SlideShare a Scribd company logo
1 of 38
Download to read offline
pwc.dk



Rapport præsentation

AAU - IdM Blueprint
Juni 2011
Agenda


Indledning
Baggrund og observationer
Proces
Roller
Transparens
Systemvalg
Implementering
Cost/Benefit




Styregruppemøde             maj 2011
PwC                                2
Baggrund og
observationer




                maj 2011
                       3
Baggrund


Workshop rapport
Viste at der er væsentlige udfordringer omkring registrering af personer
som skal have tilknytning til AAU, samt med at vedligeholde denne
tilknytning
• Proces for oprettelse i IT-systemer er fokuseret om det enkelte
system, ikke om personen der starter – Dette giver en meget rodet og
ugennemsigtig proces
• Processer håndtere kun ansatte og studerende – Mange er svære at
håndtere
• Væsentligt effektiviserings potentiale



Styregruppemøde                                                    maj 2011
PwC                                                                       4
Hovedobservationer – Behov for Affiliering og
mindskning af person afhængighed

Processer og blanketter er designet som i en 25 mands
virksomhed – ikke til et moderne universistet
• Der anvendes navne som aktører og ikke den funktion der skal udføre
  det – funktionen og personen smelter sammen.
• Afspejles i manglende brug af funktionspostkasser/telefoner
• Hvis man ikke er ansat eller studerende falder man udenfor
• Der er forskellig opfattelse af den samme proces, fordi processer ikke
  er universielt dokumenteret
• Personer der er ansatte flere steder, får ”skjult” deres sekundære
  ansættleses forhold. Dette er ikke kun et problem for IdM men også
  for Budgettering og godkendelser


Styregruppemøde                                                     maj 2011
PwC                                                                        5
Hovedobservationer – Behov for transparens


Optimering er sket lokalt på bekostning af det generelle, og
der er kun et begrænset fælles overblik over tværgående
processer
• Man finder en løsning på de største hurdler, hvor man sidder.
• Gode løsninger bliver ikke nødvendigvis udbredt til andre
• Mange optimeringer ødelægger desværre processen senere i kæden
• Der er enighed om at det er andres langsommelighed der gør det
  besværligt
• Det er svært at få status på en igangværende sag




Styregruppemøde                                                    maj 2011
PwC                                                                       6
Hovedobservationer – Behov for datamodellering


Implementering opgaven bliver tung på datamodellering men
let på integration
• De anvendte systemer har relativ simple rettigheds modeller
• Organisation og tilknytning til denne er ikke modelleret til en
forretningsmodel – opdeling i Person, tilknytning og funktion
• Der er ikke set tegn på egentlig master data management, hvorfor
mange styrende data ikke vedligeholdes centralt.
• Det skal dog huskes at personers identitet bevares (ikke medarbejder
nummer som email etc.)
• Godkendelses hierarkier bliver ikke anvendt i dag, men er under
udvikling – dog skal disse vedligeholdes løbende


Styregruppemøde                                                     maj 2011
PwC                                                                        7
Hovedobservationer – Behov for
forandringsledelse

Implementeringen bliver ligeledes tung på forandringsledelse
• Oprydning og nye processer svært – system let nok
• Der findes nogle utroligt krøllede processer, som basalt set ressource
orienteret og ikke proces orienterede. Disse skal foldes ud.
• Der skal for organisationen aktiveres atypisk stærk central styring,
men med stor følsomhed overfor de enkelte områder særpræg


• Folk taler ikke altid pænt om hinanden – det er de andres skyld




Styregruppemøde                                                     maj 2011
PwC                                                                        8
Hovedobservationer – Behov for
systemunderstøttelse af oprydning

Systemet skal kunne hjælpe med at skabe orden men må ikke
kræve at der er ryddet op inden implementering.
• Der bliver anvendt forskellige navne standarder i samme system
• Personer kan nemt have flere bruger konti i samme system.
• Der er ikke i dag mulighed for at danne sig et tilstrækkeligt overblik
  til at gennemføre en oprydning
• System skal derfor sikre overblik og transparens




