Abstract:
This paper presents a wide-voltage-range, fast-transient all-digital buck converter using a high-
resolution digital pulsewidth modulator (DPWM). The converter employs the multithreshold-
voltage band-control technique to shorten its transient response. The DPWM uses an all-digital
delay-locked loop (ADDLL) to control its cycle. The usage of ADDLL leads to the DPWM
possessing a small area while maintaining high cycle resolution. Moreover, the proposed
ADDLL-based cycle controlled DPWM can achieve synchronization between its input and
output. This decreases the loop delay of the proposed converter so that the system is easy to be
stabilized. The prototype chips of both the ADDLL-based cycle-controlled DPWM and the all-
digital buck converter are fabricated in 0.35-µm CMOS process. Measurement results of the
cycle controlled DPWM show that the duty cycle of its output is adjustable from 1% to 99% in a
0.78% increment per step when operating at 1 MHz. The measured transition time of the all-
digital buck converter is < 3.5 µs when the load current changes from 50 to 500 mA, and vice
versa. The proposed architecture of this paper the area and power consumption are analysis using
tanner tools.
Enhancement of the project:
Existing System:
A conventional buck converter is realized in analog circuits, and it requires lots of passive
components in its compensator to stabilize the loop. Compared with the analog realizations, the
digital buck converters are not only less sensitive to the process, voltage, and temperature (PVT)
variations but also much easier to be integrated into a system-on-a-chip solution. Furthermore,
benefiting from the digital nature, it is much easier for engineers to design process independent
all-digital buck converters than to design their analog counterparts. All the above features make
the all-digital buck converters attractive in power management applications.
CONTACT: PRAVEEN KUMAR. L (,+91 – 9791938249)
MAIL ID: sunsid1989@gmail.com, praveen@nexgenproject.com
Web: www.nexgenproject.com, www.finalyear-ieeeprojects.com
Fig. 1 shows the conventional digital-controlled buck converter. It consists of an analog-to-
digital converter (ADC), a digital compensator, a digital pulsewidth modulator (DPWM), two
power transistors, and an LC output filter. Conventionally, the digital-controlled buck converters
are not popular in power management because of the following reasons.
Fig. 1. Conventional digital-controlled buck converters.
1) The high-resolution ADC in a buck converter consumes significant power and occupies a
large chip area. Meanwhile, an ADC is extremely sensitive to the supply voltage variation.
Furthermore, designing a high-resolution ADC takes intensive design efforts.
2) The digital compensator is usually realized by a lookup table circuit, which also occupies a
large chip area.
3) To realize a high-resolution DPWM, lots of delay elements and multiplexers (MUXs) are
required. This results in a considerable increase of the chip area. On the other hand, the
latencies for generating different duty-cycle outputs are different. It is difficult to keep the
buck converter stable for such a wide range of latency.
4) Limit cycle oscillations (LCOs) due to finite precision of the ADC and/or finite precision of
the DPWM may occur in the digital-controlled buck converter. This not only worsens the
ripples in its regulated output, but also limits the tunable output range of the buck converter.
CONTACT: PRAVEEN KUMAR. L (,+91 – 9791938249)
MAIL ID: sunsid1989@gmail.com, praveen@nexgenproject.com
Web: www.nexgenproject.com, www.finalyear-ieeeprojects.com
5) The response time of the digital-controlled buck converter highly depends on the operating
frequency of the digital controller and the converter itself. To fulfill the fast-transient
requirement for a load change, the operating frequency of the digital controller and the
converter itself should be as high as possible. Unfortunately, increasing the operating
frequency of the converter worsens the switching loss dramatically and lowers the
converter’s conversion efficiency.
Disadvantages:
 Duty cycle range is less
 Power management is not better
Proposed System:
CONTACT: PRAVEEN KUMAR. L (,+91 – 9791938249)
MAIL ID: sunsid1989@gmail.com, praveen@nexgenproject.com
Web: www.nexgenproject.com, www.finalyear-ieeeprojects.com
Fig. 2. Simplified architecture of the fast-transient wide-voltage-range, all-digital buck converter.
Fig. 2 shows the simplified architecture of the proposed fast transient all-digital buck converter.
It consists of two power transistors, a MUX, a linear control circuit, a MTVB control circuit, a
divider, a lock detector (LD), a dead-time circuit with buffers, and an LC output filter. Two clock
signals, CLK and CLK Div, are used for the linear control circuit to lower the power
