed and grant agreement signedEC Grant confirmed and grant agreement signed with EC/EIBwith EC/EIB  Construction Works underway (€2.3M)Construction Works underway (€2.3M)  A separate presentationA separate presentation  A poster is available in the exhibition areaA poster is available in the exhibition area
  • 9. Crimea Regional Water &Crimea Regional Water & Sewerage ProjectSewerage Project  Key issues identifiedKey issues identified  Recommendations made how to address theRecommendations made how to address the issuesissues  PILOT STIP – LENINSKIY DISTRICTPILOT STIP – LENINSKIY DISTRICT • A separate poster inA separate poster in the exhibition areathe exhibition area
  • 10. Small Grants ProgrammeSmall Grants Programme ProjectsProjects  A number of smaller scale projectsA number of smaller scale projects  Low cost and high effectiveness ofLow cost and high effectiveness of projects at the local levelprojects at the local level  Some projects directly contributed to theSome projects directly contributed to the reduction of pollutionreduction of pollution  Easy to replicate nationally and in otherEasy to replicate nationally and in other countriescountries  A separate presentationA separate presentation  A poster is available in the exhibition areaA poster is available in the exhibition area
  • 11. ConclusionsConclusions  A series of pilot projects have been implementedA series of pilot projects have been implemented – an important activity of BSERP– an important activity of BSERP  Different character and objectives of projectsDifferent character and objectives of projects  Demonstrated solutions to specific issuesDemonstrated solutions to specific issues  Common features – testing of innovativeCommon features – testing of innovative approaches, development of replicationapproaches, development of replication mechanismsmechanisms  Tangible results in a short-termTangible results in a short-term  Educational and capacity building componentsEducational and capacity building components  Involvement of authorities and public at localInvolvement of authorities and public at local levellevel