Styregruppemøde                                                      maj 2011
PwC                                                                         9
Proces




         maj 2011
               10
Tilknytningsmodel

   Tilknyttet
    Person

                Affiliering   Livscyklus


                Affiliering   Livscyklus


                Affiliering   Livscyklus
Tilknytningsmodel

   Tilknyttet                 Funktionshierarki
    Person

                Affiliering


                Affiliering


                Affiliering
Affiliering - Stamkort




PwC
                         Slide   13
Affiliering - Visitkort




PwC
                          Slide   14
Affiliering - Visitkort

                               Medarbejder-
                                erklæring
                                                   AD    Exhange


        Stamkort    Infrastruktur
                                                        Adgangskort

                    Jobfunktion
        Visitkort


                                                         ØSS

                               Telefon
                                              HR



PwC
                                                                      Slide   15
Affilieringsproces
  Affiliering      Infrastruktrur    Jobfunktion       Information

                   Hvis ansat:
                      HR



                      PAU
Registrering

                                    Retur
                                                   +   Frigiv konti

                      PDS            Retur
                                      Retur
                                       Øvrige
Godkendelse                           systemer
                      AD
                     Fælles
                      Mail          Godkendelse        Orientering

 Styregruppemøde                                               maj 2011
 PwC                                                                 16
Ændring af affiliering
  Affiliering      Infrastruktrur    Jobfunktion       Information

                   Hvis ansat:
                      HR




Registrering
                                                   +   Frigiv konti
                                    Retur
                                     Retur
                                      Retur
                                       Øvrige
Godkendelse                           systemer



                                    Godkendelse        Orientering

 Styregruppemøde                                               maj 2011
 PwC                                                                 17
Afslutning af affiliering


                                                                     Hvis ansat:
   Nær udløb                                                            HR


                                       Ændring af
                  Orientering
                                       affiliering

                                                      Luk konti i    Luk konti i
                                Endeligt
                                                     Infrastruktur     Øvrige
                                 udløb
                                                        system        systemer


  Registrering
   af ophør


Styregruppemøde                                                             maj 2011
PwC                                                                               18
Anmodning om nye rettigheder
 Affiliering      Infrastruktrur    Jobfunktion   Information


                     PAU
Anmodning

                                   Retur
                      PDS           Retur
                                     Retur
                                      Øvrige
Godkendelse                          systemer
                     AD
                    Fælles
                     Mail          Godkendelse    Orientering




Styregruppemøde                                          maj 2011
PwC                                                            19
Roller




         maj 2011
               20
Anbefaling – Rollemodel


3 lags rollemodel
• Infrastruktur roller
    • Adgang til fælles arbejdsunderstøttende ressourcer (AD, ESDH,
      IdM, Adgangskort, SSO etc)


• Jobfunktions roller
    • Adgang til Fag - eller Jobfunktionssystemer


• Projekt/Kursus roller
    • Styring af adgang til ikke permanente organisationer, hvor der er
      en leder, som skal styre arbejdet
Styregruppemøde                                                     maj 2011
PwC                                                                       21
Infrastruktur: Roller eller bare klar tale


Man kan automatisere brugeradministrationen på baggrund af hvad der
 udføres manuelt i dag
- Alle medarbejdere skal have mail konto på lokal server =>
  If employee = true and Location != null then
     create(mail account, lookup(location))
- Alle timelønnede skal kunne registrer tid =>                        If
  employee = true and Location != null then
     create(SAP account, RegTimeRole, empid))




                                                                 april 2010
PwC                                                               Slide 22
Jobfunktion: Mapning af organisation og roller


                              Default – Altid tildelt
Organisation kan være
                              Optional – Kan tildeles
• Afdelinger                  Conditional – Regel styret
• Ledelses hierarkier
                                            Default
• Attestationsret
                                            Optional
• Lokation                                  Conditional
• Projekter
                                                   Default
• Tværorg. råd og udvalg
                                                   Optional
                                                   Conditional




                                                              marts 2009
PwC                                                             Slide 23
Projektrettigheder


Projektejeren kan selv eller gennem uddelegering styre adgangen til en
projektressource
• Oprettelse af eksterne deltagere
• Løbende vedligehold af projektdeltagere
• Evt. automatiseret oprettelse af ressourcer


•    Vil frigøre væsentlige ressourcer til administration af
     projektressourcer – specielt efterhånden som der vil blive krav om
     projectrooms etc.
•    Kan ses som en private cloud tanke