consumption. To shorten the response time of the buck converter, the feedback control of the
proposed buck converter operates in two modes, the nonlinear control mode and the linear
control mode, according to the outputs of the MTVB control circuits. If the regulated output is
outside the voltage range delimited by [VL, VH], the buck converter operates in the nonlinear
CONTACT: PRAVEEN KUMAR. L (,+91 – 9791938249)
MAIL ID: sunsid1989@gmail.com, praveen@nexgenproject.com
Web: www.nexgenproject.com, www.finalyear-ieeeprojects.com
control mode by selecting the comparison result of the MTVB control circuit (Comp) through the
MUX to modulate the power transistor.
Fig. 3. Flowchart of the proposed all-digital buck converter
Fig. 3 shows the flowchart of the control mechanism of the proposed buck converter. The linear
control mechanism of the proposed all-digital buck converter employs the pulse width
modulation (PWM) due to its high conversion efficiency during the heavy-load period in which
the PWM controller introduces smaller ripples to the regulated output than any other control
technique does.
Fig. 4. Block diagram of the linear control circuit.
CONTACT: PRAVEEN KUMAR. L (,+91 – 9791938249)
MAIL ID: sunsid1989@gmail.com, praveen@nexgenproject.com
Web: www.nexgenproject.com, www.finalyear-ieeeprojects.com
Fig. 4 shows the block diagram of the linear control circuit. It consists of a 7-bit up/down
counter, a cycle-controlled DPWM, and a three-input AND gate. To reduce the power
consumption in the up/down counter, the operating frequency of the counter is chosen lower than
the operating frequency of the DPWM. The duty cycle of the cycle-controlled DPWMs output is
adjustable depending on the logic level of Comp at every rising edge of CLK. If Comp is logic
HIGH, the output duty cycle of the DPWM increases. Otherwise, the output duty cycle of the
DPWM decreases.
MTVB Control Circuit
Fig. 5. Schematic of the MTVB control circuit and its truth table.
Fig. 5 shows the schematic of the MTVB control circuit and its truth table. It consists of three
hysteresis comparators and one NAND gate. The hysteresis comparators are utilized here to
prevent the comparison results from being affected by the unexpected high-frequency spikes of
Vout. The first comparator, Comp1, compares the regulated output, Vout, with the target voltage,
VRef, and generates a binary output, Comp. The second and the third comparators, Comp2 and
Comp3, are used to detect whether VH > Vout > VL or not.
Cycle-Controlled DPWM
Fig. 6(a) shows the simplified architecture of the DPWM. A pulse generator is utilized to
generate a fixed duty cycle output, CLKPULSE. This prevents both inputs of the NOR-based set-
reset flipflop (SRFF) from being set to logic HIGH at the same time. The rising edge of
CONTACT: PRAVEEN KUMAR. L (,+91 – 9791938249)
MAIL ID: sunsid1989@gmail.com, praveen@nexgenproject.com
Web: www.nexgenproject.com, www.finalyear-ieeeprojects.com
CLKPULSE sets the SRFF to logic HIGH. Meanwhile, CLKPULSE also enters the cycle-
controlled delay line (CCDL). After passing through the delay line, the rising edge of its delayed
version, CLKR, resets the SRFF to logic LOW. The schematic of the CCDL and its timing
diagram are shown in Fig. 6(b). It consists of an MUX, a deMUX (DEMUX), a one-shot circuit,
a digital-controlled delay line (DCDL), an inverter, a 7-bit counter, and a 7-bit comparator.
Fig. 6. (a) Simplified architecture of the DPWM. (b) Schematic of the CCDL and its timing diagram.
CONTACT: PRAVEEN KUMAR. L (,+91 – 9791938249)
MAIL ID: sunsid1989@gmail.com, praveen@nexgenproject.com
Web: www.nexgenproject.com, www.finalyear-ieeeprojects.com
Fig. 7 shows the detail schematic of the cycle-controlled DPWM and its corresponding timing
diagram. The proposed cyclecontrolled DPWM consists of a start-controlled circuit [17], one
pulse generator [18], a MUX, a DEMUX, a DCDL [19], a 7-bit counter, a 7-bit successive-
approximationregister (SAR) circuit [20], a bit comparator, an SRFF, a DFF, a phase detector
(PD), and some control logics as shown in Fig. 7(a). The proposed DPWM has two operation
modes, namely, the ADDLL mode and the DPWM mode, respectively. The timing diagram of
the DPWM is shown in Fig. 7(b).
Fig. 7. (a) Proposed cycle-controlled DPWM. (b) Timing diagram of the cycle-controlled DPWM.
Lock Detector
CONTACT: PRAVEEN KUMAR. L (,+91 – 9791938249)
MAIL ID: sunsid1989@gmail.com, praveen@nexgenproject.com
Web: www.nexgenproject.com, www.finalyear-ieeeprojects.com
To avoid dithering of the comparison results between VRef and Vout due to the finite resolution
of digital circuits, an LD is employed to detect dithering of Comp, the comparison result of the
MTVB circuit.
Advantages:
 wide duty cycle control
 regulated output’s tunable range wide
Software implementation:
 Tanner tools

