Use code -DIGRAJ
● To get maximum discount on all unacademy
subscriptions.
(CBSE 6 to 12 / IIT-JEE / NEET-UG / CA-CS / CUET / CLAT / NDA / UPSC)
● Fill the form given below before taking admission at
the unacademy offline centres and get additional
discount on all courses.
Click here for form link
3.
Class 10th -Geography
Full Chapter Explanation
Resources and Development
Resources and Development
Resources and Development
4.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
Resources Development
5.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
Everything available in our environment
which can be used to satisfy our needs,
provided, it is technologically accessible,
economically feasible and culturally
acceptable can be termed as ‘Resource’.
Culturally
acceptable
Economically
feasible
Technologically
accessible
Resources
6.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
Interdependent relationship between
nature, technology and institutions.
c
7.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
Indiscriminate use Problems
● Depletion of resources for satisfying the greed of a
few individuals.
● Accumulation of resources in few hands, which, in
turn, divided the society into two segments i.e.
haves and have nots.
● Indiscriminate exploitation of resources has led to
global ecological crises such as, global warming,
ozone layer depletion.
Development of Resources
An equitable distribution of resources has become essential
for a sustained quality of life and global peace.
Therefor for Sustainable
existence Sustainable
development is essential.
Rio De Janeiro Earth Summit,
1992
Agenda 21
8.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
Sustainable Development
Sustainable economic development
means ‘development should take place
without damaging the environment,
and development in the present should
not compromise with the needs of the
future generations.’
Rio de Janeiro Earth Summit, 1992
A summit where more than 100 heads of states
met in Rio de Janeiro, the Summit was convened
for addressing urgent problems of environmental
protection and socioeconomic development at the
global level.
The Rio Convention endorsed the global Forest
Principles and adopted Agenda 21.
9.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
10.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
Agenda 21
Local government should draw it’s local
Agendas. Global co-operation on
common interests, mutual needs and
shared responsibilities.
How?
Declaration signed at Rio De Janeiro,
1992 (UNCED)
Achieving global sustainable
development
Combat environmental damage,
poverty and disease
11.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
● Why do we need resource planning?
Unequal and uneven distribution of resources.
∴ Balanced resource planning at the national, state, regional and local levels is required.
Resource Planning
Explain
12.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
3 steps of resource planning in India -
1. Identifying 2. Planning Structure 3. Overall Development
13.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
3 steps of resource planning in India -
I. Identification and inventory of resources across the regions of the country.
Surveying, mapping and qualitative and quantitative estimation and measurement
of the resources.
II. Evolving a planning structure endowed with appropriate technology, skill and
institutional set up for implementing resource development plans.
III. Matching the resource development plans with overall national development plans.
14.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
Necessary for the development.
But merely availability of the resources in the absence of technology and institutions may
hinder development.
Rich in resources but economically backward.
Poor resources base but economically developed.
Availability of Resources
Explain
Countries
Connect with the History of Colonisation
15.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
Conservation of Resources
“There is enough for everybody’s need, but not for anybody’s greed”
Mahatma Gandhi
● He placed the greedy and selfish individuals and exploitative
nature of modern technology as the root cause for resource
depletion at the global level.
● He was against mass production and wanted to replace it with
the production by the masses.
16.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
● At the international level, the Club of Rome
advocated resource conservation for the first
time in a more systematic way in 1968.
● Subsequently, in 1974, Gandhian philosophy
was once again presented by Schumacher in
his book Small is Beautiful.
● The seminal contribution with respect to
resource conservation at the global level was
made by the Brundtland Commission Report,
1987.
International efforts for conservation of resources
17.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
● This report introduced the concept of
‘Sustainable Development’ and advocated
it as a means for resource conservation,
which was subsequently published in a
book entitled Our Common Future.
● Another significant contribution was made
at the Earth Summit at Rio de Janeiro,
Brazil in 1992.
18.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
➔ Uses
➔ Limitations
➔ Distribution of Landmass
Land Resources
It supports natural vegetation, wild life, human life, economic
activities, transport and communication systems.
Land is an asset of finite magnitude.
Plain area 43% Mountains 30% Plateau 27%
Significance
19.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
● Forest
● Land not available for cultivation
a. Barren and waste land.
b. Land put to non agricultural use - Road, buildings, etc.
● Other uncultivated land (excluding fallow land)
a. Permanent pastures and grazing land.
b. Land under miscellaneous tree crops groves (not included in net sown area).
c. Culturable waste land (left uncultivated for more than 5 agricultural years).
Land Utilisation
20.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
● Fallow land
a. Current fallow-(left without cultivation for one or less than one agricultural year).
b. Other than current fallow-(left uncultivated for the past 1 to 5 agricultural years).
● Net sown area - Area sown at least once in a year.
Area sown more than once in an agricultural year plus net sown area is known as gross
cropped area.
21.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
● Total geographical area of India 3.28 million sq. km
Land use data, however, is available only for 93 per cent of the total geographical area.
Land use Pattern in India
Understand the heading
The use of land is determined both by physical factors such as topography, climate, soil
types as well as human factors such as population density, technological capability and
culture and traditions etc.
Why?
22.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
● The land under permanent pasture has also decreased.
● Most of the other than the current fallow lands are either of poor quality or the cost of
cultivation of such land is very high.
● The pattern of net sown area varies greatly from one state to another.
Question
It is over 80 per cent of the total area in Punjab and Haryana and
less than 10 per cent in Arunachal Pradesh, Mizoram, Manipur and
Andaman Nicobar Islands.
Reasons for the
variation
23.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
● Forest Area 33 percent of geographical area.
Far lower than the desired percent outlined in the National Forest Policy (1952).
Understand the significance
❏ Essential for maintenance of the ecological balance.
❏ The livelihood of millions of people who live on the fringes of these forests depends upon it.
● Waste land includes rocky, arid and desert areas and land put to other non-agricultural uses
includes settlements, roads, railways, industry etc.
Challenges
24.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
Ninety-five per cent of our basic needs for food, shelter and clothing are obtained from land.
Human activities have not only brought about degradation of land but have also aggravated
the pace of natural forces to cause damage to land.
Land Degradation and Conservation Measures
Land and We
Explain
25.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
Causes
● Deforestation
● Overgrazing
● Mining and Quarrying
● Over irrigation
● Minerals processing industries
Measures
● Afforestation
● Management of grazing land
● Regulating mining
● Drip irrigation, sprinklers
● Plantation of shelter belts
growing thorny bushes.
Analyse
26.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
Difference between land and soil.
Soil Most important renewable natural resources.
➔ Relief, parent rock or bedrock, climate, vegetation and other
forms of life and time are important factors in the formation
of soil.
Soil as a Resource
Question
● Medium of plant growth.
● Supports different types of living organisms.
● It is a living system.
27.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
On the basis of the factors responsible for soil
formation, colour, thickness, texture, age,
chemical and physical properties, the soils of India
are classified in different types.
● Alluvial soil
● Black soil
● Red and Yellow soil
● Laterite soil
● Arid soil
● Forest soil
28.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
Most widely spread and important soil.
● These have been deposited by three important
Himalayan river systems - the Indus, the Ganga and
the Brahmaputra.
● Also found in the eastern coastal plains particularly
in the deltas of the Mahanadi, the Godavari, the
Krishna and the Kaveri rivers.
Alluvial Soil
Formation and location
29.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
Alluvial soils are very fertile
➔ Contain adequate proportion of potash, phosphoric
acid and lime.
➔ Ideal for the growth of sugarcane, paddy, wheat and
other cereal and pulse crops.
∴ Regions of alluvial soils are intensively cultivated
and densely populated.
30.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
● The alluvial soil consists of various proportions of sand, silt and clay.
Apart from the size of their grains or components, soils are also described on the basis of their age.
Duars, Chos, and Terai in Piedmont plains.
Bangar Khadar
● Old alluvial
● Less fertile due to higher concentration
of kanker nodules.
● New alluvial
● It is the more fertile than Bangar and it
consist of more fine particles.
31.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
● Black in colour, also known as regur soils and cotton soil.
➢ Climatic condition along with the parent rock material
are the important factors for the formation of black soil.
➢ This soil type is found in Deccan trap (Basalt) region is
made up of lava flows.
➢ They cover the plateaus of Maharashtra, Saurashtra,
Malwa, Madhya Pradesh and Chhattisgarh and extend in
the south east direction along the Godavari and the
Krishna valleys.
Black Soil
Formation and Location
32.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
● Black soils are made up of extremely fine clayey material.
● Rich in soil nutrients, such as calcium carbonate, magnesium, potash and lime.
● These soils are generally poor in phosphoric contents.
Similar to dough
Well-known for their capacity to hold moisture.
Develop deep cracks during hot weather
and sticky when wet.
Impact
33.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
34.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
● Red soil develops on crystalline igneous rocks in areas of
low rainfall in the eastern and southern parts of the
Deccan plateau.
● Also found in the parts of Odisha, Chhattisgarh, southern
parts of the middle Ganga plain and along the Piedmont
Zone of Western Ghats.
● Reddish in colour Due to diffusion of iron in
crystalline metamorphic rocks.
● It looks yellow when it occurs in hydrated form.
Red and Yellow Soil
Formation and Location
35.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
● The laterite soil develops under tropical and subtropical
climate with alternate wet and dry season.
● This soil is the result of intense leaching due to heavy
rain.
● Lateritic soils are mostly deep to very deep, acidic,
generally deficient in plant nutrients.
Occur mostly in southern states, Western Ghats region
of Maharashtra, Odisha, some parts of West Bengal and
North-east regions.
Laterite Soil
Formation and Location
36.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
● Laterite soil is generally poor in humus.
● Prone to erosion and degradation.
Due to their position on landscape.
● After adopting appropriate soil conservation techniques
particularly in the hilly areas of Karnataka, Kerala and Tamil
Nadu, this soil is very useful for growing tea and coffee.
● Red laterite soils in Tamil Nadu, Andhra Pradesh and Kerala
are more suitable for crops like cashew nut.
Characteristics
Impact
37.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
● Sandy in texture and saline in nature.
● Arid soil lacks humus and moisture.
● The lower horizons of the soil are occupied by Kankar
because of the increasing calcium content downwards.
After proper irrigation these soils become cultivable as
has been in the case of western Rajasthan.
Arid Soil
In some areas the salt content is very high and
common salt is obtained by evaporating the water.
Why?
Agriculture
38.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
● Found in the hilly and mountainous areas where
sufficient rain forests are available.
Soil texture varies according to the mountain
environment where they are formed.
Forest Soil
Characteristics
● Loamy and silty in valley sides.
● Coarse grained in the upper slopes.
39.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
● In the snow covered areas of Himalayas, these
soils experience denudation and are acidic with
low humus content.
● The soils found in the lower parts of the valleys
particularly on the river terraces and alluvial fans
are fertile.
Explain
40.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
● The denudation of the soil cover and subsequent washing down is described as soil erosion.
Causes of soil erosion
Human activities Deforestation, overgrazing, construction and mining, defective farming method.
Natural forces Wind, glaciers and water leads to soil erosion.
Soil Erosion and Soil Conservation
What is soil erosion?
● Gullies are being created due to running water.
● Bad land known as Ravines in chambal basin.
● Sheet erosion: When sheet of topsoil is washed away due to water flow.
● Wind erosion: When loose soil or soil at slope blows due to wind.
41.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
42.
Class 10th -Geography - Resources and Development - Full Chapter Explanation
Soil Conservation Methods
Contour ploughing Strip cropping
Shelterbelt farming
Terrace cultivation
44.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Class 10th - Geography
Full Chapter Explanation 2023 - 2024
Forest And Wildlife Resources
45.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
We humans along with all living organisms form a complex
web of ecological system in which we are only a part and
very much dependent on this system for our own existence.
Theme
Forest and wildlife we
And
Biodiversity or Biological Diversity is immensely rich in wildlife and cultivated
species, diverse in form and function but closely integrated in a system
through multiple network of interdependencies.
Biodiversity or Biological diversity
46.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
❖ Flora and Fauna in India
❖ Conservation of Forest and Wildlife in India
● Project tiger
❖ Types and Distribution of Forest and Wildlife Resources
❖ Community and Conservation
● Sacred groves—a wealth of diverse and rare species
What we are going to study in this chapter ?
47.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
● India is one of the world’s richest countries in terms of its vast array of
biological diversity.
● Importance of flora and fauna in our daily life.
● They are under great stress, mainly due to insensitivity to our environment.
Question
Flora and Fauna in India
48.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Conservation of forest and wildlife in India
Why do we need it? Steps taken for it? Project tiger
49.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Conservation of forest and wildlife in India
Why do we need it?
● Conservation preserves the ecological diversity and our life support
systems – water, air and soil.
● It also preserves the genetic diversity of plants and animals for
better growth of species and breeding.
For example,
➢ In agriculture, we are still dependent on traditional crop varieties.
➢ Fisheries too are heavily dependent on the maintenance of aquatic
biodiversity.
50.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Step taken Conservation of forest and wildlife in India
● The Indian Wildlife (Protection) Act was implemented in 1972.