Styregruppemøde                                                      maj 2011
PwC                                                                        24
Transparens




              maj 2011
                    25
If order and oversight do not exist –
IdM in it self will not bring this

                                                           IT




             APP                                    Operation           DEV
                   IdM


             Adm                                       Server           Adm
                   IdM                                            IdM      IdM


             Prod                                        Infra          Prod
                   IdM                                                     IdM
Real life experience with NAGS and Access Governance in general                  april 2011
PwC                                                                                      26
Transparens
IT-Sikkerhed

                                                  Leder eller lokal
                                                     ansvarlig


                                                      Affilieret


                                                  Person identitet
                                    ID
                                                       Roller
   ØS 1          ØS 2          AD          ADM   Rolle administrator
                                                   Tekniske roller


                                                      Systemer

 Sys1          Sys2     Sys3        Sys4
                                                    System Ejere



                                                             Slide 27
Teknik og system




                   maj 2011
                         28
Anbefaling – 2 lags system


Separat proces og integrations lag
• Afkobling mellem data til process og provisionering
• Mulighed for Read-only integration => understøttelse af oprydning

                                                                               Step 1                  Step 2                                Step 3



                                                                                           Identity broker

                                                                                                                                System 200




                                                                                                                                                                      System 10

                                                                                                                                                                                  System 42




                                                                                                                                                                                                         System 15

                                                                                                                                                                                                                     System 23

                                                                                                                                                                                                                                  System 67
                                              System 1

                                                         System 2

                                                                    System 3

                                                                                System 4
  System 1

             System 2

                        System 3

                                   System 4




                                                                                                                    System 11




                                                                                                                                                System 2

                                                                                                                                                           System 6




                                                                                                                                                                                              System 1
                                                                                            System 6

                                                                                                         System 9




  Provisionering                                   Database                                            Directory                                                AD                                Mail/ticket
Styregruppemøde                                                                                                                                                                                                                  maj 2011
PwC                                                                                                                                                                                                                                    29
System valg - SailPoint

                         Access Governance

                                 Analytics & Reporting


         Policy       Compliance         Role         Lifecycle           Identity
                      Management      Management     Management          Warehouse



Governance                           Provisioning                                     Closed
                                       brooker                                         Loop
IdM Infrastructure                                                                     Audit

                                                                                       Role
                  Existing        Auto        Service Desk        Admins             detection
                  scripts      provisioning     (tickets)         (e-mail)

                         Automatic                       Manual
Managed
Resources


PwC
                                                                                          Slide 30
Systemvalg - NAGS




Styregruppemøde     maj 2011
PwC                       31
Implementering




                 maj 2011
                       32
Roadmap


                          Forandringsledelse                                 Governance



Datamodellering                          Integrationog
                                                             Roller og
Affilierings life-cycle                    rettigheds                           Løbende
                          Oprydning                         Automatisering
Oprydningsproces                               -styring                         forbedringer
Manuel udførelse



                                       IdM platform


                          Etablering og udbygning af Værktøjskasse




   PwC
                                                                                          Slide   33
Projektorganisering


Styregruppe : Beslutningskraft og slagkrft


Advisoryboard : Sikre at alle intressenter bliver hørt


Projektledelse : Skal favne bredt fagligt og organisatorisk


System og Applikations ejerskab : Skal løbende sikre styring og
                                  vedligehold




Styregruppemøde                                               maj 2011
PwC                                                                 34
Cost/Benefit
Økonomi


                     År 1            År 2            År 3

 Omkostning       5,2 mio. kr.    0,2 mio. kr.    0,2 mio. kr.


  Besparelse      1,4 mio. kr.    2,8 mio. kr.    2,8 mio. kr.


       Flow       -3,8 mio. kr.   2,6 mio. kr.    2,6 mio. kr.


Akkumuleret       -3,8 mio. kr.   -1,2 mio. kr.   1,4 mio. kr.