More Related Content

Viewers also liked

Sistemas eléctricos e identificación de enrutamiento
Sistemas eléctricos e identificación de enrutamientoSistemas eléctricos e identificación de enrutamiento
Sistemas eléctricos e identificación de enrutamientoclaudiacruz85
 
Kellogg Caribbean Project Bucket diagram
Kellogg Caribbean Project Bucket diagramKellogg Caribbean Project Bucket diagram
Kellogg Caribbean Project Bucket diagramFernando Taurel
 
Mags Novel 9001-2008
Mags Novel 9001-2008Mags Novel 9001-2008
Mags Novel 9001-2008Sunil Chadha
 
Introducao ao WordPress
Introducao ao WordPressIntroducao ao WordPress
Introducao ao WordPressKennedy Lucas
 
Affiche pour journal Westmount
Affiche pour journal WestmountAffiche pour journal Westmount
Affiche pour journal WestmountRomain Duguay
 
Praxis 3 como afecta la inseguridad en el ambiente escolar del niño grdo cua...
Praxis 3 como afecta  la inseguridad en el ambiente escolar del niño grdo cua...Praxis 3 como afecta  la inseguridad en el ambiente escolar del niño grdo cua...
Praxis 3 como afecta la inseguridad en el ambiente escolar del niño grdo cua...Tatiana Wilches
 
8_STEP Problem Solving Tng Cert
8_STEP Problem Solving Tng Cert8_STEP Problem Solving Tng Cert
8_STEP Problem Solving Tng CertSteve Nails
 
Tecnologia (1)
Tecnologia (1)Tecnologia (1)
Tecnologia (1)OADS2114
 

Viewers also liked (17)

Online veiling
Online veilingOnline veiling
Online veiling
 
Memoria ROM
Memoria ROMMemoria ROM
Memoria ROM
 
Sistemas eléctricos e identificación de enrutamiento
Sistemas eléctricos e identificación de enrutamientoSistemas eléctricos e identificación de enrutamiento
Sistemas eléctricos e identificación de enrutamiento
 
Posters
PostersPosters
Posters
 
Kellogg Caribbean Project Bucket diagram
Kellogg Caribbean Project Bucket diagramKellogg Caribbean Project Bucket diagram
Kellogg Caribbean Project Bucket diagram
 
Mags Novel 9001-2008
Mags Novel 9001-2008Mags Novel 9001-2008
Mags Novel 9001-2008
 
Introducao ao WordPress
Introducao ao WordPressIntroducao ao WordPress
Introducao ao WordPress
 
Affiche pour journal Westmount
Affiche pour journal WestmountAffiche pour journal Westmount
Affiche pour journal Westmount
 
1
11
1
 
Tese marcos antonio
Tese marcos antonioTese marcos antonio
Tese marcos antonio
 
AN_LOGO_FINAL
AN_LOGO_FINALAN_LOGO_FINAL
AN_LOGO_FINAL
 
Praxis 3 como afecta la inseguridad en el ambiente escolar del niño grdo cua...
Praxis 3 como afecta  la inseguridad en el ambiente escolar del niño grdo cua...Praxis 3 como afecta  la inseguridad en el ambiente escolar del niño grdo cua...
Praxis 3 como afecta la inseguridad en el ambiente escolar del niño grdo cua...
 