● An all India list of protected species was also published.
● The thrust of the programme was towards protecting the remaining population of
certain endangered species by banning hunting, giving legal protection to their habitats,
and restricting trade in wildlife.
● Central and many state governments established national parks and wildlife sanctuaries.
● The central government also announced several projects for protecting specific animals,
which were gravely threatened, including the tiger, the one horned rhinoceros, the
Kashmir stag or hangul, three types of crocodiles – fresh water crocodile, saltwater
crocodile and the Gharial, the Asiatic lion, and others.
51.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
52.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
● Recently, the Indian elephant, black buck (chinkara), the great Indian bustard (godawan)
and the snow leopard, etc. have been given full or partial legal protection against hunting
and trade throughout India.
● The conservation projects are now focusing on biodiversity rather than on a few of its
components.
● There is now a more intensive search for different conservation measures.
● Increasingly, even insects are beginning to find a place in conservation planning.
● In the notification under Wildlife Act of 1980 and 1986, several hundred butterflies,
moths, beetles, and one dragonfly have been added to the list of protected species.
● In 1991, for the first time plants were also added to the list, starting with six species.
Step taken Conservation of forest and wildlife in India
53.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
∴ Project Tiger was started
Project
tiger
54.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Project Tiger
● Tiger is one of the key wildlife species in the faunal web.
● In 1973, the authorities realised that the tiger population had dwindled
to 1,827 from an estimated 55,000 at the turn of the century.
Reason
● The major threats to tiger population are numerous, such as poaching for trade,
shrinking habitat, depletion of prey base species, growing human population, etc.
● The trade of tiger skins and the use of their bones in traditional medicines, especially
in the Asian countries left the tiger population on the verge of extinction.
∴ Project Tiger was started
55.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Project Tiger
● One of the well publicised wildlife campaigns in
the world, was launched in 1973.
● Tiger conservation has been viewed not only as an
effort to save an endangered species, but with
equal importance as a means of preserving
biotypes of sizeable magnitude.
● Corbett National Park in Uttarakhand, Sunderbans
National Park in West Bengal, Bandhavgarh
National Park in Madhya Pradesh, Saris ka Wildlife
Sanctuary in Rajasthan, Manas Tiger Reserve in
Assam and Periyar Tiger Reserve in Kerala are
some of the tiger reserves of India.
56.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Types and distribution of forest and wildlife resources
● In India, much of its forest and wildlife resources are either owned or managed by
the government through the Forest Department or other government departments.
● These are classified under the following categories.
Conservation Management
Reserved forests Protected forests Unclassed forests
57.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Classification of forests
i. Reserved Forests: More than half of the total forest land has been declared
reserved forests. Reserved forests are regarded as the most valuable as far
as the conservation of forest and wildlife resources are concerned.
ii. Protected Forests: Almost one-third of the total forest area is protected
forest, as declared by the Forest Department. This forest land are protected
from any further depletion.
iii. Unclassed Forests: These are other forests and wastelands belonging to
both government and private individuals and communities.
58.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
● Maintained for the purpose of producing timber and other forest produce, and for
protective reasons.
● Madhya Pradesh has the largest area under permanent forests, constituting 75 per
cent of its total forest area.
● Jammu and Kashmir, Andhra Pradesh, Uttarakhand, Kerala, Tamil Nadu, West Bengal,
and Maharashtra have large percentages of reserved forests of its total forest area.
● Whereas Bihar, Haryana, Punjab, Himachal Pradesh, Odisha and Rajasthan have a bulk
of it under protected forests.
● All North-eastern states and parts of Gujarat have a very high percentage of their
forests as unclassed forests managed by local communities.
Reserved forests Protected forests Permanent forests
59.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Community and Conservation
Understand the heading
In some areas of India, local communities are struggling to conserve these habitats along with
government officials, recognising that only this will secure their own long-term livelihood.
Example:
● In Sariska Tiger Reserve, Rajasthan, villagers have fought
against mining by citing the Wildlife Protection Act.
● The inhabitants of five villages in the Alwar district of
Rajasthan have declared 1,200 hectares of forest as the
Bhairodev Dakav ‘Sonchuri’, declaring their own set of
rules and regulations which do not allow hunting, and
are protecting the wildlife against any outside
encroachments.
60.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Chipko Movement
● Successfully resisted deforestation in several areas
● Also shown that community afforestation with
indigenous species can be enormously successful.
61.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
❖ Farmers and citizen’s groups like the Beej Bachao Andolan in
Tehri and Navdanya have shown that adequate levels of
diversified crop production without the use of synthetic
chemicals are possible and economically viable.
62.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
JFM(Joint Forest Management)
● In India joint forest management (JFM) programme furnishes a good
example for involving local communities in the management and
restoration of degraded forests.
● The programme has been in formal existence since 1988 when the
state of Odisha passed the first resolution for joint forest management.
● JFM depends on the formation of local (village) institutions that
undertake protection activities mostly on degraded forest land
managed by the forest department.
● In return, the members of these communities are entitled to
intermediary benefits like nontimber forest produces and share in the
timber harvested by ‘successful protection’.
63.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Advantage
(The forests of god and goddesses)
Sacred Groves - A wealth of diverse and rare species
Nature worship is an age old tribal belief based on the
premise that all creations of nature have to be protected.
Sacred Groves Preserved several virgin forests
How?
These patches of forest or parts of large forests have been left untouched
by the local people and any interference with them is banned.
64.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Sacred Groves
● Certain societies revere a particular tree which they
have preserved from time immemorial.
● The Mundas and the Santhal of Chota Nagpur
region worship mahua (Bassia latifolia) and
kadamba (Anthocaphalus cadamba) trees,
● And the tribals of Odisha and Bihar worship the
tamarind (Tamarindus indica) and mango
(Mangifera indica) trees during weddings.
● To many of us, peepal and banyan trees are
considered sacred.
65.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Indian society comprises several cultures, each with its own set
of traditional methods of conserving nature and its creations.
● Sacred qualities are often ascribed to springs, mountain
peaks, plants and animals which are closely protected.
● Feeding Langurs and Macaques around temples.
● In and around Bishnoi villages in Rajasthan, herds of
blackbuck, (chinkara), nilgai and peacocks can be seen
as an integral part of the community and nobody harms
them.
66.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Conclusion
● Local communities everywhere have to be involved in some kind
of natural resource management.
● But there is still a long way to go before local communities are at
the centre stage in decision-making.
● Accept only those economic or developmental activities, that are
people centric, environment-friendly and economically rewarding.
Both environmental destruction and reconstruction in India
68.
Class 10th -Geography
Water Resources
Full Chapter Explanation
Water Resources
69.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
3/4 of earth surface is covered with water (but only a small part is usable)
Water as a Resource
Fresh water Usable part
Class 10th - Geography - Water Resources - Full Chapter Explanation
Surface runoff Ground water
v
All water moves within the hydrological cycle ensuring that water is a renewable resource.
70.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Water scarcity and the need for water conservation and management
Abundance and renewability of water How can it be scarce?
Class 10th - Geography - Water Resources - Full Chapter Explanation
● The availability of Water Resourcess varies over space and
time, mainly due to the variations in seasonal and annual
precipitation.
● water scarcity in most cases is caused by over-exploitation,
excessive use and unequal access to water
The actual water scarcity and our understanding about it?
71.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
What is water scarcity
Water stress occurs when availability of water is
between 1,000. And 1,600 cubic meter per person
per year
Class 10th - Geography - Water Resources - Full Chapter Explanation
72.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Why there is water scarcity?
Understand the Question
Class 10th - Geography - Water Resources - Full Chapter Explanation
● Where and when the water scarcity is likely to occur?
● Is it possible that an area or region may have ample
Water Resourcess but is still facing water scarcity?
Quantitative reasons Qualitative reasons
73.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
1. Water scarcity may be an outcome of large and growing population and
consequent greater demands for water, and unequal access to it.
2. Population = food demand
Reasons for water scarcity (Quantitative)
Class 10th - Geography - Water Resources - Full Chapter Explanation
∴ To facilitate higher food-grain production, Water Resourcess are
being over-exploited to expand irrigated areas for dry-season
agriculture.
Impact?
It may lead to falling groundwater levels, adversely affecting water
availability and food security of the people.
Solution
Developing drought resistant crops and dry farming techniques.
74.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
● Industries, apart from being heavy users of water, also require power to
run them.
● Much of this energy comes from hydroelectric power.
● multiplying urban centres with large and dense populations and urban
lifestyles have not only added to water and energy requirements but
have further aggravated the problem.
3. Intensive industrialisation and urbanisation causing water scarcity.
Class 10th - Geography - Water Resources - Full Chapter Explanation
How
Have their own groundwater pumping devices to meet their water needs.
Housing societies
Fragile Water Resourcess are being over-exploited and
have caused their depletion in several of these cities.
75.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Situation where water is sufficiently available to meet the needs
of the people, but, the area still suffers from water scarcity.
Reasons for water scarcity (Qualitative)
Class 10th - Geography - Water Resources - Full Chapter Explanation
Why?
Polluted by domestic and industrial wastes, chemicals, pesticides and
fertilisers used in agriculture, thus, making it hazardous for human use.
Bad quality of water
76.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
To save ourselves from
The need for the water conservation and management
Class 10th - Geography - Water Resources - Full Chapter Explanation
All these things will affect our lives negatively.
● Health hazards
● Ensure food security
● Degradation of natural ecosystem
● Over exploitation and mismanagement of Water
Resourcess will impoverish this resource and cause
ecological crisis
77.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Multi - purpose river projects and integrated Water Resourcess management
Class 10th - Geography - Water Resources - Full Chapter Explanation
● Archaeological and historical records show that from
ancient times we have been constructing sophisticated
hydraulic structures like dams built of stone rubble,
reservoirs or lakes, embankments and canals for irrigation.
● Not surprisingly, we have continued this tradition in
modern India by building dams in most of our river basins.
How do we conserve and manage water?
Water
Resourcess
Need Exploitation and Degradation Conservation
78.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Hydraulic Structures in Ancient India
Class 10th - Geography - Water Resources - Full Chapter Explanation
● In the first century B.C., Sringaverapura near Allahabad had
sophisticated water harvesting system channelling the flood
water of the river Ganga.
● During the time of Chandragupta Maurya, dams, lakes and
irrigation systems were extensively built.
● Evidences of sophisticated irrigation works have also been
found in Kalinga, (Odisha), Nagarjunakonda (Andhra
Pradesh), Bennur (Karnataka), Kolhapur (Maharashtra), etc.
● In the 11th Century, Bhopal Lake, one of the largest artificial
lakes of its time was built.
● In the 14th Century, the tank in Hauz Khas, Delhi was
constructed by Iltutmish for supplying water to Siri Fort rea.
79.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
What are dams? How they help us in conserving water?
Class 10th - Geography - Water Resources - Full Chapter Explanation
● “Dam” refers to the reservoir rather than the
structure.
● Most dams have a section called a spillway or
weir over which or through which it is
intended that water will flow either
intermittently or continuously.
Dams A dam is a barrier across flowing water that obstructs, directs or
retards the flow, often creating a reservoir, lake or impoundment.
80.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
What are dams? How they help us in conserving water?
Class 10th - Geography - Water Resources - Full Chapter Explanation
Classification of Dam
● Based on structure and the materials used, dams are
classified as timber dams, embankment dams or masonry
dams, with several subtypes.
● According to the height, dams can be categorised as large
dams and major dams or alternatively as low dams,
medium height dams and high dams.
81.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Class 10th - Geography - Water Resources - Full Chapter Explanation
timber dams Embankment dams or Masonry dams
large dams small dams
82.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Class 10th - Geography - Water Resources - Full Chapter Explanation
Dams
● Dams were traditionally built to impound rivers
and rainwater that could be used later to irrigate
agricultural fields.
● Today, dams are built not just for irrigation but for
electricity generation.
● Water supply for domestic and industrial uses.
● Flood control
● Recreation
● Inland navigation and fish breeding.
Multi - Purpose Project.
83.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Class 10th - Geography - Water Resources - Full Chapter Explanation
● Dams are now referred to as multi-purpose
projects where the many uses of the impounded
water are integrated with one another.
For example,
● The Sutluj-Beas river basin, the Bhakra – Nangal
project water is being used both for hydel power
production and irrigation.
● Similarly, the Hirakud project in the Mahanadi
basin integrates conservation of water with flood
control.
Multi - Purpose Project.
84.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Class 10th - Geography - Water Resources - Full Chapter Explanation
● The vehicle that would lead the nation to development
and progress, overcoming the handicap of its colonial
past.
● Integrate development of agriculture and the village
economy with rapid industrialisation and growth of the
urban economy.
Multi - Purpose project. “ Temples of Modern India ”
- Jawaharlal nehru
Why?
85.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Reason
1. Regulating and damming of rivers affect their natural flow causing poor sediment
flow and excessive sedimentation at the bottom of the reservoir,
Opposition of multipurpose projects
Class 10th - Geography - Water Resources - Full Chapter Explanation
Impact
● Resulting in rockier stream beds.