Styregruppemøde                                         maj 2011
PwC                                                           36
Kvalitative forbedringer


Nøgleforbedringer
Bedre datamodel for beskrivelse af tilknytning til AAU, som vil sikre en
ensartet håndtering af alle affilierede.
Bedre overblik over medarbejdere, brugere og data.
Bedre overblik over sagsgangen på brugeradministrationsområdet.
Mindre irritation på ansættelsesstedet ved ansættelser.
Øvrige forbedringer
Højere sikkerhedsniveau.
Implementeringen af nye systemer vil blive lettet
Bedre mulighed for føderation.


Styregruppemøde                                                     maj 2011
PwC                                                                       37
TAK FOR I DAG




This publication has been prepared for general guidance on matters of interest only, and does
not constitute professional advice. You should not act upon the information contained in this
publication without obtaining specific professional advice. No representation or warranty
(express or implied) is given as to the accuracy or completeness of the information contained
in this publication, and, to the extent permitted by law, PricewaterhouseCoopers
Statsautoriseret Revisionsaktieselskab, its members, employees and agents do not accept or
assume any liability, responsibility or duty of care for any consequences of you or anyone else
acting, or refraining to act, in reliance on the information contained in this publication or for any
decision based on it.

© 2011 PricewaterhouseCoopers Statsautoriseret Revisionsaktieselskab. All rights reserved.
In this document, “PwC” refers to PricewaterhouseCoopers Statsautoriseret
Revisionsaktieselskab which is a member firm of PricewaterhouseCoopers International
Limited, each member firm of which is a separate legal entity.

More Related Content

Featured

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by HubspotMarius Sescu
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 