20160615125805
2016061512580520160615125805
20160615125805
 
8_STEP Problem Solving Tng Cert
8_STEP Problem Solving Tng Cert8_STEP Problem Solving Tng Cert
8_STEP Problem Solving Tng Cert
 
Tecnologia (1)
Tecnologia (1)Tecnologia (1)
Tecnologia (1)
 
JSilvamidassystem
JSilvamidassystemJSilvamidassystem
JSilvamidassystem
 
316664
316664316664
316664
 

More from Nexgen Technology

MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...
    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...Nexgen Technology
 
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...
    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...Nexgen Technology
 
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...
    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...Nexgen Technology
 
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...
    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...Nexgen Technology
 
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...
    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...Nexgen Technology
 
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...
    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...Nexgen Technology
 
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CH...
     MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CH...     MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CH...
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CH...Nexgen Technology
 
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHENN...
  MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHENN...  MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHENN...
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHENN...Nexgen Technology
 
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...
    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...Nexgen Technology
 
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...
    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...Nexgen Technology
 
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHENNA...
 MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHENNA... MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHENNA...
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHENNA...Nexgen Technology
 
Ieee 2020 21 vlsi projects in pondicherry,ieee vlsi projects in chennai
Ieee 2020 21 vlsi projects in pondicherry,ieee  vlsi projects  in chennaiIeee 2020 21 vlsi projects in pondicherry,ieee  vlsi projects  in chennai
Ieee 2020 21 vlsi projects in pondicherry,ieee vlsi projects in chennaiNexgen Technology
 
Ieee 2020 21 power electronics in pondicherry,Ieee 2020 21 power electronics
Ieee 2020 21 power electronics in pondicherry,Ieee 2020 21 power electronics Ieee 2020 21 power electronics in pondicherry,Ieee 2020 21 power electronics
Ieee 2020 21 power electronics in pondicherry,Ieee 2020 21 power electronics Nexgen Technology
 
Ieee 2020 -21 ns2 in pondicherry, Ieee 2020 -21 ns2 projects,best project cen...
Ieee 2020 -21 ns2 in pondicherry, Ieee 2020 -21 ns2 projects,best project cen...Ieee 2020 -21 ns2 in pondicherry, Ieee 2020 -21 ns2 projects,best project cen...
Ieee 2020 -21 ns2 in pondicherry, Ieee 2020 -21 ns2 projects,best project cen...Nexgen Technology
 
Ieee 2020 21 ns2 in pondicherry,best project center in pondicherry,final year...
Ieee 2020 21 ns2 in pondicherry,best project center in pondicherry,final year...Ieee 2020 21 ns2 in pondicherry,best project center in pondicherry,final year...
Ieee 2020 21 ns2 in pondicherry,best project center in pondicherry,final year...Nexgen Technology
 
Ieee 2020 21 java dotnet in pondicherry,final year projects in pondicherry,pr...
Ieee 2020 21 java dotnet in pondicherry,final year projects in pondicherry,pr...Ieee 2020 21 java dotnet in pondicherry,final year projects in pondicherry,pr...
Ieee 2020 21 java dotnet in pondicherry,final year projects in pondicherry,pr...Nexgen Technology
 
Ieee 2020 21 iot in pondicherry,final year projects in pondicherry,project ce...
Ieee 2020 21 iot in pondicherry,final year projects in pondicherry,project ce...Ieee 2020 21 iot in pondicherry,final year projects in pondicherry,project ce...
Ieee 2020 21 iot in pondicherry,final year projects in pondicherry,project ce...Nexgen Technology
 