● Poorer habitats for the rivers aquatic life.
● Dam fragment rivers making it difficult for aquatic
fauna to migrate, especially for spawning.
● Submerge the existing vegetation and soil leading to its
decomposition over a period of time.
86.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
2. Multi-purpose projects and large dams have also been the cause of many new
environmental movements like the ‘Narmada Bachao Andolan’ and the ‘Tehri
dam Andolan’ etc.
Class 10th - Geography - Water Resources - Full Chapter Explanation
Why?
● Large-scale displacement of local communities.
● Local people often had to give up their land,
livelihood and their meagre access and control
over resources for the greater good of the
nation.
Who gets the benefit?
87.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
3. Irrigation has also changed the cropping pattern of many regions with farmers
shifting to water intensive and commercial crops.
Class 10th - Geography - Water Resources - Full Chapter Explanation
Impact
Excessive irrigation leads to increase
in the salt content in the soil.
Salinisation of the soil Transformed Social Landscape
Increasing the social gap between the
richer landowners and the landless poor
88.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
4. The dams did create conflicts between people wanting different uses and benefits from
the same Water Resourcess.
Class 10th - Geography - Water Resources - Full Chapter Explanation
● In Gujarat, the Sabarmati-basin farmers were agitated and almost caused
a riot over the higher priority given to water supply in urban areas.
5. Inter-state water disputes are also becoming common with regard to
sharing the costs and benefits of the multi-purpose project.
● Krishna - Godavari Dispute
● Kaveri Dispute
89.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
6. Most of the objections to the projects arose due to their failure to achieve the
purposes for which they were built.
Class 10th - Geography - Water Resources - Full Chapter Explanation
Constructed to control flood X They have triggered the flood.
Dams
How
Explain
● Sedimentation in the reservoir
● Unsuccessful in controlling floods at the time of excessive rainfall.
Impact
90.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Negative impact of Dams and multi purpose projects
Class 10th - Geography - Water Resources - Full Chapter Explanation
● Caused flood Floods have devastated life and property.
● Caused extensive soil erosion.
● Sedimentation also meant that the flood plains were
deprived of silt, a natural fertiliser, further adding on to the
problem of land degradation.
● It was also observed that the multi-purpose projects
induced earthquakes.
● Caused water-borne diseases and pests and pollution.
91.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Rainwater Harvesting
Class 10th - Geography - Water Resources - Full Chapter Explanation
Many thought that given the disadvantages and
rising resistance against the multipurpose projects,
water harvesting system was a viable alternative.
Socio-economically and Environmentally
Explain
92.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Class 10th - Geography - Water Resources - Full Chapter Explanation
In ancient India, along with the sophisticated hydraulic structures, there existed an
extraordinary tradition of water-harvesting system.
● In hill and mountainous regions, people built diversion
channels like the ‘guls’ or ‘kuls’ of the Western Himalayas
for agriculture.
● ‘Rooftop rainwater harvesting’ was commonly practised
to store drinking water, particularly in Rajasthan.
● In the flood plains of Bengal, people developed
inundation channels to irrigate their fields.
● In arid and semi-arid regions, agricultural fields were
converted into rainfed storage structures that allowed
the water to stand and moisten the soil like the ‘khadins’
in Jaisalmer and ‘Johads’ in other parts of Rajasthan
93.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Rainwater Harvesting
Class 10th - Geography - Water Resources - Full Chapter Explanation
● Rooftop rainwater is collected using a PVC pipe
● Filtered using sand and bricks
● Underground pipe takes water to sump for
immediate usage
● Excess water from the sump is taken to the well
● Water from the well recharges the underground
● Take water from the well (later)
94.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Rainwater Harvesting in India
Class 10th - Geography - Water Resources - Full Chapter Explanation
● In the semi-arid and arid regions of Rajasthan, particularly in Bikaner,
Phalodi and Barmer, almost all the houses traditionally had
underground tanks or tank for storing drinking water.
● The tankas were part of the well-developed rooftop rainwater
harvesting system and were built inside the main house or the
courtyard.
● They were connected to the sloping roofs of the houses through a pipe.
● Rain falling on the rooftops would travel down the pipe and was stored
in these underground ‘tankas’.
● The first spell of rain was usually not collected as this would clean the
roofs and the pipes.
● The rainwater from the subsequent showers was then collected.
95.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Advantages of Tankas
Class 10th - Geography - Water Resources - Full Chapter Explanation
● The rainwater can be stored in the tankas.
● Reliable source of drinking water when all other sources
are dried up.
● Rainwater, or palar pani, as commonly referred to in these
parts, is considered the purest form of natural water.
● Many houses constructed underground rooms adjoining
the ‘tanka’ to beat the summer heat as it would keep the
room cool.
96.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Rooftop Rainwater Harvesting in Present time
Class 10th - Geography - Water Resources - Full Chapter Explanation
Today, in western Rajasthan, sadly the practice of
rooftop rainwater harvesting is on the decline as plenty
of water is available due to the perennial Indira Gandhi
Canal, though some houses still maintain the tankas
since they do not like the taste of tap water.
Is it of no use?
97.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Gendathur Model
Class 10th - Geography - Water Resources - Full Chapter Explanation
● In Gendathur, a remote backward village in Mysuru, Karnataka,
villagers have installed, in their household’s rooftop, rainwater
harvesting system to meet their water needs.
● Nearly 200 households have installed this system and the
village has earned the rare distinction of being rich in rainwater.
● Gendathur receives an annual precipitation of 1,000 mm, and
with 80 percent of collection efficiency and of about 10 fillings,
every house can collect and use about 50,000 litres of water
annually.
● From the 200 houses, the net amount of rainwater harvested
annually amounts to 1,00,000 litres.
98.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Bamboo Drip Irrigation System
Class 10th - Geography - Water Resources - Full Chapter Explanation
● In Meghalaya, a 200-year-old system of tapping stream and
spring water by using bamboo pipes, is prevalent.
● About 18-20 litres of water enters the bamboo pipe system,
gets transported over hundreds of metres, and finally reduces
to 20-80 drops per minute at the site of the plant.
99.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Bamboo Drip Irrigation System
Class 10th - Geography - Water Resources - Full Chapter Explanation
Picture 1: Bamboo pipes are
used to divert perennial
springs on the hilltops to the
lower reaches by gravity
Picture 2 and 3: The channel sections, made of bamboo, divert water to
the plant site where it is distributed into branches, again made and laid
out with different forms of bamboo pipes. The flow of water into the
pipes is controlled by manipulating the pipe positions.
100.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
Bamboo Drip Irrigation System
Class 10th - Geography - Water Resources - Full Chapter Explanation
Picture 4: If the pipes pass a road,
they are taken high above the land.
Picture 5 and 6: Reduced channel sections and diversion
units are used at the last stage of water application. The last
channel section enables water to be dropped near the roots
of the plant.
101.
Class 10th -Geography - Forest and Wildlife Resources - Full Chapter Explanation
102.
Class 10th -Geography
Agriculture
Full Chapter Explanation
Agriculture
103.
Class 10th -Geography - Agriculture - Full Chapter Explanation
Agriculture and We
Our dependence over agriculture.
India
● Occupation
● Food grains
● Industrial inputs
104.
Class 10th -Geography - Agriculture - Full Chapter Explanation
Agriculture an age old economic activity
India
c
Cultivation methods have changed significantly
depending upon the characteristics of physical
environment, technological know-how and
socio-cultural practices.
● Primitive Subsistence Farming
● Intensive subsistence Farming
● Commercial Farming
Types of Farming
105.
Class 10th -Geography - Agriculture - Full Chapter Explanation
Understand the heading
➔ It is a ‘Slash and Burn’ agriculture.
● Shifting allows Nature to replenish the fertility of the soil
through natural processes.
● It is known by different names in different parts of the country.
Primitive Subsistence Farming
● Agriculture is practised on small patches of land with the help of primitive tools.
● This type of farming depends upon monsoon, natural fertility of the soil and
suitability of other environmental conditions to the crops grown.
106.
Class 10th -Geography - Agriculture - Full Chapter Explanation
Slash and Burn in India
It is jhumming in north-eastern states like
Assam, Meghalaya, Mizoram and
Nagaland; Pamlou in Manipur, Dipa in
Bastar district of Chhattisgarh, and in
Andaman and Nicobar Islands.
Slash and Burn in World
The ‘slash and burn’ agriculture is known as
‘Milpa’ in Mexico and Central America,
‘Conuco’ in Venezuela, ‘Roca’ in Brazil,
‘Masole’ in Central Africa, ‘Ladang’ in
Indonesia, ‘Ray’ in Vietnam.
107.
Class 10th -Geography - Agriculture - Full Chapter Explanation
Understand the heading
● High population = More food for them
Limited land
How to produce more?
Intensive Subsistence Farming
It is labour intensive farming, where high doses of biochemical
inputs and irrigation are used for obtaining higher production.
Intensive Subsistence Farming
108.
Class 10th -Geography - Agriculture - Full Chapter Explanation
Why there is a need for intensive Subsistence Farming?
Right of inheritance
● Reduce land size holding
● The farmer is forced to take maximum output from the
limited land.
● Creating enormous pressure on agriculture land.
109.
Class 10th -Geography - Agriculture - Full Chapter Explanation
Commercial Farming
Farming performed from the perspective of earning money by higher production through
the use of higher doses of modern inputs, e.g. high yielding variety (HYV) seeds, chemical
fertilisers, insecticides and pesticides.
The degree of commercialisation of agriculture
varies from one region to another.
Example - Rice is a commercial crop in Haryana and
Punjab, but in Odisha, it is a subsistence crop.
110.
Class 10th -Geography - Agriculture - Full Chapter Explanation
Farming in USA Farming in India
111.
Class 10th -Geography - Agriculture - Full Chapter Explanation
● Plantation is also a type of commercial farming.
● A single crop is grown on a large area.
The plantation has an interface of agriculture and industry.
Plantation
● Cover large tracts of land.
● Capital intensive inputs.
● Migrant labourers.
● Raw material for industries in produced.
● Well developed network of transport and communication is essential.
How?
112.
Class 10th -Geography - Agriculture - Full Chapter Explanation
● In India, tea, coffee, rubber, sugarcane, banana, etc., are important plantation crops.
113.
Class 10th -Geography - Agriculture - Full Chapter Explanation
Cropping Pattern
114.
Class 10th -Geography - Agriculture - Full Chapter Explanation
Physical diversity and plurality of cultures in India Reflected in agricultural practices.
Three main types of cropping seasons are -
Kharif Rabi Zaid
Sowing period Onset of monsoon
[June - July]
In winter
[October - November]
March - April
Harvesting period In September - October Summer [March - April] May - June
Crops Paddy, maize, jowar,
bajra, tur, moong, urad,
cotton, jute, groundnut
and soybean.
Wheat, barley, peas gram
and mustards.
Watermelon, muskmelon,
cucumber, vegetable and
fodder crops.
Irrigation Rainfall Western temperate
cyclone and canals
Private source of irrigation
Ex. Tubewell, lakes & well
115.
Class 10th -Geography - Agriculture - Full Chapter Explanation
Kharif Crops
Rabi Crops
Zaid Crops
116.
Class 10th -Geography - Agriculture - Full Chapter Explanation
● In states like Assam, West Bengal and Odisha, three crops of
paddy are grown in a year. These are Aus, Aman and Boro.
● Sugarcane takes almost a year to grow.
Aus, Aman and Boro
Why?
117.
Class 10th -Geography - Agriculture - Full Chapter Explanation
Soil, climate and cultivation practices.
Major Crops
Crops
Non-food
Food
● Grains
● Food crops other than grains.
India Variations
Variety of crops
118.
Class 10th -Geography - Agriculture - Full Chapter Explanation
Crops Cropping
season
Temperature Rainfall Area State Key point
Rice Kharif crop Required 25o
C Above 100
cm
Northern plains
north-eastern
states, deltaic
region
Orissa, West
Bengal, Bihar
and Tamil Nadu
Most
important
cereal crop
Wheat Rabi crop Cool growing
season bright
sunshine
during harvest
50 to 75 cm Ganga-sutlej plain,
black soil region of
Deccan
Punjab,
Haryana, U.P.
and M.P.
Second most
important
cereal crop
Maize Kharif crop 21o
C to 27o
C 60 to 110
(India 40)
Old alluvial tracks U.P., Bihar and
M.P.
Used as both
food and
fodder
Food Crops(grains)
119.
Class 10th -Geography - Agriculture - Full Chapter Explanation
Maize
Rice Wheat
120.
Class 10th -Geography - Agriculture - Full Chapter Explanation
Millets
Ragi
Jowar Bajra
Though, these are known as coarse grains, they have very high nutritional value.
121.
Class 10th -Geography - Agriculture - Full Chapter Explanation
● Third most important food crop (area and production).
● It is a rain-fed crop. (hardly needs an irrigation)
● Major producing states : Maharashtra. Karnataka, Andhra
Pradesh and Madhya Pradesh.
● Bajra grows well on sandy soils and shallow black soil.