Featured (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

24079 rapport pr--sentation-bbptemoplate

  • 1. pwc.dk Rapport præsentation AAU - IdM Blueprint Juni 2011
  • 4. Baggrund Workshop rapport Viste at der er væsentlige udfordringer omkring registrering af personer som skal have tilknytning til AAU, samt med at vedligeholde denne tilknytning • Proces for oprettelse i IT-systemer er fokuseret om det enkelte system, ikke om personen der starter – Dette giver en meget rodet og ugennemsigtig proces • Processer håndtere kun ansatte og studerende – Mange er svære at håndtere • Væsentligt effektiviserings potentiale Styregruppemøde maj 2011 PwC 4
  • 5. Hovedobservationer – Behov for Affiliering og mindskning af person afhængighed Processer og blanketter er designet som i en 25 mands virksomhed – ikke til et moderne universistet • Der anvendes navne som aktører og ikke den funktion der skal udføre det – funktionen og personen smelter sammen. • Afspejles i manglende brug af funktionspostkasser/telefoner • Hvis man ikke er ansat eller studerende falder man udenfor • Der er forskellig opfattelse af den samme proces, fordi processer ikke er universielt dokumenteret • Personer der er ansatte flere steder, får ”skjult” deres sekundære ansættleses forhold. Dette er ikke kun et problem for IdM men også for Budgettering og godkendelser Styregruppemøde maj 2011 PwC 5
  • 6. Hovedobservationer – Behov for transparens Optimering er sket lokalt på bekostning af det generelle, og der er kun et begrænset fælles overblik over tværgående processer • Man finder en løsning på de største hurdler, hvor man sidder. • Gode løsninger bliver ikke nødvendigvis udbredt til andre • Mange optimeringer ødelægger desværre processen senere i kæden • Der er enighed om at det er andres langsommelighed der gør det besværligt • Det er svært at få status på en igangværende sag Styregruppemøde maj 2011 PwC 6
  • 7. Hovedobservationer – Behov for datamodellering Implementering opgaven bliver tung på datamodellering men let på integration • De anvendte systemer har relativ simple rettigheds modeller • Organisation og tilknytning til denne er ikke modelleret til en forretningsmodel – opdeling i Person, tilknytning og funktion • Der er ikke set tegn på egentlig master data management, hvorfor mange styrende data ikke vedligeholdes centralt. • Det skal dog huskes at personers identitet bevares (ikke medarbejder nummer som email etc.) • Godkendelses hierarkier bliver ikke anvendt i dag, men er under udvikling – dog skal disse vedligeholdes løbende Styregruppemøde maj 2011 PwC 7
  • 8. Hovedobservationer – Behov for forandringsledelse Implementeringen bliver ligeledes tung på forandringsledelse • Oprydning og nye processer svært – system let nok • Der findes nogle utroligt krøllede processer, som basalt set ressource orienteret og ikke proces orienterede. Disse skal foldes ud. • Der skal for organisationen aktiveres atypisk stærk central styring, men med stor følsomhed overfor de enkelte områder særpræg • Folk taler ikke altid pænt om hinanden – det er de andres skyld Styregruppemøde maj 2011 PwC 8
  • 9. Hovedobservationer – Behov for systemunderstøttelse af oprydning Systemet skal kunne hjælpe med at skabe orden men må ikke kræve at der er ryddet op inden implementering. • Der bliver anvendt forskellige navne standarder i samme system • Personer kan nemt have flere bruger konti i samme system. • Der er ikke i dag mulighed for at danne sig et tilstrækkeligt overblik til at gennemføre en oprydning • System skal derfor sikre overblik og transparens Styregruppemøde maj 2011 PwC 9
  • 10. Proces maj 2011 10
  • 11. Tilknytningsmodel Tilknyttet Person Affiliering Livscyklus Affiliering Livscyklus Affiliering Livscyklus
  • 12. Tilknytningsmodel Tilknyttet Funktionshierarki Person Affiliering Affiliering Affiliering
  • 15. Affiliering - Visitkort Medarbejder- erklæring AD Exhange Stamkort Infrastruktur Adgangskort Jobfunktion Visitkort ØSS Telefon HR PwC Slide 15
  • 16. Affilieringsproces Affiliering Infrastruktrur Jobfunktion Information Hvis ansat: HR PAU Registrering Retur + Frigiv konti PDS Retur Retur Øvrige Godkendelse systemer AD Fælles Mail Godkendelse Orientering Styregruppemøde maj 2011 PwC 16
  • 17. Ændring af affiliering Affiliering Infrastruktrur Jobfunktion Information Hvis ansat: HR Registrering + Frigiv konti Retur Retur Retur Øvrige Godkendelse systemer Godkendelse Orientering Styregruppemøde maj 2011 PwC 17
  • 18. Afslutning af affiliering Hvis ansat: Nær udløb HR Ændring af Orientering affiliering Luk konti i Luk konti i Endeligt Infrastruktur Øvrige udløb system systemer Registrering af ophør Styregruppemøde maj 2011 PwC 18
  • 19. Anmodning om nye rettigheder Affiliering Infrastruktrur Jobfunktion Information PAU Anmodning Retur PDS Retur Retur Øvrige Godkendelse systemer AD Fælles Mail Godkendelse Orientering Styregruppemøde maj 2011 PwC 19
  • 20. Roller maj 2011 20
  • 21. Anbefaling – Rollemodel 3 lags rollemodel • Infrastruktur roller • Adgang til fælles arbejdsunderstøttende ressourcer (AD, ESDH, IdM, Adgangskort, SSO etc) • Jobfunktions roller • Adgang til Fag - eller Jobfunktionssystemer • Projekt/Kursus roller • Styring af adgang til ikke permanente organisationer, hvor der er en leder, som skal styre arbejdet Styregruppemøde maj 2011 PwC 21