Ieee 2020 21 blockchain in pondicherry,final year projects in pondicherry,bes...
Ieee 2020 21 blockchain in pondicherry,final year projects in pondicherry,bes...Ieee 2020 21 blockchain in pondicherry,final year projects in pondicherry,bes...
Ieee 2020 21 blockchain in pondicherry,final year projects in pondicherry,bes...Nexgen Technology
 
Ieee 2020 -21 bigdata in pondicherry,project center in pondicherry,best proje...
Ieee 2020 -21 bigdata in pondicherry,project center in pondicherry,best proje...Ieee 2020 -21 bigdata in pondicherry,project center in pondicherry,best proje...
Ieee 2020 -21 bigdata in pondicherry,project center in pondicherry,best proje...Nexgen Technology
 
Ieee 2020 21 embedded in pondicherry,final year projects in pondicherry,best...
Ieee 2020 21  embedded in pondicherry,final year projects in pondicherry,best...Ieee 2020 21  embedded in pondicherry,final year projects in pondicherry,best...
Ieee 2020 21 embedded in pondicherry,final year projects in pondicherry,best...Nexgen Technology
 

More from Nexgen Technology (20)

MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...
    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...
 
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...
    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...
 
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...
    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...
 
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...
    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...
 
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...
    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...
 
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...
    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...
 
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CH...
     MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CH...     MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CH...
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CH...
 
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHENN...
  MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHENN...  MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHENN...
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHENN...
 
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...
    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...
 
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...
    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...    MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHE...
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHE...
 
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHENNA...
 MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHENNA... MECHANICAL PROJECTS IN PONDICHERRY,   2020-21  MECHANICAL PROJECTS IN CHENNA...
MECHANICAL PROJECTS IN PONDICHERRY, 2020-21 MECHANICAL PROJECTS IN CHENNA...
 
Ieee 2020 21 vlsi projects in pondicherry,ieee vlsi projects in chennai
Ieee 2020 21 vlsi projects in pondicherry,ieee  vlsi projects  in chennaiIeee 2020 21 vlsi projects in pondicherry,ieee  vlsi projects  in chennai
Ieee 2020 21 vlsi projects in pondicherry,ieee vlsi projects in chennai
 
Ieee 2020 21 power electronics in pondicherry,Ieee 2020 21 power electronics
Ieee 2020 21 power electronics in pondicherry,Ieee 2020 21 power electronics Ieee 2020 21 power electronics in pondicherry,Ieee 2020 21 power electronics
Ieee 2020 21 power electronics in pondicherry,Ieee 2020 21 power electronics
 
Ieee 2020 -21 ns2 in pondicherry, Ieee 2020 -21 ns2 projects,best project cen...
Ieee 2020 -21 ns2 in pondicherry, Ieee 2020 -21 ns2 projects,best project cen...Ieee 2020 -21 ns2 in pondicherry, Ieee 2020 -21 ns2 projects,best project cen...
Ieee 2020 -21 ns2 in pondicherry, Ieee 2020 -21 ns2 projects,best project cen...
 
Ieee 2020 21 ns2 in pondicherry,best project center in pondicherry,final year...
Ieee 2020 21 ns2 in pondicherry,best project center in pondicherry,final year...Ieee 2020 21 ns2 in pondicherry,best project center in pondicherry,final year...
Ieee 2020 21 ns2 in pondicherry,best project center in pondicherry,final year...
 
Ieee 2020 21 java dotnet in pondicherry,final year projects in pondicherry,pr...
Ieee 2020 21 java dotnet in pondicherry,final year projects in pondicherry,pr...Ieee 2020 21 java dotnet in pondicherry,final year projects in pondicherry,pr...
Ieee 2020 21 java dotnet in pondicherry,final year projects in pondicherry,pr...
 
Ieee 2020 21 iot in pondicherry,final year projects in pondicherry,project ce...
Ieee 2020 21 iot in pondicherry,final year projects in pondicherry,project ce...Ieee 2020 21 iot in pondicherry,final year projects in pondicherry,project ce...
Ieee 2020 21 iot in pondicherry,final year projects in pondicherry,project ce...
 
