SlideShare a Scribd company logo
1
Kimberley Process Certification Scheme
(KPCS)
ANNUAL REPORT 2013
in accordance with Section VI, paragraph 11 of the KPCS document
Switzerland
31 March 2014
Introductory Remarks
This report has been prepared in accordance with section VI, paragraph 11 of the KPCS document
and the Guidelines for the preparation of annual reports contained in Annex I of the Administrative
Decision (AD) on the Implementation of Peer Review in the KPCS. It also takes into account the
requirements for the preparation of annual reports for submission in 2005 and subsequent years,
which were elaborated by the KP Working Group on Monitoring (WGM) as well as the
recommendation contained in the Brussels Declaration on Internal controls of Participants with rough
diamond trading and manufacturing.
A.Institutional Framework
The institutional framework for the implementation of the KPCS in Switzerland has not changed in the
year under review. For detailed information, please refer to the annual report submitted on 31
st
March
2004.
Point of contact and official coordinator
The person of contact for matters related to the KPCS and the official coordinator dealing with its
implementation in Switzerland remains
Mrs. Fabienne Juilland Metzger
State Secretariat for Economic Affairs (SECO)
Sanctions Unit
Holzikofenweg 36
CH-3003 Berne / Switzerland
Tel.: +41 31 323 23 87
Fax: +41 31 323 51 10
swissdiamonds@seco.admin.ch
These contact details are to be used also for the purpose of import confirmation according to the AD
on import confirmation adopted in Kinshasa in November 2011.
B.Legal Framework
The legal framework for the implementation of the KPCS in Switzerland has not changed in the year
under review. For detailed information, please refer to the annual report submitted on 31
st
March 2004.
The annex of the Ordinance on the International Trade in Rough Diamonds (Diamond Ordinance) lists
the participants meeting the minimum requirements of the KPCS. It has been updated in accordance
with the decision of the KPCS regarding the admission of Mali.
C.Import and Export Regime
The import and export regime has not changed in the year under review. For detailed information,
please refer to the annual report submitted on 31
st
March 2004.
2
D.System of internal controls and Industry Self-Regulation
The information provided in previous reports remains valid in substance.
E.Statistics
The Swiss statistical data has been submitted in accordance with annex III of the KPCS document via
the statistics website (quarterly data on imports and exports, as well as certificate count per
participant). On an ongoing basis Switzerland is furthermore reconciling its data bilaterally with its
trading partners.
F.Miscellaneous
Central African Republic
Following the KP's decision to temporarily suspend the Central African Republic (CAR) from the
KPCS, Switzerland has removed CAR from its national list of participants meeting the minimum
requirements. The customs offices authorized to process rough diamond shipments have been
instructed to exert special vigilance with regard to shipments possibly originating from CAR. The
relevant footprint was made available together with a call for enhanced scrutiny with regards to
shipments coming from neighbouring participants.
Special vigilance measures
Switzerland continues to exert special vigilance with regards to diamonds possibly originating from
Côte d'Ivoire. Suspicious shipments are specially scrutinized. They are detained and digital
photographs sent for appraisal to the Chair of the Working Group of Diamond Experts (WGDE).
Valuation issue
A shipment of rough diamonds imported from Sierra Leone and subsequently re-exported with a much
higher price has been temporarily seized in order to understand the reasons behind this increase of
value. Details of the shipment including digital photographs have been sent for appraisal to the Chair
of the WGDE. The case highlights once again the difficulty to establish values as well as justifiable
margins in diamond transactions.
Participation in Working Groups and other Committees
As in previous years, Switzerland actively participated in the work of the Working Group on Statistics
(WGS), the Committee on Rules and Procedures (CRP) and the Selection Committee.
Review Visit to Switzerland
The report of the second Review Visit to Switzerland (7-8 November 2012) was finalized and
endorsed by the 2013 Plenary. The report confirms Switzerland's continued compliance with KPCS
minimum requirements and acknowledges the fact that Switzerland has implemented all but one
recommendation made by the first Review Team in 2004.
Switzerland is currently working at implementing the new recommendations formulated by the Review
Team. With regard to the Team's second recommendation (i.e. further use of confiscated diamonds)
3
Switzerland has conducted a survey among selected participants to understand existing practices in
this area. Unfortunately the feedback received has been very low so far.
The issue of current practices with regard to confiscated diamonds had already been brought up in
Switzerland's 2011 annual report. Switzerland continues to believe that KP participants should strive to
develop a shared approach with regard to this matter.
G.Cases of Infringement of the KPCS
Case of diamond smuggling
A case of diamond smuggling was uncovered in 2013 in the context of an operation conducted by the
Swiss Border Guard. The operation was not targeted at uncovering diamond smuggling but falsified
identity documents. However during the mission a Guinean national having swallowed 10 carats of
rough diamonds was arrested. As the person was not in a position to present evidence of legal import
into Switzerland, the diamonds have been seized and definitively confiscated.
Pre-Kimberley Diamonds
A pending case concerning the definite seizure of 62'183 carats of rough diamonds declared to have
arrived in Switzerland before the implementation of the KPCS was decided by the Supreme Court,
which confirmed the definitive confiscation of the goods.
4