● Major Bajra producing States are Rajasthan, Uttar Pradesh,
Maharashtra, Gujarat and Haryana.
Jowar
Bajra
122.
Class 10th -Geography - Agriculture - Full Chapter Explanation
● Crop of dry region and grows well on red, black, sandy,
loamy and shallow black soils.
● Major ragi producing states are: Karnataka, Tamil Nadu,
Himachal Pradesh, Uttarakhand, Sikkim, Jharkhand and
Arunachal Pradesh.
● It is very rich in iron, calcium and other micro nutrient
and roughage.
Ragi
123.
Class 10th -Geography - Agriculture - Full Chapter Explanation
India is the largest producer as well as the consumer of pulses in the world.
Major pulses grown in India.
Pulses
● Tur (arhar)
● Urad
● Moong
● Masur
● Peas
● Gram
124.
Class 10th -Geography - Agriculture - Full Chapter Explanation
➔ Pulses need less moisture and survive even in dry conditions.
● Temperature - 25o
C to 30o
C
● Rainfall - Average 45 cm rainfall.
Leguminous crops [except arhar]
Helps in restoring soil fertility by fixing nitrogen from the air.
∴ These are mostly grown in rotation with other crops.
➔ Major pulse producing states in India are Madhya Pradesh, Rajasthan, Maharashtra, Uttar
Pradesh and Karnataka.
Pulses
125.
Class 10th -Geography - Agriculture - Full Chapter Explanation
Temperature - 21o
C to 27o
C
Rainfall - 75 cm to 100 cm
● Tropical as well as sub-tropical crop.
● Need manual labour.
● India is the second largest producer after Brazil.
● Raw material/source of jaggery, khandsari, sugar and molasses.
● U.P., Maharashtra, Karnataka.
Food Crops other than Grains
Understand the heading
Sugarcane
126.
Class 10th -Geography - Agriculture - Full Chapter Explanation
● Main oil-seeds produced in India are groundnut, mustard,
coconut, sesamum (til), soyabean, castor seeds, cotton
seeds, linseed and sunflower.
Uses -
● Most of these are edible and used as cooking mediums.
● Used as raw material in the production of soap, cosmetics
and ointments.
Oil Seeds
127.
Class 10th -Geography - Agriculture - Full Chapter Explanation
● Kharif crop and accounts for about half of the major oil
seeds produced in the country.
● Gujarat was the largest producer of groundnut
followed by Rajasthan and Andhra Pradesh in 2019-20.
Groundnut
128.
Class 10th -Geography - Agriculture - Full Chapter Explanation
● Sesamum is a kharif crop in north and rabi crop in south India.
● Castor seed is grown both as rabi and kharif crop.
Linseed Mustard
Rabi Crops
129.
Class 10th -Geography - Agriculture - Full Chapter Explanation
● Tropical as well as subtropical crops.
● Plantation crop and beverages crops.
● Grow well on deep and fertile well drained soil.
● Requires warm and moist, frost free climate.
● Frequent and evenly distributed rainfall.
● Labour intensive industry.
● Processes within tea garden to restore freshness.
● Assam, Darjeeling, Jalpaiguri district of W.B.
Tea
Explain
130.
Class 10th -Geography - Agriculture - Full Chapter Explanation
● Indian coffee is known for its quality.
[Arabic variety brought from Yemen]
● Indian produces 4% of the world’s coffee production.
● Initially produces in Baba Budan Hills.
● Now also its production is confined to Nilgiri in Karnataka,
Kerala and T.N.
Coffee
131.
Class 10th -Geography - Agriculture - Full Chapter Explanation
Fruits and vegetables
● In 2016, India was the second largest producer of fruits and vegetables in the world after China.
● India is a producer of tropical as well as temperate fruits.
Horticulture crops
● Mangoes of Maharashtra, Andhra Pradesh, Telangana, Uttar Pradesh and West Bengal.
● Oranges of Nagpur and Cherrapunjee (Meghalaya).
● Bananas of Kerala, Mizoram, Maharashtra and Tamil Nadu.
● Litchi and guava of Uttar Pradesh and Bihar.
● Pineapples of Meghalaya.
● Grapes of Andhra Pradesh, Telangana and Maharashtra.
● Apples, pears, apricots and walnuts of Jammu and Kashmir and Himachal Pradesh.
132.
Class 10th -Geography - Agriculture - Full Chapter Explanation
● India is an important producer of pea, cauliflower, onion, cabbage, tomato, brinjal and potato.
133.
Class 10th -Geography - Agriculture - Full Chapter Explanation
● Equatorial crop, but can be grown in tropical and
subtropical areas.
● It requires moist and humid climate.
● Rainfall more than 200 cm.
● Temperature more than 25o
C.
● Important industrial raw material.
● Major areas - Kerala, T.N., Meghalaya, Andaman and
Nicobar.
Non-Food Crops
Rubber
Understand the heading
134.
Class 10th -Geography - Agriculture - Full Chapter Explanation
● Crops which are used as fibre [Cloths].
● Cotton, jute, hemp and natural silk are the four major
fibre crops grown in India.
Which crop?
● Fibre is obtained from cocoons of the silkworms fed on
green leaves specially mulberry.
Fibre crops
Silk
Sericulture
135.
Class 10th -Geography - Agriculture - Full Chapter Explanation
India Original home at cotton plant.
● Cotton is one of the main raw materials for cotton textile industry.
● Cotton grows well in drier parts of the black cotton soil of the Deccan
plateau.
Climate conditions
● It requires high temperature, light rainfall or irrigation, 210 frost-free
days and bright sun-shine for its growth.
● It is a kharif crop and requires 6 to 8 months to mature.
● Major producing state : Maharashtra, Gujarat, Madhya Pradesh, etc.
Cotton
136.
Class 10th -Geography - Agriculture - Full Chapter Explanation
Also known as golden fibre.
● Grows well on well-drained fertile soils in the flood plains where soils are renewed every year.
● High temperature is required during the time of growth.
● Major producers : West Bengal, Bihar, Assam, Odisha and Meghalaya.
Uses -
● It is used in making gunny bags, mats, ropes, yarn, carpets and other artefacts.
Jute
137.
Class 10th -Geography - Agriculture - Full Chapter Explanation
Jute v/s Nylon
Due to the high cost of jute, it is losing market.
138.
Class 10th -Geography - Agriculture - Full Chapter Explanation
Sustained uses of land without compatible techno-institutional changes
have hindered the pace of agricultural development.
∴ Some serious technical and institutional reforms are required.
Technological and Institutional Reforms
Why reforms are required?
Explain
Technological reforms Institutional reforms
139.
Class 10th -Geography - Agriculture - Full Chapter Explanation
Initial institutional reforms
● Collectivisation, consolidation of holdings, cooperation and abolition of zamindari, etc.
● ‘Land reform’ was the main focus of our First Five Year Plan.
∴ To improve indian agriculture in 1960s and 1970s government
Embarked upon Green revolution and White revolution.
This too led to the concentration of development in few selected areas.
Limitations
140.
Class 10th -Geography - Agriculture - Full Chapter Explanation
141.
Class 10th -Geography - Agriculture - Full Chapter Explanation
● In 1980s and 1990s A comprehensive land development programme was initiated.
Included both institutional and technical reforms.
● ● Provision for crop insurance against drought, flood,
cyclone, fire and disease.
● Establishment of Grameen banks.
● Cooperative societies and banks for providing loan
facilities to the farmers at lower rates of interest.
● Kisan Credit Card (KCC).
● Personal Accident Insurance Scheme (PAIS).
● Special weather bulletins and agricultural
programme for farmers on radio and television.
● Minimum support price.
142.
Class 10th -Geography - Agriculture - Full Chapter Explanation
Bhoodan - Gramdan Movement
➔ Who was Vinoba Bhave?
Spiritual heir of Mahatma Gandhi, after Gandhi's martyrdom,
Vinoba Bhave undertook padyatra to spread Gandhiji’s message
covered almost the entire country.
He believed in the idea of Gram Swaraj
143.
Class 10th -Geography - Agriculture - Full Chapter Explanation
Some poor landless villagers demanded some land for their economic well-being.
➔ Shri Ram Chandra Reddy stood up and offered 80 acres of land to be distributed among 80
land-less villagers.
➔ Some zamindars, offered to distribute some villages among the landless.
Incident of Pochampalli, Andhra Pradesh
Bhoodan movement
Gramdan movement
Bloodless revolution
144.
Class 10th -Geography - Agriculture - Full Chapter Explanation
Contribution of Agriculture to the National Economy, Employment and Output
● Share in GDP ⇋ Share in employment [In 2011 about 54.6 percent of total workforce]
Matter of concern
➔ Any decline and stagnation in agriculture will lead to a
decline in other spheres of the economy having wider
implications for society.
Agriculture is an important sector
Agriculture sector
∴ Steps are taken to improve the situation.
145.
Class 10th -Geography - Agriculture - Full Chapter Explanation
● Government of India made concerted efforts to modernise agriculture.
● Establishment of Indian Council of Agricultural
Research (ICAR)
● Agricultural universities
● Veterinary services and animal breeding centres
● Horticulture development
● Research and development in the field of
meteorology and weather forecast.
● Improving the rural infrastructure
146.
Class 10th -Geography - Agriculture - Full Chapter Explanation
➔ Condition of agriculture sector in India
● The growth rate in agriculture has been decelerating and sufficient employment
opportunities are also not generated in the country.
Farmers are withdrawing their investment from agriculture causing a downfall in the employment in agriculture.
Big challenge from
international competition ⇋ ⇋
Reduction in the public
investment in agriculture sector
Reduction in import duties has led
to increase in the competition.
Reduction on subsidy of fertilizers
Cost
Indian
Farmers
147.
Class 10th -Geography - Agriculture - Full Chapter Explanation
Impact of Globalisation on Agriculture
Not a new phenomenon
Under globalisation, particularly after 1990, the farmers
in India have been exposed to new challenges.
Highly subsidised agriculture in those countries.
Globalisation Explain
How?
Despite being an important producer of various crops, Indian product
were not able to compete with the products of developed countries.
Why?
148.
Class 10th -Geography - Agriculture - Full Chapter Explanation
Indian agriculture finds itself at the crossroads.
● Proper thrust should be given to the improvement of the condition of marginal and small farmers.
● The green revolution promised much. But today it’s under controversies.
Population Income Land size
Solution
149.
Class 10th -Geography - Agriculture - Full Chapter Explanation
● Green revolution The keyword today is “gene revolution”, which includes genetic engineering.
● Organic farming It does not affect environment in a negative manner.
● Indian farmers should diversify their cropping pattern from cereals to high-value crops.
This will increase incomes and reduce environmental degradation.
150.
Class 10th -Geography - Agriculture - Full Chapter Explanation
jatropha Jojoba
152.
Minerals are anindispensable part of our lives. (Pin to Ship)
All living things and minerals.
All living things need minerals
Life processes cannot occur without minerals. Although our mineral
intake represents only about 0.3 percent of our total intake of nutrients,
they are so potent and so important that without them we would not be
able to utilise the other 99.7 percent of foodstuffs.
Class 10th - Geography - Minerals and Energy Resources
Introduction -
Minerals, Energy, Resources and We
153.
“Homogenous, naturally occurringsubstance with a definable internal structure.”
Combinations of homogenous minerals (one or more)
Formation depends upon the physical and chemical conditions.
Class 10th - Geography - Minerals and Energy Resources
Introduction -
What is a mineral?
Rocks
Impact
Igneous Rock
Limestone Rock
154.
● Study mineralsas part of the the
earth’s crust.
● Area of study - Above the earth.
Class 10th - Geography - Minerals and Energy Resources
Introduction -
Geographers and Geologists
Geographers
● Study formation of minerals, their age,
physical and chemical composition.
● Area of study - Below the earth.
Geologists
155.
● Where arethese minerals found?
Accumulation of any mineral mixed with other elements.
Extraction should be commercially viable.
➔ The type of formation or structure in which they are found determines the relative ease
with which mineral ores may be mined.
∴ It is important to understand the types of occurrence of minerals.
Class 10th - Geography - Minerals and Energy Resources
Mode of Occurence of Minerals -
Ores
156.
➔ Minerals generallyoccur in these forms:
Class 10th - Geography - Minerals and Energy Resources
Mode of Occurence of Minerals -
Veins and Lodes Beds and Layers Residual mass of
weathered material
Alluvial deposits
Ocean waters
157.
In igneous andmetamorphic rocks minerals may occur in the cracks, crevices, faults or joints.
● They are formed when minerals in liquid/ molten and gaseous
forms are forced upward through cavities towards the earth’s
surface.
● They cool and solidify as they rise.
Example - Tin, Copper, Zinc and Lead.
Class 10th - Geography - Minerals and Energy Resources
Mode of Occurence of Minerals -
Veins and Lodes
Small occurrences Large occurrences
Veins Lodes
Formation
158.
● Mostly foundin sedimentary rocks and formed as a
result of deposition, accumulation and concentration
in horizontal strata.
● Coal and iron ore (heat and pressure).
● Gypsum and Potash salt (evaporate in arid regions).