Ieee 2020 21 blockchain in pondicherry,final year projects in pondicherry,bes...
Ieee 2020 21 blockchain in pondicherry,final year projects in pondicherry,bes...Ieee 2020 21 blockchain in pondicherry,final year projects in pondicherry,bes...
Ieee 2020 21 blockchain in pondicherry,final year projects in pondicherry,bes...
 
Ieee 2020 -21 bigdata in pondicherry,project center in pondicherry,best proje...
Ieee 2020 -21 bigdata in pondicherry,project center in pondicherry,best proje...Ieee 2020 -21 bigdata in pondicherry,project center in pondicherry,best proje...
Ieee 2020 -21 bigdata in pondicherry,project center in pondicherry,best proje...
 
Ieee 2020 21 embedded in pondicherry,final year projects in pondicherry,best...
Ieee 2020 21  embedded in pondicherry,final year projects in pondicherry,best...Ieee 2020 21  embedded in pondicherry,final year projects in pondicherry,best...
Ieee 2020 21 embedded in pondicherry,final year projects in pondicherry,best...
 

Recently uploaded

Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxMd. Shahidul Islam Prodhan
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
 
Peek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfPeek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfAyahmorsy
 
Paint shop management system project report.pdf
Paint shop management system project report.pdfPaint shop management system project report.pdf
Paint shop management system project report.pdfKamal Acharya
 
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdfONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdfKamal Acharya
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-IVigneshvaranMech
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Krakówbim.edu.pl
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdfKamal Acharya
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfKamal Acharya
 
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringC Sai Kiran
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfKamal Acharya
 
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdfDR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdfDrGurudutt
 
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...Roi Lipman
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfAbrahamGadissa
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfPipe Restoration Solutions
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdfKamal Acharya
 
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...Amil baba
 
Dairy management system project report..pdf
Dairy management system project report..pdfDairy management system project report..pdf
Dairy management system project report..pdfKamal Acharya
 

Recently uploaded (20)

Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Peek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfPeek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdf
 
Paint shop management system project report.pdf
Paint shop management system project report.pdfPaint shop management system project report.pdf
Paint shop management system project report.pdf
 
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdfONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Kraków
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
 
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
 
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdfDR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
 
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
 
Dairy management system project report..pdf
Dairy management system project report..pdfDairy management system project report..pdf
Dairy management system project report..pdf
 

A fast transient wide-voltage-range digital-controlled buck converter with cycle-controlled dpwm