More Related Content

Similar to 2013 KPCS Annual Report Switzerland

2014 KPCS Annual Report Switzerland
2014 KPCS Annual Report Switzerland2014 KPCS Annual Report Switzerland
2014 KPCS Annual Report Switzerland
Dr Lendy Spires
 
2017 switzerland annual report_2017
2017 switzerland annual report_20172017 switzerland annual report_2017
2017 switzerland annual report_2017
Dr Lendy Spires
 
2017 switzerland annual report_2017
2017 switzerland annual report_20172017 switzerland annual report_2017
2017 switzerland annual report_2017
Dr Lendy Spires
 
2016 switzerland annual report_2016 - copy
2016 switzerland annual report_2016 - copy2016 switzerland annual report_2016 - copy
2016 switzerland annual report_2016 - copy
Dr Lendy Spires
 
2016 switzerland annual report_2016
2016 switzerland annual report_20162016 switzerland annual report_2016
2016 switzerland annual report_2016
Dr Lendy Spires
 
2016 switzerland annual report_2016
2016 switzerland annual report_20162016 switzerland annual report_2016
2016 switzerland annual report_2016
Dr Lendy Spires
 
Guyana annual report 2011
Guyana annual report 2011Guyana annual report 2011
Guyana annual report 2011
Africa Diamonds
 
2011 mauritius annual report
2011 mauritius annual report2011 mauritius annual report
2011 mauritius annual report
Dr Lendy Spires
 
2013 KPCS Annual Report Swaziland
2013 KPCS Annual Report Swaziland2013 KPCS Annual Report Swaziland
2013 KPCS Annual Report Swaziland
Dr Lendy Spires
 
2012 KIMBERLEY PROCESS CERTIFICATION SCHEME European Union Annual Report
2012 KIMBERLEY PROCESS CERTIFICATION SCHEME European Union Annual Report  2012 KIMBERLEY PROCESS CERTIFICATION SCHEME European Union Annual Report
2012 KIMBERLEY PROCESS CERTIFICATION SCHEME European Union Annual Report
Dr Lendy Spires
 
Angola annual report 2011
Angola annual report 2011Angola annual report 2011
Angola annual report 2011
Dr Lendy Spires
 
2014 KPCS Annual Report Australia
2014 KPCS Annual Report Australia2014 KPCS Annual Report Australia
2014 KPCS Annual Report Australia
Dr Lendy Spires
 
Australia annual report 2012
Australia annual report 2012Australia annual report 2012
Australia annual report 2012
Dr Lendy Spires
 
2014 u.s. kp annual_report_2014
2014 u.s. kp annual_report_20142014 u.s. kp annual_report_2014
2014 u.s. kp annual_report_2014
Dr Lendy Spires
 
2011 Sierra Leone Annual Report
2011 Sierra Leone Annual Report2011 Sierra Leone Annual Report
2011 Sierra Leone Annual Report
Dr Lendy Spires
 
2013 KPCS Annual Report Australia
2013 KPCS Annual Report Australia2013 KPCS Annual Report Australia
2013 KPCS Annual Report Australia
Dr Lendy Spires
 
2016 norway annual report - copy
2016 norway annual report - copy2016 norway annual report - copy
2016 norway annual report - copy
Dr Lendy Spires
 
2016 norway annual report
2016 norway annual report2016 norway annual report
2016 norway annual report
Dr Lendy Spires
 
2012 Cote D'ivoire Presentation Plenary
2012 Cote D'ivoire Presentation Plenary2012 Cote D'ivoire Presentation Plenary
2012 Cote D'ivoire Presentation Plenary
Dr Lendy Spires
 
2008 Final Communique New Delhi
2008 Final Communique New Delhi2008 Final Communique New Delhi
2008 Final Communique New Delhi
Dr Lendy Spires
 