Class 10th - Geography - Minerals and Energy Resources
Mode of Occurence of Minerals -
Beds and Layers
159.
Decomposition of surfacerocks.
Removal of soluble constituents.
Leaving a residual mass of weathered material containing ores.
Example - Bauxite.
Class 10th - Geography - Minerals and Energy Resources
Mode of Occurence of Minerals -
Residual mass of weathered material
160.
Certain minerals mayoccur as alluvial deposits
in sands of valley floors and the base of hills.
➔ Generally contain minerals, which are not
corroded by water.
Class 10th - Geography - Minerals and Energy Resources
Mode of Occurence of Minerals -
Alluvial deposits
Placer deposits
161.
● It containsvast quantities of minerals.
● Most of these are too widely diffused to be of
economic significance.
Example - Common salt, magnesium, bromine
and manganese nodules.
Class 10th - Geography - Minerals and Energy Resources
Mode of Occurence of Minerals -
Ocean waters
162.
India have fairlyrich and varied mineral resources, but these are unevenly distributed.
● Peninsular rocks contain most of the reserves of coal, metallic minerals, mica and
many other non-metallic minerals.
● Sedimentary rocks on the western and eastern flanks of the peninsula, in Gujarat and
Assam have most of the petroleum deposits.
● Rajasthan with the rock systems of the peninsula, has reserves of many non-ferrous
minerals.
● The vast alluvial plains of north India are almost devoid of economic minerals.
➔ Turning a mineral ‘deposit’ or ‘reserve’ into a mine.
Class 10th - Geography - Minerals and Energy Resources
Mode of Occurence of Minerals -
Distribution of mineral resources
163.
Iron
● Accounts forabout 3/4 of the total value of the production of metallic minerals.
● They provide a strong base for the development of metallurgical industries.
Class 10th - Geography - Minerals and Energy Resources
Ferrous Minerals -
Ferrous
Iron ore Manganese
164.
● Iron oreis the basic mineral and the backbone
of industrial development.
● India is rich in good quality iron ores.
Class 10th - Geography - Minerals and Energy Resources
Ferrous Minerals -
Iron ore
Magnetite Hematite
● It has excellent magnetic qualities.
● Valuable in the electrical industry.
● High content of iron upto 70 percent.
● The most important industrial iron
ore in terms of the quantity used.
● Has a slightly lower iron content
than magnetite. (50-60 per cent).
165.
➔ The majoriron ore belts in India are -
● In Odisha high grade hematite ore is found in Badampahar mines in the Mayurbhanj and
Kendujhar districts.
● In the adjoining Singbhum district of Jharkhand haematite iron ore is mined in Gua and
Noamundi.
● Very high grade hematites are found in the famous Bailadila range of hills in the Bastar
district of Chhattisgarh.
● The range of hills comprise of 14 deposits of super high grade hematite iron ore.
● It has the best physical properties needed for steel making.
● Iron ore from these mines is exported to Japan and South Korea via Visakhapatnam port.
Class 10th - Geography - Minerals and Energy Resources
Ferrous Minerals -
Odisha-Jharkhand belt
Durg-Bastar -Chandrapur belt
166.
● The Kudremukhmines located in the Western Ghats
of Karnataka are a 100 percent export unit.
● The ore is transported as slurry through a pipeline to
a port near Mangalore.
● Though, the ores are not of very high quality, yet they
are efficiently exploited.
● Iron ore is exported through Marmagao port.
Class 10th - Geography - Minerals and Energy Resources
Ferrous Minerals -
Ballari-Chitradurga-Chikmagalur Tumkur belt
Maharashtra-Goa belt
167.
● Manganese ismainly used in the manufacturing of
steel and ferro-manganese alloy.
● Nearly 10 kg of manganese is required to
manufacture one tonne of steel.
● It is also used in manufacturing bleaching powder,
insecticides and paints.
Class 10th - Geography - Minerals and Energy Resources
Ferrous Minerals -
Manganese
168.
Non iron content
●India’s reserves and production of non- ferrous minerals is not very satisfactory.
● However, these minerals, which include copper, bauxite, lead, zinc and gold play a vital
role in a number of metallurgical, engineering and electrical industries.
Class 10th - Geography - Minerals and Energy Resources
Non-Ferrous Minerals -
Non-Ferrous
Copper Bauxite
169.
● India iscritically deficient in the reserve and
production of copper.
● Being malleable, ductile and a good conductor,
copper is mainly used in electrical cables,
electronics and chemical industries.
● The Balaghat mines in Madhya Pradesh, Khetri
mines in Rajasthan and Singhbhum district of
Jharkhand are leading producers of copper.
Class 10th - Geography - Minerals and Energy Resources
Non-Ferrous Minerals -
Copper
170.
● India’s bauxitedeposits are mainly found in the Amarkantak plateau, Maikal hills
and the plateau region of Bilaspur-Katni.
➔ Odisha was the largest bauxite producing state in India in 2016-17.
➔ Panchpatmali deposits in Koraput district are the most important bauxite
deposits in the state.
Class 10th - Geography - Minerals and Energy Resources
Non-Ferrous Minerals -
Bauxite Alumina Aluminium
Bauxite deposits are formed by the
decomposition of a wide variety of
rocks rich in aluminium silicates.
Important metal because it combines the
strength of metals such as iron, with extreme
lightness and also with good conductivity and
great malleability.
171.
Not made upmetals
● Mica is a mineral made up of a series of plates or leaves.
● Mica can be clear, black, green, red yellow or brown.
● Due to its excellent dielectric strength, low power loss factor,
insulating properties and resistance to high voltage, mica is
one of the most indispensable minerals used in electric and
electronic industries.
Class 10th - Geography - Minerals and Energy Resources
Non-Metallic Minerals -
Non-Metallic Minerals
Mica
172.
● Mica depositsare found in the northern edge
of the Chota Nagpur plateau.
● Koderma Gaya – Hazaribagh belt of
Jharkhand is the leading producer.
● In Rajasthan, the major mica producing area
is around Ajmer.
● Nellore mica belt of Andhra Pradesh is also
an important producer in the country.
Class 10th - Geography - Minerals and Energy Resources
Non-Metallic Minerals -
Major producing areas
173.
● Found inassociation with rocks composed of
calcium carbonates or calcium and magnesium
carbonates.
● It is found in sedimentary rocks of most
geological formations.
● Limestone is the basic raw material for the
cement industry and essential for smelting iron
ore in the blast furnace.
Class 10th - Geography - Minerals and Energy Resources
Rock Minerals -
Limestone
174.
i. Risk ofcollapsing mine roofs.
ii. Inundation and fire in coal mines.
iii. Health issues.
● Dust and noxious fumes are inhaled.
Make them vulnerable to pulmonary diseases.
Class 10th - Geography - Minerals and Energy Resources
Hazards of Mining -
Understand the topic
Impact on Miners Impact on Environment
i. Water source get contaminated.
ii. Dumping of waste and slurry leads to
degradation of land, soil and increase in
stream and river pollution.
Stricter safety regulations and implementation of environmental laws are
essential to prevent mining from becoming a “killer industry”.
175.
Class 10th -Geography - Minerals and Energy Resources
Hazards of Mining -
Mine roof collapsing Fire in coal mine
Bird dying due to mining Contamination due to mining
176.
➔ Why thereis a need of conservation?
The total volume of workable mineral deposits is an insignificant fraction i.e. one percent
of the earth’s crust.
∴ Mineral resources are finite and non-renewable.
➔ Rich mineral deposits are our country’s extremely valuable but short-lived possessions.
Increasing costs mineral extraction comes from greater
depths along with decrease in quality.
Class 10th - Geography - Minerals and Energy Resources
Conservation of Minerals -
Consumption > Replenishment and mineral formation
Continued extraction =
Explain
177.
● A concertedeffort has to be made in order to use our
mineral resources in a planned and sustainable
manner.
● Improved technologies need to be constantly evolved
to allow use of low grade ores at low costs.
● Recycling of metals.
● Using scrap metals and other substitutes.
Class 10th - Geography - Minerals and Energy Resources
Conservation of Minerals -
Steps for conservation
178.
It’s requirement Howto obtain?
Energy can be generated from fuel minerals like coal,
petroleum, natural gas, uranium and from electricity.
Class 10th - Geography - Minerals and Energy Resources
Energy Resources -
Energy
Energy Resources
Conventional Non-Conventional
Firewood, cattle dung cake, coal,
petroleum, natural gas and electricity
(both hydel and thermal).
Non-conventional sources include solar,
wind, tidal, geothermal, biogas and
atomic energy.
179.
Class 10th -Geography - Minerals and Energy Resources
Energy Resources -
Conventional
Non conventional
180.
Class 10th -Geography - Minerals and Energy Resources
Conventional Source of Energy -
Coal Petroleum Natural Gas Electricity
181.
● Most abundantlyavailable fossil fuel.
● It provides a substantial part of the nation’s energy needs.
● It is used for power generation, to supply energy to industry as well as for domestic needs.
Depends upon the degrees of compression and the depth and
time of burial.
➔ Classification of coal On the basis of quality and age.
Class 10th - Geography - Minerals and Energy Resources
Conventional Source of Energy -
Coal and our energy needs
Formation
182.
Class 10th -Geography - Minerals and Energy Resources
Conventional Source of Energy -
Coal : On the basis of quality
Peat Lignite Bituminous Anthracite
Has a low carbon and
high moisture contents
and low heating
capacity.
- Low grade brown
coal, which is soft with
high moisture content.
- The principal lignite
reserves are in Neyveli
in Tamil Nadu and are
used for generation of
electricity.
- Been buried deep and
subjected to increased
temperatures.
- It is the most popular
coal in commercial use. -
Metallurgical coal is high
grade bituminous coal
which has a special value
for smelting iron in blast
furnaces.
- Highest quality
- Hard coal
183.
● A littleover 200 million years in age.
● Metallurgy coal
● Damodar valley (West Bengal Jharkhand).
Jharia, Raniganj and Bokaro.
Class 10th - Geography - Minerals and Energy Resources
Conventional Source of Energy -
Coal : On the basis of ages
Gondwana Coal
● About 55 million years old.
● Occur in the north eastern states of
Meghalaya, Assam, Arunachal Pradesh
and Nagaland.
Tertiary Coal
Bulky material
● Loses weight on use as it is reduced to ash.
● Hence, heavy industries and thermal power stations are located on or near the coalfields.
Coal
184.
● The nextmajor energy source in India after coal.
● It provides fuel for heat and lighting, lubricants for
machinery and raw materials for a number of
manufacturing industries.
● Petroleum refineries act as a “nodal industry” for
synthetic textile, fertiliser and numerous chemical
industries.
Class 10th - Geography - Minerals and Energy Resources
Conventional Source of Energy -
Petroleum and our energy needs
Explain
185.
Anticlines and faulttraps in the rock formations of the tertiary age.
Class 10th - Geography - Minerals and Energy Resources
Conventional Source of Energy -
Occurrences
● The oil bearing layer is a porous limestone or
sandstone through which oil may flow.
● The oil is prevented from rising or sinking by
intervening non-porous layers.
● Petroleum is also found in fault traps between
porous and non-porous rocks.
● Gas, being lighter usually occurs above the oil.
186.
Class 10th -Geography - Minerals and Energy Resources
Conventional Source of Energy -
● Ankleshwar is the most important field of
Gujarat.
● Assam is the oldest oil producing state of India.
● Digboi, Naharkatiya and Moran-Hugrijan are
the important oil fields in the state.
Mumbai High, Gujarat and Assam are major
petroleum production areas in India.
187.
● Clean energyresource found in association with or without
petroleum.
● Used as a source of energy as well as an industrial raw
material in the petrochemical industry.
● Environment friendly fuel : Low carbon dioxide emission
Krishna - Godavari basin,
Mumbai high, Gulf of Cambay
and Andaman and Nicobar
islands.
Class 10th - Geography - Minerals and Energy Resources
Conventional Source of Energy -
Natural Gas
Reserves
188.
The 1700 kmlong Hazira-Vijaipur Jagdishpur cross country gas
pipeline links Mumbai High and Bassein with the fertilizer,
power and industrial complexes in western and northern India.
Provided an impetus to India’s gas production.
● The power and fertilizer industries are the key users of natural gas.
● Use of Compressed Natural Gas (CNG ) for vehicles to replace liquid fuels is gaining wide
popularity in the country.
Class 10th - Geography - Minerals and Energy Resources
Conventional Source of Energy -
HVJ Pipeline
189.
Its per capitaconsumption is considered as an index of
development.
Electricity is generated mainly in two ways:
Class 10th - Geography - Minerals and Energy Resources
Conventional Source of Energy -
Electricity
Hydro electricity
By running water which drives
hydro turbines.
Thermal Power
By burning other fuels such as coal,
petroleum and natural gas to drive turbines.
190.
Class 10th -Geography - Minerals and Energy Resources
Conventional Source of Energy -
Hydro electricity
● Generated by fast flowing water, which
is a renewable resource.