  • 22. Infrastruktur: Roller eller bare klar tale Man kan automatisere brugeradministrationen på baggrund af hvad der udføres manuelt i dag - Alle medarbejdere skal have mail konto på lokal server => If employee = true and Location != null then create(mail account, lookup(location)) - Alle timelønnede skal kunne registrer tid => If employee = true and Location != null then create(SAP account, RegTimeRole, empid)) april 2010 PwC Slide 22
  • 23. Jobfunktion: Mapning af organisation og roller Default – Altid tildelt Organisation kan være Optional – Kan tildeles • Afdelinger Conditional – Regel styret • Ledelses hierarkier Default • Attestationsret Optional • Lokation Conditional • Projekter Default • Tværorg. råd og udvalg Optional Conditional marts 2009 PwC Slide 23
  • 24. Projektrettigheder Projektejeren kan selv eller gennem uddelegering styre adgangen til en projektressource • Oprettelse af eksterne deltagere • Løbende vedligehold af projektdeltagere • Evt. automatiseret oprettelse af ressourcer • Vil frigøre væsentlige ressourcer til administration af projektressourcer – specielt efterhånden som der vil blive krav om projectrooms etc. • Kan ses som en private cloud tanke Styregruppemøde maj 2011 PwC 24
  • 25. Transparens maj 2011 25
  • 26. If order and oversight do not exist – IdM in it self will not bring this IT APP Operation DEV IdM Adm Server Adm IdM IdM IdM Prod Infra Prod IdM IdM Real life experience with NAGS and Access Governance in general april 2011 PwC 26
  • 27. Transparens IT-Sikkerhed Leder eller lokal ansvarlig Affilieret Person identitet ID Roller ØS 1 ØS 2 AD ADM Rolle administrator Tekniske roller Systemer Sys1 Sys2 Sys3 Sys4 System Ejere Slide 27
  • 28. Teknik og system maj 2011 28
  • 29. Anbefaling – 2 lags system Separat proces og integrations lag • Afkobling mellem data til process og provisionering • Mulighed for Read-only integration => understøttelse af oprydning Step 1 Step 2 Step 3 Identity broker System 200 System 10 System 42 System 15 System 23 System 67 System 1 System 2 System 3 System 4 System 1 System 2 System 3 System 4 System 11 System 2 System 6 System 1 System 6 System 9 Provisionering Database Directory AD Mail/ticket Styregruppemøde maj 2011 PwC 29
  • 30. System valg - SailPoint Access Governance Analytics & Reporting Policy Compliance Role Lifecycle Identity Management Management Management Warehouse Governance Provisioning Closed brooker Loop IdM Infrastructure Audit Role Existing Auto Service Desk Admins detection scripts provisioning (tickets) (e-mail) Automatic Manual Managed Resources PwC Slide 30
  • 32. Implementering maj 2011 32
  • 33. Roadmap Forandringsledelse Governance Datamodellering Integrationog Roller og Affilierings life-cycle rettigheds Løbende Oprydning Automatisering Oprydningsproces -styring forbedringer Manuel udførelse IdM platform Etablering og udbygning af Værktøjskasse PwC Slide 33
  • 34. Projektorganisering Styregruppe : Beslutningskraft og slagkrft Advisoryboard : Sikre at alle intressenter bliver hørt Projektledelse : Skal favne bredt fagligt og organisatorisk System og Applikations ejerskab : Skal løbende sikre styring og vedligehold Styregruppemøde maj 2011 PwC 34
  • 36. Økonomi År 1 År 2 År 3 Omkostning 5,2 mio. kr. 0,2 mio. kr. 0,2 mio. kr. Besparelse 1,4 mio. kr. 2,8 mio. kr. 2,8 mio. kr. Flow -3,8 mio. kr. 2,6 mio. kr. 2,6 mio. kr. Akkumuleret -3,8 mio. kr. -1,2 mio. kr. 1,4 mio. kr. Styregruppemøde maj 2011 PwC 36
  • 37. Kvalitative forbedringer Nøgleforbedringer Bedre datamodel for beskrivelse af tilknytning til AAU, som vil sikre en ensartet håndtering af alle affilierede. Bedre overblik over medarbejdere, brugere og data. Bedre overblik over sagsgangen på brugeradministrationsområdet. Mindre irritation på ansættelsesstedet ved ansættelser. Øvrige forbedringer Højere sikkerhedsniveau. Implementeringen af nye systemer vil blive lettet Bedre mulighed for føderation. Styregruppemøde maj 2011 PwC 37
  • 38. TAK FOR I DAG This publication has been prepared for general guidance on matters of interest only, and does not constitute professional advice. You should not act upon the information contained in this publication without obtaining specific professional advice. No representation or warranty (express or implied) is given as to the accuracy or completeness of the information contained in this publication, and, to the extent permitted by law, PricewaterhouseCoopers Statsautoriseret Revisionsaktieselskab, its members, employees and agents do not accept or assume any liability, responsibility or duty of care for any consequences of you or anyone else acting, or refraining to act, in reliance on the information contained in this publication or for any decision based on it. © 2011 PricewaterhouseCoopers Statsautoriseret Revisionsaktieselskab. All rights reserved. In this document, “PwC” refers to PricewaterhouseCoopers Statsautoriseret Revisionsaktieselskab which is a member firm of PricewaterhouseCoopers International Limited, each member firm of which is a separate legal entity.