  • 1. CONTACT: PRAVEEN KUMAR. L (,+91 – 9791938249) MAIL ID: sunsid1989@gmail.com, praveen@nexgenproject.com Web: www.nexgenproject.com, www.finalyear-ieeeprojects.com A Fast-Transient Wide-Voltage-Range Digital- Controlled Buck Converter with Cycle-Controlled DPWM Abstract: This paper presents a wide-voltage-range, fast-transient all-digital buck converter using a high- resolution digital pulsewidth modulator (DPWM). The converter employs the multithreshold- voltage band-control technique to shorten its transient response. The DPWM uses an all-digital delay-locked loop (ADDLL) to control its cycle. The usage of ADDLL leads to the DPWM possessing a small area while maintaining high cycle resolution. Moreover, the proposed ADDLL-based cycle controlled DPWM can achieve synchronization between its input and output. This decreases the loop delay of the proposed converter so that the system is easy to be stabilized. The prototype chips of both the ADDLL-based cycle-controlled DPWM and the all- digital buck converter are fabricated in 0.35-µm CMOS process. Measurement results of the cycle controlled DPWM show that the duty cycle of its output is adjustable from 1% to 99% in a 0.78% increment per step when operating at 1 MHz. The measured transition time of the all- digital buck converter is < 3.5 µs when the load current changes from 50 to 500 mA, and vice versa. The proposed architecture of this paper the area and power consumption are analysis using tanner tools. Enhancement of the project: Existing System: A conventional buck converter is realized in analog circuits, and it requires lots of passive components in its compensator to stabilize the loop. Compared with the analog realizations, the digital buck converters are not only less sensitive to the process, voltage, and temperature (PVT) variations but also much easier to be integrated into a system-on-a-chip solution. Furthermore, benefiting from the digital nature, it is much easier for engineers to design process independent all-digital buck converters than to design their analog counterparts. All the above features make the all-digital buck converters attractive in power management applications.
  • 2. CONTACT: PRAVEEN KUMAR. L (,+91 – 9791938249) MAIL ID: sunsid1989@gmail.com, praveen@nexgenproject.com Web: www.nexgenproject.com, www.finalyear-ieeeprojects.com Fig. 1 shows the conventional digital-controlled buck converter. It consists of an analog-to- digital converter (ADC), a digital compensator, a digital pulsewidth modulator (DPWM), two power transistors, and an LC output filter. Conventionally, the digital-controlled buck converters are not popular in power management because of the following reasons. Fig. 1. Conventional digital-controlled buck converters. 1) The high-resolution ADC in a buck converter consumes significant power and occupies a large chip area. Meanwhile, an ADC is extremely sensitive to the supply voltage variation. Furthermore, designing a high-resolution ADC takes intensive design efforts. 2) The digital compensator is usually realized by a lookup table circuit, which also occupies a large chip area. 3) To realize a high-resolution DPWM, lots of delay elements and multiplexers (MUXs) are required. This results in a considerable increase of the chip area. On the other hand, the latencies for generating different duty-cycle outputs are different. It is difficult to keep the buck converter stable for such a wide range of latency. 4) Limit cycle oscillations (LCOs) due to finite precision of the ADC and/or finite precision of the DPWM may occur in the digital-controlled buck converter. This not only worsens the ripples in its regulated output, but also limits the tunable output range of the buck converter.
  • 3. CONTACT: PRAVEEN KUMAR. L (,+91 – 9791938249) MAIL ID: sunsid1989@gmail.com, praveen@nexgenproject.com Web: www.nexgenproject.com, www.finalyear-ieeeprojects.com 5) The response time of the digital-controlled buck converter highly depends on the operating frequency of the digital controller and the converter itself. To fulfill the fast-transient requirement for a load change, the operating frequency of the digital controller and the converter itself should be as high as possible. Unfortunately, increasing the operating frequency of the converter worsens the switching loss dramatically and lowers the converter’s conversion efficiency. Disadvantages:  Duty cycle range is less  Power management is not better Proposed System:
  • 4. CONTACT: PRAVEEN KUMAR. L (,+91 – 9791938249) MAIL ID: sunsid1989@gmail.com, praveen@nexgenproject.com Web: www.nexgenproject.com, www.finalyear-ieeeprojects.com Fig. 2. Simplified architecture of the fast-transient wide-voltage-range, all-digital buck converter. Fig. 2 shows the simplified architecture of the proposed fast transient all-digital buck converter. It consists of two power transistors, a MUX, a linear control circuit, a MTVB control circuit, a divider, a lock detector (LD), a dead-time circuit with buffers, and an LC output filter. Two clock signals, CLK and CLK Div, are used for the linear control circuit to lower the power consumption. To shorten the response time of the buck converter, the feedback control of the proposed buck converter operates in two modes, the nonlinear control mode and the linear control mode, according to the outputs of the MTVB control circuits. If the regulated output is outside the voltage range delimited by [VL, VH], the buck converter operates in the nonlinear