● India has a number of multi-purpose
projects like the Bhakra Nangal,
Damodar Valley corporation, the Kopili
Hydel Project etc.
Thermal Electricity
● Generated by using coal, petroleum and
natural gas.
● The thermal power stations use
non-renewable fossil fuels for generating
electricity.
● Major thermal power plant are - Singrauli,
Namrup, Tolcher, Neyveli, narawara.
191.
Increase in theconsumption of fossil fuels.
Rising prices of oil and gas + Potential shortages
∴ There is a pressing need to use renewable energy sources like solar energy, wind, tide,
biomass and energy from waste material.
Class 10th - Geography - Minerals and Energy Resources
Non-Conventional Source of Energy -
Need? Impact
Raised the uncertainties about the security of energy supply in
future and caused serious environmental problem.
192.
Class 10th -Geography - Minerals and Energy Resources
Non-Conventional Source of Energy -
India is blessed with an abundance of sunlight, water, wind and biomass. It has the largest
programmes for the development of these renewable energy resources.
Nuclear or Atomic Energy Solar Energy Wind Power
193.
Class 10th -Geography - Minerals and Energy Resources
Non-Conventional Source of Energy -
Bio Gas Tidal Energy Geothermal Energy
194.
➔ It isobtained by altering the structure of atoms.
When such an alteration is made, much energy is released in
the form of heat and this is used to generate electric power.
● Uranium and Thorium, which are available in Jharkhand.
● The Aravalli ranges of Rajasthan are used for generating atomic
or nuclear power.
● The Monazite sands of Kerala is also rich in Thorium.
Class 10th - Geography - Minerals and Energy Resources
Non-Conventional Source of Energy -
Nuclear or Atomic Energy
Resources
195.
Tropical country
● Ithas enormous possibilities of tapping solar energy.
● Photovoltaic technology converts sunlight directly into electricity.
● Solar energy is fast becoming popular in rural and remote areas.
Advantages of solar power plants
Will minimise the dependence of rural households on firewood and dung cakes.
Contribute to environmental conservation and adequate supply of manure in agriculture.
Class 10th - Geography - Minerals and Energy Resources
Non-Conventional Source of Energy -
Solar Energy
India
196.
Class 10th -Geography - Minerals and Energy Resources
Non-Conventional Source of Energy -
197.
● India hasgreat potential of wind power.
● The largest wind farm cluster is located in
Tamilnadu from Nagercoil to Madurai.
● Apart from these, Andhra Pradesh, Karnataka,
Gujarat, Kerala, Maharashtra and
Lakshadweep have important wind farms.
● Nagarcoil and Jaisalmer are well known for
effective use of wind energy in the country.
Class 10th - Geography - Minerals and Energy Resources
Non-Conventional Source of Energy -
Wind Power
198.
Shrubs, farm waste,animal and human waste are used to produce biogas for domestic
consumption in rural areas.
Decomposition of organic matter Yields gas
Class 10th - Geography - Minerals and Energy Resources
Non-Conventional Source of Energy -
Biogas
Has higher thermal efficiency in
comparison to kerosene, dung
cake and charcoal.
199.
● Biogas plantsare set up at municipal, cooperative and individual levels.
● The plants using cattle dung are known as ‘Gobar gas plants’ in rural India.
i. Source of energy.
ii. Provide quality of manure + prevents the loss of trees and manure due to burning of fuel
wood and cow dung cakes.
Class 10th - Geography - Minerals and Energy Resources
Non-Conventional Source of Energy -
Biogas Plant
Twin benefits
200.
Oceanic tides canbe used to generate electricity.
➔ How does it works?
● Floodgate dams are built across inlets.
● During high tide water flows into the inlet and gets trapped when the gate is closed.
● After the tide falls outside the flood gate, the water retained by the floodgate flows back to
the sea via a pipe that carries it through a power-generating turbine.
Class 10th - Geography - Minerals and Energy Resources
Non-Conventional Source of Energy -
Tidal Energy
201.
Class 10th -Geography - Minerals and Energy Resources
Non-Conventional Source of Energy -
Regions for generation of Tidal energy
In India the Gulf of Khambhat, the Gulf of
Kachchh in Gujarat on the western coast and
Gangetic delta in Sunderban regions of West
Bengal provide ideal conditions for utilising
tidal energy.
202.
Geothermal energy refersto the heat and electricity
produced by using the heat from the interior of the Earth.
How does it works?
● The Earth grows progressively hotter with increasing depth.
● Where the geothermal gradient is high, high temperatures are found at
shallow depths.
● Groundwater in such areas absorbs heat from the rocks and becomes hot.
● It is so hot that when it rises to the earth’s surface, it turns into steam.
● This steam is used to drive turbines and generate electricity.
Class 10th - Geography - Minerals and Energy Resources
Non-Conventional Source of Energy -
Geothermal Energy
203.
➔ There areseveral hundred hot springs in India, which could be used to generate electricity.
1. The Parvati valley near Manikaran
in Himachal Pradesh.
2. Puga Valley, Ladakh.
Class 10th - Geography - Minerals and Energy Resources
Non-Conventional Source of Energy -
Two experimental projects
204.
= Increase inthe need for energy.
Every sector of the national economy – agriculture, industry,
transport, commercial and domestic needs inputs of energy.
As a result, consumption of energy in all forms has been steadily rising all over the country.
● Promotion of energy conservation.
● Increased use of renewable energy sources.
Class 10th - Geography - Minerals and Energy Resources
Conservation of Energy Resources -
Development
Twins planks of sustainable energy
205.
➔ We haveto adopt a cautious approach for the judicious use of our limited energy resources.
● Using public transport systems instead of individual vehicles.
● Switching off electricity when not in use.
● Using power-saving devices.
● Using non-conventional sources of energy.
Class 10th - Geography - Minerals and Energy Resources
Conservation of Energy Resources -
“Energy saved is energy produced”
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
The economic strength of a country is measured by the development of manufacturing industries.
Introduction -
Industries
+
Manufacturing
Production of goods in large quantities after processing from raw
materials to more valuable products is called manufacturing.
Secondary activities
208.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
Backbone of development.
1. Manufacturing industries helps in modernising agriculture, it reduce the heavy dependence
of people on agriculture income.
2. Industrial development is a precondition for eradication of unemployment and poverty
from our country.
∴ Public sector industries and joint sector ventures were set up in India. ( To bring down
disparities )
Importance of Manufacturing -
Manufacturing Explain
By providing them job
209.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
3. Manufactured goods Export Brings much needed foreign exchange.
4. Manufacturing transform raw material in the country into finished good which provide
higher value for good.
Importance of Manufacturing -
Prosperity
210.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
and Not exclusive of each other.
Machinery [Irrigation pumps, fertilisers, PVC pipes, etc]
Importance of Manufacturing -
Agriculture Industry
Raw material
● The agro-industries in India
have given a major boost to
agriculture by raising its
productivity.
● Industries depend on the
Agriculture for raw materials
and sell their products to
farmers.
211.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
Self-sufficiency alone is not enough.
Importance of Manufacturing -
Globalisation
Global competition
Our manufactured goods must be at par in
quality with those in the international market.
212.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
Understand the heading
Over the last two decades
This is much lower in comparison to some East Asian economies, where it is 25 to 35 per cent.
Contribution of Industry to National Economy -
Good or Bad
The share of manufacturing sector has stagnated at 17 per
cent of GDP - out of a total of 27 per cent for the industry
which includes 10 per cent for mining, quarrying, electricity
and gas.
213.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
● The trend of growth rate in manufacturing over the last decade has been around 7 per cent
per annum. The desired growth rate over the next decade is 12 per cent.
● Since 2003, manufacturing is once again growing at the rate of 9 to 10 per cent per annum.
● With appropriate policy interventions by the government and renewed efforts by the
industry to improve productivity, economists predict that manufacturing can achieve its
target over the next decade.
● The National Manufacturing Competitiveness Council (NMCC) has been set up with this
objective.
Contribution of Industry to National Economy -
Analyse
Way forward
214.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
Influenced by many factors.
It is rarely possible to find all these factors available at one place.
∴ Selecting an appropriate location is must.
Industrial Location -
Industrial location
● Availability of raw material
● Labour
● Capital
● Market
● Power
215.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
● Cities provide markets and also provide services such as banking, insurance,
transport, labour, consultants and financial advice, etc. to the industry.
Concept of agglomeration economies
Many industries tend to come together to make use of the advantages offered by the urban
centres/agglomeration economics.
Industrial Location -
Industrialisation and urbanisation goes hand in hand Explain
Agglomeration economies refers to the benefits received by the firms and people when they come
together to make use of the advantages offered by the urban cities that prove helpful to them.
216.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
Manufacturing units in pre-independence period
● Located in places from the point of view of overseas
trade such as Mumbai, Kolkata, Chennai, etc.
Industrial Location -
Consequently, there emerged certain pockets of
industrially developed urban centres surrounded by
a huge agricultural rural hinterland.
Reasons
● The key to decision of the factory location is the least cost.
● Government policies and specialised labour also influence
the location of industry.
217.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
❖ Agro based -
➢ Cotton, woollen, jute, silk textile, rubber
and sugar, tea, coffee, edible oil.
❖ Mineral based -
➢ Iron and steel, cement, aluminium,
machine tools, petrochemicals.
Classification of Industries -
On the basis of source of raw material used
218.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
❖ Basic or key industries -
➢ Those which supply their products as raw
materials to manufacture other goods e.g.
iron and steel and copper smelting,
aluminum smelting.
❖ Consumer industries -
➢ That produce goods for direct use by
consumers-sugar, toothpaste, paper,
sewing machines, fans etc.
Classification of Industries -
According to their main role
219.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
I. Small scale industries
➔ Less than one crore.
➔ Toy industries.
II. Large scale industries
➔ One crore or more than one crore.
➔ Iron and steel industries.
❖ Limit has changed over a period of time.
Classification of Industries -
On the basis of capital investment
220.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
❖ Public sector -
➢ Owned and operated by government
agencies - BHEL, SAIL etc.
❖ Private sector -
➢ Industries owned and operated by
individuals or a group of individuals -
TISCO, Bajaj Auto Ltd., Dabur Industries.
Classification of Industries -
On the basis of ownership
221.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
❖ Joint sector industries -
➢ Jointly run by the state and individuals or a
group of individuals. Oil India Ltd. (OIL) is
jointly owned by public and private sector.
❖ Cooperative sector industries -
➢ Owned and operated by the producers or
suppliers of raw materials, workers or
both. Such examples are the sugar industry
in Maharashtra, the coir industry in Kerala.
Classification of Industries -
On the basis of ownership
222.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
● Heavy industries such as iron and steel.
● Light industries that use light raw materials and produce
light goods such as electrical goods industries.
Classification of Industries -
Based on the bulk and weight of raw material and finished goods
223.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
● Significant contribution in industrial production.
● Employment generation.
● Foreign exchange earning.
● Contribution in GDP.
● Self-reliant and complete in value chain.
Agro Based Industries -
Understand the heading
Textile industry Sugar industry
Unique position
● Cotton textile
● Jute textile
224.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
Hand spinning and handloom weaving Powerlooms
The first successful textile mill was established in Mumbai in 1854.
➔ Traditional textile industries Suffered a setback during the colonial period.
Agro Based Industries - Cotton Textile
Ancient India After 18th century
Why?
They could not compete with the mill-made
cloth from England.
225.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
● Localisation of textile industries in Gujarat and Maharashtra.
Reasons
● Availability of raw cotton
● Market
● Transport including accessible port facilities
● Labour, moist climate, etc.
Agro Based Industries - Cotton Textile
226.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
Cotton textile industry
Closely linked with agriculture and
farmers.
Supported other industries chemicals
and dyes, packaging materials and
engineering works.
Agro Based Industries - Cotton Textile
227.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
I. Strong spinning units but weak weaving sector.
● Spinning continues to be centralised in Maharashtra, Gujarat and Tamil Nadu, weaving is
highly decentralised to provide scope for incorporating traditional skills and designs.
● India has world class production in spinning, but weaving supplies low quality of fabric as
it cannot use much of the high quality yarn produced in the country.
Challenges faced by cotton textile industries in India
Impact
Explain
Agro Based Industries - Cotton Textile
228.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
Impact
Many of our spinners export cotton yarn while apparel/garment
manufacturers have to import fabric.
Analyse
Why is it important for us to improve our weaving sector instead
of exporting yarn in large quantities?
Agro Based Industries - Cotton Textile
229.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
II. Erratic power supply.
III. Upgradation of machinery is required.
IV. Low output of labour.
V. Stiff competition with the synthetic fibre industry.
Agro Based Industries - Cotton Textile
230.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
Largest producer of raw jute and jute goods and second largest exporter after Bangladesh.
Most of the mills are located in West Bengal, mainly along the banks of the Hugli river, in a narrow belt.
Agro Based Industries - Jute Textile
India
● Proximity to jute producing area.
● Inexpensive water transport.
● Good network of railways and roadways.
● Abundance of water for processing raw jute.
● Cheap labour from West Bengal and adjoining areas.
● Kolkata urban center provided banking, insurance and port facilities.