Similar to 2013 KPCS Annual Report Switzerland (20)

2014 KPCS Annual Report Switzerland
2014 KPCS Annual Report Switzerland2014 KPCS Annual Report Switzerland
2014 KPCS Annual Report Switzerland
 
2017 switzerland annual report_2017
2017 switzerland annual report_20172017 switzerland annual report_2017
2017 switzerland annual report_2017
 
2017 switzerland annual report_2017
2017 switzerland annual report_20172017 switzerland annual report_2017
2017 switzerland annual report_2017
 
2016 switzerland annual report_2016 - copy
2016 switzerland annual report_2016 - copy2016 switzerland annual report_2016 - copy
2016 switzerland annual report_2016 - copy
 
2016 switzerland annual report_2016
2016 switzerland annual report_20162016 switzerland annual report_2016
2016 switzerland annual report_2016
 
2016 switzerland annual report_2016
2016 switzerland annual report_20162016 switzerland annual report_2016
2016 switzerland annual report_2016
 
Guyana annual report 2011
Guyana annual report 2011Guyana annual report 2011
Guyana annual report 2011
 
2011 mauritius annual report
2011 mauritius annual report2011 mauritius annual report
2011 mauritius annual report
 
2013 KPCS Annual Report Swaziland
2013 KPCS Annual Report Swaziland2013 KPCS Annual Report Swaziland
2013 KPCS Annual Report Swaziland
 
2012 KIMBERLEY PROCESS CERTIFICATION SCHEME European Union Annual Report
2012 KIMBERLEY PROCESS CERTIFICATION SCHEME European Union Annual Report  2012 KIMBERLEY PROCESS CERTIFICATION SCHEME European Union Annual Report
2012 KIMBERLEY PROCESS CERTIFICATION SCHEME European Union Annual Report
 
Angola annual report 2011
Angola annual report 2011Angola annual report 2011
Angola annual report 2011
 
2014 KPCS Annual Report Australia
2014 KPCS Annual Report Australia2014 KPCS Annual Report Australia
2014 KPCS Annual Report Australia
 
Australia annual report 2012
Australia annual report 2012Australia annual report 2012
Australia annual report 2012
 
2014 u.s. kp annual_report_2014
2014 u.s. kp annual_report_20142014 u.s. kp annual_report_2014
2014 u.s. kp annual_report_2014
 
2011 Sierra Leone Annual Report
2011 Sierra Leone Annual Report2011 Sierra Leone Annual Report
2011 Sierra Leone Annual Report
 
2013 KPCS Annual Report Australia
2013 KPCS Annual Report Australia2013 KPCS Annual Report Australia
2013 KPCS Annual Report Australia
 
2016 norway annual report - copy
2016 norway annual report - copy2016 norway annual report - copy
2016 norway annual report - copy
 
2016 norway annual report
2016 norway annual report2016 norway annual report
2016 norway annual report
 
2012 Cote D'ivoire Presentation Plenary
2012 Cote D'ivoire Presentation Plenary2012 Cote D'ivoire Presentation Plenary
2012 Cote D'ivoire Presentation Plenary
 
2008 Final Communique New Delhi
2008 Final Communique New Delhi2008 Final Communique New Delhi
2008 Final Communique New Delhi
 

Recently uploaded

一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
ehbuaw
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
GrantManagementInsti
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
JSchaus & Associates
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
ehbuaw
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
JSchaus & Associates
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
ukyewh
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
ClaudioTebaldi2
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930F
ahcitycouncil
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
Antti Rautiainen
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
Mohammed325561
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
ehbuaw
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
RIDPRO11
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
850fcj96
 
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
evkovas
 
NHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdfNHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdf
AjayVejendla3
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
ahcitycouncil
 
Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
ARCResearch
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
850fcj96
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
ahcitycouncil
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
ahcitycouncil
 

Recently uploaded (20)

一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930F
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
 
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
 
NHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdfNHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdf
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
 
Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
 

2013 KPCS Annual Report Switzerland

  • 1. 1 Kimberley Process Certification Scheme (KPCS) ANNUAL REPORT 2013 in accordance with Section VI, paragraph 11 of the KPCS document Switzerland 31 March 2014
  • 2. Introductory Remarks This report has been prepared in accordance with section VI, paragraph 11 of the KPCS document and the Guidelines for the preparation of annual reports contained in Annex I of the Administrative Decision (AD) on the Implementation of Peer Review in the KPCS. It also takes into account the requirements for the preparation of annual reports for submission in 2005 and subsequent years, which were elaborated by the KP Working Group on Monitoring (WGM) as well as the recommendation contained in the Brussels Declaration on Internal controls of Participants with rough diamond trading and manufacturing. A.Institutional Framework The institutional framework for the implementation of the KPCS in Switzerland has not changed in the year under review. For detailed information, please refer to the annual report submitted on 31 st March 2004. Point of contact and official coordinator The person of contact for matters related to the KPCS and the official coordinator dealing with its implementation in Switzerland remains Mrs. Fabienne Juilland Metzger State Secretariat for Economic Affairs (SECO) Sanctions Unit Holzikofenweg 36 CH-3003 Berne / Switzerland Tel.: +41 31 323 23 87 Fax: +41 31 323 51 10 swissdiamonds@seco.admin.ch These contact details are to be used also for the purpose of import confirmation according to the AD on import confirmation adopted in Kinshasa in November 2011. B.Legal Framework The legal framework for the implementation of the KPCS in Switzerland has not changed in the year under review. For detailed information, please refer to the annual report submitted on 31 st March 2004. The annex of the Ordinance on the International Trade in Rough Diamonds (Diamond Ordinance) lists the participants meeting the minimum requirements of the KPCS. It has been updated in accordance with the decision of the KPCS regarding the admission of Mali. C.Import and Export Regime The import and export regime has not changed in the year under review. For detailed information, please refer to the annual report submitted on 31 st March 2004. 2
  • 3. D.System of internal controls and Industry Self-Regulation The information provided in previous reports remains valid in substance. E.Statistics The Swiss statistical data has been submitted in accordance with annex III of the KPCS document via the statistics website (quarterly data on imports and exports, as well as certificate count per participant). On an ongoing basis Switzerland is furthermore reconciling its data bilaterally with its trading partners. F.Miscellaneous Central African Republic Following the KP's decision to temporarily suspend the Central African Republic (CAR) from the KPCS, Switzerland has removed CAR from its national list of participants meeting the minimum requirements. The customs offices authorized to process rough diamond shipments have been instructed to exert special vigilance with regard to shipments possibly originating from CAR. The relevant footprint was made available together with a call for enhanced scrutiny with regards to shipments coming from neighbouring participants. Special vigilance measures Switzerland continues to exert special vigilance with regards to diamonds possibly originating from Côte d'Ivoire. Suspicious shipments are specially scrutinized. They are detained and digital photographs sent for appraisal to the Chair of the Working Group of Diamond Experts (WGDE). Valuation issue A shipment of rough diamonds imported from Sierra Leone and subsequently re-exported with a much higher price has been temporarily seized in order to understand the reasons behind this increase of value. Details of the shipment including digital photographs have been sent for appraisal to the Chair of the WGDE. The case highlights once again the difficulty to establish values as well as justifiable margins in diamond transactions. Participation in Working Groups and other Committees As in previous years, Switzerland actively participated in the work of the Working Group on Statistics (WGS), the Committee on Rules and Procedures (CRP) and the Selection Committee. Review Visit to Switzerland The report of the second Review Visit to Switzerland (7-8 November 2012) was finalized and endorsed by the 2013 Plenary. The report confirms Switzerland's continued compliance with KPCS minimum requirements and acknowledges the fact that Switzerland has implemented all but one recommendation made by the first Review Team in 2004. Switzerland is currently working at implementing the new recommendations formulated by the Review Team. With regard to the Team's second recommendation (i.e. further use of confiscated diamonds) 3
  • 4. Switzerland has conducted a survey among selected participants to understand existing practices in this area. Unfortunately the feedback received has been very low so far. The issue of current practices with regard to confiscated diamonds had already been brought up in Switzerland's 2011 annual report. Switzerland continues to believe that KP participants should strive to develop a shared approach with regard to this matter. G.Cases of Infringement of the KPCS Case of diamond smuggling A case of diamond smuggling was uncovered in 2013 in the context of an operation conducted by the Swiss Border Guard. The operation was not targeted at uncovering diamond smuggling but falsified identity documents. However during the mission a Guinean national having swallowed 10 carats of rough diamonds was arrested. As the person was not in a position to present evidence of legal import into Switzerland, the diamonds have been seized and definitively confiscated. Pre-Kimberley Diamonds A pending case concerning the definite seizure of 62'183 carats of rough diamonds declared to have arrived in Switzerland before the implementation of the KPCS was decided by the Supreme Court, which confirmed the definitive confiscation of the goods. 4