  • 5. CONTACT: PRAVEEN KUMAR. L (,+91 – 9791938249) MAIL ID: sunsid1989@gmail.com, praveen@nexgenproject.com Web: www.nexgenproject.com, www.finalyear-ieeeprojects.com control mode by selecting the comparison result of the MTVB control circuit (Comp) through the MUX to modulate the power transistor. Fig. 3. Flowchart of the proposed all-digital buck converter Fig. 3 shows the flowchart of the control mechanism of the proposed buck converter. The linear control mechanism of the proposed all-digital buck converter employs the pulse width modulation (PWM) due to its high conversion efficiency during the heavy-load period in which the PWM controller introduces smaller ripples to the regulated output than any other control technique does. Fig. 4. Block diagram of the linear control circuit.
  • 6. CONTACT: PRAVEEN KUMAR. L (,+91 – 9791938249) MAIL ID: sunsid1989@gmail.com, praveen@nexgenproject.com Web: www.nexgenproject.com, www.finalyear-ieeeprojects.com Fig. 4 shows the block diagram of the linear control circuit. It consists of a 7-bit up/down counter, a cycle-controlled DPWM, and a three-input AND gate. To reduce the power consumption in the up/down counter, the operating frequency of the counter is chosen lower than the operating frequency of the DPWM. The duty cycle of the cycle-controlled DPWMs output is adjustable depending on the logic level of Comp at every rising edge of CLK. If Comp is logic HIGH, the output duty cycle of the DPWM increases. Otherwise, the output duty cycle of the DPWM decreases. MTVB Control Circuit Fig. 5. Schematic of the MTVB control circuit and its truth table. Fig. 5 shows the schematic of the MTVB control circuit and its truth table. It consists of three hysteresis comparators and one NAND gate. The hysteresis comparators are utilized here to prevent the comparison results from being affected by the unexpected high-frequency spikes of Vout. The first comparator, Comp1, compares the regulated output, Vout, with the target voltage, VRef, and generates a binary output, Comp. The second and the third comparators, Comp2 and Comp3, are used to detect whether VH > Vout > VL or not. Cycle-Controlled DPWM Fig. 6(a) shows the simplified architecture of the DPWM. A pulse generator is utilized to generate a fixed duty cycle output, CLKPULSE. This prevents both inputs of the NOR-based set- reset flipflop (SRFF) from being set to logic HIGH at the same time. The rising edge of
  • 7. CONTACT: PRAVEEN KUMAR. L (,+91 – 9791938249) MAIL ID: sunsid1989@gmail.com, praveen@nexgenproject.com Web: www.nexgenproject.com, www.finalyear-ieeeprojects.com CLKPULSE sets the SRFF to logic HIGH. Meanwhile, CLKPULSE also enters the cycle- controlled delay line (CCDL). After passing through the delay line, the rising edge of its delayed version, CLKR, resets the SRFF to logic LOW. The schematic of the CCDL and its timing diagram are shown in Fig. 6(b). It consists of an MUX, a deMUX (DEMUX), a one-shot circuit, a digital-controlled delay line (DCDL), an inverter, a 7-bit counter, and a 7-bit comparator. Fig. 6. (a) Simplified architecture of the DPWM. (b) Schematic of the CCDL and its timing diagram.
  • 8. CONTACT: PRAVEEN KUMAR. L (,+91 – 9791938249) MAIL ID: sunsid1989@gmail.com, praveen@nexgenproject.com Web: www.nexgenproject.com, www.finalyear-ieeeprojects.com Fig. 7 shows the detail schematic of the cycle-controlled DPWM and its corresponding timing diagram. The proposed cyclecontrolled DPWM consists of a start-controlled circuit [17], one pulse generator [18], a MUX, a DEMUX, a DCDL [19], a 7-bit counter, a 7-bit successive- approximationregister (SAR) circuit [20], a bit comparator, an SRFF, a DFF, a phase detector (PD), and some control logics as shown in Fig. 7(a). The proposed DPWM has two operation modes, namely, the ADDLL mode and the DPWM mode, respectively. The timing diagram of the DPWM is shown in Fig. 7(b). Fig. 7. (a) Proposed cycle-controlled DPWM. (b) Timing diagram of the cycle-controlled DPWM. Lock Detector
  • 9. CONTACT: PRAVEEN KUMAR. L (,+91 – 9791938249) MAIL ID: sunsid1989@gmail.com, praveen@nexgenproject.com Web: www.nexgenproject.com, www.finalyear-ieeeprojects.com To avoid dithering of the comparison results between VRef and Vout due to the finite resolution of digital circuits, an LD is employed to detect dithering of Comp, the comparison result of the MTVB circuit. Advantages:  wide duty cycle control  regulated output’s tunable range wide Software implementation:  Tanner tools