Factors responsible for the localisation
231.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
● The first jute mill was set up near Kolkata in
1855 at Rishra.
● After Partition in 1947, the jute mills remained
in India but three-fourth of the jute producing
area went to Bangladesh (erstwhile East
Pakistan).
Agro Based Industries - Jute Textile
232.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
I. Stiff competition by synthetic substitute in international market.
II. Competition from international competitors like Bangladesh, Brazil,
Philippines, Egypt and Thailand.
III. High cost.
National Jute Policy (2005)
● It had increased international demand for jute.
● Government had made it mandatory to use jute for packaging.
● Objective was to increase productivity/cultivation of jute and ensure
good prices to the jute farmers.
Challenges faced by Jute industry
The growing global concern for environment friendly, biodegradable materials, has
once again opened the opportunity for jute products.
Agro Based Industries - Jute Textile
233.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
Second largest producer of sugar.
Largest producer of Gur and Khandsari.
Raw material Bulky Transportation In haulage its sucrose content reduces.
∴ Industries should be situated near sugarcane producing area
[60% mill are in UP and Bihar]
Agro Based Industries - Sugar Industry
Sugar Industry
India
234.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
Seasonal in nature
∴ Ideally suited to cooperative industry.
Shifted and concentrated in southern and western states, especially in Maharashtra.
Agro Based Industries - Sugar Industry
Sugar Industry
● Because the cane produced here has a higher
sucrose content.
● The cooler climate also ensures a longer
crushing season.
Why?
Why?
235.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
● Seasonal nature of industry.
● Old and inefficient methods of production.
● Transportation delays.
● Need to maximise the use of bagasse.
Agro Based Industries - Sugar Industry
Challenges faced by sugar industry
236.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
➔ Iron and Steel Industry
➔ Aluminium smelting
➔ Chemical Industries
➔ Fertilizer Industry
➔ Cement Industry
➔ Automobile Industry
➔ Information Technology and Electronics Industry
Mineral Based Industry -
Mineral Based Industry
237.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
Dependence of other industries over it.
➔ Production and consumption of steel is often regarded as the index of a country’s development.
Both raw material as well as finished goods are heavy and bulky.
Heavy transportation cost
Mineral Based Industry - Iron and Steel Industry
Iron and Steel industry Basic Industry
Iron and Steel industry Heavy Industry
Impact
238.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
➔ Iron ore, coking coal and limestone are required in the ratio of approximately 4 : 2 : 1.
➔ Some quantities of manganese, are also required to harden the steel.
Mineral Based Industry - Iron and Steel Industry
+ +
239.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
● In 2018 with 106.5 million tonnes of crude steel production.
● India ranked 2nd among the world crude steel producers.
● It is the largest producer of sponge iron.
● In 2018 per capita consumption of steel in the country was only
around 70.9 kg per annum against the world average of 224.5 kg.
Mineral Based Industry - Iron and Steel Industry
India’s position
Question
240.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
Mineral Based Industry - Iron and Steel Industry
Mini steel plants
Mini steel plants are smaller, have electric
furnaces, use steel scrap and sponge iron.
They have re-rollers that use steel ingots as
well. They produce mild and alloy steel of
given specifications.
An integrated steel plant
An integrated steel plant is large, handles
everything in one complex - from putting
together raw material to steel making,
rolling and shaping.
241.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
➔ In the 1950s China and India produced almost the same quantity of steel.
● Today, China is the largest producer of steel.
● China is also the world’s largest consumer of steel.
Mineral Based Industry - Iron and Steel Industry
Reason
242.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
➔ Chotanagpur plateau has the maximum concentration of iron and steel industries.
Mineral Based Industry - Iron and Steel Industry
Reasons
● Low cost of iron ore.
● High grade raw materials in proximity, cheap labour.
● Growth potential in the home market.
243.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
Challenges faced by iron and steel industry:
a. High costs and limited availability of coking coal.
b. Lower productivity of labour.
c. Irregular supply of energy.
d. Poor infrastructure.
Have given a boost to the industry with the efforts of private entrepreneurs.
There is a need to allocate resources for research and development to produce
steel more competitively.
Mineral Based Industry - Iron and Steel Industry
Liberalisation and Foreign Direct Investment
244.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
➔ Second most important metallurgy industry.
● It is light, resistant to corrosion, good conductor of heat,
malleable and becomes strong when mixed with other metals.
● It has gained popularity as a substitute of steel, copper, zinc
and lead in a number of industries.
Mineral Based Industry - Aluminium Smelting
Aluminium
Uses
● Manufacturing aircraft
● Utensils
● Wires
245.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
Mineral Based Industry - Aluminium Smelting
Bauxite Alumina Aluminium
4 to 6 tonnes of bauxite 2 tonnes of alumina 1 tonne of aluminium
246.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
➔ Regular supply of electricity and an assured source of raw material at minimum
cost are the two prime factors for location of the industry.
Mineral Based Industry - Aluminium Smelting
247.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
Fast growing and diversifying.
● It comprises of both large and small scale manufacturing industries.
➔ The chemical industry is its own largest consumer.
Basic chemicals undergo processing to further produce other chemicals.
Mineral Based Industry - Chemical Industry
Chemical industry
Inorganic
Sulphuric acid [fertilisers, synthetic fibres,
plastic, adhesive, paints, dyes stuffs] nitric
acid, alkalies soda ash.
Organic
Petrochemicals [synthetic fibres and
rubber plastic, dye-stuffs, drugs and
pharmaceuticals]
248.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
❖ The fertilizer industry is centred around the production of nitrogenous fertilizers (mainly
urea), phosphatic fertilizers and ammonium phosphate (DAP) and complex fertilizers which
have a combination of nitrogen (N), phosphate (P), and potash (K).
❖ Potash is entirely imported in our country.
No reserves of commercially usable potash or potassium compounds.
❖ Fertilizer industry Expanded after Green revolution.
❖ Prominents in the areas of Gujarat, Tamil Nadu, Uttar Pradesh, Punjab and Kerala.
Mineral Based Industry - Fertilizer Industry
Why?
249.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
➔ Cement is essential for construction activity such as building houses, factories, bridges,
roads, airports, dams and for other commercial establishments.
● Requires bulky and heavy raw materials like limestone, silica and gypsum.
● Coal and electric power are needed apart from rail transportation.
➔ The industry has strategically located plants in Gujarat that
have suitable access to the market in the Gulf countries.
Mineral Based Industry - Cement Industry
Cement
Cement Industry
Explain
250.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
Mineral Based Industry - Cement Industry
251.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
Set up in Chennai in 1904.
➔ Improvement in quality
● This industry is doing well in terms of production as well as export.
● Efforts are being made to generate adequate domestic demand and
supply in order to sustain this industry.
Mineral Based Industry - Cement Industry
First Cement Plant
Export
252.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
➔ This industry provides base for transport [Goods and Passengers].
E.g. Trucks, buses, cars, motorcycle, etc.
➔ Liberalisation Competition Growth of industry
➔ Foreign direct investment brought in new technology and aligned
the industry with global developments.
➔ The industry is located around Delhi, Gurgaon, Mumbai, Pune,
Chennai, Kolkata, Lucknow. Indore, Hyderabad, Jamshedpur and
Bengaluru.
Mineral Based Industry - Automobile Industry
253.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
Covers a wide range of products Calculator to computer
Bengaluru Electronic capital of India.
● Other important centres for electronic goods are Mumbai, Delhi, Hyderabad, Pune, Chennai,
Kolkata, Lucknow and Coimbatore.
Mineral Based Industry - Information Technology and Electronic Industry
254.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
● A major impact of the industry has been on employment generation.
Share of women employed in the sector is very satisfactory.
● The continuing growth in the hardware and software is the key to the success of IT industry
in India.
Mineral Based Industry - Information Technology and Electronic Industry
255.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
Contributes significantly to India’s economic growth and development.
At the same time causes pollution and environmental degradation.
Industrial Pollution and Environmental Degradation -
Industries
Industries are responsible for four types of pollution:
● Air
● Water
● Thermal
● Noise
256.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
➔ Caused by the presence of high proportion of undesirable gases such as Sulphur dioxide
and carbon monoxide.
➔ Toxic gas leaks can be very hazardous.
Industrial Pollution and Environmental Degradation -
Dust, spray mist
and smoke
Air pollution
Particulate material
[Solid and liquid]
In the form of By
Chemical and paper
factories, burning fossil
fuels, Brick kilns,
refineries and
smelting, etc.
Ignore pollution norms
Leads to pollution and hazards to human
health,plant, animals and atmosphere.
Bhopal Gas Tragedy
257.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
Industrial Pollution and Environmental Degradation -
258.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
➔ Caused by organic and inorganic industrial wastes and
effluents.
➔ Main culprits -
■ Paper, pulp, chemical, textile and dying, petroleum
refineries, tanneries and electroplating industries.
➔ These industries dump substances like dyes, detergents,
acids, salts and heavy metals like lead and mercury,
pesticides and fertilizers, plastic and rubber.
➔ Fly-ash, phospho-gypsum and iron & steel slags are the
major solid waste.
Industrial Pollution and Environmental Degradation -
Water Pollution
259.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
➔ When hot water from factories and thermal plants is
drained into river and ponds it causes water pollution.
Impact -
● Waste dumped is highly toxic. [Nuclear power plant]
leads to cancers, birth defects and miscarriage.
● It harms the aquatic life.
➔ Relation between soil and water pollution
■ Dumping waste on soil [Glass, harmful chemical, industrial effluents, etc].
■ Rain water percolates them down.
■ Ground water gets contaminated.
Industrial Pollution and Environmental Degradation -
Thermal Pollution
260.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
➔ Caused due to industrial and construction activities.
Machinery, factory equipment, generators, saws and
pneumatic and electric drills.
➔ Why there are no horn zones near Hospital and school?
Impact -
❖ Results in irritation and anger, it can also cause hearing
impairment, increased heart rate and blood pressure
and other physiological effects.
❖ Unwanted sound is source of stress and reasons for lack
of concentration.
Industrial Pollution and Environmental Degradation -
Noise Pollution
261.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
Pollutes eight times the quantity of freshwater.
➔ How can the industrial pollution of fresh water be reduced?
I. Minimising use of water for processing by reusing and recycling it.
II. Harvesting of rainwater to meet water requirements.
III. Treating hot water and effluents before releasing them in rivers and ponds.
Control of Environmental Degradation -
1 litre of waste water discharge
262.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
➔ Treatment of industrial effluents can be done in three phases.
a. Primary treatment by mechanical means. This involves
screening, grinding, flocculation and sedimentation.
b. Secondary treatment by biological process.
c. Tertiary treatment by biological, chemical and physical
processes.
● Using of groundwater reserves by industries should be
regulated legally.
Control of Environmental Degradation -
263.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
➔ Particulate matters in air can be reduced by following methods:
● Fitting smoke stacks to factories with
● Smoke can be reduced by using oil or gas instead of coal in factories.
Control of Environmental Degradation -
➢ Electrostatic precipitators
➢ Fabric filters
➢ Scrubbers
➢ Inertial separators
264.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
Control of Environmental Degradation -
265.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
Control of Environmental Degradation -
Scrubbers Inertial separators
266.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
➔ Steps to control noise pollution -
● Less sound generating machinery and equipment can be used.
● Generator should be fitted with silencers.
● Machinery can be redesigned to increase energy efficiency and reduce noise.
● Noise absorbing material may be used apart from personal use of earplugs and
earphones.
Control of Environmental Degradation -
The challenge of sustainable development requires integration
of economic development with environmental concerns.
267.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
➔ National Thermal Power Corporation has ISO certification for Environment Management
System (EMS).
➔ NTPC has taken proactive approach for preserving the natural environment and resources
in place where it is setting up power plants.
Steps taken -
a. Adopting latest techniques and upgrading existing equipment.
b. Minimising waste generation by maximise ash utilisation.
c. Providing green belts for nurturing ecological balance (Afforestation).
d. Ash pond management, ash water recycling system and liquid waste management to
reduce environmental pollution.
e. Ecological monitoring, reviews and online database management for all its power station.
NTPC shows the way -
268.
Class 10th -Geography - Manufacturing Industries - Full Chapter Explanation
NTPC shows the way -
Pond Management Green belt by NTPC Ramagundam Plant
269.
CLASS 7th
- GEOGRAPHY- CHAPTER - HUMAN ENVIRONMENT - SETTLEMENT, TRANSPORT AND COMMUNICATION
270.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
∴ Pace of development depends upon the production of goods and services
as well as their movement over the space.
Introduction -
Demand location
(Consumer)
Traders
[Transportation]
Supply location
(Industry)
271.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
➔ Movement of goods and services can be over three important domains of our earth.
Introduction -
Land transportation Water transportation Air transportation
272.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
Initially Trade and Transport
● Were restricted to limited space.
● Transport + Communication = Connectivity = Huge trade
[Railways, Waterways] [Radio, Internet] [Global village] [Local to international]
Introduction -
Development in science and technology
expanded trade and transport.
∴ Dense and efficient network of transportation and communication is
prerequisite for local, national and global trade of today.
