• 36kW Community hydro
  scheme (since 2006)
• >1 million kWh of electricity
  produced
• >550 tonnes of fossil CO2
  saved
• ~£25k/year for community
  sustainability projects
• Electric bike trial (2009)
   – 2 bikes did 2,700 miles
   – 6 people bought e-bikes as a result
• Community car club (2010)
   – 2 cars – 1 electric and 1 biodiesel
   – 13 member households
   – saved ~17 tonnes CO2
• PV panels for Village Hall (2011)
   – Generated ~4300 kWh to date
   – Charges electric car
• Key Stage 2 schools package (2010)
   – based on the Talybont turbine
   – delivered to local primary schools
• Local biodiesel production (2012/13)
   – Cooking oil from village pubs & café
   – Project awaiting planning permission

2a. CEW - Talybont-Comm energy

  • 1.
    • 36kW Communityhydro scheme (since 2006) • >1 million kWh of electricity produced • >550 tonnes of fossil CO2 saved • ~£25k/year for community sustainability projects
  • 2.
    • Electric biketrial (2009) – 2 bikes did 2,700 miles – 6 people bought e-bikes as a result • Community car club (2010) – 2 cars – 1 electric and 1 biodiesel – 13 member households – saved ~17 tonnes CO2 • PV panels for Village Hall (2011) – Generated ~4300 kWh to date – Charges electric car • Key Stage 2 schools package (2010) – based on the Talybont turbine – delivered to local primary schools • Local biodiesel production (2012/13) – Cooking oil from village pubs & café – Project awaiting planning permission