273.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
➔ India has one of the largest road networks in the world, aggregating to about 56 lakh km.
a. Construction cost is much lower.
b. Roads can transverse/cross comparatively more dissected and undulating topography.
c. Roads can negotiate higher gradients of slopes.
d. Road transportation is economical to transport goods and persons over short distance.
e. Provide door to door service, thus cost of loading and unloading is much lower.
f. Road transport is also used as a feeder to other modes of transport.
Roadways -
In India, roadways have preceded railways Reasons
274.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
Major road development project linking Delhi-Kolkata -
Chennai - Mumbai and Delhi by six-lane Super Highways.
It consists of -
● The North South corridors linking Srinagar (Jammu
& Kashmir) and Kanyakumari (Tamil Nadu).
● East-West Corridor connecting Silchar (Assam) and
Porbandar (Gujarat) are part of this project.
Roadways : Classification of Roads -
Golden quadrilateral super highways
275.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
To reduce the time and distance between the mega
cities of India.
These highway projects are being implemented by
the National Highway Authority of India (NHAI).
Roadways : Classification of Roads -
Objectives
276.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
● National Highways link extreme parts of the country.
● These are the primary road systems and are laid and
maintained by the Central Public Works Department
(CPWD).
● Spread all over the country.
● The historical Sher-Shah Suri Marg is called National
Highway No.1, between Delhi and Amritsar.
National Highways
Roadways : Classification of Roads -
277.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
● Roads linking a state capital with different district
headquarters are known as State Highways.
● These roads are constructed and maintained by the
State Public Works Department (SPWD) in State and
Union Territories.
State Highway
Roadways : Classification of Roads -
278.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
● These roads connect the district headquarters with other places of the district.
● These roads are maintained by the Zila Parishad.
● Rural roads, which link rural areas and villages with towns, are classified under this
category.
● These roads received special impetus under the Pradhan Mantri Grameen Sadak Yojana.
● Constructed to increase the connectivity between village and town by an all season
motorable road.
District Roads
Other Roads
Roadways : Classification of Roads -
279.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
● Border Roads Organisation (BRO), established in 1960, a government
of India undertaking constructs and maintains Border Roads.
Roads made in the bordering areas.
BRO (Border Roads Organisation)
These roads have improved accessibility in areas
of difficult terrain and have helped in the
economic development of these area.
Border Roads
Established in 1960 for the development of
the roads of strategic importance in the
northern and north-eastern border areas.
Roadways : Classification of Roads -
280.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
➔ Classification on the basis of the types of material used.
Metalled Roads -
➔ Made of cement, concrete or
even bitumen of coal.
➔ All weather road.
Unmetalled Roads -
➔ Made of mud and sand.
➔ Go out of use in Rainy season.
Roadways : Classification of Roads -
281.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
Principal mode of transportation for freight and passengers in India.
Useful for multifarious activities.
Business, sightseeing, pilgrimage along with transportation of goods over longer distances.
● Railways in India bind the economic life of the country as well as accelerate the
development of the industry and agriculture.
Railways
Railways -
282.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
➔ The Indian Railways is the largest public sector undertaking in the country.
The first train steamed off from Mumbai to Thane in 1853.
Covering a distance of 34 km.
➔ The Indian Railway is now reorganised into 16 zones.
Railways -
283.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
Largely influenced by physiographic, economic and administrative factors.
● Vast level land, high population density and rich agricultural resources provided the most
favourable condition for their growth.
● However, a large number of rivers requiring construction of bridges across their wide beds
posed some obstacles.
Railways -
The distribution pattern of the Railway
Northern Plain
284.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
● Hilly areas.
● Railway tracks are laid through low hills, gaps or tunnels.
● Unfavourable for the construction of railway lines due to high
relief, sparse population and lack of economic opportunities.
Railways -
Peninsular Region
Himalayan Region
285.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
Challenges faced by Railways -
I. Difficulties to lay railway lines in areas such as -
Railways -
● Sandy plains of Rajasthan.
● Swamps of Gujarat.
● Forested tracks of Madhya Pradesh, Chattisgarh, Odisha and Jharkhand.
● Stretch of sahyadri could be crossed only through gaps and passes.
286.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
II. Sinking of track in some stretches and landslides.
III. Many passengers travel without tickets.
IV. Thefts and damaging of railway property has not yet
stopped completely.
V. People stop the trains, pull the chain unnecessarily
and this causes heavy damage to the railway.
Railways -
287.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
● New found means of transportation.
● In the past, these were used to transport water to cities
and industries.
● Now, these are used for transporting crude oil, petroleum
products and natural gas fields to refineries, fertilizer
factories and big thermal power plants.
● Solids can also be transported through a pipeline when
converted into slurry.
Pipelines -
Pipelines as a means of transportation
288.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
Initially cost (establishment )
● Subsequent running costs are minimal.
● It rules out trans-shipment losses or delays.
Pipelines -
Pipelines
289.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
Important network of pipeline transportation -
I. Upper Assam to Kanpur
➔ Via Guwahati, Barauni and Allahabad.
II. From Salaya in Gujarat to Jalandhar in Punjab
➔ Via Viramgam, Mathura, Delhi and Sonipat.
III. From Hazira in Gujarat to Jagdishpur in U.P.
➔ Via Vijaipur, Kota, Shahjahanpur and Babrala.
Pipelines -
290.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
Pipelines -
291.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
One of the seafaring country.
● Waterways Cheapest means of transportation.
For heavy and bulky goods.
➔ It is a fuel-efficient and environment friendly mode of transport.
➔ India has inland navigation waterways of 14,500 km in length. Out
of these only 5685 km are navigable by mechanised vessels.
Waterways -
India
Its seamen sailed far and near, thus, carrying and spreading Indian commerce and culture.
National
Waterways
292.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
Waterways -
- The Ganga river between Allahabad and Haldia (1620 km).
- The Brahmaputra river between Sadiya and Dhubri (891 km).
- The West-Coast Canal in Kerala (Kottapuram-Kollam,
Udyogamandal and Champakara canals-205 km).
- Specified stretches of Godavari and Krishna rivers along with
Kakinada Puducherry stretch of canals (1078 km).
- Specified stretches of river Brahmani along with Matai river,
delta channels of Mahanadi and Brahmani rivers and East
Coast Canal (588 km).
National Waterway No. 1
National Waterway No. 2
National Waterway No. 3
National Waterway No. 4
National Waterway No. 5
293.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
● Inland waterways on which substantial transportation
takes place.
● These are Mandavi, Zuari and Cumberjua, Sunderbans,
Barak and backwaters of Kerala.
India’s trade with foreign countries is carried from the ports
located along the coast.
➔ 95 per cent of the country’s trade volume (68 per cent
in terms of value) is moved by sea.
Waterways -
Inland Waterways
294.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
Major Sea Ports -
The coastline = 7,516.6 km
● India is dotted with 12 major and 200 notified
non-majors (minor/intermediate) ports.
● These major ports handle 95 per cent of India’s
foreign trade.
295.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
● First port developed soon after Independence to
ease the volume of trade on the Mumbai port, in
the wake of loss of Karachi port to Pakistan after
the Partition.
● Kandla also known as the Deendayal Port, is a
tidal port.
● It caters to the convenient handling of exports
and imports of highly productive granary and
industrial belt stretching across the states of
Jammu and Kashmir, Himachal Pradesh, Punjab,
Haryana, Rajasthan and Gujarat.
Major Sea Ports -
Kandla Port
296.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
● The biggest port with a spacious natural and
well-sheltered harbour.
● The Jawaharlal Nehru port was planned with a
view to decongest the Mumbai port.
Major Sea Ports -
Mumbai Port
297.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
● The premier iron ore exporting port of the
country.
● This port accounts for about fifty per cent of
India’s iron ore export.
● Located in Karnataka caters to the export of iron
ore concentrates from Kudremukh mines.
Major Sea Ports -
Marmagao Port
New Mangalore Port
298.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
● Extreme south-western port, located at the entrance
of a lagoon with a natural harbour.
● Extreme southeastern port.
● This port has a natural harbour and rich hinterland.
● It has a flourishing trade handling of a large variety
of cargoes to even our neighbouring countries like
Sri Lanka, Maldives, etc.
Major Sea Ports -
Kochi Port
Tuticorin Port
299.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
● The oldest artificial ports of the country.
● It is ranked next to Mumbai in terms of the volume
of trade and cargo.
● The deepest landlocked and well-protected port.
● This port was, originally, conceived as an outlet for
iron ore exports.
Major Sea Ports -
Chennai Port
Visakhapatnam Port
300.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
● Port located in Odisha, specialises in the export
of iron ore.
● Kolkata is an inland riverine port.
● This port serves a very large and rich hinterland
of Ganga-Brahmaputra basin.
● Being a tidal port, it requires constant dredging
of Hooghly.
Major Sea Ports -
Paradip Port
Kolkata Port
301.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
● Port was developed as a subsidiary port, in order
to relieve growing pressure on the Kolkata port.
Major Sea Ports -
Haldia Port
302.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
Fastest, most comfortable and prestigious mode of transport.
● The air transport was nationalised in 1953.
● Pawanhans helicopter Ltd. provides helicopter services to oil and natural gas corporation
in its offshore operations to inaccessible areas and difficult terrains.
● Indian airlines operation also extend to the neighbourhood countries.
Airways -
Airways
It can cover very difficult terrains like high mountains, dreary deserts,
dense forests and also long oceanic stretches with great ease.
Explain
303.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
Is not within the reach of the common people.
Airways -
Air Travel
It is only in the north-eastern states that special
provisions are made to extend the services to the
common people.
304.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
Not a new phenomenon.
But, the pace of change, has been rapid in modern times.
Communication -
Communication
Explain
Personal Communication Mass Communication
305.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
➔ The Indian postal network is the largest in the world.
It handles parcels as well as personal written communications.
➔ To facilitate quick delivery of mails in large towns and cities, six mail channels have been
introduced recently.
Rajdhani Channel, Metro Channel, Green Channel, Business Channel, Bulk Mail Channel
and Periodical Channel.
Communication -
First class mail Second class mail
● Cards and envelope.
● Airlifted between station covering
both land and air.
● Book packets, registered newspaper
and periodicals.
● Carried by surface mail, covering land
and water transport.
306.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
Communication -
First Class Mail Second Class Mail
307.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
One of the largest telecom network in Asia.
● More than two-thirds of the villages in India have already been covered with Subscriber
Trunk Dialling (STD) telephone facility.
● The government has made special provision to extend twenty-four hours STD facility to
every village in the country.
● Integrating the development in space technology with communication technology.
Communication -
India
308.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
Communication -
Did you know?
Digital India is an umbrella programme to prepare India for a
knowledge based transformation. The focus of Digital India
Programme is on being transformative to realise - IT (Indian
Talent) + IT (Information Technology) = IT (India Tomorrow)
and is on making technology central to enabling change.
309.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
Provides entertainment and creates awareness among people
about various national programmes and policies.
➔ All India Radio (Akashwani)
➔ Doordarshan
The national television channel of India, is one of the largest terrestrial networks in the world.
➔ India publishes a large number of newspapers and periodicals annually.
➔ India is the largest producer of feature films in the world.
The Central Board of Film Certification is the authority to certify both Indian and foreign films.
Communication -
Mass Communication
310.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
Communication -
311.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
Sea, air or land routes.
Advancement of international trade of a country
is an index to its economic prosperity.
International Trade -
Trade International Trade
Market
The exchange of goods among people, states and countries is referred to as trade.
Trade between two countries is called international trade.
Economic barometer for a country.
312.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
are space bound
∴ No country can survive without International trade.
International Trade -
Resources
International Trade
Import Export
Balance of trade
313.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
● Favorable balance of trade.
● Unfavorable balance of trade.
International Trade -
Balance of trade
The balance of trade of a country is the difference
between its export and import.
314.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
● Commodities which India exports: Agriculture products, ore and minerals, gems
and jewellery, etc.
● Commodities which India import: Petroleum and petroleum products, pearls and
precious metals, electronics items, etc.
Software giant at the International level.
Helpful in earning large forigen exchange.
International Trade -
International trade and India
India
315.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
A sector having potential to generate more employment and
economic activities.
Tourism as a Trade -
Tourism
More than 15 million people are directly
engaged in the tourism industry.
How?
316.
Class 10th -Geography - Lifelines of National Economy - Full Chapter Explanation
● Foreign tourists visit India for heritage tourism, eco tourism,
adventure tourism, cultural tourism, medical tourism and
business tourism.
Tourism as a Trade -
Benefits of tourism as a trade
● Promotes national integration.
● Provides support to local handicrafts and cultural pursuits.
● Helps in the development of international understanding
about our culture and heritage.
317.
Use code -DIGRAJ
● To get maximum discount on all unacademy
subscriptions.
(CBSE 6 to 12 / IIT-JEE / NEET-UG / CA-CS / CUET / CLAT / NDA / UPSC)
● Fill the form given below before taking admission at
the unacademy offline centres and get additional
discount on all courses.
Click here for form link